Skip to content
Back to announcement

20250107_KRYA_Laporan Informasi dan Fakta Material_31843494.pdf

Other Text extracted KRYA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 7

Page 1
Go To English Page

 Nomor Surat                           002/CORSEC/BKPJ/I/2025

 Nama Perusahaan                       PT Bangun Karya Perkasa Jaya Tbk

 Kode Emiten                           KRYA

 Lampiran                              1
                                       KRYA Akselerasi Proyek di 2025, Mulai Groundbreaking Proyek Pergudangan
 Perihal
                                       Milik Wings Group di Sumedang, Jawa Barat


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Bangun Karya Perkasa Jaya Tbk

 Bidang Usaha                                  Bergerak Dalam Bidang Kontruksi Umum dan Kontruksi Baja



 Telepon                                       (031)7344509

 Faksimili                                     (031)73882177

 Alamat Surat Elektronik (email)               corsec@ptbkpjaya.com


 Tanggal Kejadian                              07 Januari 2025
 Jenis Informasi atau Fakta Material           KRYA Akselerasi Proyek di 2025, Mulai Groundbreaking
                                               Proyek Pergudangan Milik Wings Group di Sumedang, Jawa
                                               Barat
Page 2
Uraian Informasi atau Fakta Material   PT Bangun Karya Perkasa Jaya Tbk. IDX KRYA memulai
                                       tahun 2025 dengan mengakselerasi proyek konstruksi baru.
                                       Hal ini ditandai dengan pelaksanaan peletakan batu pertama
                                       groundbreaking proyek pergudangan Depo Tomo, milik PT
                                       Niagatama Kencana, anak usaha Wings Group. Proyek
                                       pergudangan dengan nilai kontrak sebesar Rp 23,87 miliar ini
                                       berlokasi di Jl. Ali Sadikin, Kecamatan Tomo, Kabupaten
                                       Sumedang, Jawa Barat. Peletakan batu pertama dilaksanakan
                                       pada Jumat, 3 Januari 2025, dan proyek ini dijadwalkan
                                       selesai dalam waktu 8 bulan. Dharmo Budiono, Direktur Utama
                                       PT Bangun Karya Perkasa Jaya Tbk., menyampaikan. Wings
                                       Group adalah salah satu klien setia yang telah memberikan
                                       kepercayaan kepada kami untuk menangani berbagai proyek
                                       pembangunan pabrik dan pergudangan. Kami berkomitmen
                                       untuk memberikan hasil terbaik pada proyek ini, ujar Dharmo.
                                       Tidak hanya itu, setelah rampungnya proyek Depo Tomo,
                                       manajemen PT Bangun Karya Perkasa Jaya Tbk juga
                                       berkomitmen untuk memberikan layanan pemeliharaan selama
                                       60 hari setelah serah terima proyek.

                                       Sementara itu, Gary Kurniawan, Direktur PT Niagatama
                                       Kencana, mengungkapkan harapannya agar pembangunan
                                       Depo Tomo dapat berjalan lancar sesuai jadwal. Kami
                                       berharap kehadiran Depo Tomo dapat mendukung
                                       operasional Wings Group di wilayah Sumedang dan Jawa
                                       Barat secara lebih optimal, ungkapnya. Sebagai informasi
                                       tambahan, PT Bangun Karya memang terus memperoleh
                                       kepercayaan dari Wings Group. Dimana pada tahun 2023,
                                       KRYA berhasil menyelesaikan proyek pembangunan pabrik
                                       nondairy creamer dan milk powder senilai Rp 14,19 miliar milik
                                       Wings Group. Kemudian, pada tahun 2024, KRYA juga
                                       mengerjakan pembangunan tujuh gudang bahan baku untuk
                                       PT Karunia Alam Segar, yang merupakan anak usaha Wings
                                       Group.
Page 3
 Dampak kejadian, informasi atau fakta          1. Dampak pada Kegiatan Operasional
 material tersebut terhadap kegiatan
 operasional, hukum, kondisi keuangan,          Pelaksanaan proyek pergudangan Depo Tomo menunjukkan
 atau kelangsungan usaha Emiten atau            aktivitas konstruksi yang terus berjalan di awal tahun 2025.
 Perusahaan Publik                              Dengan nilai kontrak sebesar Rp 23,87 miliar, proyek ini akan
                                                meningkatkan utilisasi sumber daya operasional perusahaan.

                                                2. Dampak pada Aspek Hukum

                                                Tidak terdapat indikasi dampak hukum negatif dari proyek ini.
                                                Sebaliknya, komitmen perusahaan untuk memberikan layanan
                                                pemeliharaan selama 60 hari setelah serah terima proyek
                                                menunjukkan upaya kepatuhan terhadap perjanjian kontrak
                                                dan peningkatan kualitas layanan.

                                                3. Dampak pada Kondisi Keuangan

                                                Nilai kontrak proyek Rp 23,87 miliar akan berkontribusi pada
                                                pendapatan KRYA di tahun 2025, meningkatkan potensi arus
                                                kas operasional.

                                                4. Dampak pada Kelangsungan Usaha

                                                Hubungan baik dengan Wings Group, yang secara konsisten
                                                memberikan proyek bernilai signifikan, menjadi sinyal positif
                                                bagi keberlanjutan usaha KRYA. Rekam jejak perusahaan
                                                yang sukses menyelesaikan proyek-proyek sebelumnya
                                                meningkatkan reputasi KRYA sebagai mitra terpercaya di
                                                sektor konstruksi.




Informasi Lain

Link Berita: https://ptbkpjaya.com/news/37




Demikian untuk diketahui.


Hormat Kami,
PT Bangun Karya Perkasa Jaya Tbk




Brigitta Notoatmojo, ST

Direktur




PT Bangun Karya Perkasa Jaya Tbk
Jl. Pattimura Plaza Segi Delapan C 851-852 Sono Kwijenan, Sukomanunggal,
Telepon : (031)7344509, Fax : (031)73882177, www.ptbkpjaya.com



 Nama Pengirim                       Brigitta Notoatmojo, ST

 Jabatan                             Direktur
Page 4
Tanggal dan Waktu               07-01-2025 15:36

Lampiran                       1. 2025-01-07 - KRYA Akselerasi Proyek di 2025.pdf


Dokumen ini merupakan dokumen resmi PT Bangun Karya Perkasa Jaya Tbk yang tidak memerlukan tanda tangan
    karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Bangun Karya Perkasa Jaya Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 5
Go To Indonesian Page

 Letter / Announcement No.            002/CORSEC/BKPJ/I/2025

 Issuer Name                          PT Bangun Karya Perkasa Jaya Tbk

 Issuer Code                          KRYA

 Attachment                           1

 Subject                              KRYA Accelerates Projects in 2025, Begins Groundbreaking of Wings Group
                                      Warehouse Project in Sumedang, West Java

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company             PT Bangun Karya Perkasa Jaya Tbk

 Business Activities                          Bergerak Dalam Bidang Kontruksi Umum dan Kontruksi Baja


 Telephone                                    (031)7344509

 Faximile                                     (031)73882177

 Email Address                                corsec@ptbkpjaya.com


 Date of Event                                07 January 2025

                                              KRYA Accelerates Projects in 2025, Begins Groundbreaking of
 Type of Material Information or Facts        Wings Group Warehouse Project in Sumedang, West Java

 Description of Material Information or       PT Bangun Karya Perkasa Jaya Tbk. IDX KRYA started 2025
 Facts                                        by accelerating new construction projects. This was marked by
                                              the laying of the first stone for the groundbreaking of the Depo
                                              Tomo warehousing project, owned by PT Niagatama Kencana,
                                              a subsidiary of Wings Group. The warehousing project with a
                                              contract value of IDR 23.87 billion is located on Jl. Ali Sadikin,
                                              Tomo District, Sumedang Regency, West Java. The laying of
                                              the first stone was carried out on Friday, January 3, 2025, and
                                              the project is scheduled to be completed within 8 months.
                                              Dharmo Budiono, President Director of PT Bangun Karya
                                              Perkasa Jaya Tbk., said. Wings Group is one of the loyal
                                              clients who has given us their trust to handle various factory
                                              and warehousing construction projects. We are committed to
                                              providing the best results on this project, said Dharmo. Not
                                              only that, after the completion of the Depo Tomo project, the
                                              management of PT Bangun Karya Perkasa Jaya Tbk is also
                                              committed to providing maintenance services for 60 days after
                                              the project handover.

                                              Meanwhile, Gary Kurniawan, Director of PT Niagatama
                                              Kencana, expressed his hope that the construction of Depo
                                              Tomo can run smoothly according to schedule. We hope that
                                              the presence of Depo Tomo can support Wings Group's
                                              operations in the Sumedang and West Java areas more
                                              optimally, he said. As additional information, PT Bangun Karya
                                              continues to gain trust from Wings Group. Where in 2023,
                                              KRYA successfully completed the construction project of a
                                              non-dairy creamer and milk powder factory worth IDR 14.19
                                              billion owned by Wings Group. Then, in 2024, KRYA also
                                              worked on the construction of seven raw material warehouses
                                              for PT Karunia Alam Segar, which is a subsidiary of Wings
                                              Group.
Page 6
 Impact of event, material information or       1. Impact on Operational Activities
 facts towards Issuers or Public
 Company’s operational activities, legal,       The implementation of the Depo Tomo warehousing project
 financial condition, or going concern          shows that construction activities are continuing in early 2025.
                                                With a contract value of IDR 23.87 billion, this project will
                                                increase the utilization of the company's operational resources.

                                                2. Impact on Legal Aspects

                                                There is no indication of a negative legal impact from this
                                                project. On the contrary, the company's commitment to provide
                                                maintenance services for 60 days after the project handover
                                                shows an effort to comply with the contract agreement and
                                                improve the quality of service.

                                                3. Impact on Financial Condition

                                                The project contract value of IDR 23.87 billion will contribute to
                                                KRYA's income in 2025, increasing the potential for
                                                operational cash flow.

                                                4. Impact on Business Continuity

                                                A good relationship with Wings Group, which consistently
                                                provides projects of significant value, is a positive signal for
                                                KRYA's business sustainability. The company's track record of
                                                successfully completing previous projects enhances KRYA's
                                                reputation as a trusted partner in the construction sector.

Other Information

News Links: https://ptbkpjaya.com/news/37




Thus to be informed accordingly.


Respectfully,
PT Bangun Karya Perkasa Jaya Tbk




Brigitta Notoatmojo, ST

Direktur




PT Bangun Karya Perkasa Jaya Tbk
Jl. Pattimura Plaza Segi Delapan C 851-852 Sono Kwijenan, Sukomanunggal,
Phone : (031)7344509, Fax : (031)73882177, www.ptbkpjaya.com



Sender Name                          Brigitta Notoatmojo, ST

Function                             Direktur

Date and Time                        07-01-2025 15:36

Attachment                          1. 2025-01-07 - KRYA Akselerasi Proyek di 2025.pdf
Page 7
  This is an official document of PT Bangun Karya Perkasa Jaya Tbk that does not require a signature as it was
generated electronically by the electronic reporting system. PT Bangun Karya Perkasa Jaya Tbk is fully responsible
                                 for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published7 Jan 2025
Pages7
Characters14,732
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org Bangun Karya Perkasa Jaya Tbk · Nama Perusahaan p.1 ×54
linked org PT Bangun Karya p.2 ×3
linked person Brigitta Notoatmojo, ST · Direktur p.3 ×5
unresolved org PT Niagatama Kencana p.2 ×4
unresolved org PT Karunia Alam Segar p.2 ×2
unresolved person Function · Direktur p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result