Skip to content
Back to announcement

20250106_DSSA_Laporan Bulanan Aktivitas Eksplorasi_31842705.pdf

Other Text extracted DSSA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                        004/CSDSS-01/2025

 Nama Perusahaan                    Dian Swastatika Sentosa Tbk

 Kode Emiten                        DSSA

 Lampiran                           1

 Perihal                            Laporan Bulanan Aktivitas Eksplorasi

Perseroan melaporkan aktivitas eksplorasi untuk JAN 2025 Sebagai Berikut :

                                                                                     Hasil aktivitas
      Nama           Area yang
                                  Total biaya yang   Pihak yang        Metode         eksplorasi
   Perusahaan/       dilakukan                                                                       Rencana tindak
                                        telah        melakukan      pengujian dan    hingga akhir
      Anak            aktivitas                                                                          lanjut
                                    dikeluarkan      eksplorasi     pemilihan area      periode
   perusahaan        eksplorasi
                                                                                     pelaporan ini
  PT Buana Bara      623.700 m2    268.049.000       Internal dan     Pemboran          Pemboran       Melanjutkan
   Ekapratama                                          eksternal       dengan       sebanyak 17 titik   kegiatan
                                                                    menggunakan bor dengan total pemboran pada
                                                                    metode partial kedalaman 676        rencana
                                                                    coring dan full m; Penambahan       tahapan
                                                                        coring      data kualitas in- penambangan
                                                                                      situ batu bara
                                                                                          dengan
                                                                                         pengujian
                                                                                           sampel
                                                                                       sebanyak 26
                                                                                          lapisan;
                                                                                         Perbaikan
                                                                                      model geologi
                                                                                       dan verifikasi
                                                                                        cadangan;
                                                                                      Pemboran full
                                                                                    coring sebanyak
                                                                                         6 titik bor
                                                                                       dengan total
                                                                                     kedalaman 262
                                                                                          m untuk
                                                                                       penyelidikan
                                                                                        geoteknik,
                                                                                         hidrologi,
                                                                                       geohidrologi,
                                                                                      serta air asam
                                                                                         tambang;
                                                                                      Pengujian 31
                                                                                     sampel batuan
                                                                                          untuk uji
                                                                                      geoteknik dan
                                                                                        uji air asam
                                                                                         tambang.
Page 2
                                                                                       Hasil aktivitas
      Nama          Area yang
                                  Total biaya yang   Pihak yang         Metode          eksplorasi
   Perusahaan/      dilakukan                                                                          Rencana tindak
                                        telah        melakukan       pengujian dan     hingga akhir
      Anak           aktivitas                                                                             lanjut
                                    dikeluarkan      eksplorasi      pemilihan area       periode
   perusahaan       eksplorasi
                                                                                       pelaporan ini
  PT Manggala      239.800 m2      114.803.000       Internal dan        Pemboran        Pemboran         Melanjutkan
  Alam Lestari                                         eksternal     menggunakan sebanyak 14 titik          kegiatan
                                                                     metode partial bor dengan total pemboran pada
                                                                      coring dan full kedalaman 478         rencana
                                                                            coring     m; Pemboran          tahapan
                                                                                      full coring guna penambangan
                                                                                       analisis litologi untuk verifikasi
                                                                                            batuan       cadangan batu
                                                                                      (stratigrafi) dan bara; Melakukan
                                                                                         geoteknik;       pengambilan
                                                                                       Penambahan         sampel batu
                                                                                        data kualitas    bara dari hasil
                                                                                      batu bara in-situ pemboran guna
                                                                                        sebanyak 32        pemetaan
                                                                                           lapisan;         kualitas;
                                                                                         Perbaikan       Pemboran full
                                                                                       model geologi      coring guna
                                                                                        dan verifikasi       analisis
                                                                                      cadangan batu        geoteknik,
                                                                                             bara           hidrologi,
                                                                                                          geohidrologi,
                                                                                                         serta air asam
                                                                                                           tambang.
  PT Daya Mas     32.000.000 m2    290.265.000        Eksternal            Tinjauan        Laporan              -
    Geopatra                                                          lapangan dan       kinematika
   Pangrango                                                            pemodelan          struktur
                                                                         kinematika
                                                                       struktur pada
                                                                        area PSPE
                                                                           Cipanas
  PT Daya Mas 161.000.000 m2       661.005.000        Eksternal             Survei      Survei masih      Survei masih
    Cisolok                                                           penginderaan      berlangsung      akan berlanjut
   Geothermal                                                        jarak jauh aktif   hingga akhir pada Triwulan I
                                                                             yang     Desember 2024           2025
                                                                     memanfaatkan
                                                                    sinar laser untuk
                                                                     mengumpulkan
                                                                          informasi
                                                                           tentang
                                                                        karakteristik
                                                                          topografi
                                                                    permukaan bumi
                                                                      dengan drone

Informasi Lain

'Total Biaya yang Telah Dikeluarkan' dinyatakan dalam satuan Rupiah (Rp).




Demikian untuk diketahui.


Hormat Kami,
Dian Swastatika Sentosa Tbk
Page 3
Susan Chandra

Corporate Secretary




Dian Swastatika Sentosa Tbk
Gedung Sinar Mas Land Plaza, Menara 2, Lantai 24, Jl. M.H. Thamrin No. 51,
Telepon : 021-31990258, Fax : 021-31990259, www.dssa.co.id



Nama Pengirim                     Susan Chandra

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 10-01-2025 15:50

Lampiran                         1. Laporan Eksplorasi - Des 2024.pdf


Dokumen ini merupakan dokumen resmi Dian Swastatika Sentosa Tbk yang tidak memerlukan tanda tangan karena
  dihasilkan secara elektronik oleh sistem pelaporan elektronik. Dian Swastatika Sentosa Tbk bertanggung jawab
                              penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.           004/CSDSS-01/2025

 Issuer Name                         Dian Swastatika Sentosa Tbk

 Issuer Code                         DSSA

 Attachment                          1

 Subject                             Monthly Exploration Activities Report

The Company reports exploration activities for JAN 2025 as follows :

 Company name/ Exploration               Total cost     Parties      Testing methods    Results of     Follow up plan
   Subsidiary  activities area            incurred    exploration     and selection     exploration
                                                                           area       activities until
                                                                                      the end of the
                                                                                     reporting period

  PT Buana Bara         623.700 m2   268,049,000      Internal dan      Pemboran          Pemboran       Melanjutkan
   Ekapratama                                           eksternal        dengan       sebanyak 17 titik   kegiatan
                                                                      menggunakan bor dengan total pemboran pada
                                                                      metode partial kedalaman 676        rencana
                                                                      coring dan full m; Penambahan       tahapan
                                                                          coring      data kualitas in- penambangan
                                                                                        situ batu bara
                                                                                            dengan
                                                                                           pengujian
                                                                                             sampel
                                                                                         sebanyak 26
                                                                                            lapisan;
                                                                                           Perbaikan
                                                                                        model geologi
                                                                                         dan verifikasi
                                                                                          cadangan;
                                                                                        Pemboran full
                                                                                      coring sebanyak
                                                                                           6 titik bor
                                                                                         dengan total
                                                                                       kedalaman 262
                                                                                            m untuk
                                                                                         penyelidikan
                                                                                          geoteknik,
                                                                                           hidrologi,
                                                                                         geohidrologi,
                                                                                        serta air asam
                                                                                           tambang;
                                                                                        Pengujian 31
                                                                                       sampel batuan
                                                                                            untuk uji
                                                                                        geoteknik dan
                                                                                          uji air asam
                                                                                           tambang.
Page 5
Company name/ Exploration           Total cost     Parties      Testing methods    Results of     Follow up plan
  Subsidiary  activities area        incurred    exploration     and selection     exploration
                                                                      area       activities until
                                                                                 the end of the
                                                                                reporting period

  PT Manggala      239.800 m2      114,803,000   Internal dan        Pemboran        Pemboran         Melanjutkan
  Alam Lestari                                     eksternal     menggunakan sebanyak 14 titik          kegiatan
                                                                 metode partial bor dengan total pemboran pada
                                                                  coring dan full kedalaman 478         rencana
                                                                        coring     m; Pemboran          tahapan
                                                                                  full coring guna penambangan
                                                                                   analisis litologi untuk verifikasi
                                                                                        batuan       cadangan batu
                                                                                  (stratigrafi) dan bara; Melakukan
                                                                                     geoteknik;       pengambilan
                                                                                   Penambahan         sampel batu
                                                                                    data kualitas    bara dari hasil
                                                                                  batu bara in-situ pemboran guna
                                                                                    sebanyak 32        pemetaan
                                                                                       lapisan;         kualitas;
                                                                                     Perbaikan       Pemboran full
                                                                                   model geologi      coring guna
                                                                                    dan verifikasi       analisis
                                                                                  cadangan batu        geoteknik,
                                                                                         bara           hidrologi,
                                                                                                      geohidrologi,
                                                                                                     serta air asam
                                                                                                       tambang.
  PT Daya Mas     32.000.000 m2    290,265,000    Eksternal            Tinjauan        Laporan              -
    Geopatra                                                      lapangan dan       kinematika
   Pangrango                                                        pemodelan          struktur
                                                                     kinematika
                                                                   struktur pada
                                                                    area PSPE
                                                                       Cipanas
  PT Daya Mas 161.000.000 m2       661,005,000    Eksternal             Survei      Survei masih      Survei masih
    Cisolok                                                       penginderaan      berlangsung      akan berlanjut
   Geothermal                                                    jarak jauh aktif   hingga akhir pada Triwulan I
                                                                         yang     Desember 2024           2025
                                                                 memanfaatkan
                                                                sinar laser untuk
                                                                 mengumpulkan
                                                                      informasi
                                                                       tentang
                                                                    karakteristik
                                                                      topografi
                                                                permukaan bumi
                                                                  dengan drone

Thus to be informed accordingly.


Respectfully,
Dian Swastatika Sentosa Tbk




Susan Chandra

Corporate Secretary
Page 6
Dian Swastatika Sentosa Tbk
Gedung Sinar Mas Land Plaza, Menara 2, Lantai 24, Jl. M.H. Thamrin No. 51,
Phone : 021-31990258, Fax : 021-31990259, www.dssa.co.id



Sender Name                        Susan Chandra

Function                           Corporate Secretary

Date and Time                      10-01-2025 15:50

Attachment                        1. Laporan Eksplorasi - Des 2024.pdf


 This is an official document of Dian Swastatika Sentosa Tbk that does not require a signature as it was generated
     electronically by the electronic reporting system. Dian Swastatika Sentosa Tbk is fully responsible for the
                                      information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published10 Jan 2025
Pages6
Characters21,071
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 10 people and organisations named in the text · linked when the evidence is strong

linked org Dian Swastatika Sentosa Tbk · Nama Perusahaan p.1 ×19
unresolved org PT Buana Bara p.1 ×2
unresolved — metode partial kedalaman 676 p.1
unresolved org PT Manggala p.2 ×2
unresolved — coring dan full kedalaman 478 p.2
unresolved — geoteknik; p.2
unresolved — lapisan; p.2
unresolved org PT Daya Mas p.2 ×4
unresolved org Susan Chandra · Corporate Secretary p.3 ×2
unresolved person H. Thamrin p.3 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result