PT Archi Indonesia Tbk (IDX: ARCI)
Public Expose 2025
19 June 2025
Page 2
   General Company Overview
                                      Gold Mining:
                                      - PT Meares Soputan Mining (“PT MSM”)
                                      - PT Tambang Tondano Nusajaya (“PT TTN”)
                                      Mining Contractor:
Operating Subsidiary & Associates     - PT Geopersada Mulia Abadi (“PT GMA”)
                                      Gold Refiner & Gold Bar / Minted Bar Producer:
                                      - PT Elang Mulia Abadi Sempurna (“PT EMAS”)
                                      Geothermal:
                                      - PT Toka Tindung Geothermal (“PT TTG”)
Mining Location                       North Sulawesi, Indonesia

Operation History                     Commenced mining operations in 2009, first gold production in 2011

                                      39,817 hectares Contract of Work (“CoW”) expires in 2041 &
Concession
                                      extendable as an IUPK for another 2x10 years
Date of Stock Listing                 28 June 2021 through Indonesia Stock Exchange (IDX)

Current Mining Method                 Open pit and Underground

Processing Capacity                   4.0 Mtpa  Plant Project Optimization is ongoing



                                                             Toka Tindung Gold
                                                                    Mine




                        Head Office
                          Jakarta




                                                                                                           2
Page 3
Key Highlights – FY 2024

    1         The Company successfully booked net positive earning while facing various challenges in 2024.
              Below summarizes the Company’s Operational & Financial performance for 2024:
              • Gold production volume 93.4 koz;
              • Gold sold volume 97.1 koz;
              • Revenue US$287.6m;
              • EBITDA US$79.1m; and
              • Net Income US$10.4m.




    2         Total net debt(1) was US$400.0m and the debt to equity ratio (“DER”) was 1.47x as of 31 December 2024.


     3        Capex realized totalling US$91.8 million during the year, mainly represents development for mining infrastructure.


     4        Underground mining first blast at Kopra pit & accelerate the preparation of developing new pit.


     5
              The Company established PT TTG a joint venture Company in the renewable energy (Geothermal) sector with PT Ormat
              Geothermal Indonesia.
    Note: (1) Net debt is calculated as the total balance of interest bearing debt reduced by current restricted cash in relation to Debt Service.
                                                                                                                                                     3
Page 4
    Milestones
    • Proven track record of exploration activities and gold reserves and resources discoveries
    • Sustainable operational growth through multi production pits, processing plant capacity expansion, as well as various cost efficiency initiatives
    • Expanding business lines to become an Integrated Gold Mining business


                                                                                            •    Obtaining a new Long Term Syndicated
                                                                                                 Loan Facility for the mine development       “ACCELERATING GROWTH WITH GOLDEN OPPORTUNITIES”
•     Achieved gold poured more than 200 koz                                                •    PT EMAS successful run the refinery
•     Increased plant capacity to 2.1 Mtpa                                                       plant on 3rd Quarter 2023
•     Appointed and developed a local company, PT SMA, as a mining contractor
                                                                                                                                                                                                                         2025

•     PT MSM & PT TTN were one of the first
      companies to complete the Contract of                                             •   Completed IPO and listed in IDX
                                                                                                                                                                                                               2024
      Works renegotiation, pursuant to the new                                          •   Increased plant capacity reaching 4.0 Mtpa
      Mining Regulations
•     Opening of Araren pit, which contained                                                                                                                                                    2023
                                                                                        •   Established PT GMA as main mining contractor, with
      higher grade of gold reserves
                                                                                            more effective and cost efficient fleet.                                                                       •   Establishment of
                                                                                                                                                                                       2022                    PT TTG
                                                                                        •   Additional of 1.6 moz of Ore Reserves
•    First gold pouring of 61 koz
                                                                                        •   Initiated project in Western Corridor                                                                          •   First Blast
                                                                                                                                                                          2021
                                                                                                                                                                                                               Underground
                                                                                                                                                                                                               Mining at Kopra
                                                                                                                                                              2020                                             Pit
•    Establishment of PT                                                     •   Increased plant capacity to more than 3.0 Mtpa
     Archi Indonesia
                                                                                                                                          2019

                                                                                                                                                    •   Establishment of PT EMAS as downstream
                                                                                                                      2018                              line    expansion       for   trading and      •   Remediation of
                                                                                                                                                        manufacturing gold minted bar, pendant,            Araren Pit on
                                                                                                2017                                                    medallion, and refinery businesses                 schedule
                                                                                                                                                    •   Additional of 941 koz of Ore Reserves          •   Feasibility Study of
                                                                      2016                                                                                                                                 Plant Improvement
                                                          2015
                                        2011                                                           •   Achieved gold poured more than 250 koz                                                          Project.

                 2010



             Source: Company information (as of 31st December 2024)
                                                                                                                                                                                                                         4
Page 5
Exploration Updates
                                                                                                  Comparative Gold Intercepts in Q3’24
                                      2024 Exploration Realization
 Diamond Drilling (DD)                   Reverse Circulation (RC)             Total

                       Total                              Total                     Total
 Total Drill         Meters(m)            Total Drill   Meters(m)   Total Drill   Meters(m)
   Holes               Drill                Holes         Drill       Holes         Drill
    212               52,357                 215         23,450        427         75,807
• Exploration activities are focused on the increasing of the additional reserves/resources
  discoveries within the concession area especially from Eastern and Western Corridor
  area.
• The Company intensively conducts the exploration drilling which result to the high grade
  identification at some areas. These indication of high grade exploration drilling were
  identified especially in the Northern part of Eastern Corridor - Exceptional drilling
  intercept in Q3 2024 resulted the high grade of 36m interval at 60g/t from 178m to
  214m depth.
• The Company is currently exploring further to identify the continuity of the vein
  extensions. In parallel, the Company intensively conducts infill exploration drilling to
  accelerate the conversion of additional ore resources & reserves.
• With Kopra underground phase 1 commenced, the Company has also identified the
  continuity of gold vein for further underground potential.
• Recently, the Company is also requested to present the Exploration Discovery at the
  NewGenGold International Conference 18-19 November 2025 in Perth, Australia.
                                                                                              Source : Miner Deck, October 2024
        Source: Company information
                                                                                                                                         5
Page 6
 Downstream Business – Mining Contractor Services – PT GMA

 PT GMA was established in 2020, whereby the Company owned 25% of its stakes
  through PT Jasa Pertambangan Perkasa.
 Within less than 3 (three) years, PT GMA has expanded its operation & became the
  main mining contractor for the Toka Tindung Gold Mine.
 PT GMA existing fleet has the capacity to mine ~45 MT p.a of material and currently PT
  GMA is also looking for expanding its business to another mining site area.




          List Assets of 2024         Total Unit

    Mine Heavy Equipment                  92
    Other Supporting Unit                 60
                        Total            152




        Source: Company information
                                                                                           6
Page 7
   Downstream Business – Gold Refiner & Gold Bar / Minted Bar Producer – PT EMAS
Taping into Downstream Market - Minted Bar Business                                 PT EMAS Total Revenue
• PT EMAS, established as a JV Company in 2019 between Archi Group &                (US$ mn)                                                          78.2
  Lotus Group*.
                                                                                                         72.4
• First product launch is “Emas Merah Putih”, Proudly Made Indonesia, a
  gold bar product equipped with CertiEye barcode security.
• Other products launched such as paper gold, mini gold and customized minted
  bar/pendant.                                                                                           2023                                         2024
• PT EMAS is also producing gold bars in 250g, 500g, and 1kg with a purity of
  999.9 and duly certified by SNI.
Refinery & Trading Business
• PT EMAS expanded its business into Refinery and Trading Business.
• The Refinery facilities has 30 tons per annum gold refining capacity.
• Several gold mining companies in Indonesia has continuously refine their Dore
  Bullion (which is typically mixture of gold and silver) to 99.99% gold & 99.95%
  silver granules at PT EMAS Refinery facilities.
Key Achievement:
• Collaborated with Warner Bros for products with theme of Justice League,
  Harry Potter, Looney Tunes, etc.
• Collaborated with Disney for product with theme of Monster Inc., Toy Story
  and UP!, Tsum Tsum, etc.
Future Plan
• New product launch for 2026 international event

                                                                                    *one of Indonesia’s major players in gold jewelry market with extensive outreach locally and
                                                                                    internationally
           Source: Company information
                                                                                                                                                                                   7
Page 8
Geothermal Business – PT Toka Tindung Geothermal
 Entering to Geothermal Power Plant Business
 • PT TTG is a JV Company between PT Archi Indonesia Tbk and PT Ormat
   Geothermal Indonesia (“Ormat”), established in 2024.
 • Ormat is a leading renewable energy provider with a strong track record in
   geothermal and energy storage, having built approximately 190 power plants
   and installed around 3,400 MW of geothermal and REG (Recovered Energy
   Generation) capacity to date.
 • PT TTG obtained its Geothermal Permit on 13th June 2025.
 Project Location
 • Bitung City, Ranowulu District, Pinasungkulan Sub district.
 Capacity Target
 • 40 Mega Watt (MW).
 Next Plan
 • Obtain Environmental Permit.
 • Further exploration to confirm temperature and resource size.




     Source: Company information
                                                                                8
Page 9
 Underground Opening in 2024

  Underground Opening (5th December 2024)




    On 5th December, 2024, ARCI had its
 underground first blast at Kopra pit, marking
     the start of its underground mining
                 development




Underground Current Progress as of June 2025




    As of 2nd week of June 2025, Total our
  underground development are approx. 425
                   meters




                  Source: Company information    9
Page 10
CSR & Awards

                                             • First 1000 days of life program
                                  HEALTH     • Integrated Healthcare Center (2024: 1,728 person)
                                             • Integrated care for the Elderly (2024: 428 person)




                                             • Scholarship (2024: 31 person)
                                 EDUCATION   • Early Childhood Education (2024: 20 Schools)



                                             • Integrated agribusiness of coconut, corn (2024: 16
                                               Farmers group)
                                 ECONOMIC    • Poultry cultivation
                                             • Garment Cooperative
                                             • Cattle livestock assistance



                                             • Worship facilities and/or infrastructure as well as
                            SOCIAL CULTURE     relations in the religious sector
                                             • Participation in preserving local culture and wisdom




                                             • Clean water program
                            INFRASTRUCTURE   • Chicken coop construction
                                             • Renovation of school/building/classrooms



   Source: Company information
                                                                                                      10
Page 11
Business Prospects & Focuses 2025


    1       Gold production target to grow ~25%.



    2       Expanding to develop and mine at new pit.



    3
            Accelerate the development of underground mining at Kopra pit and identify other underground potentials.



    4
            Intensively and sustainably conducts the exploration activity on the greenfield/brownfield area.



    5       Improvement in gold recovery.




   Source: Company information
                                                                                                                       11
Page 12
                  For Further Information, please contact:

                  Archi Indonesia – Head Office
     Thank You!   RAJAWALI PLACE, 27th Floor
                  Jl. HR Rasuna Said Kav. B/4, Setiabudi
                  Jakarta Selatan, DKI Jakarta, 12910, Indonesia
                  Phone          : +62 21 576 1719
                  Email          : corsec@archimining.com
                  Website        : www.archiindonesia.com




12

File

File Open PDF
Source IDX
Size2.55 MB
Published18 Jun 2025
Pages12
Characters17,772
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 20 people and organisations named in the text · linked when the evidence is strong

linked org Archi Indonesia Tbk p.1 ×7
unresolved org PT Meares Soputan Mining p.2
unresolved org PT MSM p.2 ×2
unresolved org PT Tambang Tondano Nusajaya p.2
unresolved org PT TTN p.2 ×2
unresolved org PT Geopersada Mulia Abadi p.2
unresolved org PT GMA p.2 ×7
unresolved org PT Elang Mulia Abadi Sempurna p.2
unresolved org PT Toka Tindung Geothermal p.2
unresolved org PT TTG p.2 ×5
unresolved org Indonesia Stock Exchange p.2
unresolved org PT Ormat Geothermal Indonesia. Note p.3
unresolved org PT SMA p.4
unresolved org PT Jasa Pertambangan Perkasa. p.6
unresolved org PT EMAS Taping p.7
unresolved org PT EMAS Refinery p.7
unresolved org Monster Inc. p.7
unresolved org PT Toka Tindung Geothermal Entering p.8
unresolved org PT Ormat Geothermal Indonesia p.8

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result