Page 1
                        PT Stargate Pasific Resources
                     Laporan Eksplorasi/Exploration Report
                     Januari - Maret / January - March 2025


PT Stargate Pasific Resources, didirikan        PT Stargate Pasific Resource, was
berdasarkan Akta Pendirian No 8 tanggal 28      established under the laws of the Republic
Agustus 2006, dihadapan Notaris Hasbullah       of Indonesia, by Notarial Deed No.8 dated
Abdul Rasyid, SH., M.kn. di Jakarta. Akta       28 August 2006, of Hasbullah Abdul
pendirian tersebut disahkan oleh Menteri        Rasyid, SH., M.kn., in Jakarta. The deed
Hukum dan Hak Asasi Manusia dengan surat        was approved by the Minister of Law and
keputusan     nomor     W7-03075HT.01.01-       Human Rights of the Republic of Indonesia
TH.2007 tanggal 23 Maret 2007 (“PT SPR”).       in his letter No. W7-03075HT.01.01-
                                                TH.2007 dated 23 March 2007 (“PT
                                                SPR”).

Anggaran Dasar Perseroan telah mengalami        The Company's Articles of Association
perubahan dari waktu ke waktu. Perubahan        have been amended several times, most
Anggaran Dasar terakhir dituangkan dalam        recently by Deed No. 175 dated 26
Akta No. 175 tanggal 26 November 2024,          November 2024, drawn up Notary Vincent
dibuat dihadapan Notaris Vincent Sugeng         Sugeng Fajar, SH., M.Kn., S.H., in
Fajar, SH., M.Kn. di Jakarta.                   Jakarta.



PT SPR adalah Pemegang Izin Usaha               PT SPR is the Mining Business License for
Pertambangan Operasi Produksi No 668/DPM-       Production Operations No. 668/DPM-
PTSP/VIII/2017 tanggal 3 Agustus 2017, yang     PTSP/VIII/2017 dated 3 August 2017,
dimiliki secara tidak langsung oleh PT United   which is indirectly owned by PT United
Tractors Tbk (“Perseroan”), sebanyak 90 %.      Tractors Tbk ("the Company"), 90 %.

Perseroan melakukan pelaporan kegiatan          The      Company       reports   exploration
eksplorasi periode Januari - Maret 2025 untuk   activities for the period of January - March
mengikuti ketentuan peraturan Bursa.            2025 to comply with stock Exchange
                                                regulations.

Estimasi Biaya Kegiatan Eksplorasi untuk        The cost of Exploration Activities for the
periode Januari sampai dengan Maret 2025        period of January to March 2025 is
adalah estimasi Rp 4.471.528.360.               estimate in the amount of Rp
                                                4.471.528.360.
Kegiatan Eksplorasi yang dilakukan berada di
daerah Lameruru dan Molore, Kecamatan           Exploration activities carried out are
Langgikima, Kabupaten Konawe Utara,             located in Lameruru and Molore,
Provinsi Sulawesi Tenggara.                     Kecamatan    Langgikima,      Kabupaten
                                                Konawe Utara, Province Sulawesi
Pada Januari - Maret 2025, PT SPR melakukan     Tenggara.
kegiatan pengeboran dengan jumlah 399 titik
dan memiliki tingkat kedalaman yang beragam.    In January - March 2025, PT SPR drilled
                                                around 399 holes with the various level of
Kegiatan Eksplorasi dilakukan oleh PT SPR       depth.
dibantu dengan beberapa subkontraktor.
                                                Exploration activities carried out by PT
                                                SPR      are    assisted     by    several
                                                subcontractors.




                                                                                               1
Page 2
                      PT Stargate Pasific Resources
                   Laporan Eksplorasi/Exploration Report
                   Januari - Maret / January - March 2025



AREA EKSPLORASI / EXPLORATION AREA




                Lokasi Site PT. SPR




                                                            2
Page 3
                      PT Stargate Pasific Resources
                   Laporan Eksplorasi/Exploration Report
                   Januari - Maret / January - March 2025




Ket :
Kotraktor   : PT Armindo Driliing
Lokasi      : Block Lameruru




                                                            3
Page 4
                      PT Stargate Pasific Resources
                   Laporan Eksplorasi/Exploration Report
                   Januari - Maret / January - March 2025


                                    Progress                         Depth (Meter)   Total days
Planned (29 November 2024 s.d 12 Mei 2025)                                   10112             140
Target rata-rata harian (Meter)                                              75.00
Actual 27 Februari 2025                                                     103.60
Actual (29 November 2024 - 27 Februari 2025)                               9604.20             76
Sisa hari pencapaian target                                                    508             64
Target rata-rata harian to Date (Meter)                                       7.93

Total Recovery (29 November 2024 - 27 Februari 2025)                       97.45%
Performa Armindo Dari tanggal 29 Nov 2024 - 27 Feb 2025                    94.98%
Target pencapaian selama 76 hari (29 Nov 2024 s.d 27 Feb 2025)               5700          56.37%
Selisih pencapaian target selama 140 hari                                  38.61%
Selisih penyelesaian kegiatan                                                                   7




                                 Progress                            Depth (Meter)   Total days
Planned (12 Maret 2025 s.d 12 Agustus 2025)                                  10000             133
Target rata-rata harian (Meter)                                              75.00

Actual (12 Maret 2025 -28 Maret 2025)                                      1723.80             15
Sisa hari pencapaian target                                                8276.20            118
Target rata-rata harian to Date (Meter)                                      70.14

Total Recovery (12 Maret 2025 - 27 Maret 2025)                             97.99%
Performa armindo Dari tanggal 12 Mar 2025 - 12 Agus 2025                   17.24%
Target pencapaian selama 15 hari (12 Maret 2025 s.d 28 Maret 2025)           1125          11.25%
Selisih pencapaian target selama 15 hari                                    5.99%                8
Estimasi penyelesaian kegiatan                                                                 110




                                                                                                     4
Page 5
                             PT Stargate Pasific Resources
                          Laporan Eksplorasi/Exploration Report
                          Januari - Maret / January - March 2025




Ket :
Kontraktor       : PT Quantus Survey and Drilling Indonesia
Lokasi           : Block Molore


                                   Progress                    Depth (Meter)   Total days
Planned (12 Maret 2025 s.d 10 Juli 2025)                                5294                96
Target rata-rata harian (Meter)                                        60.00

Actual (12 Maret 2025 - 28 Maret 2025)                               2312.10                15
Sisa hari pencapaian target                                          2981.90                81
Target rata-rata harian to Date (Meter)                                36.81

Total Recovery (12 Maret 20245- 28 Maret 2025)                       99.07%
Performa quantus Dari tanggal 28 Mar 2025 - 10 Jul 2025              43.67%
Target pencapaian selama 15 hari (12 Mar 2025 - 27 Mar 2025)             900         17.00%
Selisih pencapaian target selama 15 hari                             26.67%               31
Estimasi Penyelesaian Kegiatan                                                            50




                                                                                             5

File

File Open PDF
Source IDX
Size1.13 MB
Published10 Apr 2025
Pages5
Characters8,026
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 13 people and organisations named in the text · linked when the evidence is strong

linked org PT Stargate Pasific Resources p.1 ×11
linked org United Tractors Tbk p.1 ×2
unresolved org PT Stargate Pasific Resource p.1
unresolved person Abdul Rasyid p.1
unresolved person Rasyid p.1
unresolved org Minister of Law p.1
unresolved org PT SPR p.1 ×9
unresolved person Sugeng Fajar p.1
unresolved person Fajar p.1
unresolved org PT United p.1
unresolved org Tractors Tbk p.1
unresolved org PT Armindo Driliing Lokasi p.3
unresolved org PT Quantus Survey p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result