Page 1 OCR 0.804
AMMAN NN

Exploration Report - Guarter 12025

Introduction

During the period 1 of January to 31 of March 2025 (@1 2025), PT Amman Mineral Nusa
Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional Tbk (PT AMI), carried
out exploration activities within IUPK Block II (Elang) located in Sumbawa, Indonesia (Figure
1). There was no field exploration activity within Blocks I (Batu Hijau), III (Rinti) and IV
(Lampui).

Total exploration expenditure for G1 2025 was approximately USD $ 3.59 M.

Aw

Pe

PEN)

Lombok

Kayangan Porte4-

Mataram
|

|

2 omar Port 4 Lombok Int'l

Airport

Pu LI bone 53) 8.

Sumbawa

Maliwang

N

A

Lok » INDONESIA :
Sumbawa AMNT Asset Jakarta. 3
4 IUPK PTAMNT  @ Batu Hijau Mine Operation Map Loco”

Project Area — @ Elang Cu-Au Project

Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID 1
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136
Page 2 OCR 0.885
AMMAN NN

Batu Hijau Block |

No exploration field work or costs incurred in @1 2025. The 2024 drilling results were
reviewed.

Forward Plan:
e Detailed geological mapping at West Nangka.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID 2
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136
Page 3 OCR 0.876
AMMAN NN

Elang Block II

Expenditure:
e Exploration activities included drilling and geological mapping. Costs were circa USD
S3.59M.

Work Areas:
e Elang Cu-Au Project.
» Gerbang East Cu-Au Project
e Sebu Cu-Au Project.

Exploration Parties:
» Manager - AMNT Exploration.
e Drilling contractor - PT Minera Nusa Drillindo (PT MND).
e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS).

Assessment Methods:
e Diamond drilling (4 rigs).
»  Geological mapping (including rock sampling).
#  Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer.

Objectives:

e Resource development drilling continued at the Elang Cu-Au deposit (Figure 2). The
purpose of this infill program was to explore information gaps, improve the
geological model and to increase the confidence level of mineral resource
classifications.

e# Exploration drilling at Gerbang East is testing for Cu-Au porphyry mineralisation
potential below a lithocap and diatreme breccias (Figure 4).

e Exploration drilling at Sebu East is designed to test a coincidental Induced
Polarisation (IP) chargeability high and magnetic (ASVI) anomaly beneath a lithocap.

e Geological mapping at Sebu East is intended to follow up on the porphyry
mineralization indications from a previous scout drilling program.

Exploration Results:
e Elang Cu-Au project diamond drilling (10 holes for 5,262.40 m):
o Resource infill, Elang - 7 holes (2,449.40 m) completed or in progress,
o Exploration drilling, Gerbang East - 2 holes (1,828.90 m) completed or in
progress,
Oo Exploration drilling, Sebu East - 1 hole (984.10 m) completed.

e Core samples submitted to the assay lab amounted to 4,013.

Forward Plan:
e Continue infill resources drilling at Elang and exploration drilling (3 rigs) at Gerbang
East.
e IP geophysical survey (19.65 line km) at Sebu East and Elang NE.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID 3
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136
Page 4 OCR 0.789
AMMAN

ANNN

—— PTAMNTIUPK | A

AMMAN “3. N

N
|—
1Km'

amman.co.id

NMNN 1 sda y

ALMA |,

In Progress Drilling @1-2025
Completed Drilling @1-2025
Previous Holes

Mapping Area 01-2025

538000 E

540000 E

542000 3

| 544000 E

9010000 N 9012000 N 9014000 N

9008000 N

9004000 N

9006000 N

Figure 2. Elang Block II @1 2025 - Exploration Locations.

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950

1 4622157994600 F.

462 215296 4136
Page 5 OCR 0.897
AMMAN NN

Rinti Block III

There are no exploration field activities or costs incurred in O1 2025. Results of previous
work (geological mapping, soil sampling & spectral survey) were reviewed.

Forward Plan:
e IP geophysical survey (11.15 line km) at South Rinti and West Rinti.
e Exploration drilling (1 rig) at Bekolar and Sane South prospects.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID 5
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136
Page 6 OCR 0.870
AMMAN NN

Lampui Block IV

No exploration field work or costs incurred in A1 2025.

Forward Plan:
e A Cu-Au target, defined by 2024 exploration, will be drill tested (1 rig).
e An IP geophysical survey (5.4 km) is planned.

amman.co.id

PT AMMAN MINERAL INTERNASIONAL TBK
MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID 6
BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136

File

File Open PDF
Source IDX
Size1.01 MB
Published10 Apr 2025
Pages6
Characters4,841
Text sourceOCR
OCR confidence0.853

Names mentioned 7 people and organisations named in the text · linked when the evidence is strong

linked org Amman Mineral Internasional Tbk p.1 ×20
unresolved org PT Amman Mineral Nusa Tenggara p.1
unresolved org PT AMNT p.1
unresolved org PT AMI p.1
unresolved org PT AMNT IUPK p.1
unresolved org PT Minera Nusa Drillindo p.3
unresolved org PT MND p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result