Skip to content
Back to announcement

20260701_SMGA_Laporan Bulanan Aktivitas Eksplorasi_32107274.pdf

Other Text extracted SMGA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                        107/SMGA/VII/2026

 Nama Perusahaan                    PT Sumber Mineral Global Abadi Tbk

 Kode Emiten                        SMGA

 Lampiran                           1

 Perihal                            Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk JUL 2026 Sebagai Berikut :

                                                                                    Hasil aktivitas
      Nama           Area yang
                                  Total biaya yang   Pihak yang       Metode         eksplorasi
   Perusahaan/       dilakukan                                                                      Rencana tindak
                                        telah        melakukan     pengujian dan    hingga akhir
      Anak            aktivitas                                                                         lanjut
                                    dikeluarkan      eksplorasi    pemilihan area      periode
   perusahaan        eksplorasi
                                                                                    pelaporan ini
Page 2
                                                                                 Hasil aktivitas
     Nama          Area yang
                                Total biaya yang   Pihak yang      Metode         eksplorasi
  Perusahaan/      dilakukan                                                                     Rencana tindak
                                      telah        melakukan    pengujian dan    hingga akhir
     Anak           aktivitas                                                                        lanjut
                                  dikeluarkan      eksplorasi   pemilihan area      periode
  perusahaan       eksplorasi
                                                                                 pelaporan ini
PT JASATAMA       IUP Operasi 1.870.000.000 PT JASATAMA Pengeboran                1.               1.
  MANDIRI         Produksi PT                 MANDIRI    Open Hole           Diperoleh      Meningkatkan
  SUKSES           JMS Blok                   SUKSES   sebanyak 5 titik informasi litologi jumlah titik bor
                   Sambalagi                                                & ketebalan           guna
                 mencakup HPT                                            batuan sebagai memperoleh
                   Sisi Utara                                                salah satu    informasi lebih
                  Luasan 3 Ha                                              bahan dalam lanjut dan akurat
                                                                            menyusun          mengenai
                                                                          pembaharuan        litologi dan
                                                                          Laporan Akhir       ketebalan
                                                                            Eksplorasi, batuan sehingga
                                                                            menyusun            menjadi
                                                                          pembaharuan         pedoman
                                                                          Laporan Studi        informasi
                                                                            Kelayakan        manajemen
                                                                        Tambang, serta           dalam
                                                                            melakukan        mengambil
                                                                        pengurusan Izin kebijakan terkait
                                                                            Lingkungan          kegiatan
                                                                             UKL-UPL       pertambangan.
                                                                        menjadi AMDAL              2.
                                                                                guna       Menyampaikan
                                                                          meningkatkan            hasil
                                                                         target produksi pembaharuan
                                                                           tahunan dari     Laporan Akhir
                                                                         480.000 MT ke Eksplorasi dan
                                                                         3.000.000 MT. Laporan Studi
                                                                                  2.          Kelayakan
                                                                          Laporan Akhir Tambang untuk
                                                                         Eksplorasi dan       dilakukan
                                                                          Laporan Studi evaluasi oleh
                                                                            Kelayakan       Dinas ESDM
                                                                         Tambang telah          Provinsi
                                                                             selesai. 3.       Sulawesi
                                                                                             Tengah. 3.
                                                                          Perpanjangan
                                                                                 Izin        Melakukan
                                                                          Pemanfaatan        pengurusan
                                                                                 dan         Persetujuan
                                                                           Penggunaan        Kesesuaian
                                                                         Bagain-Bagian Kegiatan dan
                                                                         Jalan Provinsi, Pemanfaatan
                                                                             berkaitan       Ruang Laut
                                                                        dengan crossing (PKKRL) Tahap
                                                                          jalan tersebut           2.
                                                                           dengan jalan
                                                                         hauling menuju
                                                                              Terminal
                                                                           Khusus/Jetty
                                                                           telah selesai
                                                                         dan mendapat
                                                                        persetujuan dari
                                                                          instasi terkait.

Demikian untuk diketahui.


Hormat Kami,
Page 3
PT Sumber Mineral Global Abadi Tbk




Raymond Ng Chi Ching

Direktur Utama




PT Sumber Mineral Global Abadi Tbk
Graha BIP Lantai 2
Telepon : (+62) 21 522 9900, Fax : , https://www.smgagroup.com



Nama Pengirim                     Raymond Ng Chi Ching

Jabatan                           Direktur Utama
Tanggal dan Waktu                 02-07-2026 15:48

Lampiran                         1. Laporan Eksplorasi - 02 Juli 2026.pdf


Dokumen ini merupakan dokumen resmi PT Sumber Mineral Global Abadi Tbk yang tidak memerlukan tanda tangan
    karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Sumber Mineral Global Abadi Tbk
                    bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.         107/SMGA/VII/2026

 Issuer Name                       PT Sumber Mineral Global Abadi Tbk

 Issuer Code                       SMGA

 Attachment                        1

 Subject                           Monthly Exploration Activities Report

The Company reports exploration activities for JUL 2026 as follows :

 Company name/ Exploration             Total cost     Parties     Testing methods    Results of     Follow up plan
   Subsidiary  activities area          incurred    exploration    and selection     exploration
                                                                        area       activities until
                                                                                   the end of the
                                                                                  reporting period
Page 5
Company name/ Exploration          Total cost      Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area       incurred     exploration    and selection     exploration
                                                                     area       activities until
                                                                                the end of the
                                                                               reporting period

 PT JASATAMA      IUP Operasi 1,870,000,000 PT JASATAMA Pengeboran                1.               1.
   MANDIRI        Produksi PT                 MANDIRI    Open Hole           Diperoleh      Meningkatkan
   SUKSES          JMS Blok                   SUKSES   sebanyak 5 titik informasi litologi jumlah titik bor
                   Sambalagi                                                & ketebalan           guna
                 mencakup HPT                                            batuan sebagai memperoleh
                   Sisi Utara                                                salah satu    informasi lebih
                  Luasan 3 Ha                                              bahan dalam lanjut dan akurat
                                                                            menyusun          mengenai
                                                                          pembaharuan        litologi dan
                                                                          Laporan Akhir       ketebalan
                                                                            Eksplorasi, batuan sehingga
                                                                            menyusun            menjadi
                                                                          pembaharuan         pedoman
                                                                          Laporan Studi        informasi
                                                                            Kelayakan        manajemen
                                                                        Tambang, serta           dalam
                                                                            melakukan        mengambil
                                                                        pengurusan Izin kebijakan terkait
                                                                            Lingkungan          kegiatan
                                                                             UKL-UPL       pertambangan.
                                                                        menjadi AMDAL              2.
                                                                                guna       Menyampaikan
                                                                          meningkatkan            hasil
                                                                         target produksi pembaharuan
                                                                           tahunan dari     Laporan Akhir
                                                                         480.000 MT ke Eksplorasi dan
                                                                         3.000.000 MT. Laporan Studi
                                                                                  2.          Kelayakan
                                                                          Laporan Akhir Tambang untuk
                                                                         Eksplorasi dan       dilakukan
                                                                          Laporan Studi evaluasi oleh
                                                                            Kelayakan       Dinas ESDM
                                                                         Tambang telah          Provinsi
                                                                             selesai. 3.       Sulawesi
                                                                                             Tengah. 3.
                                                                          Perpanjangan
                                                                                 Izin        Melakukan
                                                                          Pemanfaatan        pengurusan
                                                                                 dan         Persetujuan
                                                                           Penggunaan        Kesesuaian
                                                                         Bagain-Bagian Kegiatan dan
                                                                         Jalan Provinsi, Pemanfaatan
                                                                             berkaitan       Ruang Laut
                                                                        dengan crossing (PKKRL) Tahap
                                                                          jalan tersebut           2.
                                                                           dengan jalan
                                                                         hauling menuju
                                                                              Terminal
                                                                           Khusus/Jetty
                                                                           telah selesai
                                                                         dan mendapat
                                                                        persetujuan dari
                                                                          instasi terkait.

Thus to be informed accordingly.
Page 6
Respectfully,
PT Sumber Mineral Global Abadi Tbk




Raymond Ng Chi Ching

Direktur Utama




PT Sumber Mineral Global Abadi Tbk
Graha BIP Lantai 2
Phone : (+62) 21 522 9900, Fax : , https://www.smgagroup.com



Sender Name                        Raymond Ng Chi Ching

Function                           Direktur Utama

Date and Time                      02-07-2026 15:48

Attachment                        1. Laporan Eksplorasi - 02 Juli 2026.pdf


   This is an official document of PT Sumber Mineral Global Abadi Tbk that does not require a signature as it was
      generated electronically by the electronic reporting system. PT Sumber Mineral Global Abadi Tbk is fully
                            responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published2 Jul 2026
Pages6
Characters15,568
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 10 people and organisations named in the text · linked when the evidence is strong

linked org Sumber Mineral Global Abadi Tbk · Nama Perusahaan p.1 ×30
linked person Raymond Ng Chi Ching · Direktur Utama p.3 ×5
unresolved org PT JASATAMA p.2 ×2
unresolved org PT JASATAMA Pengeboran p.2 ×2
unresolved — mencakup HPT p.2
unresolved — Luasan 3 Ha p.2
unresolved — pembaharuan p.2 ×2
unresolved — UKL-UPL p.2
unresolved — menjadi AMDAL p.2
unresolved person Function · Direktur Utama p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result