 Nomor Surat                        013/S/LGL-CORSEC/TBP/I/2025

 Nama Perusahaan                    PT Trimegah Bangun Persada Tbk.

 Kode Emiten                        NCKL

 Lampiran                           0

 Perihal                            Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk OCT 2024 Sebagai Berikut :

                                                                                       Hasil aktivitas
      Nama           Area yang
                                  Total biaya yang     Pihak yang        Metode         eksplorasi
   Perusahaan/       dilakukan                                                                         Rencana tindak
                                        telah          melakukan      pengujian dan    hingga akhir
      Anak            aktivitas                                                                            lanjut
                                    dikeluarkan        eksplorasi     pemilihan area      periode
   perusahaan        eksplorasi
                                                                                       pelaporan ini
  PT Trimegah        Blok TBP-     3.052.843.432      PT Trimegah Pemilihan area Periode bulan Perseroan akan
 Bangun Persada       Kawasi                         Bangun Persada pemetaan dan         Oktober -    melanjutkan
      Tbk                                                 Tbk          pengeboran Desember telah        kegiatan
                                                                        dilakukan       dilakukan     pengeboran
                                                                       berdasarkan      pemboran      pada titik-titik
                                                                        Rencana      sebanyak 334 bor berikutnya
                                                                    Penambangan hole, dengan           yang sudah
                                                                    (tahunan dan 5 total kedalaman direncanakan.
                                                                     tahunan) yang 5.326 meter.
                                                                   dipengaruhi oleh        Hasil
                                                                      target tonase    pengeboran
                                                                   dan kadar nikel. dengan total
                                                                   Analisa data bor intercept limonit
                                                                        dilakukan    CoG lebih dari
                                                                    dengan metoda       atau sama
                                                                           XRF      dengan 0,8% Ni
                                                                     Spectrometry.      sepanjang
                                                                                        1.155,6 m,
                                                                                     ketebalan rata-
                                                                                      rata 4 m pada
                                                                                    kadar Ni 1,09%
                                                                                     dan Co 0,13%.
                                                                                     Total intercept
                                                                                      saprolite CoG
                                                                                     lebih dari atau
                                                                                      sama dengan
                                                                                    1,4% sepanjang
                                                                                        709.49 m,
                                                                                     ketebalan rata-
                                                                                        rata 3,9 m
                                                                                    dengan kadar Ni
                                                                                          1,73%.
Page 2
                                                                                Hasil aktivitas
    Nama         Area yang
                               Total biaya yang   Pihak yang      Metode         eksplorasi
 Perusahaan/     dilakukan                                                                      Rencana tindak
                                     telah        melakukan    pengujian dan    hingga akhir
    Anak          aktivitas                                                                         lanjut
                                 dikeluarkan      eksplorasi   pemilihan area      periode
 perusahaan      eksplorasi
                                                                                pelaporan ini
PT Gane Permai Blok GPS-Loji    846.242.739 PT Gane Permai Pemilihan area Periode bulan Perseroan akan
   Sentosa                                     Sentosa      pemetaan dan       Oktober -     melanjutkan
                                                              pengeboran Desember telah        kegiatan
                                                               dilakukan       dilakukan     pengeboran
                                                              berdasarkan      pemboran      pada titik-titik
                                                               Rencana       sebanyak 33 bor berikutnya
                                                           Penambangan hole, dengan           yang sudah
                                                           (tahunan dan 5 total kedalaman direncanakan.
                                                            tahunan) yang     1.022 meter
                                                          dipengaruhi oleh        Hasil
                                                             target tonase    pengeboran
                                                           dan kadar nikel. dengan total
                                                          Analisa data bor intercept limonit
                                                               dilakukan    CoG lebih dari
                                                           dengan metoda       atau sama
                                                                  XRF      dengan 0,8% Ni
                                                            Spectrometry. sepanjang 49,44
                                                                             m, ketebalan
                                                                           rata-rata 3,09 m
                                                                            pada kadar Ni
                                                                            1,11% dan Co
                                                                             0,08%. Total
                                                                                intercept
                                                                             saprolite CoG
                                                                            lebih dari atau
                                                                             sama dengan
                                                                           1,4% sepanjang
                                                                                35,44 m,
                                                                            ketebalan rata-
                                                                              rata 2,08 m
                                                                           dengan kadar Ni
                                                                                 1,67%.
Page 3
                                                                                Hasil aktivitas
   Nama         Area yang
                             Total biaya yang    Pihak yang       Metode         eksplorasi
Perusahaan/     dilakukan                                                                       Rencana tindak
                                   telah         melakukan     pengujian dan    hingga akhir
   Anak          aktivitas                                                                          lanjut
                               dikeluarkan       eksplorasi    pemilihan area      periode
perusahaan      eksplorasi
                                                                                pelaporan ini
PT Jikodolong   Blok JMP-     3.151.413.724     PT Jikodolong Pemilihan area Periode bulan Perseroan akan
Megah Pertiwi   Jikodolong                      Megah Pertiwi pemetaan dan         Oktober -     melanjutkan
                                                                  pengeboran Desember telah kegiatan survey
                                                                   dilakukan       dilakukan     titik bor dan
                                                                  berdasarkan      pemboran      melanjutkan
                                                                   Rencana       sebanyak 76         aktifitas
                                                               Penambangan hole, dengan          pengeboran.
                                                               (tahunan dan 5 total kedalaman
                                                                tahunan) yang     5.326 meter
                                                              dipengaruhi oleh        Hasil
                                                                 target tonase    pengeboran
                                                              dan kadar nikel. dengan total
                                                              Analisa data bor intercept limonit
                                                                   dilakukan    CoG lebih dari
                                                              dengan metoda        atau sama
                                                                      XRF      dengan 0,8% Ni
                                                                Spectrometry.      sepanjang
                                                                                   199,17 m,
                                                                                ketebalan rata-
                                                                                  rata 2,85 m
                                                                                pada kadar Ni
                                                                                1,04% dan Co
                                                                                 0,11%. Total
                                                                                    intercept
                                                                                 saprolite CoG
                                                                                lebih dari atau
                                                                                 sama dengan
                                                                               1,4% sepanjang
                                                                                   250,08 m,
                                                                                ketebalan rata-
                                                                                  rata 3,62 m
                                                                               dengan kadar Ni
                                                                                     1,68%.
Page 4
                                                                                  Hasil aktivitas
     Nama          Area yang
                                Total biaya yang   Pihak yang      Metode          eksplorasi
  Perusahaan/      dilakukan                                                                      Rencana tindak
                                      telah        melakukan    pengujian dan     hingga akhir
     Anak           aktivitas                                                                         lanjut
                                  dikeluarkan      eksplorasi   pemilihan area       periode
  perusahaan       eksplorasi
                                                                                  pelaporan ini
   PT Gane          Blok GTS     2.647.258.673     PT Gane       Pemilihan area Periode bulan Perseroan akan
   Tambang                                         Tambang        pemetaan dan         Oktober -     melanjutkan
   Sentosa                                         Sentosa          pengeboran Desember telah kegiatan survey
                                                                     dilakukan         dilakukan      titik bor dan
                                                                    berdasarkan        pemboran      melanjutkan
                                                                      Rencana        sebanyak 68          aktifitas
                                                                 Penambangan hole, dengan            pengeboran.
                                                                 (tahunan dan 5 total kedalaman
                                                                  tahunan) yang       1.322 meter
                                                                dipengaruhi oleh          Hasil
                                                                   target tonase      pengeboran
                                                                dan kadar nikel. dengan total
                                                                Analisa data bor intercept limonit
                                                                     dilakukan      CoG lebih dari
                                                                dengan metoda          atau sama
                                                                        XRF        dengan 0,8% Ni
                                                                  Spectrometry. sepanjang 370,9
                                                                                     m, ketebalan
                                                                                    rata-rata 5,8 m
                                                                                     pada kadar Ni
                                                                                    1,05% dan Co
                                                                                      0,1%. Total
                                                                                        intercept
                                                                                     saprolite CoG
                                                                                    lebih dari atau
                                                                                     sama dengan
                                                                                   1,4% sepanjang
                                                                                       303,51 m,
                                                                                    ketebalan rata-
                                                                                      rata 5,32 m
                                                                                   dengan kadar Ni
                                                                                         1,72%.
    PT Obi         Blok OAM       11.779.035        PT Obi      Pemetaan akan          Persiapan    Perseroan akan
   Anugerah                                        Anugerah     mulai dilakukan          berupa      melanjutkan
    Mineral                                         Mineral      pada Q1 tahun sosialisasi dan kegiatan survey
                                                                     2025 pada       perencanaan      titik bor dan
                                                                   potensi laterit      kegiatan.    melanjutkan
                                                                       untuk                              aktifitas
                                                                    menambah                         pengeboran.
                                                                   Sumberdaya.

Demikian untuk diketahui.


Hormat Kami,
PT Trimegah Bangun Persada Tbk.




Franssoka Yunus Sumarwi

Legal Manager & Corporate Secretary




PT Trimegah Bangun Persada Tbk.
Jalan Jendral Sudirman Kav. 1
Page 5
Telepon : +62-21 5722924, Fax : +62-21 5722924, www.tbpnickel.com



Nama Pengirim                    Franssoka Yunus Sumarwi

Jabatan                          Legal Manager & Corporate Secretary
Tanggal dan Waktu                10-01-2025 15:55




 Dokumen ini merupakan dokumen resmi PT Trimegah Bangun Persada Tbk. yang tidak memerlukan tanda tangan
     karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Trimegah Bangun Persada Tbk.
                    bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 6
Go To Indonesian Page

 Letter / Announcement No.          013/S/LGL-CORSEC/TBP/I/2025

 Issuer Name                        PT Trimegah Bangun Persada Tbk.

 Issuer Code                        NCKL

 Attachment                         0

 Subject                            Monthly Exploration Activities Report

The Company reports exploration activities for OCT 2024 as follows :

 Company name/ Exploration              Total cost       Parties     Testing methods    Results of     Follow up plan
   Subsidiary  activities area           incurred      exploration    and selection     exploration
                                                                           area       activities until
                                                                                      the end of the
                                                                                     reporting period

  PT Trimegah           Blok TBP-   3,052,843,432     PT Trimegah Pemilihan area Periode bulan Perseroan akan
 Bangun Persada          Kawasi                      Bangun Persada pemetaan dan         Oktober -    melanjutkan
      Tbk                                                 Tbk          pengeboran Desember telah        kegiatan
                                                                        dilakukan       dilakukan     pengeboran
                                                                       berdasarkan      pemboran      pada titik-titik
                                                                        Rencana      sebanyak 334 bor berikutnya
                                                                    Penambangan hole, dengan           yang sudah
                                                                    (tahunan dan 5 total kedalaman direncanakan.
                                                                     tahunan) yang 5.326 meter.
                                                                   dipengaruhi oleh        Hasil
                                                                      target tonase    pengeboran
                                                                   dan kadar nikel. dengan total
                                                                   Analisa data bor intercept limonit
                                                                        dilakukan    CoG lebih dari
                                                                    dengan metoda       atau sama
                                                                           XRF      dengan 0,8% Ni
                                                                     Spectrometry.      sepanjang
                                                                                        1.155,6 m,
                                                                                     ketebalan rata-
                                                                                      rata 4 m pada
                                                                                    kadar Ni 1,09%
                                                                                     dan Co 0,13%.
                                                                                     Total intercept
                                                                                      saprolite CoG
                                                                                     lebih dari atau
                                                                                      sama dengan
                                                                                    1,4% sepanjang
                                                                                        709.49 m,
                                                                                     ketebalan rata-
                                                                                        rata 3,9 m
                                                                                    dengan kadar Ni
                                                                                          1,73%.
Page 7
Company name/ Exploration        Total cost       Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area     incurred      exploration    and selection     exploration
                                                                    area       activities until
                                                                               the end of the
                                                                              reporting period

PT Gane Permai Blok GPS-Loji    846,242,739 PT Gane Permai Pemilihan area Periode bulan Perseroan akan
   Sentosa                                     Sentosa      pemetaan dan       Oktober -     melanjutkan
                                                              pengeboran Desember telah        kegiatan
                                                               dilakukan       dilakukan     pengeboran
                                                              berdasarkan      pemboran      pada titik-titik
                                                               Rencana       sebanyak 33 bor berikutnya
                                                           Penambangan hole, dengan           yang sudah
                                                           (tahunan dan 5 total kedalaman direncanakan.
                                                            tahunan) yang     1.022 meter
                                                          dipengaruhi oleh        Hasil
                                                             target tonase    pengeboran
                                                           dan kadar nikel. dengan total
                                                          Analisa data bor intercept limonit
                                                               dilakukan    CoG lebih dari
                                                           dengan metoda       atau sama
                                                                  XRF      dengan 0,8% Ni
                                                            Spectrometry. sepanjang 49,44
                                                                             m, ketebalan
                                                                           rata-rata 3,09 m
                                                                            pada kadar Ni
                                                                            1,11% dan Co
                                                                             0,08%. Total
                                                                                intercept
                                                                             saprolite CoG
                                                                            lebih dari atau
                                                                             sama dengan
                                                                           1,4% sepanjang
                                                                                35,44 m,
                                                                            ketebalan rata-
                                                                              rata 2,08 m
                                                                           dengan kadar Ni
                                                                                 1,67%.
Page 8
Company name/ Exploration         Total cost       Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area      incurred      exploration    and selection     exploration
                                                                     area       activities until
                                                                                the end of the
                                                                               reporting period

 PT Jikodolong   Blok JMP-      3,151,413,724   PT Jikodolong Pemilihan area Periode bulan Perseroan akan
 Megah Pertiwi   Jikodolong                     Megah Pertiwi pemetaan dan         Oktober -     melanjutkan
                                                                  pengeboran Desember telah kegiatan survey
                                                                   dilakukan       dilakukan     titik bor dan
                                                                  berdasarkan      pemboran      melanjutkan
                                                                   Rencana       sebanyak 76         aktifitas
                                                               Penambangan hole, dengan          pengeboran.
                                                               (tahunan dan 5 total kedalaman
                                                                tahunan) yang     5.326 meter
                                                              dipengaruhi oleh        Hasil
                                                                 target tonase    pengeboran
                                                              dan kadar nikel. dengan total
                                                              Analisa data bor intercept limonit
                                                                   dilakukan    CoG lebih dari
                                                              dengan metoda        atau sama
                                                                      XRF      dengan 0,8% Ni
                                                                Spectrometry.      sepanjang
                                                                                   199,17 m,
                                                                                ketebalan rata-
                                                                                  rata 2,85 m
                                                                                pada kadar Ni
                                                                                1,04% dan Co
                                                                                 0,11%. Total
                                                                                    intercept
                                                                                 saprolite CoG
                                                                                lebih dari atau
                                                                                 sama dengan
                                                                               1,4% sepanjang
                                                                                   250,08 m,
                                                                                ketebalan rata-
                                                                                  rata 3,62 m
                                                                               dengan kadar Ni
                                                                                     1,68%.
Page 9
Company name/ Exploration            Total cost      Parties     Testing methods    Results of     Follow up plan
  Subsidiary  activities area         incurred     exploration    and selection     exploration
                                                                       area       activities until
                                                                                  the end of the
                                                                                 reporting period

    PT Gane         Blok GTS       2,647,258,673   PT Gane        Pemilihan area Periode bulan Perseroan akan
    Tambang                                        Tambang         pemetaan dan         Oktober -     melanjutkan
    Sentosa                                        Sentosa           pengeboran Desember telah kegiatan survey
                                                                      dilakukan         dilakukan      titik bor dan
                                                                     berdasarkan        pemboran      melanjutkan
                                                                       Rencana        sebanyak 68          aktifitas
                                                                  Penambangan hole, dengan            pengeboran.
                                                                  (tahunan dan 5 total kedalaman
                                                                   tahunan) yang       1.322 meter
                                                                 dipengaruhi oleh          Hasil
                                                                    target tonase      pengeboran
                                                                 dan kadar nikel. dengan total
                                                                 Analisa data bor intercept limonit
                                                                      dilakukan      CoG lebih dari
                                                                 dengan metoda          atau sama
                                                                         XRF        dengan 0,8% Ni
                                                                   Spectrometry. sepanjang 370,9
                                                                                      m, ketebalan
                                                                                     rata-rata 5,8 m
                                                                                      pada kadar Ni
                                                                                     1,05% dan Co
                                                                                       0,1%. Total
                                                                                         intercept
                                                                                      saprolite CoG
                                                                                     lebih dari atau
                                                                                      sama dengan
                                                                                    1,4% sepanjang
                                                                                        303,51 m,
                                                                                     ketebalan rata-
                                                                                       rata 5,32 m
                                                                                    dengan kadar Ni
                                                                                          1,72%.
     PT Obi         Blok OAM        11,779,035      PT Obi       Pemetaan akan          Persiapan    Perseroan akan
    Anugerah                                       Anugerah      mulai dilakukan          berupa      melanjutkan
     Mineral                                        Mineral       pada Q1 tahun sosialisasi dan kegiatan survey
                                                                      2025 pada       perencanaan      titik bor dan
                                                                    potensi laterit      kegiatan.    melanjutkan
                                                                        untuk                              aktifitas
                                                                     menambah                         pengeboran.
                                                                    Sumberdaya.

Thus to be informed accordingly.


Respectfully,
PT Trimegah Bangun Persada Tbk.




Franssoka Yunus Sumarwi

Legal Manager & Corporate Secretary




PT Trimegah Bangun Persada Tbk.
Page 10
Jalan Jendral Sudirman Kav. 1
Phone : +62-21 5722924, Fax : +62-21 5722924, www.tbpnickel.com



Sender Name                        Franssoka Yunus Sumarwi

Function                           Legal Manager & Corporate Secretary

Date and Time                      10-01-2025 15:55




   This is an official document of PT Trimegah Bangun Persada Tbk. that does not require a signature as it was
 generated electronically by the electronic reporting system. PT Trimegah Bangun Persada Tbk. is fully responsible
                                 for the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published10 Jan 2025
Pages10
Characters34,614
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 16 people and organisations named in the text · linked when the evidence is strong

linked org Trimegah Bangun Persada Tbk. · Nama Perusahaan p.1 ×30
possible org PT Trimegah p.1 ×2
unresolved org PT Trimegah Pemilihan p.1 ×2
unresolved — Penambangan hole, p.1 ×4
unresolved — dipengaruhi oleh p.1 ×4
unresolved — target tonase p.1 ×4
unresolved — metoda p.1 ×4
unresolved — XRF p.1 ×4
unresolved — Spectrometry. p.1 ×2
unresolved org PT Gane Permai p.2 ×2
unresolved org PT Gane Permai Pemilihan p.2 ×2
unresolved org PT Jikodolong p.3 ×2
unresolved org PT Jikodolong Pemilihan p.3 ×2
unresolved org PT Gane p.4 ×4
unresolved org PT Obi p.4 ×4
unresolved person Franssoka Yunus Sumarwi · Legal Manager & Corporate Secretary p.4 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result