(«PD BRM PT Bumi Resources Minerals Tbk. Bakrie Tower, 6 & 10” Floor Komptek Rasuna Epicentrum Jl. H.R. Rasuna Said, Kuningan Jakarta Selatan 12940 Indonesia T 462 21 5794 5698 F 46221 5794 5687 www.bumiresourcesminerals.com LAPORAN TENTANG AKTIVITAS EKSPLORASI OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK. (REPORT ON EXPLORATION ACTIVITIES BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.) PT Citra Palu Minerals Nama Perusahaan (Name of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report) PT Citra Palu Minerals (“PT CPM") Operasi Produksi (Production Operation) Oktober-Desember (October-December) 2024 Daerah Eksplorasi Exploration Areas 1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block 1, Central Sulawesi (Production 2. Blok II, Sulawesi Selatan (Eksplorasi) Operation) 3. Blok IV, Sulawesi Tengah (Eksplorasi) 2. Block Il South Sulawesi (Exploration) 4. Blok V, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration) 5. Blok VI, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exoloration) 5. Block VI, Central Sulawesi (Exploration) Biaya Eksplorasi Exploration Cost 986,381.258 Dolar AS USD 986,381.258 Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pengeboran sumber (7. Continue resource drilling program at the River daya di Prospek River Reef, Blok 1 Poboya, Reef Prospect, Block 1 Poboya, with a current dengan total kedalaman saat ini 60.437,20m. total depth of 60,437.20m. 2. Melanjutkan kegiatan pengeboran sumber |2. Continue resource drilling program in the daya di area Watuputih, Blok I Poboya, dengan Watuputih area, Block I Poboya, with a current total kedalaman saat ini 19.270,85m. total depth of 19,270.85m. 3. Melanjutkan kegiatan pengeboran sumber |3. Continue resource drilling program in the Hill daya di area Prospek Hill Reef 1, Blok | Poboya, Reef 1 Prospect area, Block I Poboya, with a dengan total kedalaman saat ini 17.873,45m. current total depth of 17,873.45m. 4. Melanjutkan kegiatan pemetaan geologi di |4. Continue geological mapping activities in Area Tinabogan Blok IV, dengan total 159 Tinabogan Area Block IV, with a total of 159 sampel batuan dan 57 sample tanah. Tock samples and 57 soil samples. 5. Melanjutkan kegiatan pemetaan geologi di |5. Continue geological mapping activities in area Moutong Blok V, dengan total 147 Moutong area Block V, with a total of 147 —. an LG
Page 2 OCR 0.897
(SD BRM sampel batuan dan 146 sample sedimen sungai. 6. Melakukan pengiriman sampel inti bor untuk analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au # ICP OES multi elemen) dan analisi AAT (Air Asam Tambang) ke Laboratorium PT Geoservices. 7. Melakukan pengiriman sampel batuan, sampel tanah dan sampel sedimen sungai untuk analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au # ICP OES multi rock samples and 146 stream sediment samples. 6. Carried out geochemical analysis from drill core samples for Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICP OES multi elements and AAT (Acid Mine Drainage) by PT Geoservices Laboratory. 7. Carried out geochemical analysis from rock samples, soil samples and stream sediment samples for Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg and combination of Au # ICP OES multi elemen) ke Laboratorium PT Geoservices. elements analysis by PT Geoservices Laboratory. Pihak-Pihak yang Terlibat Inyolved Parties 1. Laboratorium PT CPM 1. Internal PT CPM Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory 4. Bureau Varitas - PT IOL Indonesia 4. Bureau Varitas - PT IOL Indonesia 5. PT Pos Indonesia 5. PT Pos Indonesia 6. PTSN Cargo 6. PTSN Cargo 7. PT Intertek Utama Service 7. PT Intertek Utama Service Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area 1. AAS 1. AAS 2. Spedific Gravity 2. Spedific Gravity 3. Fire Assay 3. Fire Assay 4. Agua Regia Digest 4. Agua Regia Digest 5. Hg Analisis 5. Hg Analysis 6. ICP OES 42 unsur 6. ICP OES 42 elements 7. Natural density, dry density, saturated| 7. Natural density, dry density, saturated density, density, Brazillian test direct shear, ultrasonic velocity, UCS 8. Analisis Air Asam Tambang Brazillian test, direct shear, ultrasonic velocity, UCS 8. ARD Test Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward ihe Preceding Guarter Activities 1. Pengeboran sumber daya di Prospek River Reef Blok 1 Poboya dilakukan dengan menggunakan 2 rig. Total 271 titik bor, termasuk 3 titik bor hidrogeologi dan 13 titik bor geotek, dengan total kedalaman 60.437.20m sampai akhir Desember 2024. Terdapat penambahan 5 titik bor dengan jumlah kedalaman 1.456,70m dari periode 1. Resource drilling program in River Reef Prospect Block I Poboya was conducted using 2 rigs. Total of 271 drill holes, including 3 hyarogeology holes and 13 geotechnical holes, with total depth of 60,437.20m has been reached by the end of December 2024. There are 5 adaltional drill holes with total depth of 1,456.70m from previous period. Yi Pn "Ag
Page 3 OCR 0.901
(PD BRM sebelumnya. Pengeboran — sumberdaya di Prospek Watuputih Blok 1 Poboya dilanjutkan dengan menggunakan 2 rig. Total 62 titik bor dengan total kedalaman 19.270,85m sampai akhir Desember 2024. Terdapat penambahan 10 titik bor dengan jumlah kedalaman — 2831,30m — dari periode sebelumnya. Pengeboran sumberdaya di Prospek Hill Reef 1 Blok 1 Poboya dilanjutkan dengan menggunakan 1 rig. Total 205 titik bor termasuk 2 titik bor geoteknik dengan total kedalaman 17.87345m sampai akhir Desember 2024, Terdapat penambahan 18 titik bor dengan jumlah kedalaman 977,40m dari periode sebelumnya Penambahan jumlah sampel sebanyak 1.338 sampel hasil pengeboran Prospek River Reef Blok | Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, A9, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur), serta 22 sampel untuk analisis AAT (Air Asam Tambang) Penambahan jumlah sampel sebanyak 2.621 sampel hasil pengeboran Prospek Watuputih Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au # ICP 42 unsur. Penambahan jumlah sampel sebanyak 1.043 sampel hasil pengeboran Prospek Hill Reef 1 Blok 1 Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au # ICP 42 unsur dan 33 sampel untuk analisis air asam tambang. Total penambahan sebanyak 159 sampel batuan dan 57 sampel tanah berasal dari kegiatan pemetaan geologi di area Tinabogan Blok IV. Total penambahan sebanyak 3 sampel batuan berasal dari kegiatan pemetaan Geologi di Prospek Moutong Blok V. Resource diilling program in Watuputih Prospect Block 1 Poboya was continued using 2 rigs. Total of 62 drill holes with total depth of 19,270.85m has been reached by the end of December 2024. There are additional 10 drill holes with total depth of 2831.30m rom previous period. Resource drilling program in HI Reef 1 Prospect Block 1 Poboya was continued using 1 rig. Total of 205 drill holes including 2 geotechnical drillholes with total depth of 17,873.45m has been reached by the end of December 2024. There are additional 18 drill holes with total depth of 977.40m from previous period. Total of 1,338 drill core samples from River Reef Prospect of Block 1 Poboya drilling program have been sent to PT Geoseruices Laboratory during this period to be analyzed (Au, Ag, u, Pb, Zn, As Sb, Mo, Hg and combination Au # ICP 42 elements), also 22 samples for ARD (Acid Rock Drainage). Total of 2621 drill core samples from Watuputih Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory during this period to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au #& ICP 42 elements). Total of 1,043 drill core samples from Hill Reef 1 Prospect of Block I Paboya diilling program have been sent to PT Geoservices Laboratory during this period to be analyzed (Au, Ag u, Pb, Zn, As, Sb, Mo, Hg and combination Au 4 ICP 42 elements) and 33 sample for ARD (Acid Rock Drainage). Total additional 159 rock samples and 57 soil samples collected from geological mapping activity at Tinabogan area in Block IV. Total additional 3 rock samples collected from geological mapping activity at Moutong area in Block V. AP An
Page 4 OCR 0.901
(SP BRM Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek | 7. Continue resources drilling program in River River Reef Blok | Poboya dengan tujuan Reef Prospect of Block ! Poboya Prospect with untuk menambah sumber daya di Prospek Objectives to increase resources in River Reef River Reef. Prospect. 2. Melanjutkan kegiatan pengeboran di Prospek | 2. Continue resources drilling program in Watuputih Blok I Poboya dengan tujuan Watuputih Prospect of Block 1 Poboya untuk meningkatkan sumber daya dan Prospect with the objective of resources cadangan di Prospek Watuputih. definition in Watuputih Prospect. 3. Memulai kegiatan pengeboran eksplorasi di | 3 Start exploration drilling program in Barako Prospek Barako Blok | Poboya dengan tujuan Prospect of Block I Poboya Prospect with the untuk mengkonfimasi anomalu geofisika objective is to test geophysics anomaly based berdasarkan hasil survey geofisika CSAMT. on CSAMT geophysical survey analysis. 4. Melanjutkan pemetaan geologi detil di area | 4 Continue geological detailkd mapping at Tinabogan Blok IV dan melakukan persiapan Tinabogan area and conduct preparation for pengeboran di Prospek Anggasan Blok IV. drilling program in Anggasan Prospect in 5. Memulai pemetaan geologi detil di area Block IV. Upper Poboya Blok I. 5. Start detail geological mapping in Upper Poboya area Block I. Hambatan Eksplorasi Barriers to Exploration 1. Kegiatan penambangan tanpa izin (PETI) | 7. Ilegal mining activities by local community. oleh masyarakat sekitar. 2. Pembebasan lahan. 2. land acguisition, 3. Area eksplorasi regional yang masih sulit | 3 Remote area for regional exploration. dijangkau. Perizinan/ Persetujuan Baru Yang Diperoleh New Permit/Approvals Acguired gn PAN
Page 5 OCR 0.926
Nama Perusahaan (SD BRM PT. Dairi Prima Mineral (Narne of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Bulan (Monthiy Exploration Report) PT Dairi Prima Mineral Operasi Produksi Oktober-Desember (October-December) 2024 A. Daerah Eksplorasi Exploration Areas Kegiatan eksplorasi pada Prospek Anjing Hitam sudah selesai dilakukan dan saat ini prospek tersebut memasuki tahap Operasi Produksi. Selain Prospek Anjing Hitam, di dalam wilayah Kontrak Karya DPM masih terdapat prospek- prospek lainnya dengan tahap kegiatan yang berbeda-beda dari eksplorasi regional hingga pengeboran deliniasi sumberdaya. Salah satu prospek yang paling maju pengerjaannya adalah Prospek Lae Jehe yang terletak sekitar 200 meter di sebelah baratlaut Prospek Anjing Hitam. Prospek ini sudah memasuki tahap pengeboran — deliniasi sumberdaya dan masih akan dikembangkan hingga didapatkan sumberdaya mineral dengan klasifikasi terukur dan tertunjuk yang lebih dominan. Filed exploration activities on Anjing Hitam Prospect has already been completed. The prospect currently is in Operation and Production stage. Beside Anjing Hitam Prospect, there are some other prospect areas within DPM Contract of Work tenement. The prospects work progress are in different stages, range from regional exploration to delineation resource drilling. lae Jehe Prospect is the most advantage exploration activities. This prospect is situated approximately 200 meters toward northwest om Anjing Hitam Prospect. This prospect work stage is in resource delmeation drilling and will be developed to get final mineral resource value with dominant measured and Indicated mineral resources dassification. Biaya Eksplorasi Exploration Costs 31.008,51 Dollar AS USD 31,008.51 Bentuk Kegiatan Eksplorasi Form of Exploration Activities Selama bulan Oktober hingga Desember 2024 tidak ada kegiatan eksplorasi. During October to December 2024 there is no exploration activities. Pihak-Pihak yang Terlibat Parties Involved Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Kemajuan Eksplorasi Terhadap Bulan sebelumnya Exploration Progress relative to Preceding Month's Activities
Page 6 OCR 0.878
Es ss” BRM Rencana Pengeboran Selanjutnya Ne Drilling Plan Penambahan titik bor di Prospek Lae Jehe dan Basecamp Intil driling in Lae Jehe and Basecamp Prospect Hambatan Eksplorasi Barriers to Exploration Perizinan / Persetujuan Baru Yang Diperoleh New Permits/ Approvals Acguired « Persetujuan RKAB untuk Tahun 2024-2026 Nomor: T-1793/MB.04/DJB.M/2024 tanggal 14 Oktober 2024. e DPM telah mendapatkan Persetujuan Tekno- Ekonomi Dokumen Studi Kelayakan Kontrak Karya PT Dairi Prima Mineral berdasarkan Surat Persetujuan No. 2150/30/DBM/2015. » Tahap kegiatan PT DPM disesuaikan menjadi Tahap Operasi Produksi berdasarkan Surat Keputusan Menteri Energi dan Sumber Daya Mineral No. 456.K/30/DJB/2017 » DPM 2024-2026 work plan approval (RKAB) No. T-1793/MB.04/DJB.M/2024, 14 October 2024. » Letter from Direktorat Jenderal Mineral dan Batubara No. 2150/30/DBM/2015 awarding Techno-Economic Approval of Feasibility Study Document Contract of Work of PT DPM has already been received. e PT DPM work activity has already been adjusted became Operation Production Phase based on Decree af Energy and Mineral Resources Minister No, 456.K/30/DJB/2017 A3
Page 7 OCR 0.891
GP BRM
II. PT Gorontalo Minerals
Nama Perusahaan
(Name of Company
Tahap Kegiatan KK
(Phase of Activity of Contract of Work)
Laporan Eksplorasi Bulan
(Monthiy Exploration Report
PT Gorontalo Minerals ("PT GM”)
Operasi Produksi (Production Operation)
Oktober-Desember (October-December) 2024
A. | Daerah Eksplorasi Exploration Areas
1. Prospek Motombote North, Blok I|1. Motomboto North Prospect. Block” 1
(Tombulilato), Gorontalo (Tombulilato), Gorontalo
2. Prospek Motomboto East, Blok 1|2. Motomboto East Prospect Block 1
(Tombulilato), Gorontalo (Tombulilato), Gorontalo
3. Kompleks Cabang Kiri, Blok I (Tombulialto), | 3. Cabang Kiri Complex, Block 1 (Tombulilato),
Gorontalo Gorontalo
B. | Biaya Eksplorasi Exploration Costs
179,493.75 Dolar AS USD 179, 493.75
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Melanjutkan uji metalurgi tahap II dengan
berkooridinasi bersama tim penyusun BED
Heap Leach Project untuk big column test
terhadap sampel dengan komposisi 2
sampel komposit dari Prospek Motomboto
North dan 3 sampel komposit dari Prospek
Motomboto East, Blok 1 Tombulilato.
Preparasi sampel sudah dilakukan oleh Tim
Eksternal Lab.
2. Melanjutkan pemetaan geologi dan
pengambilan sampel batuan permukaan di
area Kompleks Cabang Kiri, Blok I
Tombulilato.
3. Total sampel batuan permukaan sebanyak
1.027 sampel dari Kompleks Cabang Kiri
telah dikirimkan ke Laboratorium PT
Geoservices untuk analisis geokimia.
4. Melanjutkan kegiatan tapping compass dan
ridge spur soil sampling pada area Kompleks
Cabang Kiri, Blok 1 Tombulilato.
5. Total sampel tanah sebanyak 370 sampel
dari Kompleks Cabang Kiri telah dikirimkan
ke Laboratorium PT Geoservices untuk
analisis geokirnia.
1. Continuing the second phase of metallurgical
testing in coordination with the BED Heap
Leach Project team for the big column test for
2 composite samples of Motomboto North
Prospect and 3 composite samples of
Motomboto East Prospect, Block ! Tombulilato.
Sample preparation has been completed by
the External Lab Team.
2. Continuing geological mapping and surface
rock samples collecting in Cabang Kiri
Complex area, Block I Tombulilato.
3. A total of 1,027 surface rock samples from
Cabang Kiri Complex have been sent to PT
Geoservices Laboratory for geochemical
analysis.
4. Continuing tapping compass and ridge spur
soil sampling at Cabang Kiri Complex, Block 1
Tombulilato.
5. A total of 370 soil samples from Cabang Kiri
Complex have been sent to PT Geoservices
Laboratory for geochemical analysis.
AN &
W/
Page 8 OCR 0.906
(&P BRM 6. Melanjutkan estimasi sumber daya dan | 6. Continuing the estimation of mineral cadangan mineral — untuk Prospek resources and reserves for Motomboto East Motomboto East dan Motomboto North, and Motomboto North Prospects, as well as serta domain oxide dari Prospek Sungai Mak the oxide domain of Sungai Mak Prospect, Btok | Tombulilato. Block 1 Tombulilato. 7. Melakukan pengeboran eksplorasi di area | 7. Conducting exploration drilling in Cabang Kiri Prospek Cabang Kiri East, Blok I Tombulilato East Prospect area, Block 1 Tombulilato with dengan total kedalaman pengeboran saat Current drilling progress 1,931.80 metres from ini 1.931,80 meter dari total rencana a total newest plan of 67,612.30 metres and 67.612,30 meter dan telah menyelesaikan akeady completed one drill hole out of 69 satu lubang bor dari total 69 rencana planned drill holes. lubang bor. 8. Total sampel pengeboran Prospek Cabang | 8. A total of 649 core samples from Cabang Kiri Kiri East, Blok I Tombulilato sebanyak 649 East Prospect area, Block | Tombulilato have conto inti bor telah dikirimkan ke been sent to the PT Geoservices Laboratory for Laboratorium PT Geoservices untuk analisis geochemical analysis. geokimia. Pihak-Pihak yang Terlibat Parties Involved 1. Laboratorium PT Geoservices. 1. PT Geoservices' Laboratory. 2. PT Sumagud Sapta Sinar. 2. PT Sumagud Sapta Sinar. 3. PT Minera Nusa Drillindo. 3. PT Minera Nusa Drillindo, Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Kemajuan Eksplorasi Terhadap Kegiatan | Exploration Progress toward Previous Guarters Triwulan Sebelumnya Activities 1. Menyelesaikan uji metalurgi berupa | 1. Completing bottle roll (metallurgical test) of intermittent bottle roll untuk Domain Silika Silica Au Transition and Supergene Domain of Au Transisi dan Supergen dari Prospek Sungai Mak Prospect, Block ! Tombulilato. Sungai Mak, Blok I Tombulilato. 2. Penambahan jumlah sampel batuan! 2 7ne addition of 109 surface rock samples from permukaan sebanyak 109 sampel dari Cabang Kiri Complex, has been sent to the PT Kompleks Cabang Kiri yang telah dikirimkan Geoservices Laboratory for geochemical ke Laboratorium PT Geoservices untuk analysis during this period. analisis geokimia dalam periode ini. 3. Menyelesaikan pengujian Geokimia sampel | 3. Completing geochemical testing of 109 batuan permukaan sebanyak 109 sampel surface rock samples from the Cabang Kiri dari Kompleks Cabang Kiri, Blok I Complex, Block I Tombulilato. Tembulilato. 4. Penambahan jumlah sampel tanah sebanyak | 4 The addition of 81 soil samples from Cabang 81 sampel dari Kompleks Cabang Kiri yang Kiri Complex, has been sent to the PT telah dikirimkan ke Laboratorium PT Geoservices Laboratory for geochemical Geoservices untuk analisis geokimia dalam analysis during this period. periode ini.
Page 9 OCR 0.902
(AD BRM 5. Completing the geochemical testing of 63 soil samples from Cabang Kiri Complex, Block 1 Tombulilato. 5. Menyelesaikan pengujian Geokimia sampel tanah sebanyak 63 sampel dari Kompleks Cabang Kiri, Blok | Tombulilato. 6. Memulai aktivitas pengeboran di Prospek | 6. Cabang Kiri East, Blok I Tombulilato dengan total kedalaman pengeboran 1.931,80 meter dari total rencana 67.612,30 meter dan telah menyelesaikan satu lubang nor dari total 69 rencana lubang bor. Starting drilling activities in Cabang Kiri East Prospect area, Block ! Tombulilato with drilling progress 1,931.80 metres from a total newest plan of 6261230 metres and already completed one drill hole of a total of 69 planned drill holes. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pemetaan geologi | 1. Continuing geological mapping and surface dan pengambilan — sampel batuan permukaan di area Kompleks Cabang Kiri dan area Main Ridge. rock sampling in Cabang Kiri Complex and Main Ridge area. 2. Melakukan kegiatan ridge spur soil sampling | ». Conducting ridge spur soil sampling at the pada area Main Ridge. Cabang Kiri South Ridge Prospect. 3. Melanjutkan estimasi sumber daya dan|3. Gontinuing mineral resource and reserve cadangan mineral untuk Prospek estimation for the Motomboto East and Motomboto East dan Motomboto North, Motomboto North Prospects, as well as the serta dornain oxide dari Prospek Sungai oxide domain of the Sungai Mak Prospect. Mak. 4. Melakukan persiapan kegiatan pengeboran | 4. Preparing for dhilling activities at the di area Motomboto, Blok I Tombulilato. Motomboto, Block I Tombulilato, Hambatan Eksplorasi Barriers to Exploration Munculnya aktivitas Penambangan Tanpa Izin (PETI) baru di area sepanjang jalur bukaan jalan perintis. New Illegal Mining Activity (PETI) in the opening area alongside the pioneering road construction. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired am LA LN
Page 10 OCR 0.898
IV. PT Linge Mineral Resources Nama Perusahaan (Name of Company Tahap Kegiatan IUP (Phase of Activity of Mining Permih Laporan Eksplorasi Periode (Period of Exploration Report) PT Linge Mineral Resources (“PT LMR”) Eksplorasi (Exp/oration) Oktober-Desember (October-December) 2024 Daerah Eksplorasi Exploration Areas 1. Prospek Bulan (Proyek Abong) 2. Prospek Bintang 1 (Proyek Abong) 3. Prospek Bintang 2 (Proyek Abong) 4. Eksplorasi Regional (Semua Lokasi dalam IUP) 1. Bulan Prospect (Abong Project) 2. Bintang 1 Prospect (Abong Project) 3. Bintang 2 Prospect (Abong Projec) 4. Regional Exploration (Located by IUP) Biaya Eksplorasi Exploration Cost 445,923 Dolar AS USD 445,923 Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan — studi — untuk — memenuhi kebutuhan AMDAL meliputi Studi Geoteknik, Hidrogeologi dan Metalurgi. 2. Pelaksanaan kegiatan studi menggunakan alat pengeboran dengan Rig Sumatech 200 maksimal kedalaman studi 150m 3. Melakukan pengeboran sesuai kebutuhan teknis terkait data untuk dilakukan studi metalurgi, geotek dan hidrogeologi di dalam Proyek Abong. 4. Total sampel batuan sebanyak 597 sampel studi telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia 5. Melanjutkan Proses penyelesaian studi AMDAL , Mendapatkan Persetujuan Teknis di Bidang Pengelolaan Limbah B3 untuk Kegiatan Penimbunan Limbah B3 (LB3) dan permohonan Persetujuan Teknis Pembuangan Air Limbah ke Badan Permukaan Air (BMAL) 6. Menunggu persetujuan Adendum Studi Kelayakan PT LMR oleh Direktorat Jenderal Mineral dan Batubara. Saat ini dokumen 1. Continuing studies to for AMDAL including Geotechnical, Hyarogeology and Metallurgical studies. 2. Study activities using driling took with a Sumatech 200 Rig with a maximum study depth of 150m 3. Drilling work according to technical needs regarding data to carry out metallurgical, geotechnical and hydrogeological studies in the Abong Project LA Total 597 sample study have been sent to PT Geoservices Laboratory for geochemical analysis 5. The process of completing the AMDAL study and has received Technical Approval in the Field of Hazardous Waste Management for Hazardous Waste Storage Activities (B3) and reguesting Technical Approval for Waste Water Disposal to Surface Water Bodies (BMAL) 6. Waiting approved Addendum of Feasibility Study of PT LMR by Directorate General of Mineral and Coal. Currently the document is
Page 11 OCR 0.920
GP BRM sedang dievaluasi oleh Direktorat Jenderal Mineral dan Batubara. being evaluated by Directorate General of Mineral and Coal. Pihak-Pihak yang Terlibat Involved Parties PT Bahtera Ratu Engineering PT Geoservices PT Namsuma Luban Abadi (Proposed Studi Drilling) PT Jarvis Sinergi Yasa (Geotek-hidro studi) PT Bahtera Ratu Engineering PT Geoservices PT Namsuma Luban Abadi (Proposed Drilling Study) PT Jarvis Sinergi Yasa (Geotech-hyaro study) Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding Guarter Activities 1. Menyelesaikan analisis geokimia 127 sampel batuan di Laboratorium PT Geoservices. 2. Proses penyelesaian vendor terkait studi untuk memenuhi kebutuhan AMDAL meliputi Studi Geoteknik, Hidrogeologi dan Metalurgi. 3. Melakukan Studi Geoteknik, Hidrogeologi, Geolistrik dan Metalurgi lingkup Abong. 4. Proses Persetujuan Adendum Studi Kelayakan oleh Direktorat Jenderal Mineral dan Batubara , melanjutkan penyelesaian AMDAL serta permohonan Persetujuan Teknis Pemenuhan Baku Mutu Air Limbah dalam rangka Pembuangan Air Limbah ke Badan Permukaan Air. 1. Completing the analysis of 127 Rock Chips Samples by PT Geoservices Laboratory. 2. Vendor completion process related to studies to for AMDAL including Geotechnical, Hydrogeology and Metallurgical studies 3. Geotechnical, Hyarogeology, Geoelectric and Metallurgy Study scope Abong area. 4. Approved Procces Addendum FS by Directorate General of Mineral and Coal, continue to complete the AMDAL study and Technical Approval for Waste Water Disposal to Surface Water Bodies. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pemetaan detail geologi atau follow up work di area Proyek Abong. 2. Melanjutkan kegiatan eksplorasi lanjutan atau follow up work di luar Prospek Abong, yaitu North Bintang, North Bulan, Lumut (Ujung Kambing dan Genting Kari). 3. Melanjutkan pengeboran sesuai kebutuhan teknis terkait data untuk dilakukan studi metalurgi, di dalam Proyek Abong. 4. Melakukan Studi Geoteknik, Analisis Sink Hole, dan Metalurgi lingkup Abong. 1. Continue geology exploration detail activities or follow up work in the field in Abong Project 2. Continue further exploration activities or follow up work outside the Abong Prospect, namely North Bintang, North Bulan, Lumut (Ujung Kambing and Genting Kari). 3 Drilling work according to technical needs regarding data to carry out metallurgical, geotechnical and hydrogeological studies in the Abong Project. 4. Geotechnical, Sinkhime analysis and Metallurgy Study scope Abong area. 5. Obtain Addendum Feasibility Study Techno
Page 12 OCR 0.899
(SP BRM Economy Approval from Directorate General of 5. Mendapatkan Persetujuan Tekno Ekonomi Adendum Studi Kelayakan dari Direktorat Mineral and Coal. Jenderal Mineral dan Batubara. 6. Continue to complete the AMDAL study included 6. Melanjutkan penyelesaian studi ” AMDAL technical. termasuk sidang teknis terbatas. Hambatan dalam studi AMDAL Barriers of Amdal Studies 1. There are Illegal Mining (PETI) activities in Bulan Prospect. 1. Penambangan Tanpa Izin (PETI) di Prospek Bulan. 2. There are Illegal Mining (PETI) activittes in Main River with heavy eguipment (Exavator) 2. Penambangan Tanpa Izin (PETI) di Area Sungai utama dengan menggunakan alat berat 3. The emergence of a@ third party that will accommodate PETI in the Abong Prospect 3. Munculnya pihak ketiga yang akan mengakomodir PETI di Prospek Abong. 4. Aktivitas Illegal Logging di Lokasi PT LMR. 4. There are Illegal Logging activities in LMR Area Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired 1. Persetujuan Teknis di Bidang Pengelolaan | 7. Technical Approval in the Field of Hazardous Limbah B3 untuk Kegiatan Penimbunan Limbah B3 untuk Penghasil PT Linge Mineral Resources Nomor: 5.682/PSLB3/PLB3/PLB.3/10/2024 tanggal 18 Oktober 2024. 2. Persetujuan Perpanjangan Suspensi Izin Usaha Pertambangan Tahap Kegiatan Eksplorasi PT Linge Mineral Resources Nomor: T- 2290/MB.04/DJB.M/2024 tanggal 17 Desember 2024 berlaku 25 Februari 2025 - 25 Februari 2026. . Approval of Extension of Suspension of Mining Waste Management for Hazardous Waste Storage Activities for Producer PT Linge Mineral Resources Number: S.682/PSLB3/PLB3/PLB.3/10/2024 dated 18 October 2024. Business Permit for Exoloration Activity Phase of PT Linge Mineral Resources Number: T- 2290/MB.04/DJB.M/2024 dated 17 December 2024 valid from 25 February 2025 - 25 February 2026 1 Pn
Page 13 OCR 0.901
V.
Nama Perusahaan
(2 BRM
PT
Suma Heksa Sinergi
(Name of Company
Tahap Kegiatan IUP
(Phase of Activity of Mining Permih
Laporan Eksplorasi Periode
(Period of Exploration Report)
PT Suma Heksa Sinergi (“PT SHS")
Operasi Produksi (Production Operation Phase)
Oktober-Desember (October-December) 2024
A. | Daerah Eksplorasi Exploration Areas
Prospek Cisadang Central dan Cisadang North Cisadang Central and Cisadang North Prospect
B. | Biaya Eksplorasi Exploration Cost
352,251 Dolar AS USD352,251
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Melanjutkan kegiatan pemetaan geologi di | 7. Continuing geological mapping activities in
Prospek Cisadang West, Pasir Karang dan the Cisadang West, Pasir Karang and Pasir
Pasir Awi. Awi Prospect.
2. Melanjutkan kegiatan rekonstruksi core| 2 Continuing core drilling — reconstruction
pengeboran. activities,
3. Melakukan kegiatan pengeboran di Prospek | 3. Conducting drilling activities at the Cisadang
Cisadang Central untuk program pemboran Central Prospect for infill resources,
sumberdaya, geoteknik, dan hidrogeologi. geotechnic, and hydrogeology studies drilling
4. Melanjutkan kerjasama dengan konsultan program.
untuk cadangan JORC. 4. Continuing to collaborate with consultant for
5. Melanjutkan kerjasama dengan konsultan JORC Reserve.
untuk studi Metallurgy dan Processing. 5. Continuing to collaborate with consultant for
6. Melakukan pengiriman sampel inti bor Metallurgy and Processing study.
sejumlah 2315 conto dari kegiatan pemboran | & Sending a total 2315 drill core samples from
mfill sumberdaya untuk analisa geokimia (Au, infill resources drilling — program — for
Ag) dengan metode fire assay dan ICP OES. geochemical analysis (Au, Ag) with fire assay
7. Melakukan pengiriman sample inti bor dan ICP OES.
sejumlah 47 conto dari kegiatan pemboran | 7. Sending a total 47 drill core samples from
studi geoteknik ke PT LAPI-ITB untuk analisa geotechnic studies drilling program to PT
sifat fisik dan sifat mekanik batuan. LAPIITB for analysis of physical properties and
8. Melakukan pengiriman sample inti bor mechanical properties of rocks.
sejumlah 10 conto dari kegiatan pemboran | & Sending a total 10 drill core samples from
studi hidrogeologi ke PT Jarvis untuk analisa hydrogeology studies drilling program to PT
permeabilitas batuan. Jarvis for rock permeability analysis.
9. Melakukan pengambilan sampel air untuk | 9 Conducting water sampling for
studi hidrogeologi di area prospek Cisadang hydrogeological study at Cisadang Central
Central. Prospect.
10. Melanjutkan proses permohonan Persetujuan | 10. Continuing the Forest Area Use Approval
peninjauan kembali Penggunaan Kawasan ("PPKH”) application process for further
Satu
AAN
N
Page 14 OCR 0.886
(DP BRM Hutan (“PPKH”) untuk eksplorasi lanjutan. exploration, Pihak-Pihak yang Terlibat Involved Parties 1. PT Namsuma Luban Abadi 1. PT Namsuma Luban Abadi 2. Koperasi Produsen Limantaka 2. Limantaka Producer Cooperative 3. PT Haluan Baru Energi 3. PT Haluan Baru Energi 4. Laboratorium PT Geoservices 4. PT Geoservices Laboratory 5. CV Anugerah Mitra Sejahtera 5. CV Anugerah Mitra Sejahtera 6. CV. Cipta Perdana Mandiri 6. CV. Cipta Perdana Mandiri 7. PT Universal Eco Pacific 7. PT Universal Eco Pacific 8. PT Petra Abadi Integrasi & PT Petra Abadi Integrasi 9. PT Micromine Indonesia Perdana 9. PT Micromine Indonesia Perdana 10. PT Enda Prosindo 10. PT Enda Prosindo 11. PT Tokopedia 11. PT Tokopedia 12. PT LAPI-ITB 12, PT LAP-TB 13. PT Jarvis 13. PT Jarvis 14. Laboratorium Klinik Midlab Medika 14. Clinic Laboratorium Midlab Medika 15. PT Anugrah Analisis Sempurna 15. PT Anugrah Analisis Sempurna Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area - Specific Gravity - Specific Gravity - Fire Assay -. Fire Assay - Agua Regia Digest - Agua Regia Digest - KP OESA unsur - ICP OESA elements - Uji Slug (Shallow Dug Well Recovery) - Slug Test Uji Sifat Fisik (PP) Uji Kuat Tarik Tidak Langsung (BZ) Uji Kuat Geser Langsung (DS) Uji Kuat Tekan Bebas (UCS) Uji Triaksial (TX) Uji Permeabilitas Physical Properties Test (PP) Brazilian Test (B2) Direct Shear Test (DS) Uniaxial Compressive Strength Test (UC5) Triaxial Test (TX) Permeability Test Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding Guarter Activities 1. Melanjutkan kegiatan pemetaan geologi di Prospek Cisadang Central dan Cisadang North. Melanjutkan pengeboran. Melakukan kegiatan pengeboran di Prospek Cisadang Central untuk program pemboran sumberdaya, geoteknik dan hidrogeologi. kegiatan rekonstruksi core 1. Continuing geological mapping activities in the Cisadang Central and Cisadang North Prospect. Continuing core drilling — reconstruction activities. Conducting drilling activities at the Cisadang Central Prospect for infill resources, geotechnic, and hydrogeology studies drilling Ai ap aga
Page 15 OCR 0.886
(SP BRM 4. Melanjutkan kerjasama dengan konsultan untuk cadangan JORC. program. 4. Continuing to collaborate with consultant for 5. Melanjutkan kerjasama dengan konsultan JORC Reserve. untuk Metallurgy dan Processing. 5. Continuing to collaborate with consultant for 6. Melakukan pengiriman sampel inti bor Metallurgy and Processing. sejumlah 1616 conto dari kegiatan pemboran | £ Sending a total 1616 drill core samples from infill sumberdaya untuk analisa geokimia (Au, infill resources drilling program — for Ag) dengan metode fire assay dan ICP OES. geochemical analysis (Au, Ag) with fire assay 7. Melakukan peninjauan lapangan bersama tim dan ICP OES. konsultan geoteknik PT Jarvis di prospek | 7 Conducting a field review with geotechnical Cisadang Central untuk pengecekan kondisi consultant of PT Jarvis team at Cisadang aktual area rencana pit Cisadang Central Central prospect to check actual conditions of 8. Melakukan uji hidrogeologi “Stug Test" pada Cisadang Central pit plan area. 1 titik studi pengeboran hidrogeologi di | g Gonducting hydrogeological “Slug Test” on 1 prospek Cisadang Central hole of hydrogeological study drilling program 9. Melakukan pemetaan hidrogeologi di area at Cisadang Central Prospect prospek Cisadang Central 9. Conducting hydrogeological mapping at 10. Melakukan pengambilan sampel air untuk Cisadang Central Prospect. studi hidrogeologi di area prospek Cisadang | 49 Gonducting water sampling for Central. nydrogeological study at Cisadang Central 11. Melakukan kegiatan Bimbingan — dan Prospect. Pengawasan (Binwas) Terpadu ESDM tahun | 37, conducting integrated ESDM guidance and 2024. supervision activities in 2024. 12. Melanjutkan proses permohonan Persetujuan | 32 continuing the Forest Area Use Approval Penggunaan Kawasan Hutan (“PPKH") untuk (“PPKH”) application process for further eksplorasi lanjutan. exploration. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pemetaan geologi di| 7. Continuing geological mapping activity at Prospek Cisadang West, Pasir Karang dan Pasir Cisadang West, Pasir Karang dan Pasir Awi Awi. prospect 2. Melanjutkan kegiatan pengeboran di Prospek | 2. Continuing drilling activities at the Cisadang Cisadang Central untuk jnfill sumberdaya yang Central Prospect for infill resources in berada di Kawasan Hutan Produksi (HP). Production Forest Area. 3. Melanjutkan kegiatan finalisasi rekonstruksi | 3. Continuing of finalization activities of core core pengeboran dari kegiatan pengeboran drilling reconstruction from historical drillhole. terdahulu. Hambatan Eksplorasi Barriers to Exploration 1. Terdapat tumpang tindih area dengan PT Jascleans untuk area pembangkit litrik tenaga micro hydro yang berada disamping area Sungai Ciliman dari prospek Cisadang Central hingga Gunung Gundil. 1. Overlapping with PT Jascleans for micro hydro power plant area beside the Ciliman River from Prospek Cisadang Central to Gunung Gundil. BN AI HJ
Page 16 OCR 0.923
(GP BRM 2. Terdapat tumpeng tindih dan aktifitas penambangan aktif komoditi andesit oleh PT Mandala Putra Persada (MPP) dengan izin OP (Operasi Produksi) seluas 9.9 Ha yang berada di area prospek Pasir Karang. 3. Keberadaan lokasi IUP PT SHS berada di dekat area pemukiman masyakat. 2. There are overlapping and active mining activities for andesite commodiy by PT Mandala Putra Persada (MPP) with production permit covering area 9.9 ha located in Pasir Karang prospect. 3. The location of the IUP PT SHS is near a community residential area. Perizinan/ Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired Perizinan terkait Persetujuan Penggunaan Kawasan Hutan (“PPKH”) untuk eksplorasi lanjutan sudah disetujui oleh Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia pada tanggal 16 Juli 2024 dan berlaku hingga 2 tahun yang tertera pada SK 854 tahun 2024 Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia dengan luasan 383.87 Ha. Permit related to Forest Area Use Approval (CPPKH”) for further exploration has been approved by Ministry of Environment and Forestry Of Republic of Indonesia on 16 July 2024 , valid for 2 years and stated in SK 854 of 2024 from Ministry of Environment and Forestry of Republic of Indonesia with a total area 383.87 Ha.
Names mentioned 52 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Citra Palu Minerals Nama Perusahaan
p.1
unresolved
org
PT Citra Palu Minerals
p.1
unresolved
org
PT Geoservices.
p.2 ×16
unresolved
org
PT Geoservices Laboratory.
p.2 ×12
unresolved
org
PT Geoservices Laboratory. Pihak-Pihak
p.2
unresolved
org
PT CPM Laboratory
p.2
unresolved
org
PT Sumagud Sapta Sinar
p.2 ×4
unresolved
org
PT IOL Indonesia
p.2 ×2
unresolved
org
PT Intertek Utama Service
p.2
unresolved
org
PT Intertek Utama Service Metode Pengujian
p.2
unresolved
org
PT Geoseruices Laboratory
p.3
unresolved
org
PT. Dairi Prima Mineral
p.5 ×2
unresolved
org
PT Dairi Prima Mineral Operasi Produksi Oktober-Desember
p.5
unresolved
org
PT DPM
p.6 ×3
unresolved
org
Menteri Energi dan Sumber Daya Mineral
p.6
unresolved
org
Direktorat Jenderal Mineral
p.6
unresolved
org
PT Gorontalo Minerals Nama Perusahaan
p.7
unresolved
org
PT Gorontalo Minerals
p.7
unresolved
org
PT GM
p.7
unresolved
org
PT Minera Nusa Drillindo.
p.8 ×2
unresolved
org
PT Kompleks Cabang Kiri
p.8
unresolved
org
PT Linge Mineral Resources Nama Perusahaan
p.10
unresolved
org
PT Linge Mineral Resources
p.10 ×5
unresolved
org
PT LMR
p.10 ×4
unresolved
org
Permukaan Air
p.10 ×2
unresolved
org
Direktorat Jenderal Mineral dan Batubara. Saat
p.10
unresolved
org
Directorate General of Mineral and Coal. Currently
p.10
unresolved
org
Direktorat Jenderal Mineral dan Batubara.
p.11 ×2
unresolved
org
Directorate General of Mineral and Coal. Pihak-Pihak
p.11
unresolved
org
PT Bahtera Ratu Engineering
p.11 ×2
unresolved
org
PT Namsuma Luban Abadi
p.11 ×4
unresolved
org
PT Jarvis Sinergi Yasa
p.11 ×2
unresolved
org
PT Suma Heksa Sinergi
p.13 ×2
unresolved
org
PT SHS
p.13 ×3
unresolved
org
PT LAPI-ITB
p.13 ×2
unresolved
org
PT Jarvis
p.13 ×5
unresolved
org
Koperasi Produsen Limantaka
p.14
unresolved
org
PT Haluan Baru Energi
p.14 ×2
unresolved
org
PT Universal Eco Pacific
p.14 ×2
unresolved
org
PT Petra Abadi Integrasi
p.14 ×2
unresolved
org
PT Micromine Indonesia Perdana
p.14 ×2
unresolved
org
PT Enda Prosindo
p.14 ×2
unresolved
org
PT LAP-TB
p.14
unresolved
org
PT Anugrah Analisis Sempurna
p.14
unresolved
org
PT Anugrah Analisis Sempurna Metode Pengujian
p.14
unresolved
org
PT Jascleans
p.15 ×2
unresolved
org
PT Mandala Putra Persada
p.16 ×2
unresolved
org
Kementerian Lingkungan Hidup dan Kehutanan Republik Indonesia
p.16
unresolved
org
Kementerian Lingkungan Hidup
p.16
unresolved
org
Ministry of Environment and Forestry Of Republic of Indonesia
p.16 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.