Skip to content
Back to announcement

20250619_TOBA_Public Expose_31896738_lamp1.pdf

Other Text extracted TOBA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 22

Page 1
TBS
Public Expose
2025

Company Presentation
2025
Page 2
Your Panelists for Today

         Juli Oktarina
         Director




         Gita Sjahrir
         MD – Investor Relations




         Mirza Hippy
         SVP Corporate Finance & Investor Relations




         Nafi Sentausa
         SVP Corporate Strategy & Investor Relations
Page 3
   TBS at a Glance   Our Growth Strategy   Financial Highlights




TBS at a Glance
Our Growth Strategy
Financial Highlights
Page 4
         TBS at a Glance          Our Growth Strategy              Financial Highlights




TBS at a Glance


We are Indonesia’s Leading                                                                              2 >1,800                        USD   1.0 Billion
Sustainability- focused Corporation                                                            Countries              Employees                 Asset Value




  Carbon-based Past                                                                        Sustainability-Centered Future

  Mining                                          CFPP                                     Waste                       Renewables           EV Ecosystem


   ~3.0              Annual
                     Production                   Fully Divested                           >1.2 Mn Tons
                                                                                           Annual Waste Collected
                                                                                                                       6MW Mini-Hydro
                                                                                                                             in Operation
                                                                                                                                         PP
                                                                                                                                            >5,100 Units
                                                                                                                                            E2W in Operation
      M Tons
                                                  *MCL divested on 5 March 2025 and GLP    Including Projection for    46MWp Solar PP
                                                  divested on 16 May 2025 (Post-Q1 2025)   Sembcorp Environment

MCL: PT Minahasa Cahaya Lestari, a 100MW CFPP                                                                                                                  4
GLP: PT Gorontalo Listrik Perdana, a 100MW CFPP
Page 5
           TBS at a Glance   Our Growth Strategy               Financial Highlights




Delivering on our TBS2030 Commitment
We have proven the ability to execute, shifting away from coal to sustainable businesses



 From :                                                                                Towards :
 Coal-based Business                                                                   Company Centered on Sustainability



Coal                            Coal Fired Power                                      Electric                   Renewable                  Waste
Mining                          Plant                                                 Vehicles                   Energy                     Management

ABN, IM, & TMU                 Paiton Energi Acquisition 5% (2018)                    JV with GoTo for EV        Reservoir agreement        AMES Medical Waste
Greenfield                     & Divestment (2021)                                    Ecosystem                  with BP Batam for Solar    Acquisition
                                                                                      Nov 2021                   PV                         Aug 2023
2007, 2008, 2011                                                                                                 Dec 2023

TBS IPO                        COD Sulut-3 (MCL) & Sulbagut-1 (GLP)                   Launch of the Inaugural    Financial Close & Signed   ARAH Acquisition
                               2021                                                   Product & COD              PPA with off-taker PLN     Dec 2023
Jul 2012                                                                              Electrum                   Batam for 46 MWp
                                                                                      Nov 2023                   Oct 2024
                               MCL & GLP Divestment*
                               2025                                                   Blended Concessional       Commercial Operations      Sembcorp Environnent
                                                                                      Financing from the Asian   Date of Lampung Mini-      Acquisition
                                                                                      Development Bank           hydro PP (6 MW)
                                                                                      (ADB)                                                 Mar 2025
                                *GLP divested on 16 May 2025
                                                                                      Dec 2024                   Jan 2025
                                                                                                                                                                   5
Page 6
      TBS at a Glance             Our Growth Strategy           Financial Highlights




Led by a Strong Team to Drive our Growth
Experienced management team with extensive financial and operational expertise

Board of Commissioners




                                      President & Independent            Independent                    Independent
                                      Commissioner                       Commissioner                   Commissioner                    Commissioner
                                            Bacelius Ruru                      Frances Kang                A. Fuad Rahmany                Yasmin Wirjawan


Board of Directors




             President Director                      Director                            Director                            Director                       Director
                  Dicky Yordan                           Alvin Sunanda                         Juli Oktarina                      Mufti Utomo               Sudharmono Saragih
                                                                                                                                                                                 6
Page 7
      TBS at a Glance   Our Growth Strategy   Financial Highlights




TBS2030 Vision
Recycling earnings from our fossil fuel-based business into Waste, Renewables & EV




                                                                                                             Main Business Pillars


                                                                                        Waste                    Renewable             Electric
                                                                                      Management                   Energy              Vehicle
          COAL                                      Transformation from
          COAL
                                                                                              Sembcorp
                                                                                              Environment


                                                 Fossil-Based Business to:                                                              E2W
                                                                                                                 Solar Power
                                                                                         Medical                                     Manufacturing
                                                 A Business Committed to                                         Hydro Power
                                                                                        Industry                                         Battery
                                                        Sustainability                                            Wind Power
                                                                                        Municipal                                    Infrastructure
                                                                                                                 Carbon Project


                                                                                                            Key Supporting Factors

                                                                                                             World-Class Talent
                         CFPP
                        CFPP                                                                                Strategic Partnerships

                                                                                      A Comprehensive and Proactive Stakeholder Management


                                                                                 TBS is fully committed to fostering sustainability initiatives
             TBS Fossil Based Business                                       while ensuring profitability and creating positive impacts on both the
                                                                                                   environment and society                            7
Page 8
        TBS at a Glance        Our Growth Strategy        Financial Highlights




Latest Corporate Actions
Significant milestones towards TBS2030, reducing 80% of our total emissions and strengthening our portfolio


 Divestment of CFPP assets                                                        Acquisition of an integrated waste management company
CFPP Sulut 1                               CFPP Sulut 3




PT Gorontalo Listrik Perdana               PT Minahasa Cahaya Lestari            Sembcorp Environment Pte Ltd

Capacity                  COD Date         Capacity                  COD Date    Location                   Operation              Customer Base

2 x 50 MW Dec 2021 2 x 50 MW Jul 2021                                            Singapore                  20+ Years              470k+


                                       US$ 403mn                                                                          S$ 405mn
Transaction Value                                                                Transaction Value


 Transaction rationale                                                           Transaction rationale

 • Supports long-term transition strategy by reducing exposure to coal,          • Strengthens the TBS’s presence and capabilities in the regional waste and
   aligning with global decarbonization trends                                     environmental services sector

 • Unlocks capital for reinvestment into cleaner and higher-growth segments,     • Enables transfer of knowledge and operational capabilities to accelerate
   enhancing portfolio resilience                                                  sustainable waste solutions in Indonesia
                                                                                                                                                               8
Page 9
     TBS at a Glance   Our Growth Strategy     Financial Highlights




Key Strategic Initiatives
Multi Track Approach to Continue Delivering on our Commitments


                                 TBS Coal

     From
                        1        Maintaining efficient
                                 mining operations
   Fossil Fuel
     Based                       TBS CFPP
                        2        Divestment of our CFPP Business
                                 to fuel our strategic agenda
                                                                               Fully Divested



                                 TBS Waste Management
                        3        Building a Regionally Integrated
                                 Waste Management Platform


  TOWARDS
                                 TBS Renewable Energy
  Sustainable
  Businesses            4        >500 MW of Installed Renewable
                                 Energy Capacity by 2030



                                 TBS EV Ecosystem
                        5        A leading EV Ecosystem player with >500,000
                                 total vehicles on the road by 2030                             9
Page 10
     TBS at a Glance   Our Growth Strategy   Financial Highlights




TBS Waste Management Ambition
A Leading Asia Pacific Regional Waste Company

                                                                             Growing
                                                                             overseas
                                                                    Establish regional footprint across
                                                                    Asia Pacific through acquisition
                                                                    and partnership




       Expanding in
       Indonesia
Capture large volume market,
leveraging TBS strong local
presence and acquired best
practice                                                                                                  10
Page 11
       TBS at a Glance              Our Growth Strategy        Financial Highlights




TBS Waste Management
TBS has established an integrated waste management platform across the waste value chain



         Waste        Collection       Fleet                                          Decontami-    Recycling/    Digital           Permits &     Final
         Value                                        Incineration     Smelting
                      Services         Management                                     nation        Upcycling     Services          Regulations   Disposal
                                                                                                                                                                   Sembcorp Environment
         Chain
                                                                                                                                                                   Asia Medical Enviro Services
                                                                                                                                                                   ARAH
       Presence

                     Transportation                  Processing                                                   Additional Services
                                                     Waste-to-Energy




                                   Sembcorp
                                   Environment Pte Ltd

Business Overview                  Municipal and commercial waste                     Medical waste management company                     Medical, industrial and commercial waste
                                   management company with 20+ years of               with 20+ years of operation covering                 management company serving >5,000
                                   operation serving >400,000 customers               ~50% market share in Singapore                       customers nationwide

 Service Offerings                  Municipal        Industrial                         Medical          Pharma                              Medical         Industrial

                                    Commercial       Waste-to-Energy                    Research Institutions                               Domestic


                                                                                                                                                                                                  11
Page 12
        TBS at a Glance     Our Growth Strategy     Financial Highlights




TBS Waste Management
 Operational and Financial performance summary showing growth across the board




                                                     Asia Medical Enviro                            ARAH Environmental is an
Sembcorp Environment is
an integrated waste                   300+           Services (AMES) is a
                                                     leading player in medical
                                                                                          11+       integrated waste management
                                                                                                    company in Indonesia,
                                                                                                                                              53+
management company in                       Units                                           Units                                               Units
                                                     waste management in                            operating across 15 provinces
Singapore, serving over
                                                     Singapore, commanding a
                                     700+                                                   40                                            300+
470k customers and                                                                                  and serving over 5,000
                                                     market share of                                customers in the medical,
thousands of businesses                              approximately 45%
                                       Employees                                        Employees   industrial, and domestic sectors        Employees


3M Operational Highlights                           3M Operational Highlights                       3M Operational Highlights


         232,000 ton                                            1,135 ton                                     2,400 ton
         Waste Collected                                        Waste Collected                               Waste Collected


                                84,550 ton                                        1,040 ton                                            2,010 ton
                                Waste Processed                                   Waste Processed                                      Waste Processed
Page 13
        TBS at a Glance          Our Growth Strategy         Financial Highlights




TBS Renewable Energy
Tapping into 30 GW of renewable energy potential with >370 MW project pipeline until 2030


Opportunities across Indonesia                                                           TBS Renewable Energy Projects



 Capacity expansion plans in Indonesia (in GW)



                                                                                          Mini Hydro Power Plant                   Floating Solar PV
                                                                          34.08           Lampung                                  Batam


                                                     19.97                               IN OPERATION                              UNDER CONSTRUCTION

                                                                                         Capacity               PPA Term           Capacity              PPA Term


                                                                                                    6             25                 46                    25
                                 8.97

                                                     15.35                18.69                         MW                 years               MWp                  years
            1.7                  10.43
            3.6
                                                                                         Hydro Power Plant                         Floating Solar PV
           2025                  2028                2031                 2034           Domestic (Pipeline)                       Domestic (Pipeline)
      Renewable         Fossil
                                                                                          ADVANCED DEVELOPMENT                     ADVANCED DEVELOPMENT



• Indonesia Installed Capacity in 2024 is at 93 GW (85% Fossil Fuel, 15% NRE)
                                                                                          Construction Target       Q2 2026        Construction Target       Q3 2026
• NRE penetration remains low, totaling 13 GW out of >3,600 GW potential capacity
• PLN has allocated a total of 34 GW of NRE capacity in the latest RUPTL for 2025-2034
                                                                                         Potential Emissions
                                                                                         Reduction
                                                                                                                288k tCO2e p.a.    Potential Emissions
                                                                                                                                   Reduction
                                                                                                                                                         120k tCO2e p.a.
                                                                                                                                                                            13
Page 14
     TBS at a Glance   Our Growth Strategy   Financial Highlights




TBS Renewable Energy
Tapping into 30 GW of renewable energy potential with >370 MW project pipeline until 2030


  Hydro – Jawa Barat                         TBS Renewable Energy Projects                                                             Solar         Wind             Hydro


                                             Target COD and Installed Capacity (in MW/MWp)
                                                                                                                       270


                                                            Batam I            Batam II             NTT            Batam Jawa                               Inorganic
                                                                                                                     III Barat                              growth
  Floating Solar PV - Batam                                                                                         220    50                               pursuits
                                                                                                     22

                                                                                                                                         Total
                                                             2026               2027                2028               2029
                                                                                                                                         NRE
                                             Equity
                                             (mn USD)
                                                               5.7               5.0                 9.7               100.5             120.9


                                             Project Cost
  Wind – NTT                                 (mn USD)
                                                               28.7              25.2               48.3               442.8             545.0


                                             • Batam projects are progressing well with a secured reservoir concession. Batam I is under construction, with planned
                                                expansions in Batam II and Batam III, which includes additional BESS capacity.
                                             • The wind project in Nusa Tenggara Timur (NTT) and the hydropower plant in Jawa Barat are both in advanced stages of
                                                development.
                                                                                                                                                                              14
Page 15
       TBS at a Glance     Our Growth Strategy          Financial Highlights




TBS EV Ecosystem
Electrum, a JVCo with Goto, has achieved substantial progress in driving the adoption of electric vehicles in 3M 2025


Our strength lies in our ecosystem                                                  Electrum’s E2W lowers carbon emissions while increasing
                                                                                    partner drivers' earnings

                                                                                    Products

                                                                                    Electrum H5                                         Electrum H3/H3i

                                                                                                                       Max Speed                                       Max Speed
                                                                                                                       90 km/h                                         65 km/h
                                                                                                                       Max Range                                       Max Range
                                                                                                                       60 km                                           65 km


  Business Segments       Electric                     Battery
                          2-Wheelers                   Infrastructure               Operational Highlights
                          Cutting edge E2Ws            Closed loop battery
                          developed specifically for   swapping infrastructure to    Operational Metrics                               Social & Environment Impacts
                          the Indonesian consumer      mitigate range anxiety and
                          landscape                    improve usability

  Service Offerings
                                  Direct Sales
                                                                Battery                 >5,100             >310         >10K            25%                    >20
                                                              Subscription             E2W Units           BSS Units     Batteries     Increased Earning for   Ton Emission CO2
                                   Bike Rental                                                                                         Partner Driver          Avoided per Day


  Customer                Electrum’s ecosystem is optimized for both B2C and
  Segments                B2B riders with specialized product offerings and
                                                                                              >15K                     >380K
                          commercial schemes to maximize value                        Battery Swap Daily   Km Daily Distance Covered
                                                                                                                                       as of 31st March 2025

                                                                                                                                                                                   15
Page 16
      TBS at a Glance     Our Growth Strategy    Financial Highlights




TBS EV Ecosystem
Collaboration between Electrum and GoTo has been successful and creates a massive impact in Jakarta


                                                Electrum drivers making 380,000 km trips per day - daily trip to the moon

  The partnership with
 GoTo, Indonesia’s leading
  digital ecosystem, has
   been instrumental to
  drive change at scale
                                                 >5,000 Electrum          >300 Battery        Electrum      20 tons reduced    25% additional
                                                   E2Ws on the              Swapping         facilitates   emissions of CO2   income and less
 GoTo Digital Ecosystem                            road produce         Stations available    >15,000           per day           fatigue
                                                  zero emissions                             swaps/day
         >2.6 mn partner drivers


         >15 mn merchants


         >67 mn transaction users




                                                                                                                                                16
Page 17
      TBS at a Glance          Our Growth Strategy   Financial Highlights




TBS EV Ecosystem
Electrum has achieved substantial progress in driving the adoption of electric vehicles in 3M 2025


   2029 Projection | Number of bikes                                        Strategic Milestones to Spur Exponential Growth

    Total unit     Total additional unit per year
                                                                                Partnership with large-scale fleet operators
                                              23x
                                                                                                             Established partnerships with
                                                                                                             ride hailing and e-commerce        2 mn
                                                                                                             logistics solutions to tap into     Driver
                                                                                                                                                partners
                                                                                                             an additional ecosystem of:

                                                                                Expanding into mass market segment with H3i


                                                                                                                          Launched the new H3i variant
   2029 Projection | Number of BSS                                                                                        intended to generate traction
                                                                                                                          among B2C early adopters
    Total unit     Total additional unit per year

                                              20x                               Securing funding from strategic financiers




                                                                                                                                 USD 15 mn
                                                                                                                                  Funding secured

                                                                                                                                                           17
Page 18
     TBS at a Glance   Our Growth Strategy   Financial Highlights




TBS Energi Utama
Q1 2025 LTM Summary – Maintaining efficiency and resilience as a foundation for the Company's Growth

                                                                    Financial Condition Q1 2025 LTM

                                                                                    Q1 2024 LTM               Q1 2025 LTM
  The Company’s financial
  The Company’s financial                                                          US$                          US$
  performance                                                        Revenue
                                                                                   496.0mn            (21%)     392.8mn
  performance
  demonstrates its ability to                                                      US$                          US$
                                                                     EBITDA
                                                                                                       7%
  demonstrates
  sustain growth duringits
                         theability to
                                                                     Adjusted      102.5mn                      109.2mn
  sustain    growth
  transition period, withduring
                          a       the                                Total
                                                                     Equity
                                                                                   US$

                                                                                   432.9mn            (17%)
                                                                                                                US$

                                                                                                                359.6mn
  recorded 34% increase in
  transition     period, with a                                      Cash          US$                          US$

  Adjusted EBITDA                                                    and Cash
                                                                                   87.2mn             45%       126.1mn
  recorded 7% increase in                                            Equivalents

                                                                                   US$                          US$

  EBITDA Adjusted
                                                                     Total
                                                                     Asset         946.0mn             11%      1,048.5mn
                                                                                                                            18
Page 19
      TBS at a Glance   Our Growth Strategy   Financial Highlights




Strategic Transformation Rationale
Transforming our business to maximize value for the environment and our shareholders



                                                                     Market Comps by Industry
                                                                     EV/EBITDA

  Transforming towards                                                                                          39.50x



  a Sustainability-                                                                                                         21.40x
                                                                                                                                          22.90x



  centered Business to                                                                                CFPP    Renewable   Waste        Electric
                                                                                                      6.80x   Energy      Management   Vehicles

  tap into higher
                                                                       Coal Mining
                                                                           1.00x                                 9.20x       9.00x        9.30x

                                                                           0.20x                      2.10x

  trading multiples

                                                                      Source: Capital IQ (May 2025)                                                19
Page 20
  Thank You
Disclaimer:

These materials have been prepared by PT TBS Energi Utama Tbk (the “Company”). These materials may contain statements that constitute forward-looking statements. These statements include
descriptions regarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results of operations and financial condition of the Company. These
statements can be recognized by the use of words such as “expects,” “plan,” “will,” “estimates,” “projects,” “intends,” or words of similar meaning. Such forward-looking statements are not guarantees of
future performance and involve risks and uncertainties, and actual results may differ from those in the forward-looking statements as a result of various factors and assumptions. The Company has no
obligation and does not undertake to revise forward-looking statements to reflect future events or circumstances.

These materials do not constitute or form part of an offer, solicitation or invitation of any offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part of it form
the basis of, or be relied upon in any connection with, any contract, commitment or investment decision whatsoever. Any decision to purchase or subscribe for any securities of the Company should be
made after seeking appropriate professional advice regarding legal, tax, investment and other matters. This presentation is not intended to be relied upon as advice to investors or potential investors and
does not take into account the investment objectives, financial situation or needs of any investor.

The Company has prepared this presentation based on information available to it, including information derived from public sources that have not been independently verified. No representation or
warranty, express or implied, is provided in relation to the fairness, accuracy, correctness, completeness or reliability of the information, opinions or conclusions expressed herein. Finally, these materials
may include financial information that are preliminary, unaudited and/or subject to revision upon completion of the Company’s closing and audit processes. This material is strictly confidential and must
not be copied, reproduced, distributed or passed (in whole or in part) to any other person at any time without the prior written consent of the Company.
Page 21
  TBS at a Glance   Our Growth Strategy   Financial Highlights   Key Operational Highlights




Appendix
Page 22
Transformation Towards a
Green Business Future


        Thriving       Climate                              Land and Biodiversity                   Water
        Environment    Becoming a carbon-neutral            Revegetation and conservation           Enhancing Effective Water
                       organization across all operations   efforts across all operational areas,   Management Across All
                                                            with biodiversity studies               Operations
                                                            conducted for all assets




        Empowered      Community                            Health, Wellbeing &                     Inclusivity &                         Capacity
                       Empowerment                          Safety                                  Diversity                             Development
        People
                       Enhancing the impact of social       Promoting a safe and healthy work                                             Ensuring that all employees grow
                       investments on local communities     environment with zero incidents                                               alongside the business while
                                                                                                    Promoting gender balance and
                       across all operational areas         and ensured employee well-being                                               building resilience to change as
                                                                                                    diversity across all aspects of our
                                                            across all our operations                                                     part of the Transition initiative
                                                                                                    business



                       Business Ethics &                    Sustainable                             Disclosure &
        Trusted        Conduct                              Acquisition, Investing                  Transparency
        Partner                                             and Divesting
                       Upholding business ethics and        Ensuring sustainable growth for         Actively advocating for the
                       employing a risk-based approach to   TBS, with ~80% of our revenue           adoption of globally recognized
                       ensure responsible and transparent   projected to come from green            reporting standards to enhance
                       operations                           businesses by 2030                      our transparency

File

File Open PDF
Source IDX
Size4.27 MB
Published19 Jun 2025
Pages22
Characters41,231
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 11 people and organisations named in the text · linked when the evidence is strong

linked person Juli Oktarina p.2 ×2
linked person Bacelius Ruru p.6
linked person A. Fuad Rahmany p.6
linked person Dicky Yordan p.6
linked person Mufti Utomo p.6
linked person Sudharmono Saragih p.6
linked org TBS Energi Utama p.18 ×3
unresolved org PT Minahasa Cahaya Lestari p.4 ×2
unresolved org PT Gorontalo Listrik Perdana p.4 ×2
unresolved org Sembcorp Environment Pte Ltd p.8
unresolved org Additional Services Waste-to-Energy Sembcorp Environment Pte Ltd p.11

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result