Page 1
PUBLIC EXPOSE
December, 30th 2024

Aston Believue Hotel
Jl Haji Nawi Raya No 1 Jakarta – Indonesia 12420
Page 2
1   KILAS BALIK PERJALANAN PERSEROAN
Page 3
 TREND HARGA SAHAM



 HARGA SAHAM TERUS MENUNJUKKAN
 PENURUNAN AKIBAT :
 1. PENDAPATAN MENURUN
 2. PROYEK-PROYEK BELUM BEROPERASI
 3. BELUM ADA PENAMBAHAN MODAL &
    PEMBIAYAAN.


                           HARGA SAHAM TGRA
900
                         800
800
700
600             545
500
400
300
200
                                  129      159
       100                                          88
100                                                          50       50       24
  0
      IPO 15   Dec-17   Dec-18   Dec-19   Dec-20   Dec-21   Dec-22   Dec-23   Dec-24
       May
       2017
Page 4
KINERJA KUALITATIF
                                                             2024

                                                             ❑ On Medio of April met the prospective investor
                                                             ❑ July – Dec’24 : Due Diligent and preparing for
                                                               investment agreement and corporate action in
                                                               next year
                                  2020 - 2023

                                  ❑ COVID-19 Struggle with The Investor Candidate
                                  ❑ Due diligence takes too long
 2017 - 2019                      ❑ Failed to get investors and creditors

❑ IPO undersubscribed
❑ Mis-Investment at Solar Power
  Plant in Australia
Page 5
2   KINERJA KEUANGAN 2022-2023 & SEP’2024
Page 6
KINERJA KEUANGAN 2022-2023
Page 7
KINERJA KEUANGAN 2023-2024
Page 8
3   RENCANA BISNIS
    TAHUN 2025 - 2027
Page 9
    PERSIAPAN RIGHTS ISSUE
1   HMETD
    1. PROSES UJI TUNTAS STANDBY BUYER SEDANG BERLANGSUNG,
       KESEPAKATAN AWAL SUDAH DICAPAI.
    2. PERSEROAN RENCANA MENERBITKAN SAHAM BARU SEBANYAK
       38,75 MILIAR SAHAM.
    3. TARGET WAKTU : SEPTEMBER 2025.
Page 10
    RENCANA BISNIS TRIWULAN I – II 2025
2   AKUISISI 6 MINI HYDRO POWER PLANT
    YANG TELAH OPERASIONAL                TUJUAN :
    NILAI AKUISISI +/- Rp.365 MILIAR.     MENCIPTAKAN PENGHASILAN BAGI
                                          PERSEROAN RATA-RATA Rp.54 MILIAR/THN
Page 11
    PEMBANGUNAN 5 MINI HYDRO POWER PLANT
3   1. TELAH MEMILIKI KONTRAK JUAL-BELI LISTRIK (PPA) DENGAN PT PLN
       (PERSERO) UID SUMATERA UTARA, TOTAL KAPASITAS 43,8MW.
    2. ESTIMASI CAPITAL EXPENDITURE Rp.1,5 TRILLIUN.
    3. PELAKSANAAN KONSTRUKSI DITARGETKAN TRIWULAN-I’25, TRIWULAN-
       III’25 & TRIWULAN-IV’25.
    4. TARGET COD TAHUN 2027 MULAI TRIWULAN-I, III DAN IV.
    5. ESTIMASI PENGHASILAN YANG AKAN DIKONTRIBUSIKAN OLEH 5
       PROYEK INI MENCAPAI Rp.360 MILIAR PER TAHUN.
Page 12
Terima Kasih
Thank You

File

File Open PDF
Source IDX
Size2.4 MB
Published23 Dec 2024
Pages12
Characters2,784
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 1 people and organisations named in the text · linked when the evidence is strong

unresolved org PT PLN (PERSERO) p.11

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result