                                                                            PT Bumi Resources Minerals Tbk.
                                                                            Bakrie Tower, 6 & 10th Floor
                                                                            Komplek Rasuna Epicentrum
                                                                            Jl. H.R. Rasuna Said, Kuningan
                                                                            Jakarta Selatan 12940
                                                                            Indonesia

                                                                            T +62 21 5794 5698
                                                                            F +62 21 5794 5687
                                                                            www.bumiresourcesminerals.com


                                 LAPORAN TENTANG AKTIVITAS EKSPLORASI
                         OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK.
                                    (REPORT ON EXPLORATION ACTIVITIES
                           BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.)

 I.    PT Citra Palu Minerals


        Nama Perusahaan                               :   PT Citra Palu Minerals (“PT CPM”)
        (Name of Company)
        Tahap Kegiatan KK                             :   Operasi Produksi (Production Operation)
        (Phase of Activity of Contract of Work)
        Laporan Eksplorasi Periode                    :   Januari-Maret (Jan-March) 2025
        (Period of Exploration Report)


A.    Daerah Eksplorasi                                      Exploration Areas
      1. Blok I, Sulawesi Tengah (Operasi Produksi)          1. Block I, Central Sulawesi (Production
      2. Blok II, Sulawesi Selatan (Eksplorasi)                  Operation)
      3. Blok IV, Sulawesi Tengah (Eksplorasi)               2. Block II, South Sulawesi (Exploration)
      4. Blok V, Sulawesi Tengah (Eksplorasi)                3. Block IV, Central Sulawesi (Exploration)
      5. Blok VI, Sulawesi Tengah (Eksplorasi)               4. Block V, Central Sulawesi (Exploration)
                                                             5. Block VI, Central Sulawesi (Exploration)
B.    Biaya Eksplorasi                                       Exploration Cost
      1,117,767 Dolar AS                                     USD 1,117,767
C.    Bentuk Kegiatan Eksplorasi                             Form of Exploration Activities
      1. Melanjutkan kegiatan pengeboran sumber             1. Continue resource drilling program at the River
         daya di Prospek River Reef, Blok I Poboya,            Reef Prospect, Block I Poboya, with a current
         dengan total kedalaman saat ini 61.750,60m.           total depth of 61,750.60m.
      2. Melanjutkan kegiatan pengeboran sumber             2. Continue resource drilling program in the
         daya di area Watuputih, Blok I Poboya, dengan         Watuputih area, Block I Poboya, with a current
         total kedalaman saat ini 20.485,35m.                  total depth of 20,485.35m.
      3. Menyelesaikan       kegiatan      pengeboran       3. Completed exploration drilling program in the
         eksplorasi di area Prospek Hill Reef 1, Blok I        Hill Reef 1 Prospect area, Block I Poboya, with
         Poboya, dengan total kedalaman saat ini               a current total depth of 17,931.45m.
         17.931,45m.
      4. Melanjutkan kegiatan pengeboran eksplorasi         4. Continue exploration drilling program in the
         di area Prospek Barako Blok I Poboya, dengan          Barako Prospect area, Block I Poboya, with a
         total kedalaman saat ini 641,60m.                     current total depth of 641.60m.
      5. Memulai kegiatan pengeboran eksplorasi di          5. Initiate exploration drilling program in the
         area Blok IV prospek Anggasan, dengan total           Anggasan prospect Block IV, with a current
         kedalaman saat ini 893,90m.                           total depth of 893.90m.
      6. Melanjutkan kegiatan pemetaan geologi di           6. Continue geological mapping activities in Area
         Area Blok IV meliputi prospek Anggasan dan            Block IV Area including Anggasan and
Page 2
         Ogowele – Taanes, dengan total 136 sampel      Ogowele – Taanes prospect, with a total of
         batuan.                                        136 rock samples.
      7. Melakukan kegiatan pemetaan geologi di Area 7. Initiate geological mapping activities in Upper
         Upper Poboya Blok I, dengan total 129 sampel   Poboya Area Block I, with a total of 129 rock
         batuan dan 43 sample tanah.                    samples and 43 soil samples.
     8. Melakukan pengiriman sampel inti bor untuk 8. Carried out geochemical analysis from drill
         analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, core samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo,
         Mo, Hg dan kombinasi Au + ICP OES multi        Hg and combination of Au + ICP OES multi
         elemen) dan analisi AAT (Air Asam Tambang)     elements) and AAT (Acid Mine Drainage)
         ke Laboratorium PT Geoservices.                analysis by PT Geoservices Laboratory.
     9. Melakukan pengiriman sampel batuan dan 9. Carried out geochemical analysis from rock
         sampel tanah untuk analisis geokimia (Au, Ag,  samples and soil samples (Au, Ag, Cu, Pb, Zn,
         Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au    As, Sb, Mo, Hg and combination of Au + ICP
         + ICP OES multi elemen) ke Laboratorium PT     OES multi elements) and AAT (Acid Mine
         Geoservices.                                   Drainage) analysis by PT Geoservices
                                                                   Laboratory.
D.   Pihak-Pihak yang Terlibat                                 Involved Parties
     1. Laboratorium PT CPM                                    1. Internal PT CPM Laboratory
     2. PT Sumagud Sapta Sinar                                 2. PT Sumagud Sapta Sinar
     3. Laboratorium PT Geoservices                            3. PT Geoservices Laboratory
     4. Bureau Varitas – PT IOL Indonesia                      4. Bureau Varitas – PT IOL Indonesia
     5. PT Pos Indonesia                                       5. PT Pos Indonesia
     6. PT SN Cargo                                            6. PT SN Cargo
     7. PT Intertek Utama Service                              7. PT Intertek Utama Service
E.   Metode Pengujian dan Pemilihan Areal                      Testing Method and Selection Area
     1.   AAS                                                  1.  AAS
     2.   Specific Gravity                                     2.  Specific Gravity
     3.   Fire Assay                                           3.  Fire Assay
     4.   Aqua Regia Digest                                    4.  Aqua Regia Digest
     5.   Hg Analisis                                          5.  Hg Analysis
     6.   ICP OES 42 unsur                                     6.  ICP OES 42 elements
     7.   Natural density, dry density, saturated              7.  Natural density, dry density, saturated density,
          density, Brazillian test, direct shear, ultrasonic       Brazillian test, direct shear, ultrasonic velocity,
          velocity, UCS                                            UCS
     8. Analisis Air Asam Tambang                              8. ARD Test
F.   Kemajuan Eksplorasi Terhadap Kegiatan Triwulan            Exploration Progress toward the Preceding
     Sebelumnya                                                Quarter Activities
     1. Pengeboran sumber daya di Prospek River                1. Resources drilling program in River Reef
          Reef Blok 1 Poboya dilakukan dengan                      Prospect Block I Poboya was conducted using
          menggunakan 2 rig. Total 281 titik bor,                  2 rigs. A Total of 281 drill holes, included 3
          termasuk 3 titik bor hidrogeologi dan 13 titik           hydrogeology holes and 13 geotechnical
          bor geotek, dengan total kedalaman                       holes, with total depth of 61,750.60m has
          61.750,60m sampai akhir Maret 2025.                      been reached by the end of March 2025.
          Terdapat penambahan 4 titik bor dengan                   There are 4 additional drill holes with total
          jumlah kedalaman 1.313,40m dari periode                  depth of 1,313.40m from previous period.
          sebelumnya.
     2.   Pengeboran      sumberdaya     di    Prospek         2. Resources drilling program in Watuputih
          Watuputih Blok 1 Poboya dilanjutkan                     Prospect Block 1 Poboya was continued using
Page 3
     dengan menggunakan 1 rig. Total 64 titik             1 rigs. A total of 64 drill holes with total
     bor dengan total kedalaman 20.485,35m                depth of 20,485.35m has been reached by
     sampai akhir Maret 2025. Terdapat                    the end of March 2025. There are additional
     penambahan 2 titik bor dengan jumlah                 2 drill holes with total depth of 1,214.50m
     kedalaman        1.214,50m     dari    periode       from previous period.
     sebelumnya.
3.   Pengeboran eksplorasi di Prospek Hill Reef 1     3. Exploration drilling program in Hill Reef 1
     Blok 1 Poboya diselesaikan dengan                   Prospect Block 1 Poboya is completed using 1
     menggunakan 1 rig. Total 206 titik bor              rig. A total of 206 drill holes include 2
     termasuk 2 titik bor geoteknik dengan total         geotechnical drillholes with total depth of
     kedalaman 17.931,45m sampai akhir Maret             17,931.45m has been reached by the end of
     2025. Terdapat penambahan 1 titik bor               March 2025. There are additional 1 drill holes
     dengan jumlah kedalaman 58.00m dari                 with total depth of 58.00m from previous
     periode sebelumnya.                                 period.
4.   Pengeboran eksplorasi di Prospek Barako          4. Exploration drilling program in Barako
     Blok 1 Poboya dilanjutkan dengan                    Prospect Block 1 Poboya is continue using 1
     menggunakan 1 rig. Total 3 titik bor                rig. A total of 3 drill holes with total depth of
     termasuk dengan total kedalaman 641,60m             641.60m has been reached by the end of
     sampai akhir Maret 2025. Terdapat                   March 2025. There are additional 2 drill holes
     penambahan 2 titik bor dengan jumlah                with total depth of 440.70m from previous
     kedalaman         440,70m     dari     periode      period.
     sebelumnya
5.   Pengeboran eksplorasi di Blok IV Prospek         5. Exploration drilling program Block IV in
     Anggasan dimulai dengan menggunakan 1               Anggasan Prospect is started using 1 rig. A
     rig. Total 3 titik bor dengan total kedalaman       total of 3 drill holes with total depth of
     893,90m sampai akhir Maret 2025.                    893,90m has been reached by the end of
6.   Penambahan jumlah sampel sebanyak 1.161             March 2025.
     sampel hasil pengeboran Prospek River Reef       6. Additional 1,161 drill core samples from River
     Blok I Poboya yang dikirim ke Laboratorium          Reef Prospect of Block I Poboya drilling
     PT Geoservices untuk dianalisis geokimia            program have been sent to PT Geoservices
     (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan             Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
     kombinasi Au + ICP 42 unsur), serta 22              As, Sb, Mo, Hg and combination Au + ICP 42
     sampel untuk analisis AAT (Air Asam                 elements), also 22 samples for ARD (Acid
     Tambang)                                            Rock Drainage).
7.   Penambahan jumlah sampel sebanyak 1.199          7. Additional 1,199 drill core samples from
     sampel hasil pengeboran Prospek Watuputih           Watuputih Prospect of Block I Poboya drilling
     Blok I Poboya yang dikirim ke Laboratorium          program have been sent to PT Geoservices
     PT Geoservices untuk dianalisis geokimia            Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
     (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan             As, Sb, Mo, Hg and combination Au + ICP 42
     kombinasi Au + ICP 42 unsur.                        elements).
8.   Penambahan jumlah sampel sebanyak 39             8. Additional 39 drill core samples from Hill Reef
     sampel hasil pengeboran Prospek Hill Reef 1         1 Prospect of Block I Poboya drilling program
     Blok I Poboya yang dikirim ke Laboratorium          have been sent to PT Geoservices Laboratory
     PT Geoservices untuk dianalisis geokimia            to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo,
     (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan             Hg and combination Au + ICP 42 elements)
     kombinasi Au + ICP 42 unsur dan 33 sampel           and 33 sample for ARD (Acid Rock Drainage).
     untuk analisis air asam tambang.
9.   Penambahan jumlah sampel sebanyak 708            9. Additional 708 drill core samples from Block
     sampel hasil pengeboran Blok IV Prospek             IV Anggasan Prospect drilling program have
Page 4
         Anggasan yang dikirim ke Laboratorium PT          been sent to PT Geoservices Laboratory to be
         Geoservices untuk dianalisis geokimia (Au,        analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg
         Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan                and combination Au + ICP 42 elements) and
         kombinasi Au + ICP 42 unsur dan 33 sampel         33 sample for ARD (Acid Rock Drainage).
         untuk analisis air asam tambang.
     10. Total penambahan sebanyak 129 sampel          10. Total additional 129 rock samples and 43 soil
         batuan dan 43 sampel tanah berasal dari           samples collected from geological mapping
         kegiatan pemetaan geologi di area Upper           activity at Upper Poboya area Block I.
         Poboya Blok I.
     11. Total penambahan sebanyak 136 sampel          11. Total additional 136 rock samples collected
         batuan dari kegiatan pemetaan geologi di          from geological mapping activity at Anggasan
         area Anggasan dan Ogowele – Taanes Blok           and Ogowele – Taanes area Block IV.
         IV.
G.   Rencana Selanjutnya                               Next Plan
     1.   Melanjutkan kegiatan pengeboran di Prospek   1. Continue resources drilling program in River
          River Reef Blok I Poboya dengan tujuan           Reef Prospect of Block I Poboya Prospect with
          untuk menambah sumber daya di Prospek            objectives to increase resources in River Reef
          River Reef.                                      Prospect.
     2.   Melanjutkan kegiatan pengeboran di Prospek   2. Continue resources drilling program in
          Watuputih Blok I Poboya dengan tujuan            Watuputih Prospect of Block I Poboya
          untuk meningkatkan sumber daya di Prospek        Prospect with the objective of resources
          Watuputih.                                       definition in Watuputih Prospect.
     3.   Melanjutkan kegiatan pengeboran eksplorasi   3. Continue exploration drilling program in
          di Prospek Anggasan Blok IV dengan tujuan        Anggasan Prospect Block IV with the objective
          untuk menguji hasil pemetaan geologi             is to test the geological and geophysical
          permukaan dan anomaly geofisika.                 features from previous program..
     4.   Melanjutkan pemetaan geologi detil di area   4. Continue geological detailed mapping at
          Ogowele – Taanes dan Anggasan Blok IV.           Ogowele – Taanes and Anggasan area Block
                                                           IV.
H.   Hambatan Eksplorasi                               Barriers to Exploration
     1.    Kegiatan penambangan tanpa izin (PETI)      1. Illegal mining activities by local community.
           oleh masyarakat sekitar.
     2. Pembebasan lahan.                              2. Land acquisition.
     3. Area eksplorasi regional yang masih sulit      3. Remote area for regional exploration.
           dijangkau.
I.   Perizinan/ Persetujuan Baru Yang Diperoleh        New Permits/Approvals Acquired
     -                                                 -
Page 5
II.   PT. Dairi Prima Mineral


Nama Perusahaan                      :   PT Dairi Prima Mineral
(Name of Company)
Tahap Kegiatan KK                    :   Operasi Produksi
(Phase of Activity of Contract of
Work)
Laporan Eksplorasi Bulan             :   Januari-Maret (Jan-March) 2025
(Monthly Exploration Report)


A.    Daerah Eksplorasi                                  Exploration Areas
      Kegiatan eksplorasi pada Prospek Anjing Hitam      Filed exploration activities on Anjing Hitam
      sudah selesai dilakukan dan saat ini prospek       Prospect has already been completed. The
      tersebut memasuki tahap Operasi Produksi.          prospect currently is in Operation and
      Selain Prospek Anjing Hitam, di dalam wilayah      Production stage.
      Kontrak Karya DPM masih terdapat prospek-          Beside Anjing Hitam Prospect, there are some
      prospek lainnya dengan tahap kegiatan yang         other prospect areas within DPM Contract of
      berbeda-beda dari eksplorasi regional hingga       Work tenement. The prospects work progress
      pengeboran deliniasi sumberdaya.                   are in different stages, range from regional
      Salah satu prospek yang paling maju                exploration to delineation resource drilling.
      pengerjaannya adalah Prospek Lae Jehe yang         Lae Jehe Prospect is the most advantage
      terletak sekitar 200 meter di sebelah baratlaut    exploration activities. This prospect is situated
      Prospek Anjing Hitam. Prospek ini sudah            approximately 200 meters toward northwest
      memasuki       tahap   pengeboran      deliniasi   from Anjing Hitam Prospect. This prospect
      sumberdaya dan masih akan dikembangkan             work stage is in resource delineation drilling
      hingga didapatkan sumberdaya mineral dengan        and will be developed to get final mineral
      klasifikasi terukur dan tertunjuk yang lebih       resource value with dominant measured and
      dominan.                                           indicated mineral resources classification.
B.    Biaya Eksplorasi                                   Exploration Costs
      67.372,15 Dolar AS                                 USD 67,372.15
C.    Bentuk Kegiatan Eksplorasi                         Form of Exploration Activities
      Penyelesaian Dokumen Sumber Daya             dan   Completion of Resource and Reserve
      Cadangan sesuai format SNI 4726:2019.              Documents according to SNI 4726:2019
                                                         format.
 B    Pihak-Pihak yang Terlibat                          Parties Involved
      Miningone Indonesia                                Miningone Indonesia
E.    Metode Pengujian dan Pemilihan Areal               Testing Method and Selection of Area
      -                                                  -
F.    Kemajuan Eksplorasi Terhadap Bulan sebelumnya      Exploration Progress relative to Preceding
                                                         Month’s Activities
      -                                                  -
G.    Rencana Pengeboran Selanjutnya                     Next Drilling Plan
      Penambahan titik bor di Prospek Lae Jehe     dan   Infill drilling in Lae Jehe and Basecamp
      Basecamp.                                          Prospect.
Page 6
H.   Hambatan Eksplorasi                           Barriers to Exploration
     -                                             -
I.   Perizinan / Persetujuan Baru Yang Diperoleh   New Permits / Approvals Acquired
     • Persetujuan Addendum Amdal tanggal 11       • Letter of Addendum AMDAL Approval 11
       Agustus 2022.                                 August 2022.
     • Persetujuan RKAB untuk Tahun 2024-2026      • DPM 2024-2026 work plan approval
       Nomor: T-1793/MB.04/DJB.M/2024 tanggal        (RKAB) No. T-1793/MB.04/DJB.M/2024,
       14 Oktober 2024.                              14 October 2024.
     • Tahap kegiatan PT DPM disesuaikan menjadi   • PT DPM work activity has already been
       Tahap Operasi Produksi berdasarkan Surat      adjusted became Operation Production
       Keputusan Menteri Energi dan Sumber Daya      Phase based on Decree of Energy and
       Mineral No. 456.K/30/DJB/201t                 Mineral    Resources  Minister   No.
                                                     456.K/30/DJB/2017
Page 7
III.   PT Gorontalo Minerals
Nama Perusahaan                              :   PT Gorontalo Minerals (“PT GM”)
(Name of Company)
Tahap Kegiatan KK                            :   Operasi Produksi (Production Operation)
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Bulan                     :   Januari-Maret (Jan-March) 2025
(Monthly Exploration Report)


A.     Daerah Eksplorasi                                Exploration Areas
       1. Prospek Motomboto North,           Blok   I   1. Motomboto       North    Prospect, Block  I
          (Tombulilato), Gorontalo                         (Tombulilato), Gorontalo
       2. Prospek    Motomboto       East,   Blok   I   2. Motomboto       East    Prospect,  Block  I
          (Tombulilato), Gorontalo                         (Tombulilato), Gorontalo
       3. Kompleks Cabang Kiri, Blok I (Tombulialto),   3. Cabang Kiri Complex, Block I (Tombulilato),
          Gorontalo                                        Gorontalo
B.     Biaya Eksplorasi                                 Exploration Costs
       1.552.998,48 Dolar AS                            USD 1,552,998.48
C.     Bentuk Kegiatan Eksplorasi                       Form of Exploration Activities
       1. Melanjutkan uji metalurgi tahap II dengan     1. Continuing the second phase of metallurgical
          berkooridinasi bersama tim penyusun BED          testing in coordination with the BED Heap
          Heap Leach Project untuk big column test         Leach Project team for the big column test for
          terhadap sampel dengan komposisi 2               2 composite samples of Motomboto North
          sampel komposit dari Prospek Motomboto           Prospect and 3 composite samples of
          North dan 3 sampel komposit dari Prospek         Motomboto East Prospect, Block I Tombulilato.
          Motomboto East, Blok I Tombulilato.              Sample preparation has been completed by
          Preparasi sampel sudah dilakukan oleh Tim        the External Lab Team.
          Eksternal Lab.
       2. Melakukan pengambilan sampel batuan           2. Conducting surface rock samples collecting
          bersamaan dengan kegiatan soil sampling di       alongside with soil sampling in Main Ridge,
          Main Ridge, Kayubulan, Gunung Lintah,            Kayubulan, Gunung Lintah, Mono Anomaly,
          Mono Anomaly, dan Mamungaa North                 and Mamungaa North Anomaly, Block I
          Anomaly, Blok I Tombulilato sebanyak 59          Tombulilato with total 59 samples have been
          sampel     yang  telah    dikirimkan   ke        sent to PT Geoservices Laboratory for
          Laboratorium PT Geoservices untuk analisis       geochemical analysis.
          geokimia..
       3. Melakukan kegiatan ridge spur soil sampling   3. Conducting ridge spur soil sampling at Main
          di Main Ridge, Kayubulan, Gunung Lintah,         Ridge, Kayubulan, Gunung Lintah, Mono
          Mono Anomaly, dan Mamungaa North                 Anomaly, dan Mamungaa North Anomaly,
          Anomaly, Blok I Tombulilato dengan total         Block I Tombulilato with total of 662 soil have
          sampel tanah sebanyak 662 sampel yang            been sent to PT Geoservices Laboratory for
          telah dikirimkan ke Laboratorium PT              geochemical analysis.
          Geoservices untuk analisis geokimia.
       4. Melanjutkan estimasi sumber daya dan          4. Continuing   the estimation of mineral
          cadangan     mineral      untuk    Prospek       resources and reserves for Motomboto East
          Motomboto East dan Motomboto North,              and Motomboto North Prospects, as well as
          serta domain oxide dari Prospek Sungai Mak       the oxide domain of Sungai Mak Prospect,
Page 8
         Blok I Tombulilato.                              Block I Tombulilato.
     5. Melanjutkan pengeboran eksplorasi di area      5. Continuing exploration drilling in Cabang Kiri
        Prospek Cabang Kiri East, Blok I Tombulilato      East Prospect area, Block I Tombulilato with
        dengan total kedalaman pengeboran saat            current drilling progress 3349,50 metres from
        ini 3349,50 meter dari total rencana              a total newest plan of 67,612.30 metres and
        67.612,30 meter dan telah menyelesaikan 3         already completed 3 drillholes out of 69
        lubang bor dari total 69 rencana lubang bor.      planned drill holes.
     6. Total sampel pengeboran Prospek Cabang         6. A total of 1710 core samples from Cabang Kiri
        Kiri East, Blok I Tombulilato sebanyak 1710       East Prospect area, Block I Tombulilato have
        conto inti bor telah dikirimkan ke                been sent to the PT Geoservices Laboratory for
        Laboratorium PT Geoservices untuk analisis        geochemical analysis.
        geokimia.
     7. Melakukan pengeboran geoteknik dan             7. Conducting geotechnical and hydrogeology
        hidrogeologi pada   area Motomboto                drilling in Motomboto area with 16 drillholes
        sebanyak 16 lubang bor dengan total               and total depth 685,8 meters.
        kedalaman pengeboran mencapai 685,8
        meter.
     8. Total sampel pengeboran geoteknik dan          8. Total     samples from geotechnical and
        hidrogeologi terdiri atas 30 sampel UDS,           hydrogeology drilling consist of 30 UDS
        128 sampel SPT, dan 11sampel RS.                   Samples, 128 SPT Samples, and 11 RS
                                                           Samples.
D.   Pihak-Pihak yang Terlibat                         Parties Involved
     1. Laboratorium PT Geoservices.                   1. PT Geoservices’ Laboratory.
     2. PT Sumagud Sapta Sinar.                        2. PT Sumagud Sapta Sinar.
     3. PT Minera Nusa Drillindo.                      3. PT Minera Nusa Drillindo.
     4. PT Solusi Geotek Optima.                       4. PT Solusi Geotek Optima.
     5. Jarvis Sinergi Yasa.                           5. Jarvis Sinergi Yasa.
E.   Metode Pengujian dan Pemilihan Areal              Testing Method and Selection of Area
     -                                                 -
F.   Kemajuan Eksplorasi         Terhadap   Kegiatan   Exploration Progress toward Previous Quarter’s
     Triwulan Sebelumnya                               Activities
     1. Menyelesaikan compacted permeability test      1. Completing compacted permeability test
        yang merupakan bagian dari uji metalurgi           which is part of the second phase of
        tahap II terhadap sampel dengan komposisi          metallurgical testing for 2 composite samples
        2    sampel     komposit   dari   Prospek          of Motomboto North Prospect and 3
        Motomboto North dan 3 sampel komposit              composite samples of Motomboto East
        dari Prospek Motomboto East, Blok I                Prospect, Block I Tombulilato.
        Tombulilato.
     2. Penambahan jumlah sampel batuan                2. The addition of 59 surface rock samples from
        permukaan sebanyak 59 sampel dari area            Main Ridge, Kayubulan, Mono Anomaly, and
        Main Ridge, Kayubulan, Mono Anomaly,              Mamungaa North Anomaly, has been sent to
        dan Mamungaa North Anomaly yang telah             the PT Geoservices Laboratory for geochemical
        dikirimkan ke Laboratorium PT Geoservices         analysis during this period.
        untuk analisis geokimia dalam periode ini.
     3. Menyelesaikan pengujian Geokimia sampel        3. Completing geochemical testing of 52 surface
        batuan permukaan sebanyak 52 sampel               rock samples from Main R,idge, Kayubulan,
Page 9
         dari area Main Ridge, Kayubulan, Mono              Mono Anomaly, dan Mamungaa                North
         Anomaly, dan Mamungaa North Anomaly,               Anomaly, Block I Tombulilato.
         Blok I Tombulilato.
     4. Penambahan       jumlah    sampel   tanah        4. The addition of 662 soil samples from Main
        sebanyak 662 sampel dari area Main Ridge,           Ridge, Kayubulan, Gunung Lintah, Mono
        Kayubulan,    Gunung       Lintah,  Mono            Anomaly, dan Mamungaa North Anomaly, has
        Anomaly, dan Mamungaa North Anomaly,                been sent to the PT Geoservices Laboratory for
        yang telah dikirimkan ke Laboratorium PT            geochemical analysis during this period.
        Geoservices untuk analisis geokimia dalam
        periode ini.
     5. Menyelesaikan pengujian Geokimia sampel          5. Completing the geochemical testing of 404
        tanah sebanyak 404 sampel dari Main                 soil samples from Main Ridge, Kayubulan,
        Ridge, Kayubulan, Gunung Lintah, Mono               Gunung Lintah, Mono Anomaly, dan
        Anomaly, dan Mamungaa North Anomaly,                Mamungaa North Anomaly, Block I
        Blok I Tombulilato.                                 Tombulilato.
     6. Melakukan aktivitas pengeboran di Prospek        6. Conducting drilling activities in Cabang Kiri
        Cabang Kiri East, Blok I Tombulilato dengan         East Prospect, Block I Tombulilato with drilling
        kedalaman pengeboran 1406,70 meter dari             depth 1406,70 of total drilling depth 3,349.50
        total kedalaman pengeboran 3349,50                  metres and completing 2 additional drillholes.
        meter dan telah menyelesaikan tambahan 2
        lubang bor.
     7. Penambahan sampel pengeboran Prospek             7. Additional drilling core samples from Cabang
        Cabang Kiri East, Blok I Tombulilato                Kiri Prospect, Block I Tombulilato, with total
        sebanyak 1061 conto inti bor yang telah             1061 drill core samples, has been sent to the
        dikirimkan ke Laboratorium PT Geoservices           PT Geoservices Laboratory for geochemical
        untuk analisis geokimia.                            analysis.
     8. Mulai melakukan pengeboran geoteknik             8. Starting geotechnical and hydrogeology
        dan hidrogeologi pada area Kompleks                 drilling in Motomboto Complex area with
        Motomboto dengan kemajuan sebanyak                  progress 16 drillholes and total depth 685,8
        16 lubang bor dengan total kedalaman                meters.
        pengeboran mencapai 685,8 meter.
     9. Melakukan pengambilan 30 sampel UDS,             9. Collecting 30 UDS samples, 128 SPT samples,
        128 sampel SPT, dan 11 sampel RS dari               and 11 RS samples from geotech and
        pengeboran geoteknik dan hidrogeologi di            hydrogeology drilling in Motomboto Complex.
        area Kompleks Motomboto.
G.   Rencana Selanjutnya                                 Next Plan
     1. Melanjutkan kegiatan pengambilan sampel          1. Continuing geological mapping and surface
        batuan permukaan di area Gunung Lintah,              rock sampling in Main Ridge, Cabang Kanan,
        Cabang Kanan, dan Kayubulan bersamaan                and Kayubulan alongside with soil sampling
        dengan kegiatan soil sampling.                       activities.
     2. Melakukan kegiatan ridge spur soil sampling      2. Conducting ridge spur soil sampling at the
        pada area Gunung Lintah, Cabang Kanan,               Gunung Lintah, Cabang Kanan, and
        dan Kayubulan.                                       Kayubulan area.
     3. Melanjutkan        kegiatan     pengebeorn       3. Continuing exploration drilling activities in
        eksplorasi di Prospek Cabang Kiri East, Blok I       Cabang Kiri East Prospect, Block I
        Tombulilato.                                         Tombulilato.
     4. Melanjutkan estimasi sumber daya dan             4. Continuing mineral resource and reserve
Page 10
         cadangan    mineral    untuk   Prospek         estimation for the Motomboto East and
         Motomboto East dan Motomboto North,            Motomboto North Prospects, as well as the
         serta domain oxide dari Prospek Sungai         oxide domain of the Sungai Mak Prospect.
         Mak.                                      5.   Continuing geotechnical and hydrogeology
     5. Melanjutkan pengeboran geoteknik dan            drilling in Motomboto Complex area, Block I
        hidrogeologi  pada     area    Kompleks         Tombulilato.
        Motomboto, Blok I Tombulilato.             6.   Preparing for sterilization drilling activities at
     6. Melakukan persiapan kegiatan pengeboran         Motomboto Complex area, Block I
        Sterilisasi di area Kompleks Motomboto,         Tombulilato.
        Blok I Tombulilato.
H.   Hambatan Eksplorasi                           Barriers to Exploration
     1. Munculnya aktivitas Penambangan Tanpa      1. New Illegal Mining Activities (PETI) in the
        Izin (PETI) baru di area sepanjang jalur       opening area alongside the pioneering road
        bukaan jalan perintis.                         construction.
     2. Adanya aktivitas Penambangan Tanpa Izin    2. Illegal Mining Activities (PETI) in Motomboto
        (PETI) di area Kompleks Motomboto.             Complex area.
I.   Perizinan/Persetujuan Baru Yang Diperoleh     New Permits/Approvals Acquired
     -                                             -
Page 11
 IV.    PT Linge Mineral Resources
 Nama Perusahaan                                 :   PT Linge Mineral Resources (“PT LMR”)
 (Name of Company)
 Tahap Kegiatan IUP                              :   Eksplorasi (Exploration)
 (Phase of Activity of Mining Permit)
 Laporan Eksplorasi Periode                      :   Oktober-Desember (October-December) 2024
 (Period of Exploration Report)



A.     Daerah Eksplorasi                                     Exploration Areas
       1. Prospek Bulan (Proyek Abong)                       1. Bulan Prospect (Abong Project)
       2. Prospek Bintang 1 (Proyek Abong)                   2. Bintang 1 Prospect (Abong Project)
       3. Prospek Bintang 2 (Proyek Abong)                   3. Bintang 2 Prospect (Abong Project)
       4. Eksplorasi Regional (Semua Lokasi dalam IUP)       4. Regional Exploration (Located by IUP)
B.     Biaya Eksplorasi                                      Exploration Cost
       273.061 Dolar AS                                      USD 273.061
C.     Bentuk Kegiatan Eksplorasi                            Form of Exploration Activities
       1. Melanjutkan studi untuk memenuhi kebutuhan         1. Continuing studies to for AMDAL including
          AMDAL       meliputi     Studi   Geoteknik,           Geotechnical, Hydrogeology, and Metallurgical
          Hidrogeologi, dan Metalurgi.                          studies.
       2. Melanjutkan kegiatan studi menggunakan alat        2. Continuing activities studies using drilling tools
          pengeboran dengan Rig Sumatech 200                    with a Sumatech 200 Rig with a maximum
          maksimal kedalaman studi 150m.                        study depth of 150m.
       3. Melanjutkan pengeboran sesuai kebutuhan            3. Continuing drilling activities according to
          teknis terkait data untuk dilakukan studi             technical needs regarding data to carry out
          geotek, hidrogeologi, dan metalurgi di dalam          metallurgical,          geotechnical          and
          Proyek Abong.                                         hydrogeological studies in the Abong Project.
       4. Melanjutkan kegiatan pemetaan geologi detil        4. Continuing detailed geological mapping
          atau follow up work dan dekstop study                 activities or follow up work and dekstop
       5. Melanjutkan kegiatan rekonstruksi core dari           studies
          pengeboran sebelumnya.                             5. Continuing core reconstruction from historical
       6. Total sampel batuan inti sebanyak 410 sampel          drillhole.
          studi telah dikirimkan ke Laboratorium PT          6. A Total 410 core sample study have been sent
          Geoservices untuk analisis geokimia.                  to PT Geoservices Laboratory for geochemical
       7. Total sampel batuan sebanyak 15 sampel studi          analysis.
          telah   dikirimkan    ke  Laboratorium    PT       7. A Total 15 rock sample study have been sent to
          Geoservices     untuk    analisis  metalurgi          PT Geoservices Laboratory for preliminary
          pendahuluan.                                          metallurgical analysis.
       8. Total sampel batuan inti sebanyak 29 sampel        8. A Total 29 core sample study have been sent to
          studi telah dikirimkan ke PT Jarvis Sinergi Yasa      PT Jarvis Sinergi Yasa for geotechnical
          untuk uji geoteknik laboratorium.                     laboratorium testwork.
       9. Melanjutkan Proses penyelesaian studi AMDAL,       9. The process of completing the AMDAL study
          Mendapatkan Persetujuan Teknis di Bidang              and has received Technical Approval in the
          Pengelolaan Limbah B3 untuk Kegiatan                  Field of Hazardous Waste Management for
Page 12
        Penimbunan Limbah B3 (LB3) dan permohonan           Hazardous Waste Storage Activities (LB3) and
        Persetujuan Teknis Pembuangan Air Limbah ke         requesting Technical Approval for Waste Water
        Badan Permukaan Air (BMAL).                         Disposal to Surface Water Bodies (BMAL)
     10.     Menunggu persetujuan Adendum Studi          10.     Waiting     approved    Addendum      of
        Kelayakan PT LMR oleh Direktorat Jenderal           Feasibility Study of PT LMR by Directorate
        Mineral dan Batubara. Saat ini dokumen              General of Mineral and Coal. Currently the
        sedang dievaluasi oleh Direktorat Jenderal          document is being evaluated by Directorate
        Mineral dan Batubara.                               General of Mineral and Coal
D.   Pihak-Pihak yang Terlibat                           Involved Parties
     PT Bahtera Ratu Engineering                         PT Bahtera Ratu Engineering
     PT Geoservices                                      PT Geoservices
     PT Namsuma Luban Abadi (Studi Drilling)             PT Namsuma Luban Abadi (Drilling Study)
     PT Jarvis Sinergi Yasa (Geotek-hidro studi)         PT Jarvis Sinergi Yasa (Geotech-hydro study)
E.   Metode Pengujian dan Pemilihan Areal                Testing Method and Selection Area
     - Specific Gravity                                  - Specific Gravity
     - Fire Assay                                        - Fire Assay
     - CN Leach                                          - CN Leach
     - ICP OES 4 Acid Trace                              - ICP OES 4 Acid Trace
     - Uji Pulverized Bottle Roll Testwork               - Pulverized Bottle Roll Testwork
     - Uji Slug Test (Hidrogeologi)                      - Slug Test (Hydrogeology)
     - Uji Packer Test (Hidrogeologi)                    - Packer Test (Hydrogeology)
     - Uji Sifat Fisik (Geoteknik)                       - Physical Properties Test (Geotechnical)
     - Uji Kuat Tekan Bebas (Geoteknik)                  - Uniaxial         Compresive    Strength     Test
     - Uji Kuat Geser Langsung (Geoteknik)                  (Geotechnical)
                                                         - Direct Shear Test (Geotechnical)
F.   Kemajuan Eksplorasi Terhadap Kegiatan Triwulan      Exploration Progress toward the Preceding
     Sebelumnya                                          Quarter Activities
     1. Menyelesaikan kegiatan pengeboran studi          1. Completing drilling study Stage 1 acticities
        (geoteknik, hidrogeologi, dan metalurgi) tahap      (Geotech, Hydrogeology, and Metallurgy) with
        1 dengan total kedalaman studi 2000m.               a total 2000m depth.
     2. Melakukan studi geoteknik, hidrogeologi, dan     2. Conducting         study   of     geotechnical,
        metalurgi serta tracing sinkhole di lingkup         hydrogeology, metallurgy, and tracing sinkhole
        Abong.                                              at Abong area.
     3. Menyelesaikan kegiatan rekonstruksi core dari    3. Completing core reconstruction activities from
        pengeboran sebelumnya.                              historical drillhole.
     4. Melanjutkan kegiatan pemetaan geologi detil      4. Continuing detailed geological mapping
        atau follow up work dan desktop study               activities or follow up work and Dekstop
     5. Menyelesaikan analisis geokimia 610 sampel          studies
        batuan inti di Laboratorium PT Geoservices.      5. Completing the geochemical analysis of 610
     6. Menyelesaikan analisis metalurgi pendahuluan        drillcore samples by PT Geoservices Laboratory.
        15 sampel batuan di Laboratorium PT              6. Completing the preliminary metallurgy analysis
        Geoservices.                                        of 15 rock samples by PT Geoservices
     7. Proses Persetujuan Adendum Studi Kelayakan          Laboratory.
        oleh Direktorat Jenderal Mineral dan Batubara,   7. Approved Procces Addendum FS by Directorate
        melanjutkan penyelesaian AMDAL serta                General of Mineral and Coal, continue to
Page 13
        permohonan Persetujuan Teknis Pemenuhan                 complete the AMDAL study and Technical
        Baku Mutu Air Limbah dalam rangka                       Approval for Waste Water Disposal to Surface
        Pembuangan Air Limbah ke Badan Permukaan                Water Bodies.
        Air.
G.   Rencana Selanjutnya                                     Next Plan
     1. Melanjutkan kegiatan pemetaan detail geologi         1. Continuing geology exploration detail activities
        atau follow up work di area Proyek Abong.               or follow up work in the Abong Project area.
     2. Melanjutkan kegiatan eksplorasi regional atau        2. Continuing regional exploration activities or
        follow up work di luar Prospek Abong, yaitu             follow up work outside the Abong Prospect,
        North Bintang, North Bulan, Lumut (Ujung                namely North Bintang, North Bulan, Lumut
        Kambing dan Genting Kari).                              (Ujung Kambing and Genting Kari).
     3. Memulai kegiatan pengeboran studi Tahap 2            3. Starting drilling study stage 2 activity according
        sesuai kebutuhan teknis terkait data untuk              to technical needs regarding data to carry out
        dilakukan studi metalurgi dan geotek                    metallurgical studies and additional geotech in
        tambahan, di dalam Proyek Abong dengan rata             the Abong Project with depth 40-60 meters
        rata kedalaman 40-60 meter                           4. Continuing Geotechnical, Sinkhole analysis,
     4. Melanjutkan Studi Geoteknik, Analisis Sinkhole,         and Metallurgy Study scope Abong area.
        dan Metalurgi lingkup Abong.                         5. Obtain Addendum Feasibility Study Techno
     5. Mendapatkan Persetujuan Tekno Ekonomi                   Economy Approval from Directorate General of
        Adendum Studi Kelayakan dari Direktorat                 Mineral and Coal.
        Jenderal Mineral dan Batubara.                       6. Continuing to complete the AMDAL study
     6. Melanjutkan penyelesaian studi           AMDAL          included technical.
        termasuk sidang teknis terbatas
H.   Hambatan Eksplorasi                                     Barriers to Exploration
     1. Penambangan Tanpa Izin (PETI) di Prospek             1. There are Illegal Mining (PETI) activities in Bulan
        Bulan.                                                  Prospect.
     2. Penambangan Tanpa Izin (PETI) di Area Sungai         2. There are Illegal Mining (PETI) activities in Main
        utama dengan menggunakan alat berat.                    River with heavy equipment (Excavator).
     3. Munculnya  pihak      ketiga   yang           akan   3. The emergence of a third party that will
        mengakomodir PETI di Prospek Abong.                     accommodate PETI in the Abong Prospect.
     4. Aktivitas Illegal Logging di Lokasi PT LMR.          4. There are Illegal Logging activities in LMR Area.
I.   Perizinan/Persetujuan Baru Yang Diperoleh               New Permits/Approvals Acquired
     1. Persetujuan Teknis di Bidang Pengelolaan             1. Technical Approval in the Field of Hazardous
        Limbah B3 untuk Kegiatan Penimbunan                     Waste Management for Hazardous Waste
        Limbah B3 untuk Penghasil PT Linge Mineral              Storage Activities for Producer PT Linge Mineral
        Resources                          Nomor:               Resources                               Number:
        S.682/PSLB3/PLB3/PLB.3/10/2024 tanggal 18               S.682/PSLB3/PLB3/PLB.3/10/2024 dated 18
        Oktober 2024.                                           October 2024.
     2. Persetujuan Perpanjangan Suspensi Izin Usaha         2. Approval of Extension of Suspension of Mining
        Pertambangan Tahap Kegiatan Eksplorasi PT               Business Permit for Exploration Activity Phase
        Linge    Mineral   Resources.   Nomor:     T            of PT Linge Mineral Resources Number: T
        2290/MB.04/DJB.M/2024 tanggal 17 Desember               2290/MB.04/DJB.M/2024 dated 17 December
        2024 berlaku 25 Februari 2025 – 25 Februari             2024 valid from 25 February 2025 – 25
        2026.                                                   February 2026
Page 14
 V.    PT Suma Heksa Sinergi
 Nama Perusahaan                                 :   PT Suma Heksa Sinergi (“PT SHS”)
 (Name of Company)
 Tahap Kegiatan IUP                              :   Operasi Produksi (Production Operation Phase)
 (Phase of Activity of Mining Permit)
 Laporan Eksplorasi Periode                      :   Januari-Maret (Jan-March) 2025
 (Period of Exploration Report)


A.    Daerah Eksplorasi                                       Exploration Areas
      Prospek Cisadang Central dan Pasir Awi                  Cisadang Central and Pasir Awi Prospect
B.    Biaya Eksplorasi                                        Exploration Cost
      333.313 Dolar AS                                        USD 333.313
C.    Bentuk Kegiatan Eksplorasi                              Form of Exploration Activities
      1.   Melanjutkan kegiatan pemetaan geologi di           1. Continuing geological mapping activities in
           Pasir Awi                                              the Pasir Awi Prospect.
      2.   Melanjutkan    kegiatan    rekonstruksi   core     2. Continuing core drilling reconstruction
           pengeboran.                                            activities.
      3.   Melakukan kegiatan pengeboran di Prospek           3. Conducting drilling activities at the Cisadang
           Cisadang Central untuk program pemboran                Central Prospect for infill resources program.
           sumberdaya.                                        4. Continuing to collaborate with consultant for
      4.   Melanjutkan kerjasama dengan konsultan                 JORC Reserve.
           untuk cadangan JORC.                               5. Continuing to collaborate with consultant for
      5.   Melanjutkan kerjasama dengan konsultan                 Metallurgy and Processing study.
           untuk studi Metallurgy dan Processing.             6. Sending a total 1245 drill core samples from
      6.   Melakukan pengiriman sampel inti bor                   infill resources drilling         program for
           sejumlah 1245 conto dari kegiatan pemboran             geochemical analysis (Au, Ag) with fire assay
           infill sumberdaya untuk analisa geokimia (Au,          and ICP OES.
           Ag) dengan metode fire assay dan ICP OES.          7. Sending a total 20 drill core samples from
      7.   Melakukan pengiriman sample inti bor                   geotechnic studies drilling program to PT
           sejumlah 20 conto dari kegiatan pemboran               LAPI-ITB for analysis of physical properties and
           studi geoteknik ke PT LAPI-ITB untuk analisa           mechanical properties of rocks.
           sifat fisik dan sifat mekanik batuan.              8. Sending a total 90 drill core samples from
      8.   Melakukan pengiriman sampel inti bor                   historical drillcore data for preliminary
           sejumlah 90 conto dari data pengeboran                 metallurgical testwork with PBRT and CBRT
           historical untuk uji preliminary metalurgi PBRT        analysis in Cisadang West prospect.
           & CBRT di prospek Cisadang West.                   9. Continuing the Forest Area Use Approval
      9.   Melanjutkan proses permohonan Persetujuan              (“PPKH”) application process for further
           peninjauan kembali Penggunaan Kawasan                  exploration.
           Hutan (“PPKH”) untuk eksplorasi lanjutan.
D.    Pihak-Pihak yang Terlibat                               Involved Parties
      1. PT      Namsuma      Luban     Abadi     (Drilling       1. PT Namsuma Luban Abadi (Drilling
           Contractor)                                               Contractor)
      2. PT Jarvis Sinergi Yasa (Geotek dan Geohidro)             2. PT Jarvis Sinergi Yasa (Geotec dan
      3. PT Haluan Baru Energi                                       Geohydro)
Page 15
     4. Laboratorium PT Geoservices                                 3.   PT Haluan Baru Energi
     5. PT Indomobil Prima Energi                                   4.   PT Geoservices Laboratory
     6. Laboratorium LAPI ITB                                       5.   PT Indomobil Prima Energi
     7. PT Aninditya Persada Cakra Mandiri                          6.   LAPI ITB Laboratory
                                                                    7. PT Aninditya Persada Cakra Mandiri
E.   Metode Pengujian dan Pemilihan Areal                      Testing Method and Selection Area
     - Specific Gravity                                         -   Specific Gravity
     - Fire Assay                                               - Fire Assay
     - Aqua Regia Digest                                        - Aqua Regia Digest
     - ICP OES 1 unsur                                          - ICP OES 1 elements
     - Uji Sifat Fisik (PP)                                     - Physical Properties Test (PP)
     - Uji Kuat Tarik Tidak Langsung (BZ)                       - Brazilian Test (BZ)
     - Uji Kuat Geser Langsung (DS)                             - Direct Shear Test (DS)
     - Uji Kuat Tekan Bebas (UCS)                               - Uniaxial Compressive Strength Test (UCS)
     - Uji Triaksial (TX)                                       - Triaxial Test (TX)
     - Preliminary Pulverized Bottle Role Test (PBRT)           - Preliminary Pulverized Bottle Role Test (PBRT)
     - Preliminary Coarse Bottle Role Test (CBRT)               - Preliminary Coarse Bottle Role Test (CBRT)
F.   Kemajuan Eksplorasi Terhadap Kegiatan Triwulan            Exploration Progress toward the Preceding
     Sebelumnya                                                Quarter Activities
     1.   Melanjutkan kegiatan pemetaan geologi di             1. Continuing geological mapping activities in
          Prospek Cisadang West, Pasir Karang dan                   the Cisadang West, Pasir Karang and Pasir
          Pasir Awi.                                                Awi Prospect.
     2.   Melanjutkan         kegiatan   rekonstruksi   core   2. Continuing core drilling reconstruction
          pengeboran.                                              activities.
     3.   Melakukan kegiatan pengeboran di Prospek             3. Conducting drilling activities at the Cisadang
          Cisadang Central untuk program pemboran                  Central Prospect for infill resources,
          sumberdaya, geoteknik dan hidrogeologi.                  geotechnic, and hydrogeology studies drilling
     4.   Melanjutkan kerjasama dengan konsultan                   program.
          untuk cadangan JORC.                                 4. Continuing to collaborate with consultant for
     5.   Melanjutkan kerjasama dengan konsultan                   JORC Reserve.
          untuk Metallurgy dan Processing.                     5. Continuing to collaborate with consultant for
     6.   Melakukan pengiriman sampel inti bor                     Metallurgy and Processing.
          sejumlah 2315 conto dari kegiatan pemboran           6. Sending a total 2315 drill core samples from
          infill sumberdaya untuk analisa geokimia (Au,            infill resources drilling        program for
          Ag) dengan metode fire assay dan ICP OES.                geochemical analysis (Au, Ag) with fire assay
     7.   Melakukan pengiriman sample inti bor                     dan ICP OES.
          sejumlah 47 conto dari kegiatan pemboran             7. Sending a total 47 drill core samples from
          studi geoteknik ke PT LAPI-ITB untuk analisa             geotechnic studies drilling program to PT
          sifat fisik dan sifat mekanik batuan.                    LAPI-ITB for analysis of physical properties and
     8.   Melakukan pengiriman sample inti bor                     mechanical properties of rocks.
          sejumlah 10 conto dari kegiatan pemboran             8. Sending a total 10 drill core samples from
          studi hidrogeologi ke PT Jarvis untuk analisa            hydrogeology studies drilling program to PT
          permeabilitas batuan.                                    Jarvis for rock permeability analysis.
     9.   Melakukan pengambilan sampel air untuk               9. Conducting          water      sampling        for
          studi hidrogeologi di area prospek Cisadang              hydrogeological study at Cisadang Central
Page 16
          Central.                                            Prospect.
     10. Melanjutkan proses permohonan revisi             10. Continuing revision propose for the Forest
         Persetujuan peninjauan kembali Penggunaan            Area Use Approval (“PPKH”) application
         Kawasan Hutan (“PPKH”) untuk eksplorasi              process for further exploration.
         lanjutan.
G.   Rencana Selanjutnya                                  Next Plan
     1. Melanjutkan kegiatan pemetaan geologi di          1. Continuing geological mapping activity at
        Prospek Pasir Awi dan Pasir Karang.                  Pasir Awi and Pasir Karang prospect.
     2. Melakukan kegiatan pengeboran di Prospek          2. Conducting drilling activities at the Cisadang
        Cisadang West untuk program pemboran                 West Prospect for infill resources, geotechnic,
        sumberdaya, geoteknik dan hidrogeologi.              and hydrogeology studies drilling program.
     3. Melanjutkan kegiatan finalisasi rekonstruksi      3. Continuing of finalization activities of core
        core pengeboran dari kegiatan pengeboran             drilling reconstruction from historical drillhole.
        terdahulu.
H.   Hambatan Eksplorasi                                  Barriers to Exploration
     1.   Terdapat tumpang tindih area dengan PT          1. Overlapping with PT Jascleans for micro hydro
          Jascleans untuk area pembangkit litrik tenaga        power plant area beside the Ciliman River
          micro hydro yang berada disamping area               from Prospek Cisadang Central to Gunung
          Sungai Ciliman dari prospek Cisadang                 Gundil.
          Central hingga Gunung Gundil.                   2. There are overlapping and active mining
     2.   Terdapat tumpang tindih dan aktifitas                activities for andesite commodity by PT
          penambangan aktif komoditi andesit oleh PT           Mandala Putra Persada (MPP) with production
          Mandala Putra Persada (MPP) dengan izin OP           permit covering area 9.9 ha located in Pasir
          (Operasi Produksi) seluas 9.9 Ha yang berada         Karang prospect.
          di area prospek Pasir Karang.                   3. The location of the IUP PT SHS is near a
     3.   Keberadaan lokasi IUP PT SHS berada di               community residential area.
          dekat area pemukiman masyakat.
I.   Perizinan/ Persetujuan Baru Yang Diperoleh           New Permits/Approvals Acquired
     1. Perizinan terkait Persetujuan Penggunaan          1.   Permit related to Forest Area Use Approval
        Kawasan Hutan (“PPKH”) untuk eksplorasi                (“PPKH”) for further exploration has been
        lanjutan sudah disetujui oleh Kementerian              approved by Ministry of Environment and
        Lingkungan Hidup dan Kehutanan Republik                Forestry of Republic of Indonesia on 16 July
        Indonesia pada tanggal 16 Juli 2024 dan                2024 , valid for 2 years and stated in SK 854
        berlaku hingga 2 tahun yang tertera pada SK            of 2024 from Ministry of Environment and
        854 tahun 2024 Kementerian Lingkungan                  Forestry of Republic of Indonesia with a total
        Hidup dan Kehutanan Republik Indonesia                 area 383.87 Ha.
        dengan luasan 383.87 Ha.

File

File Open PDF
Source IDX
Size0.71 MB
Published10 Apr 2025
Pages16
Characters58,236
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 44 people and organisations named in the text · linked when the evidence is strong

linked org Bumi Resources Minerals Tbk. p.1 ×8
unresolved org PT Citra Palu Minerals Nama Perusahaan p.1
unresolved org PT Citra Palu Minerals · Nama Perusahaan p.1
unresolved org PT Geoservices. p.2 ×17
unresolved org PT Geoservices Laboratory. p.2 ×15
unresolved org PT Geoservices Laboratory. D. p.2
unresolved org PT CPM Laboratory p.2
unresolved org PT Sumagud Sapta Sinar p.2 ×4
unresolved org PT IOL Indonesia p.2 ×2
unresolved org PT SN Cargo p.2 ×2
unresolved org PT Intertek Utama Service p.2
unresolved org PT Intertek Utama Service E. p.2
unresolved org PT. Dairi Prima Mineral Nama Perusahaan p.5
unresolved org PT Dairi Prima Mineral · Nama Perusahaan p.5
unresolved org PT DPM p.6 ×2
unresolved org Menteri Energi dan Sumber Daya p.6
unresolved org PT Gorontalo Minerals Nama Perusahaan p.7
unresolved org PT Gorontalo Minerals · Nama Perusahaan p.7
unresolved org PT GM p.7
unresolved org PT Minera Nusa Drillindo. p.8 ×2
unresolved org PT Solusi Geotek Optima. p.8 ×2
unresolved org PT Linge Mineral Resources Nama Perusahaan p.11
unresolved org PT Linge Mineral Resources · Nama Perusahaan p.11 ×3
unresolved org PT LMR p.11 ×4
unresolved org PT Jarvis Sinergi Yasa p.11 ×6
unresolved org Permukaan Air p.12
unresolved org PT Bahtera Ratu Engineering p.12 ×2
unresolved org PT Namsuma Luban Abadi p.12 ×3
unresolved org Direktorat Jenderal Mineral dan Batubara p.12
unresolved org Permukaan p.13
unresolved org Directorate General of Adendum Studi Kelayakan p.13
unresolved org PT Linge Mineral p.13
unresolved org PT Suma Heksa Sinergi Nama Perusahaan p.14
unresolved org PT Suma Heksa Sinergi · Nama Perusahaan p.14
unresolved org PT SHS p.14 ×3
unresolved org PT LAPI-ITB p.14 ×2
unresolved org PT Haluan Baru Energi p.14 ×2
unresolved org PT Indomobil Prima Energi p.15 ×2
unresolved org PT Aninditya Persada Cakra Mandiri p.15
unresolved org PT Aninditya Persada Cakra Mandiri E. p.15
unresolved org PT Jarvis p.15
unresolved org PT Jascleans p.16
unresolved org Ministry of Environment p.16 ×2
unresolved org Kementerian Lingkungan p.16

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result