Laporan Kuartalan Aktivitas Eksplorasi
Quarterly Report of the Exploration Activities

PT TBS Energi Utama Tbk
Kuartal-2/ the 2nd Quarter of 2025

       www.tbsenergi.com
Page 2
                    KATA PENGANTAR                           INTRODUCTION

    PT TBS Energi Utama Tbk (“Perseroan”)        PT TBS Energi Utama Tbk ("the
    adalah    perusahaan       pertambangan      Company") is a coal mining company
    batubara yang melakukan kegiatan             conducting      mining      activities    in
    penambangan di daerah Sangasanga,            Sangasanga area, Kutai Kartanegara
    Kabupaten Kutai Kartanegara, Provinsi        Regency, East Kalimantan, where the
    Kalimantan Timur, dimana area konsesi        concession area of the three subsidiaries
    ketiga   anak     perusahaan      terletak   is located side by side. All the supporting
    berdampingan.     Seluruh    infrastruktur   infrastructure of mining operations such
    pendukung operasional penambangan            as coal hauling roads, offices, workshop,
    seperti    jalan    angkut      batubara,    coal-only jetty and other infrastructures
    perkantoran, perbengkelan, pelabuhan         are located in Kutai Kartanegara
    khusus batubara dan infrastruktur lainnya    Regency, East Kalimantan.
    berada di daerah Kabupaten Kutai
    Kartanegara, Provinsi Kalimantan Timur.

    Perseroan mempunyai 3 (tiga) anak            The Company has 3 (three) subsidiaries
    perusahaan yang bergerak di bidang           engaged in the coal mining sector,
    pertambangan batubara, terletak di           located in the Sangasanga area, Kutai
    daerah Sangasanga, Kabupaten Kutai           Kartanegara Regency, East Kalimantan.
    Kartanegara, Provinsi Kalimantan Timur.      The company's subsidiaries are:
    Adapun     ketiga   anak    perusahaan
    Perseroan tersebut adalah:                   1. PT Trisensa Mineral Utama (TMU)
    1. PT Trisensa Mineral Utama (TMU)           2. PT Indomining (IM)
    2. PT Indomining (IM)                        3. PT Adimitra Baratama Nusantara
    3. PT Adimitra Baratama Nusantara               (ABN)
       (ABN)

    Dalam rangka memenuhi Ketentuan              In order to comply with the Provisions
    III.1.6, Peraturan Nomor I-E tentang         III.1.6, Regulation Number I-E concerning
    Kewajiban     Penyampaian   Informasi,       Information       Delivery    Obligations,
    Lampiran Keputusan Direksi PT Bursa          Attachment to the Decree of the Board of
    Efek Jakarta Number Kep-00066/BEI/09-        Directors of PT Bursa Efek Jakarta
    2022 tanggal 30 September 2022, maka         Nomor Kep-00066/BEI/09-2022 dated
    bersama ini kami sampaikan Laporan           September 30, 2022, we here jointly
    Kegiatan Eksplorasi Perseroan untuk          submit the Company's Exploration
    Kuartal-2 2025.                              Activity Report for the 2nd Quarter of
                                                 2025.




www.tbsenergi.com
Page 3
                        BAB I                                      CHAPTER I
                    PENDAHULUAN                                  INTRODUCTION



 I. Latar Belakang                                 I. Background

 Batubara merupakan bahan galian yang              Coal is an economically valuable excavation
 bernilai ekonomis, sehingga diminati oleh         material, so it is in demand by foreign
 investor asing maupun investor dalam negeri.      investors as well as domestic investors. The
 Usaha pertambangan batubara mempunyai             coal mining business has prospects as a
 prospek sebagai sektor andalan pengganti          mainstay sector of oil and gas replacement in
 migas dalam membangun perekonomian                building the economy of East Kalimantan in
 Kalimantan Timur di masa mendatang. Hal ini       the future. It is based on available coal
 didasarkan pada sumber daya dan potensi           resources     and     potentials,   marketing
 batubara yang tersedia, prospek pemasaran         prospects as well as local government policy
 serta dukungan kebijakan pemerintah               support.
 daerah.

 Pengusahaan pertambangan karena sifat             Strive of the Mining business because of the
 kegiatannya      pada      dasarnya      selalu   nature of its activities basically always cause
 menimbulkan       perubahan       pada    alam    changes in the nature of its environment.
 lingkungannya. Di balik perubahan pada            Behind the changes in nature and the
 alam dan lingkungannya, suatu kenyataan           environment, it is also a fact that mining
 pula bahwa usaha pertambangan telah               businesses have succeeded in improving
 berhasil    meningkatkan         kesejahteraan    human welfare by providing raw materials for
 manusia dengan menyediakan bahan baku             industry, energy, and others.
 untuk industri, energi, dan lain-lain.




                       Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
                          Image 1.1. PT TBS Energi Utama Tbk Mining Site




www.tbsenergi.com
Page 4
 Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
              Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk




       Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
       Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk




www.tbsenergi.com
Page 5
 I. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

 TMU merupakan perusahaan tambang             TMU is a coal mining company with an
 batubara dengan daerah penambangan           administrative mining area including the sub-
 secara administratif termasuk wilayah        districts of Loa Janan, Sangasanga, Muara
 Kecamatan Loa Janan, Sangasanga, Muara       Jawa, Kutai Kartanegara Regency, East
 Jawa, Kabupaten Kutai Kartanegara Provinsi   Kalimantan Province with an area of 3,414 ha
 Kalimantan Timur dengan Luas wilayah         and the 2010 KTN area code 3133 OP. TMU
 3.414 ha dan kode Wilayah KTN 2010 3133      has received approval to carry out mining
 OP. TMU telah mendapat persetujuan untuk     activities and sell excavated products with
 melakukan aktivitas penambangan dan          the      Decree    of    the    Minister   of
 penjualan hasil galian dengan Keputusan      Investment/Head       of    the   Investment
 Menteri Investasi/ Kepala Badan Koordinasi   Coordinating          Board          Number:
 Penanaman          Modal     Nomor       :   1098/1/IUP/PMDN/2022              concerning
 1098/1/IUP/PMDN/2022              Tentang    approval for granting extensions of mining
 persetujuan Pemberian Perpanjangan Izin      business permits at the production operation
 Usaha Pertambangan Pada Tahap Kegiatan       activity stage for coal commodities to PT
 Operasi Produksi untuk Komoditas Batubara    Trisensa Mineral Utama (area code
 kepada PT Trisensa Mineral Utama (kode       3364023032014055) on September 21,
 wilayah 3364023032014055) pada tanggal       2022.
 21 September 2022.

 Pada Kuartal-2 2025, pelaksanaan pekerjaan   In The 2nd Quarter of 2025, the
 yang dilakukan oleh TMU telah menyerap       implementation of work carried out by TMU
 tenaga kerja sebanyak 92 orang sedangkan     has absorbed a workforce of 92 people while
 untuk kontraktor dan subkontraktornya 770    for contractors and subcontractors 770
 orang dan dibagi menjadi 2 shift kerja.      people and divided into 2 shifts of work. The
 Kontraktor tambang yang digunakan adalah     mining contractor used is PT Multindo Prima
 PT    Multindo    Prima    Teknik  (MPT).    Teknik (MPT). Mining is done by surface
 Penambangan yang dilakukan dengan            open pit mining system with truck and shovel
 sistem tambang terbuka (surface open pit     method.
 mining) dengan metode truck dan shovel.

 Produk batubara yang dihasilkan TMU          Coal products produced by TMU have an
 memiliki kalori rata-rata 4500 GAR dengan    average calorie of 4500 GAR with Total
 Total Sulphur (TS) di bawah 1%. Kualitas     Sulphur (TS) below 1%. The quality of this
 batubara ini cukup memenuhi permintaan       coal is enough to meet the demand of the
 pasar yang menginginkan batubara dengan      market who want low sulphur coal.
 sulphur rendah. Pelaksanaan pengelolaan      Implementation of Occupational Safety and
 Keselamatan dan Kesehatan Kerja yang         Health management implemented in TMU
 diterapkan di TMU mengacu kepada             refers to the program / plan of Occupational
 program/rencana Pengelolaan Keselamatan      Safety and Health Management in
 dan Kesehatan Kerja sesuai dengan            accordance with applicable laws and
 perundang-undangan yang berlaku.             regulations.

 Kegiatan pengelolaan dan pemantauan          Environmental management and monitoring
 lingkungan yang dilakukan TMU meliputi       activities carried out by TMU include
 kegiatan penghijauan yang dilakukan di       greening activities carried out at the Road
 Tanggul Jalan, Tanggul Stockpile, Tanggul    Embankment, Embankment Stockpile, Front
 Depan Timbangan, Settling Pond, Waste        Embankment Scales, Settling Pond, Waste
 Dump dan Bench Office Baru. Pada saat ini,   Dump and New Bench Office. Currently,
www.tbsenergi.com
Page 6
 TMU juga melakukan pengelolaan dan             TMU also manages and monitors water
 pemantauan kualitas air, debu, kebisingan,     quality, dust, noise, B3 waste and domestic
 limbah B3 dan limbah domestik, serta           waste, as well as monitoring erosion rates.
 pemantauan tingkat erosi.


 I. 2. PT INDOMINING (“IM”)

 Berdasarkan Izin Usaha Produksi Nomor:         Based on Production Business License
 540/004/IUP-OP/MB-PBAT/III/2013 tanggal        Nomor: 540/004/IUP-OP/MB-PBAT/III/2013
 15 Maret 2013, IM melakukan kegiatan           dated March 15, 2013, IM conducted coal
 eksplorasi dan penambangan batubara serta      exploration and mining activities and its
 hasil produksinya di daerah Kecamatan          production in Sangasanga District, Kutai
 Sangasanga, Kabupaten Kutai Kartanegara,       Kartanegara Regency, East Kalimantan
 Propinsi Kalimantan Timur. Tahap produksi      Province. Im's production phase began in
 IM dimulai pada bulan Agustus 2007,            August 2007, while commercial production
 sedangkan produksi komersial dimulai pada      began in October 2007.
 bulan Oktober 2007.

 Kegiatan penambangan IM dilakukan              IM mining activities are carried out by mining
 kontraktor penambangan yaitu PT RPP            contractor PT RPP Contractors Indonesia
 Contractors Indonesia (RCI). Kegiatan          (RCI). Mining activities are surface open pit
 penambangan merupakan penambangan              mining with truck and shovel methods.
 terbuka (surface open pit mining) dengan
 metoda truck dan shovel.

 Pada Kuartal-2 2025, sumber daya manusia       As of 2nd Quarter 2025, human resources
 yang bekerja dalam kegiatan operasional IM     working in IM's operational activities reached
 mencapai 338 tenaga kerja termasuk             338 workers including contractors and
 kontraktor dan subkontraktor. Dari 338 orang   subcontractors. Of those 338 people, about
 tersebut sekitar 80% merupakan tenaga kerja    80% are local workers to support community
 lokal sebagai penunjang program community      development programs with the aim of
 development       dengan    tujuan     untuk   improving the welfare of the communities
 meningkatkan kesejahteraan masyarakat di       around the mine.
 sekitar tambang.

 Produk batubara IM memiliki kualitas antara    IM coal products have quality between 4200
 4200 - 5600 GAR dengan total sulphur antara    - 5600 GAR with total sulphur between 0.2%
 0.2% - 2.0%. Produk cukup bersaing di dalam    - 2.0%. The product is quite competitive in the
 pasar internasional maupun domestik            international and domestic markets.


 I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

 ABN didirikan pada tahun 2004, dan             ABN was established in 2004, and manages
 mengelola daerah pertambangan dengan           a mining area of about 2,990 ha located in
 luas area sekitar 2.990 Ha yang berlokasi di   Kampung Jawa Village, Sangasanga District
 Desa     Kampung        Jawa,     Kecamatan    and Muara Kembang Village, Muara Jawa
 Sangasanga dan Desa Muara Kembang,             District, Kutai Kartanegara Regency, East
 Kecamatan Muara Jawa, Kabupaten Kutai          Kalimantan. Based on Mining Business
 Kartanegara,         Kalimantan       Timur.   License Production Operation Number:
 Berdasarkan        pada      Izin     Usaha    540/1691/IUP-OP/MB-{BAT/XII/2009 dated
 Pertambangan Operasi Produksi Nomor:           December 1, 2009, ABN conducts
www.tbsenergi.com
Page 7
 540/1691/IUP-OP/MB-{BAT/XII/2009 tanggal        exploration, coal mining, and marketing of
 1 Desember 2009, ABN melakukan kegiatan         production at its mine site.
 eksplorasi, penambangan batubara, dan
 pemasaran hasil produksi di lokasi
 tambangnya tersebut.

 ABN mulai melakukan kegiatan eksplorasi         ABN began its exploration and infrastructure
 dan pembangunan infrastruktur pada tahun        development activities in 2007, while
 2007, sedangkan produksi komersial dimulai      commercial production began in 2008. ABN
 pada tahun 2008. Produk batubara ABN            coal products belong to thermal coal group
 termasuk dalam kelompok thermal coal            with sub-bituminous and bituminous rank,
 dengan rank sub-bituminous dan bituminous,      with 4 types of ABN 52 (CV 5200 GAR & TS
 dengan 4 jenis tipe yaitu ABN 52 ( CV 5200      < 1), ABN 50 (CV 5000 GAR & TS < 1), ABN
 gar & TS < 1), ABN 50 ( CV 5000 gar & TS <      42 (CV 4200 GAR & TS < 1) and ABN 56 HS
 1), ABN 42 ( CV 4200 gar & TS < 1) dan ABN      (CV 5600 gar & TS <2)). Thermal coal is
 56 HS(CV 5600 gar & TS < 2)). Thermal coal      marketed to several countries in the world,
 dipasarkan ke beberapa negara di dunia,         including India, China, Japan, Italy, Thailand,
 diantaranya India, Cina, Jepang, Italia,        and Korea. ABN also supplies for domestic
 Thailand, dan Korea. ABN juga mensuplai         needs, namely cement industry and several
 untuk kebutuhan dalam negeri, yaitu industri    other industries.
 semen dan beberapa industri lainnya.

 Sistem penambangan yang dilakukan ABN           ABN's mining system is surface open pit
 yaitu sistem penambangan terbuka (surface       mining. Coal ABN has a low ash content, so
 open pit mining). Batubara ABN memiliki         it is not done by washing process, only done
 kandungan abu yang rendah, sehingga tidak       by crushing process. Mining activities of
 dilakukan pencucian (washing), hanya            PT ABN is carried out by one main contractor,
 dilakukan proses peremukan (crushing).          PT RPP Contractors Indonesia (RCI).
 Kegiatan penambangan PT ABN dilakukan
 oleh satu kontraktor utama, yaitu PT RPP
 Contractors Indonesia (RCI).

 Pada Kuartal-2 2025, sumber daya manusia        In The 2nd Quarter of 2025, human resources
 yang terlibat dalam kegiatan operasional        involved in ABN's operational activities
 ABN mencapai sekitar 623 orang, yang terdiri    reached about 623 people, consisting of 242
 dari 242 orang tenaga kerja pada ABN dan        workers in ABN and 381 workers in
 381 orang tenaga kerja pada kontraktor          contractors and sub-contractors.
 maupun sub-kontraktor.

 Sebagai salah satu wujud pemberdayaan           As the form of empowerment of the
 masyarakat sekitar, ABN bersama-sama            surrounding community, ABN along with
 dengan kontraktor dan sub-kontraktor saat ini   contractors and sub-contractors currently
 telah menampung tenaga kerja lokal              have accommodated local workers in
 Kecamatan Sangasanga & Kecamatan                Sangasanga District & Muara Jawa District,
 Muara Jawa, Kabupaten Kutai Kartanegara         Kutai Kartanegara Regency approximately
 kurang lebih 80 % dari kebutuhan tenaga         about 80% of the labor needs, while the
 kerja, sedangkan sisanya sekitar 20 %           remaining about 20% comes from outside the
 berasal dari luar daerah dua kecamatan          area of the two sub-districts.
 tersebut.




www.tbsenergi.com
Page 8
                   BAB II                                        CHAPTER II
            KEGIATAN EKSPLORASI                             EXPLORATION ACTIVITY



 II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

 1. 1. DAERAH EKSPLORASI                           1. 1. EXPLORATION AREA
 Pada Kuartal-2 2025 kegiatan eksplorasi           In the 2nd Quarter of 2025, exploration
 berupa kegiatan sampling di Pit Aktif yaitu pit   activities will be in the form of sampling
 B1WA, 5B18.                                       activities in Active Pits, namely pit B1WA,
                                                   5B18.

 Kegiatan sampling batubara di pit aktif guna      Coal sampling activities in active pits to
 mengetahui nilai kualitas nya terutama nilai      determine the quality value, especially the
 total sulphur (TS) dan nilai total kalori.        total sulphur (TS) value and total calorie
 kegiatan sampling batubara. Seam target           value. coal sampling activities. The target
 adalah seam T, RU, RL, S, ZA, Z, Y, X di pit      seam is the T, RU, RL, S, ZA, Z, Y, X seams
 B1WA., sampling di pit 5B18 dengan seam           in pit B1WA. sampling in pit 5B18 with seam
 target seam 18.                                   target seam 18.

 1. 2. METODE PENGUKURAN                           1. 2. MEASUREMENT METHODS

 Trenching                                         Trenching

 Secara teknis di lapangan tim geologist           Technically in the field, the geologist team
 melakukan trenching dengan membuat                conducted trenching by making an elongated
 paritan memanjang memotong strike seam –          trench cutting the strike seam – seam target
 seam target sebatas titik plan yang dibuat        to the point plan made earlier. This serves to
 sebelumnya. Hal ini berfungsi untuk               cover the entire region so that all seams can
 mengcover seluruh wilayah agar semua              be found. The average length of trenching in
 seam dapat ditemukan. Rata – rata panjang         a day can reach 80 m -100 m depending on
 paritan trenching dalam sehari bisa mencapai      the terrain / area of work whether in a ramp,
 80 m - 100 m tergantung dari medan/areal          swamp or hilly with a steep slope.
 kerjanya apakah di tempat landai, rawa atau
 berbukit dengan kemiringan terjal.

 Pengambilan sampel untuk di mengetahui            Sampling to find out the values of quality is
 nilai –nilai kualitasnya dilakukan per jarak      done per distance of 100 m between
 100 m antar lubang trenching.                     trenching holes.

 Sampling                                          Sampling

 Tim geologi juga melakukan sampling seam          Geologies team also sampling seam - seam
 –seam di pit guna mengetahui kualitas ter         in the pit to find out the updated quality of the
 update dari seam-seam yang akan                   seam - seam that will be mine.
 ditambang.
 Metode yang digunakan adalah:                     The methods used are:

 1. Jarak antar titik sampling maksimal 20 m         1. The distance between sampling points
    per seam searah strike bukaan batubara              maximum 20 m per seam direct strike
www.tbsenergi.com
Page 9
     yang akan diambil (getting).                       coal openings to be taken (getting).

 2. Sampling ulang/update pada tiap bukaan           2. Re-sampling/update on each new layer
    layer baru pada suatu seam (maksimal 1              opening on a seam (maximum 1 layer
    bukaan layer setinggi 3 m).                         opening as high as 3 m).

 3. Sampling pada seam – seam bukaan                 3. Sampling on seam – seam new
    baru/seam yang pertama kalinya akan di              openings / seam the first time will be in
    getting. Adapun plan penambangan                    getting. The mining plan until the end of
    sampai dengan akhir tahun ditargetkan               the year is targeted at seam with calorie
    pada seam dengan nilai Calori (ar)_g di             value (ar)_g above 4500.
    atas 4500.


 1. 3. BIAYA EKSPLORASI                            1. 3. EXPLORATION COSTS
 Biaya Eksplorasi TMU yang dikeluarkan di          TMU Exploration Costs incurred in the 2nd
 Kuartal-2 2025 sebagai berikut:                   Quarter of 2025 as follows:


                                            Q2 2025                    Year To Date
           Biaya Operasional        Anggaran      Realisasi       Anggaran      Realisasi
           Operating Expense         Budget      Realization       Budget      Realization
                                      (IDR)         (IDR)           (IDR)         (IDR)
      Biaya Eksplorasi
                                    112,500,000   17,500,000     450,000,000      47,500,000
      Exploration Costs

 Catatan:                                          Note:
 Jumlah sampling di Kuartal-2 2025 berjumlah 7     The number of samplings in The 2 nd Quarter 2025
 sampel.                                           amounted to 7 samples.


 Biaya Eksplorasi untuk tahun 2025 yang            Exploration Cost for 2025 in accordance with
 sesuai dengan RKAB 2025 bagian geologi            RKAB 2025 geological section in the form of
 berupa biaya analisa kualitas batubara di         coal quality analysis cost at laboratory
 laboratorium maksimal 14 sampel/bulan.            maximum 14 samples per month. The cost for
 Biaya untuk kegiatan trenching yang               trenching activities that use PC 200 units is
 menggunakan unit PC 200 biayanya                  accommodate to production department for
 dimasukkan ke departemen produksi untuk           general work with a record of trenching
 pekerjaan general dengan catatan kegiatan         activities on the unit usage timesheet.
 trenching pada lembar timesheet pemakaian
 unit.


 1. 4. PELAKSANAAN DAN                             1. 4. IMPLEMENTATION AND
       PENGAWASAN                                        SUPERVISION
 Pengawasan     Test      Pit/Trenching  dan       Supervision of Test Pit/ Trenching sampling
 sampling batubara di pit TMU di lakukan oleh      of coal in the TMU pit conducted by TMU
 Geologist TMU.                                    geologist.




www.tbsenergi.com
Page 10
 1. 5. KEMAJUAN EKSPLORASI                        1. 5. EXPLORATION PROGRESS

 Kesimpulan Eksplorasi TMU Kuartal-2              Conclusion of TMU Exploration in the 2nd
 2025                                             Quarter of 2025

 Selain kegiatan trenching kami dari tim          In addition to our trenching activities from the
 geologi juga melakukan sampling seam –           geology team also sampling seam-seam in
 seam di pit guna mengetahui kualitas ter         the pit to find out the update quality from
 update dari seam – seam yang akan di             seam - seam to be getting. The methods used
 getting. Metode yang digunakan adalah:           are:

 1. Jarak antar titik sampling maksimal 50 m      1. Distance between sampling points
    per seam searah strike bukaan batubara           maximum 50 m per unidirectional strike
    yang akan diambil (getting).                     coal openings to be taken (getting).

 2. Sampling ulang/update pada tiap bukaan        2. Sampling/update on each new layer
    layer baru pada suatu seam (maksimal 1           opening on one seam (maximum 1-layer
    bukaan layer setinggi 3 m).                      aperture as high as 3 m).

 3. Sampling pada seam – seam bukaan              3. Sampling on seam - seam new openings
    baru/seam yang pertama kalinya akan di           / seam the first time will be in the getting.
    getting. Adapun plan penambangan                 The mining plan until the end of the year
    sampai dengan akhir tahun ditargetkan            is targeted at seam with calorie (ARB)
    pada seam dengan nilai Calori (ARB)              GAR value above 4800.
    GAR di atas 4800.

 4. Selama Kuartal-2 2025 kegiatan berupa         4. During The 2nd 2025, activities in the form
    sampling pit aktif yaitu di pit 5B18 dengan      of active pit sampling are in pit 5B18 with
    seam target adalah seam 18 Pit B1WA              target seam is 18 Pit B1WA with target
    dengan seam target T, RU, RL, S, Y, ZA,          seam T, RU, RL, S, Y, ZA, Z, X.
    Z, X.

 5. Rata – rata hasil analisa kualitas dari       5. The average quality analysis results of
    seam –seam tersebut di atas TM 28.24             the seam -seam above TM 28.14 %, ASH
    %, ASH 6.55 %, TS 0.40 % dan nilai CAL           6.55%, TS 0.40 % and CAL (ar) values
    (ar) 4.500                                       4.500.


 1. 6. RENCANA KEGIATAN                           1. 6. PLANS FOR FURTHER
       EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES
 Rencana Kegiatan Divisi Geologi Kuartal-2        The Geological Division Plan for 2nd Quarter
 2025:                                            2025:

 1. Melakukan pembaharuan/updating model          1. Updating the Geological model based on
    Geologi berdasarkan data updating                monthly roof/floor updating data from pit
    roof/floor bulanan dari data survey Pit          survey data and cs holes data from coal
    serta cs_holes dari data channel sampling        sampling channel data. The results of this
    batubara. Hasil dari pembaharuan model           model update are then sent to the mine
    ini kemudian dikirim ke bagian mine plan         plan engineering section as a basis for
    engineering sebagai dasar acuan untuk            submissions for making pit designs for
    pembuatan desain pit untuk bulan depan.          next month.



www.tbsenergi.com
Page 11
 2. Trenching di luar Rencana PIT yang di         2. Trenching outside the PIT Plan that is
    Plan kan oleh tim Engineering di tiadakan        planned by the Engineering team is not in
    dan sebagai penggantinya adalah                  place and in lieu of trenching is done in the
    trenching di lakukan di plan pit yang data       plan pit whose trenching data is lacking or
    trenchingnya     kurang    atau     tingkat      confidence level of continuity, seam
    confidence kemenerusan, ketebalan                thickness in the pit is still lacking.
    seam di pit tersebut masih kurang.

 3. Memonitoring adanya anomali pada suatu        3. Monitoring the presence of anomalies in
    bukaan PIT yang aktif.                           an active PIT aperture.

 4. Tim geologist akan melakukan sampling         4. The geological team will be sampling the
    pada bukaan seam seam yang berada di             seam seam openings located in the active
    pit aktif terutama mengontrol perubahan          pit, especially controlling changes in the
    nilai Total Sulfur, Persentase nilai Ash         value of Total Sulphur, Ash percent value
    dan nilai Kalori di seam –seam berkalori         and value of Calorie in seam -seam with
    tinggi baik kearah down dip maupun ke            high calories seams both down dip and
    arah strike nya.                                 towards the strike.

 5. Memonitoring kualitas dari seam –seam         5. Monitoring the quality of seam -seam that
    yang tertambang di bulan Juli –                  is mined in July until September 2025,
    September 2025 terutama dalam hal                especially in terms of changes in TS value
    perubahan nilai TS seiring penurunan             in line with the decrease in elevation of
    elevasi dari masing –masing seam yang            each seam that is mined.
    tertambang.

 6. Update data kualitas berdasarkan              6. Quality data update based on mining
    kemajuan penambangan pada seam–                  progress on seam–seam target in
    seam target di bulan sebelumnya.                 previous month.

 7. Rencana kegiatan pengeboran eksplorasi        7. The plan for exploration drilling activities
    di tahun 2025 sebanyak 78 titik bor atau         in 2025 is 78 drill points or as many as
    sebanyak 9.360 m di wilayah barat pit            9,360 m in the western area of the B3KL
    B3KL dengan seam Target seam R, S, T,            pit with seam Target seam R, S, T, U, WA,
    U, WA, WB, X, Y.                                 WB, X, Y.

 8. Rencana kegiatan pengeboran geoteknik         8. The plan for geotechnical drilling activities
    di tahun 2025 sebanyak 5 titik pemboran          in 2025 is 5 drilling points or as much as
    atau sebanyak 600 m di wilayah Barat pit         600 m in the Western area of the B3KL pit.
    B3KL.


 II. 2. PT INDOMINING (“IM”)

 2. 1. DAERAH EKSPLORASI                          2. 1. EXPLORATION AREA
 Pada Kuartal-2 2025, IM tidak ada kegiatan       In the 2nd Quarter of 2025, IM had no drilling
 pemboran.                                        activities.

 2. 2. METODE PENGUKURAN                          2. 2. MEASUREMENT METHODS
 Untuk kegiatan pemboran infill menggunakan       For infill drilling activities using touch coring
 metode touch coring, sedangkan untuk             method, while for geotechnical drilling is done
 pemboran geoteknik dilakukan dengan              by drilling Full Coring method.
 pemboran metode Full Coring.
www.tbsenergi.com
Page 12
 Pemboran geoteknik dilakukan juga dengan          Geotechnical drilling is also carried out using
 menggunakan metode Standard Penetration           the Standard Penetration Test (SPT) method.
 Test (SPT). Prinsip kerja SPT adalah dengan       The working principle of SPT is to hit a
 memukul sebuah tabung standar ke dalam            standard tube into a drill hole 45 cm deep
 lubang bor sedalam 45 cm menggunakan              using a hammer weighing 63.5 KG that falls
 palu dengan berat 63.5 KG yang jatuh bebas        freely from a height of 76 cm. What counts is
 dari ketinggian 76 cm. Yang dihitung adalah       the number of blows to penetrate as deep as
 jumlah pukulan untuk melakukan penetrasi          15 cm. The number of blows used is
 sedalam 15 cm. Jumlah pukulan yang                penetration as deep as the last 30 cm.
 digunakan adalah penetrasi sedalam 30 cm
 terakhir.

 2. 3. BIAYA EKSPLORASI                            2. 3. EXPLORATION COSTS
 Biaya Eksplorasi IM yang dikeluarkan di           IM Exploration Costs incurred in the 2nd
 Kuartal-2 2025 sebagai berikut:                   Quarter of 2025 as follows:


                                          Q2 2025               Year To Date
               Biaya Operasional   Anggaran Realisasi      Anggaran     Realisasi
               Operating Expense     Budget   Realization   Budget     Realization
                                      (IDR)      (IDR)       (IDR)        (IDR)
               April / April       83,333,333       -     333,333,332        -
               Mei / May           83,333,333       -     416,666,665        -
               Juni / June         83,333,333       -     499,999,998        -


 2. 4. PELAKSANAAN DAN                             2. 4. IMPLEMENTATION AND
       PENGAWASAN                                         SUPERVISION
 Kegiatan    Pemboran     diawasi     oleh         Drilling activities are supervised by the
 Departemen Engineering Section Geologist.         Department of Engineering geologist section.


 2. 5. KEMAJUAN EKSPLORASI                         2. 5. EXPLORATION PROGRESS
 Pada Kuartal-2 2025 belum ada kegiatan            As of The 2nd Quarter of 2025, there are no
 pemboran lanjutan. Namun ada beberapa             further drilling activities. But there are several
 kegiatan Geologi yang berlanjut dilakukan,        geological activities that continue to be
 diantaranya:                                      carried out, including:

 1. Melakukan pembaharuan/updating model           1. Updating the Geological model based on
    Geologi berdasarkan data updating roof/           monthly roof/floor updating data from pit
    floor bulanan dari data survey Pit serta          survey data and cs_holes data from coal
    cs_holes dari data channel sampling               sampling channel data, and supervision in
    batubara, dan pengawasan dalam                    the activities of taking roof/floor
    kegiatan pengambilan data pengukuran              measurement data and cs_holes.
    roof/floor serta cs_holes tersebut.

 2. Melakukan kegiatan channel sampling            2. Conducting channel sampling activities as
    serta pengukuran tebal aktual batubara di         well as actual thick measurement of coal
    lokasi Pit AB Blok 14-16 & sekitarnya             at the pit AB location Block 14-16 &
    untuk keperluan pembuatan data channel            surrounding areas for the purposes of
    sampling          untuk          support          making data sampling channels to
    pembaharuan/updating model Geologi                support the renewal / updating of
                                                      geological models and variations in the
www.tbsenergi.com
Page 13
     dan variasi kualitas batubara dari coal           quality of coal from coal inventory to be
     inventory yang akan ditambang.                    mined.

 3. Melakukan analisis kestabilan lereng di        3. Perform slope stability analysis in the pit
    area pit aktif Pit, baik pada sisi low wall,      active pit area, both on the low wall side,
    high wall maupun sidewall serta disposal          high wall and sidewall and disposal IPD
    IPD border Selatan, kaitannya untuk               South border, related to know the value of
    mengetahui nilai safety factor (FoS) untuk        safety factor (FoS) to control the
    kontrol pembentukan desain Pit Aktif              formation of Active Pit design to be stable
    supaya stabil dan aman.                           and safe.

 2. 6. RENCANA KEGIATAN                            2. 6. PLANS FOR FURTHER
       EKSPLORASI SELANJUTNYA                            EXPLORATION ACTIVITIES

 IM pada periode Kuartal-3 2025 belum              IM for 3rd Quarter of 2025 has not planned to
 merencanakan melakukan aktifitas kembali          resume further exploration drilling activities,
 pengeboran eksplorasi lanjutan, baik itu          be it infill drilling or Geotechnical drilling in IM
 pengeboran infill maupun pengeboran               concession area.
 Geoteknik di area konsesi IM.

 Sehubungan dengan rencana pengoptimalan           In relation to the mining optimization plan at
 penambangan pada pit utama Indomining             Indomining's main pit to a depth of RL-160
 hingga kedalaman RL-160 meter sesuai              meters according to the Mine Plan target for
 target Mine Plan untuk pit IM dan dalam           the IM pit and in order to optimize the
 rangka mengoptimalkan mineable reserve            mineable reserve of potential seams, the
 seam-seam potensial, kualitas dan kuantitas       quality and quantity of exploration data
 jumlah data eksplorasi yang dimiliki oleh PT      owned by PT Indomining through the current
 Indomining melalui model geologi saat ini         geological       model      are     sufficiently
 sudah cukup mewakili serta memenuhi               representative and meet the number of
 dengan jumlah distribusi titik – titik bor yang   distribution of existing boreholes very well to
 ada sangat baik untuk mengcover optimasi          cover the optimization of coal reserves in the
 cadangan batubara dalam perencanaan               planning of the mining process of the PIT
 proses penambangan geometri desain PIT            design geometry during the period for 2025.
 selama periode untuk Tahun 2025.


 II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

 3. 1. DAERAH EKSPLORASI                           3. 1. EXPLORATION AREA
 Pada Kuartal-2 2025, ABN melakukan                In the 2nd Quarter of 2025, ABN conducted
 update model geologi berdasarkan data             geological model updates based on channel
 channel sampling serta data roof & floor          sampling data as well as actual roof & floor
 aktual dari hasil pengukuran survey, serta        data from survey measurement results, as
 melakukan rekonsiliasi model geologi              well as reconciling geological models to
 terhadap data survey aktual. Selain itu juga,     actual survey data. In addition, ABN
 ABN menunjuk konsultan external untuk             appointed an external consultant to conduct
 melakukan kajian geoteknik di area Pit West       a geotechnical study in the Pit West
 Extension.                                        Extension area.

 Selain kegiatan eksplorasi di dalam konsesi       Apart from exploration activities within the
 IUP ABN, tim eksplorasi juga melakukan            ABN IUP concession, the exploration team
 studi prospeksi dan review terhadap potensi       also carried out prospecting studies and
 pengembangan bahan galian di luar IUP             reviews of the potential for developing
www.tbsenergi.com
Page 14
 ABN. Pada Kuartal-2, tim eksplorasi telah        minerals outside the ABN IUP. In the 2nd
 menyelesaikan sebanyak 2 desk studi              quarter, the exploration team completed 2 of
 prospeksi terhadap potensi batubara dan 3        prospecting studies on the potential coal and
 desk studi prospeksi terhadap potensi emas.      3 of prospecting studies on the potential gold.

 3. 2. METODE PENGUKURAN                          3. 2. MEASUREMENT METHODS
 Channel     sampling   dilakukan     dengan      Channel sampling is done by mapping and
 mapping dan pengukuran aktual batubara           measuring the actual exposed coal
 yang telah terekspos (thickness, strike, dip,    (thickness, strike, dip, collar) then taking
 collar) kemudian diambil sampel secara           composite samples to analyze the coal
 komposit untuk dilakukan analisa kualitas        quality as a basis for updating the geological
 batubara sebagai dasar untuk update model        model along with the progress of the mine.
 geologi seiring dengan kemajuan tambang.         Channel sampling in Q2 2025 was carried out
 Channel sampling pada Kuartal-2 2025             on seams S40, S41, S42, S44 at Pit 6.
 dilakukan pada seam S40, S41, S42, S44
 pada Pit 6.

 3. 3. BIAYA EKSPLORASI                           3. 3. EXPLORATION COSTS
 Biaya Eksplorasi ABN yang dikeluarkan di         ABN Exploration Costs issued in The 2nd
 Kuartal-2 2025 sebagai berikut:                  Quarter of 2025 as follows:


                                         Q2 2025                  Year To Date
           Biaya Operasional     Anggaran     Realisasi      Anggaran     Realisasi
           Operating Expense      Budget      Realization     Budget      Realization
                                   (IDR)         (IDR)         (IDR)        (IDR)
          April/ April                              -                                  -
          Mei/ May              222,000,000         -        888,000,000               -
          Juni/ June                         125,000,000                     125,000,000


 3. 4. PELAKSANAAN DAN                            3. 4. IMPLEMENTATION AND
       PENGAWASAN                                       SUPERVISION
 Kegiatan dilaksanakan & diawasi oleh             Activities are carried out and supervised by
 Departemen Mining section Geotech &              the Department of Mining section Geotech &
 Exploration Development, namun untuk             Exploration Development. However, for
 pelaksanaan Kajian Geoteknik Pit West            Geotechnical Study Pit West Extension was
 dilakukan oleh external, Tim PT Dinar Energi     carried out externally by PT Dinar Energi
 Utama.                                           Utama.

 3. 5. KEMAJUAN EKSPLORASI                        3. 5. EXPLORATION PROGRESS
 Pada Kuartal-2 2025 tidak ada kegiatan           In The 2nd Quarter of 2025, there are no
 pemboran    eksplorasi, namun   berikut          exploration drilling activities, but the following
 kegiatan team geologi selama Kuartal-2           are the activities of the geological team during
 2025:                                            the 2nd Quarter of 2025:

 1. Melakukan kajian geoteknik Pit West           1. Conducting a geotechnical study of the Pit
    Extension oleh tim external.                     West Extension by an external team.
 2. Melakukan monitoring di area Pit Aktif,       2. Monitoring the Active Pit area, both slope
    baik monitoring kestabilan lereng maupun         stability monitoring and coal monitoring to
    monitoring batubara untuk memantau               monitor the suitability between geological
    kesesuaian antara Model Geologi &                models and actual in the field.
    aktual di lapangan.
www.tbsenergi.com
Page 15
 3. Update Model Geologi berdasarkan data         3. Geological Model Update based on coal
    roof/floor batubara dari data survey aktual      roof/floor data from actual survey data and
    dan dari data pemboran.                          drilling data.
 4. Analisa kestabilan lereng di area Low         4. Analysis of slope stability in low wall pit
    Wall Pit Aktif & area disposal.                  area active & disposal area.
 5. Monitoring kestabilan lereng untuk pit dan    5. Pit and disposal slope stability monitoring
    disposal dengan titik pantau prisma dan          using monitoring point prism and EWS
    ekstensometer EWS.                               extensometer.
 6. Menindaklanjuti beberapa IUP yang             6. Follow up on several potential IUP for
    potensial untuk dilakukan eksplorasi             detailed exploration.
    detail.

 3. 6. RENCANA KEGIATAN                           3. 6. PLANS FOR FURTHER
       EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES

 Rencana ABN pada periode Kuartal-3 2025          In the 3rd Quarter of 2025, ABN has plans for
 ada kegiatan pemboran depresurisasi Pit 6.       depressurization drilling Pit 6. However,
 Selain itu kegiatan eksplorasi dan geologi       exploration activities are also focused on the
 juga difokuskan pada kegiatan berikut:           following activities:

 1. Pengambilan sampel untuk update               1. Sampling for coal quality updates &
    kualitas batubara & model geologi di area        geological models in the Active Pit area.
    Pit Aktif.
 2. Monitoring di area Pit Aktif untuk            2. Monitoring in the Active Pit area to monitor
    memantau kesesuaian antara Model                 the suitability between actual and
    Geologi dan aktual di lapangan.                  Geological Models in the field.
 3. Melakukan update Model Geologi                3. Update geological model based on
    berdasarkan data channel sampling, data          sampling channel, actual survey data and
    survey aktual dan data pemboran.                 drilling data.
 4. Rekonsiliasi antara Model Geologi             4. Reconciliation between Geological Model
    terhadap data survey actual.                     to actual survey data.
 5. Monitoring geotek di area pit & disposal.     5. Geotech monitoring in Pit & Disposal
                                                     Area.
 6. Analisa kestabilan lereng pit dan disposal.   6. Slope stability analysis for Pit and
                                                     Disposal.
 7. Pemasangan monitoring point          untuk    7. Monitoring point installation for slope
    pemantauan pergerakan lereng.                    movement monitoring program.




www.tbsenergi.com

File

File Open PDF
Source IDX
Size0.61 MB
Published10 Jul 2025
Pages15
Characters43,742
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 15 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×26
unresolved org PT Trisensa Mineral Utama p.2 ×5
unresolved org PT Indomining p.2 ×5
unresolved org PT Adimitra Baratama Nusantara p.2 ×4
unresolved org Menteri Investasi p.5
unresolved org Koordinasi p.5
unresolved org PT Multindo Prima p.5
unresolved org PT RPP p.6
unresolved org PT RPP Contractors Indonesia Contractors Indonesia p.6
unresolved org PT ABN p.7 ×2
unresolved org PT RPP Contractors Indonesia p.7 ×2
unresolved org Departemen Engineering Section Geologist. p.12
unresolved org Departemen Mining p.14
unresolved org PT Dinar Energi p.14
unresolved org PT Dinar Energi Utama. p.14

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result