Back to announcement
20260710_UNTR_Laporan Bulanan Aktivitas Eksplorasi_32110651_lamp1.pdf
Other Text extracted UNTRSource file signed link, expires in 15 minutes
Extracted text 3
Page 1
PT Stargate Pasific Resources
Laporan Eksplorasi/Exploration Report
April – Juni 2026 / April – June 2026
PT Stargate Pasific Resources, didirikan PT Stargate Pasific Resource, was
berdasarkan Akta Pendirian No 8 tanggal 28 established under the laws of the Republic
Agustus 2006, dihadapan Notaris Hasbullah of Indonesia, by Notarial Deed No.8 dated
Abdul Rasyid, SH., M.kn. di Jakarta. Akta 28 August 2006, of Hasbullah Abdul
pendirian tersebut disahkan oleh Menteri Rasyid, SH., M.kn., in Jakarta. The deed
Hukum dan Hak Asasi Manusia dengan surat was approved by the Minister of Law and
keputusan nomor W7-03075HT.01.01- Human Rights of the Republic of Indonesia
TH.2007 tanggal 23 Juni 2007 (“PT SPR”). in his letter No. W7-03075HT.01.01-
TH.2007 dated 23 Juny 2007 (“PT SPR”).
Anggaran Dasar Perseroan telah mengalami The Company's Articles of Association
perubahan dari waktu ke waktu. Perubahan have been amended several times, most
Anggaran Dasar terakhir dituangkan dalam recently by Deed No. 27 dated 14 Mei
Akta No. 27 tanggal 14 Mei 2025, dibuat 2025, drawn up Notary Vincent Sugeng
dihadapan Notaris Vincent Sugeng Fajar, SH., Fajar, SH., M.Kn., S.H., in Jakarta.
M.Kn. di Jakarta.
PT SPR adalah Pemegang Izin Usaha PT SPR is the Mining Business License for
Pertambangan Operasi Produksi No 668/DPM- Production Operations No. 668/DPM-
PTSP/VIII/2017 tanggal 3 Agustus 2017, yang PTSP/VIII/2017 dated 3 August 2017,
dimiliki secara tidak langsung oleh PT United which is indirectly owned by PT United
Tractors Tbk (“Perseroan”), sebanyak 60 %. Tractors Tbk ("Company"), 60 %.
Perseroan melakukan pelaporan kegiatan The Company reports exploration
eksplorasi periode April - Juni 2026 untuk activities for the period of April - June 2026
mengikuti ketentuan peraturan Bursa. to comply with stock Exchange
regulations.
Estimasi Biaya Kegiatan Eksplorasi untuk The cost of Exploration Activities for the
periode April sampai dengan Juni 2026 adalah period of April to June 2026 is estimate
estimasi Rp 6,801,600,000.- yang mengikuti in the amount of IDR 6,801,600,000.-
laporan Triwulan Pertama 2026 following the First 2026 Quarterly report.
Kegiatan Eksplorasi yang dilakukan berada di Exploration activities carried out are
daerah Molore, Kecamatan Langgikima, located Molore, Kecamatan Langgikima,
Kabupaten Konawe Utara, Provinsi Sulawesi Kabupaten Konawe Utara, Province
Tenggara dari bulan Maret hingga Mei. Sulawesi Tenggara from March to May.
Pada April – Juni 2026, PT SPR melakukan In April - June 2026, PT SPR drilled around
kegiatan pengeboran dengan jumlah 341 titik 341 holes with the various level of depth.
dan memiliki tingkat kedalaman yang beragam.
Kegiatan Eksplorasi dilakukan oleh PT SPR Exploration activities carried out by PT
dibantu dengan kontraktor. SPR are assisted by contractors.
1
Page 2
PT Stargate Pasific Resources
Laporan Eksplorasi/Exploration Report
April – Juni 2026 / April – June 2026
AREA EKSPLORASI / EXPLORATION AREA
Lokasi Site PT.
SPR
2
Page 3
PT Stargate Pasific Resources
Laporan Eksplorasi/Exploration Report
April – Juni 2026 / April – June 2026
Ket :
Lokasi Tim Armindo Block Molore
Parameters Unit Planned Actual Starting Date
Holes Finished - 354 341 Monday, March 23, 2026
Total Holes Redrilled - 0 8 Current Date**
Finished Meterage Per Today meter 6630 8948 Friday, May 29, 2026
Redrilled Meterage Per Today meter 0 175 Planned Finish Date
Total Meterage meter 9545 8948,00 Thursday, August 13, 2026
Drilling Progress % 69% 94% Days Spent
Total Core Recovery % 95% 98% 60
Total Average Daily Drilling Achievementmeter/day 120 149,13 Days Remaining
Weekly Average RoP/Rig/Hour/ meter/hour 3 5,3 64
Rig Physical Availibility (PA) % 90% 99% Total Effective Work Days
Rig Ultilization Availibility (UA) % 60% 42% 124
3
Names mentioned 11 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Stargate Pasific Resource
p.1
unresolved
person
Abdul Rasyid
p.1
unresolved
person
Rasyid
p.1
unresolved
org
Minister of Law
p.1
unresolved
org
PT SPR
p.1 ×8
unresolved
person
Vincent Sugeng Fajar
p.1
unresolved
person
Fajar
p.1
unresolved
org
PT United
p.1
unresolved
org
Tractors Tbk
p.1
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.