Page 1 OCR 0.810
AMMAN NN Exploration Report - Guarter 2 2025 Introduction During the period !t of April to 30" of June 2025 (A2 2025), PT Amman Mineral Nusa Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional Tbk (PT AMI), carried out exploration activities within IUPK Blocks II (Elang), III (Rinti) and IV (Lampui) located in Sumbawa, Indonesia (Figure 1). There was no field exploration activity within Block | (Batu Hijau). Total exploration expenditure for G2 2025 was approximately USD $ 2.85 M. Aw Pe PEN) Lombok Kayangan Porte4- Mataram Sumbawa | 2 omar Port 4 Lombok Int'l Airport Pu LI bone 1 5) 8g Maliwang N A Lok » INDONESIA : Sumbawa AMNT Asset Jakarta. 53 4 IUPK PTAMNT @ Batu Hijau Mine Operation Map Loco” Project Area — @ Elang Cu-Au Project Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 2 OCR 0.881
AMMAN NN Batu Hijau Block | No exploration field work or costs incurred in A2 2025. Forward Plan: e Review of previous exploration results amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 2
Page 3 OCR 0.887
AMMAN NN amman.co.id Elang Block II Expenditure: e Exploration activities included drilling, IP Survey acguisition and geological mapping. Costs were circa USD $ 2.2 M. Work Areas: e Elang Cu-Au Project » Gerbang East Cu-Au Project e# Sebu Cu-Au Project Exploration Parties: » Manager - AMNT Exploration. e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS). e IP Survey - PT Geo Services Assessment Methods: e Diamond drilling (3 rigs) e IP (Induced Polarization) Survey resistivity and chargeability. » Geological mapping and soil sampling e Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer Objectives: e Resource development drilling continued at the Elang Cu-Au deposit (Figure 2). The purpose of this infill program was to explore information gaps, improve the geological model and to increase the confidence level of mineral resource classifications. e Exploration drilling at Gerbang East is testing for Cu-Au porphyry mineralisation potential below alithocap and diatreme breccias (Figure 2). e IP Surveys at Sebu East and Gerbang East were a follow up to previous porphyry exploration work. e Geological mapping and grid soil sampling was conducted along the Sebu East IP survey lines. The objective is to delineate the extent of the surficial Cu-Au geochemical anomalies and to define new drill targets. Exploration Results: e Elang Cu-Au project diamond drilling (7 holes for 3,500.70 m): o Resource infill, Elang - 4 holes (2,162.0 m) completed or in progress, o Exploration drilling, Gerbang East - 3 holes (1,338.70 m) completed or in progress. e IP Survey acguisition - 11 lines (19.7 km) completed. e Core samples submitted to the assay lab amounted to 1,479. e# Geological mapping program - 94 rock samples and 41soil samples from Sebu East were submitted to the lab. Forward Plan: e Continue resource drilling at Elang, exploration drilling at Gerbang East and exploration drilling at Sebu East using 3 rigs. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 4 OCR 0.670
AMMAN | ANN ——— PTAMNT IUPK - z NN F : « ALMA |, e : 8 AMMAN — - - 5 N N — 1 1 ) — . ng - z » # SEPEKAT s ni AT 8 : 5 8 1 2 3 8 GERBANG EAST s 8 | z 5 Ag $ s 5 5 NG 5 1 : FN, . SEBU EAST | « 4 2,3) “SEBUN a: | | 3 $ | : x | - s | A 8 8 | s i N & In Progress Drilling A2-2025 | » Completed Driling A2-2025 z » Previous Holes 2 ) —— IP Survey Line 02-2025 8 Tan Ad Hen | —— IP Survey Line 2023 » Sa | |... Mapping & Grid Soil Sampling Area @2-2025 538000 E 540000 E 542000 E 544000 E Figure 2. Elang Block II A2 2025 - Exploration Locations. s 0 e a E E @ PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 2
Page 5 OCR 0.879
AMMAN NN Rinti Block III Expenditure: e Exploration activity - IP Survey preparation. Costs were circa USD $ 37.7 K Work Areas: e Rinti Cu-Au Project. Exploration Parties: # Manager - AMNT Exploration. Assessment Methods: e IP Survey preparation, setting lines by Total Station (TS) and tape compass method. Objectives: e IP (Induced Polarization) survey will test a lithocap system in the southern part of Rinti. This IP survey program aims to identify the potential for an underlying Cu-Au porphyry system beneath the lithocap (Figure 3). Exploration Results: e IP Survey preparation - 8 lines (11.35 km), 6596 complete Forward Plan: e IP Survey data acguisition 11.35 km at SW Rinti. # Exploration drilling (1 rig) at lithocap zone. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 6 OCR 0.653
AMMAN NN T T T AMAN 564000 E 566000 E AMMAN PT AMNT IUPK "8 z OP Bekolaramp s 02 D- Oo ' 4 s Pa 2 S SA Kal S Kel z S S 2- T S Ke71 IEEE Ouartz Vein ET vuggy Guartz — Hydrothermal Breccia (A Aggilic Alteration 2» — Advance Argillic Alteration $ “ Previous Holes PE Phyliic Atteration 4 —TIP Survey Line Plan 2025 (PSSI silica Alteration g h F Figure 3. Rinti Block III A2 2025 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 2
Page 7 OCR 0.877
AMMAN amman.co.id Lampui Block IV Expenditure: e Exploration activities included exploration drilling and IP Survey acguistion. Costs were circa USD $ 605 K Work Areas: e Lampui Cu-Au Project. Exploration Parties: » Manager - AMNT Exploration. e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS). e IP Survey - PT Geo Services Assessment Methods: e Diamond drilling (1 rig). » IP (Induced Polarization) Survey - resistivity and chargeability. Objectives: e Exploration drillingis deigned to test outcrop findings from geological mapping and medium-chargeability anomalies identified in a previous IP survey. e The current IP survey program aims to follow up on the results of 2023 IP survey, with extended coverage to the north and south to trace the continuity of the chargeability anomaly (Figure 4). Exploration Results: # Lampui Cu-Au project diamond drilling (2 holes for1,048.2 m completed). e Core samples submitted to the assay lab amounted to 405. e IP Surveyacguisition - 4 lines (5.4 km) completed. Forward Plan: e Review of previous exploration results. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 ANNN
Page 8 OCR 0.695
AMMAN NNN 532000 E 34000 E pi — si PT AMMAN | ———— / PT AMNT IUPK (aN10NOON L & E 3 IN d ka Ia. Kej N N 34 MN (Argillic Alteration ) — Advance Argillic Alteration Phyllic Alteration : , TAN -— Silica Alteration L Ie ana | 1-—. Ouartz Vein La LD 5 h- & Completed Drilling A2-2025 N N 2- sai Previous Holes | Kk $ —AIP Survey Line @2-2025 “ £ ——IP Survey Line 2023 N ( / Merana 4 g 1 E « Figure 4. Lampui Block IV A2 2025 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 4
Names mentioned 9 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Amman Mineral Nusa Tenggara
p.1
unresolved
org
PT AMNT
p.1
unresolved
org
PT AMI
p.1
unresolved
org
PT AMNT IUPK
p.1 ×3
unresolved
org
PT Minera Nusa Drillindo
p.3 ×2
unresolved
org
PT MND
p.3 ×2
unresolved
org
PT Geo Services Assessment Methods
p.3 ×2
unresolved
org
PT AMMAN
p.8
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.