Skip to content
Back to announcement

20241209_DGIK_Public Expose_31817631_lamp2.pdf

Other Text extracted DGIK

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 29

Page 1
PUBLIC
EXPOSE 2024.
   PT Nusa Konstruksi Enjiniring Tbk




Kamis, 12 Desember 2024
Page 2
PT Nusa Konstruksi Enjiniring Tbk.




                                                               DISCLAIMER
                          This presentation may contain forward-looking objectives and statements about PT Nusa Konstruksi Enjiniring Tbk financial
                                                       situation, operating results, business activities and expansion strategy.


                          These objectives and statement are based on assumptions that are dependent upon significant risk and uncertainl factors that
                          may prove to be inexact. The information is valid only at the time of writting and PT Nusa Konstruksi Enjiniring Tbk does not assume
                          any obligation to update or revise the objectives on the basis of new information or future or other events, subject to applicable
                                                                                      regulations.


                          Additional information on the factors that could have an impact on PT Nusa Konstruksi Enjiniring Tbk financial result is contained in
                          the documents filled by the PT Nusa Konstruksi Enjiniring Tbk with the FInancial Services Authority (OJK), Indonesia Stock Exchange
                                           (IDX) and available on the PT Nusa Konstruksi Enjiniring Tbk Website at www.nusakonstruksi.com


                          By attending the meeting where this presentation is made, or by reading the presentation materials, you agree to be bound by
                                                                               the following limitations.
Page 3
PT Nusa Konstruksi Enjiniring Tbk.




                                     AGENDA
                                            01.
                                      COMPANY
                                      OVERVIEW
                                                  FINANCIAL
                                                  UPDATE   03.
                                      UPDATE02.
                                      PROJECT     TARGET
                                                  2025     04.
Page 4
COMPANY
OVERVIEW
PT Nusa Kontruksi Enjiniring Tbk.
Page 5
PT Nusa Konstruksi Enjiniring Tbk.




       VISION
       Menjadi Perusahaan Konstruksi serta
       Investasi yang Unggul
       To be prominent construction and
       investment company


       MISSION

                  1                                  2                                 3
                  Menjadikan Perusahaan yang         Penerapan Prinsip Kinerja         Meraih Pasar yang Terpilih serta
                  Smart dan Efisien Dalam            Operasional yang Excellence       Membuat Pasar Baru sesuai
                  Menjalankan Operasionalnya                                           dengan Bisnis Perseroan
                  Smart and Efficient Organisation   Operational Excellent             Get Selected Market and
                                                                                       Create Market


                  4                                  5
                  Memberikan Nilai Tambah kepada     Menjadi Entitas yang Memiliki
                  Klien/Mitra                        Nilai bagi Pemangku Kepentingan

                  Provide Added Value for Clients    Become a Valuable Entity for
                                                     Stakeholders
Page 6
PT Nusa Konstruksi Enjiniring Tbk.




                                     Hendro Martowardojo                 Ade Rahardja               Ganda Kusuma
                                     President Commissioner              Commissioner Independent   Commissioner




                       BOARD OF COMMISSIONERS & DIRECTORS




           Djoko Prabowo                                 Hudik Pramono     Rijanto Onggo W              Rizaldi Limpas   Arvin Jahja Tjahjana
           President Director                            Director          Director                     Director         Director
                                                                                                                         Commissioner
Page 7
PT Nusa Konstruksi Enjiniring Tbk.




        COMPANY SHAREHOLDERS
        (Per 12 Desember 2024)                                                            Treasury Stock

                                                                                           7,22%


                 SHAREHOLDERS             OWNERSHIP   NUMBER OF SHARES


           PT Global Dinamika Kencana       52,29%        2.897.658.500
                                                                                 Public

            Hudson River Group Pte.Ltd.     9,65%         534.958.200        30,84%                        PT Global Dinamika
                                                                                                                Kencana

                                                                                                             52,29%
                              Public        30,84%        1.708.333.800

                       Treasury Stock       7,22%         400.214.500


                            TOTAL           100%        5.541.165.000
                                                                          Hudson River Group
                                                                               Pte.Ltd.

                                                                             9,65%
Page 8
STRATEGI DIVERSIFIKASI

                                      ENERGI




              KONSTRUKSI
                                        INTI DUTA
                                        SOLUSINDO
                           PROPERTI
                                         DUTA CIPTA
                                         ENERGI
                                                      PERTAMBANGAN

                                       WARILAYANA
                                       ENERGI


                                       MAHIJA
                                       KASTARA HITA


                                       GILANG HYDRO
                                       LESTARI


                                      MITRA ARANA
                                      SINERGI


                                      GRANTIRTA
                                      SUMBER ENERGI
Page 9
PT Nusa Konstruksi Enjiniring Tbk.




                                                              200+               200+                45MW
       REPRESENTATIVE OFFICE
                                                                                                     Proyek Investasi
                                                              Proyek Gedung   Proyek Infrastruktur
                                                                                                       Energi (EBT)




       & PROJECT LOCATION                                     550+               150+                    5+
                                                                Karyawan       Alat Berat & Truk      Alat Produksi




         Completed
         Project


         Head Office
               Jakarta

         Representative Office
               Padang                Batam      Timor Leste
               Balikpapan            Surabaya
Page 10
PT Nusa Konstruksi Enjiniring Tbk.




     AWARDS &
     CERTIFICATIONS                                            ISO 9001:2015                 ISO 45001:2018                 ISO 14001:2015
                                                                                               Occupational Health And
                                                               Quality Management System                                 Environmental Management System
                                                                                              Safety Management System




                                     ISO 37001:2016            ISO 45001:2018
                                     Anti Bribery Management     Occupational Health And   SMK3L Certification
                                             System             Safety Management System
Page 11
PT Nusa Konstruksi Enjiniring Tbk.




                                                                 GCG
     GOOD CORPORATE                                             MANUAL
                                     INFORMATION
     GOVERNANCE
                                      DISCLOSURE

                                                           Board Manual
     GCG
                                                           Code of Conduct
 ORGANIZATION                                              Code of Good Corporate
                                                           Governance
                                       Keterbukaan         Whistleblowing
                                       Informasi           System (WBS)
                                       Tanggung Jawab
                                       Sosial Perusahaan
              Rapat Umum
              Pemegang Saham
              Komite Audit
              Manajemen Risiko
              Komite Remunerasi
              dan Nominasi
Page 12
PT Nusa Konstruksi Enjiniring Tbk.


                                                COMPANY PORTFOLIO Proyek Selesai (Pekerjaan Gedung)

         Grand Indonesia Complex, Jakarta


             World Capital Tower, Jakarta


                    Kempinski Hotel, Bali
                                                                 Kempinski Hotel, Bali                                World Capital Tower, Jakarta

              Gedung Bursa Efek, Jakarta


        Casa Domaine Apartment, Jakarta


    Ciputra International Puri Indah, Jakarta


                  Holland Village, Jakarta

                                                              Grand Indonesia, Jakarta                                Casa Domaine Apart, Jakarta
             Botanica Apartment, Jakarta


            Skyline Office Tower, Surabaya            Sudirman 7.8, Jakarta              Aisyiah Hospital, Ponorogo                     Gaia Hotel, Lembang


                                                    French Embassy, Jakarta              Delft Apartment, Makassar                 The Element Kuningan, Jakarta
                    Menara BCA, Jakarta

                                                Universitas Negeri Padang, Sumbar        Buin Batu Clinic, PT Amman              Universitas Mulawarman, Samarinda
Page 13
PT Nusa Kontruksi Enjiniring Tbk.




                                    COMPANY PORTFOLIO Proyek Selesai (Pekerjaan Infrastruktur)
                Jalan Lingkar Luar Ambarawa, Jawa Tengah                   Syamsudin Airport, Banjarmasin                                    Sermo DAM, DIY



                 Jalan Simpang Rampa-Poriaha, Sumatera                           Ngurah Rai Airport, Bali                               PLTU Cirebon, Jawa Barat



                    Chevron Road Contruction, Sumatera                         Kualanamu Airport, Medan                                   PLTM Tongar, Sumbar



               Martabe Gold Mining Access Road, Sumatera                 Sultan Hassanudin Airport, Makassar                     Pengaman Pantai Tanjung Lesung, Banten




                                                                                                                                           Syamsudin Noor Airport,
              Martabe Gold Mining, Sumatera                                    Sermo Dam, Yogyakarta                                           Banjarmasin



                    Jalan Tol Solo-Jogja, Jawa Tengah       Canal Wall, PT Vale Indonesia                   Irigasi Lambunu, Sulteng                 PLTU Batang, Jawa Barat


                    Jalan Tol Balikpapan - Samarinda    Jembatan Lampesue, PT Vale Indonesia            Pengaman Pantai Tiku, Sumbar              Batubesi Dam, PT Vale Indonesia
Page 14
PROJECT
UPDATE
PT Nusa Konstruksi Enjiniring Tbk.
Page 15
PT Nusa Konstruksi Enjiniring Tbk.




                                                                                                  Carry Over             New
                     PROJECT REALIZATION                                                          2023                   Contract
                                                                                                                         2024

                                                                                                          36%                       64%
                                         Nilai Kontrak Berjalan
                                                   Tahun 2024:
                                                      (hingga Q3 2024)
                                                                           Rp 2.9 T
                                      Komposisi Nilai Kontrak Proyek Berjalan Tahun 2024:
                                                                                                           Energi


     Joint                                        Pemerintah                                                                          Gedung
 Operation                                                                     BUMN                                 9%


                        10%                                21%
                                                                                      Infrastruktur       24%              31%
                                                                         45%                Mining




                                                           34%                                                  35%
                       90%
                                     Non Joint   Swasta
                                     Operation                                                        Infrastruktur
Page 16
FINANCIAL
UPDATE
PT Nusa Konstruksi Enjiniring Tbk.
Page 17
PT Nusa Konstruksi Enjiniring Tbk.




PROYEKSI PERFORMANCE 2024

                                                                            TOTAL
                                                                Non-JO   PENDAPATAN
                                                                79%      800-835
                                                                          (dalam Miliar rupiah)
                                                                                                  JO
                                                                                                  21%
                     LABA BERSIH

                    40-50 (dalam Miliar rupiah)
                                                  LABA BERSIH
                                                   5-6%
Page 18
PT Nusa Konstruksi Enjiniring Tbk.




                                                                          FINANCIAL PERFORMANCE
                                                                                                                                                                     FOR THE PAST 5 YEARS

                   Pendapatan Usaha                                                                                   Laba Usaha                                                                   Laba Bersih


                                                                                  600-658                                                                    30-38                                                               40-50
                                                                                                                                                                                                                 25
    479                                                            463              oY                                                   14                                                                             13,9%
                                                                                                                                                                                                                                YoY
                                                                              6  %Y              FY24                                                     Y                                                                                  FY24
                                               373                         29,
                                                                                                                                                41,
                                                                                                                                                   6%
                                                                                                                                                        Yo
                                                                                                                                                                     FY24
                                                                                                                                                                                                   8
             -27
                ,2%
                      YoY
                            366                       8,4%
                                                             YoY
                                                                                                 (Proyeksi)
                                                                                                                                                                     (Proyeksi)
                                                                                                                                                                                                                                             (Proyeksi)

                                                                                                                                                              17,6
                                   18,3% YoY                                                                                                                                                                                          19,9
                                                                                         386,9



      FY20                  FY21               FY22                FY23                  Q324                 FY20   FY21        FY22    FY23                 Q324                      FY20      FY21   FY22    FY23                 Q324




                                                                                                                                (10)                                                                     (8)
                                                                                                                     (13)                                                               (15)

                                                                                                              (37)


                                                                                                                             Q3-2024

                                                                          1,41x                                                 0,6x                                                6,04x
                                                                          Current Ratio                                     Debt to Equity Ratio                                  Collectability Ratio
Page 19
2025
TARGET
PT Nusa Konstruksi Enjiniring Tbk.
Page 20
PT Nusa Konstruksi Enjiniring Tbk.




         NEW CONTRACT
         TARGETS 2025

                                                     1,6 - 1,9 T
                                                                           %                      %                   %


+ 25%
                                        90 5 5                Swasta                     BUMN              Pemerintah




                                                                                %                                       %
                                     38 50 5 7
 dari total perolehan                                %                                             %
 kontrak baru tahun 2024

                                     Proyek Gedung       Proyek Infrastruktur       Proyek Infrastruktur   Proyek Energi
                                                                                          Mining
Page 21
PT Nusa Konstruksi Enjiniring Tbk.




           REVENUE                   PROYEK BARU 2025

           TARGETS 2025                  48%
           1,2 T
                                     CARRY OVER 2025
                                            OPERATION
                                         52%EXCELLENT


           + 80%
            dari total penghasilan
            usaha tahun 2024
Page 22
PT Nusa Konstruksi Enjiniring Tbk.




     MANAGEMENT
     STRATEGY 2025                   SUMBER DAYA                       TATA KELOLA
                                     MANUSIA
                                     Pengembangan jumlah dan           Penerapan tata kelola pada
                                     kapasitas serta peningkatan       proses bisnis yang sesuai
                                     kualitas pada SDM Perseroan       regulasi berlaku




                                     DIGITALISASI                      OPERATION
                                                                       EXCELLENT
                                     Pemanfaatan dan pengaplikasian    Memastikan seluruh proses
                                     digitalisasi guna menciptakan     berjalan secara efektif
                                     proses kerja yang lebih efektif   dan efisien
                                     dan efisien
Page 23

          
Page 24
EVENTS
HIGHLIGHT 2024
PT Nusa Konstruksi Enjiniring Tbk.
Page 25
PT Nusa Konstruksi Enjiniring Tbk.




Rapat Umum                                              Peresmian Proyek
Pemegang Saham                                             Tol Solo - Jogja
Tahunan Perseroan




                                     Peresmian Proyek
                                     UNP
Page 26
PT Nusa Konstruksi Enjiniring Tbk.




Kampanye                                                                 Kunjungan
Anti Korupsi, Suap,                                           Komisaris dan Direksi:
dan Gratifikasi                                                               RSAU




                                     Kunjungan
                                     Komisaris dan Direksi:
                                     Japeksel
Page 27
PT Nusa Konstruksi Enjiniring Tbk.




Management                                                Penghargaan
Review                                                Mitra Kerjasama
                                                  Universitas Indonesia




                                     Onboarding
                                     Karyawan
Page 28
PT Nusa Konstruksi Enjiniring Tbk.




Jobfair:                                                                 Jobfair:
Universitas                                              Universitas Diponegoro
Parahyangan                                                           Semarang
Bandung




                                     Jobfair:
                                     Universitas
                                     Maranatha Bandung
Page 29
TERIMA
KASIH.

File

File Open PDF
Source IDX
Size9.53 MB
Published9 Dec 2024
Pages29
Characters24,028
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 16 people and organisations named in the text · linked when the evidence is strong

linked org Nusa Konstruksi Enjiniring Tbk p.1 ×86
linked person Ade Rahardja p.6
linked person Ganda Kusuma p.6
linked person Djoko Prabowo p.6
linked person Hudik Pramono p.6
linked person Rizaldi Limpas p.6
linked person Arvin Jahja Tjahjana p.6
linked org Grand Indonesia p.12
possible person Hendro Martowardojo p.6
unresolved org FInancial Services Authority p.2
unresolved org Indonesia Stock Exchange p.2
unresolved org Nusa Kontruksi Enjiniring Tbk. p.4 ×4
unresolved org PT Global Dinamika Kencana p.7 ×2
unresolved org Public Hudson River Group Pte.Ltd. p.7
unresolved org Hudson River Group Pte.Ltd. p.7
unresolved org PT Amman p.12

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result