Skip to content
Back to announcement

20260709_NCKL_Laporan Bulanan Aktivitas Eksplorasi_32110199.pdf

Other Text extracted NCKL

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 12

Page 1
Go To English Page

 Nomor Surat                        0288/S/CORSEC/TBP/VII/2026

 Nama Perusahaan                    PT Trimegah Bangun Persada Tbk.

 Kode Emiten                        NCKL

 Lampiran                           0

 Perihal                            Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk JUL 2026 Sebagai Berikut :

                                                                                       Hasil aktivitas
      Nama           Area yang
                                  Total biaya yang     Pihak yang        Metode         eksplorasi
   Perusahaan/       dilakukan                                                                         Rencana tindak
                                        telah          melakukan      pengujian dan    hingga akhir
      Anak            aktivitas                                                                            lanjut
                                    dikeluarkan        eksplorasi     pemilihan area      periode
   perusahaan        eksplorasi
                                                                                       pelaporan ini
  PT Trimegah        Blok TBP      1.323.042.294      PT Trimegah Pemilihan area Periode bulan Perseroan akan
 Bangun Persada       Kawasi                         Bangun Persada pemetaan dan      April sampai     melanjutkan
      Tbk                                                 Tbk          pengeboran     dengan Juni        kegiatan
                                                                        dilakukan      2026 telah      pengeboran
                                                                       berdasarkan      dilakukan     pada titik-titik
                                                                        Rencana        pemboran       bor berikutnya
                                                                    Penambangan sebanyak 16            yang sudah
                                                                    (tahunan dan 5 titik, dengan      direncanakan.
                                                                     tahunan) yang total kedalaman
                                                                   dipengaruhi oleh 287 meter Hasil
                                                                      target tonase   pengeboran
                                                                   dan kadar nikel. dengan total
                                                                   Analisa data bor intercept limonit
                                                                        dilakukan    CoG lebih dari
                                                                    dengan metoda      atau sama
                                                                           XRF      dengan 0,7% Ni
                                                                     Spectrometry. sepanjang 54,48
                                                                                      m, ketebalan
                                                                                    rata-rata 3,41 m
                                                                                     pada kadar Ni
                                                                                     1,10% dan Co
                                                                                      0,11%. Total
                                                                                        intercept
                                                                                     saprolite CoG
                                                                                     lebih dari atau
                                                                                     sama dengan
                                                                                         1,3% Ni
                                                                                    sepanjang 51,22
                                                                                      m, ketebalan
                                                                                    rata-rata 5,69 m
                                                                                    dengan kadar Ni
                                                                                         1,65%.
Page 2
                                                                                 Hasil aktivitas
    Nama         Area yang
                               Total biaya yang   Pihak yang       Metode         eksplorasi
 Perusahaan/     dilakukan                                                                       Rencana tindak
                                     telah        melakukan     pengujian dan    hingga akhir
    Anak          aktivitas                                                                          lanjut
                                 dikeluarkan      eksplorasi    pemilihan area      periode
 perusahaan      eksplorasi
                                                                                 pelaporan ini
PT Gane Permai Blok GPS-Loji    1.180.332.780 PT Gane Permai Pemilihan area Periode bulan Perseroan akan
   Sentosa                                       Sentosa      pemetaan dan      April sampai    melanjutkan
                                                                pengeboran      dengan Juni       kegiatan
                                                                 dilakukan        2026 telah    pengeboran
                                                                berdasarkan       dilakukan    pada titik-titik
                                                                 Rencana          pemboran     bor berikutnya
                                                             Penambangan sebanyak 110           yang sudah
                                                             (tahunan dan 5 titik, dengan      direncanakan.
                                                              tahunan) yang total kedalaman
                                                            dipengaruhi oleh 2.222 meter.
                                                               target tonase         Hasil
                                                             dan kadar nikel. pengeboran
                                                            Analisa data bor dengan total
                                                                 dilakukan   intercept limonit
                                                             dengan metoda CoG lebih dari
                                                                    XRF           atau sama
                                                              Spectrometry. dengan 0,7% Ni
                                                                             sepanjang 387,2
                                                                               m, ketebalan
                                                                             rata-rata 6,79 m
                                                                              pada kadar Ni
                                                                              1,07% dan Co
                                                                                0,14%. Total
                                                                                   intercept
                                                                               saprolite CoG
                                                                              lebih dari atau
                                                                               sama dengan
                                                                                    1,3% Ni
                                                                                  sepanjang
                                                                                  431,02 m,
                                                                              ketebalan rata-
                                                                                 rata 4,95 m
                                                                             dengan kadar Ni
                                                                                    1,66%.
Page 3
                                                                                Hasil aktivitas
   Nama         Area yang
                             Total biaya yang    Pihak yang       Metode         eksplorasi
Perusahaan/     dilakukan                                                                       Rencana tindak
                                   telah         melakukan     pengujian dan    hingga akhir
   Anak          aktivitas                                                                          lanjut
                               dikeluarkan       eksplorasi    pemilihan area      periode
perusahaan      eksplorasi
                                                                                pelaporan ini
PT Jikodolong    Blok JMP     2.528.355.383     PT Jikodolong Pemilihan area Periode bulan Perseroan akan
Megah Pertiwi   Jikodolong                      Megah Pertiwi pemetaan dan       April sampai    melanjutkan
                                                                  pengeboran     dengan Juni kegiatan survey
                                                                   dilakukan      2026 telah     titik bor dan
                                                                  berdasarkan      dilakukan     melanjutkan
                                                                   Rencana        pemboran           aktifitas
                                                               Penambangan sebanyak 8 titik, pengeboran.
                                                               (tahunan dan 5 dengan total
                                                                tahunan) yang kedalaman 200
                                                              dipengaruhi oleh meter. Hasil
                                                                 target tonase   pengeboran
                                                              dan kadar nikel. dengan total
                                                              Analisa data bor intercept limonit
                                                                   dilakukan    CoG lebih dari
                                                              dengan metoda       atau sama
                                                                      XRF      dengan 0,7% Ni
                                                                Spectrometry. sepanjang 44,02
                                                                                 m, ketebalan
                                                                               rata-rata 6,29 m
                                                                                pada kadar Ni
                                                                                0,96% dan Co
                                                                                 0,12%. Total
                                                                                   intercept
                                                                                saprolite CoG
                                                                                lebih dari atau
                                                                                sama dengan
                                                                                    1,3% Ni
                                                                               sepanjang 28,11
                                                                                 m, ketebalan
                                                                               rata-rata 4,02 m
                                                                               dengan kadar Ni
                                                                                    1,60%.
Page 4
                                                                            Hasil aktivitas
   Nama       Area yang
                           Total biaya yang   Pihak yang      Metode         eksplorasi
Perusahaan/   dilakukan                                                                     Rencana tindak
                                 telah        melakukan    pengujian dan    hingga akhir
   Anak        aktivitas                                                                        lanjut
                             dikeluarkan      eksplorasi   pemilihan area      periode
perusahaan    eksplorasi
                                                                            pelaporan ini
 PT Gane      Blok GTS      3.330.592.834     PT Gane       Pemilihan area Periode bulan Perseroan akan
 Tambang                                      Tambang        pemetaan dan      April sampai   melanjutkan
 Sentosa                                      Sentosa          pengeboran      dengan Juni kegiatan survey
                                                                dilakukan        2026 telah   titik bor dan
                                                               berdasarkan       dilakukan    melanjutkan
                                                                Rencana          pemboran         aktifitas
                                                            Penambangan sebanyak 140          pengeboran.
                                                            (tahunan dan 5 titik, dengan
                                                             tahunan) yang total kedalaman
                                                           dipengaruhi oleh 2.500,94 meter.
                                                              target tonase         Hasil
                                                           dan kadar nikel. pengeboran
                                                           Analisa data bor dengan total
                                                                dilakukan   intercept limonit
                                                           dengan metoda CoG lebih dari
                                                                   XRF           atau sama
                                                             Spectrometry. dengan 0,7% Ni
                                                                                 sepanjang
                                                                                 293,20 m,
                                                                             ketebalan rata-
                                                                                rata 3,09 m
                                                                             pada kadar Ni
                                                                             1,05% dan Co
                                                                               0,09%. Total
                                                                                  intercept
                                                                              saprolite CoG
                                                                             lebih dari atau
                                                                              sama dengan
                                                                                   1,3% Ni
                                                                                 sepanjang
                                                                                 595,26 m,
                                                                             ketebalan rata-
                                                                                rata 5,51 m
                                                                            dengan kadar Ni
                                                                                   1,70%.
Page 5
                                                                                    Hasil aktivitas
     Nama             Area yang
                                   Total biaya yang   Pihak yang      Metode         eksplorasi
  Perusahaan/         dilakukan                                                                     Rencana tindak
                                         telah        melakukan    pengujian dan    hingga akhir
     Anak              aktivitas                                                                        lanjut
                                     dikeluarkan      eksplorasi   pemilihan area      periode
  perusahaan          eksplorasi
                                                                                    pelaporan ini
    PT Obi            Blok OAM      6.868.271.212      PT Obi       Pemilihan area Periode bulan Perseroan akan
   Anugerah                                           Anugerah       pemetaan dan      April sampai   melanjutkan
    Mineral                                            Mineral         pengeboran      dengan Juni kegiatan survey
                                                                        dilakukan        2026 telah   titik bor dan
                                                                       berdasarkan       dilakukan    melanjutkan
                                                                        Rencana          pemboran         aktifitas
                                                                    Penambangan sebanyak 107          pengeboran.
                                                                    (tahunan dan 5 titik, dengan
                                                                     tahunan) yang total kedalaman
                                                                   dipengaruhi oleh 2.392,15 meter.
                                                                      target tonase         Hasil
                                                                   dan kadar nikel. pengeboran
                                                                   Analisa data bor dengan total
                                                                        dilakukan   intercept limonit
                                                                   dengan metoda CoG lebih dari
                                                                           XRF           atau sama
                                                                     Spectrometry. dengan 0,7% Ni
                                                                                         sepanjang
                                                                                         212,32 m,
                                                                                     ketebalan rata-
                                                                                        rata 2,65 m
                                                                                     pada kadar Ni
                                                                                     1,06% dan Co
                                                                                       0,10%. Total
                                                                                          intercept
                                                                                      saprolite CoG
                                                                                     lebih dari atau
                                                                                      sama dengan
                                                                                           1,3% Ni
                                                                                         sepanjang
                                                                                         201,78 m,
                                                                                     ketebalan rata-
                                                                                        rata 2,66 m
                                                                                    dengan kadar Ni
                                                                                           1,53%.

Demikian untuk diketahui.


Hormat Kami,
PT Trimegah Bangun Persada Tbk.




Rafika Fazrin

Corporate Secretary




PT Trimegah Bangun Persada Tbk.
Jalan Jendral Sudirman Kav. 1
Telepon : +62-21 5722924, Fax : +62-21 5722924, www.tbpnickel.com



Nama Pengirim                        Rafika Fazrin
Page 6
Jabatan                         Corporate Secretary
Tanggal dan Waktu               09-07-2026 17:14




Dokumen ini merupakan dokumen resmi PT Trimegah Bangun Persada Tbk. yang tidak memerlukan tanda tangan
    karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Trimegah Bangun Persada Tbk.
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 7
Go To Indonesian Page

 Letter / Announcement No.         0288/S/CORSEC/TBP/VII/2026

 Issuer Name                       PT Trimegah Bangun Persada Tbk.

 Issuer Code                       NCKL

 Attachment                        0

 Subject                           Monthly Exploration Activities Report

The Company reports exploration activities for JUL 2026 as follows :

 Company name/ Exploration             Total cost       Parties     Testing methods    Results of     Follow up plan
   Subsidiary  activities area          incurred      exploration    and selection     exploration
                                                                          area       activities until
                                                                                     the end of the
                                                                                    reporting period

  PT Trimegah           Blok TBP   1,323,042,294     PT Trimegah Pemilihan area Periode bulan Perseroan akan
 Bangun Persada          Kawasi                     Bangun Persada pemetaan dan      April sampai     melanjutkan
      Tbk                                                Tbk          pengeboran     dengan Juni        kegiatan
                                                                       dilakukan      2026 telah      pengeboran
                                                                      berdasarkan      dilakukan     pada titik-titik
                                                                       Rencana        pemboran       bor berikutnya
                                                                   Penambangan sebanyak 16            yang sudah
                                                                   (tahunan dan 5 titik, dengan      direncanakan.
                                                                    tahunan) yang total kedalaman
                                                                  dipengaruhi oleh 287 meter Hasil
                                                                     target tonase   pengeboran
                                                                  dan kadar nikel. dengan total
                                                                  Analisa data bor intercept limonit
                                                                       dilakukan    CoG lebih dari
                                                                   dengan metoda      atau sama
                                                                          XRF      dengan 0,7% Ni
                                                                    Spectrometry. sepanjang 54,48
                                                                                     m, ketebalan
                                                                                   rata-rata 3,41 m
                                                                                    pada kadar Ni
                                                                                    1,10% dan Co
                                                                                     0,11%. Total
                                                                                       intercept
                                                                                    saprolite CoG
                                                                                    lebih dari atau
                                                                                    sama dengan
                                                                                        1,3% Ni
                                                                                   sepanjang 51,22
                                                                                     m, ketebalan
                                                                                   rata-rata 5,69 m
                                                                                   dengan kadar Ni
                                                                                        1,65%.
Page 8
Company name/ Exploration         Total cost       Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area      incurred      exploration    and selection     exploration
                                                                     area       activities until
                                                                                the end of the
                                                                               reporting period

PT Gane Permai Blok GPS-Loji    1,180,332,780 PT Gane Permai Pemilihan area Periode bulan Perseroan akan
   Sentosa                                       Sentosa      pemetaan dan      April sampai    melanjutkan
                                                                pengeboran      dengan Juni       kegiatan
                                                                 dilakukan        2026 telah    pengeboran
                                                                berdasarkan       dilakukan    pada titik-titik
                                                                 Rencana          pemboran     bor berikutnya
                                                             Penambangan sebanyak 110           yang sudah
                                                             (tahunan dan 5 titik, dengan      direncanakan.
                                                              tahunan) yang total kedalaman
                                                            dipengaruhi oleh 2.222 meter.
                                                               target tonase         Hasil
                                                             dan kadar nikel. pengeboran
                                                            Analisa data bor dengan total
                                                                 dilakukan   intercept limonit
                                                             dengan metoda CoG lebih dari
                                                                    XRF           atau sama
                                                              Spectrometry. dengan 0,7% Ni
                                                                             sepanjang 387,2
                                                                               m, ketebalan
                                                                             rata-rata 6,79 m
                                                                              pada kadar Ni
                                                                              1,07% dan Co
                                                                                0,14%. Total
                                                                                   intercept
                                                                               saprolite CoG
                                                                              lebih dari atau
                                                                               sama dengan
                                                                                    1,3% Ni
                                                                                  sepanjang
                                                                                  431,02 m,
                                                                              ketebalan rata-
                                                                                 rata 4,95 m
                                                                             dengan kadar Ni
                                                                                    1,66%.
Page 9
Company name/ Exploration         Total cost       Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area      incurred      exploration    and selection     exploration
                                                                     area       activities until
                                                                                the end of the
                                                                               reporting period

 PT Jikodolong    Blok JMP      2,528,355,383   PT Jikodolong Pemilihan area Periode bulan Perseroan akan
 Megah Pertiwi   Jikodolong                     Megah Pertiwi pemetaan dan       April sampai    melanjutkan
                                                                  pengeboran     dengan Juni kegiatan survey
                                                                   dilakukan      2026 telah     titik bor dan
                                                                  berdasarkan      dilakukan     melanjutkan
                                                                   Rencana        pemboran           aktifitas
                                                               Penambangan sebanyak 8 titik, pengeboran.
                                                               (tahunan dan 5 dengan total
                                                                tahunan) yang kedalaman 200
                                                              dipengaruhi oleh meter. Hasil
                                                                 target tonase   pengeboran
                                                              dan kadar nikel. dengan total
                                                              Analisa data bor intercept limonit
                                                                   dilakukan    CoG lebih dari
                                                              dengan metoda       atau sama
                                                                      XRF      dengan 0,7% Ni
                                                                Spectrometry. sepanjang 44,02
                                                                                 m, ketebalan
                                                                               rata-rata 6,29 m
                                                                                pada kadar Ni
                                                                                0,96% dan Co
                                                                                 0,12%. Total
                                                                                   intercept
                                                                                saprolite CoG
                                                                                lebih dari atau
                                                                                sama dengan
                                                                                    1,3% Ni
                                                                               sepanjang 28,11
                                                                                 m, ketebalan
                                                                               rata-rata 4,02 m
                                                                               dengan kadar Ni
                                                                                    1,60%.
Page 10
Company name/ Exploration         Total cost      Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area      incurred     exploration    and selection     exploration
                                                                    area       activities until
                                                                               the end of the
                                                                              reporting period

   PT Gane        Blok GTS      3,330,592,834   PT Gane        Pemilihan area Periode bulan Perseroan akan
   Tambang                                      Tambang         pemetaan dan      April sampai   melanjutkan
   Sentosa                                      Sentosa           pengeboran      dengan Juni kegiatan survey
                                                                   dilakukan        2026 telah   titik bor dan
                                                                  berdasarkan       dilakukan    melanjutkan
                                                                   Rencana          pemboran         aktifitas
                                                               Penambangan sebanyak 140          pengeboran.
                                                               (tahunan dan 5 titik, dengan
                                                                tahunan) yang total kedalaman
                                                              dipengaruhi oleh 2.500,94 meter.
                                                                 target tonase         Hasil
                                                              dan kadar nikel. pengeboran
                                                              Analisa data bor dengan total
                                                                   dilakukan   intercept limonit
                                                              dengan metoda CoG lebih dari
                                                                      XRF           atau sama
                                                                Spectrometry. dengan 0,7% Ni
                                                                                    sepanjang
                                                                                    293,20 m,
                                                                                ketebalan rata-
                                                                                   rata 3,09 m
                                                                                pada kadar Ni
                                                                                1,05% dan Co
                                                                                  0,09%. Total
                                                                                     intercept
                                                                                 saprolite CoG
                                                                                lebih dari atau
                                                                                 sama dengan
                                                                                      1,3% Ni
                                                                                    sepanjang
                                                                                    595,26 m,
                                                                                ketebalan rata-
                                                                                   rata 5,51 m
                                                                               dengan kadar Ni
                                                                                      1,70%.
Page 11
Company name/ Exploration            Total cost      Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area         incurred     exploration    and selection     exploration
                                                                       area       activities until
                                                                                  the end of the
                                                                                 reporting period

     PT Obi           Blok OAM     6,868,271,212    PT Obi        Pemilihan area Periode bulan Perseroan akan
    Anugerah                                       Anugerah        pemetaan dan      April sampai   melanjutkan
     Mineral                                        Mineral          pengeboran      dengan Juni kegiatan survey
                                                                      dilakukan        2026 telah   titik bor dan
                                                                     berdasarkan       dilakukan    melanjutkan
                                                                      Rencana          pemboran         aktifitas
                                                                  Penambangan sebanyak 107          pengeboran.
                                                                  (tahunan dan 5 titik, dengan
                                                                   tahunan) yang total kedalaman
                                                                 dipengaruhi oleh 2.392,15 meter.
                                                                    target tonase         Hasil
                                                                 dan kadar nikel. pengeboran
                                                                 Analisa data bor dengan total
                                                                      dilakukan   intercept limonit
                                                                 dengan metoda CoG lebih dari
                                                                         XRF           atau sama
                                                                   Spectrometry. dengan 0,7% Ni
                                                                                       sepanjang
                                                                                       212,32 m,
                                                                                   ketebalan rata-
                                                                                      rata 2,65 m
                                                                                   pada kadar Ni
                                                                                   1,06% dan Co
                                                                                     0,10%. Total
                                                                                        intercept
                                                                                    saprolite CoG
                                                                                   lebih dari atau
                                                                                    sama dengan
                                                                                         1,3% Ni
                                                                                       sepanjang
                                                                                       201,78 m,
                                                                                   ketebalan rata-
                                                                                      rata 2,66 m
                                                                                  dengan kadar Ni
                                                                                         1,53%.

Thus to be informed accordingly.


Respectfully,
PT Trimegah Bangun Persada Tbk.




Rafika Fazrin

Corporate Secretary




PT Trimegah Bangun Persada Tbk.
Jalan Jendral Sudirman Kav. 1
Phone : +62-21 5722924, Fax : +62-21 5722924, www.tbpnickel.com
Page 12
Sender Name                        Rafika Fazrin

Function                           Corporate Secretary

Date and Time                      09-07-2026 17:14




   This is an official document of PT Trimegah Bangun Persada Tbk. that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Trimegah Bangun Persada Tbk. is fully responsible
                                 for the information contained within this document.

File

File Open PDF
Source IDX
Size0.03 MB
Published9 Jul 2026
Pages12
Characters41,515
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 18 people and organisations named in the text · linked when the evidence is strong

linked org Trimegah Bangun Persada Tbk. · Nama Perusahaan p.1 ×30
possible org PT Trimegah p.1 ×2
unresolved org PT Trimegah Pemilihan p.1 ×2
unresolved — Penambangan sebanyak 16 p.1
unresolved — target tonase p.1 ×5
unresolved — metoda p.1 ×2
unresolved — XRF p.1 ×5
unresolved org PT Gane Permai p.2 ×2
unresolved org PT Gane Permai Pemilihan p.2 ×2
unresolved — Penambangan sebanyak 110 p.2
unresolved org PT Jikodolong p.3 ×2
unresolved org PT Jikodolong Pemilihan p.3 ×2
unresolved org PT Gane p.4 ×4
unresolved — Penambangan sebanyak 140 p.4
unresolved org PT Obi p.5 ×4
unresolved — Penambangan sebanyak 107 p.5
unresolved — Nama Pengirim p.5
unresolved person Rafika Fazrin · Nama Pengirim p.5 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result