Source file signed link, expires in 15 minutes
Extracted text 16
Page 1
Public Expose
PT Sunindo Pratama Tbk
Jakarta, 12 Juni 2025
1
Page 2
Chapter 1
Company Profile
2
Page 3
Company Brief
PT Sunindo Pratama Tbk (SUNI) was established in Our strategic assets, PT Rainbow Tubulars Manufacture
September 2002 as the player in the oil & gas supporting (RTM), in-house OCTG tubing producers, enables us to
business and the pioneer in Indonesia for seamless Oil secure the availability of the production throughout the year,
Country Tubular Goods (OCTG) tubing as our biggest revenue making it as our vital strategic asset. RTM has also achieved
contributor. the high local content (TKDN) and aligned with government
TKDN regulation.
“ With the underserved market for tubing products in
Indonesia coupled with the Government target in increasing
oil and natural gas production by 2030,
we have an enormous potential to boost our capacity and
sustainable financial performance going forward.
”
Page 4
Milestone
The Company supplied to the ● The Company increased paid-up
First project in Oil & Gas that Geothermal industry for the capital in its subsidiary, RTM, by
setup the Company to focus in first time by winning 2 IDR 153 billion
Oil & Gas Industries (start in The Company obtained ISO The Company obtained ISO Purchase Orders from Star ● RTM started developing Plant 2
Oil & Gas Industries) 9001: 2008 Certification 9001: 2015 Certification Energy Geothermal in Batam
2002 2004 2007 2010 2017 2018 2019 2021 2023 2024
The Company established in The Company obtained ISO The Company decided to The Company acquired 60% ● The Company went IPO
September 2002 (business line 9001: 2000 Certification expand to non-Oil & Gas shares in PT Rainbow Tubulars ● Acquired a 39.96% stake in PT
in Chiller) Industries and to address Manufacture, a manufacturing Rainbow Tubulars Manufacture
environmental issues /production of seamless pipe and became the controlling
company located in Batam, shareholder in PT Rainbow
Indonesia Tubulars Manufacture with a
99.96% share
4
Page 5
Line of Business
Product Services SUNI 3 Main Products
1. OCTG Tubing (RTM Products)
Size: 2-3/8” to 4-1/2”
1. OCTG Casing
Size: 4-1/2” to 20”
OCTG Casing OCGT Tubing Wellhead and
1. Wellhead & Christmas Tree
Christmas
Tree
Most popular products
1. Tubing:
Wellhead Installation and Size: 2-3/8”, 2-7/8”, 3-1/2”, 4-1/2”
Maintenance Services Grade: J-55, N-80, L-80
Drill Bit PDC Bit Drill Bit Tricone Bit
1. Casing
Size: 7”, 9-5/8”, 13-3/8”
Grade: K-55, N-80, L-80
1. Wellhead & Christmas Tree
Classes: AA, BB, CC, EE, FF, HH
Pressure (psi): 3000, 5000, 10000
Completion Equipment
Page 6
Chapter 2
Strategy & Target
6
Page 7
Our Strategic Plan in 2025
01 Increasing the production capacity of seamless pipe/OCTG tubing
02 Product & market diversifications
03 PT Petro Synergy Manufacturing : Starting commercial operation
04 Buyback shares 1 mio lot or IDR80 bio to utilize idle cash
7
Page 8
Management Highlight 1Q - 2025
Sustainable Solid Balance Improving Strong
Profitability Sheet Cash Flow Operations
Operating revenues Equity Operating activities Sales volume
+93% YoY to IDR314 bn +8% YoY to IDR848 bn +478% YoY to net cash IDR71 bn OCTG
+71% YoY to 9,379 ton
Gross profit Financial Debt Investing activities
+75% YoY to IDR105 bn -7% YoY to IDR100 bn +61% YoY to net cash IDR56 bn
Net profit Debt to EBITDA ratio 1.17 time Financing activities
+100% YoY to IDR66 bn DER 0.33 time -31% YoY to net cash IDR7 bn
Current ratio 3.17 time
EBITDA
+88% YoY to IDR88 bn
8
Page 9
Our Target in 2025
1Q - 2025 FY 2025 Achievement
No Indicator Unit
Actual Target %
OCTG ton 9,379 34,600 27
1 Operating
Wellhead & X’mas Tree unit 12 105 11
Operating revenue billion IDR 314 1,124 28
Profitability Gross profit billion IDR 105 346 30
Net profit billion IDR 66 210 31
2 Financial
DER (max 2.5 time) time 0.33 0.24 138
Financial Debt
Current ratio (min 1 time) time 3.17 4.87 65
Capital Expenditure Capex billion IDR 56 175 32
Net profit achievement
31%
9
Page 10
Chapter 3
Operational Performance
10
Page 11
OCTG Performance
OCTG Sales Volume (ton)
1Q - 2025 +71% YoY to 9,379 ton
Achieved 27% target FY 2025
35,000 34,600
30,000
25,000
20,000
15,000
9,379
10,000
5,476
5,000
-
1Q - 24
1Q - 25
Target
11
Page 12
Wellhead & X’mas Tree Performance
Wellhead & X’mas Tree (unit)
1Q - 2025 500% YoY to 12 unit
Achieved 11% target FY 2025
120
105
100
80
60
40
20 12
2
-
1Q - 24
1Q - 25
Target
12
Page 13
Chapter 4
Highlights of the AGMS
Resolution
13
Page 14
Chapter 5
Operational Updates
14
Page 15
SUNI’s Public Expose
Zoom Link
https://us06web.zoom.us/j/85656545162?pwd=rszJbnW7TeSQOk
RwDoybjjK60WFSjC.1
Date : 12 June 2025
Time : 11.00 WIB
15
Page 16
Jl. Prof. Dr. Soepomo SH.
No. 48 Tebet Jakarta Selatan
12870 Indonesia
+62 21 8378 5773
+62 21 8378 5776
Thank You investor.relations@sunindogroup.com
16
Names mentioned 6 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Rainbow Tubulars
p.4
unresolved
org
PT Rainbow Indonesia
p.4
unresolved
person
Prof. Dr. Soepomo SH.
p.16
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.