Skip to content
Back to announcement

20260617_DPUM_Tanggapan atas Permintaan Penjelasan Bursa_32101925.pdf

Other Text extracted DPUM

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                               036/DPUM-Corsec/VI/2026

 Nama Perusahaan                           PT Dua Putra Utama Makmur Tbk.

 Kode Emiten                               DPUM

 Lampiran                                  1

 Perihal                                   Penjelasan atas Pemberitaan Media Massa


Pemberitaan Media Massa


Merujuk permintaan penjelasan oleh Bursa Efek Indonesia melalui surat nomor S-06599/BEI.PP3/06-2026 tanggal 08
Juni 2026 perihal Permintaan Penjelasan Atas Pemberitaan di media massa terkait dengan pemberitaan:



                Nama Media                               Judul Berita                             Tanggal

 Detik                                      "Detik-detik Pabrik Pengolahan Ikan di 06 June 2026
                                            Pati Terbakar" selengkapnya
                                            https://www.detik.com/jateng/berita/d-
                                            8520187/detik-detik-pabrik-pengolahan-
                                            ikan-di-pati-terbakar.

Kami sampaikan penjelasan sebagai berikut:

   No                                                        Pertanyaan

    1.     Klarifikasi atas kebenaran berita tersebut.

           a.        Klarifikasi atas kebenaran berita tersebut

           Tanggapan Perseroan      :
           Bahwa Pada Hari Sabtu, 6 Juni 2026 sekitar pukul 06.00 WIB telah terjadi insiden kebakaran di Fasilitas
           Operasional PT Dua Putra Utama Makmur Tbk

           b.        Informasi Korban luka dan/atau korban jiwa (Jika Ada)

           Tanggapan Perseroan        :
           Perseroan dengan tegas menegaskan bahwa dalam kejadian tersebut tidak ada korban jiwa maupun
           korban luka serius dan api telah berhasil dipadamkan sepenuhnya. Adapun penyebab kebakaran masih
           dalam penyelidikan pihak yang berwenang.

           c.        Dampak terhadap kegiatan operasional perseroan

           Tanggapan Perseroan         :

           Perseroan telah mengalihkan aktivitas produksi terdampak ke fasilitas operasional lainnya yang dimiliki
           Perseroan, sehingga kesinambungan pasokan kepada pelanggan dapat tetap terjaga semaksimal
           mungkin. Perseroan memperkirakan kondisi operasional dapat pulih sepenuhnya dalam kurun waktu 6
           (enam) bulan ke depan, sejalan dengan progress pemulihan fasilitas dan normalisasi lini produksi.

           d.        Nilai kerugian yang diperkirakan terjadi akibat kebakaran pada pabrik Perseroan

           Tanggapan Perseroan         :

           Nilai kerugiaan masih dalam proses perhitungan.

           e.      Kecukupan perlindungan dari asuransi untuk menutup kerugian yang diperkirakan terjadi akibat
           kebakaran pada pabrik Perseroan.

           Tanggapan Perseroan         :
Page 2
          Perseroan telah melakukan coverts asuransi Property All Risks (PAR).

   2.     Informasi/kejadian penting lainnya yang material dan dapat mempengaruhi kelangsungan hidup
          perusahaan serta dapat mempengaruhi harga saham perusahaan.

           Dengan ini, kami menegaskan, bahwa tidak ada informasi/kejadian penting lainnya yang material dan
           dapat mempengaruhi kelangsungan hidup perusahaan serta dapat mempengaruhi harga saham
           perusahaan

Demikian untuk diketahui.


Hormat Kami,
PT Dua Putra Utama Makmur Tbk.




Julius Siwalette

Corporate Secretary




PT Dua Putra Utama Makmur Tbk.
Jl Raya Pati Juwana KM 7 Kelurahan Purworejo, Kecamatan Pati, Kabupaten Pati,
Telepon : (0295) 4199 010/11, Fax : (0295) 4199 014, www.duaputra.co.id



Nama Pengirim                       Julius Siwalette

Jabatan                             Corporate Secretary
Tanggal dan Waktu                   17-06-2026 20:51

Lampiran                           1. 036- SURAT JAWABAN BURSA S 06599-BEI PP3-06 2026.pdf


 Dokumen ini merupakan dokumen resmi PT Dua Putra Utama Makmur Tbk. yang tidak memerlukan tanda tangan
     karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Dua Putra Utama Makmur Tbk.
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

Letter / Announcement No.                 036/DPUM-Corsec/VI/2026

Issuer Name                               PT Dua Putra Utama Makmur Tbk.

Issuer Code                               DPUM

Attachment                                1

Subject                                   Explanation for Mass Media


Recent Media Coverage


Referring to an explanation request by the Indonesia Stock Exchange through letter number S-06599/BEI.PP3/06-
2026 dated 08 Juni 2026 concerning Request for Explanation on Media Coverage related to:



            Name of Media                                News Headline                              Date

Detik                                         "Detik-detik Pabrik Pengolahan Ikan di 06 June 2026
                                              Pati Terbakar" selengkapnya
                                              https://www.detik.com/jateng/berita/d-
                                              8520187/detik-detik-pabrik-pengolahan-
                                              ikan-di-pati-terbakar.

We submit the explanation as follows :

   No                                                          Inquiries

    1.     Clarification of the truth of the news.

           a.           Klarifikasi atas kebenaran berita tersebut

           Tanggapan Perseroan      :
           Bahwa Pada Hari Sabtu, 6 Juni 2026 sekitar pukul 06.00 WIB telah terjadi insiden kebakaran di Fasilitas
           Operasional PT Dua Putra Utama Makmur Tbk

           b.           Informasi Korban luka dan/atau korban jiwa (Jika Ada)

           Tanggapan Perseroan        :
           Perseroan dengan tegas menegaskan bahwa dalam kejadian tersebut tidak ada korban jiwa maupun
           korban luka serius dan api telah berhasil dipadamkan sepenuhnya. Adapun penyebab kebakaran masih
           dalam penyelidikan pihak yang berwenang.

           c.           Dampak terhadap kegiatan operasional perseroan

           Tanggapan Perseroan            :

           Perseroan telah mengalihkan aktivitas produksi terdampak ke fasilitas operasional lainnya yang dimiliki
           Perseroan, sehingga kesinambungan pasokan kepada pelanggan dapat tetap terjaga semaksimal
           mungkin. Perseroan memperkirakan kondisi operasional dapat pulih sepenuhnya dalam kurun waktu 6
           (enam) bulan ke depan, sejalan dengan progress pemulihan fasilitas dan normalisasi lini produksi.

           d.           Nilai kerugian yang diperkirakan terjadi akibat kebakaran pada pabrik Perseroan

           Tanggapan Perseroan            :

           Nilai kerugiaan masih dalam proses perhitungan.

           e.      Kecukupan perlindungan dari asuransi untuk menutup kerugian yang diperkirakan terjadi akibat
           kebakaran pada pabrik Perseroan.

           Tanggapan Perseroan            :
Page 4
           Perseroan telah melakukan coverts asuransi Property All Risks (PAR).

   2.      Other important material information / events that can affect going concern of the company and the
           company's stock price.

           Dengan ini, kami menegaskan, bahwa tidak ada informasi/kejadian penting lainnya yang material dan
           dapat mempengaruhi kelangsungan hidup perusahaan serta dapat mempengaruhi harga saham
           perusahaan

Thus to be informed accordingly.


Respectfully,
PT Dua Putra Utama Makmur Tbk.




Julius Siwalette

Corporate Secretary




PT Dua Putra Utama Makmur Tbk.
Jl Raya Pati Juwana KM 7 Kelurahan Purworejo, Kecamatan Pati, Kabupaten Pati,
Phone : (0295) 4199 010/11, Fax : (0295) 4199 014, www.duaputra.co.id



Sender Name                          Julius Siwalette

Function                             Corporate Secretary

Date and Time                        17-06-2026 20:51

Attachment                          1. 036- SURAT JAWABAN BURSA S 06599-BEI PP3-06 2026.pdf


    This is an official document of PT Dua Putra Utama Makmur Tbk. that does not require a signature as it was
  generated electronically by the electronic reporting system. PT Dua Putra Utama Makmur Tbk. is fully responsible
                                  for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published17 Jun 2026
Pages4
Characters8,406
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org Dua Putra Utama Makmur Tbk. · Nama Perusahaan p.1 ×36
linked person Julius Siwalette · Corporate Secretary p.2 ×5
possible org Bursa Efek Indonesia p.1
unresolved org Indonesia Stock Exchange p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result