PUBLIC EXPOSE 2024
     JAKARTA, DECEMBER 2024
Page 2
DISCLAIMER
These materials have been prepared by PT Arkora Hydro Tbk (the “Company”) and have not been independently verified.
No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy, fairness or
completeness of the information presented or contained in these materials. The Company or any of its affiliates, advisers or
representatives accepts no liability whatsoever for any loss howsoever arising from any information presented or contained
in these materials. The information presented or contained in these materials is subject to change without notice and its
accuracy is not guaranteed. These materials contain statements that constitute forward-looking statements. These
statements include descriptions regarding the intent, belief or current expectations of the Company or its officers with
respect to the consolidated results of operations and financial condition of the Company. These statements can be
recognized by the use of words such as “expects,” “plan,” “will,” “estimates,” “projects,” “intends,” or words of similar
meaning. Such forward-looking statements are not guarantees of future performance and involve risks and uncertainties,
and actual results may differ from those in the forward-looking statements as a result of various factors and assumptions.
The Company has no obligation and does not undertake to revise forward-looking statements to reflect future events or
circumstances. These materials are for information purposes only and do not constitute or form part of an offer, solicitation
or invitation of any offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part
of it form the basis of, or be relied upon in any connection with, any contract, commitment or investment decision
whatsoever. Any decision to purchase or subscribe for any securities of the Company should be made after seeking
appropriate professional advice.
Page 3
TABLE OF CONTENT




              1                   2                3
        Company Profile   Business Landscape    Financial
                                               Performance
Page 4
Chapter 1
COMPANY PROFILE
                  4
Page 5
COMPANY IN BRIEF

                   PT Arkora Hydro Tbk (ARKO)
                   Established in 2010, PT Arkora Hydro Tbk (ARKO)
                   focuses on run-of-river as a hydropower plant with
                   a current total contracted capacity of 42.8 MW.
                   ARKO also has over 260 MW capacity of run-of-river
                   hydropower plant under its pipeline.

                   Vision
                   To expand our portfolio of renewable energy projects and become the
                   market leader of renewable energy power generation while being
                   environmentally and socially responsible.

                   Mission
                   To develop renewable energy potentials in Indonesia in which will
                   reduce carbon emission and build a more sustainable future.



                                                                                         5
Page 6
        MILESTONE
                                                                 Cikopo COD
                                                                 Project
                               Cikopo                            Tomasa Construction              Yaentu                                   Green bonds issuance
                               Project                           Project                          Project                                  Tomoni Project
                               PPA & construction                                                 Construction                             PPA




    2010                 2012                2014             2017            2020             2021              2022                 2023               2024




          Company                                   Tomasa                       Tomasa                             IPO
                                                                                         COD
          establishment                             Project                      Project                            (Initial Public Offering)
          5 Aug 2010                                PPA
                                                                                 Yaentu PPA                         Kukusan
                                                                                 Project                            Project
                                                                                                                    PPA & construction
                                                                                                                                                    Yaentu
                                                                                                                                      COD – 4Q24
                                                                                                                                                    Project

                                                                                                                                                    Tomoni
                                                                                                                                     Construction
PPA : Power Purchasing Agreement                                                                                                                    Project     6
COD : Commercial Operating Date
Page 7
    COMPANY STRENGTH

1             Strategic Location                                     5             Support for the Government's
                                                                                   "Net Zero Emission" Program
    Situated in the natural forests and connected to PLN networks.       Reducing GHG emissions by ±99,937 tons of CO₂eq annually moving forward.




2
              High-Quality
              Hydropower Plant                                       6             Experienced Management

                                                                         Professionals with over 15 years of experience in the power generation and
    Head >100 m and components of international quality.
                                                                         collectively worked on over 30 hydro power plants in their previous careers.


              Long-Term Contracts,
3             Stable Cashflow                                        7             High Safety Standards

    PLN contracts with an average duration of 15 - 25 years and          The company utilizes contractor services from PT Arkora Ekon Indonesia,
    predetermined tariffs, securing the sustainable cashflow.            supervised by PT Indokoei International, a renowned Japan consulting company.

              Competitive Construction and
4             Operational Costs                                      8             Good Corporate Governance

    Supported by in-house PT Granif Konsultan, experienced in            Implementation of GCG principles across all business lines.
    conducting feasibility studies, detailed designs, and
    comprehensive testing for hydropower plant projects.




                                                                                                                                                         7
Page 8
   RUN-OF-RIVER HPP
   ILLUSTRATION




     2. Desand        1. Weir
3. Waterway

4. Head tank

    5. Penstock

    6. Powerhouse
                        7. Tailrace



                                      8
Page 9
HYDROPOWER PLANT PROJECTS - CIKOPO


                                     Project Cikopo II
                                     Location   : Garut, West Java
                                     Capacity   : 7.4 MW (2 x 3.7 MW)
                                     COD        : 2017
                                     Period     : 15 years




                                                                        9
Page 10
HYDROPOWER PLANT PROJECTS - TOMASA


                                     Project Tomasa
                                     Location   : Poso, Central Sulawesi
                                     Capacity   : 10 MW (2 x 5 MW)
                                     COD        : 2020
                                     Period     : 15 years




                                                                           10
Page 11
COD OF HYDROPOWER PLANT PROJECTS - YAENTU
Inside powerhouse     Outside powerhouse

                                              Location
                                              Poso, Central Sulawesi

                                              Capacity
                                              10 MW (2 x 5 MW)

                                              COD
                                              October 2024

                                              Contract period
                      Turbine and generator   25 years

                                              Construction progress
                                              100%




                                                                       11
Page 12
CURRENT KUKUSAN II PROJECT PROGRESS
Penstock pipe installation   Head tank excavation

                                                                Location
                                                                Kukusan, Lampung

                                                                Capacity
                                                                5.4 MW (2 x 2.7 MW)

                                                                Expected COD
                                                                3Q25

                                                                Contract period
Waterway                     Machine foundation in powerhouse   25 years

                                                                Construction progress
                                                                49.9% (Nov-24)




                                                                                        12
Page 13
CURRENT TOMONI PROJECT PROGRESS
Excavation work          Access road clearing

                                                Location
                                                Luwu Timur,
                                                South Sulawesi

                                                Capacity
                                                10 MW (2 x 5 MW)

                                                Expected COD
                                                3Q26

Equipment mobilization   Excavation work        Contract period
                                                25 years

                                                Construction progress
                                                12.2% (Nov-24)




                                                                        13
Page 14
Chapter 2
BUSINESS LANDSCAPE
                     14
Page 15
INDONESIA NEW AND RENEWABLE ENERGY MIX



                                                                                                                                                            Only 0.37% of the
                                                                                                                                                            entire potential has
                                                                                                                                                            been utilized, leaving
  Solar                 Hydro                 Bio-                  Wind                  Geo-                  Ocean                 Total                 ample room for the
                                              energy                (>6 m/s)              thermal                                                           development of New
                                                                                                                                                            and Renewable
  Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Potentials (in GW)    Energy (NRE).

  3,294                 95                    57                    155                   23                    63                    3,687                 This opportunity is
                                                                                                                                                            promising, given the
  Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   Utilization (in MW)   support from the

  723                   6,738                 3,401                 154                   2,600                 -                     13,577                government,
                                                                                                                                                            environmental
                                                                                                                                                            concerns, and the
 Utilization (%)        Utilization (%)       Utilization (%)       Utilization (%)       Utilization (%)        Utilization (%)      Utilization (%)       rising electricity
 0.02%                  7.09%                 5.96%                 0.10%                 11.3%                  0%                   0.37%                 consumption.

Source: Directorate General of New, Renewable Energy, and Energy Conservation, Jun-24




                                                                                                                                                                                     15
Page 16
INDONESIA EXISTING NRE POLICY AHEAD

                                    RUPTL 2021-2030
                                    PLN's Electricity Supply Business
                                    Plan (RUPTL) for 2021-2030

                                       - Strategies to reduce GHG
                                         emissions for NZE by 2060;          “I was instructed by President
                                       - Renewable energy accounts for       Jokowi and President Prabowo to
                                         51.6% of the 40,575 MW of           detail and convert the RUPTL for
                                         planned power projects;
                                                                             2025 to 2035. The RUPTL covers
                                       - Of the 20,923 MW of renewable
                                         energy, hydropower plants
                                                                             10 years, and I stated that at least
                                         make up 44.3% or equivalent to      60% must be renewable energy.”
                                         9,272 MW;
                                                                          said Bahlil Lahadalia, Minister of Energy and
                                                                          Mineral Resources, during the Green Initiative
                                                                          Conference 2024 on September 25th, 2024.

Ongoing: Drafting of RUPTL for 2025-2035 or the greenest RUPTL ever.



                                                                                                                           16
Page 17
ADDITIONAL ENERGY MIX TARGET




                                                          20%
                                                                                Renewable
                                                                                energy
    “According to the model, an
    additional 100 GW of power plant                                            Gas-based
    capacity will be built by 2040, with             5%         by 2040         energy

    75% based on renewable energy.”                                             New energy sources
                                                                                (including nuclear)

                                                                          75%
  said Darmawan Prasodjo, President Director of
  PLN, during a meeting with Commission XII of the
  Indonesian House of Representatives (DPR) on
  December 2nd, 2024.




                                                                                                      17
Page 18
ARKORA PIPELINE
                   Contracted Capacity

                   42.8 MW
                   Current Pipeline

                   261.2 MW




         Lampung

         6 MW


                                         18
Page 19
PRODUCTION CAPACITY
                                                                             257.0                ARKO is going faster in utilizing the
                                                                228.6                             enormous potentials through increasing
                                                                                                  its production capacity by working on our
                                                    176.7                                         pipelines.
                                                                                                  Alongside, ARKO also contributes for
               114.4                      118.2                                                   Sustainable Development Goals (SDGs):
    95.7                     97.6




  2021        2022         2023         2024        2025         2026        2027
    Cikopo        Tomasa         Yaentu        Kukusan          Tomoni                Production (GWh)

 Estimation of production capacity given the COD target of Yaentu, Kukusan, and Tomoni project.




                                                                                                                                              19
Page 20
GREENHOUSE GASES (GHG) EMISSION REDUCTION

             GHG emission reduction                   In achieving Indonesia Net-Zero
             Period: 2017 until 3Q24                  Emissions (NZE) 2060, ARKO
 ±237,168    (Cikopo and Tomasa)
                                                      also contributes towards the
             There was an increase for GHG emission   emission reduction.
 ton CO2eq   reduction of 34,534 ton CO2eq during
             9M24 (17.1% YTD)                         Thus, ARKO emboldens its
                                                      contribution for SDGs:




             GHG emission reduction
  ±99.937    potential annually
 ton CO2eq   After all five projects operating
             (including Kukusan and Tomoni)




                                                                                        20
Page 21
STRENGTHENING ESG COMMITMENT


             Education                             Environmental
             - Renovation of elementary            - Environmental conservation
             school, SDN 1 Panawa, Garut,          through reforestation in
             West Java.                            Pamulihan subdistrict.

             - Procurement of information          - Watershed rehabilitation by
             and communication technology          planting 48,247 pine trees
             (ICT) facilities for the school.      covering 52 ha.




             Social                                Infrastructure
             - Donation of qurban in Garut         - Establishing of Baruga
             for the people nearby.                Meeting Hall.

             - Distribution of basic necessities   - Improvement of roads (800 m)
             (sembako) for Desa Panawa, Garut.     in Panjoka Village, Poso.

             - Community empowerment for           - Rehabilitation of 5 mosques in
             watershed rehabilitation for          Garumukti Village, Garut.
             Desa Datarajan, Lampung

                                                                                      21
Page 22
Chapter 3
FINANCIAL PERFORMANCE
                        22
Page 23
    IMPROVING REVENUE IN 9M24 AMID DROUGHT

                                                              248
                                                                                                         Cyclically, precipitation level is
                                                                                                         lower during 3Q24. However,
                                                     198                                                 ARKO managed to increased
                                                                                                         the    revenue       in    9M24
                                                                        179                              especially     due      to   the
                                                                                               153       construction services, thanks
                                                                                    132                  to the significant progress of
                                                                                                         Kukusan project construction
                                                     169%1              164%1       169%1      164%1
                                 52                                                                      (49.2% QoQ).

    Revenue - yearly           143%1                          157%1
    Revenue – 9M24
    EBITDA margin (%)

    INDICATOR                  2020                  2021     2022      2023        9M23       9M24     YoY
 Revenue                                52              198       248         179      132.2     153.5 16.1%
 EBITDA                                 23              137       141         114       90.7      97.4 7.5%
 Net profit                            -23               50        53          39       45.5      40.5 -10.9%
 EBITDA margin                        43%               69%       57%         64%      68.6%     63.5%   -5.1
(currency in billion IDR, unless stated otherwise)


                                                                                                                                              23
Page 24
  SOLID BALANCE SHEET

    Total Asset                                       Total Liabilities                            Total Equities
    9M24: Rp1,271 bn                                  9M24: Rp805 bn                               9M24: Rp466 bn
                                            1,271
                              1,158
                                              129                                           805
                 948            154                                          720
                                                                                             57
                                                                              70
                  183
   689                                                             548
                                                      518                                                                  466
     54                                       1,142                                         747            400      438
                               1,004                                161       650
                                                       167
                  765
    635                                                                                            171
                                                       351          387




   2021          2022          2023           9M24    2021         2022      2023         9M24     2021   2022      2023   9M24

    Non-current asset         Current asset           Long term liability   Short term liability
(currency in billion IDR, unless stated otherwise)

                                                                                                                                  24
Page 25
Head of Investor Relations
Nicko Yosafat
n.yosafat@arkora.com

PT ARKORA HYDRO TBK
Treasury Tower Level 9 Unit G-H
District 8 SCBD Lot 28
Jl. Jend. Sudirman Kav 52-53
Jakarta, Indonesia 12190

File

File Open PDF
Source IDX
Size4.47 MB
Published12 Dec 2024
Pages25
Characters24,917
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 7 people and organisations named in the text · linked when the evidence is strong

linked org Arkora Hydro Tbk p.2 ×11
linked org PT Arkora Ekon Indonesia p.7
possible person Darmawan Prasodjo p.17
unresolved org PT Indokoei International p.7
unresolved org PT Granif Konsultan p.7
unresolved org Directorate General of New p.15
unresolved org Minister of Energy p.16

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result