Skip to content
Back to announcement

20241216_GTSI_Public Expose_31829388_lamp1.pdf

Other Text extracted GTSI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 24

Page 1
    PUBLIC EXPOSE
PT GTS Internasional Tbk
         19 Desember 2024
Page 2
     AGENDA
 Profil Perusahaan

 Ikhtisar Kinerja

 Tinjauan Pasar

 Pengembangan Usaha
Page 3
PROFIL PERUSAHAAN
Page 4
STRUKTUR KEPEMILIKAN GTSI

      PT Humpuss Maritim Internasional Tbk                       Masyarakat
                                                                   Public


               84,80%                                            15,20%


                                      PT GTS Internasional Tbk



                                             100%
Page 5
SEGMEN USAHA

GTSI menyediakan layanan
menajemen kapal yang lengkap
dan profesional sesuai standar
QS-SHE (Quality, Security, Safety,
                                        Jasa             Jasa
Health, and Environmental                                           GTSI memiliki dua unit kapal yaitu
Protection).                         Manajemen       Pengangkutan   Kapal Ekaputra dan Kapal Triputra
                                       Kapal             LNG        yang menyediakan layanan
                                                                    pengangkutan LNG.




                                          Penyimpanan dan
GTSI memiliki kapal FSRU Jawa Satu
bersama dengan shareholder                 Regasifikasi LNG
lainnya sebagai penyedia
infrastruktur Penyimpanan dan
Regasifikasi LNG.
Page 6
Profil Manajemen




   AR Sofyan         Imam Supriyadi       Gembong Primadjaya   Dandun Widodo
 Komisaris Utama   Komisaris Independen     Direktur Utama        Direktur
Page 7
IKHTISAR KINERJA
Page 8
KILASAN INFO PENTING
                                     KINERJA SAHAM


     Indeks Pergerakan Harga Saham                   Indeks Pergerakan Volume Saham
Page 9
KILASAN INFO PENTING

     OPERASIONAL                          TATA KELOLA                      LINGKUNGAN

                                           GTSI telah menerapkan system      GTSI melakukan kegiatan CSR
     FSRU Jawa Satu telah melaksanakan                                       penanaman mangrove
                                           ERP untuk proses pencatatan
     Commercial Operation Date (COD).                                        dengan total 2000 bibit
                                           keuangan, akuntansi, dan
                                           procurement.                      sebagai komitmen terhadap
     Sebagai komitmen GTSI terhadap                                          kelestarian lingkungan.
     Safety, Kapal –kapal milik GTSI
                                           GTSI memperbaharui website
     telah melaksanakan dry docking
                                           dengan tampilan yang lebih
     secara rutin pada tahun 2024.
                                           fresh dan disesuaikan dengan
                                           prinsip keberlanjutan.
     Zero Accident pada operasi seluruh
     kapal-kapal GTSI sepanjang tahun
     2024.                                 GTSI melalui anak usahanya PT
                                           Humolco LNG Indonesia telah
                                           melaksanakan continuous
     Full Employment and On-Time           improvement dengan
     Delivery pada seluruh voyage yang     pembaharuan sertifikasi ISO.
     diangkut oleh seluruh kapal-kapal
     GTSI .
Page 10
KINERJA KEUANGAN
Page 11
KINERJA KEUANGAN
Page 12
KINERJA KEUANGAN
                   RATIO KEUANGAN
                             350000                                                         327.909
                                      309.232
                             300000

                                                                                  241.961
                             250000


                             200000

                                                                 142.782
                             150000


                             100000
                                                    71.593

                             50000
                                       104           106          107               98        98
                                 0
                                       2023        2024 Q1       2024 Q2         2024 Q3    2024 F

                                                Total Employee    Revenue per Employee
Page 13
TINJAUAN PASAR
Page 14
KILASAN ISU TERKINI


                PENINGKATAN                      PERUBAHAN
               ISU GEOPOLITIK                  PEMERINTAHAAN




                                PERKEMBANGAN
  PERUBAHAN
     IKLIM                        TEKNOLOGI
Page 15
PERTUMBUHAN ENERGI NASIONAL

Pertumbuhan ekonomi Indonesia yang ditargetkan
mencapai 8% pada tahun 2028-2029 (Kemenkeu, 2024),
dengan elastisitas energi 1,20 - 1,84 maka pertumbuhan
energi nasional mencapai 9,6% - 14,72%.
Peningkatan yang signifikan ini sejalan dengan
peningkatan kebutuhan energi dunia.

                                                                  2021   2025     2050




                                                                                Source : SKK Migas, 2021




                                            Source : CEIC, 2024
Page 16
LNG SEBAGAI ENERGI TRANSISI

                                                                                                       Kebutuhan Gas Nasional 2021-2030


                                                                                                                Gas(TBtu)




                            Source : ExxconMobil Global Outlook Executive Summary : Our View to 2050

                                                                                                                                          Source : RUPTL 2021-2030




 Upaya pengurangan emisi karbon perlu dilakukan tanpa mengorbankan kebutuhan energi masyarakat
 melalui optimalisasi pemanfaatan LNG.
Page 17
SUPLAI & KEBUTUHAN GAS SUMATRA & JAWA
                                            Eksisting :
                                            PLTG/GU ARUN,            180 MW, +/- 20 mmscfd
                                            Proses Pembangunan / Pengadaan :
                                                                                                                                                                           Terjadi penurunan supply gas wilayah Jawa dan Sumatra yang
                                            PLTGU SUMBAGUT II
                                            PLTG MPP BANDA ACEH I
                                                                       240 MW, COD 2020, K
                                                                        55 MW, COD 2021, R                                                                                 mengandalkan aliran pipa, sedangkan demand terus meningkat.
    Medan                                   PLTG MPP BANDA ACEH II      110 MW, COD 2022, R
                                                                                                                                                                           Sehingga diperlukan infrastruktur suplai LNG sebagai solusinya.
                                                              Eksisting :
                                                              MPP PAYA PASIR,              75 MW, +/- 12 mmscfd
Eksisting :                                                   PLTGU BELAWAN              850 MW, +/- 94 mmscfd
MPP NIAS, (BBM) 25 MW, 3.5 mmscfd                             MVPP BELAWAN,              225 MW, +/- (BBM)
Proses Pembangunan / Pengadaan :                              Proses Pembangunan / Pengadaan :
PLTMG MPP NIAS, 34 MW, COD 2019, K                            PLTGU BELAWAN III         430 MW, COD 2022, R +/- 60 mmscfd
PLTMG NIAS II
Eksisting :
                20 MW, COD 2020, R
                                                                                                          Batam          Eksisting :
                                                                                                                         Export to Singapore          +/- 400 mmscfd
                                                                                                                         Export to Malaysia           +/- 250 mmscfd
PLTMG DURI,       112 MW,                                                                                 Eksisting :    PLTMG Panaran, Batam, 24 MW,
PLTMG TELUK LEMBU 154 MW                                                                                  PUPUK SRIWIDJAJA,             +/- 240 mmscfd
PLTG BALAI PUNGUT, 75 MW, +/- 21 mmscfd                                                                   PLTGU BORANG         150 MW, +/- 30 mmscfd
Proses Pembangunan / Pengadaan :                                                                          PLTMG GN MEGANG 110 MW, +/- 15 mmscfd
PLTMG Riau P 200 MW, COD 2020, K                                                                          PLTGU INDRALAYA      135 MW, +/- 25 mmscfd
PLTGU Riau, 275 MW, COD 2021, K                                                                           PLTG/GU KERAMASAN 165 MW, +/- 13 mmscfd
Eksisting :
                                                                                                          PLTG JAKA BARING      60 MW, +/- 4 mmscfd
PLTG PAYO SELINCAH 100 MW, +/- 25 mmscfd
                                                                                                          Proses Pembangunan / Pengadaan :
PLTMG SEI GELAM    100 MW, +/- 6.5 mmscfd
                                                                                                          PLTGU BORANG         22 MW, COD 2020, R
PLTG BATANGHARI      60 MW, +/-
Proses Pembangunan / Pengadaan :
MPP TJ JABUNG      33 MW, COD 2019, PPA,
                                                                                                                      Palembang
PAYO SELINCAH ST    35 MW, COD 2020, R
       Pekanbaru - Dumai                                                                                           Eksisting :
                                                                                                                   PLTG Bangka 50 MW, +/- 3 mmscfd (BBM)

                                                                                                                                     Eksisting :
                                                                                                                                     PLTG Belitung 25 MW, +/- 2 mmscfd (BBM)
                                                                                                                                                                       Eksisting :
                                                                                                                                   FSRU Lampung                        PLTGU MUARA KARANG 1398 MW,
                                                                                                                                                                       PLTGU IP PRIOK       1815 MW,
                                                                                                                                                                       PLTGU MUARA TAWAR 1943 MW,
                                                                                                                                                                       PLTG CIKARANG L’NDO 300 MW,
                                                                               Eksisting :                                                       FSRU Jawa             PLTGU BEKASI POWER    130 MW,
                                                                                                                                                                       Proses Pembangunan / Pengadaan :
                                                    PLTG TARAHAN 100 MW, +/- 15 mmscfd
                                                       Proses Pembangunan / Pengadaan :
                                                   LAMPUNG PEAKER 200 MW, COD 2020, R
                                                                                                                                                   Barat               PLTGU JAWA II   800 MW, 2018
                                                                                                                                                                       MUARA KARANG 500 MW, 2019
                                                                                                                                                                       MUARA TAWAR     650 MW, 2020
                                                                                                                                                                       PLTMG SENAYAN 100 MW, 2019
                                                                               Eksisting :
                                                    PLTGU CILEGON 740 MW, +/- 70 mmscfd                                     Jakarta                                                     Surabaya, Gresik,
                                                                    Lampung                                                                  Cirebo                                     Sidoarjo, Mojokerto,
                                                                                                                                                n                                       Pasuruan,       Probolinggo
                                                                                                                                                                                            Eksisting :
                                                                                Cilegon                                                                                                         PLTGU PJB GRESIK 2000 MW, +/- 270 mmscfd
                                                                                                                                                                                                Proses Pembangunan / Pengadaan :
                                                                                                                                                                                                PLTGU JAWA III 800 MW,        2022
                                                                                  Bekasi            Eksisting :
                                                                                                                                                                                                PETROKIMIA GRESIK 150 mmscfd, 2019

                                                                                                                  Semarang
                                                                                                                                                                                                Eksisting :
                                                                                     Pupuk Kujang 100 mmscfd
                                                                                                                                                                                                PLTGU IP GRATI   1200 MW, +/- 84 mmscfd
                                                                           Proses Pembangunan / Pengadaan :                                       Eksisting :
                                                                                                                                                                                                Proses Pembangunan / Pengadaan :
                                                                   PLTGU JAWA I 1760 MW, +/- 150 mmscfd, 2019       PLTGU Tambak Lorok 1000 MW 200 mmscfd
                                                                                                                                                                                                GRATI ADD ON      183 MW, 2019
                                                                                                                         Proses Pembangunan / Pengadaan :
                                                                                                                                        Add on 800 MW 2019

                                                                                                                                                                                                                            Source : Data Olahan Internal
Page 18
     SUPLAI & KEBUTUHAN GAS INDONESIA TIMUR
                 PLTMG BONTANG 14 MW                                                                                                                          Perkembangan demand gas wilayah
               PLTG KALTIM PEAKER 100 MW                                                     MPP TERNATE 30 MW
                      MPP KALTIM 30 MW
                                                   PLTMG AMBON 30 MW, 2019
                                                                                                                                                              Indonesia Timur sangat tinggi baik untuk
              PLTGU TANJUNG BATU 60 MW
                    PLTG SAMBERA 40 MW             PLTG/MG/GU AMBON II 50 MW, 2022 (R)                 PLTMG SERAM 20 MW, 2018                                pembangkit listrik maupun industri.
                     PLTG SENIPAH 82 MW            PLTMG NAMLEA 10 MW, 2019 (K)                        PLTMG SERAM II 20 MW, 2020 (R)
             PLTGU SENIPAH 35 MW, 2019 (K)                                                                                                                    Namun infrasruktur suplai gas belum
                                                                                                                PLTMG WAYMON 20 MW
                                             PLTMG MINAHASA 150 MW, 2021 (R)                                    PLTG/MG SORONG 50 MW                          tersedia. Sehingga sangat diperlukan
                                                  MVPP AMURANG 125 MW
                                                                                                                       MPP MANOKWARI 20 MW                    infrastruktur suplai LNG.
                                             PLTG GORONTALO 100 MW                                                     PLTMG MANOKWARI II 20 MW, 2020 (P)
                                                                                                                              PLTMG BIAK 15 MW
                                                                                                                              PLTMG BIAK II 10 MW, 2019 (K)
                                               MPP SULTENG 60 MW, 2021 (R)
                                      PLTMG LUWUK 40 MW 2019 (K)
                                      PLTGU LUWUK 150 MW 2021 (R)
                                                     MPP KENDARI 50 MW
                                PLTG TELLO 125 MW
               PLTG/MG/GU MAKASSAR 200 MW 2023 (R)
                                                                               PLTMG LANGGUR 20 MW, 2019 (K)
                         MPP SULSELBAR 120 MW 2020 (R)

                                PLTMG BAU BAU 30 MW, 2023 (K)      PLTMG SAUMLAKI 10 MW, 2019 (K)



PLTMG PESANGGARAN 200 MW
 PLTG LOMBOK 50 MW                                                                PLTMG DOBO 10 MW, 2019 (K)
 PLTGU LOMBOK 150 MW, 2019 (K)
           PLTMG SUMBAWA 50 MW                                                            MPP     NABIRE 20 MW (E)
                       PLTMG BIMA 50 MW                                                   PLTG/MG NABIRE II 10 MW, 2019 (P)
                                PLTMG FLORES 20 MW                                                  PLTMG SERUI 10 MW, 2018 (K)
                                          PLTMG MAUMERE 40 MW                                        MPP TIMIKA 10 MW, 2019
                                           PLTMG KUPANG 40 MW                                        PLTG/MG TIMIKA II 30 MW, 2020 (P)
                                                                                                         MPP JAYAPURA 50 MW
                                                                                                         PLTMG JAYAPURA 40 MW, 2018 (K)
                                                                                                         PLTMG JAYAPURA 50 MW, 2020 (P)
                                                                                                         PLTMG MERAUKE 20 MW
                                                                                                         PLTG/MG MERAUKE II 20 MW, 2019 (P)
                                                                                                                                                                          Source : Data Olahan Internal
Page 19
PENGEMBANGAN USAHA
Page 20
 INTEGRATEDONE-STOP LNG SOLUTION
      Upstream                            Midstream                               Downstream

                                                Shipping
                                                Trucking




                                            Pemanfaatan Gas Marjinal
            Solusi Transportasi LNG Skala Besar dan Kecil | LNG Bunkering | Konversi LNGC ke FSU
Penyaluran Gas/LNG ke Industri/HoReKa | Pengembangan Infrastruktur Kepelabuhanan & Logistik Penyaluran LNG
Page 21
STRATEGI PENGEMBANGAN USAHA

                                   Pemanfaatan
                                   gas marjinal
 Intensifikasi
 • Optimasi operasional
     kapal existing
 Ekstensifikasi                  Penambahan
 • Penambahan kapal              Kapal

 Diversifikasi                                                      Infrastruktur Kepelabuhanan
                                                                    & Logistik Penyaluran LNG
 • Penambahan usaha
     upstream dan
     downstream
                                 Optimasi
                             `   operasional
                                 kapal existing
 Investasi 160 juta USD
 selama 3 tahun ke depan
                                 Konversi
 untuk meningkatkan              LNGC ke FSU
 profitabilitas perusahaan                        Distribusi LNG ke End-user
Page 22
DISTRIBUSI KE END USER



                                                                  KENDARAN BBG
                 LNG         REGAS UNIT
                                                NG                               Pipa dalam Kawasan
                                                                    GAS KOTA



         PENDINGINAN                                              PEMBANGKITAN
            UDARA                                                    LISTRIK


                                                     INDUSTRI LAINNYA


                                          Konversi LNGC keKESEHATAN
                                                            FSU     DAN
                                                             FARMASI
   PENYIMPANAN
     MAKANAN
                         GUDANG
                       BERPENDINGIN
Page 23
STRATEGI OPERASIONAL USAHA

                                   Penerapan sistem
                                                             Penerapan prinsip
                                   Preventive
 Upaya efisiensi:                                            Environmental, Social,
                                   Maintenance Plan
                                                             and Governance (ESG)
  • Penerapan digitalisasi         (PMP) dengan
                                                             untuk mendukung
  • Pengelolaan biaya yang ketat   digitalisasi dan
                                                             keberlanjutan
                                   integrasi laporan
  • Pemeliharaan sarana produksi   kapal.
                                                             perusahaan.


  Perusahaan berkomitmen
  mendukung prinsip -prinsip
                                   Penerapan sistem          Penerapan pasal atau
  keberlanjutan dan perlindungan                             klausul yang sesuai
                                   Enterprise Resource
  lingkungan.                      Planning (ERP) untuk      dengan prinsip
                                   digitalisasi pencatatan   keberlanjutan dalam
                                   keuangan secara           setiap kontrak
                                   terintegrasi.             dengan pelanggan
                                                             dan mitra.
Page 24
PT GTS Internasional Tbk
Mangkuluhur office tower 26th Floor
Jl Jend Gatot Subroto kav 1-3


corpsec@gtsi.co.id
www.gtsi.co.id

File

File Open PDF
Source IDX
Size6.16 MB
Published16 Dec 2024
Pages24
Characters25,342
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org GTS Internasional Tbk p.1 ×8
linked person AR Sofyan p.6
linked person Imam Supriyadi p.6
possible person Gatot Subroto p.24
unresolved org PT Humolco LNG Indonesia p.9

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result