Skip to content
Back to announcement

20250618_LABA_Laporan Informasi dan Fakta Material_31896294_lamp1.pdf

Asset transaction Needs review LABA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 5

Page 1
                 PRESS RELEASE
            PT GREEN POWER GROUP TBK
PT Green Power Group Tbk Acquires 65% Stake in PT Aceh Mineral Abadi,
       Strengthens Upstream Position in EV Battery Raw Materials

June 18, 2025, Wednesday, Jakarta – PT Green Power Group Tbk (“the Company”),
a publicly listed company, has taken a major step in expanding its battery raw
materials division by entering into an agreement with PT Energy Baru Investasi
Indonesia to acquire 65% of the shares in PT ACEH MINERAL ABADI (hereinafter
referred to as “the target company”). The target company is registered in Banda
Aceh and is currently in the process of applying for exploration permits for copper
and gold mining over an area of 2,522 hectares. Through this acquisition, the
Company aims to secure strategic upstream resources and position itself as a key
player in the supply chain of critical raw materials, with significant growth potential
in the future.

At the same time, the Company has been actively communicating with Chinese
companies such as China Nonferrous Metal Mining (中国有色), Jiangxi Copper (江
西铜业), and Huayou Cobalt (华友钴业) to explore potential collaboration
opportunities in developing the project.

This strategic initiative by the Company has received strong support and active
cooperation from the local government and relevant authorities, who have
conducted multiple site visits for discussion and coordination purposes.




                                                                                  1/5
Page 2
The Vice Governor of Aceh Province, Mr. Fadhlullah, led a delegation from the Aceh
Provincial Government—comprising the Investment and One-Stop Integrated
Services Agency, the Department of Energy and Mineral Resources, the Provincial
Secretariat of Aceh, the Aceh Development Planning Agency (Bappeda), and the
Department of Public Works and Housing—to attend the China–Aceh Investment
Forum organized by the Company. During the forum, the Vice Governor presented
investment opportunities and o cially awarded the title of “Aceh Government
Investment Ambassador” to the Company’s Director, Mr. An Shaohong.




                                                                             2/5
Page 3
Chinese companies such as China Nonferrous Metal Mining, Jiangxi Copper, and
Huayou Cobalt were also invited by the Company to conduct a site visit to the mining
location and discuss potential cooperation in project development.




PT Green Power Group Tbk and PT Energy Baru Investasi Indonesia have o cially
agreed on the acquisition of 65% of the shares in PT ACEH MINERAL ABADI. The
abundant copper resources in the Aceh mining area owned by the target company
are expected to position the region as an important part of the global electric vehicle
raw material supply chain.
                                                                                   3/5
Page 4
The Vice Governor of Aceh has taken the lead in coordinating various provincial
government agencies to provide full support for the permitting process, industrial
zone development, and port infrastructure to be carried out by the Company,
through an integrated and e cient service approach.




The Aceh Provincial Government has o cially declared its full commitment to
supporting the Company’s mining permit expansion in the Aceh special autonomy
region. Based on professional exploration results, the area holds abundant copper
and gold reserves and is highly suitable for development into a large-scale
integrated mining industry base.                                              4/5
Page 5
The provincial government will fully promote the development of a national-scale
mining industry cluster by the Company in Southwest Aceh, with the planned project
scope including:

 1. A modern mining system
 2. High-standard mineral processing (flotation) facilities
 3. Smart-technology-based metallurgical refining plants
 4. An integrated supply chain industrial zone for electric vehicle raw materials

The project will be implemented in accordance with Indonesia’s national mineral
resource management policies and the principles of sustainable development. The
provincial government has pledged comprehensive policy and administrative
support to ensure the smooth execution of the project.

For further information please contact:
Email : info@greenpowergroup.id
Telp : (021) 89533205




                                June 18, 2025
                        The Company’s Board of Directors




                                                                                    5/5

File

File Open PDF
Source IDX
Size2.23 MB
Published18 Jun 2025
Pages5
Characters4,564
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org GREEN POWER GROUP TBK p.1 ×8
possible person An Shaohong. p.2
unresolved org PT Aceh Mineral Abadi p.1 ×3
unresolved person Fadhlullah p.2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

Rule parser Needs review confidence 0.091 440 ms 12 Sep 2026 22:38
Raw output
{'appraiser_exempt': None,
 'appraiser_name': '',
 'assets': [],
 'currency': None,
 'fact_type': '',
 'issuer_name': '',
 'kind': 'MATERIAL_FACT',
 'kjpp_name': '',
 'letter_number': '',
 'object_text': '',
 'object_truncated': False,
 'parties': [],
 'pct_of_equity': None,
 'reference_period': '',
 'requires_rups': None,
 'rups_date': None,
 'ticker': '',
 'transaction_date': None,
 'valuation_date': None,
 'value': None}
↑↓ select ↵ open ⇧↵ see every result