Laporan Kuartalan Aktivitas Eksplorasi Quarterly Report of the Exploration Activities PT TBS Energi Utama Tbk Kuartal-I/ the 1st Quarter of 2025
Page 2
KATA PENGANTAR INTRODUCTION
PT TBS Energi Utama Tbk (“Perseroan”) PT TBS Energi Utama Tbk ("the
adalah perusahaan pertambangan Company") is a coal mining company
batubara yang melakukan kegiatan conducting mining activities in
penambangan di daerah Sangasanga, Sangasanga area, Kutai Kartanegara
Kabupaten Kutai Kartanegara, Provinsi Regency, East Kalimantan, which the
Kalimantan Timur, dimana area konsesi concession area of the three subsidiaries
ketiga anak perusahaan terletak is located side by side. All the supporting
berdampingan. Seluruh infrastruktur infrastructure of mining operations such
pendukung operasional penambangan as coal hauling roads, offices, workshop,
seperti jalan angkut batubara, coal-only jetty and other infrastructures
perkantoran, perbengkelan, pelabuhan are located in Kutai Kartanegara
khusus batubara dan infrastruktur lainnya Regency, East Kalimantan.
berada di daerah Kabupaten Kutai
Kartanegara, Provinsi Kalimantan Timur.
Perseroan mempunyai 3 (tiga) anak The Company has 3 (three) subsidiaries
perusahaan yang bergerak di bidang engaged in coal mining sector, located in
pertambangan batubara, terletak di Sangasanga area, Kutai Kartanegara
daerah Sangasanga, Kabupaten Kutai Regency, East Kalimantan. The
Kartanegara, Provinsi Kalimantan Timur. company's subsidiaries are:
Adapun ketiga anak perusahaan
Perseroan tersebut adalah:
1. PT Trisensa Mineral Utama (TMU) 1. PT Trisensa Mineral Utama (TMU)
2. PT Indomining (IM) 2. PT Indomining (IM)
3. PT Adimitra Baratama Nusantara 3. PT Adimitra Baratama Nusantara
(ABN) (ABN)
Dalam rangka memenuhi Ketentuan In order to comply with the Provisions
III.1.6, Peraturan Nomor I-E tentang III.1.6, Regulation Number I-E concerning
Kewajiban Penyampaian Informasi, Information Delivery Obligations,
Lampiran Keputusan Direksi PT Bursa Attachment to the Decree of the Board of
Efek Jakarta Number Kep-00066/BEI/09- Directors of PT Bursa Efek Jakarta
2022 tanggal 30 September 2022, maka Nomor Kep-00066/BEI/09-2022 dated
bersama ini kami sampaikan Laporan September 30, 2022, we here jointly
Kegiatan Eksplorasi Perseroan untuk submit the Company's Exploration
Kuartal-1 2025. Activity Report for the 1st Quarter of 2025.
www.tbsenergi.com
Page 3
BAB I CHAPTER I
PENDAHULUAN INTRODUCTION
I. Latar Belakang I. Background
Batubara merupakan bahan galian yang Coal is an economically valuable
bernilai ekonomis, sehingga diminati oleh excavation material, so it is in demand by
investor asing maupun investor dalam negeri. foreign investors as well as domestic
Usaha pertambangan batubara mempunyai investors. Coal mining business has
prospek sebagai sektor andalan pengganti prospects as a mainstay sector of oil and
migas dalam membangun perekonomian gas replacement in building the economy
Kalimantan Timur di masa mendatang. Hal ini of East Kalimantan in the future. It is based
didasarkan pada sumber daya dan potensi on available coal resources and potentials,
batubara yang tersedia, prospek pemasaran marketing prospects as well as local
serta dukungan kebijakan pemerintah daerah. government policy support.
Pengusahaan pertambangan karena sifat Strive of the Mining business because of
kegiatannya pada dasarnya selalu the nature of its activities basically always
menimbulkan perubahan pada alam cause changes in the nature of its
lingkungannya. Di balik perubahan pada alam environment. Behind the changes in nature
dan lingkungannya, suatu kenyataan pula and the environment, it is also a fact that
bahwa usaha pertambangan telah berhasil mining businesses have succeeded in
meningkatkan kesejahteraan manusia dengan improving human welfare by providing raw
menyediakan bahan baku untuk industri, materials for industry, energy, and others.
energi, dan lain-lain.
Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk
Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”) TMU merupakan perusahaan tambang TMU is a coal mining company with an batubara dengan daerah penambangan administrative mining area including the secara administratif termasuk wilayah sub-districts of Loa Janan, Sangasanga, Kecamatan Loa Janan, Sangasanga, Muara Muara Jawa, Kutai Kartanegara Regency, Jawa, Kabupaten Kutai Kartanegara Provinsi East Kalimantan Province with an area of Kalimantan Timur dengan Luas wilayah 3.414 3,414 ha and the 2010 KTN area code ha dan kode Wilayah KTN 2010 3133 OP. 3133 OP. TMU has received approval to TMU telah mendapat persetujuan untuk carry out mining activities and sell melakukan aktivitas penambangan dan excavated products with the Decree of the penjualan hasil galian dengan Keputusan Minister of Investment/Head of the Menteri Investasi/ Kepala Badan Koordinasi Investment Coordinating Board Number: Penanaman Modal Nomor : 1098/1/IUP/PMDN/2022 concerning 1098/1/IUP/PMDN/2022 Tentang persetujuan approval for granting extensions of mining Pemberian Perpanjangan Izin Usaha business permits at the production Pertambangan Pada Tahap Kegiatan Operasi operation activity stage for coal Produksi untuk Komoditas Batubara kepada commodities to PT Trisensa Mineral PT Trisensa Mineral Utama (kode wilayah Utama (area code 3364023032014055) on 3364023032014055) pada tanggal 21 September 21, 2022. September 2022. Pada Kuartal-1 2025, pelaksanaan pekerjaan In The 1st Quarter of 2025, the yang dilakukan oleh TMU telah menyerap implementation of work carried out by TMU tenaga kerja sebanyak 92 orang sedangkan has absorbed a workforce of 92 people untuk kontraktor dan sub-kontraktornya 770 while for contractors and sub-contractors orang dan dibagi menjadi 2 shift kerja. 770 people and divided into 2 shifts of Kontraktor tambang yang digunakan adalah work. The mining contractor used is PT PT Multindo Prima Teknik (MPT). Multindo Prima Teknik (MPT). Mining is Penambangan yang dilakukan dengan sistem done by surface open pit mining system tambang terbuka (surface open pit mining) with truck and shovel method. dengan metode truck dan shovel. Produk batubara yang dihasilkan TMU Coal products produced by TMU have an memiliki kalori rata-rata 4500 GAR dengan average calorie of 4500 GAR with Total Total Sulphur (TS) di bawah 1%. Kualitas Sulphur (TS) below 1%. The quality of this batubara ini cukup memenuhi permintaan coal is enough to meet the demand of the pasar yang menginginkan batubara dengan market who want low sulphur coal. sulphur rendah. Pelaksanaan pengelolaan Implementation of Occupational Safety Keselamatan dan Kesehatan Kerja yang and Health management implemented in diterapkan di TMU mengacu kepada TMU refers to the program / plan of program/rencana Pengelolaan Keselamatan Occupational Safety and Health dan Kesehatan Kerja sesuai dengan Management in accordance with perundang-undangan yang berlaku. applicable laws and regulations. Kegiatan pengelolaan dan pemantauan Environmental management and lingkungan yang dilakukan TMU meliputi monitoring activities carried out by TMU kegiatan penghijauan yang dilakukan di include greening activities carried out at Tanggul Jalan, Tanggul Stockpile, Tanggul the Road Embankment, Embankment Depan Timbangan, Settling Pond, Waste Stockpile, Front Embankment Scales, Dump dan Bench Office Baru. Pada saat ini, Settling Pond, Waste Dump and New TMU juga melakukan pengelolaan dan Bench Office. Currently, TMU also pemantauan kualitas air, debu, kebisingan, manages and monitors water quality, dust,
Page 6
limbah B3 dan limbah domestik, serta noise, B3 waste and domestic waste, as
pemantauan tingkat erosi. well as monitoring erosion rates.
I. 2. PT INDOMINING (“IM”)
Berdasarkan Izin Usaha Produksi Nomor: Based on Production Business License
540/004/IUP-OP/MB-PBAT/III/2013 tanggal Nomor: 540/004/IUP-OP/MB-PBAT/III
15 Maret 2013, IM melakukan kegiatan /2013 dated March 15, 2013, IM conducted
eksplorasi dan penambangan batubara serta coal exploration and mining activities and
hasil produksinya di daerah Kecamatan its production in Sangasanga District, Kutai
Sangasanga, Kabupaten Kutai Kartanegara, Kartanegara Regency, East Kalimantan
Provinsi Kalimantan Timur. Tahap produksi IM Province. Im's production phase began in
dimulai pada bulan Agustus 2007, sedangkan August 2007, while commercial production
produksi komersial dimulai pada bulan began in October 2007.
Oktober 2007.
Kegiatan penambangan IM dilakukan IM mining activities are carried out by
kontraktor penambangan yaitu PT RPP mining contractor PT RPP Contractors
Contractors Indonesia (RCI). Kegiatan Indonesia (RCI). Mining activities are
penambangan merupakan penambangan surface open pit mining with truck and
terbuka (surface open pit mining) dengan shovel methods.
metode truck dan shovel.
Pada Kuartal-1 2025, sumber daya manusia As of 1st Quarter 2025, human resources
yang bekerja dalam kegiatan operasional IM working in IM's operational activities
mencapai 338 tenaga kerja termasuk reached 338 workers including contractors
kontraktor dan sub-kontraktor. Dari 338 orang and sub-contractors. Of those 338 people,
tersebut sekitar 80% merupakan tenaga kerja about 80% are local workers to support
lokal sebagai penunjang program community community development programs with
development dengan tujuan untuk the aim of improving the welfare of the
meningkatkan kesejahteraan masyarakat di communities around the mine.
sekitar tambang.
Produk batubara IM memiliki kualitas antara IM coal products have quality between
4200 - 5600 GAR dengan total sulphur antara 4200 - 5600 GAR with total sulphur
0.2% - 2.0%. Produk cukup bersaing di dalam between 0.2% - 2.0%. The product is quite
pasar internasional maupun domestik competitive in the international and
domestic markets.
I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)
ABN didirikan pada tahun 2004, dan ABN was established in 2004, and
mengelola daerah pertambangan dengan luas manages a mining area of about 2,990 ha
area sekitar 2.990 Ha yang berlokasi di Desa located in Kampung Jawa Village,
Kampung Jawa, Kecamatan Sangasanga dan Sangasanga District and Muara Kembang
Desa Muara Kembang, Kecamatan Muara Village, Muara Jawa District, Kutai
Jawa, Kabupaten Kutai Kartanegara, Kartanegara Regency, East Kalimantan.
Kalimantan Timur. Berdasarkan pada Izin Based on Mining Business License
Usaha Pertambangan Operasi Produksi Production Operation Number:
Nomor: 540/1691/IUP-OP/MB-{BAT/XII/2009 540/1691/IUP-OP/MB-{BAT/XII/2009
tanggal 1 Desember 2009, ABN melakukan dated December 1, 2009, ABN conducts
Page 7
kegiatan eksplorasi, penambangan batubara, exploration, coal mining, and marketing of
dan pemasaran hasil produksi di lokasi production at its mine site.
tambangnya tersebut.
ABN mulai melakukan kegiatan eksplorasi dan ABN began its exploration and
pembangunan infrastruktur pada tahun 2007, infrastructure development activities in
sedangkan produksi komersial dimulai pada 2007, while commercial production began
tahun 2008. Produk batubara ABN termasuk in 2008. ABN coal products belong to
dalam kelompok thermal coal dengan rank thermal coal group with sub-bituminous
sub-bituminous dan bituminous, dengan 4 and bituminous rank, with 4 types of ABN
jenis tipe yaitu ABN 52 ( CV 5200 gar & TS < 52 (CV 5200 GAR & TS < 1), ABN 50 ( CV
1), ABN 50 ( CV 5000 gar & TS < 1), ABN 42 ( 5000 GAR & TS < 1), ABN 42 (CV 4200
CV 4200 gar & TS < 1) dan ABN 56 HS(CV GAR & TS < 1) and ABN 56 HS (CV 5600
5600 gar & TS < 2)). Thermal coal dipasarkan gar & TS <2)). Thermal coal is marketed to
ke beberapa negara di dunia, diantaranya several countries in the world, including
India, Cina, Jepang, Italia, Thailand, dan India, China, Japan, Italy, Thailand, and
Korea. ABN juga mensuplai untuk kebutuhan Korea. ABN also supplies for domestic
dalam negeri, yaitu industri semen dan needs, namely cement industry and
beberapa industri lainnya. several other industries.
Sistem penambangan yang dilakukan ABN ABN's mining system is surface open pit
yaitu sistem penambangan terbuka (surface mining. Coal ABN has a low ash content,
open pit mining). Batubara ABN memiliki so it is not done by washing process, only
kandungan abu yang rendah, sehingga tidak done by crushing process. Mining activities
dilakukan pencucian (washing), hanya of PT. ABN is carried out by one main
dilakukan proses peremukan (crushing). contractor, PT RPP Contractors Indonesia
Kegiatan penambangan PT. ABN dilakukan (RCI).
oleh satu kontraktor utama, yaitu PT. RPP
Contractors Indonesia (RCI).
Pada Kuartal-1 2025, sumber daya manusia In The 1st Quarter of 2025, human
yang terlibat dalam kegiatan operasional ABN resources involved in ABN's operational
mencapai sekitar 546 orang, yang terdiri dari activities reached about 546 people,
193 orang tenaga kerja pada ABN dan 353 consisting of 193 workers in ABN and 353
orang tenaga kerja pada kontraktor maupun workers in contractors and sub-
sub-kontraktor. contractors.
Sebagai salah satu wujud pemberdayaan As the form of empowerment of the
masyarakat sekitar, ABN bersama-sama surrounding community, ABN along with
dengan kontraktor dan sub-kontraktor saat ini contractors and sub-contractors currently
telah menampung tenaga kerja lokal have accommodated local workers in
Kecamatan Sangasanga & Kecamatan Muara Sangasanga District & Muara Jawa
Jawa, Kabupaten Kutai Kartanegara kurang District, Kutai Kartanegara Regency
lebih 80 % dari kebutuhan tenaga kerja, approximately about 80% of the labor
sedangkan sisanya sekitar 20 % berasal dari needs, while the remaining about 20%
luar daerah dua kecamatan tersebut. comes from outside the area of the two
sub-districts.
Page 8
BAB II CHAPTER II
KEGIATAN EKSPLORASI EXPLORATION ACTIVITY
II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)
1. 1. DAERAH EKSPLORASI 1. 1. EXPLORATION AREA
Pada Kuartal-1 2025 kegiatan eksplorasi In the 1ST Quarter of 2025, exploration
berupa kegiatan sampling di Pit Aktif yaitu pit activities will be in the form of sampling
B1WA, B2A. activities in Active Pits, namely pit
B1WA,B2A.
Kegiatan sampling batubara di pit aktif guna Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai determine the quality value, especially the
total sulphur (TS) dan nilai total kalori. total sulphur (TS) value and total calorie
kegiatan sampling batubara. Seam target value. coal sampling activities. The target
adalah seam T, RU, RL, S di pit B1WA., seam is the T, RU, RL, S seam seam in pit
sampling di pit B2A dengan seam target B1WA. sampling in pit B2A with seam target
seam F, E, D, C4B. seam F, E, D, C4B.
1. 2. METODE PENGUKURAN 1. 2. MEASUREMENT METHODS
Trenching Trenching
Secara teknis di lapangan tim geologist Technically in the field, the geologist team
melakukan trenching dengan membuat conducted trenching by making an elongated
paritan memanjang memotong strike seam – trench cutting the strike seam – seam target
seam target sebatas titik plan yang dibuat to the point plan made earlier. This serves to
sebelumnya. Hal ini berfungsi untuk cover the entire region so that all seams can
mengcover seluruh wilayah agar semua be found. The average length of trenching in
seam dapat ditemukan. Rata – rata panjang a day can reach 80 m -100 m depending on
paritan trenching dalam sehari bisa mencapai the terrain / area of work whether in a ramp,
80 m - 100 m tergantung dari medan/areal swamp or hilly with a steep slope.
kerjanya apakah di tempat landai, rawa atau
berbukit dengan kemiringan terjal.
Pengambilan sampel untuk di mengetahui Sampling to find out the values of quality is
nilai – nilai kualitasnya dilakukan per jarak done per distance of 100 m between
100 m antar lubang trenching. trenching holes.
Sampling Sampling
Tim geologi juga melakukan sampling seam Geologies team also sampling seam - seam
– seam di pit guna mengetahui kualitas ter in the pit to find out the updated quality of the
update dari seam – seam yang akan seam - seam that will be mined.
ditambang.
Metode yang digunakan adalah: The methods used are:
1. Jarak antar titik sampling maksimal 20 m 1. The distance between sampling points
per seam searah strike bukaan batubara maximum 20 m per seam direct strike coal
yang akan diambil (getting). openings to be taken (getting).
Page 9
2. Re-sampling/update on each new layer
2. Sampling ulang/update pada tiap bukaan opening on a seam (maximum 1 layer
layer baru pada suatu seam (maksimal 1 opening as high as 3 m).
bukaan layer setinggi 3 m).
3. Sampling on seam – seam new openings
3. Sampling pada seam – seam bukaan / seam the first time will be in getting. The
baru/seam yang pertama kalinya akan di mining plan until the end of the year is
getting. Adapun plan penambangan targeted at seam with calorie value (ar)_g
sampai dengan akhir tahun ditargetkan above 4500.
pada seam dengan nilai Calori (ar)_g di
atas 4500.
1. 3. BIAYA EKSPLORASI 1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di TMU Exploration Costs incurred in the 1st
Kuartal-1 2025 sebagai berikut: Quarter of 2025 as follows:
Q1 2025 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Biaya Eksplorasi
112,500,000 30,000,000 450,000,000 30,000,000
Exploration Costs
Catatan: Note:
Jumlah sampling di Kuartal-1 2025 berjumlah The number of samplings in The 1st Quarter
12 sampel. 2025 amounted to 12 samples
Biaya Eksplorasi untuk tahun 2025 yang Exploration Cost for 2025 in accordance with
sesuai dengan RKAB 2025 bagian geologi RKAB 2025 geological section in the form of
berupa biaya analisa kualitas batubara di coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan. maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang trenching activities that use PC 200 units is
menggunakan unit PC 200 biayanya accommodated to the production department
dimasukkan ke departemen produksi untuk for general work with a record of trenching
pekerjaan general dengan catatan kegiatan activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.
1. 4. PELAKSANAAN DAN 1. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Pengawasan Test Pit/Trenching dan Supervision of Test Pit/ Trenching sampling
sampling batubara di pit TMU dilakukan oleh of coal in the TMU pit conducted by
Geologist TMU. TMU’geologist.
1. 5. KEMAJUAN EKSPLORASI 1. 5. EXPLORATION PROGRESS
Kesimpulan Eksplorasi TMU Kuartal-1 Conclusion of TMU Exploration in the 1st
2025 Quarter of 2025
Page 10
Selain kegiatan trenching kami dari tim In addition to our trenching activities from the
geologi juga melakukan sampling seam – geology team also sampling seam-seam in
seam di pit guna mengetahui kualitas ter the pit to find out the update quality from
update dari seam – seam yang akan di seam - seam to be getting. The methods used
getting. Metode yang digunakan adalah: are:
1. Jarak antar titik sampling maksimal 50 m 1. Distance between sampling points
per seam searah strike bukaan batubara maximum 50 m per unidirectional strike
yang akan diambil (getting). coal openings to be taken (getting)
2. Sampling ulang/update pada tiap bukaan 2. Sampling/update on each new layer
layer baru pada suatu seam (maksimal 1 opening on one seam (maximum 1-layer
bukaan layer setinggi 3 m). aperture as high as 3 m).
3. Sampling pada seam – seam bukaan 3. Sampling on seam - seam new openings
baru/seam yang pertama kalinya akan di / seam the first time will be in the getting.
getting. Adapun plan penambangan The mining plan until the end of the year
sampai dengan akhir tahun ditargetkan is targeted at seam with calorie (ARB)
pada seam dengan nilai Calori (ARB) GAR value above 4800.
GAR di atas 4800.
4. Selama Kuartal-1 2025 kegiatan berupa 4. During The 1st 2025, activities in the form
sampling pit aktif yaitu di pit B2A dengan of active pit sampling are in pit B2A with
seam target adalah seam F, E, D, C4B.Pit target seam are F, E, D, C4B Pit B1WA
B1WA dengan seam target T, RU, RL, S with target seam T, RU, RL, S
5. Rata – rata hasil analisa kualitas dari 5. The average quality analysis results of
seam –seam tersebut di atas TM 29.34 the seam -seam above TM 29.34 %, ASH
%, ASH 5.55 %, TS 0.80 % dan nilai CAL 5.55%, TS 0.80 % and CAL (ar) values
(ar) 4.900 4.900.
1. 6. RENCANA KEGIATAN 1. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-1 The Geological Division Plan for 1ST Quarter
2025: 2025:
1. Melakukan pembaharuan / updating 1. Updating the Geological model based on
model Geologi berdasarkan data updating monthly roof/floor updating data from pit
roof/floor bulanan dari data survey Pit survey data and cs holes data from coal
serta cs_holes dari data channel sampling sampling channel data. The results of this
batubara. Hasil dari pembaharuan model model update are then sent to the mine
ini kemudian dikirim ke bagian mine plan plan engineering section as a basis for
engineering sebagai dasar acuan untuk submissions for making pit designs for
pembuatan desain pit untuk bulan depan. next month.
2. Trenching di luar Rencana PIT yang di 2. Trenching outside the PIT Plan that is
Plan kan oleh tim Engineering di tiadakan planned by the Engineering team is not in
dan sebagai penggantinya adalah place and in lieu of trenching is done in the
trenching di lakukan di plan pit yang data plan pit whose trenching data is lacking or
trenchingnya kurang atau tingkat confidence level of continuity, seam
confidence kemenerusan, ketebalan thickness in the pit is still lacking.
seam di pit tersebut masih kurang.
Page 11
3. Memonitoring adanya anomali pada suatu 3. Monitoring the presence of anomalies in bukaan PIT yang aktif. an active PIT aperture. 4. Tim geologist akan melakukan sampling 4. The geological team will be sampling the pada bukaan seam seam yang berada di seam seam openings located in the active pit aktif terutama mengontrol perubahan pit, especially controlling changes in the nilai Total Sulfur, Persentase nilai Ash value of Total Sulphur, Ash percent dan nilai Kalori di seam –seam ber kalori value and value of Calory in seam - tinggi baik ke arah down dip maupun ke seam with high calories both towards arah strikenya. down dip and towards the strike. 5. Memonitoring kualitas dari seam –seam 5. Monitoring the quality of seam -seam that yang tertambang di bulan April – Juni is mined in April until June 2025, 2025 terutama dalam hal perubahan nilai especially in terms of changes in TS value TS seiring penurunan elevasi dari masing in line with the decrease in elevation of –masing seam yang tertambang. each seam that is mined. 6. Update data kualitas berdasarkan 6. Quality data update based on mining kemajuan penambangan pada seam– progress on seam–seam target in seam target di bulan sebelumnya. previous month. 7. Rencana kegiatan pengeboran eksplorasi 7. The plan for exploration drilling activities di tahun 2025 sebanyak 78 titik bor atau in 2025 is 78 drill points or as many as sebanyak 9.360 m di wilayah barat pit 9,360 m in the western area of the B3KL B3KL dengan seam Target seam R, S, T, pit with seam Target seam R, S, T, U, WA, U, WA, WB, X, Y. WB, X, Y. 8. Rencana kegiatan pengeboran geoteknik 8. The plan for geotechnical drilling activities di tahun 2025 sebanyak 5 titik pemboran in 2025 is 5 drilling points or as much as atau sebanyak 600 m di wilayah Barat pit 600 m in the Western area of the B3KL pit. B3KL. II. 2. PT INDOMINING (“IM”) 2. 1. DAERAH EKSPLORASI 2. 1. EXPLORATION AREA Pada Kuartal-1 2025, IM tidak ada kegiatan In the 1st Quarter of 2025, IM had no drilling pemboran. activities. 2. 2. METODE PENGUKURAN 2. 2. MEASUREMENT METHODS Untuk kegiatan pemboran infill menggunakan For infill drilling activities using touch coring metode touch coring, sedangkan untuk method, while for geotechnical drilling is done pemboran geoteknik dilakukan dengan by drilling Full Coring method. pemboran metode Full Coring. Pemboran geoteknik dilakukan juga dengan Geotechnical drilling is also carried out using menggunakan metode Standart Penetration the Standard Penetration Test (SPT) method. Test (SPT). Prinsip kerja SPT adalah dengan The working principle of SPT is to hit a memukul sebuah tabung standar ke dalam standard tube into a drill hole 45 cm deep lubang bor sedalam 45 cm menggunakan using a hammer weighing 63.5 KG that falls palu dengan berat 63.5 KG yang jatuh bebas freely from a height of 76 cm. What counts is dari ketinggian 76 cm. Yang dihitung adalah the number of blows to penetrate as deep as jumlah pukulan untuk melakukan penetrasi
Page 12
sedalam 15 cm. Jumlah pukulan yang 15 cm. The number of blows used is
digunakan adalah penetrasi sedalam 30 cm penetration as deep as the last 30 cm.
terakhir.
2. 3. BIAYA EKSPLORASI 2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di IM Exploration Costs incurred in the 1st
Kuartal-1 2025 sebagai berikut: Quarter of 2025 as follows:
Q1 2025 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Januari/ January 83,333,333 - 83,333,333 -
Februari/ February 83,333,333 - 166,666,666 -
Maret/ March 83,333,333 - 249,999,999 -
2. 4. PELAKSANAAN DAN 2. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Kegiatan Pemboran diawasi oleh Drilling activities are supervised by the
Departemen Engineering Section Geologist. Department of Engineering geologist section.
2. 5. KEMAJUAN EKSPLORASI 2. 5. EXPLORATION PROGRESS
Pada Kuartal-1 2025 belum ada kegiatan As of the 1st Quarter of 2025, there are no
pemboran lanjutan. Namun ada beberapa further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan, geological activities that continue to be
diantaranya: carried out, including:
1. Melakukan pembaharuan / updating 1. Updating the Geological model based on
model Geologi berdasarkan data updating monthly roof/floor updating data from pit
roof/floor bulanan dari data survey Pit survey data and cs_holes data from coal
serta cs_holes dari data channel sampling sampling channel data, and supervision in
batubara, dan pengawasan dalam the activities of taking roof/floor
kegiatan pengambilan data pengukuran measurement data and cs_holes.
roof/floor serta cs_holes tersebut.
2. Melakukan kegiatan channel sampling 2. Conducting channel sampling activities as
serta pengukuran tebal aktual batubara di well as actual thick measurement of coal
lokasi Pit AB Blok 12-13 & sekitarnya at the pit AB location Block 12-13 &
untuk keperluan pembuatan data channel surrounding areas for the purposes of
sampling untuk support pembaharuan / making data sampling channels to
updating model Geologi dan variasi support the renewal / updating of
kualitas batubara dari coal inventory yang geological models and variations in the
akan ditambang. quality of coal from coal inventory to be
mined.
3. Melakukan analisis kestabilan lereng di 3. Perform slope stability analysis in the pit
area pit aktif Pit, baik pada sisi low wall, active pit area, both on the low wall side,
high wall maupun sidewall serta disposal high wall and sidewall and disposal IPD
IPD border Selatan, kaitannya untuk South border, related to know the value of
mengetahui nilai safety factor (FoS) untuk safety factor (FoS) to control the
kontrol pembentukan desain Pit Aktif formation of Active Pit design to be stable
Page 13
supaya stabil dan aman. and safe.
2. 6. RENCANA KEGIATAN 2. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
IM pada periode Kuartal-2 2025 belum IM for 2nd Quarter of 2025 has not planned to
merencanakan melakukan aktivitas kembali resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu be it infill drilling or Geotechnical drilling in IM
pengeboran infill maupun pengeboran concession area.
Geoteknik di area konsesi IM.
Sehubungan dengan rencana pengoptimalan In relation to the mining optimization plan at
penambangan pada pit utama Indomining Indomining's main pit to a depth of RL-160
hingga kedalaman RL-160 meter sesuai meters according to the Mine Plan target for
target Mine Plan untuk pit IM dan dalam the IM pit and in order to optimize the
rangka mengoptimalkan mineable reserve mineable reserve of potential seams, the
seam-seam potensial, kualitas dan kuantitas quality and quantity of exploration data
jumlah data eksplorasi yang dimiliki oleh PT owned by PT Indomining through the current
Indomining melalui model geologi saat ini geological model are sufficiently
sudah cukup mewakili serta memenuhi representative and meet the number of
dengan jumlah distribusi titik – titik bor yang distribution of existing boreholes very well to
ada sangat baik untuk mengcover optimasi cover the optimization of coal reserves in the
cadangan batubara dalam perencanaan planning of the mining process of the PIT
proses penambangan geometri desain PIT design geometry during the period for 2025.
selama periode untuk Tahun 2025.
II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)
3. 1. DAERAH EKSPLORASI 3. 1. EXPLORATION AREA
Pada Kuartal-1 2025, ABN melakukan In the 1st Quarter of 2025, ABN conducted
update model geologi berdasarkan data geological model updates based on channel
channel sampling serta data roof & floor sampling data as well as actual roof & floor
aktual dari hasil pengukuran survey, serta data from survey measurement results, as
melakukan rekonsiliasi model geologi well as reconciling geological models to
terhadap data survey aktual. actual survey data.
Selain kegiatan eksplorasi di dalam konsesi Apart from exploration activities within the
IUP ABN, tim eksplorasi juga melakukan ABN IUP concession, the exploration team
studi prospeksi dan review terhadap potensi also carried out prospecting studies and
pengembangan bahan galian di luar IUP reviews of the potential for developing
ABN. Pada kuartal-1, tim eksplorasi telah minerals outside the ABN IUP. In the first
menyelesaikan sebanyak 2 desk studi quarter, the exploration team completed 2 of
prospeksi terhadap potensi batubara, prospecting studies on the potential coal
3. 2. METODE PENGUKURAN 3. 2. MEASUREMENT METHODS
Channel sampling dilakukan dengan Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip, exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas quality as the basis for geology model update
batubara sebagai dasar untuk update model in line with the progress of the mine. Channel
Page 14
geologi seiring dengan kemajuan tambang. sampling in the 1st Quarter of 2025 was
Chanel sampling pada Kuartal-1 2025 conducted at seam S4U, S5, S6, S7 dan S8
dilakukan pada seam S4U, S5, S6, S7 dan Pit West Ext.
S8 Pit West Ext.
3. 3. BIAYA EKSPLORASI 3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di ABN Exploration Costs issued in The 1st
Kuartal-1 2025 sebagai berikut: Quarter of 2025 as follows:
Q1 2025 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Januari/ January 788,000,000 - 788,000,000 -
Februari/ February - - 788,000,000 -
Maret/ March - - 788,000,000 -
3. 4. PELAKSANAAN DAN 3. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Kegiatan dilaksanakan & diawasi oleh Activities are carried out and supervised by
Departemen Mining section Geotech & the Department of Mining section Geotech &
Exploration Development. Exploration Development.
3. 5. KEMAJUAN EKSPLORASI 3. 5. EXPLORATION PROGRESS
Pada Kuartal-1 2025 tidak ada kegiatan In The 1st Quarter of 2025there are no
pemboran eksplorasi, namun berikut exploration drilling activities, but the following
kegiatan team geologi selama Kuartal-1 are the activities of the geological team during
2025: The 1st Quarter of 2025:
1. Melakukan monitoring di area Pit Aktif, 1. Monitoring the Active Pit area, both slope
baik monitoring kestabilan lereng maupun stability monitoring and coal monitoring to
monitoring batubara untuk memantau monitor the suitability between geological
kesesuaian antara Model Geologi & models and actual in the field.
aktual di lapangan.
2. Update Model Geologi berdasarkan data 2. Geological Model Update based on coal
roof/floor batubara dari data survey actual roof/floor data from actual survey data and
dan dari data pemboran drilling data.
3. Analisa kestabilan lereng di area Low 3. Analysis of slope stability in low wall pit
Wall Pit Aktif & area disposal. area active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan 4. Pit and disposal slope stability monitoring
disposal dengan titik pantau prisma dan using monitoring point prism and EWS
ekstensometer EWS. ekstensometer.
5. Menindaklanjuti beberapa IUP yang 5. Follow up on several potential IUP for
potensial untuk dilakukan eksplorasi detailed exploration.
detail.
3. 6. RENCANA KEGIATAN 3. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
Rencana ABN pada periode Kuartal-2 2025 In the 2nd Quarter of 2025, ABN has plans for
ada kegiatan pemboran depresurisasi Pit 6 depressurization drilling Pit 6 Ext & infill
Page 15
Ext & pemboran Infill Pit West Ext . Selain itu drilling Pit West Ext. However, exploration
kegiatan eksplorasi dan geologi juga activities are also focused on the following
difokuskan pada kegiatan berikut: activities:
1. Pengambilan sampel untuk update 1. Sampling for coal quality updates &
kualitas batubara & model geologi di area geological models in the Active Pit area.
Pit Aktif.
2. Monitoring di area Pit Aktif untuk 2. Monitoring in the Active Pit area to monitor
memantau kesesuaian antara Model the suitability between actual and
Geologi dan aktual di lapangan. Geological Models in the field.
3. Melakukan update Model Geologi 3. Update geological model based on
berdasarkan data channel sampling, data sampling channel, actual survey data and
survey aktual dan data pemboran. drilling data.
4. Rekonsiliasi antara Model Geologi 4. Reconciliation between Geological Model
terhadap data survey actual. to actual survey data.
5. Monitoring geotek di area Pit & Disposal. 5. Geotech monitoring in Pit & Disposal
Area.
6. Analisa kestabilan lereng pit dan disposal. 6. Slope stability analysis for Pit and
Disposal.
7. Pemasangan monitoring point untuk 7. Monitoring point installation for slope
pemantauan pergerakan lereng. movement monitoring program.
Names mentioned 15 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Trisensa Mineral Utama
p.2 ×5
unresolved
org
PT Indomining
p.2 ×5
unresolved
org
PT Adimitra Baratama Nusantara
p.2 ×4
unresolved
org
Minister of Investment
p.5
unresolved
org
Menteri Investasi
p.5
unresolved
org
Koordinasi
p.5
unresolved
org
PT Trisensa Mineral
p.5
unresolved
org
PT RPP
p.6
unresolved
org
PT RPP Contractors Contractors Indonesia
p.6
unresolved
org
PT. ABN
p.7 ×2
unresolved
org
PT RPP Contractors Indonesia Kegiatan
p.7
unresolved
org
PT. RPP Contractors Indonesia
p.7
unresolved
org
Departemen Engineering Section Geologist.
p.12
unresolved
org
Departemen Mining
p.14