Source file signed link, expires in 15 minutes
Extracted text 2
Page 1
Go To English Page
Nomor Surat 198/CCBI/CSEC-OJK/VI/2025
Nama Perusahaan PT Bank China Construction Bank Indonesia Tbk
Kode Emiten MCOR
Lampiran 1
Perihal Penyampaian Bukti Iklan Ringkasan Risalah RUPST
Dengan ini Perseroan / Emiten menyampaikan bukti iklan tentang Ringkasan Risalah RUPST
yang telah diiklankan di media cetak :
Informasi Nama Media Cetak Tanggal Penerbitan
Iklan Ringkasan Risalah RUPS
epaper Media Indonesia 24 Juni 2025
Tahunan
Demikian untuk diketahui.
Hormat Kami,
PT Bank China Construction Bank Indonesia Tbk
Thomas Widianto
Corporate Secretary
PT Bank China Construction Bank Indonesia Tbk
Gedung Perkantoran Sahid Sudirman Center Lt. 15,Jl. Jend. Sudirman Kav. 86,
Telepon : 021-50821000, Fax : 021-50821010, idn.ccb.com
Nama Pengirim Thomas Widianto
Jabatan Corporate Secretary
Tanggal dan Waktu 24-06-2025 17:28
Lampiran 1. 198_Bukti Iklan Ringkasan Risalah RUPST_OJK PM.pdf
Dokumen ini merupakan dokumen resmi PT Bank China Construction Bank Indonesia Tbk yang tidak memerlukan
tanda tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bank China Construction
Bank Indonesia Tbk bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 2
Go To Indonesian Page
Letter / Announcement No. 198/CCBI/CSEC-OJK/VI/2025
Issuer Name PT Bank China Construction Bank Indonesia Tbk
Issuer Code MCOR
Attachment 1
Subject Advertisement Submission of Summary of Minutes of AGMS
The Issuer has advertised Summary of Minutes of AGMS
on the following news media:
Information Name of News Media Publication Date
Iklan Ringkasan Risalah RUPS
epaper Media Indonesia 24 June 2025
Tahunan
Thus to be informed accordingly.
Respectfully,
PT Bank China Construction Bank Indonesia Tbk
Thomas Widianto
Corporate Secretary
PT Bank China Construction Bank Indonesia Tbk
Gedung Perkantoran Sahid Sudirman Center Lt. 15,Jl. Jend. Sudirman Kav. 86,
Phone : 021-50821000, Fax : 021-50821010, idn.ccb.com
Sender Name Thomas Widianto
Function Corporate Secretary
Date and Time 24-06-2025 17:28
Attachment 1. 198_Bukti Iklan Ringkasan Risalah RUPST_OJK PM.pdf
This is an official document of PT Bank China Construction Bank Indonesia Tbk that does not require a signature
as it was generated electronically by the electronic reporting system. PT Bank China Construction Bank Indonesia
Tbk is fully responsible for the information contained within this document.
Names mentioned 3 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Bank Indonesia
p.1 ×10
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
Rule parser
Needs review
confidence 0.222
659 ms
12 Sep 2026 22:38
no shares_present; no pct_present; no vote table found
Raw output
{'agenda': [], 'is_electronic': True, 'meeting_type': 'AGM'}