Skip to content
Back to announcement

20260710_DEWA_Laporan Bulanan Aktivitas Eksplorasi_32110868_lamp2.pdf

Other Text extracted DEWA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 3

Page 1
                          LAPORAN TENTANG AKTIVITAS EKSPLORASI
                      OLEH ANAK PERUSAHAAN PT DARMA HENWA TBK
       (EXPLORATION ACTIVITIES REPORT BY SUBSIDIARY of PT DARMA HENWA TBK)


Nama Perusahaan                              :    PT GAYO MINERAL RESOURCES (“PT GMR”)
(Name of Company)
Tahapan Kegiatan IUP                         :    Eksplorasi (Exploration)
(Phase of Activity of Contract Work)
Laporan Eksplorasi Periode                   :    1 Januari – 30 Juni 2026
(Exploration Report Period)

A   Daerah Explorasi                                         Exploration Areas
       1. Upper Tengkareng (UT)                                  1. Upper Tengkareng (UT)
       2. Southeast Tengkareng (SET)                             2. Southeast Tengkareng (SET)

B   Biaya Eksplorasi                                         Exploration Cost
    Rp 40,279,979,916                                        Rp 40,279,979,916

C Bentuk Kegiatan Eksplorasi                        Exploration Activities
  1. Menyelesaikan kegiatan program pengeboran 1. Completed the Phase 2A resource drilling
     sumber data fase 2a di Prospek UT pada bulan      program at the UT Prospect in February 2026
     Februari 2026 dan melanjutkan program             and continued with the Phase 2B drilling
     pengeboran fase 2b dengan target 10,000 m,        program, targeting 10,000 m, including 8
     termasuk 3 titik pengeboran geoteknik dan         metallurgical drill holes and 3 geotechnical
     hidrologi.                                        and hydrological drill holes.
  2. Melanjutkan pengiriman conto batuan inti bor 2. Continued the dispatch of drill core samples
     untuk analisis geokomia ICP multi elemen          to Sucofindo Lab for multi-element ICP
     (Cu, Ag, Mo, As, Pb, Zn, dll) dan Fire Assay      geochemical analysis, including Cu, Ag, Mo,
     untuk Au ke Laboratorium PT Sucofindo.            As, Pb, Zn, and other elements, as well as Fire
     Pengiriman termasuk sampel untuk program          Assay analysis for Au. The dispatch also
     regular QAQC sampel protokol.                     included samples for the routine QAQC
  3. Melakukan kajian geologi dan geokimia di          sampling protocol.
     Prospek UT sebagai dasar pendukung dalam 3. Conducted geological and geochemical
     pengembangan model geologi, estimasi              studies at the UT Prospect to support
     sumber daya mineral, serta studi metalurgi.       geological model development, mineral
  4. Melanjutkan analisis conto untuk uji metalurgi    resource estimation, and metallurgical
     (flotasi, pemisahan gravitasi, pelindian, dan     studies.
     penggerusan)       di    Laboratorium      PT 4. Continued sample analysis for metallurgical
     Geoservices.                                      testwork, including flotation, gravity
  5. Melakukan pembaharuan pemodelan geologi           separation, leaching, and grinding tests, at PT
     internal dan sumber daya untuk Prospek UT.        Geoservices Laboratory.
  6. Melakukan penjajakan beberapa vendor 5. Updated the internal geological and resource
     terkait pekerjaan pelaporan standar JORC dan      models for the UT Prospect.
     pemrosesan metalurgi.                          6. Conducted preliminary engagement with
  7. Melanjutkan kegiatan pemetaan geologi untuk       several vendors related to JORC-standard
     Prospek Tengkereng Tenggara dan prospek           reporting and metallurgical processing work.

                                          PT Gayo Mineral Resources
                          Generali Tower Lt. 9 unit B/C, Komplek Rasuna Epicentrum,
                      Jalan H.R. Rasuna Said, Karet Kuningan, Setiabudi, Jakarta Selatan
                                 T. (+62 21) 29912350 – F. (+62 21) 29912364
Page 2
       Sangit Barat, termasuk pengambilan                    7. Continued geological mapping activities at
       tambahan contoh batuan dan perencanaan                   the SET Prospect and West Sangir Prospect,
       lokasi pengeboran awal.                                  including additional rock sampling and
                                                                planning for initial drilling locations.


D Pihak-Pihak yang Terlibat                                 Involved Parties
   1. PT Arfa Explorindo Nusantara                          1. PT Arfa Explorindo Nusantara
   2. PT Samgeo Bor                                         2. PT Samgeo Bor
   3. PT Sucofindo                                          3. PT Sucofindo
   4. PT Geoservice                                         4. PT Geoservice
   5. PT MiningOne Indonesia                                5. PT MiningOne Indonesia
E   Metode Pengujian                                        Testing Methods
    1. AAS                                                  1. AAS
    2. Specific Gravity                                     2. Specific Gravity
    3. Fire Assay                                           3. Fire Assay
    4. ICP OES 30 elements                                  4. ICP OES 30 elements
    5. Metallurgical Test                                   5. Metallurgical Test
    6. Physical Properties                                  6. Physical Properties
    7. Uniaxial Compressive Strength                        7. Uniaxial Compressive Strength
    8. Point Load Index                                     8. Point Load Index
    9. Vein Density Analysist                               9. Vein Density Analysist
    10. Magnetic Susceptibility                             10. Magnetic Susceptibility
    Kemajuan Eksplorasi Terhadap periode
F                                                           Exploration Progress (vs Previous Period)
    sebelumnya
    1. Selama Triwulan 2 tahun 2026, kegiatan               1. During Q2 2026, the Company focused on
       difokuskan pada persiapan dan pemenuhan                 the preparation and fulfillment of
       kebutuhan administrasi serta teknis terkait             administrative and technical requirements
       proses perizinan IUP. Pada periode ini belum            associated with the IUP permitting process
       terdapat aktivitas pengeboran, sehingga total           to support the continuation of the next phase
       pencapaian pengeboran Triwulan 2 adalah 0               of drilling activities. No drilling was carried
       m, dengan total pencapaian Project to Date              out during the quarter; accordingly, the
       tetap sebesar 31,485.75 m.                              drilling achievement for Q2 2026 was
    2. Total sampel batuan inti bor untuk analisis             recorded at 0 m, while the cumulative
       geokimia ICP multi elements (Cu, Ag, Mo, As,            project to date drilling achievement
       Pb, Zn, dll) dan Fire Assay untuk Au ke                 remained at 31,485.75 m.
       Laboratorium PT Sucofindo yang telah keluar          2. The total drill core samples for geochemical
       hasil analisisnya selama Triwulan 2 tahun               analysis ICP multi-elements (Cu, Ag, Mo, As,
       2026 adalah 2888 sampel, dan akumulasi                  Pb, Zn, etc.) and Fire Assay for Au submitted
       sampel yang telah keluar hasilnya adalah                to PT Sucofindo Laboratory with analytical
       20,574 conto. Pengiriman sampel ini                     results returned during Q1 2026 was 2888
       termasuk program protokol standar QAQC.                 samples, and the cumulative sample with
    3. Telah menyelesaikan rangkaian uji metalurgi             completed results is 20,574 samples.
       (flotasi, pemisahan gravitasi, pelindian, dan           Sample submissions include the standard
       penggerusan) untuk domain sampel QDP,                   QAQC sample protocol program.
       QFD dan Sediment Breccia.                            3. Metallurgical test work (flotation, gravity
    4. Total 104 conto batuan tambahan telah                   separation, leaching, and comminution) has
       dikirimkan untuk analisis geokimia ICP multi            been completed for the QDP, QFD and
       elements (Cu, Ag, Mo, As, Pb, Zn, dll) dan FA           Sediment Breccia domains.
                                         PT Gayo Mineral Resources
                         Generali Tower Lt. 9 unit B/C, Komplek Rasuna Epicentrum,
                     Jalan H.R. Rasuna Said, Karet Kuningan, Setiabudi, Jakarta Selatan
                                T. (+62 21) 29912350 – F. (+62 21) 29912364
Page 3
       untuk Au ke Laboratorium PT Sucofindo dari 4. An additional 104 rock samples from the
       Prospek Sangir Barat                          West Sangir Prospect were submitted for
    5. Persiapan penyusunan dokumen Studi            geochemical analysis (ICP multi-elements:
       Kelayakan dan AMDAL untuk disampaikan ke      Cu, Ag, Mo, As, Pb, Zn, etc.) and Fire Assay
       ESDM sebagai persyaratan perubahan            (Au) to PT Sucofindo Laboratory.
       perizinan menjadi IUP Operasi Produksi.    5. Preparation of Feasibility Study (FS) and
                                                     AMDAL documents for submission to ESDM
                                                     as part of the requirements for upgrading the
                                                     license to IUP Production Operation status.

G Rencana Selanjutnya                                       Next Plan
  1. Melaksanakan       program       pengeboran
                                                            1. Conduct a 5,000 m metallurgical drilling
     metalurgi sepanjang 5.000 m dan pengeboran
                                                               program and a 5,000 m geotechnical drilling
     geoteknik sepanjang 5.000 m di Prospek
                                                               program at the UT Prospect to support
     Tengkereng Atas untuk mendukung studi
                                                               metallurgical     studies,      geotechnical
     metalurgi,    evaluasi     geoteknik,  serta
                                                               evaluation, and the development of project
     pengembangan data teknis proyek.
                                                               technical data.
  2. Melaksanakan program pengeboran scout
                                                            2. Conduct a 1,000 m scout drilling program at
     drilling sepanjang 1.000 m di Prospek
                                                               the Southeast Tengkereng Prospect as part
     Tengkereng Tenggara sebagai bagian dari
                                                               of early-stage exploration activities to test
     kegiatan eksplorasi awal untuk menguji
                                                               mineralization potential.
     potensi mineralisasi.
                                                            3. Conduct detailed geological mapping at the
  3. Melaksanakan pemetaan geologi detail di
                                                               West Sangir Prospect, including the planning
     Prospek Sangir Barat, disertai dengan
                                                               of channel sampling and trenching programs
     perencanaan channel sampling dan trenching
                                                               to further define geological controls,
     untuk memperinci kontrol geologi, geometri,
                                                               geometry, and the distribution of the
     serta sebaran tubuh bijih.
                                                               orebody.
  4. Melanjutkan pengiriman sampel batuan inti ke
                                                            4. Continue the dispatch of drill core samples
     Laboratorium PT Sucofindo.
                                                               to PT Sucofindo Laboratory.
  5. Melakukan percepatan perpanjangan IUP
                                                            5. Accelerate the extension process of the
     Eksplorasi dan peningkatan izin menjadi IUP
                                                               Exploration IUP and the upgrade of the
     Operasi Produksi.
                                                               permit to an Operation Production IUP.

H Hambatan Eksplorasi                                       Exploration Constraints

    1. Keadaan kahar berupa bencana alam banjir 1. Force majeure conditions due to flash floods
       bandang dan tanah longsor yang melanda      and landslides in Aceh Province and
       Provinsi Aceh dan sekitarnya yang           surrounding areas, causing disruption to site
       menyebabkan akses dan logistik terhambat.   access and logistics.
    2. Sedang dalam proses perpanjangan IUP 2. Currently undergoing the extension process
       Eksplroasi.                                 of the Exploration IUP

I   Perizinan/Persetujuan Baru Yang Diperoleh               New Permits/Approvals Obtained
                                                            1. Has been granted the second Decree
    1. Telah Mendapatkan Surat Keputusan Peta
                                                               regarding the Indicative Map for the
       Indikatif Penghentian Pemberian Izin Baru
                                                               Suspension of New Permit Issuance
       (PIPPIB) kedua pada tanggal 13 Mei 2026
                                                               (PIPPIB) as of May 13, 2026.



                                         PT Gayo Mineral Resources
                         Generali Tower Lt. 9 unit B/C, Komplek Rasuna Epicentrum,
                     Jalan H.R. Rasuna Said, Karet Kuningan, Setiabudi, Jakarta Selatan
                                T. (+62 21) 29912350 – F. (+62 21) 29912364

File

File Open PDF
Source IDX
Size0.75 MB
Published10 Jul 2026
Pages3
Characters14,029
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 11 people and organisations named in the text · linked when the evidence is strong

linked org DARMA HENWA TBK p.1 ×5
unresolved org PT GAYO MINERAL RESOURCES · Nama Perusahaan p.1
unresolved org PT GMR p.1
unresolved org PT Sucofindo. p.1 ×6
unresolved org PT Gayo Mineral Resources Generali Tower p.1 ×3
unresolved org PT Arfa Explorindo Nusantara p.2 ×2
unresolved org PT Samgeo Bor p.2 ×2
unresolved org PT Geoservice p.2 ×2
unresolved org PT MiningOne Indonesia p.2
unresolved org PT MiningOne Indonesia E p.2
unresolved org PT Sucofindo Laboratory p.2 ×3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result