PT Darma Henwa Tbk 2024 Public Expose Presentation www.ptdh.co.id
Page 2
Disclaimer This communication contains forward-looking statements, financial projections and estimates with respect to the future operations and performance of PT Darma Henwa Tbk and its affiliates. Investors and shareholders are cautioned that forward-looking statements are subject to various risks and uncertainties, many of which are difficult to predict and are generally beyond the control of the Company. Such risks and uncertainties could cause actual results and developments to differ materially from those expressed in or implied by the forward-looking statements. Factors that could cause actual results to differ materially from those estimated by the forward-looking statements. Neither PT Darma Henwa Tbk or any other person assumes responsibility for the accuracy and completeness of the forward-looking statement in this communication. The forward-looking statements speak only as of the date of this communication. PT Darma Henwa Tbk is under no duty to update any of the forward-looking statements after this date to conform such statements to actual results or to reflect the occurrence of anticipated results or otherwise.
Page 3
Content
Industry 2024 Financial
Overview Highlights Performances
01 02 03 04 05 06 07
Darma Henwa DH’s Operational Awards &
at a Glance Strategy Performances CSR
Page 4
Darma Henwa at a Glance
PT Darma Henwa Tbk is a general mining contractor OB Removal
service public company, founded in 1991. We provide 1H24
integrated mining services including:
• coal and mineral mining services
63.30
• mining infrastructure & other supporting activities
• port management services
Total Asset The company was listed on the Indonesia Stock Exchange Million Bcm
1H24 on September 26, 2007, with the stock code DEWA`
Coal Mining
1H24
Total
7.48 Employee
IDR Trillion
3,037 8.18
Million Ton
Client Portfolio
Page 5
Business Activities
Coal and Mineral Mining Services
The Company provides coal mining services which
include land clearing, top soil management, drilling,
blasting, overburden removal, overburden dumping,
mining, run of mine, transportation, crushing,
barging, as well as vegetation and rehabilitation.
Port Management Services
The Company provides port management services
covering operational activities for the coal crushing and
blending
process, coal stockpile management service at the port,
maintenance of electricity generator and the supporting
equipment, & port equipment maintenance service.
Mining Infrastructure and Other Services
The Company also provides road and bridge
construction for mining areas, mining dressing plant
installation, earthworks, drilling exploration, land
preparation, machinery repair for special purposes,
and civil consultant management services.
Page 6
5
Project Area 14
2 3
Operating Project
1. Bengalon Project in East Kalimantan, a coal mining project with PT Kaltim Prima Coal (KPC).
2. Asam Asam Project in South Kalimantan, a coal mining project with PT Arutmin Indonesia.
3. Kintap Project in South Kalimantan, a coal mining project with PT Arutmin Indonesia.
4. Lubuk Tutung Port in East Kalimantan, coal port handling services through PT Dire Pratama.
Development Project
5. Gayo Project in Aceh, a gold mine asset under PT Gayo Mineral Resources.
Page 7
Industry Overviews
Interest Rates & Inflation World Energy Consumption by Fossil Fuel Prices
(%) Fuel (EJ) (USD)
Oil Coal Natural gas Oil - Brent Coal - HBA Coal - AU
FED rate BI Rate US Inflation ID Inflation
Renewables Nuclear energy Hydroelectricity Coal - SA Gas - Europe
10.0%
700 50,000.0%
9.0%
45,000.0%
8.0% 600
40,000.0%
7.0%
35,000.0%
500
6.0%
30,000.0%
5.0% 400
25,000.0%
4.0% 20,000.0%
300
3.0% 15,000.0%
2.0% 200 10,000.0%
1.0% 5,000.0%
100
0.0% 0.0%
Sep 2020
Nov 2020
Nov 2021
Nov 2022
Nov 2023
Nov 2020
Nov 2021
Nov 2022
Nov 2023
Jan 2020
May 2020
Jul 2020
Sep 2020
Jan 2021
May 2021
Jul 2021
Sep 2021
Jan 2022
May 2022
Jul 2022
Sep 2022
Jan 2023
May 2023
Jul 2023
Sep 2023
Jan 2024
May 2024
Jul 2024
Jan 2020
May 2020
Jul 2020
Jan 2021
May 2021
Jul 2021
Sep 2021
Jan 2022
May 2022
Jul 2022
Sep 2022
Jan 2023
Mar 2023
May 2023
Jul 2023
Sep 2023
Jan 2024
May 2024
Jul 2024
Mar 2020
Mar 2021
Mar 2022
Mar 2023
Mar 2024
Mar 2020
Mar 2021
Mar 2022
Mar 2024
0
2018 2019 2020 2021 2022 2023
Source : Statista, Bureau of Labor Statistic, St. Louis Fed, Bank Indonesia Source : Statista, Kearney, KPMG, Energy Institute, Statistical Review of World Energy 2024 Source : World Bank Commodity Price Data, KESDM
• Inflation surges in 2021 and 2022 due to Covid-19 • Despite growing portion of renewables, fossil • Fossil fuel price have relatively stabilized after
stimulus, commodity price hike and supply chain fuels remain a significant part of energy sources. substantial volatility driven by Covid-19, energy
disruption and followed by monetary tightening. • Coal consumption remain a significant part of crisis, geopolitical conflict and sanctions.
• By mid 2024 inflation have cooled down while global energy generation. • Indonesian HBA stabilize around USD 130 in 2024
interest rates remained elevated.
Page 8
Darma Henwa Strategy
1
Strengthening
Fundamental
Performance
Darma Henwa strategic approach focus on 3 key pillars:
1. strengthening fundamental performances
• Internal process system improvements
• Commitment to good mining practices 2 3
Creating Foundation for Operational Cost
2. Creating a foundation for future growth
• Securing financing for additional fleet capacity
Future Growth Efficiency
• Arranging incoming fleets
3. Operational cost efficiency
• Maintaining high quality service
• Better cost efficiency
Page 9
Improvement Project Initiatives
Darma Henwa initiated a new improvement program in 2024 to standardize mining operation
towards achieving Good Mining Practice (“GMP”) .
By Q3 2024, pilot project of this program in KPC Project had delivered improvement in Productivity
and better mining sequences.
Before Implementation After Implementation
Page 10
Improvement Project Initiatives
In addition, Hauler Speed Improvement project is carried out by redesigning mine access road,
enhancing road material hardness and standardizing road width. This improvement resulted in
notable efficiency gain from faster hauler speed and cycle time.
Before Implementation After Implementation
Page 11
2024 Highlights
New Securing Major Incoming Change of the
Board Members Funding Production Fleet Company’s Logo
2024 AGMS appoint new Board Secured syndication financing led by Phase one of new heavy mining In 2024 the Company has changed
members to strengthen and support BCA valued at IDR 2.6 Trillion to equipment will be progressively the logo to support the Company’s
future growth: fund and support new heavy installed in the late 2024 transformation steps to diversity its
1. Sorimuda Pulungan - Operation equipment. business.
2. Fredia Yuzirwan - Finance
3. Mahmud Samuri - HR
Page 12
Syndication Funding July 31st, 2024: The company has succeeded in obtaining a syndicated banking loan facility amounting to IDR 2.6 trillion, which was used for: • Purchase of new equipment (New Capex) amounting to IDR 2 trillion, • Bank loan refinancing amounting to IDR 100 billion, • Leasing extension refinancing amounting to IDR 240 billion, • Working capital amounting to IDR 260 billion.
Page 13
Incoming Production Fleet
November 7th, 2024:
The company plan to install the following
new equipment until early 2025:
• 8 (eight) 200T-Class Excavator
• 1 (one) 120T-Class Excavator
• 75 (seventy-five) 100T-Class Trucks
• 12 (twelve) Dozers
• 7 (seven) Motor Graders
• 48 (forty-eight) Other supporting Eq.
Which translates to 30 Mbcm per annum of
newly installed operating capacity
Page 14
Our new brand is more than a new
– it’s the signal of our evolution.
Change of Company Logo
Re-write The Future
At DH, we are writing a new chapter for the future.
A future beyond mining, to see the bigger picture.
Transforming diverse commodities as growth opportunities.
A future that champions collaboration, to foster value creation.
Operating as one integrated group, from investments, infrastructures to services.
A future dedicated to sustainable practices, to set the foundation for generations. Upholding
integrity and transparency to become the nation’s leading public company.
The act of rewriting the future calls for strong conviction and constant reinvention. It calls on us
all, as change-makers, to take bold steps today to create a brighter tomorrow.
DH. Rewrite The Future.
Page 15
Operational Performances
Waste Removal (Mbcm) Coal Mining (Mt) Material Moved (Mbcm)
120 10 120
9 8.7 103.05
100 96.36 8.18 100
8
7
80 80
6 69.58
63.3
60 5 60
4
40 40
3
2
20 20
1
0 0 0
1H 2023 1H 2024 1H 2023 1H 2024 1H 2023 1H 2024
• Waste Removal volume in 1H 2024 reached • Coal mining volume in 1H 2024 reached 8.18 Mt, • Material moved volume in 1H 2024 reached
63.30 Mbcm reflecting a 34.3% decline reflecting a 5.9% decline compared to 1H23 69.58 Mbcm reflecting a 32.9% decline
compared to 1H 2023 compared to 1H 2023
Page 16
Financial Performances (Audited Consolidated 1H24 FS)
Revenue (IDR Billion) Cost of Revenue Gross Profit (IDR Billion)
4,000.00 (IDR Billion) 300.00
3,565.39 3,500.00 3,308.72 256.67
3,500.00
250.00
3,000.00
3,000.00 2,920.65 2,703.25 217.40
2,500.00 200.00
2,500.00
2,000.00
2,000.00 150.00
1,500.00
1,500.00
100.00
1,000.00 1,000.00
50.00
500.00 500.00
0.00 0.00 0.00
1H 2023 1H 2024 1H 2023 1H 2024 1H 2023 1H 2024
• Revenue in 1H 2024 amounted to IDR 2,920.65 • Cost of Revenue in 1H 2024 amounted to IDR • Gross profit in 1H 2024 amounted to IDR 217.40 Billion,
Billion, representing a 18.1% decline compared to 2,703.25 Billion, representing a 18.3% decline representing a 15.3% decline compared to 1H 2023
1H 2023 compared to 1H 2023
Page 17
Financial Performances (Audited Consolidated 1H24 FS)
Net Income (IDR Billion) Comp. Income (IDR Billion) EBITDA (IDR Billion)
16.00 25.00 600.00
23.55 554.46
14.29
14.00
12.75 500.00
20.00
12.00
410.41
400.00
10.00
15.00
8.00 300.00
10.00
6.00 8.64
200.00
4.00
5.00
100.00
2.00
0.00 0.00 0.00
1H 2023 1H 2024 1H 2023 1H 2024 1H 2023 1H 2024
• Comprehensive Income in 1H 2024 is
• Net Income in 1H 2024 is recorded at IDR 14.29 • EBITDA in 1H 2024 amounted to IDR 410.41 Billion,
recorded at IDR 23.55 Billion, representing a
Billion, showing a 12.1% increase compared to representing a 26% decline compared to 1H 2023
172.6% increase compared to 1H 2023
1H 2023
Page 18
Financial Performances (Audited Consolidated 1H24 FS)
(In IDR Billion) 31 Dec. 2023 30 June 2024 %
Balance Sheet
Cash & Cash Equivalent 386.86 226.34 -41.49%
Assets Trade Receivables 1,774.69 1,464.85 -17.45%
Other Current Assets 745.24 756.81 +1.55%
• Lower cash & cash equivalent in 1H 2024 used for
Fixed Asset 2,551.78 2,400.42 -5.93%
bank loans settlement
Investment in Shares 1,106.34 1,106.34 0.00%
• Lower trade receivables in 1H 2024 Other Non-Current Assets 1,572.71 1,530.57 -2.68%
Total Asset 8,137.62 7,485.33 -8.02%
Liabilities
• Lower trade payables & accrued expenses Trade Payables 1,784.51 1,691.06 -5.24%
Accrued Expenses 851.04 774.09 -9.04%
• BRI Bank loans was fully paid up and settled as
Bank Loans 372.70 0.00 -100.00%
scheduled
Other Liabilities 1,840.06 1,707.32 -2.21%
Equity Total Liabilities 4,848.30 4,172.47 -13.94%
• Total equity improve slightly
Capital Shares 2,185.37 2,185.37 0.00%
Additional Paid In Capital 737.71 737.71 0.00%
Adjustment of Currency Effect 1,462.24 1,462.24 0.00%
Deficit (1,093.64) (1,070.14) -2.15%
Non-Controlling Interest (2.37) (2.32) -2.27%
Total Equity 3,289.31 3,312.87 0.72%
Page 19
Capital Expenditure 1H 24
CAPEX (IDR Billion)
250.00 1H 2024 Capital Expenditure
• Heavy Equipment Purchase (15.15%)
201.23
200.00
• Heavy Equipment Component (50.18%)
• Tyre (25.97%)
150.00
• Others (8.71%)
103.31
100.00
50.00
0.00
1H 2023 1H 2024
• Capital Expenditure in 1H 2024 is recorded
at IDR 103.31 Billion, showing a decline
compared to 1H 2023
Page 20
Awards
1 “Penghargaan Utama” for Good Mining
Practice Aspect for Mining Services
Standardization Management in 2024: for the
Asam Asam Coal Project from the Ministry of
Energy and Mineral Resources.
2 2024 Workplace HIV-AIDS Prevention and
Control Program Award for the Asam Asam Coal
Project from South Kalimantan Province.
3 Zero Accident Award 2024 for Asam Asam Coal
Project from South Kalimantan Province. 1 2 3
4 HIV-AIDS Prevention and Control Award for the
Asam Asam Coal Project from the South
Kalimantan Provincial Manpower Office.
5 Zero Accident Award for Bengalon Coal Project
from the Indonesian Minister of Manpower.
4 5
Page 21
Corporate Social Responsibility
DARMA CERDAS
1 2
DARMA MANDIRI DARMA CERDAS
BANTUAN DI BIDANG PENDIDIKAN
AID in ECONOMIC SECTOR AID in EDUCATION SECTOR
Page 22
Corporate Social Responsibility
3 4
DARMA SEHAT DARMA SOSIAL
AID in HEALTH SECTOR AID in SOCIAL SECTOR
Page 23
Thank you
PT Darma Henwa Tbk
Prosperity Tower 39th Floor
SCBD, District 8, Lot. 28
Jl. Jend. Sudirman Kav. 52-53
South Jakarta 12190 Indonesia
www.ptdh.co.id
Names mentioned 13 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Indonesia Stock Exchange
p.4
unresolved
org
PT Kaltim Prima Coal
p.6
unresolved
org
PT Arutmin Indonesia.
p.6 ×2
unresolved
org
PT Dire Pratama. Development Project
p.6
unresolved
org
PT Gayo Mineral Resources.
p.6
unresolved
org
Bank Indonesia
p.7
unresolved
org
Bank Commodity Price Data
p.7
unresolved
org
Ministry of Energy and Mineral Resources.
p.20
unresolved
org
Minister of Manpower.
p.20
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.