PT AMMAN MINERAL INTERNASIONAL TBK (AMMN) Annual Public Expose 2025 Materials FY 2024 Earnings Results March 20, 2025
Page 2
TABLE OF CONTENT
Page 3
Disclaimer
Page 4
FY 2024 Highlights
Page 5
A RECORD-BREAKING YEAR FOR GOLD PRODUCTION • • • • • • •
Page 6
EXPANSION PROJECTS HIGHLIGHTS
Page 7
JORC REPORT UPDATES • •
Page 8
Operations Update
Page 9
THE MOST MATERIAL MINED AT BATU HIJAU SINCE FIRST
PRODUCTION IN 2000
•
•
Page 10
HIGHER GOLD GRADE ORE FROM PHASE 7 LED TO RECORD-
BREAKING GOLD PRODUCTION
Page 11
QUARTERLY PRODUCTION
Page 12
HIGH SAFETY PERFORMANCE INDICATED BY TRIFR
•
•
•
•
Page 13
HIGH SAFETY PERFORMANCE INDICATED BY TRIFR (CONT’D) • •
Page 14
Project Expansion Update
Page 15
SMELTER PROGRESS AS OF MARCH 20, 2025 • • • • • •
Page 16
SMELTER COMMISSIONING UPDATE: AMMAN WILL PRODUCE ITS FIRST COPPER CATHODES IN LATE MARCH 2025
Page 17
CCPP AND LNG FACILITIES: CONSTRUCTION COMPLETION BY
END OF 2025
•
•
•
•
Page 18
PROCESSING PLANT EXPANSION UPDATE
•
•
•
•
Page 19
Financial Update
Page 20
FINANCIAL HIGHLIGHTS
Page 21
SOLID FINANCIAL PERFORMANCE DRIVEN BY GOLD RICH ORE
AND FAVORABLE METAL PRICES
•
•
•
Page 22
PRUDENT FINANCIAL MANAGEMENT AND COST CONTROL
Page 23
DEVELOPMENT TIMELINE
Page 24
BANK LOANS HELP FUND EXPANSION PROJECTS During 2024, we successfully refinanced our debt on more favorable terms
Page 25
Guidance and Outlook
Page 26
FY 2025 OUTLOOK AND BEYOND
Page 27
WE HAVE TAKEN A CONSERVATIVE APPROACH TO THE 2025 GUIDANCE AS WE TRANSITION TO PHASE 8 • • • •
Page 28
ELANG UPDATES
Super Giant undeveloped copper and gold orebody1
•
•
•
•
•
•
•
•
Page 29
THANK YOU
Names mentioned 1 people and organisations named in the text · linked when the evidence is strong
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.