Skip to content
Back to announcement

20241212_SQMI_Public Expose_31818814_lamp1.pdf

Other Text extracted SQMI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 19

Page 1
PUBLIC EXPOSE
  17 December 2024




                     1
Page 2
BUSINESS OVERVIEW
Tinjauan Bisnis
                    2
Page 3
                                    GROUP STRUCTURE
                                    Struktur Grup Usaha
               Wilton Resources Corporation Limited
                                    (Listed in SGX, Stock Code 5F7)
                                                        100%

                          Wilton Resources Holdings Pte. Ltd.
                                             (Singapore)
                      62.9%                                                     100%

PT. Wilton Makmur Indonesia Tbk.                               Wilton Assets Management Ltd
     (Listed in IDX, Stock Code SQMI)                                      (Malaysia)

                      99.0%

     PT. Wilton Investment                                            Mr Wijaya Lawrence
               (Indonesia)                            1%

                      99.0%

  PT. Wilton Wahana Indonesia
               (Indonesia)                             1%                          Operation Production Mining Licence (IUP OP)
                                                                                        Holders of two Concession Blocks
                      99.0%                                                         Pemegang 2 Konsensi IUP Operasi-Produksi
                                                                                             (“Ciemas Gold Project”)
      PT. Liektucha Ciemas
               (Indonesia)                             1%
Page 4
MINING PERMITS and CLEAR & CLEAN CERTIFICATIONS
Ijin Usaha Pertambangan dan Sertifikat Clear & Clean

Items             PT. Wilton Wahana Indonesia (“PT. WWI”)                                   Clear & Clean Certification – PT. WWI
IUP No.           503.8/7797-bppt/2011
Issued To         PT Witon Wahana Indonesia
Issued By         Integrated Licensing Services Board Administration of Sukabumi District
Issue Date        5 October 2011
Expiry Date1      7 September 2030
Area (km2)        28.785 km2
Permit Type       Exploration, mining, construction, production, transportation, and sale



Items             PT. Liektucha Ciemas (“PT. LTC”)
                                                                                            Clear & Clean Certification – PT. LTC
IUP no.           503.8/3106-bppt/2012
Issued to         PT Liektucha Ciemas
Issued by         Integrated Licensing Services Board Administration of Sukabumi District
Issue date        8 May 2012
Expiry date1      4 January 2028
Area (km2)        2.00 km2
Permit Type       Exploration, mining, construction, production, transportation, and sale


1 Can be extended two times (twice) pursuant to Mining Law No.4 of 2009.
Page 5
                  BOARD OF COMMISSIONERS
                      Dewan Komisaris




 Mr. Wijaya Lawrence                    Mr. Mohammad Raylan
President Commisioner                 Independent Commisioner
   Komisaris Utama                       Komisaris Independen
Page 6
                           BOARD OF DIRECTORS
                                 Direksi




Mr. Oktavia Budi Raharjo      Mr. Andrianto D. Lawrence   Mr. Chia Wei Yang (Ethan)
   President Director                  Director                    Director
     Direktur Utama                    Direktur                    Direktur
Page 7
                          SUPPORTING PROFESSIONALS
                              Profesi Penunjang


• Corporate Sponsor of Wilton Resources Corporation Limited (SGX: 5F7) – ZICO Capital Pte Ltd



• External Auditors – PKF Global



• Singapore Company Secretary - InCorp, Singapore Legal – SLB, Indonesian Legal – Dentons HPRP



• Indonesian Share Custodians – UOB Kay Hian Sekuritas, NH Korindo Sekuritas, Valbury Sekuritas
Page 8
               SUPPORTING TECHNICAL PROFESSIONALS
                     Profesi Penunjang Teknis


•   Resources & Reserves (IQPR; compliance to JORC 2012)




• Valuations




•   Technical Design & Processing Plant Manufacturer
Page 9
FINANCIAL OVERVIEW
Tinjauan Keuangan
                     9
Page 10
Interim Consolidated Statement of Financial position
Laporan Posisi Keuangan Konsolidasian Interim
Page 11
Interim Consolidated Statement of Financial position
Laporan Posisi Keuangan Konsolidasian Interim
Page 12
Interim Consolidated Statement of Profit or Loss
Laporan Laba Rugi Konsolidasian Interim
Page 13
PROGRESS OF
CIEMAS GOLD PROJECT
Perkembangan
Ciemas Gold Project
                      13
Page 14
MASTER PLAN OF THE 500 TPD FLOTATION AND CARBON IN LEACH PRODUCTION PLANT
(UPGRADABLE TO 1,500 TPD)
Rencana Induk Fasilitas Produksi Floatation and Carbon in Leach berkapasitas 500 tpd
(Dapat ditingkatkan menjadi 1.500 tpd)
                                                                                       Legend for the 500 tpd flotation & CIL plant

                                                                                           1      Raw Ore Stock Pile
                                                                                           2      Raw Ore Bin
                                                                                           3      Crushing
                                                                                           4      Conveyor Belt
                                                                                           5      Screening
                                                                                           6      Fine ore bin
                                                                                           7      Grinding
                                                                                           8      Flotation
                                                                                           9      Thickener flotation concentrate
                                                                                           10     Flotation concentrate filter pressing
                                                                                           11     Thickerner Flotation tailings
                                                                                           12     Flotation tailings filter pressing
                                                                                           13     Leaching
                                                                                           14     Leaching tailings filter pressing, detox
                                                                                           15     Desorption & electro winning
                                                                                           16     Smelting
                                                                                           17     Electrical substation leaching & smelting
                                                                                           18     Air compressor room
                                                                                           19     NaCN warehouse
                                                                                           20     Machine services workshop
                                                                                           21     Laboratory
                                                                                           22     Chemical reagents warehouse
                                                                                           23     Material warehouse
                                                                                           24     Electrical substation crushing & screening
                                                                                           25     Diesel generator
                                                                                           26     Back water pond for grinding, flotation, thickener, and filte
                                                                                           27     Water pump
                                                                                           28     Recycle used water for processing
                                                                                           29     Recycle leaching water
                                                                                           30     Used water pond
                                                                                           31     Electrical substation grinding & flotation
                                                                                           32     Site reserved for grinding
                                                                                           33     Site reserved for flotation
                                                                                           34     Site reserved for thickener flotation tailings
                                                                                           35     Site reserved for flotation tailings filter pressing
                                                                                           36     Site reserved for leaching
                                                                                           37     Site reserved for Leaching tailings filter pressing
                                                                                           38     Site reserved for desorption & electro winning
                                                                                           39     Site reserved for biological or roasting plant
                                                                                           40     Accommodation
                                                                                           41     Pagoda Tower
Page 15
https://wilton.id/projects/project-gallery/




                                              15
Page 16
KEY UPDATES
Perkembangan Utama
                     16
Page 17
 KEY UPDATES
 Perkembangan Utama
Operational Update:                                                 Operational Update:
     The Sukabumi Regency, where the Group’s Ciemas Gold               Kabupaten Sukabumi, lokasi Ciemas Gold Project milik
      Project is located at, has been affected by the heavy              Grup   berada,   telah    terdampak       oleh   curah   hujan
      rainfall caused by La Nina, a hydrometeorological                  berintensitas tinggi yang disebabkan oleh La Nina,
      disaster since early December 2024. The heavy rainfall             bencana hidrometeorologi yang telah berlangsung sejak
      had caused flash floods, landslides, power outage, and             awal Desember 2024. Curah hujan berintensitas tinggi ini
      damage to roads and bridges.                                       telah menyebabkan        banjir   bandang, tanah longsor,
     As a result of the power outage, the Group’s Processing            pemadaman listrik, serta kerusakan pada jalan dan
      Facility at the Ciemas Gold Project is unable to operate           jembatan.
      due to the lack of electricity. Whilst the Group is able to       Akibat pemadaman listrik tersebut, Fasilitas Pengolahan
      use the back-up fuel generators, operations can only be            Grup di Ciemas Gold Project mengalami hambatan
      sustained temporarily. In addition, damages to the roads           operasional karena kekurangan pasokan listrik. Meskipun
      and bridges have prevented vendors from delivering new             Grup dapat menggunakan generator dengan bahan bakar
      supplies of fuel to the mine site;                                 cadangan,   operasi      hanya    dapat     dilakukan    untuk
                                                                         sementara. Hal ini dikarenakan kerusakan jalan dan
                                                                         jembatan menyebabkan vendor tidak dapat mengirimkan
                                                                         pasokan bahan bakar baru ke lokasi tambang;
Page 18
 KEY UPDATES
 Perkembangan Utama
Operational Update:                                                   Operational Update:
     There has been no damage to the infrastructure of the               Tidak    ada    kerusakan      pada    infrastruktur   Fasilitas
      Group’s Processing Facility, as well as its supporting               Pengolahan Grup, serta infrastruktur pendukungnya, dan
      infrastructure to-date, and all headcount on the mine site           semua jumlah karyawan di lokasi tambang dalam kondisi
      has been accounted for;                                              baik;
     The Group’s heavy equipment for mining has also been                Alat berat milik Grup untuk pertambangan juga turut
      deployed    to   assist   in   emergency   efforts   in   the        dikerahkan untuk membantu upaya tanggap darurat di
      surrounding areas;                                                   wilayah sekitar;
     Based on weather forecasts provided by the Meteorology,             Berdasarkan        prakiraan   cuaca    Badan      Meteorologi
      Climatology and Geophysics Agency / BMKG, La Nina                    Klimatologi dan Geofisika / BMKG, fenomena La Nina ini
      phenomenon is expected to last till April 2025; and                  diperkirakan masih akan berlangsung hingga April 2025;
     The Group is currently collaborating with the local                  dan
      governmental agencies with regards to the restoration of            Saat ini, Grup tengah bekerja sama erat dengan instansi
      electricity and logistical access.                                   pemerintah daerah dalam pemulihan kembali akses listrik
                                                                           dan jalur logistik.
Page 19
PT Wilton Makmur Indonesia Tbk
Komplek Harco Mangga Dua
(Agung Sedayu), Block C No.5A
Jl. Mangga Dua Raya,
Jakarta 10730, Indonesia

Tel.      (62-21) 612 5585, 612 5586
          612 5587, 612 5588
Fax.      (+62 21) 612 5583
e-mail    email@wilton-groups.com
Website   www.wilton.id

File

File Open PDF
Source IDX
Size1.81 MB
Published12 Dec 2024
Pages19
Characters14,306
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 23 people and organisations named in the text · linked when the evidence is strong

linked org Wilton Makmur Indonesia Tbk. p.3 ×5
linked person Wijaya Lawrence p.3 ×3
linked person Oktavia Budi Raharjo p.6
linked org Valbury Sekuritas p.7
possible — UOB Kay Hian p.7
possible person Agung Sedayu p.19
unresolved org GROUP STRUCTURE Struktur Grup Usaha Wilton Resources Corporation p.3
unresolved org Wilton Resources Holdings Pte. Ltd. p.3
unresolved org Wilton Assets Management Ltd p.3
unresolved org PT. Wilton Investment p.3
unresolved org PT. Wilton Wahana Indonesia p.3 ×2
unresolved org PT. Liektucha Ciemas p.3 ×2
unresolved org PT. WWI p.4
unresolved org PT. WWI IUP p.4
unresolved org PT Witon Wahana Indonesia Issued By p.4
unresolved org PT. LTC p.4
unresolved org PT. LTC IUP p.4
unresolved org PT Liektucha Ciemas Issued p.4
unresolved person Mohammad Raylan President Commisioner p.5 ×2
unresolved person Andrianto D. Lawrence p.6
unresolved person Chia Wei Yang (Ethan p.6 ×2
unresolved org Wilton Resources Corporation Limited p.7
unresolved org ZICO Capital Pte Ltd p.7

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result