Skip to content
Back to announcement

20260623_DPUM_Laporan Informasi dan Fakta Material_32103417_lamp1.pdf

Other Text extracted DPUM

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 2

Page 1 OCR 0.953
ODPUM

PT DUA PUTRA UTAMA MAKMUR Tbk
Keterbukaan Informasi
PT Dua Putra Utama Makmur Tbk

Penyampaian Informasi Terkait Pemulihan Operasional Pasca Insiden Kebakaran

PT Dua Putra Utama Makmur Tbk ("Perseroan") menyampaikan informasi kepada pemegang
saham dan publik terkait perkembangan pemulihan operasional pasca insiden kebakaran yang
terjadi pada salah satu fasilitas produksi Perseroan.

1. Fasilitas Produksi Pabrik 1 tidak terdampak insiden kebakaran dan tetap beroperasi normal
untuk mendukung keberlangsungan produksi Perseroan.

2. Fasilitas Produksi Pabrik 2 saat ini sedang menjalani proses perbaikan ringan dan
menunggu kedatangan mesin baru. Perseroan memperkirakan fasilitas tersebut dapat
kembali beroperasi secara bertahap dalam beberapa bulan ke depan dengan target awal
sekitar tiga bulan.

3. Perseroan juga sedang melakukan pemulihan terhadap Fasilitas Produksi Pabrik 3 beserta
fasilitas penunjang yang terdampak.

4. Perseroan menargetkan kegiatan ekspor dapat kembali berjalan pada pertengahan Juli
2026.

Perseroan telah mengambil berbagai langkah-langkah strategis untuk memastikan
keberlangsungan usaha dan pemenuhan kebutuhan pelanggan selama proses pemulihan
pascakejadian.

Dengan mempertimbangkan dampak relatif dari insiden tersebut, Perseroan menilai bahwa
kejadian ini tidak akan mempengaruhi operasional secara signifikan dalam jangka panjang. Oleh
karena itu, manajemen tetap optimistis untuk mengupayakan pencapaian target kinerja tahun 2026.

Perseroan akan terus memantau perkembangan proses pemulihan dan akan menyampaikan
informasi material lainnya sesuai ketentuan peraturan perundang-undangan yang berlaku.

Pati, 22 Juni 2026
PT Dua Putra Utama Makmur Tbk

PT D MAKMUR Tbk

Head Office:

JL. Raya Pati - Juwana KM 7, Dukuh Guyangan,RT O1,RW 05, Purworejo, Pati, Jawa Tengah 59119
Phone: 162295 4199 011 Fax: 462295 4199 010

Website: www.duaputra.com

Page 2 OCR 0.939
ODPUM

PT DUA PUTRA UTAMA MAKMUR Tbk
Openness Information
PT Dua Putra Utama Makmur Tbk

Delivery Information Related Recovery Post- Incident Operations Fire

PT Dua Putra Utama Makmur Tbk ("the Company") provides information to shareholders and the
public regarding the progress of operational recovery following the fire incident that occurred at
one of the Company's production facilities.

1.

4.

Factory 1 Production Facilities were not affected by the fire incident and continued to
operate normally to support the Company's production continuity.

The Factory 2 production facility is currently undergoing minor repairs and awaiting the
arrival of new machinery. The company estimates the facility will gradually resume
operations over the next few months, with an initial target of approximately three months.
The Company is also currently restoring the Factory 3 Production Facility and the affected
supporting facilities.

The company targets export activities to resume in mid-July 2026.

The Company has taken various strategic steps to ensure business continuity and meet customer
needs during the post-incident recovery process.

Considering the relative impact of the incident, the Company believes it will not significantly
impact operations in the long term. Therefore, management remains optimistic about achieving its
2026 performance targets.

The Company will continue to monitor the progress of the recovery process and will provide other
material information in accordance with applicable laws and regulations.

Head Office:
Jl Raya Pati - Juwana KM 7, Dukuh Guyangan,RT 01,RW 05, Purworejo, Pati, Jawa Tengah 59119
Phone: -62295 4199 011 Fax: 462295 4199 010

Website: www.duaputra.com

Pati, June 22, 2026
PT Dua Putra Utama Makmur Tbk

Bambang Pancg Putra
President direptor

File

File Open PDF
Source IDX
Size0.86 MB
Published23 Jun 2026
Pages2
Characters3,702
Text sourceOCR
OCR confidence0.946

Names mentioned 2 people and organisations named in the text · linked when the evidence is strong

linked org DUA PUTRA UTAMA MAKMUR Tbk p.1 ×23
unresolved org D MAKMUR Tbk p.1 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result