Back to announcement
20260706_CBRE_Laporan Informasi dan Fakta Material_32108828_lamp1.pdf
Other Text extracted CBRESource file signed link, expires in 15 minutes
Extracted text 1
Page 1
SIARAN PERS / KETERBUKAAN INFORMASI
PRESS RELEASE / INFORMATION DISCLOSURE
PT CAKRA BUANA RESOURCES ENERGI Tbk
Jakarta, 06 Juli 2026
Jakarta, 06th July 2026
Informasi Terkini Perusahaan Corporate Update
Kapal Gunanusa Hai Long 106 Telah Tiba di Indonesia dan Siap Gunanusa Hai Long 106 Vessel Has Arrived in Indonesia and Is Ready to
Mendukung Pelaksanaan Proyek Hidayah Field Phase 1. PT Cakra Buana Support the Hidayah Field Phase 1 Development Project. PT Cakra Buana
Resources Energi Tbk (“Perseroan”) dengan ini menyampaikan Resources Energi Tbk (the “Company”) hereby provides an operational
perkembangan operasional terkait armada yang dimiliki Perseroan. update regarding the Company’s vessel fleet.
Perseroan menginformasikan bahwa Kapal Gunanusa Hai Long 106 telah The Company is pleased to announce that the Gunanusa Hai Long 106
tiba di Indonesia dan bersandar di Terminal Khusus PT Gunanusa Utama vessel arrived in Indonesia and berthed at the Special Terminal of PT
Fabricators, Cilegon, pada tanggal 29 Juni 2026. Kedatangan kapal Gunanusa Utama Fabricators, Cilegon, on 29 June 2026. The arrival of
tersebut merupakan salah satu tahapan penting dalam persiapan the vessel marks an important milestone in the preparation for the
pelaksanaan pekerjaan yang telah dipercayakan kepada Perseroan. execution of the work entrusted to the Company.
Selanjutnya, Kapal Gunanusa Hai Long 106 telah siap untuk melaksanakan Furthermore, the Gunanusa Hai Long 106 vessel is fully prepared to
pekerjaan berdasarkan penunjukan yang diterima Perseroan dari PT commence operations pursuant to the work assignment awarded to the
Gunanusa Utama Fabricators dalam rangka mendukung pelaksanaan Company by PT Gunanusa Utama Fabricators in support of the Provision
proyek Provision of EPCIC of Integrated Wellhead Platform (WHP), Central of EPCIC of Integrated Wellhead Platform (WHP), Central Processing
Processing Platform (CPP), Subsea Pipeline and Pipeline End Terminal Platform (CPP), Subsea Pipeline and Pipeline End Terminal (PLET) for the
(PLET) for Hidayah Field Phase 1 Development Project. Pelaksanaan Hidayah Field Phase 1 Development Project. The execution of the project
pekerjaan tersebut direncanakan akan dimulai pada bulan Agustus 2026. is scheduled to commence in August 2026.
Kesiapan operasional Kapal Gunanusa Hai Long 106 mencerminkan The operational readiness of the Gunanusa Hai Long 106 vessel reflects
komitmen Perseroan dalam memenuhi pelaksanaan proyek secara tepat the Company’s commitment to delivering the project in a timely manner
waktu, dengan tetap mengedepankan standar keselamatan kerja, kualitas while upholding the highest standards of occupational health and safety,
pelaksanaan, serta kepatuhan terhadap ketentuan kontrak dan peraturan quality, and compliance with all applicable contractual obligations and
yang berlaku. regulatory requirements.
Perseroan meyakini bahwa kesiapan armada ini merupakan bagian dari The Company believes that the readiness of this vessel forms part of its
upaya berkelanjutan dalam memperkuat kapabilitas operasional serta ongoing efforts to strengthen its operational capabilities and support the
mendukung pencapaian target kinerja Perseroan. Ke depan, Perseroan achievement of its business objectives. Going forward, the Company
akan terus menjalankan kegiatan usaha secara profesional, berintegritas, remains committed to conducting its business professionally and with
dan senantiasa menginformasikan setiap perkembangan yang bersifat integrity, while continuing to disclose any material developments to its
material kepada para pemegang saham dan pemangku kepentingan shareholders and other stakeholders in accordance with the prevailing
sesuai dengan ketentuan peraturan perundang-undangan yang berlaku. laws and regulations.
Hormat kami/ Sincerely,
PT Cakra Buana Resources Energi Tbk
Direksi/ Board Of Directors
PT Cakra Buana Resources Energi Tbk.
Sahid Sudirman Center Lantai 42 Unit B
Jl. Jenderal Sudirman Kav. 86 Jakarta Pusat (10220)
T. 021-29858070 F. 021-2506223
www.cbre.co.id
Names mentioned 6 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Cakra Buana
p.1
unresolved
org
Resources Energi Tbk
p.1
unresolved
org
PT Gunanusa Utama
p.1
unresolved
org
PT Fabricators
p.1
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.