Back to announcement
20260622_PTDU_Keterbukaan informasi Pailit//PKPU_32103359.pdf
Other Text extracted PTDUSource file signed link, expires in 15 minutes
Extracted text 4
Page 1
Go To English Page
Nomor Surat 069/PTDU/DIRUT/RA/VI/2026
Nama Perusahaan PT Djasa Ubersakti Tbk
Kode Emiten PTDU
Lampiran 1
Perihal Keterbukaan informasi terkait Perkara Penundaan Kewajiban Pembayaran Utang
Perkara Penundaan Kewajiban Pembayaran Utang
Nomor Perkara 169/Pdt.Sus-PKPU/2026/PN Niaga Jkt.Pst
Nama Pihak yang Mengajukan Gugatan PT Master Steel Manufactory
Kewajiban yang Diperkarakan Tagihan dari Supplier
Tanggal Kejadian 03 Juni 2026
Jenis Mata Uang IDR
Jumlah Tagihan 281.035.004
Berdampak Material Tidak
Jangka Waktu Pinjaman 60 hari
Penggunaan Pinjaman Supplier barang
Alasan Tidak Dipenuhinya Kewajiban Pembayaran Verifikasi tagihan
Penjelasan Manajemen terkait Gugatan Perseroan berusaha menyelesaiakan masalah ini
dengan musyawarah dan melakukan verifikasi tagihan.
Informasi Lain
Masih perlu klarifikasi dalam tahapan persidangan.
Demikian untuk diketahui.
Hormat Kami,
PT Djasa Ubersakti Tbk
Pio Hizkia Wehantouw
Direktur
PT Djasa Ubersakti Tbk
Bona Indah Plaza Blok A2/B8, Jl. Karang Tengah Raya, Kota Jakarta Selatan, DKI
Page 2
Telepon : 0217660114, Fax : 0217508037, http://djasaubersakti.co.id/
Nama Pengirim Pio Hizkia Wehantouw
Jabatan Direktur
Tanggal dan Waktu 22-06-2026 20:34
Lampiran 1. 0069_PTDU_DIRUT_RA_VI_2026.pdf
Dokumen ini merupakan dokumen resmi PT Djasa Ubersakti Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Djasa Ubersakti Tbk bertanggung jawab penuh
atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page
Announcement No. 069/PTDU/DIRUT/RA/VI/2026
Issuer Name PT Djasa Ubersakti Tbk
Issuer Code PTDU
Attachment 1
Subject Disclosure of Company Proposing Postponement of Payment
Case of Postponement of Debt Payment Obligations
Case No. 169/Pdt.Sus-PKPU/2026/PN Niaga Jkt.Pst
Name of the Claiming Party PT Master Steel Manufactory
Claimed Liability Claim from Suppliers
Event Date 03 June 2026
Currency IDR
Amount 281.035.004
Impact Materials No
Loan Term 60 hari
Use of Loan Supplier barang
Reasons for Not Fulfilling Obligations Payment The company is trying to resolve this problem through
deliberation and verifying the bill.
Management Explanation Regarding Lawsuit
Other Information:
There is still a need for clarification in the trial stage.
Thus to be informed accordingly.
Respectfully,
PT Djasa Ubersakti Tbk
Pio Hizkia Wehantouw
Direktur
PT Djasa Ubersakti Tbk
Bona Indah Plaza Blok A2/B8, Jl. Karang Tengah Raya, Kota Jakarta Selatan, DKI
Page 4
Phone : 0217660114, Fax : 0217508037, http://djasaubersakti.co.id/
Sender Name Pio Hizkia Wehantouw
Function Direktur
Date and Time 22-06-2026 20:34
Attachment 1. 0069_PTDU_DIRUT_RA_VI_2026.pdf
This is an official document of PT Djasa Ubersakti Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Djasa Ubersakti Tbk is fully responsible for the information
contained within this document.
Names mentioned 5 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Master Steel Manufactory Kewajiban
p.1
unresolved
org
PT Master Steel Manufactory Claimed Liability
p.3
unresolved
person
Function
· Direktur
p.4
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.