Skip to content
Back to announcement

20250415_ARCI_Laporan Bulanan Aktivitas Eksplorasi_31875669_lamp2.pdf

Other Text extracted ARCI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 5

Page 1
                      No: 0012/ARCHI/4/2025/G




EXPLORATION REPORT
PT Archi Indonesia Tbk.
     31th Mar 2025
Page 2
                                                                        No: 0012/ARCHI/4/2025/G
PT Archi Indonesia Tbk. (the ”Company” or “ARCI”) owns 100% of the Toka Tindung Gold
Mine, a pure-play gold mine located approximately 35 kilometers northeast of the regional
capital, Manado, in North Sulawesi, Indonesia, through the Company’s wholly-owned
subsidiaries, PT Meares Soputan Mining (“MSM”) and PT Tambang Tondano Nusajaya
(“TTN”).
The Toka Tindung Gold Mine consists of two long-term Contract of Works (“CoWs”) covering
39,817 hectares, which cover into two administration areas in North Sulawesi, North Minahasa
and Bitung City districts (Figure 1). The CoWs are valid until 2041 and are held by MSM and
TTN. Pursuant to the Mining Law Amendment, MSM and TTN have been guaranteed two
more extensions of the CoWs in the form of Special Mining Business License/Izin Usaha
Pertambangan Khusus (“IUPK”), each for maximum period of 10 years.
                Figure 1. Map Location of MSM and TTN’s Contract of Works




Exploration activities carried out by the Company, through its subsidiaries, which are MSM
and TTN, for the period January 2025 to March 2025 were focused on Exploration drilling and,
Resource Definition drilling activities in Eastern Corridor Project and in Western Corridor
Project as presented in the map below (Figure 2).
Page 3
                                                                           No: 0012/ARCHI/4/2025/G
Below are the details of Exploration activities costs for the period January 2025 to March 2025:

   •   Total Exploration activities costs for the period January 2025 were US$780,822
   •   Total Exploration activities costs for the period February 2025 were US$704,135
   •   Total Exploration activities costs for the period March 2025 were US$706,953


Therefore, the total Exploration activities cost for the period January 2025 to March 2025
US$2,191,911
Meanwhile, the details of drilling activities for the period of January 2025 to March 2025 with
total of 84 holes and 19,833.2 meters were as follow:

   •   In January 2025, ARCI had conducted drilling at 30 holes with a total depth of 7,469.5
       meters.
   •   In February 2025, ARCI had conducted drilling at 24 holes with a total depth of 5,394.6
       meters.
   •   In March 2025, ARCI had conducted drilling at 30 holes with a total depth of 6,969.1
       meters.


Drilling activities for gold Resource Definition and Exploration, involved Diamond Drilling
(“DD”) and Reverse Circulation (“RC”) drilling methods, conducted by PT Maxidrill Indonesia.
Details number of drill programs by project and by month, are shown in Table 1.
Page 4
                                                                               No: 0012/ARCHI/4/2025/G



Table 1. 2025 Quarterly drilling statistics by prospect and drill type.

                                        Diamond Drilling (DD)         Reverse Circulation (RC)
                       Prospect
      Period                           Number of     Drilling         Number of      Drilling
                         Area
                                       Drill Holes    Meters          Drill Holes    Meters
                     Marawuwung              9         3,097.7             17        3,076.0
  January 2025       Wesco                   4         1,295.8
                     Sub Total              13        4,393.5             17             3,076.0
                     Marawuwung              8         2,507.5            12             2,113.0
  February 2025      Wesco                   4          774.1
                     Sub Total              12        3,281.6             12             2,113.0
   March 2025        Marawuwung              9         3,086.1            21             3,883.0
                     Sub Total               9        3,086.1             21             3,883.0
    Q1 TOTAL                                34        10,761.2            50             9,072.0
Page 5
                                                                 No: 0012/ARCHI/4/2025/G



Figure 2, Map of drilling progress for the period January 2025 to March 2025

File

File Open PDF
Source IDX
Size0.42 MB
Published15 Apr 2025
Pages5
Characters4,267
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org Archi Indonesia Tbk. p.1 ×5
unresolved org PT Meares Soputan Mining p.2
unresolved org PT Tambang Tondano Nusajaya p.2
unresolved org PT Maxidrill Indonesia. Details p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result