Skip to content
Back to announcement

20241115_ELSA_Laporan Informasi dan Fakta Material_31768619.pdf

Other Text extracted ELSA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 8

Page 1
Go To English Page

 Nomor Surat                           L9.013C-2024.262

 Nama Perusahaan                       Elnusa Tbk

 Kode Emiten                           ELSA

 Lampiran                              2
                                       Siaran Pers - Penutupan Survei Seismik 2D Amalia: Elnusa Selesaikan Proyek
 Perihal
                                       dengan Standar Keselamatan Optimal di Kabupaten OKU


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            Elnusa Tbk

 Bidang Usaha                                  Jasa Energi



 Telepon                                       (021) 788-30850

 Faksimili                                     (021) 788-30883

 Alamat Surat Elektronik (email)               corporate@elnusa.co.id


 Tanggal Kejadian                              15 November 2024
 Jenis Informasi atau Fakta Material           Siaran Pers - Penutupan Survei Seismik 2D Amalia: Elnusa
                                               Selesaikan Proyek dengan Standar Keselamatan Optimal di
                                               Kabupaten OKU
Page 2
Uraian Informasi atau Fakta Material   Jakarta, 15 November 2024 - PT Elnusa Tbk (Elnusa),
                                       bersama dengan Pertamina Hulu Energi (PHE) dan Pertamina
                                       EP (PEP) telah sukses menyelesaikan survei seismik 2D
                                       Amalia - 2D Amalia Extension yang merupakan wilayah kerja
                                       dari Pertamina Hulu Rokan (PHR) Regional 1 Sumatera Zona
                                       4, di Kabupaten Ogan Komering Ulu (OKU), Sumatera
                                       Selatan. Proses ini menjadi salah satu upaya penting untuk
                                       mendukung peningkatan eksplorasi minyak dan gas di
                                       Indonesia, sekaligus menunjukkan komitmen Elnusa dalam
                                       menjaga standar tinggi dalam Health, Safety, Security, and
                                       Environment (HSSE).

                                       Penutupan kegiatan survei ini dihadiri oleh Penjabat Bupati
                                       OKU M. Iqbal Alisyahbana, Sekretaris Daerah OKU
                                       Dharmawan Irianto, serta jajaran forkopimda OKU seperti
                                       Kapolres OKU AKBP Imam Zamroni, Dandim 0403 OKU
                                       Letkol Inf Harri Feriawan, dan Kajari OKU Choirun Parapat SH,
                                       MH. Pada kesempatan tersebut, Penjabat Bupati OKU M.
                                       Iqbal Alisyahbana menyampaikan apresiasinya atas kinerja
                                       Elnusa dan mitra terkait dalam menyelesaikan survei seismik
                                       dengan lancar dan tanpa kendala signifikan.

                                       Dalam pernyataannya, Bupati OKU juga menegaskan
                                       pentingnya koordinasi yang baik antara pemerintah daerah,
                                       Pertamina, Elnusa, dan seluruh stakeholder dalam
                                       mendukung kegiatan eksplorasi ini. Beliau menyebutkan
                                       bahwa survei seismik ini tidak hanya berdampak positif pada
                                       sektor energi, namun juga berpotensi meningkatkan
                                       kesejahteraan masyarakat setempat melalui peningkatan
                                       investasi dan pendapatan daerah.

                                       Dari perspektif Elnusa, kegiatan ini adalah cerminan nyata dari
                                       penerapan standar HSSE yang ketat. Dina Novi Susanti,
                                       Manager Exploration Planning & Operation Regional 1
                                       Sumatera, mengungkapkan bahwa keberhasilan survei ini
                                       tidak terlepas dari komitmen Elnusa untuk menjalankan praktik
                                       terbaik di bidang HSSE, yang melibatkan sosialisasi
                                       berjenjang dengan masyarakat dan kolaborasi yang erat
                                       dengan pihak keamanan serta pemerintah daerah setempat.
                                       Dukungan ini memungkinkan pelaksanaan survei seismik
                                       tanpa adanya hambatan atau gangguan berarti di lapangan.

                                       Syafei Syafri, Kepala Departemen Formalitas & Komunikasi
                                       SKK Migas Perwakilan Sumbagsel, turut menyampaikan
                                       apresiasi atas keterlibatan aktif pemerintah Kabupaten OKU
                                       dan dukungan masyarakat dalam menjaga ketertiban selama
                                       berlangsungnya survei seismik ini. Menurut Syafei,
                                       keberlanjutan eksplorasi energi nasional hanya dapat tercapai
                                       melalui kolaborasi erat lintas instansi dan dukungan penuh
                                       dari masyarakat. Kegiatan ini sejalan dengan target jangka
                                       panjang untuk mencapai produksi 1 juta barel minyak per hari
                                       (BOPD) dan 12 miliar standar kaki kubik gas per hari (BSCFD)
                                       pada 2030.

                                       Di sisi lain, Ilham Togi Sihombing selaku Field Supervisor
                                       project ini menjelaskan bahwa tahap operasional survei di
                                       lapangan telah selesai pada September 2024, diikuti dengan
                                       penyelesaian kompensasi kepada masyarakat pada akhir
                                       Oktober 2024. Semua tahapan ini berjalan dengan lancar
                                       berkat pendekatan HSSE yang tepat serta komunikasi yang
                                       efektif ke berbagai stakeholder.

                                       Keberhasilan survei seismik ini menjadi bukti bahwa Elnusa
Page 3
                                            berkomitmen untuk menjaga keselamatan kerja dan
                                            memperhatikan lingkungan dalam setiap kegiatan
                                            operasionalnya. Dengan dukungan seluruh pihak, Elnusa
                                            yakin bahwa keberlanjutan energi nasional dapat terjaga, dan
                                            kegiatan eksplorasi ini akan membuka peluang baru untuk
                                            ketahanan energi Indonesia.

                                           Sekilas Elnusa (IDX: ELSA)
                                           PT Elnusa Tbk (Elnusa) merupakan Anak Perusahaan PT
                                           Pertamina Hulu Energi (PHE) yang tergabung dalam
                                           Subholding Upstream Pertamina, bergerak dalam bidang jasa
                                           energi yang terintegrasi untuk memberikan solusi total. Elnusa
                                           memiliki DNA Resillience dan inovasi lebih dari 54 Tahun
                                           dalam industri energi, memiliki kompetensi inti pada jasa hulu
                                           migas, jasa distribusi dan logistik energi serta jasa penunjang.
                                           Lini jasa hulu migas meliputi jasa Geoscience & Reservoir
                                           (land, transition zone & marine serta data processing), jasa
                                           pengeboran & pemeliharaan lapangan migas (drilling &
                                           workover), jasa engineering, procurement, construction &
                                           operation maintenance (EPC-OM). Lini jasa distribusi dan
                                           logistik energi meliputi jasa transportasi BBM, pengelolaan
                                           depot, dan penjualan chemical. Lini jasa penunjang meliputi
                                           jasa marine support, fabrikasi, hingga manajemen data.
                                           Elnusa terus berkomitmen menerapkan Tata Kelola
                                           Perusahaaan sesuai dengan prinsip-prinsip GCG dan juga
                                           ESG untuk memuwujudkan Perusahaan yang berdaya saing
                                           tinggi, terus tumbuh dan memberikan kebermanfaatan yang
                                           keberlanjutan untuk seluruh pemangku kepentingan. Informasi
                                           lebih lanjut dapat diakses pada www.elnusa.co.id
Dampak kejadian, informasi atau fakta      Tidak Ada
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik



Demikian untuk diketahui.


Hormat Kami,
Elnusa Tbk




Retnowati

Corporate Governance Specialist




Elnusa Tbk
Graha Elnusa, Jl. TB Simatupang Kav. 1B, Jakarta 12560
Telepon : (021) 788-30850, Fax : (021) 788-30883, www.elnusa.co.id



Nama Pengirim                     Retnowati

Jabatan                           Corporate Governance Specialist
Tanggal dan Waktu                 15-11-2024 17:16
Page 4
Lampiran                        1. Elnusa Selesaikan Proyek di Kabupaten OKU.pdf


                                2. Elnusa Completes Project in OKU Regency.pdf


Dokumen ini merupakan dokumen resmi Elnusa Tbk yang tidak memerlukan tanda tangan karena dihasilkan secara
  elektronik oleh sistem pelaporan elektronik. Elnusa Tbk bertanggung jawab penuh atas informasi yang tertera
                                               didalam dokumen ini.
Page 5
Go To Indonesian Page

 Letter / Announcement No.           L9.013C-2024.262

 Issuer Name                         Elnusa Tbk

 Issuer Code                         ELSA

 Attachment                          2

 Subject                             Press Release - Closure of the 2D Amalia Seismic Survey: Elnusa Completes
                                     Project with Optimal Safety Standards in OKU Regency

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            Elnusa Tbk

 Business Activities                         Jasa Energi


 Telephone                                   (021) 788-30850

 Faximile                                    (021) 788-30883

 Email Address                               corporate@elnusa.co.id


 Date of Event                               15 November 2024

                                             Press Release - Closure of the 2D Amalia Seismic Survey:
 Type of Material Information or Facts       Elnusa Completes Project with Optimal Safety Standards in
                                             OKU Regency
Page 6
Description of Material Information or   Jakarta, 15 November 2024 - PT Elnusa Tbk (Elnusa), in
Facts                                    collaboration with Pertamina Hulu Energi (PHE) and Pertamina
                                         EP (PEP), has successfully completed the 2D Amalia - 2D
                                         Amalia Extension seismic survey, an exploration project within
                                         Pertamina Hulu Rokan (PHR) Regional 1 Sumatera Zone 4,
                                         located in Ogan Komering Ulu (OKU) Regency, South
                                         Sumatra. This survey marks a significant effort to support oil
                                         and gas exploration in Indonesia while demonstrating Elnusa's
                                         commitment to maintaining high standards in Health, Safety,
                                         Security, and Environment (HSSE).

                                         The closing event of the survey was attended by the Acting
                                         Regent of OKU, M. Iqbal Alisyahbana; OKU Regional
                                         Secretary, Dharmawan Irianto; and local OKU authorities
                                         including OKU Police Chief AKBP Imam Zamroni, Military
                                         District Commander 0403 OKU Lt. Col. Inf Harri Feriawan, and
                                         OKU District Attorney Choirun Parapat, SH, MH. During the
                                         occasion, Acting Regent M. Iqbal Alisyahbana expressed his
                                         appreciation for Elnusa's and its partners' smooth and
                                         successful completion of the seismic survey without significant
                                         issues.

                                         The Regent emphasized the importance of good coordination
                                         between the local government, Pertamina, Elnusa, and all
                                         stakeholders in supporting this exploration activity. He
                                         highlighted that this seismic survey not only positively impacts
                                         the energy sector but also has the potential to improve the
                                         welfare of the local community through increased investment
                                         and regional income.

                                         From Elnusa's perspective, this activity reflects a strong
                                         commitment to strict HSSE standards. Dina Novi Susanti,
                                         Manager of Exploration Planning & Operation for Regional 1
                                         Sumatera, explained that the success of this survey was
                                         achieved through Elnusa's dedication to implementing best
                                         practices in HSSE, which involved layered socialization efforts
                                         with the community and close collaboration with security forces
                                         and local government. This support enabled the seamless
                                         execution of the seismic survey without major disruptions in
                                         the field.

                                         Syafei Syafri, Head of Formalities & Communications for SKK
                                         Migas Sumbagsel, also expressed appreciation for the active
                                         involvement of the OKU Regency government and community
                                         support in maintaining order throughout the seismic survey
                                         process. According to Syafei, the sustainability of national
                                         energy exploration can only be achieved through close inter-
                                         agency collaboration and full public support. This activity aligns
                                         with the long-term goal of reaching production of 1 million
                                         barrels of oil per day (BOPD) and 12 billion standard cubic feet
                                         of gas per day (BSCFD) by 2030.

                                         Additionally, Ilham Togi Sihombing, the project's Field
                                         Supervisor, stated that field operations for the survey were
                                         completed in September 2024, followed by compensation
                                         settlements for the community at the end of October 2024. All
                                         phases were executed smoothly, thanks to effective HSSE
                                         measures and efficient communication with various
                                         stakeholders.

                                         The success of this seismic survey stands as a testament to
                                         Elnusa's commitment to maintaining safety and environmental
                                         care in all its operational activities. With the support of all
Page 7
                                              parties involved, Elnusa is confident that the sustainability of
                                              national energy can be upheld and that this exploration activity
                                              will pave the way for new opportunities in Indonesia's energy
                                              resilience.

                                              About Elnusa (IDX: ELSA)
                                              Elnusa is a subsidiary of PT Pertamina Hulu Energi (PHE),
                                              which is part of the Pertamina Upstream Subholding, operating
                                              in the field of integrated energy services to provide total
                                              solutions. Elnusa has a DNA of resilience and innovation for
                                              over 54 years in the energy industry, with core competencies
                                              in upstream oil and gas services, energy distribution and
                                              logistics services, as well as support services. The upstream
                                              oil and gas services line includes Geoscience & Reservoir
                                              services (land, transition zone & marine, as well as data
                                              processing), drilling & field maintenance services (drilling &
                                              workover), engineering, procurement, construction & operation
                                              maintenance (EPC-OM) services. The energy distribution and
                                              logistics services line includes fuel transportation services,
                                              depot management, and chemical sales. The support services
                                              line includes marine support services, fabrication, and data
                                              management. Elnusa is committed to implementing Corporate
                                              Governance in accordance with GCG principles to realize a
                                              highly competitive, continuously growing company and provide
                                              sustainability for all stakeholders. For more information, please
                                              visit www.elnusa.co.id.
 Impact of event, material information or     No Impact
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Thus to be informed accordingly.


Respectfully,
Elnusa Tbk




Retnowati

Corporate Governance Specialist




Elnusa Tbk
Graha Elnusa, Jl. TB Simatupang Kav. 1B, Jakarta 12560
Phone : (021) 788-30850, Fax : (021) 788-30883, www.elnusa.co.id



Sender Name                          Retnowati

Function                             Corporate Governance Specialist

Date and Time                        15-11-2024 17:16

Attachment                          1. Elnusa Selesaikan Proyek di Kabupaten OKU.pdf


                                    2. Elnusa Completes Project in OKU Regency.pdf
Page 8
 This is an official document of Elnusa Tbk that does not require a signature as it was generated electronically by
the electronic reporting system. Elnusa Tbk is fully responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.02 MB
Published15 Nov 2024
Pages8
Characters20,382
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org Pertamina Hulu Energi p.2 ×5
possible org Elnusa Tbk · Nama Perusahaan p.1 ×17
unresolved person Kajari OKU Choirun Parapat SH p.2
unresolved org Departemen Formalitas & Komunikasi SKK Migas Perwakilan Sumbagsel p.2
unresolved person Retnowati · Corporate Governance Specialist p.3 ×2
unresolved person OKU District Attorney Choirun Parapat p.6

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result