Skip to content
Back to announcement

20241210_PSAB_Public Expose_31817989_lamp1.pdf

Other Text extracted PSAB

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 27

Page 1
No. JRAP/SKLR/CSD/2024/XII/115                                          Jakarta, 10 Desember 2024
Lampiran: Materi Public Expose


Kepada Yth.
PT Bursa Efek Indonesia
Gedung Bursa Efek Indonesia Tower I
Jl. Jend. Sudirman Kav. 52-53
Jakarta 12190
Up : Direktur Pencatatan Perusahaan

Perihal : Penyampaian Materi Public Expose PT J Resources Asia Pasifik Tbk (“Perseroan”)

Dengan hormat,

Kami merujuk pada surat kami No. JRAP/SKLR/CSD/2024/XI/109 tanggal 28 November 2024
tentang Public Expose PT J Resources Asia Pasifik Tbk, terlampir kami sampaikan materi Public
Expose Perseroan yang akan diadakan pada hari Jumat, tanggal 13 Desember 2024.

Demikian kami sampaikan. Atas perhatiannya kami ucapkan terima kasih.


Hormat kami,
PT J Resources Asia Pasifik Tbk
Page 2
        PUBLIC EXPOSE


PT J RESOURCES ASIA PASIFIK TBK
             2024
Page 3
             PUBLIC EXPOSE 2024



•   Operations

•   Awards

•   Drilling Updates and 2024 New Discovery

•   Project Development

•   Financials




                                              1
Page 4
Section 1

Operations
Page 5
Bakan Resource-Reserve-Production Reconciliation




                                                   3
Page 6
                     2024 Production Growth

Production performance has started to ramp up around beginning of Q2 2023, which is
shown in the comparation figures below. Cumulated production in 2024 has grown
significantly compared to 2023 and is expected to grow more than 107% by end of 2024.




                                                                                        4
Page 7
Section 2

Awards
Page 8
                          Bakan Awards
      MEMR - GOOD MINING PRACTICE (GMP) AWARDS FOR 2023




 Utama Award from         Pratama Award from         Utama Award from
Minister of Energy and    Minister of Energy and    Minister of Energy and
 Mineral Resources         Mineral Resources         Mineral Resources


Mining Technic Category   Mineral Conservation     Environment Management
                               Category                    Category
Page 9
                      Bakan Awards

Award from the Governor of North Sulawesi Investment Award 2024
 for fulfilling Business Permits, Obligations and Responsibilities of
                            Business Actors
Page 10
                        Bakan Awards

Award from Governor of North Sulawesi for CSR Program - Commitment and
    Contribution on Lowering Growth Stunting 2023 in South Bolaang
                         Mongondow Regency
Page 11
              Bakan Awards

          Subroto Award from MEMR
Most Innovative CSR Program in Mineral Category
Page 12
                             Bakan Awards
     Tamasya Award from MEMR                Tamasya Award from MEMR
      Performance of Community              Performance of Community
 Development and Empowerment in the      Development and Empowerment in
   Category of Mineral Commodities            the Category of Mineral
Planning for Real Income or Employment    Commodities Implementation for
                                            Real Income or Employment
Page 13
         PT J Resources Nusantara Awards

                                     Jakarta Investment Award 2024
   Award for the Largest
Contribution to Tax Revenue -      Company with the Largest Investment
 KPP Madya South Jakarta II      Realization Contribution in Other Services
                                Sectors in 2023 - PMDM Category II Winner
Page 14
Section 3
Drilling Updates and 2024 New Discovery
Page 15
Drilling Updates in Bakan Mine
Page 16
      Drilling Updates in Bakan Mine




                                           9.40m @0.45 g/t
                                                 Au.




Extension of                                          112.10m @0.27 g/t Au, include 16.50m @0.86 g/t

mineralized zone                                                           Au.

                   118.80m @0.17 g/t Au.




                                                                         BBD1799 & BBD1801
Page 17
                                            Assay Result




                                                 16.60m @0.69 g/t
                                                       Au.




                                                                      99.80m @0.29 g/t Au, include 11.60m @0.55 g/t Au and 37.70m @0.52
                                                                                                    g/t Au.
141.60m @0.65 g/t Au, include 50.55m @1.41 g/t
                     Au.
                                                                    Extension of
                                                                    mineralized zone




                                                                                             BBD1795 & BBD1797
Page 18
2024 New Discovery Highlights


                             New discovery in one of
                              the Company’s asset
                             30km distance from
                              existing mine
                             3 mineralized vein sets
                              (500 - 1,000m length)
                             High grade intercepts from
                              drilling: 14m at 2.25 g/t Au;
                              13m at 1.58 g/t Au; 93m at
                              0.87 g/t Au.
                             Exploration targets: 10 -
                              15 Mt at 1.50 - 2.50 g/t Au,
                              and addition from district
                              exploration targets: 7 - 10
                              Mt at 1.0 - 3.0 g/t Au.
                             Potential for 10 years LOM
                              at 80 - 100 Koz gold
                              production per annum.
Page 19
2024 New Discovery Highlights

     Metallurgical Test and Result


                                        5 metallurgical from surface samples
                                         representing 5 ore domains (959kg)

                                        Average QLT (quick leach test) 85%

                                        Majority of gold in oxide materials

                                        Higher recovery of gold from finer
                                         size

                                        Indication for CIL method processing
                                         route

                                        Future plan: to carry out drilling
                                         programs and sample tests from the
                                         drill core samples
Page 20
Section 4

Project Development
Page 21
                     Doup Project Update

 Doup’s Reserve by end October 2024: 38.2Mt at 1.28gpt and 1.6Moz of
  Gold

 Design plant capacity is 3 Mtpa with Gravity - Flotation - POX - CIL,
  yielding an operating mine life of 14 years, with a life of mine stripping ratio
  of 4.3:1

 Expected LOM recovery is 91%
 Gold production target in the range of 140,000 - 155,000oz per year
 With the current gold price, expected revenue from Doup Project LOM is
  more than US$3 Billion




                                                                                     19
Page 22
20
Page 23
21
Page 24
Section 5

Financials
Page 25
                     2024 Production & Sales


                          Q1           Q2            Q3            Oct - Nov
                          (actual)     (actual)      (actual)      (actual)
Production (oz)           33,272       24,116        20,079        15,560
Accum. Production (US$)   33,272       57,388        77,467        93,027


Sales (US$)               58,738,395   71,404,642    43,722,698    43,393,920
Accum. Sales (US$)        58,738,395   130,143,037   173,865,735   217,259,655



 The Company is expecting 2024 full year production to surpass 100koz of
  gold compared to prior year’s production of 93.7koz

 With the current gold price, 2024 expected revenue is estimated to be
  US$230 - US$240 million compared to prior year’s revenue of US$170
  million




                                                                                 23
Page 26
    IDR Bond Outstanding & Amortization



In 2024, the Company has fulfilled its commitment to Bondholders
in a timely manner totaling up to IDR 239,203,065,625 comprising
of principal and interest.


In February 2025, there is an upcoming principal payment due for
the Company’s Bond 1 Phase 3 amounting IDR 227,860,000,000,
which will be settled in full and on time.




                                                                   24
Page 27
                                            Thank You
PT J Resources Asia Pasifik Tbk
Equity Tower, 48th Floor
Sudirman Central Business District, Lot.9
Jl. Jenderal Sudirman, Kav 52-53
Jakarta Selatan

T +6221-515 3335
F +6221-515 3579
www.jresources.com

File

File Open PDF
Source IDX
Size2.72 MB
Published10 Dec 2024
Pages27
Characters8,839
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 5 people and organisations named in the text · linked when the evidence is strong

linked org J Resources Asia Pasifik Tbk p.1 ×14
possible org PT Bursa Efek Indonesia p.1 ×2
possible — Central Business p.27
unresolved org Minister of Energy p.8 ×3
unresolved org PT J Resources Nusantara Awards Jakarta Investment Award p.13

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 1

↑↓ select ↵ open ⇧↵ see every result