Laporan Kuartalan Aktivitas Eksplorasi
Quarterly Report of the Exploration Activities

PT TBS Energi Utama Tbk
Kuartal-IV/ the 4th Quarter of 2024
Page 2
                    KATA PENGANTAR                            INTRODUCTION

     PT TBS Energi Utama Tbk (“Perseroan”)        PT TBS Energi Utama Tbk ("the
     adalah    perusahaan       pertambangan      Company") is a coal mining company
     batubara yang melakukan kegiatan             conducting      mining      activities    in
     penambangan di daerah Sangasanga,            Sangasanga area, Kutai Kartanegara
     Kabupaten Kutai Kartanegara, Provinsi        Regency, East Kalimantan, where the
     Kalimantan Timur, dimana area konsesi        concession area of the three subsidiaries
     ketiga   anak     perusahaan      terletak   is located side by side. All the supporting
     berdampingan.     Seluruh    infrastruktur   infrastructure of mining operations such
     pendukung operasional penambangan            as coal hauling roads, offices, workshop,
     seperti    jalan    angkut      batubara,    coal-only jetty and other infrastructures
     perkantoran, perbengkelan, pelabuhan         are located in Kutai Kartanegara
     khusus batubara dan infrastruktur lainnya    Regency, East Kalimantan.
     berada di daerah Kabupaten Kutai
     Kartanegara, Provinsi Kalimantan Timur.

     Perseroan mempunyai 3 (tiga) anak            The Company has 3 (three) subsidiaries
     perusahaan yang bergerak di bidang           engaged in coal mining sector, located in
     pertambangan batubara, terletak di           Sangasanga area, Kutai Kartanegara
     daerah Sangasanga, Kabupaten Kutai           Regency,    East     Kalimantan.     The
     Kartanegara, Provinsi Kalimantan Timur.      company's subsidiaries are:
     Adapun     ketiga   anak    perusahaan
     Perseroan tersebut adalah:
     1. PT Trisensa Mineral Utama (TMU)           1. PT Trisensa Mineral Utama (TMU)
     2. PT Indomining (IM)                        2. PT Indomining (IM)
     3. PT Adimitra Baratama Nusantara            3. PT Adimitra Baratama Nusantara
        (ABN)                                        (ABN)

     Dalam rangka memenuhi Ketentuan              In order to comply with the Provisions
     III.1.6, Peraturan Nomor I-E tentang         III.1.6, Regulation Number I-E concerning
     Kewajiban     Penyampaian   Informasi,       Information       Delivery     Obligations,
     Lampiran Keputusan Direksi PT Bursa          Attachment to the Decree of the Board of
     Efek Jakarta Number Kep-00066/BEI/09-        Directors of PT Bursa Efek Jakarta
     2022 tanggal 30 September 2022, maka         Nomor Kep-00066/BEI/09-2022 dated
     bersama ini kami sampaikan Laporan           September 30, 2022, we here jointly
     Kegiatan Eksplorasi Perseroan untuk          submit the Company's Exploration
     Kuartal-4 2024.                              Activity Report for the 4th Quarter of 2024.




www.tbsenergi.com
Page 3
                  BAB I                                           CHAPTER I
              PENDAHULUAN                                       INTRODUCTION



I. Latar Belakang                                 I. Background

Batubara merupakan bahan galian yang              Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh         material, so it is in demand by foreign
investor asing maupun investor dalam negeri.      investors as well as domestic investors. Coal
Usaha pertambangan batubara mempunyai             mining business has prospects as a mainstay
prospek sebagai sektor andalan pengganti          sector of oil and gas replacement in building
migas dalam membangun perekonomian                the economy of East Kalimantan in the future.
Kalimantan Timur di masa mendatang. Hal ini       It is based on available coal resources and
didasarkan pada sumber daya dan potensi           potentials, marketing prospects as well as
batubara yang tersedia, prospek pemasaran         local government policy support.
serta dukungan kebijakan pemerintah
daerah.

Pengusahaan pertambangan karena sifat             Strive of the Mining business because of the
kegiatannya      pada      dasarnya      selalu   nature of its activities basically always cause
menimbulkan       perubahan       pada    alam    changes in the nature of its environment.
lingkungannya. Di balik perubahan pada            Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan           environment, it is also a fact that mining
pula bahwa usaha pertambangan telah               businesses have succeeded in improving
berhasil    meningkatkan         kesejahteraan    human welfare by providing raw materials for
manusia dengan menyediakan bahan baku             industry, energy, and others.
untuk industri, energi, dan lain-lain.




                    Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
                       Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
             Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk




    Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
    Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

TMU merupakan perusahaan tambang             TMU is a coal mining company with an
batubara dengan daerah penambangan           administrative mining area including the sub-
secara administratif termasuk wilayah        districts of Loa Janan, Sangasanga, Muara
Kecamatan Loa Janan, Sangasanga, Muara       Jawa, Kutai Kartanegara Regency, East
Jawa, Kabupaten Kutai Kartanegara Provinsi   Kalimantan Province with an area of 3,414 ha
Kalimantan Timur dengan Luas wilayah         and the 2010 KTN area code 3133 OP. TMU
3.414 ha dan kode Wilayah KTN 2010 3133      has received approval to carry out mining
OP. TMU telah mendapat persetujuan untuk     activities and sell excavated products with
melakukan aktivitas penambangan dan          the      Decree    of    the    Minister   of
penjualan hasil galian dengan Keputusan      Investment/Head       of    the   Investment
Menteri Investasi/ Kepala Badan Koordinasi   Coordinating          Board          Number:
Penanaman          Modal     Nomor       :   1098/1/IUP/PMDN/2022              concerning
1098/1/IUP/PMDN/2022              Tentang    approval for granting extensions of mining
persetujuan Pemberian Perpanjangan Ijin      business permits at the production operation
Usaha Pertambangan Pada Tahap Kegiatan       activity stage for coal commodities to PT
Operasi Produksi untuk Komoditas Batubara    Trisensa Mineral Utama (area code
kepada PT Trisensa Mineral Utama (kode       3364023032014055) on September 21,
wilayah 3364023032014055) pada tanggal       2022.
21 September 2022.

Pada Kuartal-4 2024, pelaksanaan pekerjaan   In The 4th Quarter of 2024, the
yang dilakukan oleh TMU telah menyerap       implementation of work carried out by TMU
tenaga kerja sebanyak 91 orang sedangkan     has absorbed a workforce of 91 people while
untuk kontraktor dan subkontraktornya 808    for contractors and sub-contractors 808
orang dan dibagi menjadi 2 shift kerja.      people and divided into 2 shifts of work. The
Kontraktor tambang yang digunakan adalah     mining contractor used is CV Multindo Prima
CV    Multindo    Prima    Teknik  (MPT).    Teknik (MPT). Mining is done by surface
Penambangan yang dilakukan dengan            open pit mining system with truck and shovel
sistem tambang terbuka (surface open pit     method.
mining) dengan metode truck dan shovel.

Produk batubara yang dihasilkan TMU          Coal products produced by TMU have an
memiliki kalori rata-rata 4900 GAR dengan    average calorie of 4900 GAR with Total
Total Sulphur (TS) di bawah 1%. Kualitas     Sulphur (TS) below 1%. The quality of this
batubara ini cukup memenuhi permintaan       coal is enough to meet the demand of the
pasar yang menginginkan batubara dengan      market who want low sulphur coal.
sulphur rendah. Pelaksanaan pengelolaan      Implementation of Occupational Safety and
Keselamatan dan Kesehatan Kerja yang         Health management implemented in TMU
diterapkan di TMU mengacu kepada             refers to the program / plan of Occupational
program/rencana Pengelolaan Keselamatan      Safety and Health Management in
dan Kesehatan Kerja sesuai dengan            accordance with applicable laws and
perundang-undangan yang berlaku.             regulations.
Page 6
Kegiatan pengelolaan dan pemantauan            Environmental management and monitoring
lingkungan yang dilakukan TMU meliputi         activities carried out by TMU include
kegiatan penghijauan yang dilakukan di         greening activities carried out at the Road
Tanggul Jalan, Tanggul Stockpile, Tanggul      Embankment, Embankment Stockpile, Front
Depan Timbangan, Settling Pond, Waste          Embankment Scales, Settling Pond, Waste
Dump dan Bench Office Baru. Pada saat ini,     Dump and New Bench Office. Currently,
TMU juga melakukan pengelolaan dan             TMU also manages and monitors water
pemantauan kualitas air, debu, kebisingan,     quality, dust, noise, B3 waste and domestic
limbah B3 dan limbah domestik, serta           waste, as well as monitoring erosion rates.
pemantauan tingkat erosi.


I. 2. PT INDOMINING (“IM”)

Berdasarkan Izin Usaha Produksi Nomor:         Based on Production Business License
540/004/IUP-OP/MB-PBAT/III/2013 tanggal        Nomor: 540/004/IUP-OP/MB-PBAT/III/2013
15 Maret 2013, IM melakukan kegiatan           dated March 15, 2013, IM conducted coal
eksplorasi dan penambangan batubara serta      exploration and mining activities and its
hasil produksinya di daerah Kecamatan          production in Sangasanga District, Kutai
Sangasanga, Kabupaten Kutai Kartanegara,       Kartanegara Regency, East Kalimantan
Provinsi Kalimantan Timur. Tahap produksi      Province. Im's production phase began in
IM dimulai pada bulan Agustus 2007,            August 2007, while commercial production
sedangkan produksi komersial dimulai pada      began in October 2007.
bulan Oktober 2007.

Kegiatan penambangan IM dilakukan              IM mining activities are carried out by mining
kontraktor penambangan yaitu PT RPP            contractor PT RPP Contractors Indonesia
Contractors Indonesia (RCI). Kegiatan          (RCI). Mining activities are surface open pit
penambangan merupakan penambangan              mining with truck and shovel methods.
terbuka (surface open pit mining) dengan
metode truck dan shovel.

Pada Kuartal-4 2024, sumber daya manusia       As of 4th Quarter 2024, human resources
yang bekerja dalam kegiatan operasional IM     working in IM's operational activities reached
mencapai 338 tenaga kerja termasuk             338 workers including contractors and sub-
kontraktor dan subkontraktor. Dari 338 orang   contractors. Of those 338 people, about 80%
tersebut sekitar 80% merupakan tenaga kerja    are local workers to support community
lokal sebagai penunjang program community      development programs with the aim of
development       dengan    tujuan     untuk   improving the welfare of the communities
meningkatkan kesejahteraan masyarakat di       around the mine.
sekitar tambang.

Produk batubara IM memiliki kualitas antara    IM coal products have quality between 4200
4200 - 5600 GAR dengan total sulphur antara    - 5600 GAR with total sulphur between 0.2%
0.2% - 2.0%. Produk cukup bersaing di dalam    - 2.0%. The product is quite competitive in the
pasar internasional maupun domestik.           international and domestic markets.
Page 7
I. I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

  ABN didirikan pada tahun 2004, dan              ABN was established in 2004, and manages
  mengelola daerah pertambangan dengan            a mining area of about 2,990 ha located in
  luas area sekitar 2.990 Ha yang berlokasi di    Kampung Jawa Village, Sangasanga District
  Desa      Kampung        Jawa,   Kecamatan      and Muara Kembang Village, Muara Jawa
  Sangasanga dan Desa Muara Kembang,              District, Kutai Kartanegara Regency, East
  Kecamatan Muara Jawa, Kabupaten Kutai           Kalimantan. Based on Mining Business
  Kartanegara,         Kalimantan        Timur.   License Production Operation Number:
  Berdasarkan pada Izin Usaha Pertambangan        540/1691/IUP-OP/MB-{BAT/XII/2009 dated
  Operasi Produksi Nomor: 540/1691/IUP-           December 1, 2009, ABN conducts
  OP/MB-{BAT/XII/2009 tanggal 1 Desember          exploration, coal mining, and marketing of
  2009, ABN melakukan kegiatan eksplorasi,        production at its mine site.
  penambangan batubara, dan pemasaran
  hasil produksi di lokasi tambangnya tersebut.

  ABN mulai melakukan kegiatan eksplorasi         ABN began its exploration and infrastructure
  dan pembangunan infrastruktur pada tahun        development activities in 2007, while
  2007, sedangkan produksi komersial dimulai      commercial production began in 2008. ABN
  pada tahun 2008. Produk batubara ABN            coal products belong to thermal coal group
  termasuk dalam kelompok thermal coal            with sub-bituminous and bituminous rank,
  dengan rank sub-bituminous dan bituminous,      with 2 types of ABN 42 (CV 4200 GAR & TS
  dengan 2 jenis tipe yaitu ABN 42 (CV 4200       < 1) and ABN 50 (CV 5000 gar & TS<1)).
  gar & TS < 1) dan ABN 50 (CV 5000 gar & TS      Thermal coal is marketed to several countries
  < 1). Thermal coal dipasarkan ke beberapa       in the world, including India, China, Japan,
  negara di dunia, diantaranya India, Cina,       Italy, Thailand, and Korea. ABN also supplies
  Jepang, Italia, Thailand, dan Korea. ABN        for domestic needs, namely cement industry
  juga mensuplai untuk kebutuhan dalam            and several other industries.
  negeri, yaitu industri semen dan beberapa
  industri lainnya.

  Sistem penambangan yang dilakukan ABN           ABN's mining system is surface open pit
  yaitu sistem penambangan terbuka (surface       mining. Coal ABN has a low ash content, so
  open pit mining). Batubara ABN memiliki         it is not done by washing process, only done
  kandungan abu yang rendah, sehingga tidak       by crushing process. Mining activities of PT.
  dilakukan pencucian (washing), hanya            ABN is carried out by one main contractor, PT
  dilakukan proses peremukan (crushing).          RPP Contractors Indonesia (RCI).
  Kegiatan penambangan PT. ABN dilakukan
  oleh satu kontraktor utama, yaitu PT. RPP
  Contractors Indonesia (RCI).

  Pada Kuartal-4 2024, sumber daya manusia        In The 4th Quarter of 2024, human resources
  yang terlibat dalam kegiatan operasional        involved in ABN's operational activities
  ABN mencapai sekitar 680 orang, yang terdiri    reached about 680 people, consisting of 199
  dari 199 orang tenaga kerja pada ABN dan        workers in ABN and 481 workers in
  481 orang tenaga kerja pada kontraktor          contractors and sub-contractors.
  maupun subkontraktor.
Page 8
Sebagai salah satu wujud pemberdayaan          As the form of empowerment of the
masyarakat sekitar, ABN bersama-sama           surrounding community, ABN along with
dengan kontraktor dan subkontraktor saat ini   contractors and sub-contractors currently
telah menampung tenaga kerja lokal             have accommodated local workers in
Kecamatan Sangasanga & Kecamatan               Sangasanga District & Muara Jawa District,
Muara Jawa, Kabupaten Kutai Kartanegara        Kutai Kartanegara Regency approximately
kurang lebih 70 % dari kebutuhan tenaga        about 70% of the labor needs, while the
kerja, sedangkan sisanya sekitar 30 %          remaining about 30% comes from outside the
berasal dari luar daerah dua kecamatan         area of the two sub-districts.
tersebut.
Page 9
                BAB II                                          CHAPTER II
         KEGIATAN EKSPLORASI                               EXPLORATION ACTIVITY



II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

1. 1. DAERAH EKSPLORASI                           1. 1. EXPLORATION AREA
Pada Kuartal-4 2024 kegiatan eksplorasi           In the 4th Quarter of 2024, exploration
berupa kegiatan sampling di Pit Aktif yaitu pit   activities will be in the form of sampling
B1WA, B2A, dan pit 5B36.                          activities in Active Pits, namely pit B1WA,
                                                  B2A, and pit 5B36.


Kegiatan sampling batubara di pit aktif guna      Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai      determine the quality value, especially the
total sulphur (TS) dan nilai total kalori.        total sulphur (TS) value and total calorie
kegiatan sampling batubara. Seam target           value. coal sampling activities. The target
adalah seam T, RU, RL, S, WB di pit B1WA.,        seam is the T, RU, RL, S, WB seam seam in
sampling di pit B2A dengan seam target            pit B1WA. sampling in pit B2A with seam
seam F, E, D, G20, G. Pit 5B36 pada seam          target seam F, E, D, G20, G. Pit 5B36 with
28, 29, 30.                                       seams 28, 29, 30.


1. 2. METODE PENGUKURAN                           1. 2. MEASUREMENT METHODS

Trenching                                         Trenching

Secara teknis di lapangan tim geologist           Technically in the field, the geologist team
melakukan trenching dengan membuat                conducted trenching by making an elongated
paritan memanjang memotong strike seam –          trench cutting the strike seam – seam target
seam target sebatas titik plan yang dibuat        to the point plan made earlier. This serves to
sebelumnya. Hal ini berfungsi untuk               cover the entire region so that all seams can
mengcover seluruh wilayah agar semua              be found. The average length of trenching in
seam dapat ditemukan. Rata – rata panjang         a day can reach 80 m -100 m depending on
paritan trenching dalam sehari bisa mencapai      the terrain / area of work whether in a ramp,
80 m - 100 m tergantung dari medan/areal          swamp or hilly with a steep slope.
kerjanya apakah di tempat landai, rawa atau
berbukit dengan kemiringan terjal.

Pengambilan sampel untuk di mengetahui            Sampling to find out the values of quality is
nilai-nilai kualitasnya dilakukan per jarak 100   done per distance of 100 m between
m antar lubang trenching.                         trenching holes.
Page 10
Sampling                                        Sampling

Tim geologi juga melakukan sampling seam-       Geologies team also sampling seam- seam in

seam    di pit guna mengetahui kualitas ter     the pit to find out the updated quality of the
update dari seam-seam yang akan                 seam- seam that will be mine.
ditambang.
Metode yang digunakan adalah:                   The methods used are:

1. Jarak antar titik sampling maksimal 20 m     1. The distance between sampling points
   per seam searah strike bukaan batubara          maximum 20 m per seam direct strike coal
   yang akan diambil (getting).                    openings to be taken (getting).

2. Sampling ulang/update pada tiap bukaan       2. Re-sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1          opening on a seam (maximum 1 layer
   bukaan layer setinggi 3 m).                     opening as high as 3 m).

3. Sampling pada seam – seam bukaan             3. Sampling on seam – seam new openings
   baru/seam yang pertama kalinya akan di          / seam the first time will be in getting. The
   getting. Adapun plan penambangan                mining plan until the end of the year is
   sampai dengan akhir tahun ditargetkan           targeted at seam with calorie value (ar)_g
   pada seam dengan nilai Calori (ar)_g di         above 4700.
   atas 4700.


1. 3. BIAYA EKSPLORASI                          1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di        TMU Exploration Costs incurred in The 4th
Kuartal-4 2024 sebagai berikut:                 Quarter of 2024 as follows:

                                      Q4 2024                 Year To Date
         Biaya Operasional     Anggaran    Realisasi     Anggaran     Realisasi
         Operating Expense      Budget     Realization    Budget      Realization
                                 (IDR)        (IDR)        (IDR)        (IDR)
         Biaya Eksplorasi
                              105,000,000 31,500,000 360,000,000 255,500,000
         Exploration Costs

Catatan:                                        Note:
Jumlah sampling di Kuartal-4 2024 berjumlah     The number of samplings in The 4th Quarter
21 sampel.                                      2024 amounted to 21 samples

Biaya Eksplorasi untuk tahun 2024 yang          Exploration Cost for 2024 in accordance with
sesuai dengan RKAB 2024 bagian geologi          RKAB 2024 geological section in the form of
berupa biaya analisa kualitas batubara di       coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan.          maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang             trenching activities that use PC 200 units is
menggunakan unit PC 200 biayanya                accommodate to production department for
dimasukkan ke departemen produksi untuk         general work with a record of trenching
pekerjaan general dengan catatan kegiatan       activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.
Page 11
1. 4. PELAKSANAAN DAN                           1. 4. IMPLEMENTATION AND
      PENGAWASAN                                      SUPERVISION
Pengawasan     Test     Pit/Trenching  dan      Supervision of Test Pit/ Trenching sampling
sampling batubara di pit TMU dilakukan oleh     of coal in the TMU pit conducted by
Geologist TMU.                                  TMU’geologist.


1. 5. KEMAJUAN EKSPLORASI                       1. 5. EXPLORATION PROGRESS

Kesimpulan Eksplorasi TMU Kuartal-4             Conclusion of TMU Exploration in the 4th
2024                                            Quarter of 2024

Selain kegiatan trenching kami dari tim         In addition to our trenching activities from the
geologi juga melakukan sampling seam-           geology team also sampling seam-seam in
seam di pit guna mengetahui kualitas ter        the pit to find out the update quality from
update dari seam-seam yang akan di getting.     seam- seam to be getting. The methods used
Metode yang digunakan adalah:                   are:

1. Jarak antar titik sampling maksimal 50 m     1. Distance between sampling points
   per seam searah strike bukaan batubara          maximum 50 m per unidirectional strike
   yang akan diambil (getting).                    coal openings to be taken (getting)

2. Sampling ulang/update pada tiap bukaan       2. Sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1          opening on one seam (maximum 1-layer
   bukaan layer setinggi 3 m).                     aperture as high as 3 m).

3. Sampling pada seam – seam bukaan             3. Sampling on seam - seam new openings
   baru/seam yang pertama kalinya akan di          / seam the first time will be in the getting.
   getting. Adapun plan penambangan                The mining plan until the end of the year
   sampai dengan akhir tahun ditargetkan           is targeted at seam with calorie (ARB)
   pada seam dengan nilai Calori (ARB)             GAR value above 4800.
   GAR di atas 4800.

4. Selama Kuartal-4 2024 kegiatan berupa        4. During The 4th 2024, activities in the form
   sampling pit aktif yaitu di pit B2A dengan      of active pit sampling are in pit B2A with
   seam target adalah seam F, E, D, G20,           target seam are F, E, D, G20, G Pit 5B36
   G. Pit 5B36 seam 28, 29, 30. Pit B1WA           seam 28, 29, 30. Pit B1WA with target
   dengan seam target WB, T, RU, RL, S             seam WB, T, RU, RL, S

5. Rata – rata hasil analisa kualitas dari      5. The average quality analysis results of
   seam –seam tersebut di atas TM 30.34            the seam -seam above TM 30.34 %, ASH
   %, ASH 6.51 %, TS 0.90 % dan nilai CAL          6.51%, TS 0.90 % and CAL (ar) values
   (ar) 4.900                                      4.900.
Page 12
1. 6. RENCANA KEGIATAN                            1. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                            EXPLORATION ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-4         The Geological Division Plan for 4th Quarter
2024:                                             2024:
1. Melakukan pembaharuan/updating model           1. Updating the Geological model based on
   Geologi berdasarkan data updating                 monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit           survey data and cs holes data from coal
   serta cs_holes dari data channel sampling         sampling channel data. The results of this
   batubara. Hasil dari pembaharuan model            model update are then sent to the mine
   ini kemudian dikirim ke bagian mine plan          plan engineering section as a basis for
   engineering sebagai dasar acuan untuk             submissions for making pit designs for
   pembuatan desain pit untuk bulan depan.           next month.

2. Trenching di luar Rencana PIT yang di Plan     2. Trenching outside the PIT Plan that is
   kan oleh tim Engineering di tiadakan dan          planned by the Engineering team is not in
   sebagai penggantinya adalah trenching di          place and in lieu of trenching is done in the
   lakukan di plan pit yang data trenchingnya        plan pit whose trenching data is lacking or
   kurang     atau      tingkat     confidence       confidence level of continuity, seam
   kemenerusan, ketebalan seam di pit                thickness in the pit is still lacking.
   tersebut masih kurang.

3. Memonitoring adanya anomali pada suatu         3. Monitoring the presence of anomalies in
   bukaan PIT yang aktif.                            an active PIT aperture.

4. Tim geologist akan melakukan sampling          4. The geological team will conduct
   pada bukaan seam-seam yang berada di              sampling on seam openings in the active
   pit aktif terutama mengontrol perubahan           pit, especially to control changes in Total
   nilai Total Sulfur, Persentase nilai Ash dan      Sulfur values, Ash percentage values and
   nilai Kalori di seam –seam berkalori tinggi       Calorie values in high-calorie seams both
   baik ke arah down dip maupun ke arah              in the down dip and strike directions.
   strike nya.

5. Memonitoring kualitas dari seam-seam           5. Monitoring the quality of seam -seam that
   yang tertambang di bulan Januari–Maret            is mined in January until March 2025,
   2025 terutama dalam hal perubahan nilai           especially in terms of changes in TS value
   TS seiring penurunan elevasi dari masing-         in line with the decrease in elevation of
   masing seam yang tertambang.                      each seam that is mined.
6. Update    data     kualitas berdasarkan        6. Quality data update based on mining
   kemajuan penambangan pada seam–                   progress on seam–seam target in
   seam target di bulan sebelumnya.                  previous month.
7. Rencana kegiatan pengeboran eksplorasi         7. The plan for exploration drilling activities
   di tahun 2025 sebanyak 78 titik bor atau          in 2025 is 78 drill points or as many as
   sebanyak 9.360 m di wilayah barat pit             9,360 m in the western area of the B3KL
   B3KL dengan seam Target seam R, S, T,             pit with seam Target seam R, S, T, U, WA,
   U, WA, WB, X, Y.                                  WB, X, Y.
Page 13
8. Rencana kegiatan pengeboran geoteknik      8. The plan for geotechnical drilling activities
   di tahun 2025 sebanyak 5 titik pemboran       in 2025 is 5 drilling points or as much as
   atau sebanyak 600 m di wilayah Barat pit      600 m in the Western area of the B3KL pit.
   B3KL.


II. 2. PT INDOMINING (“IM”)

2. 1. DAERAH EKSPLORASI                       2. 1. EXPLORATION AREA
Pada Kuartal-4 2024, IM tidak ada kegiatan    In the 4th Quarter of 2024, IM had no drilling
pemboran.                                     activities.

2. 2. METODE PENGUKURAN                       2. 2. MEASUREMENT METHODS
Untuk kegiatan pemboran infill menggunakan    For infill drilling activities using touch coring
metode touch coring, sedangkan untuk          method, while for geotechnical drilling is done
pemboran geoteknik dilakukan dengan           by drilling Full Coring method.
pemboran metode Full Coring.

Pemboran geoteknik dilakukan juga dengan      Geotechnical drilling is also carried out using
menggunakan metode Standard Penetration       the Standard Penetration Test (SPT) method.
Test (SPT). Prinsip kerja SPT adalah dengan   The working principle of SPT is to hit a
memukul sebuah tabung standar ke dalam        standard tube into a drill hole 45 cm deep
lubang bor sedalam 45 cm menggunakan          using a hammer weighing 63.5 kg that falls
palu dengan berat 63.5 kg yang jatuh bebas    freely from a height of 76 cm. What counts is
dari ketinggian 76 cm. Yang dihitung adalah   the number of blows to penetrate as deep as
jumlah pukulan untuk melakukan penetrasi      15 cm. The number of blows used is
sedalam 15 cm. Jumlah pukulan yang            penetration as deep as the last 30 cm.
digunakan adalah penetrasi sedalam 30 cm
terakhir.


2. 3. BIAYA EKSPLORASI                        2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di       IM Exploration Costs incurred in the 4th
Kuartal-4 2024 sebagai berikut:               Quarter of 2024 as follows:

                                  Q4 2024               Year To Date
          Biaya OperasionalAnggaran Realisasi      Anggaran     Realisasi
          Operating Expense  Budget   Realization   Budget      Realization
                              (IDR)      (IDR)       (IDR)        (IDR)
         Oktober/ October  83,333,333       -     833,333,330        -
         November/November 83,333,333       -     916,666,663        -
         Desember/Desember 83,333,333       -     999,999,996        -


2. 4. PELAKSANAAN DAN                         2. 4. IMPLEMENTATION AND
      PENGAWASAN                                     SUPERVISION
Kegiatan    Pemboran     diawasi     oleh     Drilling activities are supervised by the
Departemen Engineering Section Geologist.     Department of Engineering geologist section.
Page 14
2. 5. KEMAJUAN EKSPLORASI                         2. 5. EXPLORATION PROGRESS
Pada Kuartal-4 2024 belum ada kegiatan            As of the 4th Quarter of 2024, there are no
pemboran lanjutan. Namun ada beberapa             further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan,        geological activities that continue to be
diantaranya:                                      carried out, including:

1. Melakukan pembaharuan/updating model           1. Updating the Geological model based on
   Geologi berdasarkan data updating                 monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit           survey data and cs_holes data from coal
   serta cs_holes dari data channel sampling         sampling channel data, and supervision in
   batubara, dan pengawasan dalam                    the activities of taking roof/floor
   kegiatan pengambilan data pengukuran              measurement data and cs_holes.
   roof/floor serta cs_holes tersebut.

2. Melakukan kegiatan channel sampling            2. Conducting channel sampling activities as
   serta pengukuran tebal aktual batubara di         well as actual thick measurement of coal
   lokasi Pit AB Blok 14-16 & sekitarnya             at the pit AB location Block 14-16 &
   untuk keperluan pembuatan data channel            surrounding areas for the purposes of
   sampling untuk support pembaharuan/               making data sampling channels to
   updating model Geologi dan variasi                support     the    renewal/updating     of
   kualitas batubara dari coal inventory yang        geological models and variations in the
   akan ditambang.                                   quality of coal from coal inventory to be
                                                     mined.

3. Melakukan analisis kestabilan lereng di        3. Perform slope stability analysis in the pit
   area pit aktif Pit, baik pada sisi low wall,      active pit area, both on the low wall side,
   high wall maupun sidewall serta disposal          high wall and sidewall and disposal IPD
   IPD border Selatan, kaitannya untuk               South border, related to know the value of
   mengetahui nilai safety factor (FoS) untuk        safety factor (FoS) to control the
   kontrol pembentukan desain Pit Aktif              formation of Active Pit design to be stable
   supaya stabil dan aman.                           and safe.

2. 6. RENCANA KEGIATAN                            2. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                            EXPLORATION ACTIVITIES
IM pada periode Kuartal-1 2025 belum              IM for 1st Quarter of 2025 has not planned to
merencanakan melakukan aktifitas kembali          resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu          be it infill drilling or Geotechnical drilling in IM
pengeboran infill maupun pengeboran               concession area.
Geoteknik di area konsesi IM.

Sehubungan dengan rencana pengoptimalan           In relation to the mining optimization plan at
penambangan pada pit utama Indomining             Indomining's main pit to a depth of RL-160
hingga kedalaman RL-160 meter sesuai              meters according to the Mine Plan target for
target Mine Plan untuk pit IM dan dalam           the IM pit and in order to optimize the
rangka mengoptimalkan mineable reserve            mineable reserve of potential seams, the
seam-seam potensial, kualitas dan kuantitas       quality and quantity of exploration data
jumlah data eksplorasi yang dimiliki oleh PT      owned by PT Indomining through the current
Indomining melalui model geologi saat ini         geological       model     are      sufficiently
Page 15
sudah cukup mewakili serta memenuhi               representative and meet the number of
dengan jumlah distribusi titik – titik bor yang   distribution of existing boreholes very well to
ada sangat baik untuk mengcover optimasi          cover the optimization of coal reserves in the
cadangan batubara dalam perencanaan               planning of the mining process of the PIT
proses penambangan geometri desain PIT            design geometry during the period for 2025.
selama periode untuk Tahun 2025.


II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)


3. 1. DAERAH EKSPLORASI                           3. 1. EXPLORATION AREA
Pada Kuartal-4 2024, ABN melakukan                In the 4th Quarter of 2024, ABN conducted
pemboran      geotek     &   Pemasangan           Geotech Drilling & Piezometer Installation in
Piezometer di area Pit 6_Ext and update           Pit 6_Ext and geology model updates based
model geologi berdasarkan data roof & floor       on actual roof & floor data from survey
aktual dari hasil pengukuran survey, serta        measurement results, as well as reconciling
melakukan rekonsiliasi model geologi              geological models to actual survey data.
terhadap data survey aktual.
                                                  Apart from exploration activities within the
Selain kegiatan eksplorasi di dalam konsesi       ABN IUP concession, the exploration team
IUP ABN, tim eksplorasi juga melakukan            also carried out prospecting studies and
studi prospeksi dan review terhadap potensi       reviews of the potential for developing
pengembangan bahan galian di luar IUP             minerals outside the ABN IUP. In the 4th
ABN. Pada Kuartal-4, tim eksplorasi telah         quarter, the exploration team completed 5 of
menyelesaikan sebanyak 5 desk studi               prospecting studies on the potential for new
prospeksi terhadap potensi bahan galian           minerals including coal and gold.
baru meliputi batubara & emas.


3. 2. METODE PENGUKURAN                           3. 2. MEASUREMENT METHODS
Pemboran Geotek Pit 6_Ext menggunakan             Geotech drilling Pit 6_Ext using vertical
metode pemboran partial coring secara             drilling with partial coring method.
vertikal.
Channel     sampling   dilakukan     dengan       Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara            actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip,     exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara            taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas         quality as the basis for geology model update
batubara sebagai dasar untuk update model         in line with the progress of the mine. Channel
geologi seiring dengan kemajuan tambang.          sampling in the 4th Quarter of 2024 was
Channel sampling pada Kuartal-4 2024              conducted at seam S43L & S42 Pit 6.
dilakukan pada seam S43L & S42 Pit 6.
Page 16
3. 3. BIAYA EKSPLORASI                           3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di         ABN Exploration Costs issued in the 4th
Kuartal-4 2024 sebagai berikut:                  Quarter of 2024 as follows:


                               Q4 2024                     Year to Date
    Biaya Operasional Anggaran       Realisasi     Anggaran         Realisasi
    Operating Expense   Budget      Realization      Budget        Realization
                         (IDR)         (IDR)          (IDR)           (IDR)
   Oktober/October   931.273.350,-  109.755.350,- 931.273.350,-    109.755.350,-
   November/Nvember              -  427.315.000.- 931.273.350,-    537.070.350,-
   Desember/December             -   94.825.000,- 931.273.350,-    631.895.350,-


3. 4. PELAKSANAAN DAN                            3. 4. IMPLEMENTATION AND
      PENGAWASAN                                       SUPERVISION
Kegiatan dilaksanakan & diawasi oleh             Activities are carried out and supervised by
Departemen Mining section Geotech &              the Department of Mining section Geotech &
Exploration Development.                         Exploration Development.

3. 5. KEMAJUAN EKSPLORASI                        3. 5. EXPLORATION PROGRESS
Kemajuan kegiatan pemboran pada kuartal-         Drilling progress in 4th Quarter of 2024, in Pit
IV 2024 Pit 6_Ext telah selesai 5 titik bor      6_Ext has completed 5 drill holes with a total
dengan total kedalaman 510 meter dari            depth of 510 meters from the planned 500
rencana 500 meter.                               meters.
Selain kegiatan pemboran, berikut kegiatan       Besides the drilling activities, following are
team geologi selama Kuartal-IV 2024:             the activities of the geological team during
                                                 The 4th Quarter of 2024:

1. Melakukan monitoring di area Pit Aktif,       1. Monitoring the Active Pit area, both slope
   baik monitoring kestabilan lereng maupun         stability monitoring and coal monitoring to
   monitoring batubara untuk memantau               monitor the suitability between geological
   kesesuaian antara Model Geologi &                models and actual in the field.
   aktual di lapangan.
2. Update Model Geologi berdasarkan data         2. Geological Model Update based on coal
   roof/floor batubara dari data survey aktual      roof/floor data from actual survey data and
   dan dari data pemboran                           drilling data.
3. Analisa kestabilan lereng di area Low         3. Analysis of slope stability in low wall pit
   Wall Pit Aktif & area disposal.                  area active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan    4. Pit and disposal slope stability monitoring
   disposal dengan titik pantau prisma dan          using monitoring point prism and EWS
   ekstensometer EWS.                               ekstensometer.
5. Menindaklanjuti beberapa IUP yang             5. Follow up on several potential IUP for
   potensial untuk dilakukan eksplorasi             detailed exploration.
   detail.
Page 17
3. 6. RENCANA KEGIATAN                           3. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES
Rencana ABN pada periode Kuartal-I 2025          In the 1st quarter of 2025, ABN has no plans
tidak ada rencana kegiatan pemboran di IUP       for drilling activities in ABN IUP. Exploration
ABN. Kegiatan eksplorasi dan geologi             activities are focused on the following
difokuskan pada kegiatan berikut:                activities:

1. Pengambilan sampel untuk update               1. Sampling for coal quality updates &
   kualitas batubara & model geologi di area        geological models in the Active Pit area.
   Pit Aktif.

2. Monitoring di area Pit Aktif untuk            2. Monitoring in the Active Pit area to monitor
   memantau kesesuaian antara Model                 the suitability between actual and
   Geologi dan aktual di lapangan.                  Geological Models in the field.

3. Melakukan update Model Geologi                3. Update geological model based on
   berdasarkan data channel sampling, data          sampling channel, actual survey data and
   survey aktual dan data pemboran.                 drilling data.

4. Rekonsiliasi antara Model         Geologi     4. Reconciliation between Geological Model
   terhadap data survey actual.                     to actual survey data.

5. Monitoring geotek di area Pit & Disposal.     5. Geotech monitoring in Pit & Disposal
                                                    Area.

6. Analisa kestabilan lereng pit dan disposal.   6. Slope stability analysis for Pit and
                                                    Disposal.

7. Pemasangan monitoring point          untuk    7. Monitoring point installation for slope
   pemantauan pergerakan lereng.                    movement monitoring program.

File

File Open PDF
Source IDX
Size0.52 MB
Published10 Jan 2025
Pages17
Characters42,468
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 12 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×26
unresolved org PT Trisensa Mineral Utama p.2 ×5
unresolved org PT Indomining p.2 ×5
unresolved org PT Adimitra Baratama Nusantara p.2 ×4
unresolved org Menteri Investasi p.5
unresolved org Koordinasi p.5
unresolved org PT RPP p.6
unresolved org PT RPP Contractors Indonesia Contractors Indonesia p.6
unresolved org PT. ABN p.7
unresolved org PT. RPP Contractors Indonesia p.7
unresolved org Departemen Engineering Section Geologist. p.13
unresolved org Departemen Mining p.16

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result