Skip to content
Back to announcement

LK-PLN September 2024.pdf

Financial statement Text extracted PPLN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 196

Page 1
PERUSAHAAN PERSEROAN (PERSERO)
PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

LAPORAN KEUANGAN KONSOLIDASIAN/
CONSOLIDATED FINANCIAL STATEMENTS


30 SEPTEMBER 2024 DAN 31 DESEMBER 2023
SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
Page 2
25 Oktober   October 25
Page 3
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 1/1 Schedule

LAPORAN POSISI KEUANGAN                                                                         CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL                                                                                       FINANCIAL POSITION
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                          AS AT SEPTEMBER 30, 2024 AND DECEMBER 31,
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                              2023
                                                                                  (Expressed in millions of Rupiah, unless otherwise stated)


                                                           30 September/            31 Desember/
                                           Catatan/        September 30,            December 31,
                                            Notes               2024                    2023
ASET                                                                                                                                      ASSETS
ASET TIDAK LANCAR                                                                                                   NON-CURRENT ASSETS
Aset tetap                                      6            1,453,464,499           1,448,970,621               Property, plant and equipment
Aset hak-guna                                   7               30,032,902              30,574,504                          Right-of-use assets
Properti investasi                              8                5,927,852               5,939,235                       Investment properties
Investasi pada entitas asosiasi                 9                        -                                           Investments in associates
  dan ventura bersama                           9               28,533,199              26,526,781                Investments in joint ventures
Aset pajak tangguhan                           47                  324,717                 540,694                          Deferred tax assets
Piutang pihak berelasi                         10                1,005,114               1,028,387             Receivables from related parties
Rekening bank
  dibatasi penggunaannya                       11                   4,837,560            4,434,080                    Restricted cash in banks
Piutang lain-lain                              17                   1,341,586            1,883,832                           Other receivables
Pajak dibayar di muka                          19                  13,063,804           12,376,005             Prepaid expenses and advances
Piutang dari Pemerintah                        16                           -                    -               Receivables from Government
Biaya dibayar di muka dan uang muka            20                      71,515               41,138             Prepaid expenses and advances
Aset tidak lancar lain                         12                   8,281,162            6,940,941                    Other non-current assets
Jumlah Aset Tidak Lancar                                     1,546,883,909           1,539,256,218                    Total Non-current Assets

ASET LANCAR                                                                                                               CURRENT ASSETS
Kas dan setara kas                             13                  28,071,646           55,920,541                   Cash and cash equivalents
Rekening bank
  dibatasi penggunaannya                       11                      88,119               99,019                    Restricted cash in banks
Investasi jangka pendek                        14                   1,572,852              913,670                      Short-term investments
Piutang usaha                                                                                                                Trade receivables
  Pihak berelasi                               15                   2,486,558            2,412,928                            Related parties
  Pihak ketiga                                 15                  26,597,307           24,428,027                               Third parties
Piutang dari pemerintah                        16                  60,982,733           22,446,998               Receivables from Government
Piutang lain-lain                              17                   3,333,852            2,306,621                           Other receivables
Persediaan                                     18                  20,990,353           17,862,312                                   Inventories
Pajak dibayar di muka                          19                   5,553,197            3,783,609                                Prepaid taxes
Biaya dibayar di muka dan uang muka            20                   1,912,663              952,477             Prepaid expenses and advances
Piutang pihak berelasi                         10                      19,863              251,026             Receivables from related parties
Aset derivatif                                 56                     565,313                6,258                            Derivative assets

Jumlah Aset Lancar                                                152,174,457          131,383,486                         Total Current Assets

JUMLAH ASET                                                  1,699,058,366           1,670,639,704                              TOTAL ASSETS




   Catatan atas laporan keuangan konsolidasian merupakan bagian             The accompanying notes to the consolidated financial statements
     yang tidak terpisahkan dari laporan keuangan konsolidasian              form an integral part of these consolidated financial statements
Page 4
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 1/2 Schedule
LAPORAN POSISI KEUANGAN                                                          CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL                                                                        FINANCIAL POSITION
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                     AS AT SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)


                                                             30 September/           31 Desember/
                                             Catatan/        September 30,           December 31,
                                              Notes               2024                   2023


 LIABILITAS DAN EKUITAS                                                                                                 LIABILITIES AND EQUITY
 EKUITAS                                                                                                                                  EQUITY
 Ekuitas yang dapat diatribusikan                                                                                   Equity attributable to owners
   kepada pemilik entitas induk                                                                                                    of the parent
 Modal saham - nilai nominal Rp1 per saham                                                            Capital stock - par value of Rp1 per share
   Modal dasar - 439.000.000 saham                                                                          Authorized - 439,000,000 shares
   Modal ditempatkan dan disetor penuh                                                                                 Subscribed and paid-up
     150.536.096 saham                                                                                                    150,536,096 shares,
     pada 30 September 2024 dan                                                                                 as at September 30, 2024 and
     150.536.096 saham pada                                                                                         150,536,096 shares, as at
     31 Desember 2023                            21                150,536,096           150,536,096                      December 31, 2023.
 Tambahan modal disetor                          22                     34,608                34,608                    Additional paid-in capital
 Penyertaan modal Negara dalam proses                                                                      Stock subscription from Government
   penerbitan saham                              21                           -                     -                      in issuance process
 Selisih transaksi dengan pihak                                                                           Difference in value from transactions
   non-pengendali                                                        (2,100)               (2,100)           with non-controlling interests
 Saldo laba                                                                                                                     Retained earnings
   Ditentukan penggunaannya                      21                 76,803,066            76,803,066                               Appropriated
   Tidak ditentukan penggunaannya                21                129,579,678           107,538,313                            Unappropriated
 Penghasilan komprehensif lain                                     674,251,950           679,584,024               Other comprehensive income
 Ekuitas yang dapat diatribusikan                                                                                   Equity attributable to owners
   kepada pemilik entitas induk                                   1,031,203,298         1,014,494,007                              of the parent
 Kepentingan non-pengendali                                          1,142,132             1,137,392                    Non-controlling interests
 Jumlah Ekuitas                                                   1,032,345,429        1,015,631,399                                    Total Equity

 LIABILITAS JANGKA PANJANG                                                                                           NON-CURRENT LIABILITIES
 Liabilitas pajak tangguhan                      47                 60,265,748             58,228,739                     Deferred tax liabilities
 Pendapatan ditangguhkan                         23                 32,521,337             27,104,985                         Deferred revenue
 Utang jangka panjang -
   setelah dikurangi bagian
   jatuh tempo                                                                                                                Long-term liabilities -
   dalam satu tahun                                                                                                         net of current portion
   Penerusan pinjaman                            24                 22,954,127             26,243,812                             Two-step loans
   Utang kepada Pemerintah                                                                                                       Government and
     dan lembaga keuangan                                                                                               non-bank Government
     Pemerintah non-bank                         25                  1,109,722             1,472,907                 financial institution loans
   Utang sewa                                    26                 11,584,988            10,501,832                              Lease liabilities
   Utang bank                                    27                114,504,989           127,875,171                                   Bank loans
   Utang obligasi dan sukuk ijarah               28                187,566,141           191,986,322              Bonds payable and sukuk ijara
   Utang listrik swasta                          29                  4,574,330             5,101,199                Electricity purchase payable
   Liabilitas imbalan kerja                      49                 72,852,292            62,831,038                Employee benefits liabilities
   Utang lain-lain                               31                    568,295               466,867                              Other payables

 Jumlah Liabilitas Jangka Panjang                                  508,501,967           511,812,872                 Total Non-current Liabilities




   Catatan atas laporan keuangan konsolidasian merupakan bagian             The accompanying notes to the consolidated financial statements
     yang tidak terpisahkan dari laporan keuangan konsolidasian              form an integral part of these consolidated financial statements
Page 5
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 1/3 Schedule


LAPORAN POSISI KEUANGAN                                                                     CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL                                                                                   FINANCIAL POSITION
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      AS AT SEPTEMBER 30, 2024 AND DECEMBER 31,
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                          2023
                                                                              (Expressed in millions of Rupiah, unless otherwise stated)


                                                            30 September/          31 Desember/
                                             Catatan/       September 30,          December 31,
                                              Notes              2024                  2023

 LIABILITAS JANGKA PENDEK                                                                                               CURRENT LIABILITIES
 Utang usaha                                                                                                                      Trade payables
   Pihak berelasi                               30                 18,887,877           15,523,529                              Related parties
   Pihak ketiga                                 30                 49,349,673           41,623,998                                 Third parties
 Utang pajak                                    32                  5,555,022            4,231,945                                 Taxes payable
 Biaya masih harus dibayar                      33                 10,754,223            8,049,497                             Accrued expenses
 Uang jaminan langganan                         34                 18,363,669           17,245,794                Customers' security deposits
 Utang biaya proyek                             35                     11,254            1,512,219                          Project cost payable
 Pendapatan ditangguhkan                        23                  1,933,413            1,581,942                              Deferred revenue
 Liabilitas derivatif                           56                    398,689              201,359                           Derivative liabilities
 Utang jangka panjang jatuh tempo                                                                                           Current maturities of
   dalam satu tahun                                                                                                        long-term liabilities
   Penerusan pinjaman                           24                  2,731,377             2,939,616                             Two-step loans
   Utang kepada Pemerintah                                                                                        Government and non-bank
     dan lembaga keuangan                                                                                            Government financial
     Pemerintah non-bank                        25                    375,000              750,000                           institution loans
   Utang sewa                                   26                  1,580,290            2,267,698                              Lease liabilities
   Utang bank                                   27                 24,805,962           20,947,017                                   Bank loans
   Utang obligasi dan sukuk ijarah              28                  1,793,785            5,578,511             Bonds payable and sukuk ijara
   Utang listrik swasta                         29                    568,375              554,608               Electricity purchase payable
   Liabilitas imbalan kerja                     49                  7,379,855            7,882,380               Employee benefits liabilities
   Utang lain-lain                              31                 13,722,505           12,305,320                              Other payables
 Jumlah Liabilitas Jangka Pendek                                  158,210,969          143,195,433                      Total Current Liabilities

 JUMLAH LIABILITAS                                                666,712,936          655,008,305                           TOTAL LIABILITIES

 JUMLAH EKUITAS DAN LIABILITAS                                1,699,058,365          1,670,639,704          TOTAL EQUITY AND LIABILITIES




   Catatan atas laporan keuangan konsolidasian merupakan bagian            The accompanying notes to the consolidated financial statements
     yang tidak terpisahkan dari laporan keuangan konsolidasian             form an integral part of these consolidated financial statements
Page 6
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 2/1 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                        CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN                                                     AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE YANG BERAKHIR                                                                           FOR THE PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                      SEPTEMBER 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)



                                                          30 September/             30 September/
                                          Catatan/        September 30,             September 30,
                                            Notes                 2024                    2023
 PENDAPATAN USAHA                                                                                                                      REVENUES
 Penjualan tenaga listrik                     36              261,583,340               244,666,209                              Sale of electricity
 Penyambungan pelanggan                       23                1,261,586                   920,622                      Customer connection fees
 Subsidi listrik Pemerintah                   37               58,046,623                49,110,836                 Government's electricity subsidy
 Pendapatan kompensasi                        16               72,624,246                56,342,345                         Compensation income
 Lain-lain                                    38                9,046,881                 7,036,451                                           Others
 Jumlah Pendapatan Usaha                                      402,562,677               358,076,463                                    Total Revenues
 BEBAN USAHA                                                                                                         OPERATING EXPENSES
 Bahan bakar dan pelumas                      39              133,331,153               116,138,222                         Fuel and lubricants
 Pembelian tenaga listrik                     40              131,008,576               112,039,381                       Purchased electricity
 Sewa                                         41                1,814,017                 1,462,493                                      Lease
 Pemeliharaan                                 42               21,341,516                19,337,957                               Maintenance
 Kepegawaian                                  43               26,305,105                22,893,206                                  Personnel
 Penyusutan aset tetap                         6               34,231,929                32,205,835 Property, plant and equipment depreciation
 Penyusutan aset hak-guna                      7                2,516,231                 2,030,105            Right-of-use assets depreciation
 Lain-lain                                    44                7,811,195                 6,353,011                                     Others

 Jumlah Beban Usaha                                           358,359,722               312,460,210                        Total Operating Expenses

 LABA USAHA                                                       44,202,954              45,616,253                           OPERATING PROFIT

 Penghasilan (beban) lain-lain - bersih       46                  964,900                    385,722                   Other income (expense) - net
 Keuntungan (kerugian)                                                  -                                                      Gain (loss) on foreign
  kurs mata uang asing - bersih                                 3,965,299                  2,187,967                               exchange - net
 Penghasilan keuangan                                             864,247                    735,766                               Financial income
 Beban keuangan                               45              (18,287,928)
                                                                        -                (15,578,025)                                  Financial cost

 LABA SEBELUM PAJAK                                               31,709,473              33,347,683                         PROFIT BEFORE TAX

 BEBAN PAJAK                                  47                  (6,573,364)             (7,337,888)                                TAX EXPENSES

 LABA TAHUN BERJALAN                                              25,136,109              26,009,795                       PROFIT FOR THE YEAR




   Catatan atas laporan keuangan konsolidasian merupakan bagian                The accompanying notes to the consolidated financial statements
     yang tidak terpisahkan dari laporan keuangan konsolidasian                 form an integral part of these consolidated financial statements
Page 7
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 2/2 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                        CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN                                                     AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE YANG BERAKHIR                                                                           FOR THE PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                      SEPTEMBER 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)


                                                              30 September/       30 September/
                                                Catatan/      September 30,       September 30,
                                                 Notes             2024               2023

 Penghasilan komprehensif lain                                                                                      Other comprehensive income
  tahun berjalan                                                                                                                       for the year
 Pos-pos yang akan direklasifikasi                                                                                   Items that may be reclassified
  ke laba rugi:                                                                                                     subsequently to profit or loss:
  Bagian penghasilan komprehensif lain dari                                                                Share of other comprehensive income
    entitas asosiasi dan ventura bersama            9                (354,660)            324,414            from associates and joint venture
  Lindung nilai arus kas                                            1,197,115                   -                               Cash flow hedging
 Pos-pos yang tidak akan direklasifikasi                                                                          Items that will not be reclassified
  ke laba rugi:                                                                                                                    to profit or loss:
  Perubahan surplus revaluasi                                                                           Changes in property, plant and equipment
    aset tetap                                      6                         -           (374,513)                          revaluation surplus
  Pengukuran kembali                                                                                                              Remeasurement
    atas program imbalan pasti                     49              (7,916,063)            (122,532)                     on defined benefit plans
 Manfaat (Beban) pajak terkait                     47               1,741,534              109,350                      Related income tax benefits
 Penghasilan komprehensif lain                                                                                       Other comprehensive income
  tahun berjalan setelah pajak                                     (5,332,074)             (63,281)                         for the year after tax
 JUMLAH PENGHASILAN KOMPREHENSIF                                                                               TOTAL COMPREHENSIVE INCOME
   TAHUN BERJALAN                                                  19,804,035          25,946,514                          FOR THE YEAR

 Laba (rugi) tahun berjalan                                                                                                Income (loss) for the year
   diatribusikan kepada:                                                                                                            attributable to:
   kepada Pemilik entitas induk                                    25,131,369          25,988,262                             Owners of the parent
   Kepentingan non-pengendali                                           4,740-             21,533                          Non-controlling interest

  Jumlah                                                           25,136,109-         26,009,795                                               Total

 Jumlah penghasilan komprehensif tahun                                                                                  Total comprehensive income
   berjalan diatribusikan kepada:                                                                                       for the year attributable to:
   Pemilik entitas induk                                           19,799,295          25,924,981                             Owners of the parent
   Kepentingan non-pengendali                                           4,740              21,533                           Non-controlling interest
  Jumlah                                                           19,804,035          25,946,514                                               Total

 LABA PER SAHAM DASAR
  (Dalam Rupiah penuh)                             48                 171,007             178,569                   BASIC EARNINGS PER SHARE




    Catatan atas laporan keuangan konsolidasian merupakan bagian            The accompanying notes to the consolidated financial statements
      yang tidak terpisahkan dari laporan keuangan konsolidasian             form an integral part of these consolidated financial statements
Page 8
                                                                                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                                                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                                                                                    Lampiran 3/1 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN                                                                                                                                                                                                CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE YANG BERAKHIR                                                                                                                                                                                                                                           FOR THE PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                                                                                                                                                                                      SEPTEMBER 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                                                                                                                                 (Expressed in millions of Rupiah, unless otherwise stated)


                                                                                                                                                                                                                                                                                                                                                             `

                                                                                                                                 Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                                                 Penghasilan komprehensif lain/
                                                                                                                                                                                 Other comprehensive income
                                                                                                                                                                                                 Bagian
                                                            Penyertaan                                                                                                                        penghasilan
                                                           modal Negara                                                                                                                     komprehensif
                                                           dalam proses                                                                         Surplus                                         lain dari                             Selisih transaksi            Ekuitas
                                           Modal             penerbitan                                                                        revaluasi                                   entitas asosiasi                            dengan pihak             yang dapat
                                       ditempatkan             saham/                                                                             aset                Pengukuran              dan ventura                             non-pengendali/          diatribusikan
                                       dan disetor              Stock         Tambahan                                                           tetap/                 kembali                bersama/                                Difference in          kepada pemilik
                                          penuh/           subscription         modal                        Saldo laba/                       Property,             atas program           Share of other                              value from             entitas induk/
                                       Subscribed               from           disetor/                  Retained earnings                     plant and            imbalan pasti/         comprehensive          Lindung nilai        transactions                Equity            Kepentingan
                                       and paid-up         Government         Additional          Ditentukan        Tidak ditentukan          equipment            Remeasurement             income from            arus kas/                with               attributable        non-pengendali/
                                          capital           in issuance        paid-in          penggunaannya/      penggunaannya/            revaluation             on defined           associates and          Cash flow          non-controlling           to owner of         Non-controlling   Jumlah ekuitas/
                                           stock              process          capital           Appropriated       Unappropriated              surplus              benefit plans          joint ventures           hegdes               interests              the parent            interests       Total equity


Saldo per 1 Januari 2023                 145,536,096          5,000,000            34,608            64,657,026             99,438,371            688,538,705              (16,929,028)           4,085,359                                      (2,100)          990,359,037             1,091,529       991,450,566          Balance as of January 1, 2023

                                                                                                                                                                                                                                                                                                                                Reclassification from additional
Cadangan umum tahun berjalan                                          -                              12,146,040             (12,146,040)                                                                                                                                        -                                       -                      paid-in capital
Dividen                                                                                                                      (2,188,000)                                                                                                                            (2,188,000)                             (2,188,000)                              Dividends
Jumlah penghasilan komprehensif                                                                                                                                                                                                                                                                                      -            Total comprehensive income
  tahun berjalan                                       -                  -                 -                     -         25,988,262               (292,120)                 (95,575)             324,414                       -                       -        25,924,981                21,533         25,946,514                          for the year

Saldo per 30 September 2023              145,536,096          5,000,000            34,608            76,803,066            111,092,593            688,246,585              (17,024,603)           4,409,773                       -              (2,100)        1,014,096,018             1,113,062     1,015,209,080       Balance as of September 30, 2023




Saldo per 1 Januari 2024                 150,536,096                  -            34,608            76,803,066            107,538,313            688,394,826              (12,464,458)           3,790,009             (136,353)                (2,100)        1,014,494,007             1,137,392      1,015,631,399         Balance as of January 1, 2024



Cadangan umum tahun berjalan                                          -                                        -                      -                                                                                                                                         -                                       -         Appropriation during the year
Penambahan modal                                                                                                                                                                                                                                                                                                                          Addition from shares
  dari penerbitan saham                              -                -                                                                                                                                                                                                         -                                       -                           issuance
Dividen                                                                                                                      (3,090,004)                                                                                                                            (3,090,004)                             (3,090,004)                              Dividends
Jumlah penghasilan komprehensif                                                                                                                                                                                                                                                                                         -         Total comprehensive income
  tahun berjalan                                       -                  -                 -                     -         25,131,369                       -              (6,174,529)             (354,660)          1,197,115                          -        19,799,295                 4,740         19,804,034                            for the year

Saldo per 30 September 2024              150,536,096                  -            34,608            76,803,066            129,579,678            688,394,826              (18,638,987)           3,435,349            1,060,762                 (2,100)        1,031,203,298             1,142,132     1,032,345,429       Balance as of September 30, 2024




                                  Catatan atas laporan keuangan konsolidasian merupakan bagian                                                                                                                  The accompanying notes to the consolidated financial statements
                                    yang tidak terpisahkan dari laporan keuangan konsolidasian                                                                                                                   form an integral part of these consolidated financial statements
Page 9
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 4/1 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN                                                               CONSOLIDATED STATEMENTS OF
UNTUK PERIODE YANG BERAKHIR                                                          CASH FLOWS FOR THE PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                        SEPTEMBER 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)


                                                    30 September/        30 September/
                                                    September 30,        September 30,
                                                         2024                2023
ARUS KAS DARI                                                                                                           CASH FLOWS FROM
 AKTIVITAS OPERASI                                                                                                OPERATING ACTIVITIES
Penerimaan kas dari pelanggan                            276,967,686         257,555,168                         Cash receipts from customers
Pembayaran kas kepada pemasok                          (292,381,101)       (252,182,251)                                Cash paid to suppliers
Pembayaran kas kepada karyawan                          (23,842,608)        (23,513,569)                              Cash paid to employees
Penerimaan subsidi listrik                                50,829,383          42,736,313                         Government subsidy received
Penerimaan kompensasi                                     41,305,752          34,482,296                               Compensation received
Penerimaan bunga                                              864,247             735,766                                     Interest received
Pembayaran bunga                                        (17,972,915)        (13,788,460)                                 Interest expense paid
Penerimaan restitusi pajak lainnya                            284,518           2,017,093                         Cash receipts for other taxes
Pembayaran pajak penghasilan                              (3,303,180)         (1,615,010)                                      Income tax paid
Kas bersih diperoleh dari                                                                                                Net cash provided by
 aktivitas operasi                                        32,751,783         46,427,346                                  operating activities

ARUS KAS DARI                                                                                                           CASH FLOWS FROM
 AKTIVITAS INVESTASI                                                                                                INVESTING ACTIVITIES
Hasil penjualan aset                                                                                              Proceeds from sale of assets
 tidak digunakan dalam operasi                                 45,372            220,934                              not used in operations
Perolehan aset tetap                                     (38,601,951)       (35,387,794)             Addition of property, plant and equipment
Perolehan dividen dari                                                                                                Dividends received from
 entitas asosiasi dan ventura bersama                        735,872            570,190                        associates and joint ventures
Perolehan investasi pada                                                                                          Acquisition of investments in
 entitas asosiasi dan ventura bersama                       (236,878)                    -                    associates and joint ventures
Penerimaan (pembayaran) kembali dari                                                                     Proceeds (repayment) of receivables
 piutang kepada pihak berelasi                                       -          196,396                                  from related parties
Penarikan rekening bank dan                                                                                          Withdrawal of restricted
 deposito berjangka dibatasi penggunaannya                  (392,580)                    -                 cash in banks and time deposits
Penempatan rekening bank dan                                                                                          Placement of restricted
 deposito berjangka dibatasi penggunaannya                          -        (1,422,254)                   cash in banks and time deposits
Penempatan investasi jangka pendek                          (659,182)          (823,777)                Placement of short-term investments
Kas bersih digunakan untuk aktivitas investasi           (39,109,348)       (36,646,306)               Net cash used in investing activities




      Catatan atas laporan keuangan konsolidasian merupakan bagian         The accompanying notes to the consolidated financial statements
        yang tidak terpisahkan dari laporan keuangan konsolidasian          form an integral part of these consolidated financial statements
Page 10
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 4/2 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN                                                                CONSOLIDATED STATEMENTS OF
UNTUK PERIODE YANG BERAKHIR                                                           CASH FLOWS FOR THE PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                         SEPTEMBER 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)


                                                      30 September/        30 September/
                                                      September 30,        September 30,
                                                           2024                2023

ARUS KAS DARI                                                                                                            CASH FLOWS FROM
 AKTIVITAS PENDANAAN                                                                                                FINANCING ACTIVITIES
Pembayaran dividen                                          (3,090,004)        (2,188,000)                                Payment of dividends
Penerimaan penerusan pinjaman                                    14,378            140,568                          Proceeds of two-step loans
Pembayaran penerusan pinjaman                               (2,912,273)        (2,818,849)                         Payments of two-step loans
Pembayaran utang kepada Pemerintah dan                                                                  Payments of Government and non-bank
 lembaga keuangan Pemerintah non-bank                        (750,000)           (750,000)              Government financial institution loans
Penerimaan utang bank - jangka pendek                       19,902,411          10,500,000                 Proceeds of bank loans - short-term
Penerimaan utang bank - jangka panjang                       4,726,815           2,187,872                  Proceeds of bank loans- long-term
Pembayaran utang bank - jangka pendek                     (15,000,000)                   -                  Payment of bank loans- short-term
Pembayaran utang bank - jangka panjang                    (18,428,395)        (27,068,428)                   Payment of bank loans- long-term
Pembayaran utang obligasi dan sukuk ijarah                 (5,352,934)         (1,780,200)            Payment of bonds payable and sukuk ijara
Pembayaran utang sewa                                        (189,875)         (1,351,919)                         Payments of lease liabilities
Pembayaran utang listrik swasta                              (427,253)           (381,289)             Payments of electricity purchase payable

Kas bersih (digunakan)/diperoleh dari                                                                           Net cash (used in)/provided by
 aktivitas pendanaan                                      (21,507,131)        (23,510,246)                                financing activities
KENAIKAN (PENURUNAN) BERSIH KAS                                                                         NET INCREASE (DECREASE) IN CASH
 DAN SETARA KAS                                           (27,864,695)        (13,729,206)                      AND CASH EQUIVALENTS
Pengaruh perubahan kurs mata uang asing                         15,808           (219,832)                  Effect of changes in foreign currency
Cadangan kerugian kredit ekspektasian atas                                                                  Allowance for expected credit loss of
 kas dan setara kas                                                  (7)               (15)                          cash and cash equivalents
                                                                                                             CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AWAL PERIODE                             55,920,541         51,503,096                   AT BEGINNING OF THE PERIOD
                                                                                                              CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AKHIR PERIODE                            28,071,646         37,554,043                         AT END OF THE PERIOD




      Catatan atas laporan keuangan konsolidasian merupakan bagian          The accompanying notes to the consolidated financial statements
        yang tidak terpisahkan dari laporan keuangan konsolidasian           form an integral part of these consolidated financial statements
Page 11
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/1 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM                                           1.    GENERAL INFORMATION

     a.   Pendirian dan informasi lainnya                           a.   Establishment and other information

          Perusahaan Perseroan (Persero) PT Perusahaan                   Perusahaan        Perseroan      (Persero)     PT
          Listrik Negara (“PLN” atau “Perusahaan”)                       Perusahaan Listrik Negara (“PLN” or the
          didirikan pada tahun 1961 dalam bentuk jawatan                 “Company”) was established in 1961 as a unit of
          di dalam lingkungan Kementerian Pekerjaan                      the Indonesian Ministry of Energy and Public
          Umum dan Tenaga. Perusahaan merupakan                          Works. The Company is a business continuation
          kelanjutan usaha beberapa perusahaan listrik                   of several Dutch electricity companies which
          Belanda yang diambil alih oleh Pemerintah                      have been taken over by the Government of the
          Republik Indonesia tersebut meliputi: NV ANIEM,                Republic of Indonesia including, among others,
          NV SEM, NV OJEM, NV EMS, NV EMBALOM,                           the following: NV ANIEM, NV SEM, NV OJEM,
          NV GEBEO, NV OGEM dan NV WEMI.                                 NV EMS, NV EMBALOM, NV GEBEO, NV
          Berdasarkan Peraturan Pemerintah No. 19 tahun                  OGEM and NV WEMI. Based on Government
          1965, status Perusahaan berubah menjadi                        Regulation No. 19 year 1965, the status of the
          perusahaan yang berbadan hukum. Selanjutnya                    Company was changed to that of a legal entity.
          ditetapkan menjadi Perusahaan Umum (Perum)                     Subsequently, based on Government Regulation
          berdasarkan Peraturan Pemerintah No. 30 tahun                  No. 30 year 1970, as amended by Government
          1970 yang dipertegas dengan Peraturan                          Regulation No. 18 year 1972, the Company
          Pemerintah No. 18 tahun 1972. Kemudian                         became a Perusahaan Umum (Perum). Based
          berdasarkan Akta No. 169 tanggal 30 Juli 1994                  on Notarial Deed No. 169 of Sutjipto, S.H.,
          dari Sutjipto, S.H., Notaris di Jakarta, status                Notary in Jakarta, dated July 30, 1994, the
          badan hukum Perusahaan berubah menjadi                         Company’s status was changed to a Limited
          Perseroan Terbatas dengan nama Perusahaan                      Liability Company and it was named Perusahaan
          Perseroan PT Perusahaan Listrik Negara                         Perseroan PT Perusahaan Listrik Negara or PT
          disingkat PT PLN (Persero). Akta perubahan ini                 PLN (Persero). This change was approved by the
          disahkan dengan Keputusan Menteri Kehakiman                    Minister of Justice in his decision letter No. C2-
          No. C2-11.519.HT.01.01.Th.94 tanggal 1 Agustus                 11.519.HT.01.01.Th.94 dated August 1, 1994
          1994, serta diumumkan dalam Berita Negara                      and was published in State Gazette of the
          Republik Indonesia No.73 tanggal 13 September                  Republic of Indonesia No. 73 dated September
          1994, Tambahan No. 6731.                                       13, 1994, Supplement No. 6731.

          Anggaran Dasar Perusahaan telah diubah                         The Articles of Association of the Company have
          beberapa kali dengan perubahan terakhir                        been amended several times, with the most
          berdasarkan Akta Notaris No. 17, tanggal 14                    recent change by Notarial Deed No. 17, dated
          Agustus 2024 dari Muhammad Hanafi, S.H.,                       August 14, 2024 of Muhammad Hanafi, S.H.,
          Notaris di Jakarta mengenai perubahan direksi                  Notary in Jakarta regarding the board of director
          dan komisaris. Perubahan ini telah disetujui oleh              and board of commissioners of the Company.
          Menteri Hukum dan Hak Asasi Manusia Republik                   This amendment has been approved by the
          Indonesia berdasarkan Surat Keputusan Menteri                  Minister of Law and Human Rights based on
          No.    AHU-AH.01.09.-0246826        tanggal     2              Ministerial Decree No. AHU-AH.01.09.-0246826,
          September 2024.                                                dated September 2, 2024.

          Perusahaan berdomisili di Jakarta dan memiliki                 The Company is domiciled in Jakarta, with 48
          48 unit pelaksana yang tersebar di wilayah                     business unit offices across Indonesia and 11
          Indonesia dan 11 entitas anak. Kantor Pusat                    subsidiaries. The Company’s Head Office is
          Perusahaan beralamat di Jl. Trunojoyo Blok M I                 located at Jl. Trunojoyo Blok M I No. 135,
          No. 135, Jakarta.                                              Jakarta.
Page 12
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                    Lampiran 5/2 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                           1.   GENERAL INFORMATION (continued)

     a.   Pendirian dan informasi lainnya (lanjutan)                                          a.     Establishment              and         other          information
                                                                                                     (continued)

          Sesuai dengan Pasal 3 Anggaran Dasar                                                       In accordance with Article 3 of the Company’s
          Perusahaan, Maksud dan Tujuan Perusahaan                                                   Articles of Association, the Purpose and
          adalah     untuk    menyelenggarakan usaha                                                 Objective of the Company is to engage in
          penyediaan tenaga listrik bagi kepentingan                                                 electricity business for public use of sufficient
          umum dalam jumlah dan mutu yang memadai                                                    quantity and quality and also to earn profit and
          serta memupuk keuntungan dan melaksanakan                                                  perform the Government’s assignment in
          penugasan         Pemerintah     di  bidang                                                electricity business in order to support the
          ketenagalistrikan dalam rangka mendukung                                                   development of the country with the application of
          pembangunan negara dengan menerapkan                                                       the principles of a Limited Liability Company.
          prinsip-prinsip Perseroan Terbatas.

          Sesuai dengan Undang-Undang No. 19 tahun                                                   Based on Law No. 19 year 2003, regarding State-
          2003 tentang Badan Usaha Milik Negara                                                      Owned Enterprises (“SOEs”), the Government is
          (“BUMN”), Pemerintah wajib memberikan                                                      obliged to provide compensation to SOEs, that
          kompensasi atas semua biaya yang telah                                                     were appointed to perform special assignments,
          dikeluarkan oleh BUMN termasuk margin                                                      for all expenses which they have incurred,
          tertentu yang diharapkan kepada BUMN yang                                                  including a certain expected return (margin). The
          diberikan penugasan khusus. Perusahaan                                                     Company is an SOE, that performs the special
          merupakan BUMN yang sedang melaksanakan                                                    assignment of providing subsidised electricity to
          penugasan khusus berupa penyediaan tenaga                                                  the public (Note 37).
          listrik bersubsidi kepada masyarakat (Catatan
          37).

          Pada tanggal 30 September 2024, Grup memiliki                                              As at September 30, 2024 the Group had 50,915
          50.915 karyawan tetap (Desember 2023: 51.245                                               permanent employees (December 2023: 51,245
          karyawan tetap) (tidak diaudit). Jumlah karyawan                                           permanent employees) (unaudited). The total
          tidak termasuk karyawan dari PT Haleyora                                                   number of employees does not include
          Powerindo yang bergerak dibidang jasa tenaga                                               employees of     PT Haleyora Powerindo whose
          kerja. PT Haleyora Powerindo adalah entitas                                                nature of business is manpower services. PT
          anak dari PT Haleyora Power, entitas anak                                                  Haleyora Powerindo is a subsidiary of PT
          Perusahaan.                                                                                Haleyora Power, the Company’s subsidiary.

     b.   Penawaran umum efek utang Perusahaan                                                b.     The Company’s public offering of bonds

          Perusahaan telah beberapa kali menerbitkan                                                 The Company has issued several PLN Bonds
          Obligasi dan Surat Utang PLN, sebagai berikut:                                             and Notes, as follows:
                                                                                                                      Jumlah yang
                                                                                                    Tanggal            ditawarkan/
                                               Tanggal efektif/      Bursa pencatatan/             pencatatan/       Offered amount
                                                Effective date          Listed on *)               Listed date             Rp

          Obligasi Rupiah                                                                                                                                        Rupiah Bonds

          Obligasi Berkelanjutan IV PLN                                                                                                      Shelf Registration Bonds IV PLN
          Tahap I Tahun 2020                   31 Agustus 2020/     Bursa Efek Indonesia/     8 September 2020/            1,500,000                       Phase I Year 2020
                                               August 31, 2020    Indonesia Stock Exchange    September 8, 2020
          Sukuk Ijarah Berkelanjutan IV PLN                                                                                                Shelf Registration Sukuk Ijara IV PLN
          Tahap I Tahun 2020                   31 Agustus 2020/      Bursa Efek Indonesia/     8 September 2020/             376,500                          Phase I Year 2020
                                               August 31, 2020    Indonesia Stock Exchange     September 8, 2020
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap VII Tahun 2020                  29 Juni 2018/        Bursa Efek Indonesia/         6 Mei 2020/              1,737,135                      Phase VII Year 2020
                                                June 29, 2018     Indonesia Stock Exchange         May 6, 2020
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap VI Tahun 2020                   29 Juni 2018/        Bursa Efek Indonesia/     18 Februari 2020/            4,812,430                       Phase VI Year 2020
                                                June 29, 2018     Indonesia Stock Exchange     February 18, 2020
          Sukuk Ijarah Berkelanjutan III PLN                                                                                               Shelf Registration Sukuk Ijara III PLN
          Tahap VI Tahun 2020                   29 Juni 2018/        Bursa Efek Indonesia/     18 Februari 2020/             115,500                        Phase VI Year 2020
                                                June 29, 2018     Indonesia Stock Exchange     February 18, 2020
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap V Tahun 2019                    29 Juni 2018/        Bursa Efek Indonesia/      1 Oktober, 2019             1,912,900                        Phase V Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      October 1, 2019
          Sukuk Ijarah Berkelanjutan III PLN                                                                                               Shelf Registration Sukuk Ijara III PLN
          Tahap V Tahun 2019                    29 Juni 2018/        Bursa Efek Indonesia/      1 Oktober, 2019               797,500                        Phase V Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      October 1, 2019
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap IV Tahun 2019                   29 Juni 2018/        Bursa Efek Indonesia/      1 Agustus 2019/             2,953,620                       Phase IV Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      August 1, 2019
          Sukuk Ijarah Berkelanjutan III PLN                                                                                               Shelf Registration Sukuk Ijara III PLN
          Tahap IV Tahun 2019                   29 Juni 2018/        Bursa Efek Indonesia/      1 Agustus 2019/             1,250,000                       Phase IV Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      August 1, 2019
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap III Tahun 2019                  29 Juni 2018/        Bursa Efek Indonesia/     19 Februari 2019/            2,393,000                       Phase III Year 2019
                                                June 29, 2018     Indonesia Stock Exchange     February 19, 2019

          *)    Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia diakuisisi oleh                    *)   On July 22, 1995 the Indonesia Parallel Exchange was acquired by the
                Bursa Efek Surabaya. Pada tanggal 30 November 2007, Bursa Efek                            Surabaya Stock Exchange. On November 30, 2007, the Surabaya Stock
                Surabaya dan Bursa Efek Jakarta digabungkan dan berubah nama                              Exchange and Jakarta Stock Exchange merged and changed their
                menjadi Bursa Efek Indonesia.                                                             name to the Indonesia Stock Exchange.
Page 13
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/3 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                         (Expressed in millions of Rupiah, unless otherwise stated)



1.   INFORMASI UMUM (lanjutan)                                                              1.    GENERAL INFORMATION (continued)

     b.     Penawaran umum efek utang Perusahaan                                                  b.      The Company’s public offering of bonds
            (lanjutan)                                                                                    (continued)

            Perusahaan telah beberapa kali menerbitkan                                                   The Company has issued several PLN Bonds and
            Obligasi dan Surat Utang PLN, sebagai berikut:                                               Notes, as follows: (continued)
            (lanjutan)
                                                                                                                           Jumlah yang
                                                                                                        Tanggal             ditawarkan/
                                                Tanggal efektif/        Bursa pencatatan/              pencatatan/        Offered amount
                                                 Effective date            Listed on *)                Listed date              Rp

          Sukuk Ijarah Berkelanjutan III PLN                                                                                                    Shelf Registration Sukuk Ijara III PLN
          Tahap III Tahun 2019                   29 Juni 2018/         Bursa Efek Indonesia/       19 Februari 2019/              863,000                         Phase III Year 2019
                                                 June 29, 2018      Indonesia Stock Exchange       February 19, 2019
          Obligasi Berkelanjutan III PLN                                                                                                            Shelf Registration Bonds III PLN
          Tahap II Tahun 2018                    29 Juni 2018/         Bursa Efek Indonesia/        10 Oktober 2018/              832,000                        Phase II Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange        October 10, 2018
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                    Shelf Registration Sukuk Ijara III PLN
          Tahap II Tahun 2018                    29 Juni 2018/         Bursa Efek Indonesia/        10 Oktober 2018/              224,000                         Phase II Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange        October 10, 2018
          Obligasi Berkelanjutan III PLN                                                                                                            Shelf Registration Bonds III PLN
          Tahap I Tahun 2018                     29 Juni 2018/         Bursa Efek Indonesia/           10 Juli 2018/             1,278,500                        Phase I Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange           July 10, 2018
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                    Shelf Registration Sukuk Ijara III PLN
          Tahap I Tahun 2018                     29 Juni 2018/         Bursa Efek Indonesia/           10 Juli 2018/              750,000                          Phase I Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange           July 10, 2018
          Obligasi Berkelanjutan II PLN                                                                                                              Shelf Registration Bonds II PLN
          Tahap III Tahun 2018                   21 Juni 2017/         Bursa Efek Indonesia/       23 Februari 2018/             2,535,000                      Phase III Year 2018
                                                 June 21, 2017      Indonesia Stock Exchange       February 23, 2018
          Sukuk Ijara Berkelanjutan II PLN                                                                                                      Shelf Registration Sukuk Ijara II PLN
          Tahap III Tahun 2018                   21 Juni 2017/         Bursa Efek Indonesia/       23 Februari 2018/              698,500                        Phase III Year 2018
                                                 June 21, 2017      Indonesia Stock Exchange       February 23, 2018
          Obligasi Berkelanjutan II PLN                                                                                                              Shelf Registration Bonds II PLN
          Tahap II Tahun 2017                    21 Juni 2017/         Bursa Efek Indonesia/       2 November 2017/              2,545,500                       Phase II Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange       November 2, 2017
          Sukuk Ijarah Berkelanjutan II PLN                                                                                                     Shelf Registration Sukuk Ijara II PLN
          Tahap II Tahun 2017                    21 Juni 2017/         Bursa Efek Indonesia/       2 November 2017/               694,500                         Phase II Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange       November 2, 2017
          Obligasi Berkelanjutan II PLN                                                                                                              Shelf Registration Bonds II PLN
          Tahap I Tahun 2017                     21 Juni 2017/         Bursa Efek Indonesia/           12 Juli 2017/             1,600,000                        Phase I Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange           July 12, 2017
          Sukuk Ijarah Berkelanjutan II PLN                                                                                                     Shelf Registration Sukuk Ijara II PLN
          Tahap I Tahun 2017                     21 Juni 2017/         Bursa Efek Indonesia/           12 Juli 2017/              400,000                         Phase I Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange           July 12, 2017
          Obligasi Berkelanjutan I PLN                                                                                                                Shelf Registration Bonds I PLN
          Tahap II Tahun 2013                    27 Juni 2013/         Bursa Efek Indonesia/       11 Desember 2013/             1,244,000                       Phase II Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange       December 11, 2013
          Sukuk Ijarah Berkelanjutan I PLN                                                                                                       Shelf Registration Sukuk Ijara I PLN
          Tahap II Tahun 2013                    27 Juni 2013/         Bursa Efek Indonesia/       11 Desember 2013/              429,000                         Phase II Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange       December 11, 2013
          Obligasi Berkelanjutan I PLN                                                                                                                Shelf Registration Bonds I PLN
          Tahap I Tahun 2013                     27 Juni 2013/         Bursa Efek Indonesia/           8 Juli 2013/               879,000                         Phase I Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange           July 8, 2013
          Sukuk Ijarah Berkelanjutan I PLN                                                                                                       Shelf Registration Sukuk Ijara I PLN
          Tahap I Tahun 2013                      27 Juni 2013/        Bursa Efek Indonesia/           8 Juli 2013/               121,000                          Phase I Year 2013
                                                  June 27, 2013     Indonesia Stock Exchange           July 8, 2013
          Obligasi PLN XII Tahun 2010             30 Juni 2010/        Bursa Efek Indonesia/           9 Juli 2010/              2,500,000                 PLN XII Bonds Year 2010
                                                  June 30, 2010     Indonesia Stock Exchange           July 9, 2010
          Sukuk Ijarah PLN V Tahun 2010           30 Juni 2010/        Bursa Efek Indonesia/           9 Juli 2010/               500,000              Sukuk Ijara V PLN Year 2010
                                                  June 30, 2010     Indonesia Stock Exchange           July 9, 2010
          Obligasi PLN XI Tahun 2010           31 Desember 2009/       Bursa Efek Indonesia/        13 Januari 2010/             2,703,000                 PLN XI Bonds Year 2010
                                               December 31, 2009    Indonesia Stock Exchange        January 13, 2010
          Sukuk Ijarah PLN IV Tahun 2010       31 Desember 2009/       Bursa Efek Indonesia/        13 Januari 2010/              297,000              Sukuk Ijara IV PLN Year 2010
                                               December 31, 2009    Indonesia Stock Exchange        January 13, 2010
          Obligasi PLN X Tahun 2009            31 Desember 2008/       Bursa Efek Indonesia/        12 Januari 2009/             1,440,000                  PLN X Bonds Year 2009
                                               December 31, 2008    Indonesia Stock Exchange        January 12, 2009
          Sukuk Ijarah PLN III Tahun 2009      31 Desember 2008/       Bursa Efek Indonesia/        12 Januari 2009/              760,000              Sukuk Ijara III PLN Year 2009
                                               December 31, 2008    Indonesia Stock Exchange        January 12, 2009
          Obligasi PLN IX Tahun 2007              29 Juni 2007/        Bursa Efek Surabaya/           11 Juli 2007/              2,700,000                 PLN IX Bonds Year 2007
                                                  June 29, 2007      Surabaya Stock Exchange          July 11, 2007
          Sukuk Ijarah PLN II Tahun 2007          29 Juni 2007/        Bursa Efek Surabaya/           11 Juli 2007/               300,000               Sukuk Ijara II PLN Year 2007
                                                  June 29, 2007      Surabaya Stock Exchange          July 11, 2007
          Obligasi PLN VIII Tahun 2006            12 Juni 2006/        Bursa Efek Surabaya/           22 Juni 2016/              2,200,100                PLN VIII Bonds Year 2006
                                                  June 12, 2006      Surabaya Stock Exchange         June 22, 2016
          Sukuk Ijarah PLN I Tahun 2006           12 Juni 2006/        Bursa Efek Surabaya/           22 Juni 2016/               200,000               Sukuk Ijara I PLN Year 2006
                                                  June 12, 2006      Surabaya Stock Exchange         June 22, 2016
          Obligasi PLN VII Tahun 2004           3 November 2004/       Bursa Efek Surabaya/        12 November 2004/             1,500,000                 PLN VII Bonds Year 2004
                                                November 3, 2004     Surabaya Stock Exchange       November 12, 2004
          Obligasi PLN VI Tahun 1997              27 Juni 1997/        Bursa Efek Surabaya/         12 Agustus 1997/              600,000                  PLN VI Bonds Year 1997
                                                  June 27, 1997      Surabaya Stock Exchange        August 12, 1997
          Obligasi PLN V Tahun 1996               28 Juni 1996/        Bursa Efek Surabaya/         28 Agustus 1996/             1,000,000                  PLN V Bonds Year 1996
                                                  June 28, 1996      Surabaya Stock Exchange        August 28, 1996
          Obligasi PLN IV Tahun 1995              30 Juni 1995/       Bursa Paralel Indonesia/     4 September 1995/              680,000                  PLN IV Bonds Year 1995
                                                  June 30, 1995     Indonesia Parallel exchange    September 4, 1995
          Obligasi PLN III Tahun 1995            30 Januari 1995/     Bursa Paralel Indonesia/        18 April 1995/              318,430                   PLN III Bonds Year 1995
                                                January 30, 1995    Indonesia Parallel exchange       April 18, 1995
          Obligasi PLN II Tahun 1993           28 September 1993/     Bursa Paralel Indonesia/     8 November 1993/               600,000                   PLN II Bonds Year 1993
                                               September 28, 1993   Indonesia Parallel exchange    November 8, 1993
          Obligasi PLN I Tahun 1992            25 September 1992/     Bursa Paralel Indonesia/     10 November 1992/              300,000                    PLN I Bonds Year 1992
                                               September 25, 1992   Indonesia Parallel exchange    November 10, 1992

          Jumlah                                                                                                                51,541,115                                      Total

            *)     Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia diakuisisi oleh                     *)    On July 22, 1995 the Indonesia Parallel Exchange was acquired by the
                   Bursa        Efek         Surabaya.        Pada          tanggal                            Surabaya Stock Exchange. On November 30, 2007, the Surabaya Stock
                   30 November 2007, Bursa Efek Surabaya dan Bursa Efek Jakarta                                Exchange and Jakarta Stock Exchange merged and changed their
                   digabungkan dan berubah nama menjadi Bursa Efek Indonesia.                                  name to the Indonesia Stock Exchange.
Page 14
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/4 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                      1.   GENERAL INFORMATION (continued)

     b.     Penawaran umum efek utang Perusahaan                                         b.     The Company’s public offering of bonds
            (lanjutan)                                                                          (continued)

            Perusahaan telah beberapa kali menerbitkan                                          The Company has issued several PLN Medium-
            Surat Utang Jangka Menengah PLN, sebagai                                            term Notes, as follows:
            berikut:
                                                                                                                  Jumlah yang
                                                                                               Tanggal             ditawarkan/
                                         Tanggal efektif/       Bursa pencatatan/             pencatatan/        Offered amount
                                          Effective date            Listed on                 Listed date             USD *)

          Surat Utang Jangka Menengah                                                                                                    Global Medium Term
          Global - USD                                                                                                                            Notes - USD
          Penerbitan tahun 2020            30 Juni 2020/       Bursa Efek Singapura/          1 Juli 2020/          1,500,000,000               Issued in 2020
                                          June 30, 2020      Singapore Stock Exchange         July 1, 2020
          Penerbitan tahun 2019         5 November 2019/       Bursa Efek Singapura/      7 November 2019/          1,000,000,000               Issued in 2019
                                        November 5, 2019     Singapore Stock Exchange     November 7, 2019
                                           17 Juli 2019/       Bursa Efek Singapura/         18 Juli 2019/          1,400,000,000
                                           July 17, 2019     Singapore Stock Exchange        July 18, 2019
          Penerbitan tahun 2018          25 Oktober 2018/      Bursa Efek Singapura/       26 Oktober 2018/         1,000,000,000               Issued in 2018
                                         October 25, 2018    Singapore Stock Exchange      October 26, 2018
                                           21 Mei 2018/        Bursa Efek Singapura/         16 Mei 2018/           2,000,000,000
                                           May 21, 2018      Singapore Stock Exchange        May 16, 2018
          Penerbitan tahun 2017            15 Mei 2017/        Bursa Efek Singapura/         16 Mei 2017/           2,000,000,000               Issued in 2017
                                           May 15, 2017      Singapore Stock Exchange        May 16, 2017
          Penerbitan tahun 2012          24 Oktober 2012/      Bursa Efek Singapura/       25 Oktober 2012/         1,000,000,000               Issued in 2012
                                         October 24, 2012    Singapore Stock Exchange      October 25, 2012
          Penerbitan tahun 2011         22 November 2011/      Bursa Efek Singapura/      23 November 2011/         1,000,000,000               Issued in 2011
                                        November 22, 2011    Singapore Stock Exchange     November 23, 2011
          Jumlah                                                                                                   10,900,000,000                       Total

          Surat Utang Jangka Menengah                                                                                                    Global Medium Term
          Global - EUR                                                                                                                            Notes - EUR
          Penerbitan tahun 2019         5 November 2019/       Bursa Efek Singapura/      7 November 2019/              500,000,000             Issued in 2019
                                        November 5, 2019     Singapore Stock Exchange     November 7, 2019
          Penerbitan tahun 2018         25 Oktober 2018/       Bursa Efek Singapura/      26 Oktober 2018/              500,000,000             Issued in 2018
                                        October 25, 2018     Singapore Stock Exchange     October 26, 2018
          Jumlah                                                                                                    1,000,000,000                       Total

          Surat Utang Jangka Menengah                                                                                                    Global Medium Term
          Global - JPY                                                                                                                            Notes - JPY
          Penerbitan tahun 2019         20 September 2019/        Tidak tercatat/                N/A               23,200,000,000               Issued in 2019
                                        September 20, 2019          Not listed
          Jumlah                                                                                                   23,200,000,000                       Total


            *)     Dalam jumlah penuh                                                           *)     In full amount

            Majapahit Holding B.V., Belanda, entitas anak                                       Majapahit Holding B.V., the Netherlands, a wholly-
            yang bertujuan khusus yang sepenuhnya milik                                         owned special-purpose subsidiary of the
            Perusahaan, menerbitkan Obligasi Terjamin,                                          Company, issued Guaranteed Notes, as follows:
            sebagai berikut:
                                                                                                                  Jumlah yang
                                                                                               Tanggal             ditawarkan/
                                         Tanggal efektif/       Bursa pencatatan/             pencatatan/        Offered amount
                                          Effective date            Listed on                 Listed date             USD *)

          Obligasi Terjamin - USD                                                                                                     Guaranteed Notes - USD
          Penerbitan 2009               6 November 2009/       Bursa Efek Singapura/      9 November 2009/          1,250,000,000              Issued in 2009
                                        November 6, 2009     Singapore Stock Exchange     November 9, 2009
          Penerbitan 2009                7 Agustus 2009/       Bursa Efek Singapura/      11 Agustus 2009/              750,000,000             Issued in 2009
                                          August 7, 2009     Singapore Stock Exchange      August 11, 2009
          Penerbitan 2007                  28 Juni 2007/       Bursa Efek Singapura/        29 Juni 2007/           1,000,000,000               Issued in 2007
                                          June 28, 2007      Singapore Stock Exchange       June 29, 2007
          Penerbitan 2006               16 Oktober 2006/       Bursa Efek Singapura/      17 Oktober 2006/          1,000,000,000               Issued in 2006
                                        October 16, 2006     Singapore Stock Exchange     October 17, 2006
          Jumlah                                                                                                    4,000,000,000                       Total

            *)     Dalam jumlah penuh                                                             *)    In full amount
Page 15
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/5 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                  1.     GENERAL INFORMATION (continued)
     c.    Susunan pengurus dan informasi lain                                         c.      Management and other information
           Pada tanggal 30 September 2024 dan 31 Desember                                      As at September 30, 2024 and December 31, 2023, the
           2023, susunan pengurus Perusahaan adalah sebagai                                    Company’s management consisted of the following:
           berikut:
                                                         30 September 2024 /            31 Desember 2023 /
                                                       September 30, 2024              December 31,2023
          Dewan Komisaris                                                                                                              Board of Commissioners
          Komisaris Utama                               Burhanuddin Abdullah             Agus Dermawan W                                President Commissioner
          Wakil Komisaris Utama                           Suahasil Nazara                  Martowardojo
          Komisaris                                       Dadan Kusdiana                  Suahasil Nazara                           Vice President Commissioner
                                                         Dudy Purwagandhi                 Dadan Kusdiana                                         Commissioners
                                                          Mohamad Ikhsan                Susiwijono Moegiarso
                                                             Nawal Nely                   Mohamad Ikhsan
                                                        Susiwijono Moegiarso             Dudy Purwagandhi
                                                                                            Tedi Bharata
                                                                                            Eko Sulistyo

          Komisaris Independen                             Arcandra Tahar                    Arcandra Tahar                          Independent Commissioners
                                                           Charles Sitorus                   Charles Sitorus
                                                              Andi Arief
                                                           Mutanto Juwono

          Direksi                                                                                                                             Board of Directors
          Direktur Utama                                 Darmawan Prasodjo              Darmawan Prasodjo                                       President Director
          Direktur Keuangan                                Sinthya Roesly                 Sinthya Roesly                                       Director of Finance
          Direktur Perencanaan Korporat                                                                                           Director of Corporate Planning
          dan Pengembangan Bisnis                         Hartanto Wibowo                   Hartanto Wibowo                           and Business Development
          Direktur Legal dan Manajemen Human Capital      Yusuf Didi Setiarto               Yusuf Didi Setiarto             Director of Legal and Human Capital
          Direktur Retail dan Niaga                        Edi Srimulyanti                                                                           Management
          Direktur Transmisi dan Perencanaan Sistem         Evy Haryadi                      Edi Srimulyanti                    Director of Retail and Commerce
          Direktur Manajemen Pembangkitan                   Adi Lumakso                       Evy Haryadi         Director of Transmission and System Planning
          Direktur Distribusi                               Adi Priyanto                      Adi Lumakso                    Director of Generation Management
          Direktur Manajemen Proyek                                                           Adi Priyanto                                 Director of Distribution
             dan Energi Baru Terbarukan                  Wiluyo Kusdwiharto                                                Director of Management Projects and
          Direktur Manajemen Risiko                       Suroso Isnandar                Wiluyo Kusdwiharto                              New Renewable Energy
                                                                                          Suroso Isnandar                           Director of Risk Management
          Komite Audit
          Ketua                                            Arcandra Tahar
          Anggota                                          Charles Sitorus                                                                     Audit Committee
                                                              Nawal Nely                   Arcandra Tahar                                             Chairman
                                                          Mohamad Ikhsan                  Mohamad Ikhsan                                              Members
                                                          Mutanto Juwono                   Charles Sitorus
                                                              Andi Arief               Tomi Parisianto Wibowo
                                                         Dwi Siska Susanti               Nizam Burhanuddin
                                                       Tomi Parisianto Wibowo             Dwi Siska Susanti
                                                       Oktofriawan Hagiardana
          Sekretaris Perusahaan
          Sekretaris Perusahaan                          Alois Wisnuhardana                                                                 Corporate Secretary
                                                                                        Alois Wisnuhardana                                   Corporate Secretary

           Lihat Catatan 58(i) untuk informasi terkait                                      Refer to Note 58(i) for the information regarding to
           perubahan pada Dewan Komisaris.                                                  the changes in Board of Commissioners.

     d. Pembentukan struktur subholding                                                d.       Establishment of subholding structure
           Berdasarkan Surat Keputusan Menteri BUMN                                            Based on Decision Letter of the Minister of SOE
           Republik Indonesia Nomor S-886/MBU/12/2022                                          of the Republic of Indonesia No. S-
           tanggal 30 Desember 2022 perihal Persetujuan                                        886/MBU/12/2022 dated December 30, 2022,
           Pembentukan Holding dan Subholding PT PLN                                           regarding the Approval for the Establishment of
           (Persero) Masa/tahap Legal End-State Serta                                          Holding and Subholding of PT PLN (Persero) for
           Restrukturisasi dan Pengalihan Harta, Perseroan                                     the Legal End-State Period/Stage as well as the
           membentuk Subholding Grup yang berlaku efektif                                      Restructuring and Transfer of Assets, the
           tanggal 1 Januari 2023 melalui:                                                     Company established Group Subholdings which
                                                                                               became effective on January 1, 2023, through:
           1.    Pemekaran usaha atau pemisahan tidak                                         1. A partial spin-off of part of the Company’s
                 murni/spin-off atas sebagian aktiva dan pasiva                                  assets and liabilities relating to the generation
                 kegiatan usaha pembangkitan dan energi                                          and primary energy business activities to PT
                 primer Perusahaan kepada PT PLN Nusantara                                       PLN Nusantara Power (“PNP”; previously
                 Power     (“PNP”;    dahulu    bernama     PT                                   named PT Pembangkitan Jawa-Bali) and PT
                 Pembangkitan Jawa-Bali) dan PT PLN                                              PLN Indonesia Power (“PIP”; previously
                 Indonesia Power (“PIP”; dahulu bernama PT                                       named PT Indonesia Power).
                 Indonesia Power).
           2.    Penyertaan modal non-tunai (inbreng) kepada                                   2. In-kind capital participation (inbreng) to PT
                 PT PLN Energi Primer Indonesia (“EPI”;                                           PLN Energi Primer Indonesia (“EPI”;
                 dahulu bernama PT PLN Batu bara) berupa                                          previously named PT PLN Batu bara) in the
                 seluruh kepemilikan saham Grup pada PT                                           form of the Group’s entire share ownership in
                 Pengembang Listrik Nasional Gas dan                                              PT Pengembang Listrik Nasional Gas dan
                 Geothermal (“PLN GG”) dan PT Pelayaran                                           Geothermal (“PLN GG”) and PT Pelayaran
                 Bahtera Adhiguna (“BAG”).                                                        Bahtera           Adhiguna            (“BAG”).
Page 16
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/6 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                              1.   GENERAL INFORMATION (continued)

     d. Pembentukan struktur subholding (lanjutan)               d.   Establishment       of   subholding      structure
                                                                      (continued)

        Pembentukan empat Subholding Grup yang                        The formation of four Subholdings of the Group,
        terdiri atas:                                                 consisting of the following:

        1.   Dua Subholding di bidang pembangkitan                    1. Two Subholdings in the power generation
             tenaga listrik, yaitu PNP dan PIP;                          sector, namely PNP and PIP;
        2.   Satu Subholding di bidang penyediaan dan                 2. One Subholding in the primary energy
             logistik energi primer, yaitu EPI; dan                      procurement and logistics sector, namely
                                                                         EPI; and
        3.   Satu Subholding untuk kegiatan usaha di                  3. One Subholding for business activities
             luar pembangkitan, transmisi, dan distribusi                outside of power generation, transmission,
             ketenagalistrikan, yaitu bernama PT                         and distribution, namely PT Indonesia
             Indonesia Comnets Plus (“PT ICON Plus").                    Comnets Plus (“PT ICON Plus”).

         Pada tanggal 30 Desember 2022, sebagai                       On December 30, 2022, as part of the
         bagian dari Pembentukan Holding dan                          Establishment of PLN Holding and Subholdings,
         Subholding       PLN,   Perusahaan       telah               the Company signed the following Deeds that
         menandatangani akta-akta sebagai berikut yang                took effect on January 1, 2023, as approved
         telah berlaku efektif pada 1 Januari 2023                    and/or notified to the Minister of Law and Human
         sebagaimana disetujui dan/atau diberitahukan                 Rights:
         kepada Menteri Hukum dan Hak Asasi Manusia
         sebagai berikut:

        1.   Akta      pemisahan      kegiatan    usaha               1. Deed of spin-off of power generation
             pembangkitan kepada PNP dengan nilai                        business activities to PNP to be
             yang akan ditukar menjadi kepemilikan                       compensated with newly issued shares of
             saham baru Perusahaan pada PNP sebesar                      the Company in PNP amounting to
             Rp151.255.249, sesuai dengan hasil                          Rp151,255,249 as per the independent
             penilaian Kantor Jasa Penilai Publik                        appraisal of Kantor Jasa Penilai Publik
             Rengganis, Hamid, & Rekan (“KJPP RHR”),                     Rengganis, Hamid, & Rekan (“KJPP RHR”),
             yang tertuang dalam Akta Notaris No. 70                     as stated in the Notarial Deeds No. 70 and
             dan No. 76 tanggal 30 Desember 2022 dari                    No. 76 dated December 30, 2022 of
             Muhammad Hanafi, S.H.                                       Muhammad Hanafi, S.H.
        2.   Akta      pemisahan      kegiatan     usaha              2. Deed of spin-off of power generation
             pembangkitan dengan PIP dengan nilai                        business activities to PIP to be compensated
             yang akan ditukar menjadi kepemilikan                       with newly issued shares of the Company in
             saham baru Perusahaan pada PIP sebesar                      PIP amounting to Rp175,974,993 as per the
             Rp175.974.993, sesuai dengan hasil                          independent appraisal of KJPP RHR, as
             penilaian KJPP RHR yang tertuang dalam                      stated in Notarial Deeds No. 71 and No. 77
             Akta Notaris No. 71 dan No. 77 dari tanggal                 dated December 30, 2022 of Muhammad
             30 Desember 2022 dari Muhammad Hanafi,                      Hanafi, S.H.
             S.H.
        3.   Akta pemasukan (inbreng) ke dalam EPI                    3.   Deed of in-kind capital participation to EPI in
             berupa     seluruh    kepemilikan    saham                    the form of the Company’s entire share-
             Perusahaan pada PLN GG dan BAG dengan                         ownership in PLN GG and BAG to be
             nilai yang akan ditukar menjadi kepemilikan                   compensated with newly issued shares in
             saham baru sebesar Rp2.273.717, sesuai                        the value of Rp2,273,717 as per the
             dengan hasil penilaian KJPP RHR, yang                         independent appraisal of KJPP RHR, as
             tertuang dalam Akta Notaris No. 72 dan No.                    stated in Notarial Deeds No. 72 and No. 78
             78 tanggal 30 Desember 2022 dari                              dated December 30, 2022 of Muhammad
             Muhammad Hanafi, S.H.                                         Hanafi, S.H.
Page 17
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/7 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                1.   GENERAL INFORMATION (continued)

     d. Pembentukan struktur subholding (lanjutan)                 d.    Establishment      of    subholding      structure
                                                                        (continued)

        Setelah transaksi tersebut di atas dilaksanakan,                 Upon the consummation of the transaction, the
        Perusahaan akan memiliki tambahan kepemilikan                    Company will have additional share ownership in
        saham pada anak perusahaan terkonsolidasi, yaitu                 consolidated subsidiaries, which are PNP, PIP,
        PNP, PIP, dan EPI dalam nilai masing-masing                      and EPI in the value as mentioned above. This is
        tersebut di atas, dimana hal ini diharapkan akan                 expected to provide additional value to the Group
        memberikan nilai tambah bagi Grup serta                          and have a positive impact on the continuity of the
        memberikan dampak positif bagi keberlangsungan                   Group’s business activities.
        kegiatan usaha Grup.

        Berdasarkan Keputusan Direktur Jenderal Pajak                   Based on the Decree of the Director General of
        No. Kep-86/WPJ.19/2023 tanggal 15 Juni 2023,                    Taxes No. Kep-86/WPJ.19/2023 dated June 15,
        Direktorat Jenderal Pajak menyetujui penggunaaan                2023, the Directorate General of Taxes approved
        nilai buku atas pengalihan harta dari Perusahaan ke             the use of book value for the transfer of assets from
        PT PLN Energi Primer Indonesia dalam rangka                     the Company to PT PLN Energi Primer Indonesia
        pengambilalihan usaha yang berlaku mulai tanggal                for the purposes of a business take over which
        1 Januari 2023.                                                 became effective on January 1, 2023.

        Berdasarkan Keputusan Direktur Jenderal Pajak                   Based on the Decree of the Director General of
        No. Kep-87/WPJ.19/2023 tanggal 15 Juni 2023,                    Taxes No. Kep-87/WPJ.19/2023 dated June 15,
        Direktorat Jenderal Pajak menyetujui penggunaaan                2023, the Directorate General of Taxes approved
        nilai buku atas pengalihan harta dari Perusahaan ke             the use of book value for the transfer of assets from
        PT PLN Nusantara Power dan PT PLN Indonesia                     the Company to PT PLN Nusantara Power and PT
        Power dalam rangka pemekaran usaha yang                         PLN Indonesia Power for the purposes of partial
        berlaku mulai tanggal 1 Januari 2023.                           spin-off which became effective on January 1,
                                                                        2023.
Page 18
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/8 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                          2.   IMPLEMENTATION      OF                  INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                             GENERALLY      ACCEPTED                ACCOUNTING
                                                                    PRINCIPLES (“GAAP”)

     a.   Penerapan Peraturan Otoritas Jasa Keuangan                a.   Implementation of Financial Services Authority
          No.6/POJK.04/2017       tentang       Perlakuan                Regulation   No.6/POJK.04/2017      regarding
          Akuntansi atas Transaksi Berdasarkan                           Accounting Treatment for Transactions Based
          Perjanjian Jual Beli Tenaga Listrik (“POJK No.                 on Power Purchase Agreements (“POJK No.
          6”)                                                            6”)

          Grup mengadakan perjanjian jual beli tenaga                    The Group has entered into Power Purchase
          listrik, yakni Perjanjian Jual Beli Tenaga Listrik             Agreements (“PPAs”) and Energy Sales
          (“PPA”) dan Kontrak Penjualan Energi (“ESC”),                  Contracts (“ESCs”), with Independent Power
          dengan Penyedia dan Pengembang Tenaga                          Producers (“IPPs”). Those IPPs are holders of
          Listrik Swasta (“IPP”). IPP tersebut merupakan                 Electricity Business Licences for public use.
          pemegang Izin Usaha Ketenagalistrikan untuk
          kepentingan umum.

          Sebelum 1 Januari 2016, Grup menerapkan                        Before January 1, 2016, the Group applied
          Interpretasi Standar Akuntansi Keuangan                        Interpretation of Financial Accounting Standards
          (“ISAK”) No. 8: “Penentuan Apakah Suatu                        (“IFAS”) No. 8: “Determining Whether an
          Perjanjian Mengandung Suatu Sewa” (“ISAK No.                   Arrangement Contains a Lease” (“IFAS No. 8”) in
          8”) dalam mengevaluasi apakah PPA dan ESC                      evaluating whether PPAs and ESCs with IPPs
          dengan IPP mengandung unsur sewa (Catatan                      contain a lease (Note 3.l).
          3.l).

          Pada tanggal 1 Juni 2017, Otoritas Jasa                        On June 1, 2017, the Financial Services
          Keuangan (“OJK”) menerbitkan POJK No. 6                        Authority (“FSA”) issued POJK No. 6 which is
          yang berlaku bagi Emiten dan Perusahaan                        applicable for listed and public companies.
          Publik. Berdasarkan POJK No. 6, transaksi                      Based on POJK No. 6, transactions based on a
          berdasarkan perjanjian jual beli tenaga listrik                PPA are treated as sale and purchase
          diperlakukan sebagai transaksi jual beli,                      transactions, even though the PPAs contain
          meskipun perjanjian jual beli tenaga listrik                   substances other than that of the sale and
          tersebut mengandung substansi selain jual beli                 purchase of electricity. POJK No. 6 applies
          listrik. POJK No. 6 berlaku secara prospektif                  prospectively for the year beginning on January
          untuk tahun buku yang dimulai sejak                            1, 2017, and early implementation is allowed for
          1 Januari 2017 dan mengizinkan perlakuan lebih                 the year beginning on January 1, 2016. POJK
          awal sejak 1 Januari 2016. POJK No. 6 berlaku                  No. 6 is valid until the end of the assignment on
          sampai akhir tahun buku berakhirnya penugasan                  the acceleration of electricity infrastructure
          untuk percepatan pembangunan infrastruktur                     development in accordance with Presidential
          ketenagalistrikan    berdasarkan     Peraturan                 Regulation No. 14 year 2017.
          Presiden No. 14 tahun 2017.

          Grup memutuskan untuk menerapkan lebih awal                    The Group decided to implement POJK No. 6
          POJK     No.6     secara     prospektif      sejak             early prospectively beginning on January 1,
          1 Januari 2016. Oleh karena itu, transaksi                     2016. Therefore, the electricity sale and
          berdasarkan perjanjian jual beli tenaga listrik                purchase transactions based on PPAs which
          yang mengandung sewa (Catatan 3.l), mulai                      contain a lease (Note 3.l), since January 1, 2016,
          1 Januari 2016 disajikan sebagai pembelian                     are presented as purchases of electricity in the
          tenaga listrik dalam laporan laba rugi dan                     consolidated statement of profit or loss and other
          penghasilan komprehensif lain konsolidasian                    comprehensive income when incurred. On
          pada    tahun    terjadinya.    Pada      tanggal              January 1, 2016, the Group also adjusted the
          1 Januari 2016, Grup juga melakukan                            related assets and liabilities.
          penyesuaian atas aset dan liabilitas terkait.

          Jumlah bersih penyesuaian atas aset dan                        The net adjustments on related assets and
          liabilitas terkait sebesar Rp43.428.454 dan telah              liabilities amounted to Rp43,428,454 and were
          dicatat sebagai penyesuaian saldo laba pada                    recorded as an adjustment to retained earnings on
          tanggal 1 Januari 2016, dengan rincian sebagai                 January 1, 2016, the details of which are as
          berikut:                                                       follows:
Page 19
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/9 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                        SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                                2.   IMPLEMENTATION         OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                                   GENERALLY      ACCEPTED         ACCOUNTING
     (lanjutan)                                                           PRINCIPLES (“GAAP”) (continued)

     a.    Penerapan Peraturan Otoritas Jasa Keuangan                     a.      Implementation of Financial Services Authority
           No.6/POJK.04/2017       tentang       Perlakuan                        Regulation      No.6/POJK.04/2017   regarding
           Akuntansi atas Transaksi Berdasarkan                                   Accounting Treatment for Transactions Based
           Perjanjian Jual Beli Tenaga Listrik (“POJK No.                         on Power Purchase Agreements (“POJK No.
           6”) (lanjutan)                                                         6”) (continued)

                                            1 Januari 2016                          1 Januari 2016
                                               sebelum        Penyesuaian               setelah
                                             penyesuaian/      saldo awal/           penyesuaian/
                                            January 1, 2016    Beginning            January 1, 2016
                                                before          balance                  after
                                              adjustment       adjustment             adjustment

          Aset tetap                         1,187,879,590          (72,227,600)     1,115,651,990      Property, plant and equipment
          Aset pajak tangguhan                  29,088,271          (14,787,769)        14,300,502                 Deferred tax assets

                                             1,216,967,861          (87,015,369)     1,129,952,492
          Liabilitas jangka panjang                                                                               Non-current liabilities
             Utang listrik swasta                7,093,280              755,783          7,849,063     Electricity purchase payable
             Utang sewa                        149,621,763         (128,065,144)        21,556,619                  Lease Liabilities

          Liabilitas jangka pendek                                                                                    Current liabilities
             Utang sewa                          6,759,138           (3,313,534)         3,445,604                   Lease liabilities
             Biaya masih harus dibayar          10,627,055           (2,216,084)         8,410,971                Accrued expenses
             Utang listrik swasta                  311,196                9,968            321,164     Electricity purchase payable
             Utang usaha                                                                                             Trade payables
                Pihak berelasi                   8,910,438              380,409          9,290,847                 Related parties
                Pihak ketiga                    17,715,563            1,998,142         19,713,705                   Third parties
             Utang lain-lain                    20,188,608                6,637         20,195,245                   Other payables

                                               221,227,041         (130,443,823)        90,783,218

                                                                                                           The effect of POJK No. 6
          Dampak penerapan POJK No. 6                                                                    application on beginning
            terhadap saldo laba awal                                43,428,454                                  retained earnings

           Mulai 1 Januari 2020, Grup menerapkan                                  Starting January 1, 2020, the Group
           Pernyataan Standar Akuntansi Keuangan                                  implemented Statement of Financial Accounting
           (“PSAK”) 73, “Sewa”. Standar akuntansi ini                             Standards (“SFAS”) 73, “Leases”. This standard
           menggantikan standar akuntansi berikut:                                replaced the previous accounting standards as
                                                                                  follows:
           •     PSAK No. 30: “Sewa”                                              •    SFAS No. 30: “Leases”
           •     ISAK No. 8: “Penentuan apakah Suatu                              •    IFAS No. 8: “Determining Whether an
                 Perjanjian Mengandung Suatu Sewa”                                     Arrangement Contains a Lease”
           •     ISAK No. 23: “Sewa Operasi-Insentif”                             •    IFAS No. 23: “Operating Leases-Incentives”
           •     ISAK No. 24: “Evaluasi Substansi Beberapa                        •    IFAS No. 24: “Evaluating the Substance of
                 Transaksi yang Melibatkan Suatu Bentuk                                Transactions Involving the Legal Form of a
                 Legal Sewa”                                                           Lease”
           •     ISAK No. 25: “Hak atas Tanah”                                    •    IFAS No. 25: “Land Rights”

           Perjanjian jual beli tenaga listrik yang diikuti oleh                  The PPAs entered into by the Group are still
           Grup tetap mengacu pada POJK No. 6 karena                              accounted for under POJK No. 6 because it
           peraturan tersebut masih berlaku sampai                                remains valid until the end of the assignment on
           berakhirnya penugasan untuk percepatan                                 acceleration     of    electricity  infrastructure
           pembangunan infrastruktur ketenagalistrikan                            development in accordance with Presidential
           berdasarkan Peraturan Presiden. Dengan                                 Regulation. Therefore, the accounting treatment
           demikian perlakuan akuntansi untuk PPA dan                             for PPAs and ESCs with IPPs remains the same
           ESC dengan IPP masih tetap sama seperti                                as before the Group implemented SFAS No. 73,
           sebelum Grup menerapkan PSAK No. 73, yaitu                             i.e. treated as sale and purchase transactions;
           diperlakukan sebagai transaksi jual beli dan                           hence, excluded from the scope of SFAS No. 73.
           dikecualikan dari ruang lingkup penerapan PSAK
           No. 73.
Page 20
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/10 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN  PRINSIP AKUNTANSI YANG                         2.    IMPLEMENTATION         OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                              GENERALLY      ACCEPTED         ACCOUNTING
     (lanjutan)                                                      PRINCIPLES (“GAAP”) (continued)

     b.   Perubahan pada PSAK dan amandemen yang                     b.    Changes to SFAS and amendments which are
          berlaku efektif untuk tahun buku yang dimulai                    effective for years beginning on or after
          pada atau setelah tanggal 1 Januari 2023                         January 1, 2023

          Penerapan dari amandemen yang berlaku efektif                    The adoption of the following amendments to
          untuk tahun buku yang dimulai pada atau setelah                  accounting standards which are effective from
          tanggal 1 Januari 2023 tidak menyebabkan                         January 1, 2023 did not result in substantial
          perubahan signifikan atas kebijakan akuntansi                    changes to the Group's accounting policies and
          Grup dan tidak memberikan dampak yang                            had no material effect on the amounts reported
          material terhadap jumlah yang dilaporkan di                      in the consolidated financial statements for the
          laporan keuangan konsolidasian pada tahun                        current year:
          berjalan:

          • Amandemen PSAK No. 1: “Penyajian Laporan                       • Amendment to SFAS No. 1, “Presentation of
            Keuangan    -   Pengungkapan      Kebijakan                      Financial Statements - Disclosure of Accounting
            Akuntansi”                                                       Policies”
          • Amandemen PSAK No. 16: “Aset Tetap - Hasil                     • Amendment to SFAS No. 16: “Property, Plant
            Sebelum Penggunaan yang Diintensikan”                            and Equipment - Proceeds Before Intended
                                                                             Use”
          • Amandemen PSAK No. 25: “Kebijakan                              • Amendment to SFAS No. 25: “Accounting
            Akuntansi, Perubahan Estimasi Akuntansi dan                      Policies, Changes in Accounting Estimates and
            Kesalahan - Definisi Estimasi Akuntansi”                         Errors - Definition of Accounting Estimates”
          • Amandemen PSAK No. 46: “Pajak Penghasilan -                    • Amendment to SFAS No. 46: “Income Taxes -
            Pajak Tangguhan terkait Aset dan Liabilitas yang                 Deferred Tax related to Assets and Liabilities
            Timbul dari Transaksi Tunggal”                                   Arising from a Single Transaction”
          • Amandemen PSAK No. 46: “Pajak Penghasilan -                    • Amendment to SFAS No. 46, “Income Taxes -
            Reformasi Pajak Internasional - Ketentuan Model                  International Tax Reform - Pillar Two Model
            Pilar Dua”                                                       Rules”

          Standar baru dan amandemen yang telah                            New standards and amendments issued but not
          diterbitkan, namun belum berlaku efektif untuk                   yet effective for the financial year beginning
          tahun buku yang dimulai pada 1 Januari 2023                      January 1, 2023, are as follows:
          adalah sebagai berikut:

          Standar baru dan amandemen di atas berlaku                      The above new standard and amendments are
          efektif mulai 1 Januari 2024, kecuali untuk PSAK                effective beginning January 1, 2024, except for
          No. 74 dan Amandemen PSAK No. 74 yang                           SFAS No. 74 and Amendment to SFAS No. 74
          berlaku efektif mulai 1 Januari 2025, tetapi                    which are effective beginning January 1, 2025, but
          penerapan dini diperkenankan.                                   early adoption is permitted.

          Pada tanggal penyelesaian laporan keuangan                      As at the completion date of these consolidated
          konsolidasian ini, Grup sedang mempelajari                      financial statements, the Group is evaluating the
          dampak yang mungkin timbul dari penerapan                       potential impact of these new standards,
          standar baru, amandemen, revisi, dan                            amendments,        revisions,    and       annual
          penyesuaian tahunan pada laporan keuangan                       improvements on the Group’s consolidated
          konsolidasian Grup.                                             financial statements.

          Mulai 1 Januari 2024, referensi terhadap masing-                Starting on January 1, 2024, references to the
          masing PSAK dan ISAK akan diubah                                individual SFAS and IFAS will be changed as
          sebagaimana diterbitkan oleh Dewan Standar                      published by the Financial Accounting Standards
          Akuntansi Keuangan - Ikatan Akuntan Indonesia                   Board - Indonesian Institute of Accountants
          (“DSAK-IAI”).                                                   (“DSAK-IAI”).
Page 21
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/11 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION

     Berikut ini adalah kebijakan akuntansi material yang         Presented below are the material accounting policies
     diterapkan dalam penyusunan laporan keuangan                 adopted in preparing the consolidated financial
     konsolidasian Grup. Kebijakan ini telah diaplikasikan        statements of the Group. These policies have been
     secara konsisten terhadap semua tahun yang                   consistently applied to all of the years presented,
     disajikan, kecuali dinyatakan lain.                          unless otherwise stated.

     a.   Pernyataan kepatuhan                                    a.   Statement of compliance

          Sejak 1 Januari 2016, laporan keuangan                       Since January 1, 2016, the consolidated financial
          konsolidasian telah disusun dan disajikan sesuai             statements have been prepared and presented
          dengan PABU, yang mencakup sebagai berikut:                  in accordance with Indonesian GAAP, which
                                                                       covers the following:
          (a) Standar     Akuntansi    Keuangan     yang               (a) Financial Accounting Standards issued by
              dikeluarkan oleh DSAK-IAI, yang meliputi                      DSAK-IAI, which cover SFAS and IFAS;
              PSAK dan ISAK;
          (b) Standar Akuntansi Keuangan Syariah yang                  (b) Syariah Financial Accounting Standards
              dikeluarkan oleh Dewan Standar Akuntansi                     issued by the Syariah Accounting Standards
              Syariah - Ikatan Akuntan Indonesia (“DSAS-                   Board - Indonesian Institute of Accountants
              IAI”), yang meliputi Standar Akuntansi                       (“DSAS-IAI”),    which      cover    Syariah
              Syariah (“SAS”); dan                                         Accounting Standards (“SAS”); and
          (c) Ketentuan akuntansi keuangan yang                        (c) Applicable Capital Market Regulations as
              ditetapkan oleh OJK, terdiri dari Peraturan                  stated by the FSA, including FSA Regulation
              OJK No. VIII.G.7 tentang Pedoman                             No. VIII.G.7 consisting of Guidance for the
              Penyajian Laporan Keuangan, Keputusan                        Presentation of Financial Statements,
              Ketua Badan Pengawas Pasar Modal -                           Decree of Chairman of the Capital Market
              Lembaga Keuangan (“Bapepam-LK”) No.                          and Financial Institutions Supervisory Board
              KEP-347/BL/2012 tentang Penyajian dan                        (“CM-FISB”)      No.       KEP-347/BL/2012
              Pengungkapan Laporan Keuangan Emiten                         regarding Presentation and Disclosure of
              atau Perusahaan Publik, dan Peraturan OJK                    Financial Statements of Listed or Public
              No. 6 POJK.04/2017 tentang Perlakuan                         Companies, and FSA Regulation No. 6
              Akuntansi atas Transaksi Berdasarkan                         POJK.04/2017        regarding     Accounting
              Perjanjian Jual Beli Tenaga Listrik.                         Treatment for Transactions Based on Power
                                                                           Purchase Agreements.

     b.   Dasar penyusunan          laporan     keuangan          b.   Basis of preparation of the consolidated
          konsolidasian                                                financial statements

          Dasar     penyusunan        laporan    keuangan              The consolidated financial statements, except for
          konsolidasian, kecuali untuk laporan arus kas                the consolidated statements of cash flows, have
          konsolidasian adalah dasar akrual. Mata uang                 been prepared using the accrual basis of
          penyajian yang digunakan untuk penyusunan                    accounting. The presentation currency used in
          laporan keuangan konsolidasian adalah mata                   the preparation of the consolidated financial
          uang Rupiah (“Rp”), yang juga merupakan mata                 statements is the Rupiah (“Rp”), which is also the
          uang fungsional Grup. Laporan keuangan                       functional currency of the Group. The
          konsolidasian disusun dan disajikan berdasarkan              preparation and presentation of the consolidated
          asumsi kelangsungan usaha dan dengan                         financial statements are based on the going
          pengukuran nilai historis, kecuali beberapa akun             concern assumption and the measurement basis
          tertentu disusun berdasarkan pengukuran lain                 is historical cost, except for certain accounts
          sebagaimana diuraikan dalam kebijakan                        which are measured on the basis described in
          akuntansi masing-masing akun tersebut.                       the related accounting policies.
Page 22
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/12 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     b.   Dasar penyusunan laporan              keuangan          b.   Basis of preparation of the consolidated
          konsolidasian (lanjutan)                                     financial statements (continued)

          Penyusunan laporan keuangan konsolidasian                    The preparation of consolidated financial
          sesuai dengan Standar Akuntansi Keuangan di                  statements in conformity with Indonesian Financial
          Indonesia mengharuskan penggunaan estimasi                   Accounting Standards requires the use of certain
          dan asumsi. Hal tersebut juga mengharuskan                   critical accounting estimates and assumptions. It
          manajemen untuk membuat pertimbangan dalam                   also requires management to exercise its
          proses penerapan kebijakan akuntansi Grup. Area              judgement in the process of applying the Group’s
          yang kompleks atau memerlukan tingkat                        accounting policies. The areas involving a higher
          pertimbangan yang lebih tinggi atau area di mana             degree of judgement or complexity, or areas where
          asumsi dan estimasi dapat berdampak signifikan               assumptions and estimates are significant to the
          terhadap laporan keuangan konsolidasian                      consolidated financial statements are disclosed in
          diungkapkan di Catatan 4.                                    Note 4.

     c.   Prinsip-prinsip konsolidasian                           c.   Principles of consolidation

          i. Entitas anak                                              i.   Subsidiaries

             i.1. Konsolidasi                                               i.1. Consolidation

                 Entitas anak merupakan semua entitas                          Subsidiaries are all entities (including
                 (termasuk entitas bertujuan khusus), di                       structured entities) over which the Group
                 mana Grup memiliki pengendalian. Grup                         has control. The Group controls an entity
                 mengendalikan suatu entitas ketika Grup                       when the Group is exposed to, or has
                 memiliki hak atas imbal hasil variabel                        rights to, variable returns from its
                 dari keterlibatannya dengan suatu                             involvement with the entity and has the
                 entitas dan memiliki kemampuan untuk                          ability to affect those returns through its
                 memengaruhi imbal hasil tersebut                              power over the entity.
                 melalui kekuasaannya atas entitas
                 tersebut.

                 Entitas anak dikonsolidasi sejak tanggal                      Subsidiaries are consolidated from the
                 pengendalian beralih kepada Grup dan                          date on which control is transferred to the
                 tidak lagi dikonsolidasi sejak tanggal                        Group and are de-consolidated from the
                 hilangnya pengendalian.                                       date on which that control ceases.

                 Saldo, transaksi, penghasilan, dan                            Intragroup    balances,     transactions,
                 beban intra kelompok usaha dieliminasi.                       income and expenses are eliminated.
                 Keuntungan dan kerugian hasil dari                            Profits and losses resulting from
                 transaksi intra kelompok usaha yang                           intragroup    transactions     that   are
                 diakui dalam aset juga dieliminasi.                           recognised in assets are also eliminated.
                 Kebijakan akuntansi entitas anak telah                        The accounting policies of subsidiaries
                 diubah seperlunya untuk memastikan                            have been amended where necessary to
                 konsistensi penerapan kebijakan oleh                          ensure consistency with the policies
                 Grup.                                                         adopted by the Group.
Page 23
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/13 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                        POLICY
     (lanjutan)                                                     INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                  c.   Principles of consolidation (continued)

          i. Entitas anak (lanjutan)                                     i.   Subsidiaries (continued)

             i.2. Akuisisi                                                    i.2. Acquisition

                Grup menerapkan metode akuisisi untuk                            The Group applies the acquisition
                mencatat setiap kombinasi bisnis.                                method to account for business
                Imbalan       yang       dialihkan    untuk                      combinations.        The       consideration
                mengakuisisi entitas anak adalah nilai                           transferred for the acquisition of a
                wajar seluruh aset yang dialihkan,                               subsidiary is the fair value of the assets
                liabilitas yang diakui oleh pihak                                transferred, the liabilities incurred to the
                pengakuisisi kepada pemilik sebelumnya                           former owners of the acquiree and the
                dari entitas yang diakuisisi dan                                 equity interests issued by the Group. The
                kepentingan ekuitas yang diterbitkan oleh                        consideration transferred includes the
                Grup. Imbalan yang dialihkan termasuk                            fair value of any asset or liability resulting
                nilai wajar setiap aset dan liabilitas yang                      from       a   contingent      consideration
                dihasilkan dari suatu kesepakatan                                arrangement. The identifiable assets
                imbalan kontinjensi. Aset teridentifikasi,                       acquired, liabilities and contingent
                liabilitas dan liabilitas kontinjensi yang                       liabilities assumed in a business
                diambil alih, yang diperoleh dalam                               combination are measured initially at
                kombinasi bisnis diukur pada awalnya                             their fair values as at the acquisition date
                sebesar nilai wajar pada tanggal akuisisi.

                Grup mengakui kepentingan non-                                   The Group recognises any non-
                pengendali pada pihak yang diakuisisi                            controlling interest in the acquiree on an
                baik sebesar nilai wajar atau sebesar                            acquisition-by-acquisition basis, either at
                bagian proporsional kepentingan non-                             fair value or at the non-controlling
                pengendali atas aset neto teridentifikasi                        interest’s proportionate share of the
                pihak yang diakuisisi. Kepentingan non-                          acquiree’s identifiable net assets. Non-
                pengendali disajikan di ekuitas dalam                            controlling interests are reported as
                laporan posisi keuangan konsolidasian,                           equity in the consolidated statements of
                terpisah dari ekuitas pemilik entitas induk.                     financial position, separate from the
                                                                                 owner of the parent entity.

                Biaya terkait akuisisi dibebankan pada                           Acquisition-related costs are expensed
                saat terjadinya.                                                 as incurred.

                Jika kombinasi bisnis diperoleh secara                           If the business combination is achieved
                bertahap,     Grup      akan    mengukur                         in stages, the Group will remeasure its
                kepentingan ekuitas yang sebelumnya                              previously held equity interest in the
                dimiliki pada pihak yang diakuisisi                              acquiree at its fair value at its acquisition
                sebesar nilai wajar pada tanggal akuisisi                        date and recognise the resulting gain or
                dan mengakui keuntungan atau kerugian                            loss, if any, in profit or loss. Any
                yang dihasilkan, jika ada, dalam laba rugi.                      contingent      consideration       to     be
                Imbalan kontinjensi yang masih harus                             transferred by the Group is recognised at
                dialihkan oleh Grup diakui sebesar nilai                         its fair value as at the acquisition date.
                wajar pada tanggal akuisisi. Perubahan                           Subsequent changes to the fair value of
                selanjutnya atas nilai wajar imbalan                             the contingent consideration that is
                kontinjensi yang diakui sebagai aset atau                        deemed to be an asset or a liability are
                liabilitas dan dicatat dalam laba rugi.                          recognised in profit or loss. A contingent
                Imbalan kontinjensi yang diklasifikasikan                        consideration that is classified as equity
                sebagai ekuitas tidak diukur kembali dan                         is not remeasured and its subsequent
                penyelesaian selanjutnya diperhitungkan                          settlement is accounted for within equity.
                dalam ekuitas.
Page 24
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/14 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          i. Entitas anak (lanjutan)                                    i.   Subsidiaries (continued)

             i.2. Akuisisi (lanjutan)                                        i.2. Acquisition (continued)

                Selisih lebih antara imbalan yang                               The excess of the consideration
                dialihkan, jumlah setiap kepentingan non-                       transferred, the amount of any non-
                pengendali dalam pihak yang diakuisisi,                         controlling interests in the acquiree and
                dan nilai wajar pada tanggal akuisisi dari                      the acquisition-date fair value of any
                kepemilikan ekuitas yang sebelumnya                             previous equity interest in the acquiree
                dimiliki oleh pihak pengakuisisi pada                           over the fair value of the Group’s share of
                pihak yang diakuisisi, dibandingkan                             the identifiable net assets acquired are
                dengan nilai wajar bagian Grup atas aset                        recorded as goodwill. If these amounts
                bersih teridentifikasi yang diakuisisi,                         are less than the fair value of the net
                dicatat sebagai goodwill. Jika jumlah                           identifiable assets of the subsidiary
                tersebut lebih kecil dari nilai wajar atas                      acquired and the measurement of all
                aset bersih teridentifikasi entitas anak                        amounts has been reviewed, in the case
                yang diakuisisi dan pengukuran atas                             of a bargain purchase, the difference is
                seluruh jumlah tersebut telah ditelaah,                         recognised directly in profit or loss.
                dalam hal pembelian dengan diskon,
                selisih tersebut diakui secara langsung
                dalam laba rugi.

          ii. Perubahan kepemilikan atas entitas anak                   ii. Changes in ownership interest                 in
              tanpa kehilangan pengendalian                                 subsidiaries without loss of control

             Transaksi    dengan      kepentingan     non-                   Transactions with non-controlling interests
             pengendali yang tidak mengakibatkan                             that do not result in a loss of control are
             hilangnya pengendalian dicatat sebagai                          accounted for as equity transactions. The
             transaksi ekuitas. Selisih antara nilai wajar                   difference between the fair value of any
             imbalan yang dibayarkan dan bagiannya atas                      consideration paid and the relevant share
             jumlah tercatat aset neto yang diperoleh                        acquired of the carrying amount of net assets
             dicatat dalam ekuitas. Keuntungan atau                          of the subsidiary is recorded in equity. Gains
             kerugian     atas     pelepasan       kepada                    or losses on disposals to non-controlling
             kepentingan non-pengendali juga dicatat                         interests are also recorded in equity.
             pada ekuitas.

          iii. Pelepasan entitas anak                                   iii. Disposal of subsidiaries

             Ketika Grup kehilangan pengendalian atas                        When the Group loses control of a
             entitas anak, Grup menghentikan pengakuan                       subsidiary, the Group derecognises the
             aset (termasuk setiap goodwill) dan liabilitas                  assets (including any goodwill) and liabilities
             entitas anak pada nilai tercatatnya ketika                      of the subsidiary at their carrying amounts as
             pengendalian       hilang.   Jumlah      yang                   at the date on which control is lost. Amounts
             sebelumnya diakui dalam penghasilan                             previously      recognised         in    other
             komprehensif lain juga direklasifikasi ke laba                  comprehensive income are also reclassified
             rugi atau dialihkan secara langsung ke saldo                    to profit or loss, or transferred directly to
             laba jika disyaratkan oleh PSAK lain.                           retained earnings if required under other
                                                                             SFAS.

             Sisa investasi pada entitas anak terdahulu                      Any investment retained in the former
             diakui sebesar nilai wajarnya. Setiap                           subsidiary is recognised at its fair value. The
             perbedaan antara nilai tercatat sisa investasi                  difference between the carrying amount of
             pada tanggal hilangnya pengendalian dan                         the investment retained on the date when the
             nilai wajarnya diakui dalam laba rugi.                          control is lost and its fair value is recognised
                                                                             in profit or loss.
Page 25
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/15 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas       asosiasi   dan               iv. Accounting for associates and joint
              ventura bersama                                               ventures

             Entitas asosiasi adalah suatu entitas dimana                   An associate is an entity over which the
             Grup mempunyai pengaruh signifikan, tetapi                     Group has significant influence, but not
             tidak mengendalikan, dan biasanya Grup                         control, and is generally accompanied by a
             memiliki 20% atau lebih hak suara, tetapi                      shareholding giving rise to voting rights of
             tidak melebihi 50% hak suara. Investasi pada                   20% or greater but not exceeding 50%.
             entitas asosiasi dicatat pada laporan                          Investment in associates is accounted for in
             keuangan     konsolidasian     menggunakan                     the consolidated financial statements using
             metode     ekuitas      dikurangi   kerugian                   the equity method less impairment losses, if
             penurunan nilai, jika ada.                                     any.

             Ventura bersama merupakan pengaturan                           A joint venture is a joint arrangement in which
             bersama antara beberapa pihak yang                             the parties that share joint control have rights
             melakukan    kesepakatan        pengendalian                   to the net assets of the arrangement. Joint
             bersama yang memiliki hak atas aset neto                       ventures are accounted for using the equity
             pengaturan tersebut. Ventura bersama ini                       method less impairment losses, if any.
             menggunakan metode ekuitas dikurangi
             kerugian penurunan nilai, jika ada.

             - Akuisisi                                                     - Acquisitions

              Investasi pada entitas asosiasi atau ventura                   Investment in an associate or a joint
              bersama pada awalnya diakui sebesar                            venture is initially recognised at cost. The
              biaya perolehan. Biaya perolehan diukur                        cost of an acquisition is measured at the
              berdasarkan nilai wajar aset yang                              fair value of the assets transferred, equity
              diserahkan, instrumen ekuitas yang                             instruments issued or liabilities incurred or
              diterbitkan atau liabilitas yang timbul atau                   assumed as at the date of exchange, plus
              diambil alih pada tanggal akuisisi, ditambah                   costs directly attributable to the acquisition.
              biaya yang berhubungan langsung dengan
              akuisisi.

              Goodwill pada akuisisi entitas asosiasi atau                   Goodwill on the acquisition of an associate
              ventura bersama merupakan selisih lebih                        or a joint venture represents the excess of
              yang terkait dengan biaya perolehan                            the cost of acquisition of the associate or
              investasi pada entitas asosiasi atau ventura                   joint venture over the Group’s share of the
              bersama dengan bagian Grup atas nilai                          fair value of the identifiable net assets of
              wajar neto aset teridentifikasi dari entitas                   the associate or joint venture and is
              asosiasi atau ventura bersama dan                              included in the carrying amount of the
              dimasukkan      dalam     jumlah     tercatat                  investment.
              investasi.

             - Metode ekuitas                                               - Equity method of accounting

              Dalam menerapkan metode ekuitas,                               In applying the equity method of
              bagian Grup atas laba rugi entitas asosiasi                    accounting, the Group’s share of its
              atau ventura Bersama setelah perolehan                         associate’s or joint venture’s post-
              diakui dalam laba rugi, dan bagian Grup                        acquisition profit or loss is recognised in
              atas penghasilan komprehensif lain setelah                     profit or loss and its share of post-
              tanggal    perolehan     diakui      dalam                     acquisition other comprehensive income is
              penghasilan komprehensif lain.                                 recognised in other comprehensive
                                                                             income.
Page 26
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/16 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas asosiasi dan                       iv. Accounting for associates and joint
              ventura bersama (lanjutan)                                    ventures (continued)

             - Metode ekuitas (lanjutan)                                    - Equity method of accounting (continued)

              Perubahan dan penerimaan distribusi dari                       These post-acquisition movements and
              entitas asosiasi atau ventura bersama                          distributions received from an associate or
              setelah tanggal perolehan disesuaikan                          a joint venture are adjusted against the
              terhadap nilai tercatat investasi.                             carrying amounts of the investment.

              Jika bagian Grup atas rugi entitas asosiasi                    When the Group’s share of the losses of an
              atau ventura bersama sama dengan atau                          associate or a joint venture equals or
              melebihi kepentingannya pada entitas                           exceeds its interest in the associate or joint
              asosiasi atau ventura bersama, termasuk                        venture, including any other unsecured
              piutang tidak lancar tanpa jaminan, maka                       non-current receivables, the Group does
              Grup menghentikan pengakuan bagiannya                          not recognise further losses, unless it has
              atas rugi lebih lanjut, kecuali Grup memiliki                  obligations to make or has made payments
              kewajiban untuk melakukan pembayaran                           on behalf of the associate or joint venture.
              atau telah melakukan pembayaran atas
              nama entitas asosiasi atau ventura
              bersama.

              Keuntungan yang belum direalisasi atas                         Unrealised gains on transactions between
              transaksi antara Grup dengan entitas                           the Group and its associates or joint
              asosiasi atau ventura bersama dieliminasi                      ventures are eliminated to the extent of the
              sebesar bagian Grup dalam entitas                              Group’s interest in the associate or joint
              asosiasi atau ventura bersama tersebut.                        venture. Unrealised losses are also
              Kerugian yang belum direalisasi juga                           eliminated unless the transaction provides
              dieliminasi kecuali transaksi tersebut                         evidence of the impairment of the asset
              memberikan bukti penurunan nilai atas aset                     being transferred. The accounting policies
              yang ditransfer. Kebijakan akuntansi                           of the associate or joint venture have been
              entitas asosiasi atau ventura bersama akan                     changed where necessary to ensure
              disesuaikan, apabila diperlukan, agar                          consistency with the accounting policies
              konsisten dengan kebijakan akuntansi                           adopted by the Group.
              Grup.

              Dividen yang akan diterima dari entitas                        Dividend receivables from an associate or
              asosiasi atau ventura bersama diakui                           a joint venture are recognised as
              sebagai pengurang jumlah       tercatat                        reductions in the carrying amount of the
              investasi.                                                     investment.

              Pada setiap tanggal pelaporan, Grup                            At each reporting date, the Group
              menentukan apakah terdapat bukti objektif                      determines whether there is any objective
              bahwa telah terjadi penurunan nilai atas                       evidence that the investment in an
              investasi pada entitas asosiasi atau ventura                   associate or joint venture is impaired. If any
              bersama. Jika bukti tersebut ada, maka                         such evidence exists, the Group calculates
              Grup menghitung besarnya penurunan nilai                       the amount of impairment as the difference
              sebagai selisih antara jumlah yang                             between the recoverable amount of the
              terpulihkan dan nilai tercatat atas investasi                  associate or the joint venture and its
              pada entitas asosiasi atau ventura bersama                     carrying amount and recognises the
              dan mengakui selisih tersebut pada laba                        amount in profit or loss.
              rugi.
Page 27
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/17 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas asosiasi         dan              iv. Accounting for associates and joint
              ventura bersama (lanjutan)                                   ventures (continued)

             - Pelepasan                                                   - Disposals

               Investasi pada entitas asosiasi atau                          An investment in an associate or a joint
               ventura bersama dihentikan pengakuannya                       venture is derecognised when the Group
               apabila Grup tidak lagi memiliki pengaruh                     loses significant influence and any retained
               signifikan. Grup mengukur investasi yang                      equity interest in the entity is remeasured
               tersisa sebesar nilai wajar. Selisih antara                   at its fair value. The difference between the
               jumlah tercatat investasi yang tersisa pada                   carrying amount of the retained interest at
               tanggal hilangnya pengaruh signifikan dan                     the date when significant influence is lost
               nilai wajarnya diakui dalam laba rugi.                        and its fair value is recognised in profit or
                                                                             loss.

               Keuntungan dan kerugian yang timbul dari                      Gains and losses arising from partial
               pelepasan sebagian atau dilusi yang timbul                    disposal or dilution of an investment in an
               pada investasi pada entitas asosiasi dan                      associate and a joint venture in which
               ventura bersama dimana pengaruh                               significant influence is retained are
               signifikan masih dipertahankan diakui                         recognised in profit or loss, and only a
               dalam laba rugi dan hanya suatu bagian                        proportionate share of the amount
               proporsional atas jumlah yang telah diakui                    previously      recognised      in    other
               sebelumnya         pada       penghasilan                     comprehensive income is reclassified to
               komprehensif lain yang direklasifikasi ke                     profit or loss where appropriate.
               laba rugi.

     d.   Goodwill                                                d.   Goodwill

          Goodwill timbul dari akuisisi entitas anak dan               Goodwill arises from the acquisition of
          merupakan selisih imbalan yang ditransfer                    subsidiaries and represents the excess of the
          terhadap kepemilikan dalam nilai wajar neto atas             consideration transferred over the interest in the
          aset, liabilitas, dan liabilitas kontinjensi                 net fair value of the net identifiable assets,
          teridentifikasi dan nilai wajar kepentingan non-             liabilities and contingent liabilities of the acquiree
          pengendali pada pihak diakuisisi.                            and the fair value of the non-controlling interest
                                                                       in the acquiree.

          Untuk pengujian penurunan nilai, goodwill yang               For the purposes of impairment testing, goodwill
          diperoleh dalam kombinasi bisnis dialokasikan                acquired in a business combination is allocated
          pada setiap Unit Penghasil Kas (“UPK”), atau                 to each Cash-Generating Unit (“CGU”), or group
          kelompok UPK, yang diharapkan dapat                          of CGUs, that is expected to benefit from the
          memberikan manfaat dari sinergi kombinasi                    synergies of the combination. Each CGU or
          bisnis tersebut. Setiap unit atau kelompok unit              group of CGUs to which the goodwill is allocated
          yang memperoleh alokasi goodwill menunjukkan                 represents the lowest level within the entity at
          tingkat terendah dalam entitas yang goodwill-nya             which goodwill is monitored for internal
          dipantau untuk tujuan manajemen internal.                    management purposes. Goodwill is monitored at
          Goodwill dipantau pada level segmen operasi.                 the operating segment level.
Page 28
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/18 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     e.   Penjabaran mata uang asing                                 e.   Foreign currency translation

          i.     Mata uang fungsional dan penyajian                       i.     Functional and presentation currency

                 Akun-akun yang disertakan dalam laporan                         Items included in the financial statements of
                 keuangan setiap entitas anggota Grup                            each of the Group’s entities are measured
                 diukur menggunakan mata uang dari                               using the currency of the primary economic
                 lingkungan ekonomi utama dimana entitas                         environment in which the relevant entity
                 tersebut      beroperasi    (“mata    uang                      operates (the “functional currency”). The
                 fungsional”).      Laporan        keuangan                      consolidated financial statements are
                 konsolidasian disajikan dalam Rp, yang                          presented in Rp, which is the Company’s
                 merupakan       mata     uang    fungsional                     functional currency and the Group’s
                 Perusahaan dan penyajian Grup.                                  presentation currency.

          ii.    Transaksi dan saldo                                      ii.    Transactions and balances

                 Transaksi dalam mata uang asing                                 Foreign currency transactions are translated
                 dijabarkan menjadi mata uang fungsional                         into the functional currency using the
                 menggunakan kurs yang berlaku pada                              exchange rates prevailing as at the date of
                 tanggal transaksi. Pada tanggal pelaporan,                      the transactions. As at the reporting date,
                 setiap aset dan liabilitas moneter dalam                        monetary assets and liabilities denominated
                 mata uang asing disesuaikan untuk                               in foreign currency were adjusted to reflect
                 mencerminkan kurs yang berlaku pada                             the exchange rates prevailing at this date.
                 tanggal tersebut. Keuntungan dan kerugian                       Foreign exchange gains and losses
                 selisih kurs yang timbul dari penyelesaian                      resulting from the settlement of such
                 transaksi dalam mata uang asing dan dari                        transactions and from the translation at
                 penjabaran aset dan liabilitas moneter                          year-end exchange rates of monetary
                 dalam mata uang asing menggunakan kurs                          assets and liabilities denominated in foreign
                 yang berlaku pada akhir tahun pelaporan                         currencies are recognised in profit or loss.
                 diakui dalam laba rugi.

                 Kurs yang digunakan pada tanggal laporan                        As at the consolidated statement of financial
                 posisi keuangan konsolidasian, berdasarkan                      position dates, the exchange rates used,
                 kurs penutup yang berlaku pada tanggal                          based on the exchange rates prevailing at
                 laporan posisi keuangan konsolidasian yang                      the date of the consolidated statement of
                 diterbitkan Bank Indonesia, adalah sebagai                      financial position published by Bank
                 berikut:                                                        Indonesia were as follows:

                                                  30 September/      31 Desember/
                                                  September 30,      December 31,
                                                      2024                 2023
                                                   Kurs tengah/        Kurs tengah/
                                                   Middle rate*)       Middle rate*)

                Yen Jepang (JPY)                               106                  109                     Japan Yen (JPY)
                Ringgit Malaysia (MYR)                       3,677                3,364              Malaysian Ringgit (MYR)
                Dolar AS (USD)                              15,144               15,439                    US Dollars (USD)
                Euro (EUR)                                  16,929               17,086                          Euro (EUR)
                Franc Swiss (CHF)                           17,968               18,374                   Swiss Franc (CHF)
                Dolar Kuwait (KWD)                          49,646               50,220                Kuwait Dollars (KWD)

                 *)   dalam jumlah penuh                                  *)    in full amount
Page 29
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/19 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     e.   Penjabaran mata uang asing (lanjutan)                      e.     Foreign currency translation (continued)

          iii. Entitas dalam Grup                                           iii. Group companies

              Hasil usaha operasi dan posisi keuangan                             The results of the operations and financial
              dari seluruh entitas anak Grup (tidak ada                           position of all of the Group’s subsidiaries
              yang mata uang fungsionalnya mata uang                              (none of which has the currency of a
              dari suatu ekonomi hiperinflasi) yang                               hyperinflationary economy) that have a
              memiliki mata uang fungsional yang                                  functional currency different from the
              berbeda dengan mata uang penyajian                                  Company’s presentation currency are
              Perusahaan, ditranslasikan dalam mata                               translated into the Company’s presentation
              uang penyajian Perusahaan sebagai                                   currency as follows:
              berikut:

              (a) Aset dan liabilitas yang disajikan pada                         (a) The assets and liabilities presented in
                  laporan posisi keuangan konsolidasian,                              the consolidated statement of financial
                  dijabarkan pada kurs penutup tanggal                                position are translated at the closing
                  laporan posisi keuangan konsolidasian                               rate at the date of the consolidated
                  tersebut;                                                           statement of financial position;

              (b) Penghasilan dan beban untuk setiap                              (b) The income and expenses for each
                  laba rugi dijabarkan menggunakan kurs                               item of profit or loss are translated at
                  rata-rata (kecuali jika rata-rata tersebut                          the average exchange rates (unless
                  bukan perkiraan wajar efek kumulatif                                this average is not a reasonable
                  dari kurs yang berlaku pada tanggal                                 approximation of the cumulative effect
                  transaksi, maka penghasilan dan beban                               of the rates prevailing on the
                  dijabarkan menggunakan kurs tanggal                                 transaction dates, in which case the
                  transaksi); dan                                                     income and expenses are translated at
                                                                                      the rates in force on the dates of the
                                                                                      transactions); and

                                                    30 September /        31 Desember /
                                                   September 30,          December 31,
                                                        2024                   2023
                                                   Kurs rata-rata/        Kurs rata-rata/
                                                   Average rate*)         Average rate*)

                   Dolar AS (USD)                           15,869                 15,254                    US Dollars (USD)

                   *)   dalam jumlah penuh                                            *)    in full amount

              (c) Seluruh selisih kurs yang timbul diakui                         (c) All of the resulting exchange
                  dalam penghasilan komprehensif lain.                                differences are recognised in other
                                                                                      comprehensive income.

     f.   Transaksi-transaksi dengan pihak berelasi                   f.     Transactions with related parties

          Grup melakukan transaksi dengan pihak-pihak                        The Group has transactions with related parties
          berelasi sesuai yang didefinisikan oleh PSAK No.                   as defined under SFAS No. 7: “Related Party
          7: “Pengungkapan Pihak-Pihak Berelasi” dan                         Disclosures” and OJK Regulation No. VIII.G.7:
          Peraturan OJK No. VIII.G.7:
          (a) Orang atau anggota keluarga dekatnya                           (a) A person or a close member of that person's
              mempunyai relasi dengan entitas pelapor jika                       family is related to a reporting entity if that
              orang tersebut:                                                    person:
              (i) Memiliki         pengendalian        atau                      (i) Has control or joint control over the
                    pengendalian bersama atas entitas                                reporting entity;
                    pelapor;
              (ii) Memiliki pengaruh signifikan atas entitas                      (ii) Has significant influence over the
                    pelapor; atau                                                       reporting entity; or
              (iii) Merupakan personil manajemen kunci                            (iii) Is a member of the key management
                    entitas pelapor atau entitas induk dari                             personnel of the reporting entity or of a
                    entitas pelapor.                                                    parent of the reporting entity.
Page 30
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/20 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                       3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                        (continued)

     f.   Transaksi-transaksi dengan pihak berelasi                    f.   Transactions with related parties (continued)
          (lanjutan)

          (b) Suatu entitas berelasi dengan entitas pelapor                 (b) An entity is related to a reporting entity if any
              jika memenuhi salah satu hal berikut:                             of the following conditions apply:
              (i) Entitas dan entitas pelapor adalah
                    anggota dari kelompok usaha yang                             (i)   The entity and the reporting entity are
                    sama (artinya entitas induk, entitas anak                          members of the same group (which
                    dan entitas anak berikutnya saling                                 means that each parent, subsidiary and
                    berelasi dengan entitas lain);                                     fellow subsidiary is related to each
              (ii) Satu entitas adalah entitas asosiasi atau                           other);
                    ventura bersama dari entitas lain (atau                      (ii) One entity is an associate or joint
                    entitas asosiasi atau ventura bersama                              venture of the other entity (or an
                    yang merupakan anggota               suatu                         associate or joint venture of a member of
                    kelompok usaha, yang mana entitas lain                             a group of which the other entity is a
                    tersebut adalah anggotanya);                                       member);
              (iii) Kedua entitas tersebut adalah ventura                        (iii) Both entities are joint ventures of the
                    bersama dari pihak ketiga yang sama;                               same third party;
              (iv) Satu entitas adalah ventura bersama                           (iv) One entity is a joint venture of a third
                    dari entitas ketiga dan entitas yang lain                          entity and the other entity is an associate
                    adalah entitas asosiasi dari entitas                               of the third entity;
                    ketiga;
              (v) Entitas tersebut adalah suatu program                          (v) The entity is a post-employment benefit
                    imbalan pascakerja untuk imbalan kerja                           plan for the benefit of the employees of
                    dari salah satu entitas pelapor atau                             either the reporting entity or an entity
                    entitas yang terkait dengan entitas                              related to the reporting entity. If the
                    pelapor. Jika entitas pelapor adalah                             reporting entity is itself such a plan, the
                    entitas yang menyelenggarakan program                            sponsoring employers are also related to
                    tersebut, maka entitas sponsor juga                              the reporting entity;
                    berelasi dengan entitas pelapor;
              (vi) Entitas      yang     dikendalikan      atau
                    dikendalikan bersama oleh orang yang                         (vi) The entity is controlled or jointly
                    diidentifikasi dalam huruf (a);                                   controlled by a person identified in (a);
              (vii) Orang yang diidentifikasi dalam huruf (a)
                    (i) memiliki pengaruh signifikan atas                        (vii) A person identified in (a) (i) has
                    entitas atau personil manajemen kunci                              significant influence over the entity or is
                    entitas (atau entitas induk dari entitas).                         a member of the key management
                                                                                       personnel of the entity (or of a parent of
                                                                                       the entity).

          Entitas yang berelasi dengan Pemerintah adalah                    A Government-related entity is an entity that is
          entitas yang dikendalikan, dikendalikan bersama,                  controlled, jointly controlled or significantly
          atau dipengaruhi oleh Pemerintah. Pemerintah                      influenced by a Government. Government refers
          mengacu       kepada     Pemerintah,     instansi                 to the Government of the Republic of Indonesia,
          Pemerintah dan badan yang serupa baik lokal,                      Government agencies and similar bodies whether
          nasional maupun internasional.                                    local, national or international.

          Entitas yang berelasi dengan Pemerintah                           Government-related entities include entities
          termasuk entitas yang dikendalikan atau                           which are controlled or significantly influenced by
          dipengaruhi secara signifikan oleh Kementerian                    the Ministry of Finance or Local Governments
          Keuangan atau Pemerintah Daerah yang                              being the shareholders of the entity or an entity
          merupakan pemegang saham entitas, atau                            controlled by the Government of the Republic of
          entitas yang dikendalikan oleh Pemerintah                         Indonesia, represented by the Ministry of SOEs
          Republik Indonesia melalui Kementerian BUMN                       as the shareholder’s representative.
          sebagai kuasa pemegang saham.
Page 31
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/21 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                       POLICY
     (lanjutan)                                                     INFORMATION (continued)

     f.   Transaksi-transaksi dengan pihak berelasi                 f.   Transactions with related parties (continued)
          (lanjutan)

          Seluruh transaksi dan saldo yang signifikan                    All significant transactions and balances with
          dengan pihak berelasi diungkapkan dalam                        related parties are disclosed in the relevant
          Catatan yang relevan.                                          Notes.

     g.   Aset keuangan                                             g.   Financial assets

          i.   Klasifikasi, pengakuan dan pengukuran                     i.   Classification,        recognition         and
                                                                              measurement

               Grup mengklasifikasikan aset keuangannya                       The Group classifies its financial assets in
               dalam kategori pengukuran berikut:                             the following measurement categories:
               •   aset keuangan yang diukur pada nilai                       •    financial assets measured at fair value
                   wajar melalui laba rugi atau melalui                            either through profit or loss (“FVTPL”) or
                   penghasilan komprehensif lain; dan                              through other comprehensive income
                                                                                   (“FVOCI”); and
               •   aset keuangan yang diukur pada biaya                       •    those to be measured at amortised
                   perolehan diamortisasi.                                         cost.

               Klasifikasi tersebut tergantung pada model                     The classification depends on the Group’s
               bisnis Grup dan persyaratan kontraktual                        business model and the contractual terms of
               arus kas - apakah penentuan arus kasnya                        the cash flows of the cash flows when
               semata dari pembayaran pokok dan bunga.                        determining whether their cash flows are
                                                                              solely payments of principal and interest
                                                                              (“SPPI”).

               Untuk aset yang diukur pada nilai wajar,                       For assets measured at fair value, gains and
               keuntungan dan kerugian akan dicatat                           losses will either be recorded in profit or loss
               dalam laporan laba rugi atau penghasilan                       or other comprehensive income. For
               komprehensif lain. Untuk investasi pada                        investments in debt instruments, this will
               instrumen utang, hal ini akan bergantung                       depend on the business model in which the
               pada model bisnis dimana investasi tersebut                    investment is held. For investments in equity
               diadakan. Untuk investasi pada instrumen                       instruments that are not held for trading, this
               ekuitas    yang     tidak    dimiliki  untuk                   will depend on whether the Group has made
               diperdagangkan, hal ini akan tergantung                        an irrevocable election at the time of initial
               pada apakah Grup telah memilih tidak dapat                     recognition to account for the equity
               dibatalkan pada saat pengakuan awal untuk                      investment at fair value through other
               mencatat           investasi          ekuitas                  comprehensive income.
               pada nilai wajar melalui penghasilan
               komprehensif lain.

               Grup mereklasifikasi investasi utang jika dan                  The Group reclassifies debt investments
               hanya jika model bisnis untuk mengelola                        when and only when its business model for
               aset tersebut berubah.                                         managing such assets changes.
Page 32
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/22 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     g.   Aset keuangan (lanjutan)                                   g.   Financial assets (continued)

          i.   Klasifikasi, pengakuan dan pengukuran                      i.   Classification,   recognition             and
               (lanjutan)                                                      measurement (continued)

               Pada pengakuan awal, Grup mengukur aset                         At initial recognition, the Group measures a
               keuangan pada nilai wajarnya ditambah,                          financial asset at its fair value plus, in the
               dalam hal aset keuangan tidak diukur pada                       case of a financial asset not at fair value
               nilai wajar melalui laba rugi, biaya transaksi                  through profit or loss, transaction costs that
               yang dapat diatribusikan secara langsung                        are directly attributable to the acquisition of
               dengan perolehan aset keuangan. Biaya                           the financial asset. Transaction costs of
               transaksi dari aset keuangan yang dicatat                       financial assets carried at fair value through
               pada nilai wajar melalui laba rugi                              profit or loss are expensed in profit or loss.
               dibebankan pada laba rugi.

               Aset keuangan dengan derivatif melekat                          Financial assets with embedded derivatives
               dipertimbangkan secara keseluruhan saat                         are considered in their entirety when
               menentukan apakah arus kasnya hanya                             determining whether their cash flows are
               merupakan pembayaran pokok dan bunga.                           SPPI.

               Instrumen utang                                                 Debt instruments

               Pengukuran selanjutnya instrumen utang                          Subsequent     measurement       of   debt
               bergantung pada model bisnis Grup dalam                         instruments depends on the Group’s
               mengelola aset dan karakteristik arus kas                       business model for managing the asset and
               dari aset tersebut. Ada tiga kategori                           the cash flow characteristics of the asset.
               pengukuran yang Grup mengklasifikasikan                         There are three measurement categories
               instrumen utangnya:                                             into which the Group classifies its debt
                                                                               instruments:

               -   Biaya perolehan diamortisasi: Aset                          -   Amortised cost: Assets that are held for
                   yang dimiliki untuk mengumpulkan arus                           the collection of contractual cash flows
                   kas kontraktual dimana arus kas                                 in cases where such cash flows
                   tersebut hanya mewakili pembayaran                              represent SPPI are measured at
                   pokok dan bunga diukur dengan biaya                             amortised cost. A gain or loss on a debt
                   perolehan diamortisasi. Keuntungan                              investment that is subsequently
                   atau kerugian dari investasi utang yang                         measured at amortised cost and that is
                   selanjutnya     diukur   pada     biaya                         not part of a hedging relationship is
                   perolehan diamortisasi dan bukan                                recognised in profit or loss when the
                   merupakan bagian dari hubungan                                  asset is derecognised or impaired.
                   lindung nilai, diakui dalam laba rugi                           Interest income from these financial
                   pada saat aset tersebut dihentikan                              assets is included in finance income
                   pengakuannya        atau     penurunan                          using the effective interest rate method.
                   nilainya. Pendapatan bunga dari aset
                   keuangan tersebut dimasukkan ke
                   dalam pendapatan keuangan dengan
                   menggunakan metode suku bunga
                   efektif.
Page 33
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/23 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     g.   Aset keuangan (lanjutan)                                 g.   Financial assets (continued)

          i.   Klasifikasi, pengakuan dan pengukuran                    i.   Classification,   recognition             and
               (lanjutan)                                                    measurement (continued)

               Instrumen utang (lanjutan)                                    Debt instruments (continued)

               -   Nilai wajar melalui penghasilan                           -   Fair       value        through      other
                   komprehensif lain: Aset yang dimiliki                         comprehensive income: Assets that are
                   untuk     mendapatkan      arus    kas                        held for the collection of contractual
                   kontraktual dan untuk menjual aset                            cash flows and for selling the financial
                   keuangan, di mana arus kas aset                               assets, in cases where the assets’ cash
                   tersebut hanya atas pembayaran pokok                          flows represent SPPI, are measured at
                   dan bunga, diukur pada nilai wajar                            FVOCI. Movements in the carrying
                   melalui penghasilan komprehensif lain.                        amount are taken through other
                   Perubahan nilai tercatat dilakukan                            comprehensive income, except for the
                   melalui penghasilan komprehensif lain,                        recognition of impairment gains or
                   kecuali untuk pengakuan keuntungan                            losses, interest revenue and foreign
                   atau    kerugian    penurunan     nilai,                      exchange gains and losses which are
                   pendapatan bunga dan keuntungan                               recognised in profit or loss. When the
                   dan kerugian selisih kurs yang diakui                         financial asset is derecognised, the
                   dalam laba rugi. Ketika aset keuangan                         cumulative gain or loss previously
                   dihentikan pengakuannya, keuntungan                           recognised in OCI is reclassified from
                   atau     kerugian    kumulatif    yang                        equity to profit or loss and recognised in
                   sebelumnya diakui di penghasilan                              other income and expenses. Interest
                   komprehensif lain direklasifikasi dari                        income from these financial assets is
                   ekuitas ke laba rugi dan diakui dalam                         included in finance income using the
                   penghasilan atau beban lain-lain.                             effective interest rate method. Foreign
                   Pendapatan bunga dari aset keuangan                           exchange gains and losses are
                   tersebut    dimasukkan     ke    dalam                        presented in other gains and losses on
                   pendapatan       keuangan       dengan                        foreign exchanges, net and impairment
                   menggunakan metode suku bunga                                 expenses in other expenses.
                   efektif. Keuntungan dan kerugian
                   selisih    kurs    disajikan     dalam
                   penghasilan dan beban kurs mata uang
                   asing dan beban penurunan nilai pada
                   beban lain-lain.

               -   Nilai wajar melalui laba rugi: Aset yang                  -   Fair value through profit or loss: Assets
                   tidak memenuhi kriteria untuk biaya                           that do not meet the criteria for
                   perolehan diamortisasi atau nilai wajar                       amortised cost or FVOCI are measured
                   melalui penghasilan komprehensif lain                         at fair value through profit or loss. A
                   diukur pada nilai wajar melalui laporan                       gain or loss on a debt investment that is
                   laba rugi. Keuntungan atau kerugian                           subsequently measured at fair value
                   dari investasi utang yang selanjutnya                         through profit or loss and that is not part
                   diukur pada nilai wajar melalui laporan                       of a hedging relationship, is recognised
                   laba rugi dan bukan merupakan bagian                          in profit or loss and presented net in
                   dari hubungan lindung nilai, diakui                           profit or loss.
                   dalam laba rugi dan disajikan bersih
                   dalam laba rugi.
Page 34
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/24 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     g.   Aset keuangan (lanjutan)                                   g.   Financial assets (continued)

          i.    Klasifikasi, pengakuan, dan pengukuran                    i.    Classification,   recognition             and
                (lanjutan)                                                      measurement (continued)

                Instrumen ekuitas                                               Equity instruments

                Grup      selanjutnya  mengukur     semua                       The Group subsequently measures all
                investasi ekuitas pada nilai wajar. Jika                        equity investments at fair value. In cases
                manajemen Grup telah memilih untuk                              where the Group’s management has elected
                menyajikan keuntungan dan kerugian nilai                        to present fair value gains and losses on
                wajar atas investasi ekuitas dalam                              equity investments in other comprehensive
                penghasilan komprehensif lain, tidak ada                        income,      there      is   no    subsequent
                reklasifikasi keuntungan dan kerugian nilai                     reclassification of fair value gains and losses
                wajar ke laba rugi setelah penghentian                          to profit or loss following the derecognition
                pengakuan investasi tersebut. Dividen dari                      of the investment. Dividends from such
                investasi semacam itu tetap diakui dalam                        investments continue to be recognised in
                laba rugi sebagai pendapatan lainnya ketika                     profit or loss as other income when the
                hak Grup untuk menerima pembayaran                              Group’s right to receive payments is
                ditetapkan.                                                     established.

                Perubahan nilai wajar aset keuangan yang                        Changes in the fair value of financial assets
                diukur pada nilai wajar melalui laporan laba                    at fair value through profit or loss are
                rugi diakui dalam keuntungan/(kerugian)                         recognised in other gains/(losses) in the
                lain-lain    dalam    laporan    laba    rugi                   consolidated statement of profit or loss as
                konsolidasian      sebagaimana      berlaku.                    applicable. Impairment losses (and the
                Kerugian penurunan nilai (dan pemulihan                         reversal of impairment losses) on equity
                kerugian penurunan nilai) atas investasi                        investments measured at FVOCI are not
                ekuitas yang diukur pada nilai wajar melalui                    reported separately from other changes in
                penghasilan komprehensif lain tidak                             fair value.
                dilaporkan secara terpisah dari perubahan
                nilai wajar lainnya.

          ii.   Penghentian pengakuan                                     ii.   Derecognition

                Aset keuangan dihentikan pengakuannya                           Financial assets are derecognised when the
                ketika hak untuk menerima arus kas dari                         rights to receive cash flows from the
                investasi tersebut telah jatuh tempo atau                       investments have expired or have been
                telah ditransfer dan Grup telah mentransfer                     transferred and the Group has transferred
                secara substansial seluruh risiko dan                           substantially all the risks and rewards of
                manfaat atas kepemilikan aset.                                  ownership.

          iii. Saling hapus antar instrumen keuangan                      iii. Offsetting financial instruments

                Aset keuangan dan liabilitas keuangan                           Financial assets and liabilities are offset and
                disalinghapuskan dan jumlah netonya                             the net amount is reported in the
                dilaporkan pada laporan posisi keuangan                         consolidated statement of financial position
                konsolidasian ketika terdapat hak yang                          when there is a legally enforceable right to
                berkekuatan hukum untuk melakukan saling                        offset the recognised amounts and there is
                hapus atas jumlah yang telah diakui                             an intention to settle on a net basis, or
                tersebut      dan    adanya  niat  untuk                        realise the asset and settle the liability
                menyelesaikan secara neto, atau untuk                           simultaneously.
                merealisasikan aset dan menyelesaikan
                liabilitas secara bersamaan.
Page 35
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/25 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     h.   Penurunan nilai aset keuangan                              h.    Impairment of financial assets

          Pada setiap tahun pelaporan, Grup menilai                        At each reporting date, the Group assesses
          apakah risiko kredit dari instrumen keuangan                     whether the credit risk on a financial instrument
          telah meningkat secara signifikan sejak                          has     increased significantly         since    initial
          pengakuan awal. Ketika melakukan penilaian,                      recognition. When making the assessment, the
          Grup menggunakan perubahan atas risiko gagal                     Group uses the change in the risk of a default
          bayar yang terjadi sepanjang perkiraan usia                      occurring over the expected life of the financial
          instrumen keuangan daripada perubahan atas                       instrument instead of the change in the amount of
          jumlah kerugian kredit ekspektasian. Dalam                       expected credit losses. To make that
          melakukan penilaian, Grup membandingkan                          assessment, the Group compares the risk of a
          antara risiko gagal bayar yang terjadi atas                      default occurring on the financial instrument as at
          instrumen keuangan pada saat tahun pelaporan                     the reporting date with the risk of a default
          dengan risiko gagal bayar yang terjadi atas                      occurring on the financial instrument as at the
          instrumen keuangan pada saat pengakuan awal                      date of initial recognition and considers
          dan mempertimbangkan kewajaran serta                             reasonable and supportable information, which is
          ketersediaan informasi yang tersedia pada saat                   available without undue cost or effort at the
          tanggal pelaporan terkait dengan kejadian masa                   reporting date about past events, current
          lalu, kondisi terkini dan perkiraan atas kondisi                 conditions and forecasts of future economic
          ekonomi di masa depan, yang mengindikasikan                      conditions, that is indicative of significant
          kenaikan risiko kredit sejak pengakuan awal.                     increases in credit risk since initial recognition.

          Grup      menerapkan          “pendekatan     yang               The Group applies the “simplified approach” to
          disederhanakan” untuk mengukur kerugian kredit                   measuring expected credit losses which uses a
          ekspektasian yang menggunakan cadangan                           lifetime expected credit loss allowance for all
          kerugian kredit ekspektasian seumur hidup untuk                  trade receivables, other receivables and contract
          seluruh saldo piutang usaha, dan piutang lain-                   assets without significant financing components
          lain, dan aset kontrak tanpa komponen                            and the “general approach” for other financial
          pendanaan yang signifikan, dan “pendekatan                       assets. The general approach incorporates a
          umum” untuk aset keuangan lainnya. Pendekatan                    review for any significant increase in counterparty
          umum      termasuk       penelaahan     perubahan                credit risk since initial recognition. The expected
          signifikan risiko kredit sejak pengakuan awal.                   credit loss reviews include assumptions about the
          Penelaahan kerugian kredit ekspektasian                          risk of default and expected loss rates. To
          termasuk asumsi mengenai risiko gagal bayar                      measure the expected credit losses, trade
          dan tingkat kerugian ekspektasian. Untuk                         receivables have been grouped based on similar
          mengukur kerugian kredit ekspektasian, piutang                   credit risk characteristics and the days past due,
          usaha     telah     dikelompokkan     berdasarkan                with the exception of the receivables which can be
          karakteristik risiko kredit dan jatuh tempo yang                 assessed at their own rating of expected credit
          serupa, terkecuali kepada piutang-piutang yang                   losses.
          dapat     dinilai     sendiri    kerugian    kredit
          ekspektasiannya.
     i.   Aset tetap                                                  i.   Property, plant and equipment
          Pada tanggal akuisisi, Grup menganalisis fakta                   At the acquisition date, the Group analyses the
          dan keadaan untuk masing-masing jenis tanah                      facts and circumstances for each type of land and
          dan hak atas tanah dalam menentukan akuntansi                    land rights in determining the accounting for each
          untuk masing-masing tanah dan hak atas tanah                     of these land and land rights so that it can
          tersebut sehingga dapat merepresentasikan                        accurately represent an underlying economic
          dengan tepat suatu kejadian atau transaksi                       event or transaction. If the land and land rights do
          ekonomis yang mendasarinya. Jika tanah dan                       not transfer control of the underlying assets to the
          hak atas tanah tersebut tidak mengalihkan                        Group, but give the rights to use the underlying
          pengendalian atas aset pendasar kepada Grup,                     assets, the Group accounts for these transactions
          melainkan mengalihkan hak untuk menggunakan                      as leases under SFAS No. 73, “Leases”. If the
          aset pendasar, Grup menerapkan perlakuan                         land and land rights are substantially similar to
          akuntansi atas transaksi tersebut sebagai sewa                   land purchases, the Group applies SFAS No. 16,
          berdasarkan PSAK No. 73, “Sewa”. Jika tanah                      “Fixed Assets” under which land and land rights
          dan hak atas tanah secara substansi menyerupai                   are recognised at cost and not depreciated.
          pembelian tanah, maka Grup menerapkan PSAK
          No. 16, “Aset Tetap” yaitu tanah dan hak atas
          tanah diakui sebesar harga perolehan dan tidak
          disusutkan.
Page 36
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/26 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                      3.     MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                         (continued)

     i.   Aset tetap (lanjutan)                                         i.   Property, plant and equipment (continued)

          Aset tetap pada awalnya diakui sebesar biaya                       Property, plant and equipment are initially
          perolehan yang meliputi harga perolehannya dan                     recognised at cost, which comprises the purchase
          setiap biaya yang dapat diatribusikan langsung untuk               price and any cost directly attributable to bringing
          membawa aset ke kondisi dan lokasi yang diinginkan                 the asset to the location and condition necessary
          agar aset siap digunakan sesuai intensi manajemen.                 for it to be capable of operating in the manner
                                                                             intended by management.

          Setelah pengakuan awal, kelas-kelas aset berikut                   After initial recognition, the following classes of
          ini yang diukur menggunakan metode revaluasi:                      assets are measured using the revaluation method:
          •    Tanah dan hak atas tanah;                                     •    Land and land rights;
          •    Bangunan umum, waduk, dan prasarana;                          •    Buildings, reservoirs and infrastructure;
          •    Instalasi dan mesin pembangkit;                               •    Installations and power plants;
          •    Perlengkapan transmisi;                                       •    Transmission equipment;
          •    Perlengkapan distribusi;                                      •    Distribution equipment;
          •    Perlengkapan       pengolahan   data   dan                    •    Telecommunications and data processing
               telekomunikasi yang digunakan dalam                                equipment used for electricity supply; and
               penyediaan listrik; dan
          •    Material cadangan utama.                                      •    Major spare parts.

          Kelas aset di atas, disajikan sebesar nilai wajar                  The classes of asset above are shown at fair value
          dikurangi penyusutan dan penurunan nilai. Tanah                    less subsequent depreciation and impairment
          tidak disusutkan. Tanah dan hak atas tanah tidak                   losses. Land and land rights are not depreciated.
          didepresiasi. Penilaian terhadap aset-aset tersebut                Valuation of those assets is performed by external
          dilakukan oleh penilai independen eksternal yang                   independent valuers which are registered with the
          terdaftar di OJK. Penilaian atas aset tersebut                     FSA. Valuations are performed with sufficient
          dilakukan secara berkala untuk memastikan bahwa                    regularity to ensure that the fair value of a revalued
          nilai wajar aset yang direvaluasi tidak berbeda                    asset does not differ materially from its carrying
          secara material dengan nilai tercatatnya. Aset yang                amount. Assets that do not change significantly in
          tidak mengalami perubahan nilai wajar secara                       fair value must be re-evaluated at least every 3
          signifikan wajib direvaluasi paling kurang setiap 3                (three) years. Any accumulated depreciation at the
          (tiga) tahun. Akumulasi penyusutan pada tanggal                    date of revaluation is eliminated against the gross
          revaluasi dieliminasi terhadap nilai tercatat bruto                carrying amount of the asset and the net amount is
          aset, dan nilai netonya disajikan kembali sebesar                  restated to the revalued amount of the property,
          nilai revaluasi aset tetap.                                        plant and equipment.

          Kenaikan nilai tercatat yang timbul dari revaluasi                 Increases in the carrying amount arising on
          aset tetap yang menggunakan model revaluasi                        revaluation of property, plant and equipment that
          dikreditkan pada “surplus revaluasi aset” sebagai                  use a revaluation model are credited to “asset
          bagian dari penghasilan komprehensif lain.                         revaluation    surplus”    as    part    of    other
          Penurunan yang menghapus nilai kenaikan                            comprehensive income. Decreases that offset
          sebelumnya atas aset yang sama dibebankan                          previous increases of the same asset are debited
          terhadap “surplus revaluasi aset” sebagai bagian                   against “asset revaluation surplus” as part of other
          dari penghasilan komprehensif lain termasuk aset                   comprehensive income including the assets that
          tersebut ditransfer ke aset tidak digunakan dalam                  are transferred to assets not used in operations; all
          operasi; penurunan lainnya dibebankan pada laba                    other decreases are charged to profit or loss.
          rugi.
Page 37
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/27 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                       3.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                         (continued)

     i.    Aset tetap (lanjutan)                                        i.   Property, plant and equipment (continued)

           Aset tetap disusutkan hingga mencapai estimasi                     Property, plant and equipment are depreciated to
           nilai sisa dengan menggunakan metode garis                         their residual values using the straight-line
           lurus selama masa manfaatnya sebagai berikut:                      method over their expected useful lives as
                                                                              follows:
                                                           Tahun/Years

          Bangunan umum, waduk, dan prasarana                    10 - 50                   Buildings, reservoirs, and infrastructure
          Instalasi dan mesin pembangkit                         12 - 40                            Installations and power plants
          Perlengkapan transmisi                                   40                                     Transmission equipment
          Perlengkapan distribusi                                10 - 40                                    Distribution equipment
          Perlengkapan umum                                        5                                            General equipment
          Kendaraan bermotor                                       5                                                Motor vehicles
          Material cadangan utama                                10 - 40                                          Major spare parts
          Perlengkapan pengolahan data dan                                                               Telecommunications and
             telekomunikasi yang digunakan                                                                         Data processing
             dalam penyediaan listrik                              10                                    used for electricity supply
          Perlengkapan pengolahan data dan                                                    Other telecommunications and data
             telekomunikasi lainnya                                10                                    processing equipmentAA
          Kapal dan perlengkapan                                 10 - 25                                   Vessels and equipment

           Masa manfaat ekonomis, nilai sisa, dan metode                      The useful lives, residual values and depreciation
           penyusutan aset tetap ditelaah, jika diperlukan,                   methods of property, plant and equipment are
           setidaknya disesuaikan, pada setiap akhir tahun                    reviewed and adjusted if appropriate, at the end
           buku. Dampak dari setiap revisi diakui dalam laba                  of each financial year. The effects of any revisions
           rugi, ketika perubahan terjadi.                                    are recognised in profit or loss, when the changes
                                                                              arise.

           Nilai tercatat aset segera diturunkan sebesar                      An asset’s carrying amount is written down
           jumlah yang dapat dipulihkan apabila nilai tercatat                immediately to its recoverable amount if the
           aset lebih besar daripada estimasi jumlah yang                     asset’s carrying amount is greater than its
           dapat dipulihkan (Catatan 3.j).                                    estimated recoverable amount (Note 3.j).

           Beban perbaikan dan pemeliharaan dibebankan                        The costs of repairs and maintenance are
           pada laba rugi pada saat terjadinya. Biaya-biaya                   charged to profit or loss as incurred. Subsequent
           lain yang terjadi selanjutnya yang timbul untuk                    costs incurred to add to, replace part of, or service
           menambah, mengganti atau memperbaiki aset                          an item of property, plant and equipment, are
           tetap diakui sebagai biaya perolehan aset jika dan                 recognised as assets if and only if it is probable
           hanya jika besar kemungkinan manfaat ekonomis                      that future economic benefits associated with the
           di masa depan berkenaan dengan aset tersebut                       item will flow to the entity and the cost of the item
           akan mengalir ke entitas dan biaya perolehan                       can be measured reliably.
           aset dapat diukur secara andal.

           Aset tetap yang tidak digunakan lagi atau dijual,                  For property, plant and equipment which can no
           nilai tercatatnya dikeluarkan dari kelompok aset                   longer be utilised or sold, the carrying amount is
           tetap. Keuntungan atau kerugian dari penjualan                     eliminated from the group of property, plant and
           aset tetap tersebut diakui dalam laba rugi.                        equipment. The resulting gains or losses on
                                                                              disposals of property, plant and equipment are
                                                                              recognised in profit or loss.

           Jika aset yang direvaluasi tidak digunakan lagi                    When revalued assets are no longer utilised or
           atau dijual, jumlah yang dicatat di dalam ekuitas                  sold, the amounts included in equity are
           dipindahkan ke saldo laba.                                         transferred to retained earnings.

           Aset tidak digunakan dalam operasi terdiri dari                    Assets not used in operations consist of property,
           aset tetap yang akan direlokasi/ditransfer, sedang                 plant     and     equipment     that    will   be
           diperbaiki, dan akan dihapus. Aset yang tidak                      relocated/transferred, repaired, and disposed.
           digunakan dalam operasi, kecuali aset yang akan                    Assets not used in operations, except for assets
           dihapus, disusutkan dengan metode garis lurus                      to be disposed, are depreciated using the same
           dan berdasarkan taksiran masa manfaat                              method and based on the economic useful lives
           ekonomis yang sama dengan aset tetap.                              of the property, plant and equipment.
Page 38
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/28 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     i.   Aset tetap (lanjutan)                                     i.    Property, plant and equipment (continued)

          Aset dalam pembangunan merupakan biaya-                         Construction in progress represents costs
          biaya yang berhubungan langsung dengan                          directly attributable to the construction of
          pembangunan aset tetap. Aset dalam                              property, plant and equipment. Construction in
          pembangunan dinyatakan sebesar biaya                            progress is stated at cost, which includes
          perolehan, termasuk biaya pinjaman selama                       borrowing costs during construction on debts
          masa pembangunan dari pinjaman yang                             incurred to finance the construction, depreciation
          digunakan       untuk    pembangunan,        beban              of property, plant and equipment used in the
          penyusutan aset tetap yang digunakan dalam                      construction and cost of testing whether the
          pekerjaan pembangunan dan biaya pengujian                       asset is functioning properly after deducting
          ketika aset dapat berfungsi setelah dikurangi                   sales of electricity during the commissioning
          penjualan listrik ketika masa uji coba. Aset dalam              period. Construction in progress is transferred to
          pembangunan akan dipindahkan ke masing-                         the respective property, plant and equipment
          masing aset tetap yang bersangkutan pada saat                   account when completed and ready for use.
          selesai dan siap digunakan. Penyusutan dimulai                  Depreciation is charged from the date on which
          pada saat aset tersebut siap untuk digunakan                    the assets are ready for use in the manner
          sesuai dengan tujuan yang diinginkan                            intended by management.
          manajemen.

     j.   Penurunan nilai aset non-keuangan                          j.   Impairment of non-financial assets

          Aset yang memiliki masa manfaat yang tidak                      Assets that have an indefinite useful life - for
          terbatas, misalnya goodwill, tidak diamortisasi                 example, goodwill - are not subject to amortisation
          namun diuji penurunan nilainya setiap tahun atau                but are tested annually for impairment, or more
          lebih sering apabila terdapat peristiwa atau                    frequently if events or changes in circumstances
          perubahan pada kondisi yang mengindikasikan                     indicate that they might be impaired. Assets that
          kemungkinan penurunan nilai. Aset yang                          are subject to amortisation are reviewed for
          diamortisasi diuji ketika terdapat indikasi bahwa               impairment whenever events or changes in
          nilai tercatatnya mungkin tidak dapat dipulihkan.               circumstances indicate that the carrying amount
          Penurunan nilai diakui jika nilai tercatat aset                 may not be recoverable. An impairment loss is
          melebihi jumlah terpulihkan. Jumlah terpulihkan                 recognised for the amount by which the asset’s
          adalah yang lebih tinggi antara nilai wajar aset                carrying amount exceeds its recoverable amount.
          dikurangi biaya pelepasan dan nilai pakai aset.                 The recoverable amount is the higher of an
          Dalam menentukan penurunan nilai, aset                          asset’s fair value less costs of disposal and value-
          dikelompokkan pada tingkat yang paling rendah                   in-use. For the purposes of assessing
          dimana terdapat arus kas yang dapat                             impairment, assets are grouped at the lowest
          diidentifikasi. Aset non-keuangan selain goodwill               levels for which there are separately identifiable
          yang mengalami penurunan nilai diuji setiap                     cash flows. Non-financial assets other than
          tanggal pelaporan untuk menentukan apakah                       goodwill that suffer impairment are reviewed for a
          terdapat kemungkinan pemulihan penurunan                        possible reversal of the impairment at each
          nilai.                                                          reporting date.

          Pembalikan rugi penurunan nilai untuk aset selain               Reversal of impairment losses for assets other
          goodwill, diakui jika dan hanya jika, terdapat                  than goodwill would be recognised, if and only if,
          perubahan estimasi yang digunakan dalam                         there has been a change in the estimates used to
          menentukan jumlah terpulihkan aset sejak                        determine the asset’s recoverable amount since
          pengujian penurunan nilai terakhir kali dilakukan.              the last impairment testing was carried out.
          Pembalikan rugi penurunan nilai tersebut diakui                 Reversal of impairment losses will be immediately
          langsung dalam laba rugi. Rugi penurunan nilai                  recognised in profit or loss. Impairment losses
          yang diakui atas goodwill tidak dibalik lagi.                   relating to goodwill would not be reversed.
Page 39
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/29 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     k.   Utang usaha                                             k.   Trade payables

          Utang usaha adalah kewajiban untuk membayar                  Trade payables are obligations to pay for goods
          barang atau jasa yang telah diterima dalam                   or services that have been acquired in the
          kegiatan usaha normal dari pemasok. Utang                    ordinary course of business from suppliers.
          usaha diklasifikasikan sebagai liabilitas jangka             Trade payables are classified as current liabilities
          pendek apabila pembayarannya jatuh tempo                     if payment is due within one year of the reporting
          dalam waktu satu tahun atau kurang setelah                   date. If not, they are presented as non-current
          tanggal pelaporan. jika tidak, utang usaha                   liabilities.
          tersebut disajikan sebagai liabilitas jangka
          panjang.

          Utang usaha pada awalnya diakui sebesar nilai                Trade payables are recognised initially at fair
          wajar dan selanjutnya diukur pada biaya                      value and subsequently measured at amortised
          perolehan diamortisasi dengan menggunakan                    cost using the effective interest method.
          metode suku bunga efektif.

     l.   Sewa                                                    l.   Leases

          Grup sebagai pesewa                                          The Group as a lessor

          Ketika Grup bertindak sebagai pesewa, Grup                   When the Group acts as a lessor, it will classify
          akan mengklasifikasi masing-masing sewanya                   each of its leases as either an operating lease or
          baik sewa operasi atau sewa pembiayaan.                      a finance lease.

          Untuk mengklasifikasi masing-masing sewa,                    To classify each lease, the Group makes an
          Grup membuat penilaian secara keseluruhan                    overall assessment of whether the lease
          atas apakah sewa mengalihkan secara                          transfers substantially all of the risks and rewards
          substansial seluruh risiko dan manfaat yang                  incidental to ownership of the underlying asset. If
          terkait dengan kepemilikan aset pendasar. Jika               this is the case, then the lease is classified as a
          penilaian membuktikan hal tersebut, maka sewa                finance lease; if not, then it is an operating lease.
          diklasifikasikan sebagai sewa pembiayaan; jika
          tidak, maka merupakan sewa operasi.

          Pendapatan sewa dari operasi sewa dimana                     Lease income from operating leases where the
          Grup bertindak sebagai penyewa diakui sebagai                Group is a lessor is recognised as revenue on a
          pendapatan secara garis lurus selama masa                    straight-line basis over the lease term. Initial
          sewa. Biaya langsung awal yang terjadi saat                  direct costs incurred in obtaining an operating
          mendapatkan sewa operasi ditambahkan pada                    lease are added to the carrying amount of the
          nilai tercatat aset pendasar dan diakui sebagai              underlying asset and recognised as expense
          beban selama masa sewa dengan basis yang                     over the lease term on the same basis as lease
          sama dengan pendapatan sewa. Aset terkait                    income. The respective leased assets are
          yang disewakan ditampilkan di laporan posisi                 included in the statement of financial position
          keuangan berdasarkan sifatnya.                               based on their nature.

          Grup sebagai penyewa                                         The Group as a lessee

          Penentuan apakah suatu perjanjian merupakan,                 Determination of whether an arrangement is, or
          atau mengandung, sewa dibuat berdasarkan                     contains, a lease is made based on the
          substansi perjanjian itu sendiri dan penilaian               substance of the arrangement and assessment
          apakah pemenuhan atas perjanjian bergantung                  of whether fulfilment of the arrangement is
          dari penggunaan aset tertentu atau aset, dan                 dependent on the use of a specific asset or
          apakah perjanjian memberikan hak untuk                       assets, and the arrangement conveys a right to
          menggunakan aset.                                            use the asset.

          Grup menyewa aset tetap tertentu. Kontrak sewa               The Group leases certain property, plant and
          biasanya dibuat untuk periode tetap dari 2                   equipment. Rental contracts are typically made
          hingga 20 tahun tetapi mungkin memiliki opsi                 for fixed periods of 2 to 20 years but may have
          ekstensi. Kontrak dapat berisi komponen sewa                 extension options. Contracts may contain both
          dan non-sewa berdasarkan harga relatif yang                  lease and non-lease components based on their
          berdiri sendiri.                                             relative stand-alone prices.

          Sewa diakui sebagai aset hak guna dan liabilitas             Leases are recognised as a right-of-use asset
          terkait pada tanggal di mana aset sewaan                     and a corresponding liability at the date on which
          tersedia untuk digunakan oleh Grup.                          the leased asset is available for use by the
                                                                       Group.
Page 40
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/30 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     l.   Sewa (lanjutan)                                           l.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

          Aset dan liabilitas yang timbul dari sewa pada                 Assets and liabilities arising from a lease are
          awalnya diukur dengan basis nilai kini. Liabilitas             initially measured on a present value basis.
          sewa termasuk nilai bersih sekarang dari                       Lease liabilities include the net present value of
          pembayaran sewa berikut:                                       the following lease payments:
          -   pembayaran tetap (termasuk pembayaran                      -     fixed payments (including in-substance fixed
              tetap secara substansi), dikurangi piutang                       payments), less any lease incentives
              insentif sewa;                                                   receivables;
          -   pembayaran sewa variabel yang didasarkan                   -     variable lease payments that are based on
              pada indeks atau tingkat, pada awalnya                           an index or a rate, initially measured using
              diukur menggunakan indeks atau tingkat                           the index or rate as at the commencement
              pada tanggal mulai;                                              date;
          -   jumlah yang diperkirakan akan dibayarkan                   -     amounts expected to be payable by the
              oleh penyewa berdasarkan jaminan nilai                           lessee under residual value guarantees;
              residu;
          -   harga pelaksanaan dari opsi pembelian jika                 -   the exercise price of a purchase option if the
              penyewa cukup yakin untuk menggunakan                          lessee is reasonably certain to exercise that
              opsi tersebut; dan                                             option; and
          -   pembayaran penalti untuk penghentian                       -   payments of penalties for terminating the -
              sewa, jika masa sewa mencerminkan                              lease, if the lease term reflects the lessee
              penyewa yang melaksanakan opsi tersebut.                       exercising that option.

          Pembayaran sewa yang harus dilakukan                           Lease payments to be made under reasonably
          berdasarkan opsi perpanjangan tertentu juga                    certain extension options are also included in the
          termasuk dalam pengukuran liabilitas.                          measurement of the liability.

          Pembayaran sewa didiskontokan dengan                           The lease payments are discounted using the
          menggunakan suku bunga implisit dalam sewa.                    interest rate implicit in the lease. If the rate
          Jika tarif tidak dapat segera ditentukan, di mana              cannot be readily determined, which is generally
          hal tersebut secara umum terjadi pada sewa                     the case for leases in the Group, the lessee’s
          dalam Grup, suku bunga pinjaman inkremental                    incremental borrowing rate is used, being the
          penyewa digunakan, yaitu tarif yang harus                      rate that the individual lessee would have to pay
          dibayar oleh penyewa untuk meminjam dana                       to borrow the funds necessary to obtain an asset
          yang diperlukan untuk memperoleh aset dengan                   of similar value to the right-of-use asset in a
          nilai yang sama dengan aset hak guna dalam                     similar economic environment with similar terms,
          lingkungan ekonomi serupa dengan syarat dan                    security and conditions.
          ketentuan yang serupa.

          Untuk menentukan suku bunga pinjaman                           To determine the incremental borrowing rate, the
          inkremental, Grup:                                             Group:
          -    jika     memungkinkan,       menggunakan                  -   where possible, uses recent third-party
               pembiayaan pihak ketiga terkini yang                          financing received by the individual lessee
               diterima oleh penyewa individu sebagai titik                  as a starting point, adjusted to reflect
               awal, disesuaikan untuk mencerminkan                          changes in financing conditions since third
               perubahan kondisi pembiayaan sejak                            party financing was received;
               pembiayaan pihak ketiga diterima;
          -    menggunakan pendekatan build-up yang                      -   uses a build-up approach that starts with a
               dimulai dengan suku bunga bebas risiko                        risk free interest rate adjusted for credit risk
               yang disesuaikan dengan risiko kredit untuk                   for leases held by the Group, where there is
               sewa yang dimiliki oleh Grup, yang tidak                      no recent third-party financing; and
               memiliki pembiayaan pihak ketiga baru-baru
               ini; dan
          -    membuat penyesuaian spesifik untuk sewa,                  -   makes adjustments specific to the lease,
               misalnya jangka waktu, mata uang, dan                         e.g., term, currency and security.
               jaminan.
Page 41
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/31 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     l.   Sewa (lanjutan)                                         l.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                              The Group as a lessee (continued)

          Grup dihadapkan pada potensi kenaikan di masa                The Group is exposed to potential future
          depan dalam pembayaran sewa variabel                         increases in variable lease payments based on
          berdasarkan indeks atau tarif, yang tidak                    an index or rate, which are not included in the
          termasuk dalam liabilitas sewa sampai                        lease liability until they take effect. When
          diberlakukan. Ketika penyesuaian pembayaran                  adjustments to lease payments based on an
          sewa berdasarkan indeks atau suku bunga mulai                index or rate take effect, the lease liability is
          berlaku, liabilitas sewa dinilai kembali dan                 reassessed and adjusted against the right-of-use
          disesuaikan dengan aset hak guna.                            asset.

          Pembayaran sewa dialokasikan antara biaya                    Lease payments are allocated between principal
          pokok dan keuangan. Biaya keuangan                           and finance cost. The finance cost is charged to
          dibebankan pada laporan laba rugi selama masa                profit or loss over the lease period so as to
          sewa sehingga menghasilkan suku bunga                        produce a constant periodic rate of interest on
          periodik yang konstan atas sisa saldo liabilitas             the remaining balance of the liability for each
          untuk setiap periode.                                        period.

          Aset hak guna diukur pada biaya perolehan yang               Right-of-use assets are measured at cost
          terdiri dari berikut ini:                                    comprising the following:
          -    jumlah pengukuran awal liabilitas sewa;                 -   the amount of the initial measurement of
                                                                           lease liability;
          -   pembayaran sewa yang dilakukan pada                      -   any lease payments made at or before the
              atau sebelum tanggal dimulainya dikurangi                    commencement date less any lease
              insentif sewa yang diterima; dan                             incentives received; and
          -   biaya langsung awal, dan biaya restorasi.                -   any initial direct costs, and restoration costs.

          Aset hak guna umumnya disusutkan sepanjang                   Right-of-use assets are generally depreciated
          waktu yang lebih pendek antara lama masa                     over the shorter of the asset’s useful life and the
          manfaat aset dan jangka waktu sewa                           lease term on a straight-line basis. If the Group
          menggunakan metode garis lurus. Jika Grup                    is reasonably certain to exercise a purchase
          cukup yakin untuk melaksanakan opsi                          option, the right-of-use assets are depreciated
          pembelian, aset hak guna disusutkan selama                   over the underlying assets’ useful life.
          masa manfaat aset yang mendasarinya.

          Aset hak guna juga mengalami penurunan nilai                 The right-of-use assets are also subject to
          (Catatan 3.j).                                               impairment (Note 3.j).

          Pembayaran terkait dengan sewa jangka pendek                 Payments associated with short-term leases and
          dan sewa aset bernilai rendah diakui atas dasar              leases of low-value assets are recognised on a
          garis lurus sebagai beban dalam laporan laba                 straight-line basis as an expense in profit or loss.
          rugi. Sewa jangka pendek adalah sewa dengan                  Short-term leases are leases with a lease term of
          masa sewa 12 bulan atau kurang. Aset bernilai                12 months or less. Low-value assets comprise
          rendah terdiri dari peralatan umum.                          general equipment.

          Opsi ekstensi dan terminasi                                  Extension and termination options

          Opsi ekstensi dan terminasi termasuk dalam                   Extension and termination options are included
          sejumlah sewa properti dan peralatan di seluruh              in a number of property and equipment leases
          Grup. Istilah-istilah ini digunakan untuk                    across the Group. These terms are used to
          memaksimalkan fleksibilitas operasional dalam                maximise operational flexibility in terms of
          hal pengelolaan kontrak. Mayoritas opsi ekstensi             managing contracts. The majority of extension
          dan terminasi yang dimiliki hanya dapat                      and termination options held are exercisable only
          dilaksanakan oleh Grup dan bukan oleh pemberi                by the Group and not by the respective lessor.
          sewa masing-masing.
Page 42
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/32 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                       3.   MATERIAL       ACCOUNTING                      POLICY
     (lanjutan)                                                        INFORMATION (continued)

     l.       Sewa (lanjutan)                                          l.   Leases (continued)

              Grup sebagai penyewa (lanjutan)                               The Group as a lessee (continued)

              Jaminan nilai residu                                          Residual value guarantees

              Untuk mengoptimalkan biaya sewa selama                        To optimise lease costs during the contract
              periode kontrak, Grup terkadang memberikan                    period, the Group sometimes provides residual
              jaminan nilai residu sehubungan dengan sewa                   value guarantees in relation to equipment
              peralatan.                                                    leases.

              Modifikasi sewa                                               Lease modification

              Penyewa mencatat modifikasi sewa sebagai                      A lessee shall account for a lease modification
              sewa terpisah jika:                                           as a separate lease if both:

          -      modifikasi meningkatkan ruang lingkup sewa                 -    the modification increases the scope of the
                 dengan      menambahkan       hak      untuk                    lease by adding the right to use one or more
                 menggunakan satu aset pendasar atau lebih;                      underlying assets; and
                 dan
          -      imbalan sewa meningkat sebesar jumlah yang                 -    the consideration for the lease increases by
                 setara dengan harga tersendiri untuk                            an amount commensurate with the stand-
                 peningkatan dalam ruang lingkup dan                             alone price for the increase in scope and any
                 penyesuaian yang tepat pada harga tersendiri                    appropriate adjustments to that stand-alone
                 tersebut untuk merefleksikan kondisi kontrak                    price to reflect the circumstances of the
                 tertentu.                                                       particular contract.

          Untuk modifikasi sewa yang tidak dicatat sebagai                  For a lease modification that is not accounted for
          sewa terpisah, pada tanggal efektif modifikasi                    as a separate lease, at the effective date of the
          sewa, penyewa:                                                    lease modification, a lessee shall:

          -      mengalokasikan          imbalan        kontrak             -    allocate the consideration in the modified
                 modifikasian;                                                   contract;
          -      menentukan      masa     sewa     dari   sewa              -    determine the lease term of the modified
                 modifikasian; dan                                               lease; and
          -      mengukur kembali liabilitas sewa dengan                    -    remeasure the lease liability by discounting
                 mendiskontokan pembayaran sewa revisian                         the revised lease payments using a revised
                 menggunakan tingkat diskonto revisian.                          discount rate. The revised discount rate is
                 Tingkat diskonto revisian ditentukan sebagai                    determined as the interest rate implicit in the
                 suku bunga implisit dalam sewa untuk sisa                       lease for the remainder of the lease term, if
                 masa sewa, jika dapat ditentukan; atau suku                     that rate can be readily determined, or the
                 bunga pinjaman inkremental penyewa pada                         lessee’s incremental borrowing rate at the
                 tanggal efektif modifikasi, jika suku bunga                     effective date of the modification, if the
                 implisit dalam sewa tidak dapat ditentuka                       interest rate implicit in the lease cannot be
                                                                                 readily determined.

          Untuk modifikasi sewa yang tidak dicatat sebagai                  For a lease modification that is not accounted for
          sewa terpisah, penyewa mencatat pengukuran                        as a separate lease, the lessee shall account for
          kembali liabilitas sewa dengan:                                   the measurement of the lease liability by:

          -      menurunkan jumlah tercatat aset hak guna                   -    decreasing the carrying amount of the right-
                 untuk merefleksikan penghentian parsial atau                    of-use asset to reflect the partial or full
                 penuh sewa untuk modifikasi sewa yang                           termination of the lease for lease
                 menurunkan ruang lingkup sewa. Penyewa                          modifications that decrease the scope of the
                 mengakui dalam laba rugi setiap keuntungan                      lease. The lessee shall recognise in profit or
                 atau     kerugian  yang   terkait   dengan                      loss any gain or loss relating to the partial or
                 penghentian parsial atau penuh sewa                             full termination of the lease.
                 tersebut.
          -      membuat penyesuaian terkait dengan aset                    -    making a corresponding adjustment to the
                 hak guna untuk seluruh modifikasi sewa                          right-of-use asset for all other lease
                 lainnya.                                                        modifications.
Page 43
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/33 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                      POLICY
     (lanjutan)                                                     INFORMATION (continued)

     m. Biaya pinjaman                                              m. Borrowing costs

          Biaya bunga dan biaya pinjaman lainnya, seperti                Interest and other borrowing costs, such as
          biaya diskonto pinjaman baik yang secara                       discount fees on loans either directly or indirectly
          langsung atau tidak langsung digunakan untuk                   used in financing the construction of a qualifying
          pendanaan konstruksi aset kualifikasian,                       asset, are capitalised up to the date when
          dikapitalisasi hingga aset tersebut selesai                    construction is complete. For borrowings that are
          dikonstruksi. Untuk biaya pinjaman yang dapat                  directly attributable to a qualifying asset, the
          diatribusikan secara langsung pada aset                        amount to be capitalised is determined as the
          kualifikasian,    jumlah    yang    dikapitalisasi             actual borrowing cost incurred during the year,
          ditentukan dari biaya pinjaman aktual yang                     less any income earned on the temporary
          terjadi selama tahun berjalan, dikurangi                       investment of such borrowings. For borrowings
          penghasilan yang diperoleh dari investasi                      that are not directly attributable to a qualifying
          sementara atas dana hasil pinjaman tersebut.                   asset, the amount to be capitalised is determined
          Untuk pinjaman yang tidak dapat diatribusikan                  by applying a capitalisation rate to the amount
          secara langsung pada suatu aset kualifikasian,                 expended on the qualifying assets. The
          jumlah yang dikapitalisasi ditentukan dengan                   capitalisation rate is the weighted average of the
          mengalikan tingkat kapitalisasi terhadap jumlah                total borrowing costs applicable to the total
          yang dikeluarkan untuk memperoleh aset                         borrowings outstanding during the period, other
          kualifikasian. Tingkat kapitalisasi dihitung                   than borrowings made specifically for the
          berdasarkan rata-rata tertimbang biaya pinjaman                purpose of obtaining a qualifying asset.
          yang dibagi dengan jumlah pinjaman yang
          tersedia selama periode, selain pinjaman yang
          secara spesifik diambil untuk tujuan memperoleh
          suatu aset kualifikasian.

     n.   Properti investasi                                        n.   Investment properties

          Properti investasi adalah properti (tanah dan hak              Investment properties are properties (land and
          atas tanah atau bangunan atau bagian dari suatu                land rights or a building or part of a building or
          bangunan atau kedua-duanya) yang dikuasai                      both) held by the owner or the lessee under a
          oleh pemilik atau penyewa melalui sewa                         finance lease to earn rentals or for capital
          pembiayaan untuk menghasilkan sewa atau                        appreciation or both, rather than for use in the
          untuk kenaikan nilai atau kedua-duanya, dan                    production or supply of goods or services or for
          tidak untuk digunakan dalam produksi atau                      administrative purposes; or sale in the daily
          penyediaan barang atau jasa atau untuk tujuan                  business activities.
          administratif; atau dijual dalam kegiatan usaha
          sehari-hari.

          Properti investasi diakui sebagai aset jika dan                Investment property is recognised as an asset
          hanya jika besar kemungkinan manfaat                           when, and only when it is probable that the future
          ekonomis masa depan yang terkait dengan                        economic benefits that are associated with the
          properti investasi akan mengalir ke entitas; dan               investment property will flow to the entity; and the
          biaya perolehan properti investasi dapat diukur                cost of the investment property can be measured
          dengan andal.                                                  reliably.

          Properti investasi pada awalnya diukur sebesar                 An investment property shall be measured
          biaya perolehan, meliputi harga pembelian dan                  initially at its cost, comprising its purchase price
          setiap pengeluaran yang dapat diatribusikan                    and any directly attributable expenditure
          secara langsung (biaya jasa hukum, pajak                       (professional fees for legal services, property
          pengalihan properti, dan biaya transaksi lain).                transfer taxes and other transaction costs).
          Biaya transaksi termasuk dalam pengukuran                      Transaction costs are included in the initial
          awal tersebut.                                                 measurement.
Page 44
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/34 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     n.   Properti investasi (lanjutan)                              n.   Investment properties (continued)

          Setelah pengakuan awal, Grup memilih                             After initial recognition, the Group chooses to use
          menggunakan model nilai wajar dan mengukur                       the fair value model and measure all of its
          seluruh properti investasi berdasarkan nilai wajar.              investment properties at fair value. Any gain or
          Keuntungan atau kerugian yang timbul dari                        loss arising from a change in the fair value of
          perubahan nilai wajar properti investasi diakui                  investment property is recognised in profit or loss
          dalam laba rugi pada tahun terjadinya.                           for the year in which it arises.

          Nilai wajar didasarkan kepada harga pasar aktif,                 Fair value is based on active market prices,
          disesuaikan, jika perlu, dengan perbedaan alam,                  adjusted, if necessary, for differences in the
          lokasi atau kondisi dari aset tersebut. Jika                     nature, location or condition of the specific asset.
          informasi tersebut tidak tersedia, Grup                          If this information is not available, the Group uses
          menggunakan metode penilaian alternatif, seperti                 alternative valuation methods, such as recent
          harga terbaru di pasar yang kurang aktif atau                    prices on less active markets or discounted cash
          proyeksi arus kas yang didiskontokan.                            flow projections.

          Penentuan nilai wajar investasi dilakukan pada                   The fair value of investment property as at the
          tanggal posisi keuangan didasarkan pada                          financial position date is based on an annual
          penilaian oleh penilai independen yang                           valuation by an independent valuer who holds a
          mempunyai kualifikasi profesional yang telah                     recognised and relevant professional qualification
          diakui dan relevan serta memiliki pengalaman                     and has recent experience in the location and
          terkini di lokasi dan kategori properti investasi                category of the investment property being valued.
          yang dinilai. Penilaian ini membentuk dasar untuk                These valuations form the basis for the carrying
          nilai   tercatat     pada     laporan  keuangan                  amounts in the consolidated financial statements.
          konsolidasian.

          Properti investasi dihentikan pengakuannya pada                  Investment properties are derecognised either
          saat dilepaskan (pada tanggal penerima                           when they have been disposed of (i.e., at the date
          mendapatkan kontrol) atau ketika tidak digunakan                 the recipient obtains control) or when they are
          lagi secara permanen dan tidak memiliki manfaat                  permanently withdrawn from use and no future
          ekonomi masa depan yang diperkirakan dari                        economic benefit is expected from their disposal.
          pelepasannya. Selisih antara hasil neto                          The difference between the net disposal proceeds
          pelepasan dan jumlah tercatat aset diakui dalam                  and the carrying amount of the asset is
          laba rugi pada tahun terjadinya penghentian atau                 recognised in profit or loss in the year of
          pelepasan.      Dalam        menentukan      nilai               derecognition. In determining the amount of
          pertimbangan dari pelepasan properti investasi,                  consideration from the derecognition of
          Grup mempertimbangkan dampak dari variabel                       investment property, the Group considers the
          pertimbangan, adanya komponen pembiayaan                         effects of variable consideration, the existence of
          yang signifikan, dan pertimbangan utang ke                       a significant financing component, non-cash
          pembeli (jika ada).                                              consideration, and consideration payable to the
                                                                           buyer (if any).

          Pengalihan dilaksanakan ke (atau dari) properti                  Transfers are made to (or from) investment
          investasi hanya ketika adanya perubahan                          property only when there is a change in use. For
          pemakaian. Untuk pengalihan dari properti                        a transfer from investment property to owner-
          investasi menjadi properti yang ditempati pemilik,               occupied property, the deemed cost for
          biaya yang dianggap untuk akuntansi selanjutnya                  subsequent accounting is the fair value at the date
          adalah nilai wajar pada tanggal perubahan                        of change in use. If owner-occupied property
          pemakaian tersebut. Jika properti yang ditempati                 becomes an investment property, the Group
          pemilik menjadi properti investasi, Grup                         accounts for such property in accordance with the
          mengakui properti tersebut sesuai dengan                         policy stated under property, plant and equipment
          kebijakan yang tercantum pada aset tetap sampai                  up to the date of change in use.
          tanggal perubahan pemakaian.
Page 45
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/35 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     o.   Aset tak berwujud                                         o.    Intangible assets

          Piranti lunak komputer                                          Computer software

          Biaya yang terkait dengan pemeliharaan                          Costs associated with maintaining computer
          program piranti lunak komputer diakui sebagai                   software programs are recognised as an
          beban      pada     saat    terjadinya.     Biaya               expense as incurred. Development costs that are
          pengembangan yang dapat secara langsung                         directly attributable to the design and testing of
          diatribusikan kepada desain dan pengujian                       identifiable and unique software products
          produk piranti lunak yang dapat diidentifikasi dan              controlled by the Group are recognised as
          unik yang dikendalikan oleh Grup diakui sebagai                 intangible assets. Directly attributable costs are
          aset tak berwujud. Biaya yang dapat                             capitalised as part of the software product
          diatribusikan secara langsung dikapitalisasi                    include the software development employee
          sebagai bagian produk piranti lunak mencakup                    costs and an appropriate portion of relevant
          beban pekerja pengembang piranti lunak dan                      overheads. Computer software development
          bagian     overhead yang relevan. Biaya                         costs recognised as assets are amortised using
          pengembangan piranti lunak komputer diakui                      the straight-line method over their estimated
          sebagai aset yang diamortisasi dengan metode                    useful lives of between four to five years.
          garis lurus berdasarkan estimasi masa
          manfaatnya antara 4 sampai dengan 5 tahun.

          Biaya legal terkait pembaruan tanah dan hak atas                Legal costs to renew land and land rights
          tanah

          Biaya legal terkait dengan pembaruan tanah dan                  Legal costs related to the renewal of land and land
          hak atas tanah diakui sebagai aset tak berwujud                 rights are recognised as intangible assets and
          dan diamortisasi sepanjang umur hukum tanah                     amortised over the period of the land or land rights
          dan hak atas tanah antara 20 sampai dengan 30                   between 20 to 30 years.
          tahun.

     p.   Biaya dibayar di muka                                      p.   Prepaid expenses

          Biaya dibayar di muka diamortisasi selama                       Prepaid expenses are amortised over the periods
          periode manfaat dengan menggunakan metode                       benefited using the straight-line method.
          garis lurus.

     q.   Kas dan setara kas                                         q    Cash and cash equivalents

          Kas dan setara kas termasuk kas, kas di bank,                   Cash and cash equivalents consist of cash on hand,
          dan deposito berjangka yang jatuh tempo dalam                   cash in banks and time deposits with maturity
          jangka waktu enam bulan atau kurang pada saat                   periods of six months or less at the time of
          penempatan yang tidak digunakan sebagai                         placement that are not used as collateral or are not
          jaminan atau tidak dibatasi penggunaannya.                      restricted.

          Laporan arus kas konsolidasian disusun                          The consolidated statements of cash flows have
          menggunakan         metode     langsung   dengan                been prepared using the direct method by
          mengklasifikasikan arus kas berdasarkan                         classifying the cash flows on the basis of
          aktivitas operasi, investasi, dan pendanaan.                    operating, investing, and financing activities.

     r.   Persediaan                                                 r.   Inventories

          Persediaan suku cadang, bahan bakar, minyak                     Spare parts, fuel, lubricants, tools and supplies
          pelumas, perlengkapan, dan bahan pendukung                      are valued at cost less a provision for obsolete
          dinilai dengan harga perolehan dikurangi dengan                 and slow-moving inventory. Cost is determined
          provisi persediaan usang dan bergerak lambat.                   based on the moving average method. A
          Harga perolehan ditentukan dengan metode rata-                  provision for obsolete and slow-moving inventory
          rata bergerak. Provisi persediaan usang dan                     is determined on the basis of estimated future
          bergerak lambat ditentukan berdasarkan estimasi                 usage of individual inventory items.
          penggunaan jenis persediaan pada masa
          mendatang.
Page 46
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/36 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     s.   Pengakuan pendapatan dan beban                             s.   Revenue and expense recognition

          Pendapatan dari kontrak dengan pelanggan                        Revenue from contracts with customers

          Pengakuan pendapatan harus memenuhi 5                           Revenue recognition has to fulfil 5 (five) steps of
          (lima) langkah penilaian sebagai berikut:                       assessment as follows:

          i.   identifikasi kontrak dengan pelanggan;                     i.     identify contract(s) with a customer;
          ii.  identifikasi kewajiban pelaksanaan dalam                   ii.    identify the performance obligations in the
               kontrak.         Kewajiban      pelaksanaan                       contract. Performance obligations are
               merupakan janji-janji dalam kontrak untuk                         promises in a contract to transfer to a
               menyerahkan barang atau jasa yang                                 customer goods or services that are distinct;
               memiliki       karakteristik  berbeda       ke
               pelanggan;                                                 iii.   determine the transaction price. The
          iii. penetapan harga transaksi. Harga transaksi                        transaction price is the amount of
               merupakan jumlah imbalan yang berhak                              consideration to which an entity expects to
               diperoleh suatu entitas sebagai kompensasi                        be entitled in exchange for transferring
               atas diserahkannya barang atau jasa yang                          promised goods or services to a customer.
               dijanjikan ke pelanggan. Jika imbalan yang                        If the consideration promised in a contract
               dijanjikan di kontrak mengandung suatu                            includes a variable amount, the Group
               jumlah yang bersifat variabel, maka Grup                          estimates the amount of consideration to
               membuat estimasi jumlah imbalan tersebut                          which it expects to be entitled in exchange
               sebesar jumlah yang diharapkan berhak                             for transferring the promised goods or
               diterima atas diserahkannya barang atau                           services to a customer less the estimated
               jasa yang dijanjikan ke pelanggan dikurangi                       amount of service level guarantee which will
               dengan estimasi jumlah jaminan kinerja jasa                       be paid during the contract period;
               yang akan dibayarkan selama periode
               kontrak;                                                   iv. allocate the transaction price to each
          iv. alokasi harga transaksi ke setiap kewajiban                     performance obligation on the basis of the
               pelaksanaan dengan menggunakan dasar                           relative stand-alone selling prices of each
               harga jual berdiri sendiri relatif dari setiap                 distinct good or service promised in the
               barang atau jasa berbeda yang dijanjikan di                    contract. Where these are not directly
               kontrak. Ketika tidak dapat diamati secara                     observable, the relative stand-alone selling
               langsung, harga jual berdiri sendiri relatif                   prices are estimated based on expected
               diperkirakan berdasarkan biaya yang                            cost-plus margin; and
               diharapkan ditambah margin; dan                            v. recognise revenue when the performance
          v. pengakuan pendapatan ketika kewajiban                            obligation is satisfied by transferring a
               pelaksanaan telah dipenuhi dengan                              promised good or service to a customer
               menyerahkan barang atau jasa yang                              (which is when the customer obtains control
               dijanjikan ke pelanggan (ketika pelanggan                      of that good or service).
               telah memiliki kendali atas barang atau jasa
               tersebut).

          Kewajiban pelaksanaan dapat dipenuhi dengan                      A performance obligation may be satisfied at the
          cara sebagai berikut:                                            following:
          -   Pada waktu tertentu (umumnya janji untuk                     -    A point in time (typically for promises to
              menyerahkan barang ke pelanggan); atau                            transfer goods to a customer); or
          -   Sepanjang waktu (umumnya janji untuk                         -    Over time (typically for promises to transfer
              menyerahkan jasa ke pelanggan). Untuk                             services to a customer). For a performance
              kewajiban pelaksanaan yang dipenuhi                               obligation satisfied over time, the Group
              sepanjang waktu, Grup memilih ukuran                              selects an appropriate measure of progress
              penyelesaian yang sesuai untuk penentuan                          to determine the amount of revenue that
              jumlah pendapatan yang harus diakui karena                        should be recognised as the performance
              telah terpenuhinya kewajiban pelaksanaan.                         obligation is satisfied.
Page 47
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/37 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     s.   Pengakuan pendapatan dan beban (lanjutan)                s.   Revenue and expense recognition (continued)

          Penjualan tenaga listrik                                      Sale of electricity

          Pendapatan penjualan listrik diakui berdasarkan               Revenue from the sale of electricity is recognised
          pemakaian energi listrik (kWh). Umumnya,                      based on customers’ electricity usage (kWh).
          pelanggan dapat membeli token mereka sendiri                  Generally, customers can buy their own token
          ("prabayar")   atau   ditagih setiap      bulan               (“prepaid”) or are billed monthly (“postpaid”). For
          ("pascabayar"). Untuk pelanggan pascabayar,                   postpaid customers, revenue from the sale of
          pendapatan dari penjualan listrik diakui setiap               electricity is recognised monthly based on the
          bulan berdasarkan hasil baca meter atas                       meter reading result of each customer. For
          pemakaian pelanggan. Untuk pelanggan                          prepaid customers, the Group recognises the
          prabayar,    Grup     mengakui      pendapatan                revenue based on the estimated usage of the
          berdasarkan estimasi jumlah penggunaan token                  customer during the period. The prepayment
          pelanggan pada periode tertentu. Penerimaan                   from customers received is recorded under other
          dimuka dari pelanggan telah dicatat pada utang                payables.
          lain-lain.

          Subsidi listrik Pemerintah                                    The Government’s electricity subsidy

          Pendapatan subsidi merupakan pendapatan dari                  Subsidy revenue represents the revenue from
          Pemerintah Indonesia atas selisih antara biaya                the Government of Indonesia for the difference
          yang diperbolehkan ditambah margin 7%                         between allowable cost plus a 7% margin and
          dengan harga jual aktual per masing-masing                    the actual sales price for each tariff group except
          golongan tarif kecuali untuk golongan tarif yang              for tariff groups for which tariff adjustments were
          diberlakukan     penyesuaian      tarif  menurut              applied based on Minister of Energy and Mineral
          Peraturan Menteri Energi dan Sumber Daya                      Resources (“ESDM”) Regulation No. 28 Year
          Alam Mineral (“ESDM”) No. 28 Tahun 2016                       2016 on tariff for electricity provided          by
          tentang tarif tenaga listrik yang disediakan oleh             Perusahaan         Perseroan        (Persero)   PT
          Perusahaan       Perseroan       (Persero)    PT              Perusahaan Listrik Negara with the latest
          Perusahaan Listrik Negara sebagaimana                         amendment by Regulation of the Minister of
          terakhir diubah dengan Peraturan Menteri ESDM                 ESDM No. 8 Year 2023 (together referred as
          No. 8 Tahun 2023 (bersama-sama disebut                        “ESDM Regulation on tariff for electricity”).
          “Peraturan ESDM tentang tarif tenaga listrik”).

          Subsidi listrik Pemerintah diakui sebagai                     The Government’s electricity subsidy is
          pendapatan berdasarkan berita acara verifikasi                recognised as revenue based on a monthly
          bulanan dimana tertera berapa jumlah subsidi                  verification report where the amount of subsidy
          yang akan dibayarkan oleh Pemerintah dan telah                to be paid by the Government is stated and has
          diakui sebagai kewajiban oleh Pemerintah                      been recognised as an obligation by the
          Indonesia. Nilai subsidi listrik Pemerintah pada              Government of Indonesia. The Government’s
          akhir tahun perlu diaudit oleh Badan Pemeriksa                electricity subsidy value at the end of the year is
          Keuangan (“BPK”).                                             subjected to the Supreme Audit Agency (“BPK”)
                                                                        audit.
Page 48
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/38 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     s.   Pengakuan pendapatan dan beban (lanjutan)               s.   Revenue and expense recognition (continued)

          Pendapatan kompensasi                                        Compensation income

          Pendapatan       kompensasi         merupakan                Compensation income is income from the
          pendapatan dari Pemerintah Indonesia atas tarif              Government of Indonesia for non-subsidy tariff
          golongan non-subsidi yang tidak mengalami                    groups which have not experienced a tariff
          perubahan kenaikan tarif berdasarkan Peraturan               adjustment based on ESDM Regulation on tariff
          ESDM tentang tarif tenaga listrik. Kompensasi                for electricity. Compensation from the
          dari Pemerintah diakui sebagai pendapatan                    Government is recognised as income based on
          berdasarkan Laporan Hasil Pemeriksaan                        the Audit Report (“LHP”) of the State
          (“LHP”) Badan Pengawasan Keuangan dan                        Development Audit Agency (“BPKP”) and/or
          Pembangunan (“BPKP”) dan/atau BPK Republik                   BPK of the Republic of Indonesia and the amount
          Indonesia dan jumlahnya telah diakui sebagai                 has been recognised as an obligation by the
          kewajiban oleh Pemerintah Indonesia.                         Government of Indonesia.

          Nilai  kompensasi    merupakan     estimasi                  The compensation value is a management
          manajemen yang pada akhir tahun akan direviu                 estimate which at the end of the year will be
          oleh BPKP dan/atau BPK.                                      reviewed by BPKP and/or BPK.

          Biaya penyambungan pelanggan                                 Customer connection fees

          Grup menganggap biaya penyambungan yang                      The Group views connection fees received from
          diterima dari pelanggan yang digunakan untuk                 customers that are used to construct or acquire
          membangun atau mengakuisisi aset tetap untuk                 property, plant and equipment to connect the
          menghubungkan pelanggan secara tidak                         customers as indirectly related to the promise of
          langsung berkaitan erat dengan pasokan listrik               providing a supply of electricity to the customers.
          kepada pelanggan. Pasokan listrik dan biaya                  Supply of electricity and connection fees are not
          penyambungan merupakan satu kesatuan                         distinct because the customers cannot benefit
          karena pelanggan tidak dapat memperoleh                      from these two services on their own. The
          manfaat dari kedua layanan ini sendiri.                      purpose of the connection infrastructure is to fulfil
          Infrastruktur penyambungan berfungsi untuk                   the obligation to supply electricity to the
          memenuhi kewajiban penyediaan tenaga listrik                 customers. Both the supply of electricity and
          kepada pelanggan. Pasokan listrik dan biaya                  connection fees are substantially the same and
          penyambungan pada dasarnya sama, dan                         have the same pattern of transfer to the
          memiliki pola transfer yang sama ke pelanggan.               customers. Therefore, connection fees and the
          Oleh karena itu, biaya penyambungan dan                      supply of electricity are one performance
          pasokan tenaga listrik merupakan satu                        obligation. As such, connection fees are
          kewajiban pelaksanaan. Dengan demikian,                      recognised as deferred revenue and amortised
          biaya      penyambungan       diakui   sebagai               at the rate of 5% per annum starting from the
          pendapatan ditangguhkan dan diamortisasi                     connection date.
          dengan tarif 5% per tahun terhitung sejak
          tanggal koneksi.

          Penjualan batu bara                                          Sales of coal

          Pendapatan penjualan diakui pada setiap                      Sales revenue is recognised on each individual
          penjualan individu ketika mengontrol transfer ke             sale when control transfers to the customer.
          pelanggan. Kontrol beralih ke pelanggan dan                  Control passes to the customer and sales
          pendapatan penjualan diakui ketika batu bara                 revenue is recognised when the coal is loaded
          dimuat ke kapal dimana batu bara akan dikirim                onto the vessel on which the coal will be shipped
          ke pelabuhan tujuan atau tempat pelanggan.                   to the destination port or the customer’s
                                                                       premises.
Page 49
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/39 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     s.   Pengakuan pendapatan dan beban (lanjutan)                 s.   Revenue and expense recognition (continued)

          Penjualan batu bara (lanjutan)                                 Sales of coal (continued)

          Grup menjual batu bara dengan syarat Free on                   The Group generally sells its coal products under
          Board (“FOB”), di mana Grup tidak memiliki                     Free on Board (“FOB”) terms, where the Group
          tanggung jawab untuk pengangkutan atau                         has no responsibility for freight or insurance once
          asuransi setelah kontrol barang telah berlalu di               control of the goods has passed at the loading
          pelabuhan muat. Untuk jangka waktu ini hanya                   port. For this term there is only one performance
          ada satu kewajiban pelaksanaan, yaitu untuk                    obligation, which is for the provision of a product
          penyediaan produk pada titik di mana kontrol                   at the point where control passes. In addition, the
          lewat. Selain itu, Grup menjual batu bara dengan               Group also sells coal under Cost, Insurance and
          syarat Cost, Insurance and Freight (“CIF”), tetapi             Freight (“CIF”) terms, but under the sales
          berdasarkan perjanjian penjualan, kepemilikan                  agreement, the title and risk of loss of coal shall
          dan risiko kerugian atas batu bara akan tetap                  remain with the Group until such coal passes at
          berada pada Grup sampai batu bara melewati                     the discharging port. As such, the Group
          pelabuhan bongkar. Oleh karena itu, Grup                       considers that the insurance and freight costs are
          menganggap bahwa biaya asuransi dan                            not separate performance obligations but one
          pengangkutan bukan merupakan kewajiban                         performance obligation with the sale of coal,
          pelaksanaan terpisah melainkan satu kesatuan                   because the control over coal supplies passes to
          dengan     kewajiban     pelaksanaan      dengan               the buyer when the coal has arrived at the
          penjualan batu bara dikarenakan kontrol atas                   buyer’s location. Accordingly, the Group does
          persediaan batu bara berpindah ke pembeli                      not have any separate performance obligations
          pada saat batu bara tersebut sudah sampai di                   for the transportation and insurance services
          lokasi pembeli. Oleh karena itu, Grup tidak                    provided.
          memiliki kewajiban pelaksanaan terpisah untuk
          jasa pengangkutan dan asuransi yang
          disediakan.

          Pendapatan usaha lainnya                                       Other revenues

          Pendapatan       usaha      lainnya   merupakan                Other revenues consist of telecommunications
          pendapatan yang berasal dari pelayanan                         network and services, transformer rental and
          jaringan dan jasa telekomunikasi, sewa trafo dan               other administrative services. Revenue from
          jasa-jasa administratif lainnya. Pendapatan dari               providing services is recognised in the
          pemberian jasa diakui pada periode akuntansi                   accounting period in which the services are
          saat jasa tersebut telah diberikan. Untuk kontrak              rendered. For fixed-price contracts, revenue is
          harga tetap, pendapatan diakui berdasarkan                     recognised based on the actual service provided
          servis aktual yang diberikan hingga akhir periode              to the end of the reporting period as a proportion
          pelaporan sebagai proporsi dari total servis yang              of the total services to be provided because the
          akan diberikan karena pelanggan telah                          customers received and consumed the benefit
          menerima dan menggunakan manfaat secara                        simultaneously.
          simultan.

          Komponen pembiayaan                                            Financing component

          Grup tidak memperkirakan adanya kontrak di                     The Group does not expect to have any contracts
          mana jangka waktu antara pengalihan barang                     where the period between the transfer of the
          atau jasa yang dijanjikan kepada pelanggan dan                 promised goods or services to the customer and
          pembayaran oleh pelanggan melebihi satu                        payment by the customer exceeds one year.
          tahun. Akibatnya, Grup tidak menyesuaikan                      Consequently, the Group does not adjust any of
          harga transaksi apa pun dengan nilai waktu                     the transaction prices for the time value of
          uang.                                                          money.

          Beban                                                          Expenses

          Beban diakui pada saat terjadinya dengan dasar                 Expenses are recognised as incurred on an
          akrual.                                                        accrual basis.
Page 50
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/40 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     t.   Imbalan kerja                                            t.   Employee benefits

          Imbalan pascakerja                                            Post-employment benefits

          Skema pensiun diklasifikasikan sebagai program                Pension schemes are classified as either defined
          iuran pasti atau program manfaat pasti,                       contribution plans or defined benefit plans,
          tergantung pada substansi ekonomi dari syarat                 depending on the economic substance of the
          dan kondisi utama program tersebut. Program                   plan as derived from its principal terms and
          iuran pasti adalah program pensiun yang                       conditions. A defined contribution plan is a
          mewajibkan Grup membayar sejumlah iuran                       pension plan under which the Group pays fixed
          tertentu kepada entitas terpisah. Grup tidak                  contributions into a separate entity. The Group
          memiliki kewajiban hukum atau konstruktif untuk               has no legal or constructive obligations to pay
          membayar iuran lebih lanjut jika entitas tersebut             further contributions if the fund does not hold
          tidak memiliki aset yang cukup untuk membayar                 sufficient assets to pay all employees the
          seluruh imbalan atas jasa yang diberikan pekerja              benefits relating to employee service in the
          pada     tahun    berjalan   dan     tahun-tahun              current period and prior years. A defined benefit
          sebelumnya. Program manfaat pasti adalah                      plan is a pension plan that is not a defined
          program pensiun yang bukan merupakan                          contribution plan. Typically, defined benefit plans
          program iuran pasti. Program manfaat pasti                    define an amount of pension benefit that an
          adalah program pensiun yang menentukan                        employee will receive upon retirement, usually
          jumlah imbalan pensiun yang akan diterima                     dependent on one or more factors such as age,
          seorang pekerja pada saat pensiun, biasanya                   years of service and compensation.
          berdasarkan pada satu atau lebih faktor seperti
          usia, masa kerja, dan kompensasi.

          Grup harus mencadangkan jumlah minimal                        The Group is required to provide a minimum
          imbalan pensiun sesuai dengan Peraturan                       amount of pension benefit in accordance with
          Ketenagakerjaan atau Perjanjian Kerja Bersama                 Manpower Regulations or the Group’s Collective
          (“PKB”), mana yang lebih tinggi. Karena                       Labour Agreement (the “CLA”), whichever is
          Peraturan     Ketenagakerjaan     atau    PKB                 higher. Since the Manpower Regulations or the
          menentukan rumus tertentu untuk menghitung                    CLA set the formula for determining the minimum
          jumlah minimal imbalan pensiun, pada dasarnya,                amount of benefits, in substance pension plans
          program pensiun berdasarkan Peraturan                         under the Manpower Regulations or the CLA
          Ketenagakerjaan atau PKB adalah program                       represent defined benefit plans.
          manfaat pasti.

          Sehubungan dengan program manfaat pasti,                      The liability recognised in the consolidated
          liabilitas diakui pada laporan posisi keuangan                statement of financial position in respect of
          konsolidasian setara dengan nilai kini kewajiban              defined benefit pension program is equivalent to
          manfaat pasti pada akhir tahun pelaporan                      the present value of the defined benefit obligation
          dikurangi nilai wajar aset program. Kewajiban                 at the end of the reporting year less the fair value
          manfaat pasti dihitung setiap tahun oleh aktuaris             of plan assets. The defined benefit obligation is
          independen dengan menggunakan metode                          calculated annually by independent actuaries
          Projected Unit Credit. Imbalan pascakerja terdiri             using the Projected Unit Credit method. Post-
          dari imbalan pesangon dan penghargaan purna                   employment benefits consist of severance
          jabatan.                                                      benefits and employment awards.

          Nilai kini kewajiban manfaat pasti ditentukan                 The present value of the defined benefit
          dengan mendiskontokan arus kas keluar yang                    obligation is determined by discounting the
          diestimasi dengan menggunakan tingkat bunga                   estimated future cash outflows using the interest
          obligasi korporat berkualitas tinggi dalam                    rates of high-quality corporate bonds that are
          denominasi mata uang dimana imbalan akan                      denominated in the currency in which the
          dibayarkan dan memiliki jangka waktu jatuh                    benefits will be paid and that have terms of
          tempo mendekati jangka waktu kewajiban                        maturity approximating the terms of the related
          pensiun. Apabila tidak terdapat pasar aktif untuk             pension obligations. When there is no deep
          obligasi korporat tersebut, digunakan imbal hasil             market for such bonds, the yields of Government
          obligasi Pemerintah.                                          bonds are used.
Page 51
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/41 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     t.   Imbalan kerja (lanjutan)                                 t.   Employee benefits (continued)

          Imbalan pascakerja (lanjutan)                                 Post-employment benefits (continued)

          Biaya jasa lalu diakui segera dalam laba rugi.                Past service costs are recognised immediately in
          Keuntungan dan kerugian atas kurtailmen atau                  profit or loss. Gains or losses on the curtailment
          penyelesaian suatu program manfaat pasti                      or settlement of a defined benefit plan are
          diakui pada saat kurtailmen atau penyelesaian                 recognised when the curtailment or settlement
          tersebut terjadi.                                             occurs.

          Pengukuran kembali yang        timbul dari                    Remeasurements arising from experience
          penyesuaian pengalaman dan perubahan                          adjustments and changes in actuarial
          asumsi-asumsi aktuarial dibebankan atau                       assumptions are charged or credited to equity in
          dikreditkan pada ekuitas dalam laporan                        the    consolidated     statement     of  other
          penghasilan komprehensif lain konsolidasian                   comprehensive income in the year in which they
          pada tahun dimana beban tersebut terjadi.                     arise. The accumulated remeasurements
          Akumulasi saldo pengukuran kembali dilaporkan                 balance is reported in retained earnings.
          di saldo laba.

          Untuk program iuran pasti, Grup membayar                      For defined contribution plans, the Group pays
          iuran kepada dana pensiun yang dikelola oleh                  contributions to publicly or privately managed
          publik atau swasta. Grup tidak memiliki                       pension plans. The Group has no further
          kewajiban membayar lebih lanjut jika iuran                    payment obligations once the contributions have
          tersebut telah dibayarkan. Iuran tersebut diakui              been paid. The contributions are recognised as
          sebagai beban imbalan kerja ketika jatuh tempo.               employee benefit expenses when they become
          Iuran dibayar di muka diakui sebagai aset                     due. Prepaid contributions are recognised as an
          sepanjang      pengembalian       dana      atau              asset to the extent that a cash refund or
          pengurangan      pembayaran     masa      depan               reduction in the future payments is available.
          dimungkinkan.

          Pesangon pemutusan kontrak kerja                              Termination benefits

          Pesangon pemutusan kontrak kerja dibayarkan                   Termination benefits are payable when
          ketika pekerja diberhentikan, atau ketika pekerja             employment is terminated by the Group before
          menerima penawaran mengundurkan diri secara                   the normal retirement date, or when an employee
          sukarela. Grup mengakui pesangon pemutusan                    accepts voluntary redundancy in exchange for
          kontrak kerja pada tanggal yang lebih dahulu                  certain benefits. The Group recognises
          dari: (i) ketika Grup tidak bisa lagi membatalkan             termination benefits at the earlier of the following
          penawaran pesangon; dan (ii) ketika Grup                      dates: (i) when the Group can no longer withdraw
          mengakui biaya untuk restrukturisasi yang                     the offer of those benefits; and (ii) when the
          berada dalam lingkup PSAK No. 57, “Provisi,                   Group recognises costs for a restructuring that is
          Liabilitas Kontinjensi dan Aset Kontinjensi” dan              within the scope of SFAS No. 57, “Provisions,
          melibatkan pembayaran pesangon pemutusan                      Contingent Liabilities and Contingent Assets”
          kontrak      kerja.   Dalam      hal   penawaran              and involves the payment of termination benefits.
          pengunduran diri secara sukarela, pesangon                    In the case of an offer made to encourage
          pemutusan kontrak kerja diukur berdasarkan                    voluntary redundancy, the termination benefits
          ekspektasi jumlah karyawan yang menerima                      are measured based on the number of
          penawaran tersebut. Pesangon pemutusan                        employees expected to accept the offer. Benefits
          kontrak kerja yang jatuh tempo lebih dari 12                  falling due more than 12 months after the
          bulan setelah tanggal pelaporan didiskontokan                 reporting date are discounted to their present
          ke nilai kini.                                                value.
Page 52
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/42 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                      3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     t.   Imbalan kerja (lanjutan)                                    t.   Employee benefits (continued)

          Imbalan pemeliharaan kesehatan                                   Health care benefits

          Grup menyediakan imbalan pemeliharaan                            The Group provides health care benefits to its
          kesehatan untuk karyawan yang berhak atas                        employees who are entitled to these benefits.
          imbalan tersebut. Hak atas imbalan ini pada                      The entitlement to these benefits is usually
          umumnya diberikan pada karyawan aktif dan                        granted to both active and retired employees
          pensiunan yang memenuhi masa kerja minimum                       who have fulfilled the minimum service period or
          tertentu atau berhenti bekerja karena cacat atau                 ceased working due to disability or death. The
          meninggal dunia. Perkiraan biaya imbalan ini                     expected costs of these benefits are accrued
          dicadangkan sepanjang masa kerja karyawan                        over the years of employment using the same
          dengan menggunakan metode akuntansi yang                         accounting method as used for defined benefit
          sama dengan yang digunakan untuk program                         pension plans. Actuarial gains and losses arising
          pensiun imbalan pasti. Keuntungan dan kerugian                   from experience adjustments and changes in
          aktuarial yang timbul dari penyesuaian                           actuarial assumptions are charged or credited to
          pengalaman dan perubahan asumsi aktuarial                        equity in other comprehensive income in the
          dibebankan atau dikreditkan ke                                   period they arise.
          ekuitas di penghasilan komprehensif lain pada
          periode saat terjadinya.

          Imbalan kerja jangka panjang lainnya                             Other long-term benefits

          Grup memberikan imbalan pascakerja lainnya                       The Group provides other long-term employee
          seperti uang cuti besar, tunjangan kecelakaan                    benefits such as a long leave allowance,
          dinas, bantuan kematian, dan penghargaan                         disability benefit, death benefit, and loyalty
          kesetiaan kerja. Nilai imbalan yang diberikan                    benefit. The benefits paid are based on the
          didasari pada Perjanjian Kerja Bersama.                          Group’s CLA.

          Cuti besar diberikan kepada karyawan yang                        The long leave allowance is given to employees
          telah bekerja sekurang-kurangnya enam tahun                      who have worked for at least six years
          terus menerus. Tunjangan kecelakaan dinas                        continuously. The disability benefit is provided to
          diberikan kepada karyawan yang mengalami                         employees who have a work accident. The death
          kecelakaan dinas. Bantuan kematian diberikan                     benefit is provided to the heirs whether or not the
          kepada ahli waris bagi karyawan yang                             employee passes away as a result of a work
          meninggal dunia akibat kecelakaan kerja                          accident. The loyalty benefit is given every eight
          maupun tidak. Penghargaan kesetiaan kerja                        years for employees who have worked for 16
          diberikan setiap delapan tahun bagi pegawai                      years continuously.
          yang telah bekerja selama 16 tahun terus
          menerus.

          Perhitungan imbalan kerja jangka panjang                         Long-term benefits are determined using the
          ditentukan dengan menggunakan metode                             Projected Unit Credit Method. The long-term
          Projected Unit Credit. Jumlah yang diakui                        employee benefits liabilities recognised in the
          sebagai liabilitas imbalan kerja jangka panjang di               consolidated statement of financial position
          laporan     posisi    keuangan       konsolidasian               represent the present value of the defined benefit
          merupakan nilai kini liabilitas imbalan kerja pasti.             obligation.
Page 53
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/43 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     u.   Provisi                                                   u.   Provisions

          Provisi diakui ketika Grup memiliki kewajiban kini             Provisions are recognised when the Group has a
          (baik bersifat hukum maupun konstruktif)                       present obligation (legal or constructive) as a
          sebagai akibat peristiwa masa lalu dan                         result of a past event and it is probable that the
          kemungkinan         besar   Grup      diharuskan               Group will be required to settle the obligation and
          menyelesaikan kewajiban dan estimasi andal                     a reliable estimate can be made of the amount of
          mengenai jumlah kewajiban tersebut dapat                       the obligation.
          dibuat.

          Provisi diukur sebesar nilai kini dari estimasi                The provisions are measured at the present
          terbaik manajemen atas pengeluaran yang                        value of the management’s best estimate of the
          diperlukan untuk menyelesaikan kewajiban kini                  expenditure required to settle the present
          pada akhir periode pelaporan. Tingkat diskonto                 obligation at the end of the reporting period. The
          yang digunakan untuk menentukan nilai kini                     discount rate used to determine the present
          adalah tingkat diskonto sebelum pajak, yang                    value is a pre-tax rate that reflects current market
          mencerminkan penilaian pasar kini atas nilai                   assessments of the time value of money and the
          waktu uang dan risiko yang terkait dengan                      risks specific to the liability. The increase in the
          liabilitas  tersebut.   Peningkatan     provisi                provision due to the passage of time is
          sehubungan dengan berlalunya waktu diakui                      recognised as interest expense.
          sebagai beban keuangan.

          Ketika beberapa atau seluruh manfaat ekonomi                   When some or all of the economic benefits
          untuk penyelesaian provisi yang diharapkan                     required to settle a provision are expected to be
          dapat dipulihkan dari pihak ketiga, piutang diakui             recovered from a third party, a receivable is
          sebagai aset apabila terdapat kepastian bahwa                  recognised as an asset if it is virtually certain that
          penggantian akan diterima dan jumlah piutang                   reimbursement will be received, and the amount
          dapat diukur secara andal.                                     of the receivable can be measured reliably.

     v.   Piutang                                                   v.   Receivables

          Piutang usaha merupakan jumlah yang dapat                      Trade receivables represent amounts due from
          diterima dari pelanggan atas penjualan tenaga                  customers for sales of electricity, primary energy
          listrik, energi primer dan jasa dalam kegiatan                 and services in the normal course of business.
          usaha normal. Piutang lain-lain merupakan saldo                Other receivables represent receivables that are
          piutang yang tidak terkait dengan kegiatan                     not related to the normal business activities of
          usaha normal Grup. Jika piutang diperkirakan                   the Group. If receivables are expected to be
          dapat ditagih dalam waktu satu tahun atau                      collected within one year or less, they are
          kurang, piutang diklasifikasikan sebagai aset                  classified as current assets. Otherwise, the
          lancar. Jika tidak, piutang disajikan sebagai aset             receivables are presented as non-current assets
          tidak lancar pada laporan posisi keuangan                      in the consolidated statement of financial
          konsolidasian.                                                 position

          Piutang usaha pada awalnya diakui sebesar nilai                Trade receivables are recognised initially at fair
          wajar dan kemudian diukur sebesar biaya                        value and subsequently measured at amortised
          perolehan diamortisasi dengan menggunakan                      cost using the effective interest method, if the
          metode suku bunga efektif, jika efek                           impact of discounting is significant, less any loss
          pendiskontoan signifikan, dikurangi dengan                     allowance.
          cadangan kerugian.

          Kerugian penurunan nilai piutang disajikan                     Impairment losses on receivables are presented
          sebagai bagian dari beban usaha pada laba rugi.                as part of operating expenses in profit or loss.
          Jumlah yang selanjutnya dapat dipulihkan                       Subsequent recoveries of amounts previously
          kembali atas piutang yang sebelumnya telah                     written off are credited against the same line
          dihapusbukukan, dikreditkan terhadap item baris                item.
          yang sama.
Page 54
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/44 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     v.   Piutang (lanjutan)                                       v.   Receivables (continued)

          Piutang pihak berelasi pada awalnya disajikan                 Receivables from related parties are initially
          sebagai aset tidak lancar kecuali jika ada alasan             presented as non-current assets unless there
          tertentu untuk disajikan sebagai aset lancar pada             are specific reasons for them to be presented as
          laporan posisi keuangan konsolidasian.                        current assets in the consolidated statements of
                                                                        financial position.

          Lihat Catatan 3h untuk informasi lebih lanjut                 See Note 3h for further information regarding the
          mengenai     kebijakan   penentuan    jumlah                  policy on the determination of the amount for the
          cadangan kerugian piutang Grup.                               loss allowance on the Group’s receivables.

     w. Pajak penghasilan                                          w. Income tax

          Beban pajak terdiri dari pajak kini dan pajak                 Tax expense comprises current and deferred
          tangguhan. Pajak diakui dalam laba rugi, kecuali              tax. Tax is recognised in profit or loss, except to
          jika pajak itu terkait dengan kejadian atau                   the extent that it relates to items recognised in
          transaksi   yang    diakui   di    penghasilan                other comprehensive income or directly in equity.
          komprehensif lain atau langsung diakui ke                     In this case, the tax expense is recognised in
          ekuitas. Dalam hal ini, beban pajak tersebut                  other comprehensive income or directly in equity,
          masing-masing diakui pada penghasilan                         respectively.
          komprehensif lain atau secara langsung dicatat
          ke ekuitas.

          Beban pajak kini dihitung berdasarkan peraturan               The current income tax charge is calculated on
          perpajakan yang berlaku pada tanggal                          the basis of the tax laws enacted as at the
          pelaporan keuangan, di negara dimana Grup                     reporting date, in the countries where the Group
          beroperasi dan menghasilkan penghasilan kena                  operates and generates taxable income.
          pajak.      Manajemen       secara     periodik               Management periodically evaluates the positions
          mengevaluasi posisi yang diambil dalam Surat                  taken in Annual Tax Returns with respect to
          Pemberitahuan Tahunan sehubungan dengan                       situations in which the applicable tax regulations
          situasi dimana aturan pajak yang berlaku                      are subject to interpretation. It establishes a
          membutuhkan interpretasi atas peraturan pajak                 provision where appropriate on the basis of the
          yang     berlaku.   Jika   perlu,   manajemen                 amounts expected to be paid to the tax
          menentukan provisi dibentuk berdasarkan                       authorities.
          jumlah yang diharapkan akan dibayar pada
          otoritas pajak.

          Untuk pendapatan yang menjadi subjek pajak                    For income which is subject to final tax, tax
          penghasilan final, beban pajak diakui secara                  expenses are recognised proportionally with the
          proporsional dengan jumlah pendapatan                         accounting revenue recognised and presented
          akuntansi yang diakui dan disajikan dalam                     as part of the operating expenses account in the
          sebagai bagian dari akun beban operasional                    current year as such tax does not satisfy the
          pada tahun berjalan dikarenakan pajak tersebut                criteria of income tax.
          tidak memenuhi kriteria sebagai pajak
          penghasilan.
Page 55
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/45 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     w. Pajak penghasilan (lanjutan)                                 w. Income tax (continued)

          Pajak penghasilan tangguhan diakui, dengan                      Deferred income tax is recognised, using the
          menggunakan metode liabilitas untuk semua                       liability method, on temporary differences arising
          perbedaan temporer antara dasar pengenaan                       between the tax bases of assets and liabilities
          pajak aset dan liabilitas dengan nilai tercatatnya              and their carrying amounts in the consolidated
          pada laporan keuangan konsolidasian. Namun,                     financial statements. However, deferred tax
          liabilitas pajak tangguhan tidak diakui jika timbul             liabilities are not recognised if they arise from the
          dari pengakuan awal goodwill; atau pada saat                    initial recognition of goodwill; or deferred income
          pengakuan awal suatu aset atau liabilitas yang                  tax is not accounted for if it arises from the initial
          timbul dari transaksi selain kombinasi bisnis                   recognition of an asset or liability in a transaction
          yang pada saat transaksi tersebut tidak                         other than a business combination that at the
          mempengaruhi laba rugi akuntansi maupun laba                    time of the transaction affects neither accounting
          rugi kena pajak. Pajak penghasilan tangguhan                    nor taxable profit or loss. Deferred income tax is
          ditentukan menggunakan tarif dan peraturan                      determined using the tax rates and laws that
          pajak yang berlaku atau yang secara substansial                 have been enacted or substantially enacted at
          telah berlaku pada akhir tahun pelaporan dan                    the end of the reporting year and are expected to
          diharapkan diterapkan jika aset pajak                           apply when the related deferred income tax asset
          penghasilan tangguhan direalisasikan atau                       is realised or the deferred income tax liability is
          liabilitas pajak tangguhan diselesaikan.                        settled.

          Aset pajak penghasilan tangguhan diakui hanya                   Deferred income tax assets are recognised only
          jika besar kemungkinan jumlah penghasilan                       to the extent that it is probable that future taxable
          kena pajak di masa depan akan memadai untuk                     profits will be available against which the
          dikompensasi dengan perbedaan temporer yang                     temporary differences can be utilised.
          masih dapat digunakan.

          Aset dan liabilitas pajak tangguhan tidak diakui                Deferred tax assets and liabilities are not
          untuk perbedaan temporer antara nilai tercatat                  recognised for temporary differences between
          dan dasar pengenaan pajak atas dalam ventura                    the carrying amount and tax bases of
          bersama dan asosiasi dimana Grup dapat                          investments in joint ventures and associates
          mengendalikan waktu pembalikan perbedaan                        where the Group is able to control the timing of
          temporer dan kemungkinan perbedaan tersebut                     the reversal of the temporary differences and it is
          tidak akan dibalik di masa mendatang.                           probable that the differences will not be reversed
                                                                          in the foreseeable future.

          Aset dan liabilitas pajak penghasilan tangguhan                 Deferred income tax assets and liabilities are
          dapat saling hapus jika terdapat hak yang                       offset when there is a legally enforceable right to
          berkekuatan secara hukum untuk melakukan                        offset current tax assets against current tax
          saling hapus antara aset pajak kini dengan                      liabilities.
          liabilitas pajak kini.

     x.   Aset donasi dari Pemerintah                                x.   Government-contributed assets

          Aset donasi dari Pemerintah Indonesia, dalam                    Assets contributed by the Government of
          kapasitasnya sebagai pemegang saham                             Indonesia, in its capacity as a shareholder of the
          Perusahaan, diakui sebagai transaksi ekuitas                    Company, are accounted for as an equity
          dengan pemegang saham. Aset yang                                transaction with the shareholder. The assets are
          didonasikan tersebut dicatat sesuai dengan nilai                recorded at the transaction costs agreed upon
          transaksi yang telah disepakati dengan                          with the Government. The Company records the
          Pemerintah. Perusahaan mencatat aset donasi                     Government contributed asset as an addition to
          dari Pemerintah sebagai penambahan aset tetap                   property, plant and equipment with a
          dan peningkatan tambahan modal disetor oleh                     corresponding increase to additional paid-in
          pemegang saham.                                                 capital by the shareholder.
Page 56
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/46 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     y.   Laba per saham                                             y.   Earnings per share

          Laba per saham dasar dihitung dengan                            Basic earnings per share is calculated by dividing
          membagi laba yang dapat diatribusikan kepada                    the profit attributable to the equity holders of the
          pemegang saham Perusahaan dengan jumlah                         Company by the weighted average number of
          rata-rata tertimbang saham biasa yang beredar                   ordinary shares outstanding for the year.
          pada tahun berjalan.

          Laba per saham dilusian dihitung dengan                         Diluted earnings per share is calculated by
          menyesuaikan rata-rata tertimbang jumlah                        adjusting the weighted average number of
          saham      biasa    yang    beredar     untuk                   ordinary shares outstanding to assume the
          mengasumsikan konversi seluruh potensi saham                    conversion of all dilutive potential ordinary
          biasa yang dilutif.                                             shares.

     z.   Informasi segmen                                           z.   Segment information

          Segmen operasi diidentifikasi berdasarkan                       Operating segments are identified on the basis of
          laporan internal mengenai komponen dari Grup                    internal reports about components of the Group
          yang secara reguler direviu oleh “pengambil                     and are regularly reviewed by the “chief operating
          keputusan     operasional”   dalam   rangka                     decision maker” in order to allocate resources to
          mengalokasikan sumber daya dan menilai                          the segments and to assess their segment
          kinerja segmen operasi.                                         operation performance.

          Informasi yang digunakan oleh pengambil                         Information reported to the chief operating
          keputusan operasional dalam rangka alokasi                      decision maker for the purposes of resource
          sumber daya dan penilaian kinerja mereka                        allocation and assessment of their performance
          dikategorikan berdasarkan lokasi geografis di                   is grouped based on the geographical location
          mana penjualan tenaga listrik dilakukan.                        where electricity sales are made.

     aa. Properti pertambangan                                       aa. Mining properties

          Biaya pengembangan yang dikeluarkan oleh atau                   Development expenditure incurred by or on
          atas nama Grup diakumulasikan secara terpisah                   behalf of the Group is accumulated separately for
          untuk setiap area of interest pada saat cadangan                each area of interest in which economically
          terpulihkan yang secara ekonomis dapat                          recoverable resources have been identified.
          diidentifikasi. Biaya tersebut termasuk biaya yang              Such expenditure includes costs directly
          dapat diatribusikan secara langsung pada                        attributable to the construction of mines and
          konstruksi tambang dan infrastruktur terkait dan                related infrastructure and excludes physical
          tidak termasuk biaya aset berwujud dan hak atas                 assets and land rights (i.e., right to build, right to
          tanah (seperti hak guna bangunan, hak guna                      cultivate and right to use), which are recorded as
          usaha, dan hak pakai) yang dicatat sebagai aset                 fixed assets.
          tetap.

     ab. Kombinasi bisnis entitas sepengendali                       ab. Business combinations of entities under
                                                                         common control

          Kombinasi bisnis entitas sepengendali dicatat                   Business combinations of entities under common
          menggunakan metode penyatuan kepemilikan                        control are accounted for using the pooling-of-
          (pooling-of-interest).   Selisih   antara    harga              interest method. The difference between the
          pengalihan dengan nilai buku setiap transaksi                   transfer price and the book value of each
          restrukturisasi antara entitas sepengendali dicatat             restructuring transaction between entities under
          sebagai bagian dari tambahan modal disetor                      common control is recorded as part of additional
          dalam bagian ekuitas di laporan posisi keuangan                 paid-in capital in the equity section of the
          konsolidasian.                                                  consolidated statement of financial position.
Page 57
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/47 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     ac. Pinjaman                                                   ac. Borrowings

         Pada saat pengakuan awal, pinjaman diakui                       Borrowings are recognised initially at fair value,
         sebesar nilai wajar, dikurangi dengan biaya-                    net of transaction costs incurred. Borrowings are
         biaya transaksi yang terjadi. Selanjutnya,                      subsequently carried at amortised cost; any
         pinjaman diukur sebesar biaya perolehan                         difference between the proceeds (net of
         diamortisasi;   selisih   antara    penerimaan                  transaction costs) and the redemption value is
         (dikurangi biaya transaksi) dan nilai pelunasan                 recognised in the profit or loss over the period of
         dicatat pada laporan laba rugi selama periode                   the borrowings using the effective interest
         pinjaman dengan menggunakan metode bunga                        method.
         efektif.

         Biaya yang dibayar untuk memperoleh fasilitas                   Fees paid on the establishment of loan facilities
         pinjaman diakui sebagai biaya transaksi                         are recognised as transaction costs of the loan
         pinjaman sepanjang besar kemungkinan                            to the extent that it is probable that some or all of
         sebagian atau seluruh fasilitas akan ditarik.                   the facility will be drawn down. In this case, the
         Dalam hal ini, biaya memperoleh pinjaman                        fee is deferred until the draw-down occurs. To
         ditangguhkan sampai penarikan pinjaman                          the extent that there is no evidence that it is
         terjadi. Sepanjang tidak terdapat bukti bahwa                   probable that some or all of the facility will be
         besar kemungkinan sebagian atau seluruh                         drawn down, the fee is capitalised as a pre-
         fasilitas akan ditarik, biaya memperoleh                        payment for liquidity services and amortised
         pinjaman dikapitalisasi sebagai pembayaran di                   over the period of the facility to which it relates.
         muka untuk jasa likuiditas dan diamortisasi
         selama periode fasilitas yang terkait.

         Biaya pinjaman akan dihentikan pengakuannya                     Borrowings are derecognised from the
         dari laporan posisi keuangan ketika kewajiban                   statement of financial position when the
         yang tertulis pada kontrak diselesaikan,                        obligation specified in the contract is discharged,
         dibatalkan, atau sudah tidak berlaku. Selisih                   cancelled or expired. The difference between the
         antara nilai tercatat dari liabilitas keuangan yang             carrying amount of a financial liability that has
         sudah berakhir atau dialihkan ke pihak lain dan                 been extinguished or transferred to another
         imbalan yang dibayarkan, termasuk aset non kas                  party and the consideration paid, including any
         yang dialihkan atau liabilitas yang ditanggung,                 non-cash assets transferred or liabilities
         diakui dalam laba rugi sebagai pendapatan lain-                 assumed, is recognised in profit or loss as other
         lain atau biaya keuangan.                                       income or finance costs.

         Ketika liabilitas keuangan dinegosiasikan                       Where the terms of a financial liability are
         kembali dan entitas mengeluarkan instrumen                      renegotiated and the entity issues equity
         ekuitas kepada kreditor untuk menyelesaikan                     instruments to a creditor to extinguish all or part
         seluruh atau sebagian liabilitas (debt for equity               of the liability (debt for equity swap), a gain or
         swap), keuntungan atau kerugian diakui dalam                    loss is recognised in profit or loss, which is
         laporan laba rugi yang dicatat sebagai selisih                  measured as the difference between the
         antara jumlah tercatat dari liabilitas keuangan.                carrying amount of the financial liability and the
                                                                         fair value of the equity instruments issued.

         Pinjaman diklasifikasikan sebagai liabilitas                    Loans are classified as current liabilities unless
         jangka pendek kecuali Grup memiliki hak tanpa                   the Group has an unconditional right to defer
         syarat untuk menunda pembayaran liabilitas                      payment of the liability for at least 12 months
         selama paling tidak 12 bulan setelah tanggal                    after the reporting date.
         pelaporan.
Page 58
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/48 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 3.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     ac. Pinjaman (lanjutan)                                      ac. Borrowings (continued)

         Dampak reformasi acuan suku bunga                             IBOR reform impact

         Kebijakan praktis berlaku untuk pinjaman.                     A practical guidance applies to borrowings. This
         Panduan praktis ini hanya berlaku untuk                       practical guidance only applies to changes
         perubahan yang diperlukan oleh reformasi acuan                required by interest rate benchmark reform, which
         tingkat suku bunga, yang terjadi jika, dan hanya              occur if, and only if, the modification is required as
         jika, modifikasi diperlukan sebagai akibat                    a direct result of the interest rate benchmark
         langsung dari reformasi acuan suku bunga dan                  reform and the new basis for determining
         dasar baru untuk menentukan arus kas                          contractual cash flows is economically equivalent
         kontraktual yang secara ekonomis setara dengan                to the previous basis (that is, the basis that
         dasar sebelumnya (yaitu, dasar yang mendahului                precedes the change).
         perubahan).

         Jika sebagian atau seluruh perubahan dalam                    If some or all of the changes in the basis for
         dasar penentuan arus kas kontraktual liabilitas               determining the contractual cash flows of financial
         keuangan tidak memenuhi kriteria di atas,                     liabilities do not meet the above criteria, the above
         panduan praktis di atas pertama-tama diterapkan               practical guidance is first applied to the changes
         pada perubahan yang disyaratkan oleh reformasi                required by the interest rate benchmark reform,
         acuan     tingkat   suku     bunga,   termasuk                including updating the effective interest rate
         memperbarui instrumen suku bunga efektif.                     instrument. Any additional changes are recorded
         Setiap perubahan tambahan dicatat dengan cara                 in the normal manner (i.e., assessed for
         normal (yaitu, dinilai untuk modifikasi atau                  modification or derecognition, with modification
         penghentian          pengakuan,         dengan                gains/losses recognised immediately in profit or
         keuntungan/kerugian modifikasian langsung                     loss if the instrument is not derecognised).
         diakui dalam laba rugi jika instrumen tidak
         dihentikan pengakuannya).

         Grup telah menerapkan panduan praktis yang                    The Group has applied the practical guidance
         diberikan dalam reformasi acuan suku bunga -                  provided in the interest rate benchmark reform -
         tahap 2 terhadap utang bank dan penerusan                     stage 2 to its bank loans and two-step loans,
         pinjaman, kecuali untuk pinjaman dari Asian                   except for loans from Asian Development Bank
         Development Bank (“ADB”), International Bank                  (“ADB”), International Bank for Reconstruction
         for Reconstruction and Development (“IBRD”)                   and     Development      (“IBRD”)   and     Asian
         dan Asian Infrastructure Investment Bank                      Infrastructure Investment Bank (“AIIB”). the
         (“AIIB”). Grup menyimpulkan bahwa dasar                       Group has concluded that the basis for
         penentuan arus kas kontraktual untuk pinjaman                 determining contractual cash flows for loans from
         dari ADB, IBRD, dan AIIB tidak berubah karena                 ADB, IBRD and AIIB remains unchanged since
         ADB, IBRD, dan AIIB menggunakan pass through                  the ADB, IBRD and AIIB use a pass through
         policy untuk biaya pendanaannya kepada                        policy for their funding cost to the borrower.
         peminjam. Oleh karena itu, tidak terdapat dampak              Therefore, there is no IBOR reform impact on
         reformasi acuan suku bunga pada pinjaman dari                 loans from ADB, IBRD and AIIB.
         ADB, IBRD, dan AIIB.
Page 59
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/49 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING                     DAN      4.    CRITICAL ACCOUNTING JUDGEMENTS                      AND
     ESTIMASI AKUNTANSI SIGNIFIKAN                                     SIGNIFICANT ACCOUNTING ESTIMATES

     Dalam rangka penerapan kebijakan akuntansi Grup,                  In the application of the Group’s accounting policies,
     sebagaimana       dijelaskan   dalam    Catatan    3,             which are described in Note 3, the management is
     manajemen         diharuskan      untuk      membuat              required to make judgements, estimates, and
     pertimbangan, estimasi, dan asumsi tentang nilai aset             assumptions about the carrying amounts of assets
     dan liabilitas yang tidak tersedia dari sumber lain.              and liabilities that are not readily apparent from other
     Estimasi dan asumsi berdasarkan pengalaman                        sources. The estimates and associated assumptions
     historis dan faktor lain yang dianggap relevan. Hasil             are based on historical experience and other factors
     aktual dapat berbeda dari estimasi tersebut.                      that are considered relevant. Actual results may differ
                                                                       from these estimates.

     Estimasi dan asumsi yang mendasari direviu secara                 The estimates and underlying assumptions are
     berkelanjutan. Revisi terhadap estimasi akuntansi                 reviewed on an ongoing basis. Revisions to
     akan diakui pada tahun dimana estimasi tersebut                   accounting estimates are recognised in the year in
     direvisi, jika revisi tersebut hanya berpengaruh                  which the estimate is revised if the revision affects only
     terhadap tahun tersebut, atau pada tahun revisi dan               that year, or in the year of the revision and future years
     tahun berikutnya jika revisi tersebut mempengaruhi                if the revision affects both current and future years.
     tahun tersebut.

     Pertimbangan penting dalam penerapan kebijakan                    Critical judgements        in   applying    accounting
     akuntansi                                                         policies

     Dalam proses penerapan kebijakan akuntansi yang                   In the process of applying the accounting policies
     dijelaskan dalam Catatan 3, Grup telah menentukan                 described in Note 3, the Group has identified the
     hal-hal berikut yang memerlukan pertimbangan                      following matters under which significant judgements
     signifikan:                                                       are made:

     Penentuan umur sewa                                               Determining lease term

     Penentuan apakah suatu perjanjian mengandung                      Determining whether an arrangement is or contains a
     unsur sewa membutuhkan pertimbangan yang cermat                   lease requires careful judgement to assess whether
     untuk menilai apakah perjanjian tersebut memberikan               the arrangement conveys a right to obtain
     hak untuk mendapatkan secara substansial seluruh                  substantially all the economic benefits from use of the
     manfaat      ekonomis     dari    penggunaan        aset          asset throughout the period of use and right to direct
     identifikasian    dan   hak    untuk     mengarahkan              the use of the asset, even if the right is not explicitly
     penggunaan aset identifikasian, bahkan jika hak                   specified in the arrangement.
     tersebut tidak dijabarkan secara eksplisit di perjanjian.

     Dalam menentukan jangka waktu sewa, Grup                          In determining the lease term, Group considers all
     mempertimbangkan semua fakta dan keadaan yang                     facts and circumstances that create an economic
     menimbulkan insentif ekonomi untuk menggunakan                    incentive to exercise an extension option, or not
     opsi perpanjangan, atau tidak menggunakan opsi                    exercise a termination option. Extension options (or
     penghentian. Opsi perpanjangan (atau tahun setelah                years after termination options) are only included in
     opsi penghentian kontrak kerja) hanya termasuk                    the lease term if the lease is reasonably certain to be
     dalam jangka waktu sewa jika cukup pasti akan                     extended (or not terminated). The lease term is
     diperpanjang (atau tidak dihentikan). Umur sewa                   reassessed if an option is actually exercised (or not
     dinilai kembali ketika opsi sebenarnya diambil (atau              exercised) or the group becomes obliged to exercise
     tidak diambil) atau grup menjadi berkewajiban untuk               (or not exercise) it. The assessment of reasonable
     mengambil (atau tidak mengambil) opsi tersebut.                   certainty is only revised if a significant event or a
     Penilaian kepastian yang wajar hanya direvisi ketika              significant change in circumstances occurs, which
     peristiwa signifikan atau perubahan signifikan terjadi,           affects this assessment, and that is within the control
     yang mempengaruhi penilaian ini, dan hal tersebut                 of the lessee.
     dalam pengendalian penyewa.
Page 60
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/50 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.    CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                      SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                   (continued)

     Pertimbangan penting dalam penerapan kebijakan                Critical judgements         in   applying     accounting
     akuntansi (lanjutan)                                          policies (continued)

     Pendapatan dari jasa penyambungan pelanggan                   Revenues from customer connection fees

     Sebagai bagian dari implementasi PSAK No. 72, Grup            As a result of the implementation of SFAS No. 72, the
     telah menilai kembali perlakuan yang diterapkan               Group has reassessed its treatment of revenue from
     pendapatan dari penyambungan pelanggan. Grup                  customer connection fees. The Group has considered
     mempertimbangkan semua fakta dan kondisi yang                 all relevant facts and circumstances to determine the
     relevan untuk menentukan pengakuan pendapatan                 exact timing of revenue recognition pertaining to
     terkait biaya penyambungan pelanggan. Untuk itu,              connection fees paid by customers. To do so, the
     Grup perlu menentukan kewajiban pelaksanaan yang              Group needs to determine what performance
     timbul sehubungan dengan penerimaan biaya                     obligations it has as a result of receiving connection
     penyambungan          dari    pelanggan.         Grup         fees. The Group considered the fact that the obligation
     mempertimbangkan fakta bahwa kewajiban untuk                  to provide an ongoing supply of electricity is regulated
     menyediakan tenaga listrik secara berkelanjutan               by the 2009 Electricity Law and that the Group charges
     diatur dalam Undang-Undang Ketenagalistrikan tahun            all customers the same regulated tariff for electricity
     2009 dan semua pelanggan dikenakan tarif listrik yang         usage prescribed by the Government of the Republic
     telah ditentukan oleh Pemerintah Republik Indonesia           of Indonesia. The receipt of connection fees creates
     untuk penggunaan tenaga listrik. Penerimaan biaya             an obligation for the Group to provide ongoing
     penyambungan menimbulkan kewajiban bagi Grup                  electricity supply to its customers. The Group has
     untuk menyediakan akses listrik secara berkelanjutan          concluded that connecting the customers to its
     kepada pelanggan. Grup menyimpulkan bahwa                     network is an obligation which cannot be separated
     menghubungkan pelanggan ke jaringan listrik                   from the delivery of electricity.
     Perusahaan merupakan kewajiban yang tidak terpisah
     dengan penyediaan tenaga listrik kepada pelanggan.

     Kepentingan dalam pengaturan bersama                          Interest in joint arrangements

     Pertimbangan diperlukan untuk menentukan ketika               Judgement is required to determine when the Group
     Grup memiliki pengendalian bersama, yang                      has joint control, which requires an assessment of the
     membutuhkan penilaian mengenai aktivitas yang                 relevant activities and when the decisions in relation to
     relevan dan ketika keputusan yang berkaitan dengan            those activities require unanimous consent. The
     aktivitas tersebut membutuhkan persetujuan dengan             Group has determined that the relevant activities for
     suara bulat. Grup menentukan bahwa aktivitas yang             its joint arrangements are those relating to the
     relevan untuk pengaturan bersama adalah aktivitas             operating and capital decisions of the arrangement.
     yang berkaitan dengan operasi dan pengambilan
     keputusan dalam pengaturan tersebut.

     Pertimbangan        juga       diperlukan      untuk          Judgement is also required to classify a joint
     mengklasifikasikan pengaturan bersama sebagai                 arrangement as either a joint operation or a joint
     pengendalian bersama atau ventura bersama.                    venture. Classifying the arrangement requires the
     Pengklasifikasian pengaturan tersebut mengharuskan            Group to assess its rights and obligations arising from
     Grup untuk menilai hak dan kewajiban yang timbul              the arrangement. Specifically, it considers:
     dari pengaturan tersebut. Secara khusus, Grup
     mempertimbangkan:
     • Struktur dari pengaturan bersama - apakah                   •   The structure of the joint arrangement - whether it
        dibentuk melalui kendaraan terpisah;                           is structured through a separate vehicle;
     • Ketika pengaturan tersebut terstruktur melalui              •   When the arrangement is structured through a
        kendaraan         terpisah,       Grup       juga              separate vehicle, the Group also considers the
        mempertimbangkan hak dan kewajiban yang                        rights and obligations arising from:
        timbul dari:
        - bentuk legal dari kendaraan terpisah;                        -   the legal form of the separate vehicle;
        - persyaratan dari perjanjian kontraktual; dan                 -   the terms of the contractual arrangement; and
        - fakta dan kondisi lain (ketika relevan).                     -   other facts and circumstances (when relevant).
Page 61
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/51 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.    CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                      SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                   (continued)

     Pertimbangan penting dalam penerapan kebijakan                Critical judgements        in   applying    accounting
     akuntansi (lanjutan)                                          policies (continued)

     Kepentingan dalam pengaturan bersama (lanjutan)               Interest in joint arrangements (continued)

     Penilaian ini sering membutuhkan pertimbangan yang            This assessment often requires significant judgement.
     signifikan. Kesimpulan yang berbeda mengenai                  A different conclusion on joint control and also whether
     pengendalian bersama dan apakah suatu pengaturan              the arrangement is a joint operation or a joint venture,
     adalah sebuah operasi bersama atau ventura                    may materially impact the consolidated financial
     bersama, dapat memiliki dampak material terhadap              statements.
     laporan keuangan konsolidasian.

     Grup memiliki pengaturan bersama yang terstruktur             The Group has joint arrangements which are
     melalui ventura bersama, lihat Catatan 9 untuk daftar         structured through joint ventures, see Note 9 for the
     ventura bersama tersebut. Struktur dan persyaratan            list of joint ventures. These structures and the terms of
     dari perjanjian kontraktual mengindikasikan bahwa             the contractual arrangements indicate that the Group
     Grup memiliki hak atas aset bersih dari pengaturan            has rights to the net assets of the arrangements. The
     bersama tersebut. Grup menilai fakta dan kondisi lain         Group has also assessed the other facts and
     yang berkaitan dengan pengaturan ini dan                      circumstances relating to these arrangements and
     menyimpulkan      bahwa      pengaturan      tersebut         concluded that the arrangements are joint ventures.
     merupakan ventura bersama.

     Sumber ketidakpastian estimasi                                Sources of estimation uncertainty

     Asumsi utama mengenai masa depan dan sumber                   The key assumptions concerning future and other key
     estimasi lainnya pada akhir tahun pelaporan, yang             sources of estimation at the end of the reporting year,
     memiliki risiko signifikan yang mengakibatkan                 which have a significant risk of causing a material
     penyesuaian material terhadap jumlah tercatat aset            adjustment to the carrying amounts of assets and
     dan liabilitas dalam tahun pelaporan berikutnya               liabilities within the next financial year, are discussed
     dijelaskan dibawah ini:                                       below:

     Provisi atas kerugian kredit ekspektasian piutang             Provision for expected credit losses of trade
     usaha dan aset keuangan lainnya                               receivables and other financial assets

     Grup menggunakan matriks provisi untuk menghitung             The Group uses a provision matrix to calculate
     kerugian kredit ekspektasian piutang usaha. Tingkat           expected credit losses for trade receivables. The
     provisi adalah berdasarkan hari jatuh tempo atas              provision rates are based on days past due for
     kelompok segmen pelanggan yang mempunyai                      groupings of various customer segments that have
     karakteristik risiko kredit yang serupa (misalnya             similar credit risk characteristics (e.g., by product type
     berdasarkan tipe produk dan tipe dan/atau peringkat           and customer type and/or customer rating).
     pelanggan).

     Matriks provisi pada mulanya didasarkan pada tingkat          The provision matrix is initially based on the Group’s
     gagal bayar historis Grup yang diobservasi. Grup akan         historical observed default rates. The Group will
     memperbaharui       matriks   untuk    menyesuaikan           calibrate the matrix to adjust the historical credit loss
     pengalaman kerugian kredit historis dengan informasi          experience with forward-looking information. For
     forward-looking. Sebagai contoh, jika perkiraan atas          instance, if forecast economic conditions are expected
     kondisi ekonomi diperkirakan memburuk selama                  to deteriorate over the next year, which can lead to an
     tahun      depan,     yang    dapat    menyebabkan            increased number of defaults, the historical default
     meningkatnya jumlah gagal bayar, tingkat gagal bayar          rates are adjusted. At every reporting date, the
     historis disesuaikan. Pada setiap tanggal pelaporan,          historical observed default rates are updated and
     tingkat gagal bayar historis diperbaharui dan                 changes in the forward-looking estimates are
     perubahan estimasi forward-looking dianalisis.                analysed.
Page 62
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/52 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.    CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                     SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                  (continued)

     Sumber ketidakpastian estimasi (lanjutan)                    Sources of estimation uncertainty (continued)

     Provisi atas kerugian kredit ekspektasian piutang            Provision for expected credit losses of trade
     usaha dan aset keuangan lainnya (lanjutan)                   receivables and other financial assets (continued)

     Penilaian atas korelasi antara tingkat gagal bayar           The assessment of the correlation between historical
     historis yang diobservasi, perkiraan atas kondisi            observed default rates, forecast economic conditions,
     ekonomi, dan kerugian kredit ekspektasian                    and expected credit losses is a significant estimate.
     merupakan estimasi yang signifikan. Jumlah kerugian          The amount of expected credit losses is sensitive to
     kredit ekspektasian paling dipengaruhi oleh                  changes in circumstances and forecast economic
     perubahan keadaan dan perkiraan kondisi ekonomi.             conditions. The Group’s historical credit loss
     Pengalaman kerugian kredit historis Grup dan                 experience and forecast of economic conditions may
     perkiraan kondisi ekonomi juga mungkin tidak                 also not be representative of a customer’s actual
     menggambarkan gagal bayar aktual pelanggan di                default in the future.
     masa yang akan datang.

     Pengakuan pendapatan                                         Revenue recognition

     Penjualan tenaga listrik prabayar                            Prepaid sales of electricity

     Penjualan tenaga listrik prabayar mencakup estimasi          Prepaid sales of electricity includes an estimate of
     atas listrik yang dikonsumsi oleh pelanggan antara           electricity consumed by customers between the date
     tanggal pembelian token terakhir dan akhir tahun             of the last token purchased and the financial year end
     keuangan Grup. Estimasi dilakukan dengan                     of the Group. An estimate is made by prorating the
     memproratakan jumlah hari antara tanggal terakhir            total days between the date of the last token
     pembelian token yang dibeli dengan tanggal laporan           purchased and the date of the Group’s financial
     keuangan Grup dengan konsumsi historis pelanggan.            statement using the historical consumption of the
                                                                  customers.

     Biaya penyambungan pelanggan                                 Customer connection fees

     Jasa koneksi yang diserahkan kepada pelanggan                A connection service which is provided to the customer
     tidak merepresentasikan nilai yang berdiri sendiri           does not represent a stand-alone value for that
     (stand-alone value) untuk pelanggan tersebut.                customer. Consequently, the Group recognises
     Sebagai     hasilnya,     Grup     mencatat   biaya          connection fees received from customers to connect
     penyambungan yang diterima dari pelanggan untuk              the customers to its network as revenue over time and
     menghubungkan pelanggan ke jaringan listrik Grup             amortises it starting from the connection date based
     sebagai pendapatan yang diakui sepanjang waktu dan           on the estimated consumption pattern of the customer.
     diamortisasi sejak tanggal penyambungan sesuai               The customers’ consumption is estimated based on
     masa estimasi konsumsi pelanggan. Konsumsi                   the average useful life of the distribution assets. Given
     pelanggan diestimasi berdasarkan rata-rata masa              the wide variety of distribution assets and remaining
     manfaat aset distribusi. Dengan mempertimbangkan             useful lives, the Group has applied an average life of
     banyaknya variasi aset distribusi dan masa manfaat           20 years, which the Group believes to be
     atas aset-aset tersebut, Grup telah menerapkan rata-         representative of the useful lives of the assets. A
     rata masa manfaat 20 tahun yang dipercaya telah              change in the estimated useful lives of distribution
     merepresentasikan keseluruhan masa manfaat.                  assets would result in a change in the revenue
     Perubahan estimasi atas masa manfaat aset distribusi         recognised from connection fees.
     akan mengakibatkan perubahan pada pengakuan
     pendapatan dari biaya penyambungan.
Page 63
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/53 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.    CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                     SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                  (continued)

     Sumber ketidakpastian estimasi (lanjutan)                    Sources of estimation uncertainty (continued)

     Taksiran masa manfaat ekonomis aset tetap                    Estimated useful lives of property, plant and
                                                                  equipment

     Masa manfaat setiap aset tetap yang dimiliki Grup            The useful life of each item of the Group’s property,
     ditentukan berdasarkan periode aset tersebut                 plant and equipment is estimated based on the period
     diharapkan masih dapat digunakan. Estimasi ini               over which the asset is expected to be available for
     ditentukan berdasarkan evaluasi teknis internal dan          use. Such estimation is based on internal technical
     pengalaman atas aset sejenis. Masa manfaat setiap            evaluation and experience with similar assets. The
     aset direviu secara periodik dan disesuaikan apabila         estimated useful life of each asset is reviewed
     prakiraan berbeda dengan estimasi sebelumnya                 periodically and updated if expectations differ from
     karena keausan, keusangan teknis atau komersial,             previous estimates due to physical wear and tear,
     dan hukum atau keterbatasan lainnya atas pemakaian           technical or commercial obsolescence, and legal or
     aset. Namun terdapat kemungkinan bahwa hasil                 other limits on the use of the asset. It is possible,
     operasi dimasa mendatang dapat dipengaruhi secara            however, that future results of operations could be
     signifikan oleh perubahan atas jumlah serta tahun            materially affected by changes in the amounts and
     pencatatan beban yang diakibatkan karena                     timing of recorded expenses brought about by
     perubahan faktor yang disebutkan di atas.                    changes in the factors mentioned above.

     Perubahan masa manfaat aset tetap dapat                      A change in the estimated useful life of any item of
     mempengaruhi jumlah biaya penyusutan yang diakui             property, plant and equipment would affect the
     dan nilai tercatat aset tetap.                               recorded depreciation expense and the carrying
                                                                  values of property, plant and equipment.

     Nilai wajar properti investasi yang menggunakan              Fair value of investment properties that use the
     model revaluasi                                              revaluation model

     Dalam    proses   revaluasi   properti  investasi,           In the process of investment properties revaluation,
     manajemen, dengan bantuan penilai publik                     management, with the assistance of an independent
     independen, menentukan data dan asumsi, menelaah             public valuer, determines the data inputs and
     metode penilaian serta berdiskusi dengan penilai.            assumptions, assesses valuation methods, and holds
     Pendekatan dan metode yang digunakan dalam                   discussions with the valuers as part of the valuation
     melakukan revaluasi tergantung pada kelas aset.              process. The approaches and methods used in the
     Walaupun data dan asumsi Grup dianggap tepat dan             revaluation depend on the asset class. While it is
     wajar, namun perubahan signifikan pada data input            believed that the Group’s data and assumptions are
     atau asumsi yang digunakan dapat berpengaruh                 reasonable and appropriate, significant changes in
     secara signifikan terhadap nilai aset yang                   data inputs or significant changes in assumptions may
     menggunakan model revaluasi.                                 materially affect the value of assets that use the
                                                                  revaluation model.

     Rincian dari pendekatan dan data input signifikan            Details of the valuation approach and significant data
     yang digunakan dalam melakukan revaluasi properti            inputs used in the revaluation of investment properties
     investasi diungkapkan dalam Catatan 8.                       are disclosed in Notes 8.
Page 64
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/54 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                        4.    CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                        SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                     (continued)

     Sumber ketidakpastian estimasi (lanjutan)                       Sources of estimation uncertainty (continued)

     Imbalan pascakerja                                              Post-employment benefits

     Penentuan liabilitas imbalan pascakerja tergantung              The determination of post-employment benefits is
     pada pemilihan asumsi tertentu yang digunakan oleh              dependent on the selection of certain assumptions
     aktuaris dalam menghitung jumlah liabilitas tersebut.           used by actuaries when calculating such amounts.
     Asumsi tersebut termasuk antara lain tingkat diskonto           Those assumptions include, among others, the
     dan tingkat kenaikan gaji. Realisasi yang berbeda dari          discount rate and rate of salary increase. Actual
     asumsi Grup diakumulasi dan diamortisasi selama                 results that differ from assumptions are accumulated
     periode mendatang dan akibatnya akan berpengaruh                and amortised over future periods and therefore,
     terhadap jumlah biaya serta liabilitas yang diakui di           generally affect the recognised expenses and
     masa mendatang. Walaupun asumsi Grup dianggap                   liabilities recorded in such future periods. While it is
     tepat dan wajar, namun perubahan signifikan pada                believed that the assumptions are reasonable and
     kenyataannya atau perubahan signifikan dalam                    appropriate, significant differences in actual
     asumsi yang digunakan dapat berpengaruh secara                  experience or significant changes in assumptions may
     signifikan terhadap liabilitas imbalan pascakerja Grup.         materially affect the post-employment benefits liability
                                                                     of the Group.

     Asumsi yang digunakan untuk perhitungan liabilitas              Assumptions used in the calculation of post-
     imbalan pascakerja diungkapkan dalam Catatan 49.                employment benefits are disclosed in Note 49.

     Pajak penghasilan                                               Income taxes

     Perhitungan beban pajak penghasilan Grup                        The calculations of income tax expenses for the Group
     memerlukan pertimbangan dan asumsi dalam                        require judgements and assumptions in determining
     menentukan pengurangan beban tertentu selama                    the deductibility of certain expenses during the
     proses pengestimasian. Semua pertimbangan dan                   estimation process. All judgements and estimates
     estimasi yang dibuat manajemen dapat dipertanyakan              made by management may be challenged by the
     oleh Direktorat Jenderal Pajak. Sebagai akibatnya,              Directorate General of Taxation. As a result, the
     terjadi ketidakpastian dalam penentuan pajak.                   ultimate tax determination becomes uncertain. The
     Resolusi posisi pajak yang diambil oleh Grup, melalui           resolution of tax positions taken by the Group, through
     negosiasi dengan otoritas pajak yang relevan dapat              negotiations with the relevant tax authorities can take
     berlangsung bertahun-tahun dan sangat sulit untuk               several years to complete and in some cases it is
     memprediksi hasil akhirnya. Apabila terdapat                    difficult to predict the ultimate outcome. Where the
     perbedaan perhitungan pajak dengan jumlah yang                  final outcome of these matters is different from the
     telah dicatat, perbedaan tersebut akan berdampak                amounts initially recorded, such differences will have
     pada pajak penghasilan dan pajak tangguhan dalam                an impact on the income tax and deferred income tax
     tahun dimana penentuan pajak tersebut dibuat.                   provision in the year in which this determination is
                                                                     made.

     Aset pajak tangguhan, termasuk yang timbul dari rugi            Deferred tax assets, including those arising from tax
     fiskal dan perbedaan temporer, diakui apabila                   losses carried forward and temporary differences, are
     dianggap lebih mungkin daripada tidak bahwa mereka              recognised only where it is considered more likely than
     dapat diterima kembali, dimana hal ini tergantung               not that they will be recovered, which is dependent on
     pada kecukupan pembentukan laba kena pajak di                   the generation of sufficient future taxable profits. The
     masa depan. Asumsi atas pembentukan laba kena                   assumptions about the generation of future taxable
     pajak sangat dipengaruhi oleh estimasi dan asumsi               profits are heavily affected by management’s
     manajemen atas tingkat penjualan dan biaya-biaya                estimation and assumption regarding the level of sales
     terkait yang terdapat risiko ketidakpastian, sehingga           and the associated costs which are subject to risk and
     ada kemungkinan perubahan estimasi dan asumsi                   uncertainty and hence there is a possibility that
     tersebut akan mengubah proyeksi laba kena pajak di              changes in circumstances will alter the projected
     masa mendatang.                                                 future taxable profits.
Page 65
                              PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                           DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                      Lampiran 5/55 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                               (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                                                                         4.       CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                                                                            SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                                                                         (continued)

     Sumber ketidakpastian estimasi (lanjutan)                                                                           Sources of estimation uncertainty (continued)

     Sewa-estimasi suku bunga pinjaman inkremental                                                                       Leases-estimation of the incremental borrowing
                                                                                                                         rate

     Karena Grup tidak dapat dengan mudah menentukan                                                                     Since the Group cannot readily determine the implicit
     suku bunga implisit, manajemen menggunakan suku                                                                     rate, management uses the Group’s incremental
     bunga pinjaman inkremental Grup sebagai tingkat                                                                     borrowing rate as a discount rate. There are a number
     diskonto. Ada beberapa faktor yang perlu                                                                            of factors to consider in determining an incremental
     dipertimbangkan dalam menentukan suku bunga                                                                         borrowing rate, many of which need estimation in
     pinjaman inkremental, yang banyak di antaranya                                                                      order to be able to reliably quantify any necessary
     memerlukan estimasi untuk dapat secara andal                                                                        adjustments to arrive at the final discount rates.
     mengukur penyesuaian yang diperlukan untuk sampai
     pada tingkat diskonto akhir.

     Dalam    menentukan      suku    bunga    pinjaman                                                                  In determining the incremental borrowing rate, the
     inkremental, Grup mempertimbangkan faktor-faktor                                                                    Group considers the following main factors: the
     utama berikut: risiko kredit korporat Grup, jangka                                                                  Group’s corporate credit risk, the lease term, the lease
     waktu sewa, jangka waktu pembayaran sewa,                                                                           payment term, the economic environment, the time at
     lingkungan ekonomi, waktu di mana sewa                                                                              which the lease is entered into, and the currency in
     dimasukkan, dan mata uang di mana pembayaran                                                                        which the lease payments are denominated.
     sewa ditentukan.


5.   ENTITAS ANAK                                                                                               5.       SUBSIDIARIES
     Perusahaan memiliki saham entitas anak baik                                                                         The Company has ownership interests, directly or
     langsung maupun tidak langsung sebagai berikut:                                                                     indirectly, in the following subsidiaries:
                                                                                                                                                                                      Jumlah aset
                                                                                                                                                                                  sebelum eliminasi **)/
                                                                                                                                  Persentase pemilikan/          Tahun             Total assets before
                                                                                                                                 Percentage of ownership        operasi              elimination **)
                                                                                                                             30 September/     31 Desember/    komersial/    30 September/      31 Desember/
                                                                                                                             September 30,     December 31,     Year of      September 30,     December 31,
                                Entitas Anak/                             Domisili/                 Jenis usaha/                 2024              2023       commercial         2024                2023
                                Subsidiaries                              Domicile               Nature of business                %                %          operation           Rp                 Rp
       PT Indonesia Power (IP) / PT PLN Indonesia Power (PLN IP) *****)    Jakarta      Pembangkitan tenaga listrik/                 99.99            99.99         1995           413,956          400,904
              dan entitas anak/ and subsidiaries                                        Power generation

             PT PLN Indonesia Power Services                               Jakarta      Kogenerasi, pemasok energi,                  99.99            99.99         1999             1,277            1,146
               (IPS) *)                                                                 jasa pelayanan dan manajemen/
                                                                                        Cogeneration, energy distribution,
                                                                                        energy service and management

             PT Artha Daya Coalindo (ADC) *)                               Jakarta      Perdagangan batu bara/                       80.00            80.00         1998               804              719
                                                                                        Coal trading

             PT Indo Ridlatama Power (IRP) *)                               Kutai       Pembangkitan tenaga listrik/                 90.00            90.00         2018             1,716            1,538
                                                                                        Power generation

             PT PLN Indonesia Power Renewables (IPRen)                     Jakarta      Ketenagalistrikan dan energi/                99.99            99.99         2016             8,669            8,341
               dan entitas anak/and its subsidiary *)                                   Electricity and energy

                PT PLN Indonesia Geothermal (IPGeo) *)                     Jakarta      Pengembangan energi baru                     96.04            95.81           ***)             201              203
                                                                                        dan terbarukan/
                                                                                        Development of new and renewable energy

                PT Suralaya Indo Tenaga (SIT)                              Jakarta      Ketenagalistrikan dan energi/                99.99            99.99           ***)           6,937            6,531
                  dan entitas anak/and its subsidiary ***)                              Electricity and energy

                   PT Putra Suralaya Indo Tenaga (PSI) ***)                Jakarta      Ketenagalistrikan dan energi/                99.99            99.99           ***)           6,936            6,531
                                                                                        Electricity and energy

       PT Pembangkitan Jawa-Bali / PT PLN Nusantara Power (PLN NP) *****) Surabaya      Pembangkitan tenaga listrik/                 99.99            99.99         1995           347,543          343,072
             (PJB) dan entitas anak/ and subsidiaries                                   Power generation

             PT PLN Nusantara Power Services (PLN NPS) *****)             Surabaya      Jasa/ Service                                99.00            99.00         2001             1,852            2,046
               dan entitas anak/ and subsidiaries

                PT Mitra Karya Prima (MKP) *)                             Surabaya      Jasa/ Service                                92.00            92.00         2005               183              183

             PT PLN Nusantara Power Construction (PT PLN NPC) *****)       Jakarta      Jasa listrik dan enjiniring/                 99.00            98.90         2004             2,147            2,278
               dan entitas anak/ and subsidiary                                         Electricity and engineering

             PT Prima Power Nusantara (PPN) ******)                        Jakarta      Jasa enjiniring, pengadaan                   99.99           100.00         2017               199              199
                                                                                        dan konstruksi/
                                                                                        Engineering, procurement and
                                                                                        construction

             PT Navigat Innovative Indonesia (NII) *)                     Palembang     Perdagangan, konstruksi,                     72.97            72.97         2002               529              483
                                                                                        pertambangan dan pertanian/
                                                                                        Trading, construction,
                                                                                        mining and agriculture

             PT PLN Nusantara Renewables (PLN NR) *****)                   Jakarta      Investasi/                                   99.99            99.99         2015             9,341            8,672
                                                                                        Investment
Page 66
                                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                         Lampiran 5/56 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                          SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                   (Expressed in millions of Rupiah, unless otherwise stated)

5.   ENTITAS ANAK (lanjutan)                                                                                         5.      SUBSIDIARIES (continued)

     Perusahaan memiliki saham entitas anak baik                                                                             The Company has ownership interests, directly or
     langsung maupun tidak langsung sebagai berikut:                                                                         indirectly, in the following subsidiaries: (continued)
     (lanjutan)

                                                                                                                                                                                                     Jumlah aset
                                                                                                                                                                                                sebelum eliminasi **)/
                                                                                                                                               Persentase pemilikan/           Tahun             Total assets before
                                                                                                                                              Percentage of ownership         operasi              elimination **)
                                                                                                                                         30 September/       31 Desember/    komersial/    30 September/      31 Desember/
                                                                                                                                         September 30,      December 31,      Year of      September 30,      December 31,
                                 Entitas Anak/                              Domisili/                    Jenis usaha/                        2024                2023       commercial         2024                2023
                                 Subsidiaries                               Domicile                  Nature of business                       %                  %          operation          Rp                  Rp

             PT Pembangkitan Jawa-Bali Investindo                            Jakarta         Investasi/                                          99.99              99.99         2020                260             260
               (PJB Investindo) *)                                                           Investment

               PT Pembangkitan Jawa Baskara Investasi Cirata                 Jakarta         Investasi/                                          99.99              99.99         2020                258             258
                 (PJBIC)                                                                     Investment

             PT Prima Layanan Niaga                                          Jakarta         Perdagangan barang dan jasa enjiniring             100.00             100.00         2018             1,106              925
               Suku Cadang (PLN SC) *)                                                       supply chain dan konsultasi dibidang
                                                                                             ketenagalistrikan/ Operation and services
                                                                                             trading, engineering supply chain and
                                                                                             consultation in the electricity sector

      PT Pelayanan Listrik Nasional Batam (PLN Batam)                         Batam          Penyedia tenaga listrik/                            99.99              99.99         2000            21,550           21,022
            dan entitas anak/ and subsidiary                                                 Electricity supplier

             PT Pelayanan Energi Batam (PEB)                                  Batam          Pembangunan pipa gas dan                            99.99              99.99         2016               939             1,139
                                                                                             energi lainnya/
                                                                                             Construction of gas pipeline and
                                                                                             other energy sector

      PT Indonesia Comnets Plus / PT PLN ICON Plus (PLN ICON+) *****)        Jakarta         Jasa penyedia jaringan                              99.99              99.99         2000            11,106           11,036
            (ICON)                                                                           telekomunikasi/
                                                                                             Telecommunication provider

             PT Indonesia                                                    Jakarta         Investasi/                                          99.99              99.80         2010                107             107
               Connectivity Investasi (ICI) ******)                                          Investment

      PT Prima Layanan Nasional Enjiniring (PLNE)                            Jakarta         Jasa enjiniring, pengadaan                          99.90              99.90         2003             1,532             1,546
             dan entitas anak/ and subsidiary                                                dan konstruksi/
                                                                                             Engineering, procurement and
                                                                                             construction

      PT Pelayanan Listrik Nasional                                          Tarakan         Jasa pemeliharaan dan operasi/                      99.97              99.97         2004             1,582             1,074
            Nusa Daya (PLN Nusa Daya)                                                        Maintenance and operation
            dan entitas anak/ and subsidiary

             PT Paguntaka Cahaya Nusantara (PCN) *)                        Balikpapan        Jasa pemeliharaan dan operasi/                      99.96              99.96         2018                 2                2
                                                                                             Maintenance and operation

      Majapahit Holding B.V. (MH)                                           Belanda/         Lembaga keuangan/                                  100.00             100.00         2006             5,744             5,736
            dan entitas anak/ and its subsidiary                         The Netherlands     Financial Institution

             Majapahit Finance B.V. (MF) *)                                 Belanda/         Lembaga keuangan/                                  100.00             100.00         2006              5,744            5,736
                                                                         The Netherlands     Financial Institution

      PT PLN Batubara (PLN Batubara) / PT PLN Energi Primer Indonesia (PLN EPI)
                                                                           Jakarta
                                                                                *****)       Perdagangan batu bara/                              99.99              99.99         2009            22,884           17,892
            dan entitas anak/ and subsidiaries                                               Coal trading

             PT Jambi Prima Coal (JPC)                                        Jambi          Pertambangan batu bara/                             60.00              60.00         2010               246              282
                                                                                             Coal mining

             PT PLN Batubara Investasi (BBI)                                 Jakarta         Investasi/                                          99.96              99.96         2018             2,800             2,800
             dan entitas anak/ and subsidiaries                                              Investment

             PT Bangun Persada Jambi Energi (BPJE)*)                          Jambi          Pertambangan batu bara/                             80.00              80.00           ***)              37                37
                                                                                             Coal mining

             PT Mahakarya Abadi Prima (MAP)*)                                 Jambi          Pertambangan batu bara/                             80.00              80.00           ***)               3                 3
                                                                                             Coal mining

             PT Bayan Koalindo Lestari *)                                   Palembang        Pertambangan batu bara/                             51.00              51.00         2018               792              706
                                                                                             Coal mining

             PT Prima Bara Indonesia *)                                 Kalimantan Tengah/   Pertambangan batu bara/                             51.00              51.00           ***)             187              187
                                                                        Central Kalimantan   Coal mining

             PT PLN Batubara Niaga (BBN)                                     Jakarta         Perdagangan batu bara/                             100.00             100.00           ***)           4,038             3,038
                                                                                             Coal trading

             PT PLN Energi Gas                                               Jakarta         Pembangkitan tenaga listrik/                        99.99              99.99         2010             2,562             2,562
             (d/h PT Pengembang Listrik Negara Geothermal)                                   Power generation


             PT Pelayaran Bahtera Adhiguna (BAG)                             Jakarta         Pelayaran/                                          99.99              99.99         2011             5,670             5,670
                                                                                             Shipping
Page 67
                                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                   Lampiran 5/57 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                          (Expressed in millions of Rupiah, unless otherwise stated)

5.    ENTITAS ANAK (lanjutan)                                                                            5.        SUBSIDIARIES (continued)

      Perusahaan memiliki saham entitas anak baik                                                                  The Company has ownership interests, directly or
      langsung maupun tidak langsung sebagai berikut:                                                              indirectly, in the following subsidiaries: (continued)
      (lanjutan)
                                                                                                                                                                                           Jumlah aset
                                                                                                                                                                                      sebelum eliminasi **)/
                                                                                                                                     Persentase pemilikan/           Tahun             Total assets before
                                                                                                                                    Percentage of ownership         operasi              elimination **)
                                                                                                                               30 September/       31 Desember/    komersial/    30 September/      31 Desember/
                                                                                                                               September 30,      December 31,      Year of      September 30,      December 31,
                                     Entitas Anak/                     Domisili/                 Jenis usaha/                      2024                2023       commercial         2024                2023
                                     Subsidiaries                      Domicile               Nature of business                     %                  %          operation          Rp                  Rp

            PT Haleyora Power (HP)                                     Jakarta       Jasa pemeliharaan dan operasi/                    99.99              99.99         2013             1,804             1,554
                  dan entitas anak/ and subsidiary                                   Maintenance and operation

                  PT Haleyora Powerindo (HPI) *)                       Jakarta       Jasa/ Service                                     95.00              95.00         2013               667              641

            PT Energy Management Indonesia (EMI) ****)                 Jakarta       Jasa konservasi energi dan lingkungan             99.99              99.99         1987                58              126
                  dan entitas anak/and subsidiary                                    serta energi baru terbarukan/Energy and
                                                                                     environmental conservation service
                                                                                     and renewable energy

                  PT Energi Biomassa Indonesia (EBI)                   Jakarta       Jasa konservasi energi dan lingkungan             99.00              99.00         2015                 4                 4
                                                                                     serta energi baru terbarukan/Energy and
                                                                                     environmental conservation service
                                                                                     and renewable energy

                  PT Energi Bangun Indonesia (EBI 2) ***)              Jakarta       Jasa Perdagangan Ekspor dan Impor, Perindustrian, Pembangunan        80.00           ***)                   -             -
                                                                                     Export and Import Trading, Industry, Construction

                  PT Energi Biomassa Indonesia (EBI 2)                 Jakarta       Jasa perdagangan ekspor dan impor,                99.87              80.00           ***)                1                1
                                                                                     perindustrian, pembangunan
                                                                                     Export and import trading, industry,
                                                                                     construction

            PT PLN Mandau Cipta Tenaga Nusantara (MCTN) ****)          Jakarta       Jasa pengelolaan energi/                          95.00              95.00         2000             1,588             1,247
                                                                                     Energy Service



     *) Pemilikan tidak langsung/Indirect ownership
     **) Dalam miliaran Rupiah/Stated in billions of Rupiah
     ***) Dalam tahap pengembangan/Under development stage
     ****) Sub holding PT PLN (Persero) yang telah disahkan pada Legal End-state Holding Subholding PT PLN (Persero) pada tanggal 30 Desember 2022/
           Sub holding of PT PLN (Persero) which has been approved in the Legal End-state Holding Subholding of PT PLN (Persero) on December 30, 2022
     *****) Diakuisisi pada tahun berjalan (sesama PLN Grup)/Acquired during the year (within PLN Group)



       Berdasarkan Akta Notaris No. 38 tanggal 27 April                                                             Based on Notarial Deed No. 38 dated April 27, 2022
       2022 dari Lenny Janis Ishak, S.H., Notaris di Jakarta,                                                       of Lenny Janis Ishak, S.H., Notary in Jakarta, PLN NP
       PLN NP mengadakan perjanjian jual beli saham untuk                                                           entered into a share sale and purchase agreement to
       membeli saham PJBS dari YK PJB, di mana                                                                      purchase shares of PJBS of YK PJB under which the
       Perusahaan membeli sebagian kepemilikan saham                                                                Company purchased a part of PJBS shares or
       PJBS atau setara dengan 1% kepemilikan atas PJBS                                                             equivalent to 1% ownership of PJBS with a total
       dengan nilai pengalihan sebesar Rp11.184.                                                                    transaction value of Rp11,184.
Page 68
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                       Lampiran 5/58 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                          (Expressed in millions of Rupiah, unless otherwise stated)

6.      ASET TETAP                                                                           6.         PROPERTY, PLANT AND EQUIPMENT
                                                                            30 September 2024/ September 30, 2024

                                                Saldo awal/        Penambahan/          Pengurangan/         Reklasifikasi/         Saldo akhir/
                                             Beginning balance       Additions           Deductions         Reclassifications      Ending balane

       Biaya perolehan
       Pemilikan langsung                                                                                                                                                Direct acquisitions
         Tanah                                      168,127,620              60,461                     -              2,586,570           170,774,651                               Land
         Bangunan umum, waduk                                                                                                                                    Buildings, reservoir and
           dan prasarana                              83,884,900            126,234                     -              4,933,038            88,944,172                    infrastructure
         Instalasi dan mesin                                                                                                                                      Installation and power
           pembangkit                               590,572,905             637,615                     -             20,460,698           611,671,218                             plant
         Perlengkapan transmisi                     265,057,265               8,916                     -             18,918,995           283,985,176          Transmission equipment
         Perlengkapan distribusi                    267,255,807              28,651                     -             13,093,977           280,378,435            Distribution equipment
         Perlengkapan umum                           21,674,868             203,415                     -                632,436            22,510,719                General equipment
         Kendaraan bermotor                           3,156,177             442,567                     -                306,101             3,904,845                     Motor vehicles
         Material cadang                              3,316,055             123,398                     -                 51,294             3,490,747                        Spare parts
         Perlengkapan pengolahan                                                                                                                           Telecommunication and data
           data dan telekomunikasi                     8,655,541             11,301                     -                952,625             9,619,467           processing equipment
         Perlengkapan pengolahan                                                                                                                          Others telecommunication and
           data dan telekomunikasi lainnya             9,328,873              4,147                     -                771,718            10,104,738      data processing equipment
         Kapal dan perlengkapan                        2,681,505             31,386                     -                      1             2,712,892            Vessels and equipment

        Sub-jumlah                                 1,423,711,516          1,678,091                     -             62,707,453         1,488,097,060                           Subtotal


       Aset dalam pembangunan                       128,753,555          38,181,127                  -              (64,521,404)           102,413,278             Construction in progress
       Aset tidak digunakan dalam operasi            16,077,130                   -        (1,469,823)                 1,441,872            16,049,180          Assets not used in operation

       Jumlah                                     1,568,542,201         39,859,218        (1,469,823)                 (372,078)        1,606,559,518                                 Total



     Akumulasi penyusutan
     Pemilikan langsung                                                                                                                                                 Direct acquisitions
       Bangunan umum, waduk                                                                                                                                     Buildings, reservoir and
         dan prasarana                               5,434,440           2,104,244                  -                   (7,497)             7,531,187                    infrastructure
       Instalasi dan mesin                                                                                                                                       Installation and power
         pembangkit                                 39,593,908          15,247,413                  -                (411,757)            54,429,564                              plant
       Perlengkapan transmisi                       13,649,962           5,680,602                  -                   21,596            19,352,160           Transmission equipment
       Perlengkapan distribusi                      19,558,835           8,170,553                  -                (101,981)            27,627,407             Distribution equipment
       Perlengkapan umum                            18,548,886           1,057,276                  -                 (36,013)            19,570,149                 General equipment
       Kendaraan bermotor                            2,575,549              97,206                  -                  148,612             2,821,367                      Motor vehicles
       Material cadang                                 188,461              78,687                  -                 (44,591)               222,557                   Major spare parts
       Perlengkapan pengolahan                                                                                                                             Telecommunication and data
         data dan telekomunikasi                     2,301,142            846,805                   -                   15,093              3,163,040           processing equipment
       Perlengkapan pengolahan                                                                                                                           Others telecommunication and
         data dan telekomunikasi lainnya             3,793,630            868,751                   -                     (153)             4,662,228     data processimg equipment
       Kapal dan perlengkapan                        1,117,064            107,399                   -                       (1)             1,224,462            Vessels and equipment

      Sub-jumlah                                   106,761,877          34,258,936                  -                (416,692)           140,604,121                           Subtotal


     Aset tidak digunakan dalam operasi              8,999,230            941,219         (1,136,264)                  (27,096)             8,777,088         Assets not used in operation

     Jumlah                                        115,761,107         35,200,155         (1,136,264)                (443,788)           149,381,209                                 Total

     Penyisihan penurunan nilai                      3,810,473                      -               -                  (96,663)             3,713,810         Provision for impairment

     Jumlah Tercatat                            1,448,970,620                                                                          1,453,464,499                 Net carriying value
Page 69
                              PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                           DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/59 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

6.     ASET TETAP (lanjutan)                                                     6.         PROPERTY, PLANT AND EQUIPMENT (continued)
                                                            31 Desember 2023 / December 31, 2023
                                      Saldo awal/                                                                   Saldo akhir/
                                      Beginning       Penambahan/       Pengurangan/          Reklasifikasi/          Ending
                                       balance          Additions         Disposals          Reclassifications       balance

     Biaya perolehan                                                                                                                                            At cost
     Pemilikan langsung                                                                                                                            Direct acquisitions
     Tanah dan hak atas tanah           165,722,533          44,296                    -              2,360,791       168,127,620               Land and land rights
     Bangunan umum, waduk                                                                                                                  Buildings, reservoirs and
         dan prasarana                   80,241,862         189,350             (1,176)               3,454,864         83,884,900                   infrastructure
     Instalasi dan mesin                                                                                                                     Installations and power
         pembangkit                     576,903,905        2,928,906          (635,018)              11,375,112       590,572,905                             plants
     Perlengkapan transmisi             242,370,927           19,316                 -               22,667,022       265,057,265          Transmission equipment
     Perlengkapan distribusi            248,760,910          112,344                 -               18,382,553       267,255,807             Distribution equipment
     Perlengkapan umum                   20,255,166          326,228                 -                1,093,474        21,674,868                General equipment
     Kendaraan bermotor                   2,862,730          256,039                 -                    37,408        3,156,177                      Motor vehicles
     Material cadangan utama              3,194,857          209,561                 -                   (88,363)       3,316,055                   Major spare parts
     Perlengkapan                                                                                                                              Telecommunications
         pengolahan data dan                                                                                                                              and data
         telekomunikasi yang                                                                                                              processing equipment
         digunakan dalam                                                                                                                                   used for
         penyediaan listrik               7,274,300          40,843                    -              1,340,398          8,655,541               electricity supply
     Perlengkapan pengolahan data                                                                                                    Other telecommunications and
         Dan telekomunikasi lainnya       5,795,912           4,034                    -              3,528,927          9,328,873   data processing equipment
     Kapal dan perlengkapan               1,912,780         422,303                    -                346,422          2,681,505          Vessels and equipment

     Subjumlah                        1,355,295,882        4,553,220          (636,194)              64,498,608      1,423,711,516                           Subtotal

     Aset dalam pembangunan             135,756,415       57,878,648          (468,031)             (64,413,477)      128,753,555           Construction in progress

     Aset tidak digunakan                                                                                                                            Assets not used
        dalam operasi                    19,283,887                 -       (2,699,613)                (507,144)        16,077,130                   in operations

     Jumlah                           1,510,336,184       62,431,868        (3,803,838)                (422,013)     1,568,542,201                               Total

     Akumulasi penyusutan                                                                                                              Accumulated depreciation
         dan penurunan nilai                                                                                                                    and impairment
     Pemilikan langsung                                                                                                                            Direct acquisitions
     Bangunan umum, waduk                                                                                                                  Buildings, reservoirs and
         Dan prasarana                    2,703,562        2,676,431               (63)                  54,510          5,434,440                   infrastructure
     Instalasi dan mesin                                                                                                                     Installations and power
         pembangkit                      19,968,790       20,140,221           (36,470)                (478,633)        39,593,908                            plants
     Perlengkapan transmisi               6,298,086        7,073,908                 -                  277,968         13,649,962         Transmission equipment
     Perlengkapan distribusi              9,470,612       10,166,288                 -                  (78,065)        19,558,835            Distribution equipment
     Perlengkapan umum                   17,033,001        1,579,007                 -                  (63,122)        18,548,886               General equipment
     Kendaraan bermotor                   2,313,026          103,494                 -                  159,029          2,575,549                     Motor vehicles
     Material cadangan utama                 97,143          102,082                 -                  (10,764)           188,461                  Major spare parts
     Perlengkapan                                                                                                                              Telecommunications
         pengolahan data dan                                                                                                                              and data
         telekomunikasi yang                                                                                                              processing equipment
         digunakan dalam                                                                                                                                   used for
         penyediaan listrik               1,127,653        1,167,405                   -                  6,084          2,301,142               electricity supply
     Perlengkapan pengolahan data                                                                                                    Other telecommunications and
         Dan telekomunikasi lainnya       2,978,984         835,349                    -                (20,703)         3,793,630   data processing equipment
     Kapal dan perlengkapan                 948,992         175,441                    -                 (7,369)         1,117,064          Vessels and equipment

     Subjumlah                           62,939,849       44,019,626           (36,533)                (161,065)      106,761,877                            Subtotal

     Aset tidak digunakan                                                                                                                            Assets not used
        dalam operasi                    10,594,605        1,052,915        (2,628,824)                 (19,466)         8,999,230                   in operations

     Jumlah                              73,534,454       45,072,541        (2,665,357)                (180,531)      115,761,107                                Total

     Penyisihan penurunan nilai           3,752,747          30,219                    -                 27,507          3,810,473          Provision for impairment

     Jumlah tercatat                  1,433,048,983                                                                  1,448,970,621               Net carrying value




       Beban penyusutan dialokasikan sebagai berikut:                                       Depreciation expense was allocated as follows:


                                                             2024                               2023
                                                       (Sembilan Bulan/                    Sembilan Bulan/
                                                         Nine Months)                       Nine Months)

                    Beban usaha                                  34,231,929                        32,205,835             Operating expenses
                    Pekerjaan dalam pelaksanaan                      27,008                            38,090          Construction in progress
                    Beban lain-lain                                 941,219                           361,436                            Others

                                                                 35,200,156                        32,605,361
Page 70
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/60 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                    6.    PROPERTY, PLANT AND EQUIPMENT (continued)

     Grup memiliki beberapa bidang tanah dengan hak                 The Group owns several pieces of land with Rights to
     legal berupa Hak Pakai dan Hak Guna Bangunan                   Use and Building Use Rights (“HGB”). Rights to Use
     (“HGB”). Hak Pakai tidak mempunyai jangka waktu,               have no expiration date while HGB will expire from
     sedangkan HGB Perusahaan jatuh tempo antara                    2024 to 2051, but they are renewable by the Group.
     tahun 2024 sampai dengan 2051, tetapi dapat                    The Group also has several pieces of land and land
     diperpanjang oleh Grup. Grup juga mempunyai                    rights, which are still in an extension process and in
     beberapa bidang tanah yang sedang dalam proses                 the process of transfer of certificates to the name of
     perpanjangan HGB dan pengurusan balik nama                     the Group.
     menjadi atas nama Grup.

     Pada tanggal 30 September 2024, bangunan, instalasi            As at September 30, 2024, the buildings, installations
     dan mesin pembangkit, perlengkapan transmisi,                  and power plants, transmission equipment, other
     perlengkapan pengolahan data dan telekomunikasi                telecommunications and data processing equipment
     lainnya serta kapal diasuransikan kepada beberapa              and vessels were insured with several insurance
     perusahaan asuransi yaitu PT Asuransi Central Asia             companies, with PT Asuransi Central Asia and others,
     dan lainnya, dengan jumlah pertanggungan sebesar               with total insurance coverage of USD23,875,141,465
     USD23.875.141.465 (nilai penuh) atau setara dengan             (full amount) or equivalent to Rp361,565,142
     Rp361.565.142 (Desember 2023: PT Asuransi Central              (December 2023: PT Asuransi Central Asia and
     Asia dan lainnya, dengan jumlah pertanggungan                  others,     with   total  insurance    coverage      of
     sebesar USD23.379.863.502 (nilai penuh) atau setara            USD23,379,863,502 (full amount) or equivalent to
     dengan Rp360.961.713) dan PT Asuransi Tugu                     Rp360,961,713) and          PT Asuransi Tugu Kresna
     Kresna Pratama, PT Asuransi Asei Indonesia, PT                 Pratama, PT Asuransi Asei Indonesia, PT Asuransi
     Asuransi Perisai Listrik Nasional, dan lainnya sebagai         Perisai Listrik Nasional, and others as the insurer
     penanggung risiko kebakaran dan kemungkinan risiko             against fire and other possible risks with total
     lainnya dengan jumlah pertanggungan sebesar                    insurance coverage of Rp7,927,060 (December 2023:
     Rp7.927.060 (Desember 2023: Rp10.857.070). Grup                Rp10,857,070). The Group does not insure property,
     tidak mengasuransikan aset tetap selain bangunan,              plant and equipment other than buildings, installations
     instalasi dan mesin pembangkit, perlengkapan                   and power plants, transmission equipment, other
     transmisi, perlengkapan pengolahan data dan                    telecommunications and data processing equipment
     telekomunikasi lainnya serta kapal. Manajemen                  and vessels. Management believes that the risks of
     berpendapat bahwa risiko kerugian yang berkaitan               losses related to the uninsured assets can be
     dengan aset yang tidak diasuransikan tersebut dapat            managed by the Group in consideration of the costs
     dikelola oleh Grup sehubungan dengan pertimbangan              that would be spent and the benefits that would be
     biaya yang akan dikeluarkan dan manfaat yang akan              obtained. Management believes that the insurance
     diperoleh. Manajemen berpendapat bahwa nilai                   coverage is adequate to cover possible losses on the
     pertanggungan tersebut cukup untuk menutup                     assets insured.
     kemungkinan       kerugian      atas     aset    yang
     dipertanggungkan.

     Jumlah tercatat dari aset tetap yang telah disusutkan          The carrying amount of property, plant and equipment
     penuh dan masih digunakan pada tanggal 30                      that has been fully depreciated but is still in use as at
     September 2024 dan 31 Desember 2023 masing-                    September 30, 2024 and December 31, 2023
     masing sebesar Rp25.510.515 dan Rp17.699.061.                  amounted to Rp25,510,515 and Rp17,699,061
                                                                    respectively.

     Pada tahun 2021, manajemen mempekerjakan penilai               In 2021, management engaged external independent
     eksternal independen dan berkualifikasi untuk                  and qualified valuers, KJPP RHR to determine the fair
     menentukan nilai wajar aset tetap yaitu KJPP RHR,              value of fixed assets, based on its report No.
     berdasarkan     laporannya     No.    00142/2.0012-            00142/2.0012-00/PI/02/0006/1/IV/2022, dated April
     00/PI/02/0006/1/IV/2022, tertanggal 26 April 2022.             26, 2022. KJPP RHR is an independent valuer
     KJPP RHR merupakan penilai independen yang telah               registered with the Ministry of Finance and FSA.
     terdaftar di Kementerian Keuangan dan OJK.
Page 71
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/61 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                                6.    PROPERTY, PLANT AND EQUIPMENT (continued)

      Tabel di bawah ini menganalisis aset tetap yang                            The table below analyses fixed assets recorded at fair
      dicatat pada nilai wajar berdasarkan hierarki nilai                        value, based on the fair value hierarchy in SFAS No.
      wajar sesuai dengan PSAK No. 68 dan berdasarkan                            68 and based on valuation as at December 31, 2021
      valuasi pada tanggal 31 Desember 2021 sebagai                              as follows:
      berikut:

                                              Tingkat pengukuran nilai wajar 31 Desember 2021 menggunakan/
                                                  Fair value measurement at December 31, 2021 using
                                        Level 1/             Level 2/              Level 3/          Jumlah/
                                        Level 1               Level 2              Level 3            Total

     Pengukuran nilai wajar                                                                                                Recurring fair value
         berulang                                                                                                             measurement
     Tanah dan hak atas tanah                      -          36,735,664             126,806,369      163,542,033          Land and land rights
     Bangunan umum, waduk                                                                                              Buildings, reservoirs and
         dan prasarana                             -           6,988,067              69,138,909       76,126,976               infrastructure
     Instalasi dan mesin                                                                                                Installations and power
         pembangkit                                -                   -             556,182,532      556,182,532                       plants
     Perlengkapan transmisi                        -                   -             204,873,601      204,873,601      Transmission equipment
     Perlengkapan distribusi                       -                   -             235,012,113      235,012,113        Distribution equipment
     Perlengkapan pengolahan
         data dan telekomunikasi data                                                                                  Telecommunications and
         yang digunakan dalam                                                                                          processing equipment
         penyediaan listrik                        -                   -               6,134,499        6,134,499   used for electricity supply
     Material cadang utama                         -                   -               3,090,753        3,090,753              Major spare parts

     Jumlah                                        -          43,723,731         1,201,238,776      1,244,962,507                         Total


      -       Harga dikutip (tidak disesuaikan) dari pasar yang                  -      Quoted prices (unadjusted) in active markets for
              aktif untuk aset atau liabilitas yang identik                             identical assets or liabilities (Level 1);
              (Tingkat 1);
      -       Input selain harga yang dikutip dari pasar yang                    -      Inputs other than quoted prices included within
              disertakan pada Tingkat 1 yang dapat diobservasi                          Level 1 that are observable for the asset or
              untuk aset dan liabilitas, baik secara langsung                           liability, either directly (that is, as prices) or
              (yaitu sebagai sebuah harga) atau secara tidak                            indirectly (that is, derived from prices) (Level 2);
              langsung (yaitu sebagai turunan dari harga)                               and
              (Tingkat 2); dan
      -       Input untuk aset atau liabilitas yang tidak                        -      Inputs for the asset or liability that are not based
              didasarkan pada data pasar yang dapat                                     on observable market data (that is, unobservable
              diobservasi (informasi yang tidak dapat                                   inputs) (Level 3).
              diobservasi) (Tingkat 3).

      Tidak terdapat aset tetap yang bisa digolongkan ke                         There were no fixed assets which could be classified
      dalam nilai wajar Tingkat 1.                                               at Level 1 fair value.

      Tidak terdapat transfer antara Tingkat 1 dan Tingkat 2                     There were no transfers between Level 1 and Level 2
      selama tahun berjalan.                                                     during the year.

      Nilai wajar Tingkat 2 dari tanah dan hak atas tanah                        The Level 2 fair value of land and land rights is calculated
      dihitung dengan menggunakan pendekatan pasar dan                           using the market approach and income approach, while
      pendekatan pendapatan, sedangkan untuk bangunan                            the value of building is calculated using the cost
      menggunakan pendekatan biaya. Input yang                                   approach. Data inputs were obtained from the market
      diperoleh dari pendekatan pasar yaitu:                                     approach that consists of the following:
                                                                                 a. Sale or rental price per square metre;
      a.      Harga jual atau harga sewa per meter persegi;                      b. Occupancy rate;
      b.      Tingkat hunian;                                                    c. Growth rate;
      c.      Tingkat pertumbuhan;                                               d. Discount and capitalisation rate;
      d.      Tingkat diskonto dan kapitalisasi;                                 e. Replacement cost new per square metre;
      e.      Biaya pembuatan baru per meter persegi;                            f. Depreciation rate;
      f.      Tingkat depresiasi;                                                g. Operational expense;
      g.      Biaya operasional;                                                 h. Developers margin; and
      h.      Keuntungan pengembangan; dan                                       i. Construction cost index.
      i.      Indeks kemahalan konstruksi.
Page 72
                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                        Lampiran 5/62 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                               (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                                                     6.       PROPERTY, PLANT AND EQUIPMENT (continued)

      Rekonsiliasi atas saldo awal terhadap saldo akhir dari                                             Reconciliation of the beginning balances to the closing
      pengukuran nilai wajar dengan menggunakan                                                          balances of the fair value measurements using
      informasi signifikan yang tidak dapat diobservasi                                                  significant unobservable inputs (Level 3) is as follows:
      (Tingkat 3) adalah sebagai berikut:
                                                                                                                         Jumlah yang
                                                                                                                           diakui pada
                                                                                       Jumlah yang diakui pada            penghasilan
                                                                                               laba rugi/                komprehensif
                                                                                        Amount recognised in              lain/Amount
                                                                                             profit or loss                recognised
                                   1 Januari/                                                            Penurunan           in other       31 Desember/
                                    January       Penambahan/     Reklasifikasi/      Depresiasi/           nilai/      comprehensive        December
                                      2021          Additions    Reclassification    Depreciation       Impairment           income             2021

     Tanah                         120,748,069             90             344,881                  -        (233,550)         5,946,879      126,806,369                           Land
     Bangunan umum,                                                                                                                                                 Building, reservoirs
         waduk dan prasarana        68,575,318          11,935          1,396,506       (2,075,199)         (326,876)         1,557,225       69,138,909        and infrastructures
     Instalasi dan                                                                                                                                                         Installations
         mesin pembangkit          569,627,746       1,307,825          9,073,213      (18,644,822)       (1,098,687)         (4,082,743)    556,182,532         and power plants
     Perlengkapan transmisi        186,216,183          86,471         17,752,609       (5,481,988)         (688,075)          6,988,401     204,873,601     Transmissions equipment
     Perlengkapan distribusi       222,243,033          93,123         12,051,446       (8,336,371)          (21,800)          8,982,682     235,012,113       Distributions equipment
     Perlengkapan
         pengolahan data                                                                                                                                         Telecommunications
         dan telekomunikasi                                                                                                                                   and data processing
         yang digunakan dalam                                                                                                                                  equipment used for
         penyediaan listrik          5,997,253          20,142            711,983           (960,551)        (58,427)           424,099         6,134,499         electricity supply
     Material cadangan utama         4,063,814          29,766         (1,137,411)           (96,006)         (4,179)           234,769         3,090,753            Major spare parts

     Jumlah                       1,177,471,416      1,549,352         40,193,227      (35,594,937)       (2,431,594)        20,051,312     1,201,238,776                         Total


      Nilai wajar Tingkat 3 dihitung dengan menerapkan                                                   The Level 3 fair value is calculated through the market
      pendekatan pasar, pendekatan pendapatan, dan                                                       approach, income approach, and cost approach by
      pendekatan biaya dengan menggunakan input yang                                                     using unobservable inputs.
      tidak dapat diobservasi.

      Perubahan surplus revaluasi, dikurangi dengan                                                      The changes in revaluation surplus, net of final income
      penghasilan final dan penghasilan pajak tangguhan                                                  tax and applicable deferred income taxes, were charged
      yang terkait, yang dibebankan pada penghasilan                                                     to other comprehensive income and are presented in
      komprehensif lain dan disajikan sebagai surplus                                                    property, plant and equipment revaluation surplus in the
      revaluasi aset tetap dalam laporan perubahan ekuitas                                               consolidated statements of changes in equity.
      konsolidasian.

      Tidak terdapat perbedaan yang signifikan antara nilai                                              There is no significant difference between the fair value
      wajar aset tetap dengan nilai tercatatnya selain aset                                              and carrying value of fixed assets other than assets that
      yang menggunakan model revaluasi.                                                                  have applied the revaluation model.

      Mutasi surplus revaluasi aset tetap adalah sebagai                                                 The movements of property, plant and equipment
      berikut:                                                                                           revaluation surplus are as follows:

                                                                  30 September/                    31 Desember/
                                                                  September 30                      December 31
                                                                      2024                             2023

     Saldo awal                                                        688,394,826                      688,538,705                                         Beginning balance

     Kenaikan surplus revaluasi                                                         -                   346,260             Increase on revaluation surplus
     Penghapusan aset tetap                                                             -                    (7,147) Disposals of property, plant and equipment

                                                                                       -                    339,113
     Reklasifikasi surplus revaluasi                                                                                              Reclassification of revaluation surplus
       ke saldo laba atas aset tetap                                                                                               to retained earnings from disposals
       yang telah dijual                                                                -                  (408,387)                  of property, plant and equipment
     Beban pajak terkait                                                                -                   (74,605)                        Related income tax expense

     Saldo akhir                                                       688,394,826                      688,394,826                                          Ending balance
Page 73
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                         Lampiran 5/63 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                     (Expressed in millions of Rupiah, unless otherwise stated)

6.     ASET TETAP (lanjutan)                                                                                          6.       PROPERTY, PLANT AND EQUIPMENT (continued)

       Selain menggunakan input yang berasal dari pasar,                                                                       Other than the data inputs observed from the market,
       KJPP RHR juga menggunakan input yang tidak dapat                                                                        KJPP RHR also used unobservable market data inputs
       diobservasi dari pasar dan menggunakan asumsi                                                                           and used special assumptions related to the assets
       khusus terkait dengan jenis aset yang tergolong                                                                         classified as specialised property, such as power plants
       sebagai properti khusus, seperti pembangkit listrik dan                                                                 and others.
       lainnya.

       Penyesuaian      dilakukan    berdasarkan    ukuran,                                                                    Adjustments were made based on size, capacity, age,
       kapasitas, usia, lokasi, bentuk dan spesifikasi, hak                                                                    location, shapes and specifications, land rights and other
       atas tanah, dan elemen perbandingan lainnya.                                                                            comparison elements.

       Informasi mengenai pengukuran nilai wajar yang                                                                          Information about fair value measurements using
       menggunakan informasi signifikan yang tidak dapat                                                                       significant unobservable inputs (Level 3) are as follows:
       diobservasi (Tingkat 3) adalah sebagai berikut:
                                                                                                                                    Kisaran input
                                                                                                                                     yang tidak
                                            Nilai wajar                                                                                  dapat                   Hubungan
                                           pada tanggal                                                   Informasi                  diobservasi            informasi yang tidak
                                           31 Desember                                                    yang tidak                yang dipakai/             dapat diobservasi
                                               2021/                         Teknik                          dapat                    Range of              terhadap nilai wajar/
                                          Fair value as at                 penilaian/                    diobservasi/               unobservable               Relationship of
                                           31 December                     Valuation                    Unobservable                    inputs                  unobservable
                                                2021                       technique                        inputs                       used                inputs to fair value

     Tanah                                                                                                                                                                                                                Land

     Tapak Tower                            51,471,076          Pendekatan biaya               - Luas Right of Way (“ROW”)/        60.00% - 70.00%*    -   Semakin tinggi luas dan                          Land for tower site
                                                                dengan metode                     ROW area                                                 kompensasi ROW
                                                                penjumlahan/                                                                               maka semakin
                                                                The cost approach                                                                          tinggi nilai wajar/
                                                                with the summation                                                                         The higher the ROW area
                                                                method                                                                                     and compensation
                                                                                                                                                           the higher the fair value
                                                                                               - Kompensasi ROW/
                                                                                                  Compensation ROW

     Tanah gardu dan pembangkit              75,335,293          Pendekatan pendapatan         - Peruntukan sesuai                 60.00% - 80.00%*    -   Semakin tinggi koefisien                        Land for substation
                                                                dengan metode                     pengembangan/                                            luas bangunan (“KLB”)                           and power plant
                                                                pengembangan lahan/               Adjustment of parameter                                  maka semakin
                                                                The income approach               development                                              tinggi nilai wajar/
                                                                with the land                                                                              The higher the KLB,
                                                                development method                                                                         the higher the fair value
                                                                                               - Data luas dan aspek legal/                            -   Tanah bersertifikat akan
                                                                                                  Land area and legal                                      memiliki nilai wajar
                                                                                                  aspects                                                  lebih tinggi/
                                                                                                                                                           Certified land will have
                                                                                                                                                           higher fair value
                                                                                               - Perubahan peruntukan/                                 -   Peruntukan tanah sekitar
                                                                                                  Zoning changes                                           mengindikasikan nilai wajar
                                                                                                                                                           yang lebih tinggi/
                                                                                                                                                           Zoning of neighboring land
                                                                                                                                                           might have higher fair value

     Bangunan                                                                                                                                                                                                       Buildings

     Bangunan umum                          52,306,552          Pendekatan biaya/              - Indeks koefisien/                    0.45 - 5.46      -   Semakin besar                                     General buildings
                                                                Cost approach                     Index coefficient                                        indeks koefisien maka
                                                                                                                                                           semakin tinggi nilai wajar/
                                                                                                                                                           The higher the index coefficient,
                                                                                                                                                           the higher the fair value
                                                                                               - Volume bangunan/                  60.00% - 70.00%*    -   Semakin besar volume
                                                                                                  Building volumes                                         maka semakin tinggi
                                                                                                                                                           nilai wajar/
                                                                                                                                                           The higher building
                                                                                                                                                           volumes, the higher the fair value

     Waduk dan prasarana                     16,832,357        Tren/                           - Indeks koefisien/                    1.00 - 2.27      -   Semakin besar tingkat                 Reservoirs and infrastructures
                                                                Trending                          Index coefficient                                        indeks maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the index coefficient,
                                                                                                                                                           the higher the fair value

     Instalasi dan mesin                    556,182,532        Pendekatan biaya/               - Tingkat kemunduran                1.00% - 30.00%      -   Semakin besar tingkatnya,                         Installations and
       pembangkit                                               Cost approach                      fungsional/                                             maka semakin                                        power plants
                                                                                                   Functional                                              rendah nilai wajar/
                                                                                                   obsolescence rate                                       The higher the rate,
                                                                                                                                                           the lower the fair value
                                                                                               - Tingkat kemunduran                 1.00% - 3.00%      -   Semakin besar tingkatnya,
                                                                                                  ekonomis/                                                maka semakin
                                                                                                  Economic                                                 rendah nilai wajar/
                                                                                                  obsolescence rate                                        The higher the rate,
                                                                                                                                                           the lower the fair value
                                                                                               - Tingkat indeks PPI/                  1.00 - 2.00      -   Semakin besar tingkat
                                                                                                  PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher the fair value

     Perlengkapan transmisi                 204,873,601        Pendekatan biaya/               - Tingkat indeks PPI/                  1.00 - 3.00      -   Semakin besar tingkat                  Transmissions equipment
                                                                Cost approach                     PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher the fair value

     Perlengkapan distribusi                235,012,113        Pendekatan biaya/               - Tingkat indeks PPI/                  1.00 - 1.65      -   Semakin besar tingkat                    Distributions equipment
                                                                Cost approach                     PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher the fair value

     Perlengkapan pengolahan                  6,134,499        Pendekatan biaya/               - Tingkat indeks PPI/                  1.01 - 1.02      -   Semakin besar tingkat                        Telecommunications
       data dan telekomunikasi                                  Cost approach                     PPI index rate                                           indeks PPI maka semakin                    and data processing
       yang digunakan dalam                                                                                                                                tinggi nilai wajar/                         equipment used for
       penyediaan listrik                                                                                                                                  The higher the PPI index rate,         electricity supply
                                                                                                                                                           the higher the fair value

     Material cadang utama                   3,090,753         Pendekatan biaya/               - Tingkat indeks PPI/                  1.00 - 3.00      -   Semakin besar tingkat                            Major spare parts
                                                                Cost approach                     PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher fair value

     *) Terdapat banyak input yang tidak dapat diobservasi. Hal ini merepresentasikan kisaran bobot dari input yang tidak dapat diobservasi./There are too many unobservable inputs. This represents the weights of the
        unobservable inputs.
Page 74
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/64 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                       6.    PROPERTY, PLANT AND EQUIPMENT (continued)

     Surplus revaluasi, dikurangi dengan penghasilan                   The revaluation surplus, net of applicable deferred
     pajak tangguhan yang terkait, telah dikreditkan pada              income taxes, was credited to other comprehensive
     pendapatan komprehensif lain dan disajikan sebagai                income and is shown in “property, plant and equipment
     “surplus revaluasi aset tetap” pada laba komprehensif             revaluation surplus” in other comprehensive income.
     lain.

     Jika Grup tidak menerapkan model revaluasi, nilai                 If the Group did not apply the revaluation model, the net
     tercatat bersih aset tetap Perusahaan pada tanggal 30             carrying value of property, plant and equipment as at
     September 2024 dan 31 Desember 2023 masing-                       September 30, 2024 and December 31, 2023 would
     masing sebesar Rp721.716.422 dan Rp688.378.882.                   have amounted to Rp721,716,422 and Rp688,378,882
                                                                       respectively.

     Aset dalam pembangunan                                            Construction in progress

     Akun ini merupakan biaya-biaya yang terjadi                       This account represents costs incurred in relation to the
     sehubungan dengan pembangunan dan renovasi/                       construction and renovation/betterment of power supply
     perbaikan sarana kelistrikan, sebagai berikut:                    facilities, as follows:

                                                30 September/         31 Desember/
                                                September 30,         December 31,
                                                    2024                  2023

                       Proyek penugasan -                                                    Mandatory project -
                           Program percepatan                                              Fast track program
                           Pembangkitan              5,065,954               4,689,759            Power plants
                           Transmisi                 5,108,398               5,108,398           Transmission

                          Sub Jumlah                10,174,352               9,798,158               Sub Total

                       Konstruksi Rutin                                                       Regular construction
                          Pembangkitan              51,919,045           70,020,323               Power plants
                          Transmisi                 29,336,830           38,440,674              Transmission
                          Distribusi                10,635,966            9,881,967                Distribution
                          Perlengkapan                 347,085              612,434                 Equipment

                          Sub Jumlah                92,238,926          118,955,398                  Sub Total

                          Jumlah                   102,413,278          128,753,556                       Total


     (i)   Program percepatan                                          (i)     Fast track program

           Program percepatan (fast track program)                             The fast track program represents projects which
           merupakan proyek yang ditugaskan Pemerintah                         are mandated by the Government to the Group.
           kepada Grup. Aset dalam pembangunan untuk                           Construction in progress under the fast track
           program percepatan termasuk pembayaran uang                         program includes advance payments made to the
           muka kepada kontraktor, biaya pinjaman serta                        contractors, borrowing costs and other capitalised
           pengeluaran lain yang dikapitalisasi.                               expenditures.

           Pembangkitan                                                        Power plants

           Program percepatan aset dalam pembangunan                           The fast track program of power plants under
           pembangkitan terutama merupakan PLTU 1                              construction consists mainly of PLTU 1 Kalimantan
           Kalimantan Barat – Parit Baru 2x50 MW dan                           Barat – Parit Baru 2x50 MW and PLTU 2 West
           PLTU 2 Kalimantan Barat Bengkayang 2x27,5                           Kalimantan Bengkayang 2x27.5 MW.
           MW.

           Transmisi                                                           Transmission

           Program percepatan aset dalam pembangunan                           The fast track program of transmission and
           transmisi dan gardu induk antara lain proyek                        substation under construction mainly consists of
           SUTT 275 kV Meulaboh – Sigli dan SUTT 150 kV                        projects such as Overhead Powerline 275 kV
           Blang Pidie – Tapak Tuan.                                           Meulaboh – Sigli and Overhead Powerline 150 kV
                                                                               Blang Pidie – Tapak Tuan.
Page 75
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/65 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                    6.    PROPERTY, PLANT AND EQUIPMENT (continued)

     Aset dalam pembangunan (lanjutan)                              Construction in progress (continued)

     (ii) Konstruksi rutin                                          (ii) Regular construction

         Pembangkitan                                                   Power plants

         Aset dalam pembangunan untuk pembangkitan                      Power plants under construction consist mainly of
         terutama merupakan PLTU Sulut 1 2x50 MW,                       PLTU Sulut 1 2x50 MW, PLTU Kalselteng 2 2x100
         PLTU Kalselteng 2 2x100 MW dan PLTA                            MW and PLTA Peusangan 2x88 MW.
         Peusangan 2x88 MW.

         Transmisi                                                      Transmission

         Aset dalam pembangunan transmisi terutama                      Transmission under construction consists mainly of
         merupakan proyek jaringan transmisi 500 kV                     projects of transmission lines of 500 kV in
         untuk Sumatera, Jawa - Bali, 150 kV untuk luar                 Sumatera, Java - Bali, 150 kV outside Sumatera,
         Sumatera, Jawa - Bali, proyek gardu induk 150                  Java - Bali, substations of 150 kV and
         kV serta proyek interkoneksi jaringan.                         interconnection of transmission projects.

         Distribusi                                                     Distribution

         Aset dalam pembangunan distribusi terutama                     Distribution under construction consists mainly of
         merupakan proyek jaringan distribusi tegangan                  projects of mid and low voltage distribution lines of
         menengah dan rendah 20 kV serta proyek gardu                   20 kV and distribution substation projects.
         distribusi.

         Perlengkapan                                                   Equipment

         Perlengkapan untuk aset dalam pembangunan                      Equipment under construction consists of
         termasuk materi dan perlengkapan khusus yang                   specialised materials and equipment used to
         digunakan     untuk      menunjang     fungsi                  support the generation and distribution of electricity.
         pembangkitan dan distribusi listrik.

         Pada tanggal 30 September 2024, estimasi                       As at September 30, 2024, the estimated
         persentase jumlah tercatat aset dalam                          percentage of completion of the Group’s
         pembangunan Grup terhadap nilai kontrak                        construction in progress projects was as follows:
         adalah sebagai berikut:

                                                                          Nilai/           Persentase penyelesaian/
                         Nama Proyek/Project Name                        Amount              Percentage of completion


           PLTA PEUSANGAN                                                    8,866,898                   97%
           PLTA ASAHAN III                                                   7,878,239                  99.73%
           PLTA UPPER CISOKAN PUMPED STORAGE                                 4,840,180                    7%
           PLTU SULUT-1 (2x50 MW)                                            4,137,930                   98%
           PLTU PALU-3 (2x50 MW)                                             4,028,251                   98%
           PLTU LOMBOK FTP 2 (2x50 MW)                                       3,478,868                   85%
           PLTU KALBAR 1 - PARIT BARU (2 x 50 MW)                            1,713,759                   86%
           SUTET 275 kV GUMAWANG - LAMPUNG 1                                 1,392,560                   55%
           PLTU SORONG Ex. TIMIKA (4 x 7 MW)                                 1,079,030                   49%
           PLTU TIMOR 1                                                        457,380                   96%
           Transmisi lainnya/Various transmission line                      32,731,469                 2%-98%
           Pembangkitan lainnya /other power plants                         20,825,662                 2%-98%
           Lainnya/Others                                                   10,983,051                 2%-98%


           Jumlah Umum                                                    102,413,278
Page 76
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/66 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                   6.    PROPERTY, PLANT AND EQUIPMENT (continued)

      Aset dalam pembangunan (lanjutan)                             Construction in progress (continued)

      Pada tanggal 31 Desember 2023, estimasi persentase            As at December 31, 2023, the estimated percentage of
      jumlah tercatat aset dalam pembangunan Grup                   completion of the Group’s construction in progress
      terhadap nilai kontrak adalah sebagai berikut:                projects was as follows:
                                                                                                         Persentase
                                                                                                        penyelesaian/
                                                                                 Nilai/                  Percentage
                        Nama Proyek/Project Name                                Amount                  of completion

     PLTU Kalselteng 2 (2x100 MW)                                                       8,271,637           96%
     PLTA Peusangan (2x88 MW)                                                           7,779,468           94%
     PLTA Asahan III - Sumatera Utara (2x87 MW)                                         6,936,508           96%
     PLTU 1 Sulut (2x50 MW)                                                             4,174,398           94%
     PLTU Palu 3 (2x50 MW)                                                              4,032,968           90%
     PLTA Jatigede (2x55 MW)                                                            3,924,462           98%
     PLTU Lombok FTP-2 (2x50 MW)                                                        3,367,632           82%
     PLTU Timor 1 (2X50 MW)                                                             2,226,187           95%
     PLTU 1 Kalimantan Barat – Parit Baru (2x50 MW)                                     1,741,384           86%
     PLTMG Luwuk (40 MW)                                                                  512,824           80%
     Transmisi lainnya/Various transmission lines                                      43,549,072          2%-98%
     Pembangkitan lainnya/Other power plants                                           31,742,614          2%-98%
     Lainnya/Others                                                                    10,494,401          2%-98%

     Jumlah/Total                                                                     128,753,555

      Setelah penyelesaian suatu proyek, masih perlu                After completion of a project, there are still a number of
      dilakukan sejumlah pengujian-pengujian sebelum                tests that need to be performed during the
      proyek aset dalam pembangunan menerima Sertifikat             commissioning phase before the projects are Certified
      Laik Operasi.                                                 for Operations.

      Selama tahun berjalan, Grup telah mengapitalisasi             During the year, the Group has capitalised borrowing
      biaya pinjaman mencakup bunga pinjaman dan selisih            costs including interest expense and foreign exchange
      kurs mata uang asing ke pekerjaan dalam                       differences to construction in progress amounting to
      pelaksanaan aset dalam pembangunan sebesar                    Rp3,912,039 (September 2023: Rp-736,655). In
      Rp3.912.039 (September 2023: Rp-736.655). Pada                September 2024, borrowing costs were capitalised at
      September 2024 biaya pinjaman dikapitalisasi pada             the weighted average rate of general borrowings of
      tingkat bunga rata-rata tertimbang dari pinjaman              5.92% (September 2023: 5.98%).
      umum yaitu sebesar 5,92% (September 2023: 5,98%).
Page 77
                               PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                            DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                          Lampiran 5/67 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                              (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan)                                                                         6. PROPERTY, PLANT AND EQUIPMENT (continued)


      Aset tidak digunakan dalam operasi                                                                 Assets not used in operations

      Aset tidak digunakan dalam operasi meliputi aset                                                   Assets not used in operations comprised property, plant
      tetap yang akan direlokasi, sementara belum                                                        and equipment to be relocated, those temporarily not in
      digunakan dalam operasi, serta aset akan diperbaiki.                                               use in operations, and assets to be repaired.

      Kerugian penurunan nilai dari penghapusan aset yang                                                Loss on impairment of assets not used in operations for
      tidak digunakan dalam operasi untuk periode                                                        the nine months periods ended September 30, 2024 and
      sembilan bulan yang berakhir pada tanggal 30                                                       2023 amounted to Rp941,219 and Rp361,436,
      September 2024 dan 2023 masing-masing sebesar                                                      respectively, which are presented as part of the other
      Rp941.219 dan Rp361.436 yang disajikan sebagai                                                     income - net (Note 46).
      bagian dari penghasilan lain-lain - bersih (Catatan 46).

      Keuntungan penjualan aset tertentu yang tidak                                                      Gain on sale of certain assets not used in operations for
      digunakan dalam operasi untuk periode sembilan                                                     the nine months periods ended September 30, 2024 and
      bulan yang berakhir pada tanggal 30 September 2024                                                 2023 amounted to Rp67,014 and Rp220,934
      dan 2023 masing-masing adalah sebesar Rp67.014                                                     respectively (Note 46).
      dan Rp220.934 (Catatan 46).

      Berdasarkan penelaahan manajemen, manajemen                                                        Based on management’s assessment, management is
      berpendapat bahwa penyisihan penurunan nilai Grup                                                  of the opinion that the provision for impairment is
      adalah cukup untuk menutupi kemungkinan adanya                                                     adequate to cover the possible impairment losses of the
      kerugian yang timbul dari nilai tercatat aset tetap pada                                           carrying amount of fixed assets as at September 30,
      tanggal 30 September 2024 dan 31 Desember 2023.                                                    2024 and December 31, 2023.


7.    ASET HAK GUNA                                                                              7.      RIGHT-OF-USE ASSETS



                                                                                30 September 2024/ September 30, 2024

                                                       Saldo Awal/                                                                      Saldo Akhir/
                                                    Beginning Balance   Penambahan/         Pengurangan/          Reklasifikasi/      Ending Balance
                                                                         Additions           Deductions         Reclassifications


      Biaya Perolehan :                                                                                                                                                                             At Cost
      Tanah dan Hak atas Tanah                              1,490,380           3,344                (2,572)             1,044,738           2,535,890                            Land and Rights of Land
      Bangunan umum waduk dan prasarana                     3,023,161         100,651               (12,088)               (79,399)          3,032,325            Buildings, reservoirs, and infrastructure
      Instalasi dan Mesin                                  43,335,756       1,808,495                     -              1,404,376          46,548,627                       Installations and Power Plant
      Perlengkapan distribusi                               1,501,637               -                     -                      0           1,501,637                               Distribution equipment
      Perlengkapan Umum                                       157,317          20,334               (50,758)                    (0)            126,893                                  General Equipment
      Kendaraan Bermotor dan Alat yang Mobil                3,615,409         797,691            (1,232,756)                24,206           3,204,550                                       Motor Vehicles
      Perlengkapan pengolahan data dan telekomunikasi               -               -                     -                      -                   - Telecommunications and data processing equipment
      Kapal dan perlengkapan                                2,316,459               -                     -             (1,734,607)            581,852                              Vessels and equipment

      Jumlah                                               55,440,119       2,730,515            (1,298,174)              659,315           57,531,774                                               Total



     Akumulasi Penyusutan                                                                                                                                                     Accumulated Depreciation
     Tanah dan Hak atas Tanah                                 96,455           97,530                  (597)              101,643              295,031                            Land and Rights of Land
     Bangunan umum waduk dan prasarana                     1,184,876          212,119               (18,408)              (60,632)           1,317,955            Buildings, reservoirs, and infrastructure
     Instalasi dan Mesin                                  21,429,780        1,252,115                     -                84,611           22,766,506                       Installations and Power Plant
     Perlengkapan distribusi                                  12,514          112,623                     -                     -              125,137                               Distribution equipment
     Perlengkapan Umum                                       106,161           38,719               (49,028)               (1,510)              94,342                                  General Equipment
     Kendaraan Bermotor dan Alat yang Mobil                1,806,240          830,280              (276,391)              239,248            2,599,377                                       Motor Vehicles
     Perlengkapan pengolahan data dan telekomunikasi               -                -                     -                     -                    - Telecommunications and data processing equipment
     Kapal dan perlengkapan                                  229,589          104,357                     -               (33,421)             300,525

     Jumlah                                               24,865,615        2,647,743              (344,424)              329,939           27,498,873                                                 Total

     Jumlah tercatat                                      30,574,504                                                                        30,032,902                                  Net carriying value
Page 78
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/68 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

7.    ASET HAK GUNA (lanjutan)                                                  7.       RIGHT-OF-USE ASSETS (continued)
                                                           31 Desember 2023 / December 31, 2023
                                                                                        Selisih kurs
                                                                                              dari
                                                                                         penjabaran
                                                                                            laporan
                                                                                         keuangan/
                                                                                          Exchange
                                                                                         differences
                                                                                             due to
                                      Saldo awal/                                          financial       Saldo akhir/
                                      Beginning       Penambahan/    Pengurangan/        statements          Ending
                                       balance          Additions      Deductions       translations         balance

     Biaya perolehan                                                                                                                               At cost
     Tanah                                1,074,786         416,187             (593)                  -       1,490,380                              Land
     Bangunan umum, waduk                                                                                                       Buildings, reservoirs and
         dan prasarana                   2,314,441          760,445           (51,725)                -        3,023,161                  infrastructure
     Instalasi dan mesin pembangkit     43,195,022        1,252,188        (1,101,817)           (9,637)      43,335,756   Installations and power plants
     Perlengkapan distribusi                     -        1,501,637                 -                 -        1,501,637           Distribution equipment
     Perlengkapan umum                     127,917           60,399           (30,999)                -          157,317               General equipment
     Kendaraan bermotor                  2,340,694        1,581,183          (306,468)                -        3,615,409                    Motor vehicles
     Perlengkapan pengolahan                                                                                               Telecommunications and data
         data dan telekomunikasi              6,037              12           (6,049)                  -               -        processing equipment
     Kapal dan perlengkapan               2,912,692               -         (596,233)                  -       2,316,459          Vessels and equipment

     Jumlah                             51,971,589        5,572,051        (2,093,884)           (9,637)      55,440,119                            Total


     Akumulasi penyusutan                                                                                                    Accumulated depreciation
     Tanah                                  66,105           30,943             (593)                  -          96,455                              Land
     Bangunan umum, waduk                                                                                                       Buildings, reservoirs and
         dan prasarana                     947,658          295,632           (58,414)                -        1,184,876                  infrastructure
     Instalasi dan mesin pembangkit     20,512,269        1,925,852        (1,010,110)            1,769       21,429,780   Installations and power plants
     Perlengkapan distribusi                     -           12,514                 -                 -           12,514           Distribution equipment
     Perlengkapan umum                      85,892           49,385           (29,116)                -          106,161               General equipment
     Kendaraan bermotor                  1,112,352        1,060,007          (366,119)                -        1,806,240                    Motor vehicles
     Perlengkapan pengolahan                                                                                               Telecommunications and data
         data dan telekomunikasi             3,393               78           (3,471)                  -               -        processing equipment
     Kapal dan perlengkapan                238,727          139,142         (148,280)                  -         229,589          Vessels and equipment

     Jumlah                             22,966,396        3,513,553        (1,616,103)            1,769       24,865,615                            Total

     Jumlah tercatat                    29,005,193                                                            30,574,504             Net carrying value




      Pada tanggal 30 September 2024, aset Pembangkit                                    As at September 30, 2024, assets of Tanjung Jati B
      Listrik Tenaga Uap (“PLTU”) Tanjung Jati B 4x660 MW                                Steam Power Plant (“PLTU”) 4x660 MW were insured
      diasuransikan kepada PT Asuransi Mitsui Sumitomo                                   with PT Asuransi Mitsui Sumitomo Indonesia against fire
      Indonesia terhadap risiko kebakaran dan risiko lainnya                             and other possible risks with insurance coverage of
      dengan jumlah pertanggungan masing-masing                                          JPY45,996,893,134 (full amount) or equivalent to
      sebesar JPY45.996.893.134 (nilai penuh) atau setara                                Rp4,891,521 (December 2023: JPY216,052,563,775
      dengan       Rp4.891.521       (Desember         2023:                             (full amount) or equivalent to Rp23,668,558) and
      JPY216.052.563.775 (nilai penuh) atau setara dengan                                USD3,924,900,000 (full amount) or equivalent to
      Rp23.668.558) dan USD3.924.900.000 (nilai penuh)                                   Rp59,438,686 (December 2023: USD1,936,320,000 (full
      atau setara dengan Rp59.438.686 (Desember 2023:                                    amount) or equivalent to Rp29,894,844). The Group’s
      USD1.936.320.000 (nilai penuh) atau setara dengan                                  management believes that the right-of-use assets were
      Rp29.894.844). Manajemen Grup berpendapat bahwa                                    adequately insured as at September 30, 2024 and
      aset hak guna tersebut telah diasuransikan secara                                  December 31,2023.
      memadai pada tanggal 30 September 2024 dan 31
      Desember 2023.
Page 79
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/69 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

7.   ASET HAK GUNA (lanjutan)                                       7.       RIGHT-OF-USE ASSETS (continued)


                                                 2024               2023
                                           (Sembilan Bulan/    Sembilan Bulan/
                                             Nine Months)       Nine Months)

         Beban Usaha                                                                                         Operating expenses
            Penyusutan aset hak guna              2,516,231              2,030,105         Right-of-use of assets depreciation
            Bahan bakar dan pelumas                       -                      -                         Fuel and lubricants

         Subjumlah                                2,516,231              2,030,105                                      Subtotal

         Persediaan                                 104,357                       -                                  Inventories
         Beban lain lain                                  -                       -                              Other expenses
         Aset dalam pembangunan                      27,155                  19,985                     Construction in progress

          Jumlah                                  2,647,743              2,050,090                                         Total




     Nilai beban penyusutan yang dikapitalisasi sebagai              The amount of depreciation expense which is
     persediaan, sebagian telah dibebankan pada beban                capitalised as inventories, has been partially charged to
     bahan bakar dan pelumas saat persediaan digunakan.              fuel and lubricants expense when the inventories are
                                                                     used.

     Berdasarkan      penelaahan    manajemen,      Grup             Based on management’s assessment, the Group is of
     berpendapat bahwa tidak terdapat indikasi penurunan             the opinion that there were no indications of impairment
     nilai aset hak guna pada tanggal 30 September 2024              of right-of-use assets as at September 30, 2024 and
     dan 31 Desember 2023.                                           December 31, 2023.



8.   PROPERTI INVESTASI                                        8.    INVESTMENT PROPERTIES



                                                30 September 2024/ September 30, 2024
                                             Perubahan
                             Saldo awal/     nilai wajar/                                         Saldo Akhir/
                             Beginning       Charge in     Pengurangan/ Reklasifikasi/              Ending
                              balance         fair value     Deduction   Reclacification           balance

      Pemilikan langsung                                                                                              Direct acquisition
      Tanah dan Bangunan       5,939,235               -                 -            (11,383)       5,927,852       land and buildings




                                                   31 Desember/ December 31 , 2023
                                             Perubahan
                             Saldo awal/     nilai wajar/                                         Saldo Akhir/
                             Beginning       Charge in     Pengurangan/ Reklasifikasi/              Ending
                              balance        fair value     Deduction   Reclacification            balance

      Pemilikan langsung                                                                                            Direct acquisition
      Tanah dan Bangunan      5,623,489         207,770                  -        107,976            5,939,235     land and buildings
Page 80
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/70 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

8.   PROPERTI INVESTASI (lanjutan)                             8.    INVESTMENT PROPERTIES (continued)

     Akun ini merupakan tanah milik Grup, yaitu PIP, PNP             This account represents pieces of land owned by
     dan PLN Batam yang terletak di Pademangan -                     members of the Group comprising of PIP, PNP and PLN
     Jakarta Utara, Paiton - Jawa Timur, Bekasi - Jawa               Batam, located in Pademangan North Jakarta, Paiton -
     Barat, Pluit - Jakarta Utara, Asahan - Sumatera Utara           East Java, Bekasi - West Java, Pluit - North Jakarta,
     dan Kramatwatu Serang dengan hak legal berupa                   Asahan - North Sumatera and Kramatwatu Serang with
     HGB berjangka waktu dari 7 sampai 40 tahun, jatuh               HGB for periods between 7 to 40 years until 2032, which
     tempo pada 2032, yang disewakan kepada PT                       are leased to PT Pertamina (Persero) (“Pertamina”), PT
     Pertamina (Persero) (“Pertamina”), PT Pertamina                 Pertamina Hulu Energi ONWJ, PT Nusantara Regas, PT
     Hulu Energi ONWJ, PT Nusantara Regas, PT                        Bajradaya Sentranusa, PT Karya Semesta Gemilang,
     Bajradaya Sentranusa, PT Karya Semesta Gemilang,                PT Shenhua Guohua Pembangkitan Jawa Bali and
     PT Shenhua Guohua Pembangkitan Jawa Bali dan                    several pieces of land that are leased to third parties.
     beberapa tanah yang disewakan ke pihak ketiga.

     Selama periode sembilan bulan yang berakhir pada                During nine months periods ended September 30, 2024,
     tanggal 30 September 2024, beberapa tanah dan                   certain lands amounting to Rp11,495 have been
     bangunan sejumlah Rp11.495 telah direklasifikasi ke             reclassified to fixed assets while certain lands and
     aset tetap sedangkan beberapa tanah dan bangunan                buildings amounting to Rp112 have been reclassified
     sejumlah Rp112 telah direklasifikasi dari aset tetap ke         from fixed assets to investment properties
     properti investasi.

     Penghasilan sewa yang diperoleh dari properti                   Rental income earned from investment properties
     investasi untuk tahun yang berakhir pada tanggal 30             forthe years ended September 30, 2024 and 2023
     September 2024 dan 2023 adalah masing-masing                    amounted to Rp42,108 and Rp40,451 respectively
     sebesar Rp42.108 dan Rp40.451.

     Pada tanggal 31 Desember 2023, Grup melakukan                   As at December 31, 2023, the Group performed a
     penilaian kembali atas nilai wajar properti investasi           revaluation of the fair value of its investment properties
     yang dilakukan oleh KJPP RHR berdasarkan                        which was performed by KJPP RHR based on the
     laporannya    No.    0008/MBPRU-JKT/E/MT1/2024                  reports No. 0008/MBPRU-JKT/E/MT1/2024 dated Jan
     tanggal 05 Januari 2024 perihal : Executive Summary             05, 2024 subject: Executive Summary of Assessment of
     Penilaian dalam Rangka Penilaian Wajar Properti                 Fair Valuation of PT PLN (Persero) Investment Property
     Investasi PT PLN (Persero) Tahun 2023, penilai                  in 2023, independent valuers registered in the Ministry
     independen yang telah terdaftar di Kementerian                  of Finance and OJK..
     Keuangan dan OJK.


     Nilai wajar properti investasi diklasifikasikan sebagai         The fair values of investment properties are within level
     level 2 dalam hierarki nilai wajar.                             2 of the fair value hierarchy.

     Nilai wajar level 2 dari tanah dihitung dengan                  The level 2 fair value of land is calculated using the
     menggunakan pendekatan pasar dan pendekatan                     market approach and income approach. Data inputs
     pendapatan. Input yang diperoleh dari pendekatan                were obtained from the market approach and consist of
     pasar yaitu:                                                    the following:
     a. Harga jual atau harga sewa per meter persegi;                a. Sale or rental price per square metre;
     b. Tingkat hunian;                                              b. Occupancy rate;
     c. Tingkat pertumbuhan; dan                                     c. Growth rate; and
     d. Tingkat diskonto dan kapitalisasi.                           d. Discount and capitalisation rate.

     Penyesuaian dilakukan berdasarkan ukuran, lokasi,               Adjustments were made based on size, location, shapes
     bentuk dan spesifikasi, tanah dan hak atas tanah dan            and specifications, land and land rights and other
     elemen perbandingan lainnya.                                    comparison elements.

     Berdasarkan      penilaian  manajemen,       Grup               Based on the management’s assessment, the Group is
     berpendapat bahwa tidak ada kejadian-kejadian atau              of the opinion that there are no events or changes in
     perubahan-perubahan         keadaan          yang               circumstances that indicate any impairment in the value
     mengindikasikan adanya penurunan nilai properti                 of investment properties as at September 30, 2024 and
     investasi pada tanggal 30 September 2024 dan 31                 December 31, 2023.
     Desember 2023.

     Pada 30 September 2024 dan 31 Desember 2023,                    As at September 30, 2024 and December 31, 2023, the
     Grup tidak memiliki kewajiban kontraktual untuk                 Group does not have any contractual obligations for
     perbaikan dan perawatan di masa depan.                          future repairs and maintenance.
Page 81
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                Lampiran 5/71 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS                          ASOSIASI            DAN       9.      INVESTMENTS       IN    ASSOCIATES            AND        JOINT
     VENTURA BERSAMA                                                                       VENTURES

     Rincian investasi pada entitas asosiasi dan ventura                                   The details of investments in associates and joint
     bersama adalah sebagai berikut:                                                       ventures are as follows:

                                                                                                                                   Persentase penyertaan/
                                                                                                                   Tahun          Percentage of ownership
                                                                                                                  operasi     30 September /     31 Desember/
                                                                                                                 komersial/   September 30       December 31,
                         Entitas anak/                   Domisili/                         Jenis usaha/        Commercial          2024              2023
                         Subsidiaries                    Domicile                       Nature of business      operations          Rp                Rp

     Entitas asosiasi/Associates
     PT Geo Dipa Energi ("GDE")                       Jakarta            Pembangkit tenaga listrik/                2002               5.50%            5.50%
                                                                         Electricity supplier
     PT Mitra Energi Batam("MEB")                     Batam              Pembangkit tenaga listrik/                2004              30.00%           30.00%
                                                                         Electricity supplier
     PT Sumber Segara Primadaya ("S2P")               Cilacap            Pembangkit tenaga listrik/                2006              49.00%           49.00%
                                                                         Electricity supplier
     PT Dalle Energy Batam ("DEB")                    Batam              Pembangkit tenaga listrik/                2013              20.00%           20.00%
                                                                         Electricity supplier
     PT Energi Pelabuhan Indonesia ("EPEI")           Jakarta            Pembangkit tenaga listrik/                2013              45.00%           45.00%
                                                                         Electricity supplier
     PT Tanjung Kasam Power ("TJK")                   Batam              Pembangkit tenaga listrik/                2012              10.00%           10.00%
                                                                         Electricity supplier
     PT Indo Pusaka Berau ("IPB")                     Berau              Perdagangan batu bara/                    2005              46.53%           46.53%
                                                                         Coal trading
     PT Adhiguna Putera ("AGP")                       Jakarta            Pelayaran/                                1987              25.00%           25.00%
                                                                         Shipping
     PT Musi Mitra Jaya ("MMJ")                       Palembang          Transportasi batubara/                    2011              25.50%           25.50%
                                                                         Coal transportation
     PT Sriwijaya Bara Logistic ("SBL")               Musi Banyuasin     Transportasi batubara/                    2014              25.50%           25.50%
                                                                         Coal transportation
     PT Rekind Daya Mamuju ("RDM")                    Jakarta            Pembangkit tenaga listrik/                2018              10.00%           10.00%
                                                                         Electricity supplier
     PT Sumbagselenergy Sakti Pewali ("SS Pewali")    Sumatera Selatan   Pembangkit tenaga listrik/                 *)               10.00%           10.00%
                                                                         Electricity supplier
     PT Energi Prima Elektrika ("EPE")                Sumatera Selatan   Pembangkit tenaga listrik/                2006               7.50%            7.50%
                                                                         Electricity supplier
Page 82
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/72 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                           SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                    (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS                             ASOSIASI            DAN        9.      INVESTMENTS IN ASSOCIATES                                     AND        JOINT
     VENTURA BERSAMA (lanjutan)                                                                VENTURES (continued)

     Rincian investasi pada entitas asosiasi dan ventura                                       The details of investments in associates and joint
     bersama adalah sebagai berikut: (lanjutan)                                                ventures are as follows: (continued)

                                                                                                                                                       Persentase penyertaan/
                                                                                                                                       Tahun          Percentage of ownership
                                                                                                                                      operasi     30 September /     31 Desember/
                                                                                                                                     komersial/   September 30       December 31,
                          Entitas anak/                     Domisili/                          Jenis usaha/                        Commercial          2024              2023
                          Subsidiaries                      Domicile                        Nature of business                      operations          Rp                Rp

      Ventura bersama/Joint ventures
      PT Unelec Indonesia ("UNINDO")                     Jakarta             Penunjang penyedia tenaga listrik/                        1988              32.35%           32.35%
                                                                             Electrical supports
      PT Bajradaya Sentranusa ("BDSN")                   Asahan              Pembangkit tenaga listrik/                                2011              36.61%           36.61%
                                                                             Electricity supplier
      PT Bukit Pembangkit Innovative ("BPI")             Palembang           Pembangkit tenaga listrik/                                2015              40.25%           40.25%
                                                                             Electricity supplier
      PT Komipo Pembangkitan Jawa Bali ("Komipo PJB")    Jepara              Operasi dan pemeliharaan/                                 2010              49.00%           49.00%
                                                                             Operational and maintenance
      PT Indo Raya Tenaga ("IRT")                        Jakarta             Pembangkit tenaga listrik/                                 *)               51.00%           51.00%
                                                                             Electricity supplier
      PT Rajamandala Electric Power ("REP")              Jakarta             Pembangkit tenaga listrik/                                2019              51.00%           51.00%
                                                                             Electricity supplier
      PT Perta Daya Gas ("PDG")                          Jakarta             Transportasi dan penyimpanan LNG/                         2015              35.00%           35.00%
                                                                             Transportation and storage of LNG
      PT Crompton Prima Switchgear Indonesia ("CPSI")    Jakarta             Peralatan pengontrol dan pendistribusian listrik/         2014              49.00%           49.00%
                                                                             Electricity controller and distribution
      PT Pura Daya Prima ("PDP")                         Sumatera Selatan    Pembangkit tenaga listrik/                                2006              15.00%           15.00%
                                                                             Electricity supplier
      PT Shenhua Guohua                                  Jakarta             Pembangkit tenaga listrik/                                2019              30.00%           30.00%
       Pembangkitan Jawa Bali ("SGPJB")                                      Electricity supplier
      PT GCL Indotenaga ("GCL")                          Jakarta             Pembangkit tenaga listrik/                                2021              35.00%           35.00%
                                                                             Electricity supplier
      PT Guohua Taidian                                  Jakarta             Pembangkit tenaga listrik/                                2019              30.00%           30.00%
       Pembangkitan Jawa Bali ("GTPJB")                                      Electricity supplier
      PT North Sumatra Hydro Energy                      Sumatera Utara      Pembangkit tenaga listrik/                                 *)               25.00%           25.00%
       Pembangkitan Jawa Bali ("NSHE")                                       Electricity supplier
      PT Pembangkitan Jawa Bali Masdar                   Jakarta             Pembangkit tenaga listrik/                                 *)               51.00%           51.00%
      Solar Energi ("PMSE")                                                  Electricity supplier
      PT Maxpower Cogindo Batam ("MCB")                  Batam               Pembangkit tenaga listrik, kelistrikan, perdagangan        *)               30.00%           30.00%
                                                                             besar mesin kantor dan
                                                                             industri, suku cadang dan perlengkapannya/
                                                                             Power generation,
                                                                             supporting activities electricity,
                                                                             wholeseller of office machinery and
                                                                             industry, spare parts and pittings
      PT Industri Baterai Indonesia ("IBI")              Jakarta             Industri EV Battery dan ESS/                               *)               25.00%           25.00%
      PT Trina Mas Agra Indonesia ("TMAI")               Kendal              Solar PV Manufacture                                      2023              25.00%              -
      PT Nusantara Sembcorp Solar Energi ("NSSE")        Jakarta             Pembangkit tenaga listrik/                                 *)               51.00%              -
                                                                             Electricity supplier
      PT Nusantara Tembesi Bayu Energi ("NTBE")          Batam               Pembangkit tenaga listrik/                                 *)               51.00%               -
                                                                             Electricity supplier
      PT Terang Wahana Hijau (Icon Green)                Jakarta             Penyediaan Solusi Layanan/                                2024              51.00%               -
                                                                             Service Solution
      PT Indo Acwa Tenaga Saguling ("IATS")              Bandung             Pembangkit tenaga listrik/                                2024              51.00%               -
                                                                             Electricity supplier


     *)   Dalam tahap pengembangan                                                     *) In development stage
Page 83
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/73 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS                        ASOSIASI         DAN          9.    INVESTMENTS IN ASSOCIATES                               AND      JOINT
     VENTURA BERSAMA (lanjutan)                                                        VENTURES (continued)

     Seluruh entitas asosiasi dan ventura bersama dicatat                             All the associates and joint ventures are recorded by the
     oleh Grup dengan menggunakan metode ekuitas.                                     Group using the equity method. They are private entities
     Seluruh entitas adalah entitas tertutup dan tidak                                and there is no quoted market price available for their
     terdapat harga pasar yang dikutip yang tersedia untuk                            shares.
     sahamnya.

     Pada tanggal 30 September 2024 dan 31 Desember                                   As at September 30, 2024 and December 2023,
     2023, manajemen berpendapat bahwa tidak terdapat                                 management believes that there is no restriction and
     pembatasan dan risiko signifikan yang terkait dengan                             significant risk regarding the investments in associates
     investasi pada asosiasi dan ventura bersama.                                     and joint ventures.

     Mutasi investasi pada entitas asosiasi dan ventura                               Changes in investments in associates and joint ventures
     bersama adalah sebagai berikut:                                                  are as follows:

                      amount              Penambahan/         Dividen/             Share of            comprehensive          amount
                   January 1, 2024         Additions          Dividend            profit (loss)           income            Sept 30, 2024
                         Rp                   Rp                 Rp                    Rp                    Rp                  Rp

     Entitas asosiasi                                                                                                                           Associates
     S2P                   7,590,934                    --        (193,733)            1,119,253                       --         8,516,455           S2P
     SBL                     352,656            (33,164)                    --              8,461                      --           327,953           SBL
     MMJ                     263,342            (34,834)                    --            (1,576)                      --           226,932           MMJ
     TJK                     148,212                    --                  --            (1,618)                      --           146,594           TJK
     MEB                     138,161                    --                  --            12,330                       --           150,491           MEB
     IPB                     126,174                    --                  --           (13,160)                      --           113,014           IPB
     GDE                     114,458                    --          (1,202)                       --                   --           113,256           GDE
     DEB                      95,844                    --                  --            (3,149)                      --            92,695           DEB
     EPI                      57,849                    --                  --                643                      --            58,492           EPI
     AGP                      41,292                 (0)                    --                    --                   --            41,292           AGP
     RDM                      46,588                    --                  --            (7,894)                  868               39,562           RDM
     SS PEWALI                68,001                    --                  --                (85)                     --            67,916           SS PEWALI
                           9,043,511            (67,999)          (194,935)            1,113,205                   868            9,894,650



     Ventura bersama                                                                                                                                 Joint ventures
     IRT                   6,444,894                    --               --               634,893             (143,062)            6,936,725            IRT
     SGPJB                 4,593,871                    --        (171,150)               642,250              (18,284)            5,046,687            SGPJB
     NSHE                  1,984,981                    --               --               151,002               (4,446)            2,131,537            NSHE
     BPI                   1,803,802                    --         (84,313)                47,374             (114,355)            1,652,508            BPI
     BDSN                  1,146,697                    --        (125,165)               107,401                42,732            1,171,664            BDSN
     GCL                     854,342                    --        (160,001)                93,129             (110,482)              676,988            GCL
     PMSE                    177,557                    --               --                33,541                     --             211,098            PMSE
     REP                     146,743                    --               --                (3,597)              (3,046)              140,100            REP
     IBI                     112,951                    --               --                     --                    --             112,951            IBI
     Komipo PJB               78,732                    --               --                29,656                     --             108,388            Komipo PJB
     PDG                      79,208                    --               --                14,068                     --              93,276            PDG
     PDP                      13,673                    --                  --                    --                   --             13,673           PDP
     MCB                      12,290                    --                  --               (185)                     --             12,105           MCB
     GTPJB                     3,061                    --               (308)                219                    (6)               2,965           GTPJB
     TMI                      30,468             96,627                     --             (8,358)                     --            118,737           TMI
     NSSE                            --         154,168                     --              5,469               (4,564)              155,072           NSSE
     NTBE                            --          43,372                     --                    --               (13)               43,358           NTBE
     IATS                                        10,710                     --                    7                    --             10,717           IATS
                          17,483,270            304,877           (540,938)             1,746,867             (355,527)           18,638,548

     Jumlah               26,526,781            236,878           (735,872)             2,860,071             (354,660)           28,533,198                  Total
Page 84
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/74 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

9.     INVESTASI PADA ENTITAS                   ASOSIASI        DAN          9.    INVESTMENTS IN ASSOCIATES                  AND      JOINT
       VENTURA BERSAMA (lanjutan)                                                  VENTURES (continued)

       Mutasi investasi pada entitas asosiasi dan ventura                         Changes in investments in associates and joint ventures
       bersama adalah sebagai berikut: (lanjutan)                                 are as follows: (continued)
                                                           31 Desember/ December 31, 2023
                                  Jumlah                      Bagian atas    Bagian atas                        Jumlah
                                  tercatat                     laba/(rugi)   penghasilan/                       tercatat
                                 1 Januari                       bersih       (kerugian)                     31 Desember
                                   2023/                         entitas/   komprehensif                         2023/
                                 Carrying                         Share        lainnya/                        Carrying
                                  amount                          in net    Share of other                      amount
                                January 1,      Penambahan/     income/    comprehensive       Dividen/      December 31,
                                    2023         Additions        (loss)    income/(loss)     Dividends           2023

     Entitas asosiasi                                                                                                            Associates
     S2P                            6,702,401              -    1,189,343           (1,709)      (299,101)        7,590,934            S2P
     SBL                              335,061              -       17,595                -              -           352,656            SBL
     MMJ                              255,178              -        8,164                -              -           263,342           MMJ
     TJK                              139,107              -        9,759                -           (654)          148,212            TJK
     MEB                              133,463              -        6,198                -         (1,500)          138,161           MEB
     IPB                              122,602              -        5,453                -         (1,881)          126,174             IPB
     GDE                              114,458              -            -                -              -           114,458           GDE
     DEB                              107,959              -       (6,115)               -         (6,000)           95,844            DEB
     SS Pewali                         26,787         42,063         (849)               -              -            68,001       SS Pewali
     EPEI                              54,955              -        3,421                -           (527)           57,849           EPEI
     RDM                               57,596              -      (11,008)               -              -            46,588           RDM
     AGP                               36,147              -       13,464             (383)        (7,936)           41,292           AGP

     Subjumlah                      8,085,714         42,063    1,235,425           (2,092)      (317,599)        9,043,511         Subtotal

     Ventura bersama                                                                                                          Joint ventures
     IRT                            5,693,459              -      940,566         (189,131)             -         6,444,894              IRT
     SGPJB                          4,257,899              -      583,291          (37,268)      (210,051)        4,593,871           SGPJB
     NSHE                           1,857,315              -      138,752          (11,086)             -         1,984,981            NSHE
     BPI                            1,766,927              -       60,648          (17,549)        (6,224)        1,803,802              BPI
     BDSN                           1,216,250              -      117,074          (35,415)      (151,212)        1,146,697            BDSN
     GCL                              796,984              -      117,796           (1,469)       (58,969)          854,342             GCL
     PMSE                             149,866              -       27,691                -              -           177,557            PMSE
     REP                              142,903              -        5,180           (1,340)             -           146,743             REP
     IBI                              112,951              -            -                -              -           112,951               IBI
     PDG                               62,992              -       16,216                -              -            79,208             PDG
     Komipo PJB                        76,190              -        9,023                -         (6,481)           78,732     Komipo PJB
     TMAI                                   -         31,000         (532)               -              -            30,468             TMAI
     PDP                               11,409              -        2,264                -              -            13,673             PDP
     MCB                                9,521              -        2,769                -              -            12,290             MCB
     GTPJB                              3,088              -          275                -           (302)            3,061           GTPJB

     Subjumlah                    16,157,754          31,000    2,021,013         (293,258)      (433,239)       17,483,270         Subtotal

     Jumlah                       24,243,468          73,063    3,256,438         (295,350)      (750,838)       26,526,781            Total
Page 85
                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/75 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

9.    INVESTASI PADA ENTITAS                           ASOSIASI        DAN       9.    INVESTMENTS IN ASSOCIATES                               AND         JOINT
      VENTURA BERSAMA (lanjutan)                                                       VENTURES (continued)

      Berikut ini adalah ringkasan informasi keuangan                                  The following table contains the summarised financial
      entitas asosiasi dan ventura bersama pada                                        information for associates and joint ventures as at
      30 September 2024 dan 31 Desember 2023 yang                                      September 30, 2024 and December 31, 2023 which are
      dicatat dengan menggunakan metode ekuitas.                                       accounted for using the equity method.

      Entitas asosiasi                                                                 Associates
                                                         30 September 2024/September 30, 2024

                                         S2P              MMJ            SBL          Lain-lain/ Others   Jumlah



     Lancar
     Kas dan setara kas                  1,415,938           28,673           7,670         1,993,658      3,445,939                     Cash and cash equivalents
     Aset lancar lainnya                                                                                                                       Other current assets
           (tidak termasuk kas)         15,704,533          314,922       355,011           1,050,885     17,425,351                         (excluding cash)

     Jumlah aset lancar                 17,120,471          343,594       362,681           3,044,543     20,871,290                             Total current assets

     Liabilitas keuangan                                                                                                                          Financial liabilities
            Utang usaha                  1,859,773          319,147       154,347             435,305      2,768,572                           Trade payables
            Liabilitas lancar lainnya    2,593,135          369,660       126,464             524,766      3,614,025                     Other current liabilities

     Jumlah liabilitas lancar            4,452,908          688,807       280,810             960,071      6,382,597                           Total current liabilities

     Tidak lancar
     Aset                               19,441,862        1,039,247       550,115           7,540,753     28,571,976                      Total non-current liabilities

     Liabilitas                                                                                                                                             Liabilities
     Liabilitas keuangan                19,441,862                -             -           2,251,736     21,693,598                               Financial liabilities
     Liabilitas lainnya                 (3,132,600)         502,447       156,682             968,304     (1,505,167)                                 Other liabilities

     Jumlah liabilitas tidak lancar     16,309,262          502,447       156,682           3,220,040     20,188,430                      Total non-current liabilities

     Aset bersih                        15,800,162          191,587       475,304           6,405,185     22,872,238                                        Net assets

     % kepemilikan efektif              49.00%           25.50%         25.50%        6.67% - 46.53%                                                  % of ownership

     Bagian Grup atas aset bersih                                                                                                      The Group’s share of the net
          asosiasi                       7,742,080           48,855       121,203             791,431      8,703,568                      assets of associates
     Penyesuaian ISAK 16                                                                                                                      Adjusment of ISAK 16
     Penyesuaian metode ekuitas            774,375          178,077       206,750              31,880      1,191,082                  Adjustments of equity methods

     Jumlah tercatat                     8,516,455          226,932       327,953             823,311      9,894,650                            Total carrying value



     Pendapatan                          17,076,665         159,843       130,144             741,343      18,107,995                                       Revenue
     Beban pokok penjualan              (13,184,879)       (166,633)      (82,439)           (914,824)    (14,348,775)                               Cost of revenue
     Depresiasi dan amortisasi               26,951               -             -             (17,893)          9,058                  Depreciation and amortisation
     Pendapatan keuangan                          -               -             -                  39              39                               Finance income
     Beban keuangan                        (869,387)              -             -                   -        (869,387)                                Finance costs
     Beban operasi                             (859)         (4,336)       (3,210)           (241,003)       (249,407)                          Operating expenses
     Pendapatan (beban) lain-lain,                -               -             -                 (94)            (94)                     Other income/(expenses)
          bersih                              2,995           4,944        (1,959)            (80,241)        (74,261)                                       net
     Beban pajak penghasilan               (767,294)              -        (9,358)            (66,160)       (842,812)                          Income tax expense

     Laba/(rugi) periode berjalan        2,284,191           (6,182)         33,179          (578,833)     1,732,355                      Profit/(loss) for the periode

     % kepemilikan efektif              49.00%           25.50%         25.50%        6.67% - 46.53%                                                  % of ownership

     Bagian Grup atas laba/(rugi)                                                                                        The Group’s share in net income/(loss) for
          asosiasi periode berjalan      1,119,254           (1,576)          8,461           (12,934)     1,113,205                   the year of associates



     Laba/(rugi) komprehensif lainnya             -               -               -             8,680           8,680                           The Group’s share
     Bagian Grup atas laba/(rugi)                                                                                                     of other comprehensive
          komprehensif asosiasi                   -               -               -               868              868   -               income of associates

     Dividen yang diterima dari                                                                                                                 Dividends received
          perusahaan asosiasi             (193,733)               -               -             (1,202)     (194,935)                         from associates
Page 86
                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/76 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

9.     INVESTASI PADA ENTITAS                          ASOSIASI        DAN    9.      INVESTMENTS IN ASSOCIATES                            AND          JOINT
       VENTURA BERSAMA (lanjutan)                                                     VENTURES (continued)

       Entitas asosiasi (lanjutan)                                                    Associates (continued)
                                                               31 Desember/ December 31, 2023
                                                                                           Lainnya/          Jumlah/
                                         S2P               MMJ              SBL             Others            Total

     Kas dan setara kas                   2,495,233            4,274               4,884        1,721,563      4,225,954       Cash and cash equivalents
     Aset lancar lainnya                                                                                                             Other current assets
        (tidak termasuk kas)              4,395,057          312,278          380,094           1,441,314      6,528,743              (excluding cash)

     Jumlah aset lancar                   6,890,290          316,552          384,978           3,162,877     10,754,697               Total current assets

     Aset tidak lancar                   29,807,788          878,598          429,514          10,703,592     41,819,492                Non-current assets

     Liabilitas keuangan                                                                                                                Financial liabilities
        Utang usaha                       1,693,298          227,889          157,059             264,198      2,342,444               Trade payables
        Liabilitas lancar lainnya         5,589,416          283,541          104,343           1,283,632      7,260,932         Other current liabilities

     Jumlah liabilitas lancar             7,282,714          511,430          261,402           1,547,830      9,603,376             Total current liabilities

     Liabilitas                                                                                                                                   Liabilities
     Liabilitas keuangan                  7,650,942                -                -           4,183,932     11,834,874                 Financial liabilities
     Liabilitas lainnya                   6,272,720          481,536          149,283           1,205,499      8,109,038                    Other liabilities

     Jumlah liabilitas tidak lancar      13,923,662          481,536          149,283           5,389,431     19,943,912        Total non-current liabilities

     Aset bersih                         15,491,702          202,184          403,807           6,929,208     23,026,901                         Net assets

     % kepemilikan                          49.00%           25.50%           25.50%       5.50% - 46.53%                                   % of ownership

     Bagian Grup atas aset bersih                                                                                            The Group’s share of the net
        asosiasi                          7,590,934           51,557          102,971            888,734       8,634,196          assets of associates
     Penyesuaian metode ekuitas                   -          228,950          265,290            (52,155)        442,085    Adjustment of equity methods
     Amortisasi kenaikan nilai wajar              -          (17,165)         (15,605)                 -         (32,770)   Amortisation of fair value uplift

     Jumlah tercatat                      7,590,934          263,342          352,656            836,579       9,043,511             Total carrying value

     Pendapatan                          12,962,233          336,402          402,361           2,261,237     15,962,233                        Revenue
     Beban pokok pendapatan              (6,159,683)        (285,514)        (302,745)         (1,872,334)    (8,620,276)                Cost of revenue
     Depresiasi dan amortisasi             (111,687)               -                -             (30,295)      (141,982)   Depreciation and amortisation
     Pendapatan keuangan                     14,267                -                -               1,589         15,856                 Finance income
     Beban keuangan                      (1,119,760)               -                -             (74,770)    (1,194,530)                  Finance costs
     Beban operasi                       (2,520,773)          (6,232)          (6,455)           (445,150)    (2,978,610)            Operating expenses
     Pendapatan/(beban) lain-lain,
        bersih                               46,261           (5,298)          (5,529)           (161,747)      (126,313) Other income/(expenses) - net
     Beban pajak penghasilan               (683,627)          (7,342)         (18,631)           (117,916)      (827,516)           Income tax expense

     Laba/(rugi) tahun berjalan           2,427,231           32,016           69,001            (439,386)     2,088,862           Profit/(loss) for the year

     % kepemilikan                          49.00%           25.50%           25.50%       5.50% - 46.53%                                   % of ownership

                                                                                                                                   The Group’s share in
     Bagian Grup atas laba                                                                                                    net income for the year
       bersih asosiasi tahun berjalan     1,189,343            8,164           17,595             20,323       1,235,425               of associates

                                                                                                                                     Other comprehensive
     Kerugian komprehensif lainnya           (3,487)               -                   -           (1,534)        (5,021)                         loss

     Bagian Grup atas kerugian                                                                                                       The Group’s share
       komprehensif lainnya                                                                                                  of other comprehensive
       asosiasi                              (1,709)               -                   -             (383)        (2,092)          loss of associates

     Dividen yang diterima dari                                                                                                       Dividends received
        perusahaan asosiasi                (299,101)               -                   -          (18,498)      (317,599)             from associates
Page 87
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/77 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                         SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS                                ASOSIASI         DAN     9.       INVESTMENTS IN ASSOCIATES                                      AND           JOINT
     VENTURA BERSAMA (lanjutan)                                                              VENTURES (continued)

     Ventura bersama                                                                         Joint ventures

                                                                   30 September 2024/September 30, 2024
                                                                                                                     Lain-lain/
                                         BDSN        BPI           IRT             SGPJB            NSHE                             Jumlah
                                                                                                                      Others


     Lancar
     Kas dan setara kas                  588,218      183,756       1,688,866        3,840,558            83,820      1,484,511       7,869,729           Cash and cash equivalents
     Aset lancar lainnya                                                                                                                                        Other current assets
           (tidak termasuk kas)          667,425      445,995            28,693      6,735,930            74,532      1,304,072       9,256,647                (excluding cash)

     Jumlah aset lancar                 1,255,643     629,751       1,717,559       10,576,488        158,352         2,788,584      17,126,377                   Total current assets

     Liabilitas keuangan                                                                                                                                           Financial liabilities
            Utang usaha                  156,577       81,202         103,296          508,308       1,474,517          276,013       2,599,912                  Trade payables
            Liabilitas lancar lainnya     97,787      248,064       1,506,292        3,414,867         156,718        1,058,857       6,482,585            Other current liabilities

     Jumlah liabilitas lancar            254,364      329,266       1,609,588        3,923,174       1,631,236        1,334,869       9,082,497                 Total current liabilities

     Tidak lancar
     Aset                               5,524,192    5,178,720     49,280,777       22,187,930      16,906,808       10,953,936     110,032,363            Total non-current liabilities

     Liabilitas                                                                                                                                                              Liabilities
     Liabilitas keuangan                2,171,042           -      34,186,808       11,356,736       6,445,302        6,328,357      60,488,245                     Financial liabilities
     Liabilitas lainnya                 1,134,896     557,634       1,595,129        1,435,919         828,459        1,384,729       6,936,765                        Other liabilities

     Jumlah liabilitas tidak lancar     3,305,938     557,634      35,781,936       12,792,655       7,273,761        7,713,086      67,425,009            Total non-current liabilities

     Aset bersih                        3,219,534    4,921,571     13,606,811       16,048,589       8,160,163        4,694,565      50,651,234                              Net assets

     % kepemilikan efektif               37%         37%           51%              30%              25%                                                               % of ownership

     Bagian Grup atas aset bersih                                                                                                                       The Group’s share of the net
          asosiasi                      1,178,671    1,833,285      6,939,474        4,814,577       2,040,041        1,792,299      18,598,347             assets of associates
     Penyesuaian ISAK 16                                                                                                                                       Adjusment of ISAK 16
     Penyesuaian metode ekuitas            (7,007)    (180,777)          (2,749)       232,110            91,496         (92,872)        40,201        Adjustments of equity methods

     Jumlah tercatat                    1,171,664    1,652,508      6,936,725        5,046,687       2,131,537        1,699,427      18,638,548                 Total carrying value



     Pendapatan                           658,118     198,364       5,802,775         5,243,225      2,722,343        1,441,103      16,065,928                              Revenue
     Beban pokok penjualan               (103,248)    (49,622)     (2,309,335)       (2,238,668)    (1,750,900)      (1,006,274)     (7,458,047)                      Cost of revenue
     Depresiasi dan amortisasi               (225)     (1,315)         (3,336)                -              -          (38,447)        (43,322)        Depreciation and amortisation
     Pendapatan keuangan                    3,414           -             353                 -              -          592,756         596,523                      Finance income
     Beban keuangan                      (171,123)          -      (1,669,367)                -       (220,157)        (329,958)     (2,390,604)                       Finance costs
     Beban operasi                              -      (7,732)        (71,389)         (887,606)       (23,259)        (187,515)     (1,177,501)                 Operating expenses
     Pendapatan (beban) lain-lain,              -           -               -                 -              -                -               -             Other income/(expenses)
          bersih                                -      (1,223)        (66,519)                -              -          (30,262)        (98,003)                               net
     Beban pajak penghasilan              (93,573)    (11,292)       (438,296)           23,883       (124,020)         (38,041)       (681,339)                 Income tax expense

     Laba/(rugi) periode berjalan        293,364      127,180       1,244,887        2,140,833        604,008           403,362       4,813,635            Profit/(loss) for the periode

     % kepemilikan efektif               37%         37%           51%              30%              25%             30%-51%                                           % of ownership

     Bagian Grup atas laba/(rugi)                                                                                                         The Group’s share in net income/(loss) for
          asosiasi periode berjalan      107,401       47,375        634,892           642,250        151,002           163,947       1,746,867          the year of associates



     Laba/(rugi) komprehensif lainnya    116,721      (306,993)      (280,514)           (60,948)         (17,785)     (330,994)       (880,513)                  The Group’s share
     Bagian Grup atas laba/(rugi)                                                                                                                       of other comprehensive
          komprehensif asosiasi           42,732      (114,355)      (143,062)           (18,284)          (4,446)     (118,111)       (355,527)          income of associates

     Dividen yang diterima dari                                                                                                                                  Dividends received
          perusahaan asosiasi            (125,165)     (84,313)               -       (171,150)                 -      (160,310)       (540,938)                from associates
Page 88
                                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                          Lampiran 5/78 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                          (Expressed in millions of Rupiah, unless otherwise stated)


9.     INVESTASI PADA ENTITAS                               ASOSIASI              DAN        9.         INVESTMENTS IN ASSOCIATES                                       AND            JOINT
       VENTURA BERSAMA (lanjutan)                                                                       VENTURES (continued)

       Ventura bersama (lanjutan)                                                                       Joint ventures (continued)

                                                                           31 Desember/ December 31, 2023
                                                                                                                           Lainnya/       Jumlah/
                                              BDSN          BPI             IRT          SGPJB              NSHE            Others         Total

     Kas dan setara kas                          599,714     209,818         509,503        3,194,233          233,384        949,926       5,696,578          Cash and cash equivalents
     Aset lancar lainnya                                                                                                                                             Other current assets
        (tidak termasuk kas)                     611,023     673,896           28,287       2,477,130          209,434       1,885,437      5,885,207                (excluding cash)

     Jumlah aset lancar                        1,210,737     883,714         537,790        5,671,363          442,818       2,835,363     11,581,785                  Total current assets

     Aset tidak lancar                         5,629,893    4,430,640      45,536,417    28,000,415         14,212,401       9,809,054    107,618,820                   Non-current assets

     Liabilitas keuangan                                                                                                                                                 Financial liabilities
         Utang usaha                              65,526      91,815          136,834          25,233                -         322,721        642,129                   Trade payables
         Liabilitas lancar lainnya               198,803     101,541        1,199,738       1,911,154          764,924       1,314,779      5,490,939          Other financial liabilities

     Jumlah liabilitas lancar                    264,329     193,356        1,336,572       1,936,387          764,924       1,637,500      6,133,068                Total current liabilities

     Liabilitas                                                                                                                                                                   Liabilities
     Liabilitas keuangan                       2,244,129           -                -    13,206,945          5,253,892       6,134,353     26,839,319                    Financial liabilities
     Liabilitas lainnya                        1,189,370     591,295       32,100,588     3,217,640            720,152       1,029,199     38,848,244                       Other liabilities

     Jumlah liabilitas tidak lancar            3,433,499     591,295       32,100,588    16,424,585          5,974,044       7,163,552     65,687,563        Total of non-current liabilities

     Aset bersih                               3,142,802    4,529,703      12,637,047    15,310,806          7,916,251       3,843,365     47,379,974                            Net assets

     % kepemilikan                               36.61%       40.25%          51.00%          30.00%           25.00% 25.00%-51.00%                                         % of ownership

     Bagian Grup atas aset bersih                                                                                                                            The Group’s share of the net
        ventura bersama                        1,150,580    1,823,205       6,444,894       4,593,242        1,979,063       1,425,858     17,416,842            assets of joint ventures
     Penyesuaian metode ekuitas                   (3,883)     (19,403)              -             629            5,918          83,167         66,428       Adjustments of equity methods

     Jumlah tercatat                           1,146,697    1,803,802       6,444,894       4,593,871        1,984,981       1,509,025     17,483,270                Total carrying value

     Pendapatan                                  632,625    1,056,929      11,016,251    10,028,632           4,372,076      3,978,925     31,085,438                            Revenue
     Beban pokok pendapatan                      (21,594)    (783,257)     (7,077,375)   (6,677,829)         (3,381,658)    (2,722,479)   (20,664,192)                    Cost of revenue
     Depresiasi dan amortisasi                    (1,650)     (14,013)              -       (16,889)                  -        (59,438)       (91,990)      Depreciation and amortisation
     Pendapatan keuangan                           3,681        1,922             336       159,838                   -         11,201        176,978                     Finance income
     Beban keuangan                             (170,697)        (140)     (2,589,954)   (1,388,379)           (219,994)      (528,574)    (4,897,738)                   Interest expense
     Beban operasi                               (42,712)     (90,904)        (36,031)     (201,312)            (42,732)      (167,693)      (581,384)               Operating expenses
     Pendapatan/(beban) lain-lain,
        bersih                                     8,737       83,638         932,857          75,475              359          74,743      1,175,809        Other income/(expense) - net
     Beban pajak penghasilan                     (88,602)    (103,497)       (401,836)        (35,233)        (173,043)        (97,814)      (900,025)                Income tax expense

     Laba tahun berjalan                         319,788     150,678        1,844,248       1,944,303          555,008        488,871       5,302,896                     Profit for the year

     % kepemilikan                               36.61%       40.25%          51.00%          30.00%           25.00% 25.00%-51.00%                                        % of ownership

                                                                                                                                                                   The Group’s share of
     Bagian Grup atas laba bersih                                                                                                                                      net income for
        ventura bersama tahun berjalan           117,074        60,648       940,566         583,291           138,752        180,682       2,021,013       the year of joint ventures

     Kerugian komprehensif                                                                                                                                           Other comprehensive
        lainnya                                  (96,737)     (43,599)       (370,845)       (124,228)         (44,343)         (6,825)      (686,577)                           loss

     Bagian atas kerugian                                                                                                                                Share of other comprehensive
        komprehensif lainnya                                                                                                                                                     loss
        ventura bersama                          (35,415)     (17,549)       (189,131)        (37,268)         (11,086)         (2,809)      (293,258)              of joint ventures

     Dividen yang diterima dari                                                                                                                                      Dividends received
         perusahaan ventura bersama             (151,212)       (6,224)             -        (210,051)                -        (65,752)      (433,239)            from joint ventures


       Investasi pada entitas di atas diperoleh terutama                                                The investments in the above entities are held primarily
       untuk tujuan potensi pertumbuhan jangka panjang,                                                 for long-term growth potential, since these entities are
       karena seluruh entitas tersebut bergerak dalam                                                   engaged in the same electricity industry as the Group.
       industri ketenagalistrikan yang sama dengan industri                                             Management believes that there is no indication of
       Grup. Manajemen meyakini bahwa tidak ada indikasi                                                impairment.
       penurunan nilai.

10. PIUTANG PIHAK BERELASI                                                                   10. RECEIVABLES FROM RELATED PARTIES

                                                                           30 September/        31 Desember/
                                                                           September 30,        December 31,
                                                                                2024                2023

                                          SGPJB                                   337,248                 578,667                              SGPJB
                                          REP                                     449,999                 437,855                                REP
                                          PDG                                      17,635                  36,387                                PDG
                                          PMSE                                     67,120                 136,437                               PMSE
                                          GCL                                      88,415                  58,923                                GCL
                                          IPB                                         -                     1,411                                 IPB
                                          Lain-lain                                64,560                  29,733                              Others

                                          Jumlah                               1,024,977                 1,279,413                                  Total

                                          Dikurangi: bagian lancar                 19,863                 251,026            Less: current portion

                                          Bagian tidak lancar                  1,005,114                 1,028,387              Non-current portion
Page 89
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/79 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES         FROM       RELATED        PARTIES
                                                                (continued)

    SGPJB                                                       SGPJB

    Pada tanggal 20 November 2018, PLN NR, entitas              On November 20, 2018, PLN NR, a PNP subsidiary,
    anak PNP, memberikan pinjaman jangka panjang                granted a long-term loan to SGPJB amounting to
    sebesar USD56.516.733 kepada SGPJB dengan suku              USD56,516,733 with an interest rate of LIBOR 6 months
    bunga LIBOR 6 bulan + 4%. Pinjaman akan jatuh               + 4%. The loan will mature on December 15, 2033. The
    tempo pada tanggal 15 Desember 2033. Pelunasan              interest will be due every January 15 and July 15. PLN
    pembayaran bunga dilakukan setiap tanggal 15                NR and SGPJB obtained approval from the General
    Januari dan 15 Juli. PLN NR dan SGPJB telah                 Meeting of Shareholders to change the interest rate
    mendapatkan persetujuan dari Rapat Umum                     benchmark from LIBOR to SOFR, effective from May 12,
    Pemegang Saham untuk melakukan perubahan                    2023. During period September 30, 2024, SGPJB there
    acuan suku bunga dari LIBOR menjadi SOFR, berlaku           was no loan payments (2023: USD17,389,764 or
    efektif pada tanggal 12 Mei 2023. Selama periode            equivalent to Rp264,603).
    sampai dengan 30 September 2024, SGPJB belum
    melakukan      pembayaran     pinjaman     (2023:
    USD17.389.764 atau setara dengan Rp264.603).

    Pada tanggal 30 September 2024, saldo piutang               As at September 30, 2024, PNP’s principal outstanding
    pokok pinjaman PNP dari SGPJB adalah sebesar                loan balance from SGPJB was USD17,795,854
    USD17.795.854 (setara dengan Rp269.500) dan                 (equivalent to Rp269,500) and interest receivables
    piutang bunga sebesar USD5.347.442 (setara dengan           amounted to USD5,347,442 (equivalent to Rp80,982).
    Rp80.982).

    Pada tanggal 31 Desember 2023, saldo piutang pokok          As at December 31, 2023, PNP’s principal outstanding
    pinjaman PNP dari SGPJB adalah sebesar                      loan balance from SGPJB was USD34,779,528
    USD34.779.528 (setara dengan Rp536.960) dan                 (equivalent to Rp536,960) and interest receivables
    piutang bunga sebesar USD2.545.639 (setara dengan           amounted to USD2,545,639 (equivalent to Rp41,707).
    Rp41.707).
    REP                                                         REP
    Pada tanggal 4 Juli 2014, PIP, entitas anak,                On July 4, 2014, PIP, a subsidiary, provided a long-term
    memberikan pinjaman jangka panjang sebesar                  loan of USD9,399,962 to REP, an associate, for the
    USD9.399.962 kepada REP, entitas asosiasi, untuk            financing of the 46.6 MW project at Hydroelectric Power
    membiayai proyek 46,6 MW di Pembangkit Listrik              Plant (“HPP”) Citarum River at Cianjur, West Java. This
    Tenaga Air (“PLTA”) Sungai Citarum di Cianjur, Jawa         loan bears an interest rate of 10% per annum with a 17.5
    Barat. Pinjaman ini dikenakan bunga 10% per tahun           year term of repayment after a grace period during
    dengan jangka waktu 17,5 tahun setelah grace period         construction. The Commercial Operation Date (“COD”)
    selama pembangunan. Tanggal operasi komersial               has been amended, most recently through the First
    PLTA telah diamandemen, terakhir kali melalui               Amendment of PPA dated August 10, 2017, to become
    Amandemen Pertama atas PJBTL tertanggal 10                  57 months after the financial close date. On May 12,
    Agustus 2017, menjadi 57 bulan setelah tanggal              2019, the HPP Rajamandala 1 x 47 MW was
    pendanaan. Pada tanggal 12 Mei 2019, PLTA                   commercially operated based on COD certificate No.
    Rajamandala 1 x 47 MW telah beroperasi secara               188.BA/159/REP/2019. The principal shall be invoiced
    komersial berdasarkan sertifikat tanggal operasi            and due every six months starting on COD.
    komersial No. 188.BA/159 /REP/2019. Pokok
    pinjaman akan ditagihkan dan terutang setiap enam
    bulan sejak tanggal operasi komersial.

    Pada tanggal 23 November 2016, PIP memberikan               On November 23, 2016, PIP provided additional loans of
    tambahan pinjaman sebesar USD5.724.490 kepada               USD5,724,490 to REP with similar terms and conditions
    REP dengan persyaratan dan kondisi yang sama                to the previous loan.
    dengan pinjaman sebelumnya.
Page 90
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/80 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES          FROM       RELATED         PARTIES
                                                                (continued)

    REP (lanjutan)                                              REP (continued)

    Pada tanggal 30 September 2024, saldo pokok                 As at September 30, 2024, PIP’s principal amounts due
    pinjaman PIP kepada REP adalah sebesar                      from REP is USD15,124,452 or equivalent to Rp229,044
    USD15.124.452 atau setara dengan Rp229.044                  (2023: USD15,124,452 or equivalent to Rp233,057) and
    (2023: USD15.124.452 atau setara dengan                     interest receivables amounted to USD14,134,930 or
    Rp233.507)     dan     piutang   bunga    sebesar           equivalent to Rp214,060 (2023: USD12,999,560 or
    USD14.134.930 atau setara dengan Rp214.060                  equivalent to Rp200,700). Other receivables of Rp6,895
    (2023: USD12.999.560 atau setara dengan                     (2023: Rp3,648) represent costs of employee relocation
    Rp200.700). Piutang lainnya sebesar Rp6.895 (2023:          and operation and maintenance services revenue.
    Rp3.648) merupakan biaya relokasi pegawai dan
    pendapatan jasa operasi dan pemeliharaan.

    Pada periode yang berakhir 30 September 2024,               During the period ended September 30, 2024, interest
    penghasilan bunga masing-masing adalah sebesar              income amounted to USD1,135,370 or equivalent to
    USD1.135.370 atau setara dengan Rp18.069 (2023:             Rp18,069 (2023: USD1,512,445 or equivalent to
    USD1.512.445 atau setara dengan Rp23.350) yang              Rp23,350) which is presented in the consolidated
    disajikan dalam laporan laba rugi konsolidasian.            statements of profit or loss.

    Pada periode yang berakhir 30 September 2024 dan            During period ended September 30, 2024 and
    31 Desember 2023, tidak ada pembayaran kembali              December 31, 2023, there was no repayment of the
    pokok pinjaman dan bunga yang dibayarkan oleh               loan principal and interest paid by REP. PIP is not
    REP. PIP tidak berhak untuk meminta pembayaran              entitled to request repayment of loan principal
    kembali atas pokok pinjaman yang diberikan kepada           provided to REP before the Senior Facility Release
    REP sebelum Tanggal Pembebasan Fasilitas Senior,            Date, while interest paid by REP should fulfil several
    namun untuk pembayaran bunga yang dilakukan oleh            terms and conditions as stated in the shareholder
    REP harus memenuhi syarat dan kondisi yang                  agreement as follows:
    tertuang dalam perjanjian pemegang saham sebagai
    berikut:
    - Uang yang ada pada kredit dari Rekening Distribusi;       - The monies stand to the credit of the Distribution
      atau                                                        Accounts; or
    - Sumber - sumber lain yang dapat disetujui secara          - Other sources as may be approved in writing by the
      tertulis oleh Agen Antar Kreditur.                          Intercreditor Agent.

    PDG                                                         PDG
    Pada tanggal 12 Juni 2013, PIP, entitas anak,               On June 12, 2013, PIP, a subsidiary, granted a long-
    memberikan pinjaman jangka panjang sebesar                  term loan amounting to USD18,837,112 to PDG, a joint
    USD18.837.112 kepada PDG, ventura bersama,                  venture, for financing the PLTU Tambak Lorok,
    untuk membiayai proyek PLTU Tambak Lorok,                   Semarang. On November 30, 2015, PIP made an
    Semarang. Pada tanggal 30 November 2015, PIP                amendment to the long-term loan given to PDG which
    melakukan amandemen atas pinjaman jangka                    resulted in the revision of the total loan granted to
    panjang yang diberikan kepada PDG sehingga jumlah           become USD18,191,529 in accordance with the funds
    pinjaman berubah menjadi USD18.191.529 sesuai               transferred up to January 9, 2014, and the tenor of the
    dengan jumlah seluruh pencairan hingga tanggal              loan was amended to eight years and will be due on
    terakhir yakni 9 Januari 2014 dan jangka waktu              December 1, 2023. This loan bears an interest of rate
    pinjaman berubah menjadi delapan tahun yang jatuh           6.5% per annum.
    tempo pada 1 Desember 2023. Pemberian pinjaman
    ini dikenakan bunga 6,5% per tahun.
    Jumlah bunga atas pokok pinjaman terutang selama            The total interest on the principal during the construction
    masa pembangunan proyek (Interest During                    of the project (Interest During Construction) is effective
    Construction) dihitung sejak tanggal pencairan dana         from the date of cash withdrawal until May 30, 2014 and
    sampai tanggal 30 Mei 2014 dan dibayarkan secara            was fully paid on June 1, 2016. The principal shall be
    penuh pada tanggal 1 Juni 2016. Pokok pinjaman              collected every six months from June 1, 2016 until
    akan ditagihkan setiap 6 bulan dari tanggal 1 Juni          December 1, 2023.
    2016 sampai dengan 1 Desember 2023.

    Pada periode sampai dengan 30 September 2024,               During period ended September 30, 2024, PDG has
    PDG melakukan pembayaran pokok pinjaman                     made a principal loan repayment of USD1,136,971
    sebesar USD1.136.971 (setara dengan Rp17.218)               (equivalent to Rp17,218) and interest amounting to
    dan bunga sebesar USD27.508 (setara dengan                  USD27,508 (equivalent to Rp417) (December 2023:
    Rp417 (Desember 2023: pokok USD2.273.941                    principal USD2,273,941 (equivalent to Rp34,681) and
    (setara dengan Rp34.681) dan bunga sebesar                  interest amounted to USD680,250 (equivalent to
    USD680.250     (setara   dengan    Rp10.361)).              Rp10,361)).
Page 91
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/81 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES         FROM       RELATED        PARTIES
                                                                (continued)

    PDG (lanjutan)                                              PDG (continued)

    Pada tanggal 30 September 2024 dan 31 Desember              As at September 30, 2024 and December 31, 2023,
    2023, piutang lainnya sebesar RpNihil dan Rp754,            other receivables amounted to RpNil and Rp754
    merupakan piutang atas bunga dan biaya pegawai.             respectively, representing interest receivables and
                                                                employee costs.

    GCL                                                         GCL

    Pada tanggal 27 Juni 2023, GCL, entitas asosiasi PIP,       On June 27, 2023, GCL, the associates of PIP, through
    melalui Rapat Umum Pemegang Saham (“RUPS”) No.              the General Meeting of Shareholders (“GMS”) No.
    005/GMS-GCLIT/2023 telah mengumumkan dividen                005/GMS-GCLIT/2023, declared its dividends to IPRen,
    kepada IPRen, entitas anak PIP, sebesar                     the subsidiary of PIP, which amounted to USD3,500,000
    USD3.500.000 (setara dengan Rp52.591).                      (equivalent to Rp52,591).

    Pada tanggal 30 September 2024 dan 31 Desember              As at September 30, 2024 and December 31, 2023,
    2023, saldo piutang PIP dari GCL masing-masing              PIP’s principal outstanding loan balance from GCL was
    adalah sebesar USD583.831 (setara dengan                    USD583,831        (equivalent    to   Rp8,841)    and
    Rp8.841) dan USD3.816.530 (setara dengan                    USD3,816,530 (equivalent to Rp58,923) respectively.
    Rp58.923)

    GCL telah membayar IPRen sebesar USD4.200.000               GCL has paid IPRen for USD4,200,000 (equivalent to
    (setara dengan Rp63.605) dan sisa saldo yang belum          Rp63,605) and the remaining amount that has not been
    dibayar sebesar USD583.831 (setara dengan                   paid amounted to USD583,831 (equivalent to Rp8,841).
    Rp8.841).

    PMSE                                                        PMSE

    Pada tanggal 30 September 2024, saldo piutang               As at September 30, 2024, PMSE’s principal
    pokok pinjaman PMSE dari PJBIC adalah sebesar               outstanding loan balance from PJBIC was
    USD8.905.609 (setara dengan Rp134.866) dan                  USD8,905,609 (equivalent to Rp134,866), and the
    piutang bunga sebesar USD270.093 (setara dengan             balance of interest receivables amounted to
    Rp4.090).                                                   USD270,093 (equivalent to Rp4,090).

    Pada tanggal 31 Desember 2023, saldo piutang pokok          As at December 31, 2023, PMSE’s principal outstanding
    pinjaman PMSE dari PJBIC adalah sebesar                     loan balance from PJBIC was USD8,588,400
    USD8.588.400 (setara dengan Rp132.396) dan                  (equivalent to Rp132,396), and the balance of interest
    piutang bunga sebesar USD225.193 (setara dengan             receivables amounted to USD225,193 (equivalent to
    Rp4.041).                                                   Rp4,041).

    IPB                                                         IPB

    Pada tanggal 25 Oktober 2023, IPB melalui Rapat             On October 25, 2023, IPB through the General Meeting
    Umum      Pemegang     Saham     (“RUPS”)   telah           of Shareholders (“GMS”), declared its dividends to PIP,
    mengumumkan dividen kepada PIP sebesar Rp1.881.             which amounted to Rp1,881. IPB has paid PIP Rp470,
    IPB telah membayar kepada PIP sebesar Rp470 dan             and the remaining amount that has not been paid
    sisanya yang belum dibayarkan sebesar Rp1.411.              amounted to Rp1,411.

    Pada tanggal 30 September 2024, saldo piutang PIP           As at September 30, 2024, PIP’s principal outstanding
    dari IPB masing-masing adalah sebesar RpNihil.              loan balance from IPB was amounted to RpNil.
Page 92
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/82 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                         SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                                    10. RECEIVABLES          FROM          RELATED            PARTIES
                                                                             (continued)

    Manajemen Grup berpendapat bahwa penyisihan atas                         Management of the Group is of the opinion that the
    kerugian kredit ekspektasian atas piutang pihak                          provision for expected credit losses of receivables from
    berelasi tidak material, sehingga penyisihan atas                        related parties is not material, therefore, a provision for
    kerugian kredit ekspektasian dianggap tidak                              expected credit losses is not considered necessary as at
    diperlukan pada 30 September 2024 dan 31                                 September 30, 2024 and December 31, 2023.
    Desember 2023.

    Lihat Catatan 51 untuk informasi rincian transaksi dan                   Refer to Note 51 for the information on the details of
    saldo dengan pihak berelasi.                                             transactions and balances with related parties.


11. REKENING BANK               DIBATASI                                 11. RESTRICTED CASH IN BANKS
    PENGGUNAANNYA
                                                       30 September/       31 Desember/
                                                       September 30,       December 31,
                                                            2024               2023

          Angsuran sewa pembiayaan dan                                                                       Lease installments and
           jaminan operasi                                                                                    operation guarantee
           Rekening bank                                                                                               Cash in bank
             Sumitomo Mitsui                                                                                     Sumitomo Mitsui
               Banking Corporation, Singapura                                                    Banking Corporation, Singapore
               JPY                                          3,876,849           3,442,122                                 JPY
               USD                                            869,963             878,677                                USD

          Jaminan bank garansi                                                                                         Bank guarantee
            Pihak berelasi:                                                                                             Related parties:
              PT Bank Rakyat Indonesia (Persero) Tbk                                         PT Bank Rakyat Indonesia (Persero) Tbk
              (“Bank Rakyat Indonesia”)                                                                   (“Bank Rakyat Indonesia”)
                Rupiah                                           771              20,057                                  Rupiah
                USD                                           31,032              31,032                                    USD
              PT Bank Mandiri (Persero) Tbk                                                          PT Bank Mandiri (Persero) Tbk
              (“Bank Mandiri”)                                                                                      (“Bank Mandiri”)
                Rupiah                                        87,299              51,756                                  Rupiah
                USD                                                -              39,369                                    USD
              PT Bank Negara Indonesia (Persero) Tbk                                         PT Bank Negara Indonesia (Persero) Tbk
              (“Bank Negara Indonesia”)                                                                   (“Bank Negara Indonesia”)
                Rupiah                                             49               2,643                                 Rupiah
              PT Bank Pembangunan Daerah                                                            PT Bank Pembangunan Daerah
              ("Bank Jatim")                                                                                           ("Bank Jatim")
                Rupiah                                                               459                                    Rupiah
            Pihak ketiga:                                                                                                 Third parties:
              PT Bank KB Bukopin Tbk                                                                       PT Bank KB Bukopin Tbk
              (“Bank Bukopin”)                                                                                     (“Bank Bukopin”)
                Rupiah                                        16,749              16,749                                  Rupiah
              PT Bank CIMB Niaga Tbk                                                                       PT Bank CIMB Niaga Tbk
              ("CIMB Niaga")                                                                                          ("CIMB Niaga")
                Rupiah                                        39,539              50,237                                  Rupiah
                USD                                            2,109                                                        USD
                MYR                                            1,323                                                        MYR
          Subjumlah                                         4,925,683           4,533,101                                      Subtotal
          Cadangan kerugian kredit ekspektasian                    (5)                 (2)            Allowance for expected credit loss

          Jumlah                                            4,925,678           4,533,099                                         Total

          Dikurangi: bagian lancar                            88,119              99,019                         Less: current portion

          Bagian tidak lancar                               4,837,560           4,434,080                        Non - current portion


   Tingkat bunga deposito                                                                                     Interest rate per annum
      berjangka per tahun                                                                                            on time deposits
      Rupiah                                       1.50% - 6.25%          1.50% - 5.42%                                         Rupiah
      USD                                                  3.61%          3.80% - 4.50%                                           USD

    Perusahaan menempatkan dana cadangan pada                                The Company established a reserve account with
    Sumitomo Mitsui Banking Corporation, Singapura                           Sumitomo Mitsui Banking Corporation, Singapore
    sebesar JPY36.455.531.131 dan 57.446.027 pada                            amounting to JPY36,455,531,131 and USD57,446,027
    tanggal 30 September 2024 (2023: JPY31.519.528.142                       as at September 30, 2024 (2023: JPY31,519,528,142
    dan USD56.912.835) untuk memenuhi persyaratan                            and USD56,912,835) to fulfil the requirements of the
    Financial Lease Agreement (Catatan 26).                                  Financial Lease Agreement (Note 26).
Page 93
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/83 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)


11. REKENING BANK DIBATASI PENGGUNAANNYA                                        11. RESTRICTED CASH IN BANKS (continued)
    (lanjutan)

    Jaminan bank garansi merupakan rekening bank yang                               Bank guarantees represent cash in banks and were
    digunakan untuk jaminan pelaksanaan proyek dan                                  used as collateral for projects and services provided by
    pemberian jasa oleh Grup.                                                       the Group.
    Rincian rekening bank dibatasi penggunaannya                                    Details of restricted cash in banks by currency are as
    berdasarkan mata uang adalah sebagai berikut:                                   follows:

                             30 September 2024/ September 30, 2024                    31 Desember/ December 31, 2023
                                Dalam mata                                            Dalam mata
                               uang original/                                        uang original/
                                 In original        Ekuivalen Rp/                      In original       Ekuivalen/
                                currencies *)      Equivalent Rp                     currencies *)       Equivalent

              Rupiah                        144,403                   144,403                   141,901                      141,901     Rupiah
              JPY                    36,455,531,131                3,876,849          31,519,528,142                      3,442,122       JPY
              USD                        59,634,425                  903,104              61,472,835                        949,078       USD
              MYR                                                      1,323
              Jumlah                                               4,925,679                                              4,533,101       Total
   *) Dalam jumlah penuh, kecuali Rupiah                                          *) In full amount, except for Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi dan                          Refer to Note 51 for information on the details of
    saldo dengan pihak berelasi.                                                    transactions and balances with related parties.


12. ASET TIDAK LANCAR LAIN                                                      12. OTHER NON-CURRENT ASSETS

                                                                30 September/          31 Desember/
                                                                September 30,          December 31,
                                                                     2024                  2023

                         Properti pertambangan                        1,839,908              1,832,596             Mining properties

                         Uang muka                                                                                        Advances
                           Pengembangan proyek                        4,068,997              2,702,707       Project development
                           Pembelian batu bara                           89,533                103,254          Purchase of coal
                         Subjumlah                                    4,158,530              2,805,961                        Subtotal


                         Biaya dibayar di muka                                                                    Prepaid expenses
                            Pembelian gas                               525,275                 76,902            Gas purchased
                            Lain-lain                                    50,550                225,991                    Others
                         Subjumlah                                      575,826                302,893                        Subtotal

                         Aset takberwujud                                                                          Intangible assets
                           Piranti lunak                                572,932                547,829                  Software
                           Biaya legal terkait perpanjangan                                               Legal costs for renewal
                               tanah dan hak atas tanah                 284,974                371,794           land of rights



                         Subjumlah                                      857,906                919,623                        Subtotal

                         Biaya kontrak                                  848,991              1,060,056                   Contract cost

                         Lain-lain                                          -                   19,812                         Others
                         Jumlah                                       8,281,162              6,940,941                           Total


    Manajemen      Grup meyakini     bahwa     properti                             Management of the Group believes that the mining
    pertambangan, uang muka, dan biaya dibayar di muka                              properties,  advances, and    prepayments    are
    dapat dipulihkan.                                                               recoverable.
    Beban amortisasi aset tak berwujud dan biaya kontrak                            Amortisation of intangible assets and contract cost for
    untuk tahun yang berakhir pada tanggal 30 September                             the years ended September 30, 2024 and 2023,
    2024 dan 2023, masing-masing sebesar Rp720.855                                  amounting to Rp720,855 and Rp405,800 respectively, is
    dan Rp405.800 disajikan sebagai beban usaha lain-                               presented as part of other operating expenses (Note
    lain (Catatan 44).                                                              44).
Page 94
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/84 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS                                              13. CASH AND CASH EQUIVALENTS


                                                  30 September/      31 Desember/
                                                  September 30,      December 31,
                                                      2024               2023


        Kas                                              12,222              9,539                              Cash on hand
        Bank                                                                                                    Cash in banks
          Entitas yang berelasi dengan
           Pemerintah                                                                           Government related entities
              Bank Rakyat Indonesia                                                               Bank Rakyat Indonesia
                Rupiah                                 3,703,990         8,464,570                              Rupiah
                USD                                    2,534,383         8,561,088                                USD
                EUR                                       97,945           130,260                                EUR
                JPY                                       21,941            18,189                                JPY
              Bank Negara Indonesia                                                               Bank Negara Indonesia
                Rupiah                                 8,680,058        10,324,109                              Rupiah
                USD                                    2,475,711         4,484,442                                USD
                EUR                                       35,468            14,700                                EUR
                JPY                                       48,421            49,760                                JPY
                MYR                                        2,589             3,058                               MYR
              Bank Mandiri                                                                                 Bank Mandiri
                Rupiah                                 4,058,753        14,225,085                              Rupiah
                USD                                    2,020,803           941,420                                USD
                EUR                                       30,958            39,425                                EUR
                JPY                                       53,957           169,555                                JPY
                MYR                                        4,847             4,459                               MYR
                GBP                                            -                                                  GBP
              PT Bank DKI (“Bank DKI”)                                                         PT Bank DKI (“Bank DKI”)
                Rupiah                                  154,720            665,609                             Rupiah
                USD                                           -             44,274                                USD
                JPY                                           -                831                                JPY
              Bank Tabungan Negara                                                               Bank Tabungan Negara
                Rupiah                                  404,028          1,689,507                              Rupiah
              Bank Syariah Indonesia                                                             Bank Syariah Indonesia
                Rupiah                                  415,338          1,048,175                              Rupiah
          Subjumlah                                   24,743,910        50,878,516                                  Subtotal
          Cadangan kerugian kredit ekspektasian               (9)              (15)       Allowance for expected credit loss
          Jumlah entitas yang berelasi                                                                    Total Government
              dengan Pemerintah                       24,743,901        50,878,501

          Pihak ketiga                                                                                      Third parties
            Bank Bukopin                                                                                  Bank Bukopin
              Rupiah                                    102,944             13,904                            Rupiah
              JPY                                        31,413             32,337                               JPY
              USD                                         6,972              7,185                              USD
            PT Bank Central Asia Tbk                                                          PT Bank Central Asia Tbk
              (“Bank Central Asia”)                                                              (“Bank Central Asia”)
              Rupiah                                    136,021            200,950                            Rupiah
            PT Bank Danamon Indonesia Tbk                                               PT Bank Danamon Indonesia Tbk
              (“Bank Danamon”)                                                                      (“Bank Danamon”)
              Rupiah                                    241,050            716,187                            Rupiah
              PT Bank OCBC NISP Tbk                                                         PT Bank OCBC NISP Tbk
                (“Bank OCBC NISP”)                                                                (“Bank OCBC NISP”)
                Rupiah                                   87,005            583,337                              Rupiah
              PT Bank Maybank Indonesia Tbk                                              PT Bank Maybank Indonesia Tbk
                (“Bank Maybank Indonesia”)                                                   (“Bank Maybank Indonesia”)
                (dahulu Bank Internasional                                                   (formerly Bank Internasional
                Indonesia)                                                                                     Indonesia)
                Rupiah                                   83,573            260,418                              Rupiah
              Lain-lain (masing-masing                                                                            Others
                dibawah 5% dari jumlah)                                                        (each below 5% of total)
                Rupiah                                    40,059           349,975                              Rupiah
                USD                                    1,328,100           953,749                                USD
                EUR                                        7,763           370,914                                EUR
                Dinar Kuwait                               2,842            10,356                                KWD
          Subjumlah                                    2,067,742         3,499,312                                  Subtotal
          Cadangan kerugian kredit ekspektasian               (2)               (3)       Allowance for expected credit loss
          Jumlah pihak ketiga                          2,067,740         3,499,309                        Total third parties
        Jumlah kas dan bank                           26,823,863        54,387,349          Total cash on hand and in banks
Page 95
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/85 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                        SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS (lanjutan)                                     13. CASH AND CASH EQUIVALENTS (continued)

                                                         30 September/      31 Desember/
                                                         September 30,      December 31,
                                                             2024               2023
         Setara kas - deposito berjangka                                                                        Cash equivalents - time deposits
           Pihak berelasi                                                                                                     Related parties
             Bank Negara Indonesia                                                                                  Bank Negara Indonesia
               Rupiah                                           26,198               135,735                                        Rupiah
               USD                                                   -               169,829                                          USD
             Bank Mandiri                                                                                                     Bank Mandiri
               Rupiah                                            1,700                76,150                                        Rupiah
               USD                                              10,000                     -                                           USD
             Bank Tabungan Negara (BTN)
               Rupiah                                           25,000                45,000
               USD                                              75,720
             Bank Rakyat Indonesia                                                                                  Bank Rakyat Indonesia
               Rupiah                                          709,483               792,500                                       Rupiah
               USD                                             227,160               161,466                                         USD
             Bank Syariah Indonesia                                                                                 Bank Syariah Indonesia
               Rupiah                                          105,000               130,000                                       Rupiah
               USD                                               5,010                     -                                         USD
           Jumlah pihak berelasi                              1,185,271            1,510,680                               Total related parties
                                                                                           -
           Pihak ketiga                                                                                                             Third parties
             Bank Bukopin                                                                                                     Bank Bukopin
               Rupiah                                           62,400                22,400                                       Rupiah
               USD                                                                                                                    USD
               JPY                                                                                                                    JPY
             Lain-lain (masing-masing                                                                                                   Others
               dibawah 5% dari jumlah)                                                                              (each below 5% of total)
               Rupiah                                              112                   112                                         Rupiah
           Jumlah pihak ketiga                                  62,512                22,512                               Total third parties
           Jumlah deposito berjangka                          1,247,783            1,533,192                               Total time deposits
         Jumlah kas dan setara kas                           28,071,646           55,920,541                    Total cash and cash equivalent
   Tingkat bunga deposito berjangka                                                                              Interest rate per annum on
      per tahun                                                                                                              time deposits
      Rupiah                                       0.25% - 6.50%         3.73% - 4.92%                                              Rupiah
      USD                                            5.00 – 5.20%        2.98% - 3.75%                                                USD
   Jangka waktu                                 1 - 6 Bulan/Months    1 - 3 Bulan/Months                                             Maturity

    Rincian kas dan setara kas berdasarkan mata uang                       Details of cash and cash equivalents by currency are as
    adalah sebagai berikut:                                                follows:

                                 30 September 2024/ September 30, 2024                     31 Desember/ December 31, 2023
                                    Dalam mata                                             Dalam mata
                                    uang asing/                                            uang asing/
                                     In foreign         Ekuivalen Rp/                       In foreign        Ekuivalen/
                                    currencies *)       Equivalent Rp                      currencies *)      Equivalent

            Rupiah                          19,049,644               19,049,644                39,753,262                  39,753,262
            USD                            573,419,358                8,683,859               992,515,957                  15,323,453
            EUR                             10,168,109                  172,133                32,499,596                     555,299
            JPY                          1,464,409,191                  155,732             2,478,548,665                     270,672
            Lain-lain **)                    2,079,708                   10,278                 1,157,691                      17,873
            Jumlah                                                   28,071,646                                            55,920,559
    *)   Dalam jumlah penuh, kecuali Rupiah                                *)   In full amount, except Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi                     Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                       transactions and balances with related parties.
Page 96
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/86 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

14. INVESTASI JANGKA PENDEK                                         14. SHORT-TERM INVESTMENTS


                                                 30 September/       31 Desember/
                                                 September 30,       December 31,
                                                      2024               2023

         Deposito berjangka                                                                                  Time deposits
          Pihak berelasi                                                                                 Related parties
            Bank Rakyat Indonesia                                                              Bank Rakyat Indonesia
              Rupiah                                     154,257            135,000                     Rupiah
              USD                                              -            355,407                          USD
            Bank Mandiri                                                                               Bank Mandiri
              Rupiah                                   1,394,801                303                     Rupiah
              USD                                              -            312,521                         USD
            Bank Negara Indonesia                                                              Bank Negara Indonesia
              Rupiah                                         106               5,227                    Rupiah
              USD                                            114              80,798                        USD
           Jumlah pihak berelasi                       1,549,277            889,256                   Total related parties


         Investasi lain-lain                                                                              Other investments
           Rupiah                                         23,575              24,414                               Rupiah
         Jumlah investasi jangka pendek                1,572,852            913,670            Total short-term investments

   Tingkat bunga deposito berjangka                                                                    Interest rate per annum on
      per tahun                                                                                                    time deposits
      Rupiah                                      4.42% - 5.04%      4.42% - 5.04%                                       Rupiah
      USD                                         2.04% - 3.57%      2.04% - 3.57%                                         USD
   Jangka waktu                                                                                                            Maturity
      Rupiah                                        6 - 12 Bulan/      6 - 12 Bulan/                                     Rupiah
                                                         Months             Months
     USD                                            3 - 12 Bulan/      6 - 12 Bulan/                                       USD
                                                         Months             Months

    Lihat Catatan 51 untuk informasi rincian transaksi dan              Refer to Note 51 for information on the details of
    saldo dengan pihak berelasi.                                        transactions and balances with related parties.


15. PIUTANG USAHA                                                   15. TRADE RECEIVABLES

                                                 30 September/      31 Desember/
                                                 September 30,      December 31,
                                                     2024               2023



     Pihak berelasi                                                                                           Related parties
     Entitas berelasi dengan pemerintah               2,555,392         2,485,622                  Government related entities
     Cadangan kerugian kredit ekspektasian              (68,834)          (72,694)         Allowance for expected credit losses

     Subjumlah                                        2,486,558         2,412,928                                      Subtotal

     Pihak ketiga                                                                                                 Third parties
     Umum                                            29,605,016        27,639,793                                         Public
     Tentara Nasional Indonesia dan Kepolisian                                                  Tentara Nasional Indonesia and
       Negara Republik Indonesia                                                       Kepolisian Negara Republik Indonesia
       (TNI dan POLRI)                                  916,042           622,856                          (TNI dan POLRI)
     Lainnya                                                                                               Other institutions
     Sub jumlah                                      30,521,058        28,262,649                                      Sub total
     Cadangan kerugian kredit ekspektasian           (3,923,751)       (3,834,622)         Allowance for expected credit losses

     Subjumlah                                       26,597,307        24,428,027                                      Subtotal

     Jumlah, bersih                                  29,083,865        26,840,955                                     Total, net
Page 97
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/87 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)


15. PIUTANG USAHA (lanjutan)                                   15. TRADE RECEIVABLES (continued)

    Analisis umur piutang usaha adalah sebagai berikut:           The aging analysis of trade receivables is as follows:

                                              30 September/      31 Desember/
                                              September 30,      December 31,
                                                  2024               2023

                Belum jatuh tempo                 27,559,639         25,244,818                    Not yet due
                Lewat jatuh tempo                                                                     Past due
                  1 s/d 30 hari                      534,099            542,714               1 to 30 days
                  31 s/d 60 hari                     381,203            370,391              31 to 60 days
                  61 s/d 360 hari                    916,366          1,563,547            61 to 360 days
                  Lebih dari 360 hari              3,685,143          3,026,801        More than 360 days
                Jumlah                            33,076,450         30,748,271                                Total


    Pergerakan      perubahan    cadangan          kerugian       The movement of changes in the allowance for
    penurunan nilai adalah sebagai berikut:                       impairment losses is as follows:

                                              30 September/    31 Desember/
                                              September 30,    December 31,
                                                  2024             2023

          Saldo awal                               3,907,316       3,559,350                 Balance at beginning
          Penyesuaian saldo awal                                                Opening balance adjustments upon
            atas penerapan awal PSAK No. 71                                          initial application of SFAS No. 71
                                                                           -
          Penambahan                                 88,922          348,870                               Additions
          Penghapusan                                (3,653)            (904)                              Write-off
          Saldo akhir                              3,992,585       3,907,316                       Ending Balance

    Piutang usaha Perusahaan dan PLN Batam dijamin                The Company and PLN Batam’s trade receivables are
    sebagian dengan uang jaminan langganan jika terjadi           partially secured by customer security deposits in case
    kegagalan pembayaran (Catatan 34).                            of default (Note 34).

    Pada tanggal 30 September 2024 dan 31 Desember                As at September 30, 2024 and December 31, 2023, all
    2023, seluruh nilai tercatat piutang usaha Grup               carrying amounts of the Group’s trade receivables were
    berdominasi Rupiah.                                           dominated in Rupiah.

    Pada tanggal 30 September 2024, sebagian dari                 As at September 30, 2024, some of the trade
    piutang usaha sebesar Rp33.076.450 mengalami                  receivables of Rp33,076,450 were impaired and have
    penurunan nilai dan telah diprovisikan sebesar                been provisioned by Rp3,992,585. The impaired trade
    Rp3.992.585. Piutang usaha yang diturunkan nilainya           receivables mainly relate to public customers who have
    terutama terkait dengan pelanggan umum yang belum             not paid the receivables for more than three months.
    melakukan pembayaran piutang lebih dari tiga bulan.

    Manajemen berkeyakinan bahwa tidak ada risiko                 Management believes there is no heightened risk of poor
    kredit kualitas yang buruk atas piutang usaha karena          credit quality of trade receivables because the Group
    Grup memiliki jumlah pelanggan yang besar, tersebar           has a broad customer base, dispersed across varying
    mencakup segmen pasar dan area geografis yang                 market segments and geographic locations throughout
    luas di seluruh Indonesia. Kesimpulan ini didukung            Indonesia. This assessment is also supported by the
    juga oleh data historis kolektibilitas Grup atas piutang      Group’s good historical collection rates of trade
    usaha yang baik selama beberapa periode. Oleh                 receivables across the periods. Therefore, management
    karena itu, manajemen berpendapat bahwa cadangan              is of the opinion that the allowance for expected credit
    atas kerugian kredit ekspektasian atas piutang usaha          loss of trade receivables is adequate.
    adalah cukup.

    Lihat Catatan 51 untuk informasi rincian transaksi dan        Refer to Note 51 for information on the details of
    saldo dengan pihak berelasi.                                  transactions and balances with related parties.
Page 98
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/88 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH                                    16. RECEIVABLES FROM GOVERNMENT

    Piutang dari Pemerintah terdiri atas piutang                  Receivables from the Government consist of
    kompensasi dan piutang subsidi listrik kepada Grup.           compensation receivables and electricity subsidy
                                                                  receivables to the Group.

                                            30 September/         31 Desember/
                                            September 30,         December 31,
                                                2024                  2023

     Piutang Kompensasi                           49,153,692           17,835,197                     Compensation receivables

     Piutang subsidi listrik (catatan 37)         11,829,041            4,611,801    Receivables on electricity subsidy (note 37)

     Total                                        60,982,733           22,446,998                                          Total

     Dikurangi: bagian lancar                     60,982,733           22,446,998                           Less: current portion

     Bagian tidak lancar                                -                     -                              Non-current portion



    Piutang kompensasi                                            Compensation receivables

    Piutang kompensasi merupakan piutang atas                     Compensation receivables represent receivables of
    pendapatan kompensasi dari Pemerintah yang belum              compensation revenue from the Government that have
    diterima untuk penggantian perbedaan tarif aktual dan         not yet been received for the difference between the
    tarif yang dihitung oleh Grup. Grup selalu menerima           actual tariffs charged versus the tariffs calculated by the
    keputusan tarif tetap dari Pemerintah. Dengan kata            Group. The Group has always accepted the fixed
    lain, perhitungan yang dilakukan oleh Grup terkait tarif      electricity tariff decision from the Government. In other
    listrik tidak disetujui oleh Kementerian ESDM. Grup           words, the calculation of the electricity tariff proposed by
    diharuskan menggunakan tarif listrik tetap yang sudah         the Group was not approved by the Ministry of ESDM.
    disetujui atau tarif aktual.                                  The Group was required to use a fixed electricity tariff
                                                                  that had been approved or the actual tariff.


    Berdasarkan      PMK        No.    159/PMK.02/2022,           Based on PMK No. 159/PMK.02/2022, the Company
    Perusahaan mencatat pendapatan dan piutang                    records compensation income and receivables in
    kompensasi sesuai dengan asersi manajemen dan                 accordance with management estimates and they will be
    akan ditetapkan sebagai kebijakan dana kompensasi             finally determined based on the compensation fund
    oleh Menteri Keuangan berdasarkan hasil reviu oleh            policy by the Minister of Finance based on the results of
    BPKP. Finalisasi kebijakan dana kompensasi tersebut           the review by BPKP. Finalisation of the compensation
    akan dilakukan berdasarkan LHP BPK. Perbedaan                 fund policy will be made based on the LHP of the BPK.
    yang timbul dari hasil audit BPK akan mempengaruhi            Any differences from the audit of BPK will impact profit
    laba rugi pada tahun audit tersebut difinalisasi. Nilai       or loss in the year the audit is finalised. The amount of
    piutang kompensasi pada tanggal 31 Desember 2022              compensation receivables as at December 31, 2022
    dan 2023 diakui berdasarkan estimasi terbaik                  and 2023 was recognised based on management’s
    manajemen yang akan direviu oleh BPKP dan/atau                best estimate which will be reviewed by BPKP and/or
    BPK.                                                          BPK.
Page 99
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/89 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH (lanjutan)                       16. RECEIVABLES FROM GOVERNMENT (continued)

    Piutang kompensasi (lanjutan)                               Compensation receivables (continued)

    Berdasarkan     surat   BPKP    No.   PE.12.03/S-           Based on letter from BPKP No. PE.12.03/S-
    133/D4/04/2024     tanggal 13     Februari 2024,            133/D4/04/2024 dated February 13, 2024, the
    disampaikan penggantian biaya pokok penyediaan              reimbursement of cost of sales in the form of
    dalam bentuk kompensasi dari Pemerintah atas                compensation from the Government for potential loss of
    kehilangan potensi pendapatan tenaga listrik untuk          electricity income for the 2023 non-subsidised tariff
    golongan tarif non-subsidi tahun 2023 sebesar               group is amounting to Rp74,170,900 (2022:
    Rp74.170.900 (2022: Rp64.325.806). Namun,                   Rp64,325,806). However, based on the Government
    berdasarkan Kebijakan Pemerintah atas Kekurangan            Policy regarding PT PLN (Persero)'s Revenue Shortfall
    Penerimaan PT PLN (Persero) akibat Penetapan Tarif          due to the 2023 Electricity Tariff Determination issued by
    Tenaga Listrik Tahun 2023 yang diterbitkan oleh             the Ministry of Finance on June 13, 2024, the value of
    Kementerian Keuangan tanggal 13 Juni 2024, nilai            the compensation fund in 2023 is Rp74,014,279. During
    dana kompensasi pada tahun 2023 sebesar                     2023, the Group has received compensation payments
    Rp74.014.279. Selama tahun 2023, Grup telah                 for 2023 amounting to Rp56,179,082 and during the
    menerima pembayaran kompensasi tahun 2023                   period ending 31 December 2023, the Group has
    sebesar Rp56.179.082 dan selama periode yang                received a shortfall in compensation payments for 2022
    berakhir pada tanggal 31 Desember 2023, Grup telah          amounting to Rp16,770,789 with details received in cash
    menerima kekurangan pembayaran kompensasi                   amounting to Rp16,094,804 and set-off with excess
    tahun 2022 sebesar Rp16.770.789 dengan rinciannya           compensation received in 2022 from the Government
    diterima    kas    sebesar    Rp16.094.804    dan           amounting to Rp675,985 the balance compensation
    disalinghapuskan dengan kelebihan penerimaan                receivables at 2023 Rp17,835,197.
    kompensasi tahun 2022 dari Pemerintah sebesar
    Rp675.985 sehingga saldo piutang kompensasi tahun
    2023 Rp17.835.197.

    Berdasarkan Berita Acara Hasil Pemeriksaan                  Based on Minutes of Audit and calculation of electricity
    perhitungan dana kompensasi listrik tahun 2023 yang         compensation for fiscal year 2023 issued by BPK on
    diterbitkan oleh BPK tanggal 27 Mei 2024, nilai dana        May 27, 2024, the amount of the compensation in 2023
    kompensasi pada tahun 2023 sebesar Rp74.171.946             amounted to Rp74,171,946 so there was an excess
    sehingga terdapat kelebihan penerimaan kompensasi           of 2023 compensation received amounted to
    listrik tahun 2023 sebesar Rp176.409. Selama periode        Rp176,409. During nine months period ending at 30
    sembilan bulan yang berakhir pada tanggal 30                September 2024, Group has received payment of
    September 2024, Grup telah menerima pembayaran              compensation 2023 and 2024 amounting to
    kompensasi tahun 2023 dan 2024 sebesar                      Rp41,305,752 include set off with an excess of 2023
    Rp41.305.752 termasuk set off dengan kelebihan              compensation received amounting to Rp176,409.
    penerimaan kompensasi tahun 2023 senilai                    Balance of compensation receivables at 30 September
    Rp176.409. Sehingga saldo piutang kompensasi pada           2024 amounted to Rp49,153,692.
    tanggal 30 September 2024 sebesar Rp49.153.692.

    Lihat Catatan 37 untuk informasi rincian piutang            Refer to Note 37 for information on the details of
    subsidi listrik.                                            receivables for electricity subsidy.

    Lihat Catatan 51 untuk informasi rincian transaksi dan      Refer to Note 51 for information on the details of
    saldo dengan pihak berelasi.                                transactions and balances with related parties.
Page 100
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/90 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

17. PIUTANG LAIN-LAIN                                        17. OTHER RECEIVABLES


                                                 30 September/        31 Desember/
                                                 September 30,        December 31,
                                                      2024                2023

         Karyawan                                      1,108,593            1,437,586               Employees
         Pekerjaan Untuk Pihak Ketiga                  2,559,337            2,041,178
         Lain-lain                                     1,007,508              711,689                   Others
         Jumlah                                        4,675,438            4,190,453                     Total
         Dikurangi bagian jangka pendek                3,333,852            2,306,621     Less current portion
         Bagian jangka panjang                         1,341,586            1,883,832       Long-term portion



    Piutang karyawan merupakan pinjaman kepemilikan                 Receivables from employees represent housing loans,
    rumah yang pelunasannya dilakukan melalui                       which are paid monthly through salary deduction.
    pemotongan gaji.

    Piutang pekerjaan pihak ketiga sebagian besar terdiri           Work for third party receivables mostly consist of
    dari piutang atas penjualan LNG kepada Jawa Satu                receivables from LNG sales to Jawa Satu Power.
    Power.
    Piutang untuk lain-lain sebagian besar terdiri dari             Other receivables mostly consist of non-electricity
    piutang non-listrik yang akan dilunasi dengan                   receivables which will be repaid by cash payments and
    pembayaran tunai dan piutang dari vendor yang akan              receivables from vendor which will be settled through
    dilunasi dengan pemotongan tagihan vendor.                      cash payments or deduction of vendor invoices.
Page 101
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/91 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

18. PERSEDIAAN                                                     18. INVENTORIES
                                                 30 September/      31 Desember/
                                                 September 30,      December 31,
                                                      2024              2023

          Batu bara, bahan bakar, dan pelumas        12,997,535        12,872,697                        Coal fuel and lubricants
          Biomassa                                       55,656            26,468                                       Biomassa
          Persediaan umum                             3,638,163         3,249,223                               General supplies
          Switchgear dan jaringan                     2,670,570         1,228,772                     Switchgear and networking
                                                                                                      Meter recording device and
          Alat ukur, pembatas dan kontrol             1,505,763           789,539                         control equipment
          Transformator                                 412,811           130,681                                   Transformers
          Kabel                                         292,841           113,497                                            Wire
          Jumlah                                     21,573,339        18,410,877                                            Total
          Cadangan kerugian penurunan nilai                                                       Allowance for decline in value of
            dan persediaan usang                       (582,986)         (548,565)    inventories and inventory obsolescence
          Jumlah bersih                              20,990,353        17,862,312                                       Total, net

    Pergerakan      perubahan     cadangan     kerugian                The movement of changes in allowance for decline in
    penurunan nilai dan persediaan usang adalah sebagai                value of inventories and inventory obsolescence is as
    berikut:                                                           follows:

                                                30 September/       31 Desember/
                                                September 30,       December 31,
                                                     2024               2023

                    Saldo awal tahun                  (548,565)           (379,628) Balance at beginning of year
                    Penambahan                         (34,421)           (168,937)                    Addition
                    Saldo akhir tahun                 (582,986)           (548,565)        Balance at end of year

    Grup tidak mengasuransikan persediaan untuk                        The Group does not have any insurance to cover the
    menutup risiko atas kemungkinan kerugian yang                      possible losses on inventories except for coal stock in
    timbul pada persediaan kecuali persediaan batu bara                Unit Tanjung Jati B which were insured with PT Asuransi
    di Unit Tanjung Jati B yang diasuransikan kepada PT                Mitsui Sumitomo Indonesia against fire and other
    Asuransi Mitsui Sumitomo Indonesia terhadap risiko                 possible risks      with insurance coverage of
    kebakaran dan risiko lainnya dengan jumlah                         JPY3.000.000.000 (full amount) or equivalent to
    pertanggungan sebesar JPY3.000.000.000 (nilai                      Rp319.035 (2023: USD31,000,000 (full amount) or
    penuh) atau setara dengan Rp319.035 (2023:                         equivalent to Rp478,609 and JPY3,000,000,000 (full
    USD31.000.000 (nilai penuh) atau setara dengan                     amount) or equivalent to Rp328,650). The Group’s
    Rp478.609 dan JPY3.000.000.000 (nilai penuh) atau                  management believes that the inventories were
    setara dengan Rp328.650). Manajemen Grup                           adequately insured as at September30, 2024 and
    berpendapat bahwa persediaan tersebut telah                        December 31, 2023.
    diasuransikan secara memadai pada tanggal 30
    September 2024 dan 31 Desember 2023.

    Jumlah persediaan yang diakui sebagai beban untuk                  The total amount of inventories recognised as expenses
    periode sembilan bulan yang berakhir pada tanggal 30               for the nine months periods ended September 30,
    September 2024 dan 2023 adalah masing-masing                       2024 and 2023 amounted to Rp91,124,853 and
    sebesar Rp91,124,853 dan Rp79.128.965.                             Rp79,128,965 respectively.


    Manajemen berpendapat bahwa penyisihan yang                        Management believes that the allowance is adequate to
    ditetapkan memadai untuk menutup risiko penurunan                  cover possible losses on the decline in the value of
    nilai persediaan dan persediaan usang.                             inventories and inventory obsolescence.
Page 102
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/92 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

19. PAJAK DIBAYAR DI MUKA                                             19. PREPAID TAXES

    Pada tahun 2023, Grup telah melakukan                                In 2023, the Group has written off the 2019 corporate
    penghapusan atas kelebihan bayar PPh Badan tahun                     income tax overpayment amounting Rp210,830. Then,
    2019 sebesar Rp210.830. Kemudian, Grup juga telah                    the Group has also received refund for the overpayment
    mendapatkan pembayaran atas kelebihan bayar PPh                      of corporate income tax for 2021 amounting to
    Badan untuk tahun 2021 sebesar Rp325.592.                            Rp325,592.

    Pada tahun 2024, Grup telah melakukan                                In 2024, the Group has written off the 2021 corporate
    penghapusan atas kelebihan bayar PPh Badan tahun                     income tax overpayment amounting Rp4,753. Then, the
    2021 sebesar Rp4.753. Kemudian, Grup juga telah                      Group has also received refund for the overpayment of
    mendapatkan pembayaran atas kelebihan bayar PPh                      corporate income tax for 2022 amounting to Rp241,619.
    Badan untuk tahun 2022 sebesar Rp241.619.

    Lihat Catatan 47 untuk informasi mengenai beban                      Refer to Note 47 for income tax expense information and
    pajak penghasilan dan surat ketetapan pajak.                         tax assessment letters.


                                                 30 September/          31 Desember/
                                                 September 30,          December 31,
                                                      2024                  2023

                 Pajak pertambahan nilai (PPN)          2,629,575             2,247,953                 Value-Added Tax ("VAT")
                 Pajak penghasilan badan                                                        Overpayment of Corporate Income
                    lebih bayar                                                                                   Tax ("CIT")
                    2024                                 1,627,835                 -                                    2024
                    2023                                  439,061              820,124                                  2023
                    2022                                  126,386              368,005                                  2022
                    2021                                         -               4,753                                  2021
                 Bea materai                               43,873               86,193                               Stamp duty
                 PPh Pasal 25                             191,263                  -                                   Article 25
                 Pembayaran dimuka atas                                                    Prepayments of Tax Assessment Letters
                    Surat Ketetapan Pajak                                                         for Underpayment (Note 47)
                    Kurang Bayar (Catatan 47)          19,652,571            17,540,760

                 Jumlah                                24,710,565            21,067,788                                      Total
                 Provisi atas ketidakpastian                                                             Allowance for uncertainty
                    dalam perlakuan pajak               (6,093,564)          (4,908,174)                     over tax treatment

                 Jumlah, bersih                        18,617,001            16,159,614                                 Total, net

                 Dikurangi, bagian lancar               5,553,197             3,783,609                      Less: current portion

                 Bagian tidak lancar                   13,063,804            12,376,005                       Non-current portion



20. BIAYA DIBAYAR DI MUKA DAN UANG MUKA                               20. PREPAID EXPENSES AND ADVANCES

                                                 30 September/            31 Desember/
                                                 September 30,            December 31,
                                                      2024                    2023
                    Biaya dibayar di muka                                                                Prepaid expenses
                       Premi asuransi                     272,724                  178,545                  Insurance
                       sewa                               121,451                   44,138                       Rent

                    Subjumlah                             394,174                  222,683                   Subtotal

                    Uang muka                                                                                    Advances
                       Proyek                             488,205                  318,673           Projects
                       Pembelian barang                   363,263                  223,069 Purchases of goods
                       Pembelian bahan bakar                  799                      503   Purchases of fuel
                       Lain-lain                          407,342                   39,791             Others

                    Subjumlah                           1,259,609                  582,036                   Subtotal

                    Aset kontrak                          330,395                  188,896                Contract assets

                    Jumlah                              1,984,178                  993,615                           Total

                    Dikurangi jangka pendek             1,912,663                  952,477          Less : Current portion

                    Bagian jangka panjang                  71,515                   41,138            Non Current Portion
Page 103
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/93 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA                              21. CAPITAL STOCK AND RETAINED EARNINGS

    Modal saham                                                 Capital stock

    Seluruh saham Perusahaan dimiliki oleh Pemerintah           The Company’s shares of stock are fully owned by the
    Republik Indonesia.                                         Government of the Republic of Indonesia.

    Pada tanggal 30 September 2024 dan 31 Desember              As at September 30, 2024 and December 31, 2023, the
    2023, Perusahaan mempunyai modal dasar masing-              Company has authorised capital amounted to
    masing sebesar Rp150.536.096 yang terbagi atas              Rp150,536,096, consisting of 439,000,000 shares, with
    439.000.000 saham dengan nilai nominal Rp1 per              par value of Rp1 per share.
    saham.

    Berdasarkan      surat    Menteri   BUMN        S-          Based on letter of the Minister of SOE No. S-
    106MBU/02/2022 tanggal 14 Februari 2022,                    106/MBU/02/2022 dated February 14, 2022 the decision
    pernyataan Keputusan Menteri BUMN sebagai RUPS              of the Minister of SOE as the GMS approved additional
    menyetujui penambahan penyertaan modal Negara               Government equity participation of 10,075,210 shares
    sebesar    10.075.210    saham     dengan     nilai         for a value of Rp10,075,210, thereby increasing the
    Rp10.075.210 sehingga meningkatkan modal                    subscribed and paid-up capital to Rp145,536,096.
    ditempatkan dan disetor menjadi Rp145.536.096.              Following the approval of the Government Participation,
    Atas persetujuan Penyertaan Modal Negara tersebut,          the stock subscription from the Government in the
    maka penyertaan modal Negara dalam proses                   issuance process (Note 22b) has therefore been
    penerbitan saham (Catatan 22b) direklasifikasi ke           reclassified to subscribed and paid-in capital.
    modal ditempatkan dan disetor.

    Berdasarkan Akta Notaris Muhammad Hanafi, S.H.              Based on the Notarial Deed of Notary Muhammad
    tanggal 19 September 2023 No. 37 mengesahkan                Hanafi, S.H. dated September 19, 2023 No. 37 had
    penambahan penyertaan modal negara sebesar                  authorised an increase in state capital participation of
    5.000.000 saham dengan nilai Rp5.000.000 sehingga           5,000,000 shares with a value of Rp5,000,000. Thereby
    meningkatkan modal ditempatkan dan disetor menjadi          increasing the issued and paid-up capital to
    Rp150.536.096. Atas persetujuan penyertaan modal            Rp150,536,096. Upon approval of state capital
    negara tersebut, maka saldo penyertaan modal                participation, the balance of state capital participation in
    negara dalam proses penerbitan saham (Catatan 22b)          the share issuance process (Note 22b) is reclassified to
    direklasifikasi ke modal ditempatkan dan disetor.           issued and paid-up capital.

    Saldo laba                                                  Retained earnings

    Saldo laba terdiri dari sebagai berikut:                    Retained earnings consist of the following:

    i.   Saldo laba yang ditentukan penggunaannya               i.   Appropriated retained earnings

         Berdasarkan      Undang-Undang       Perseroan              Under Indonesian Limited Company Law, the
         Terbatas, Perusahaan diharuskan untuk membuat               Company is required to establish a statutory
         penyisihan cadangan wajib hingga sekurang-                  reserve amounting to at least 20% of the
         kurangnya 20% dari jumlah modal yang                        Company’s subscribed and paid-up capital.
         ditempatkan dan disetor penuh.

         Berdasarkan        RUPS       tahun       2022              Based on RUPS for the year 2022
         No.0164.K/DIR/2023 pada tanggal 7 Juni 2023,                No.0164.K/DIR/2023 dated June 7, 2023, an
         terdapat saldo laba tahun 2022 yang ditetapkan              appropriation from the 2022 retained earnings
         sebagai cadangan umum sebesar Rp12.146.040.                 amounted to Rp12,146,040 was approved.
Page 104
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA (lanjutan)                         21. CAPITAL STOCK AND RETAINED EARNINGS
                                                                      (continued)

    Saldo laba (lanjutan)                                                Retained earnings (continued)

    ii. Saldo laba yang belum ditentukan penggunaannya                   ii.     Unappropriated retained earnings


         Pada tanggal 30 September 2024 dan 31                                   As at September 30, 2024 and December 31, 2023,
         Desember 2023, saldo laba yang belum ditentukan                         the balance of the unappropriated retained earnings
         penggunaannya      masing-masing        sebesar                         amounted to Rp129,578,678 and Rp107,538,313,
         Rp129.579.678 dan Rp107.538.313.                                        respectively.

    Dividen                                                              Dividends

    Berdasarkan hasil keputusan RUPS tahun 2023 No.                      Based on the decision of the GMS for the year 2023
    0152.K/DIR/2024 yang diadakan pada tanggal 22 Juli                   0152.K/DIR/2024 on July 22, 2024, the shareholders
    2024, pemegang saham menyutujui pembagian                            agreed to distribute cash dividends from 2023 net
    dividen tunai final untuk tahun 2023 sejumlah                        income amounting to Rp3,090,004 (dividend per share
    Rp3.090.004 (dividen per saham Rp20.527). Dividen                    Rp20,527). The cash dividends for 2023 were paid per
    tunai final tahun 2023 telah dibayarkan per                          September 30, 2024.
    30 September 2024.

    Berdasarkan hasil keputusan RUPS tahun 2022                          Based on the decision of the GMS for the year 2022
    0164.K/DIR/2023 yang diadakan pada tanggal 7 Juni                    0164.K/DIR/2023 on June 7, 2023, the shareholders
    2023, pemegang saham menyetujui pembagian                            agreed to distribute cash dividends from 2022 net
    dividen tunai final untuk tahun 2022 sejumlah                        income amounting to Rp2,188,000 (dividend per share
    Rp2.188.000 (dividen per saham Rp15.034). Dividen                    Rp15,034). The cash dividends for 2022 were paid on
    tunai final tahun 2022 telah dibayarkan pada tanggal                 July 6, 2023.
    6 Juli 2023.

    Berdasarkan hasil keputusan RUPS tahun 2021                          Based on the decision of the GMS for the year 2021 No.
    No. 0223.K/DIR2022 yang diadakan pada tanggal 27                     0223.K/DIR2022 on June 27, 2022, the shareholders
    Juni 2022, pemegang saham menyetujui pembagian                       agreed to distribute cash dividends from 2021 net
    dividen tunai final untuk tahun 2022 sejumlah                        income amounting to Rp750,000 (dividend per share
    Rp750.000 (dividen per saham Rp5.153). Dividen                       Rp5,153). The cash dividends for 2021 were paid on
    tunai final tahun 2021 telah dibayarkan pada tanggal                 July 27, 2022.
    27 Juli 2022.


22. TAMBAHAN     MODAL    DISETOR    DAN                          22. ADDITIONAL PAID-IN CAPITAL AND STOCK
    PENYERTAAN MODAL NEGARA DALAM PROSES                              SUBSCRIPTION   FROM   GOVERNMENT   IN
    PENERBITAN SAHAM                                                  ISSUANCE PROCESS

    a.   Tambahan modal disetor                                          a.      Additional paid-in capital
         Tambahan modal disetor pada tanggal 30                                  Additional paid-in capital as at September 30, 2024
         September 2024 terdiri dari selisih nilai transaksi                     consists of the difference in restructuring
         restrukturisasi entitas sepengendali dan aset                           transactions between entities under common
         yang dibukukan dan sebagai akibat keikutsertaan                         control and the assets booked as a result of the
         Perusahaan dalam pengampunan pajak, dengan                              Company’s participation in the tax amnesty
         rincian sebagai berikut:                                                program with the following details:

                                                      30 September/            31 Desember/
                                                      September 30,            December 31,
                                                           2024                    2023


           Selisih nilai transaksi restrukturisasi                                                 Difference in restructuring transactions
             entitas sepengendali                           (106,753)                (106,753)   between entities under common control
           Aset pengampunan pajak                             141,361                  141,361                         Tax amnesty assets
           Jumlah                                              34,608                  34,608                                        Total
Page 105
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

22. TAMBAHAN     MODAL        DISETOR DAN                                 22. ADDITIONAL PAID-IN CAPITAL AND STOCK
    PENYERTAAN MODAL NEGARA DALAM PROSES                                      SUBSCRIPTION   FROM      GOVERNMENT IN
    PENERBITAN SAHAM (lanjutan)                                               ISSUANCE PROCESS (continued)

    b.   Penyertaan modal              negara      dalam      proses            b.    Stock subscription            from      Government   in
         penerbitan saham                                                             issuance process

          Berdasarkan Peraturan Pemerintah Republik                                   Based on Government Regulation No. 27 year
          Indonesia No. 27 tahun 2022, tanggal 31 Agustus                             2022, dated August 31, 2022, the additions of stock
          2022, penambahan penyertaan modal negara                                    subscription from the Government in cash which is
          secara tunai yang masih dalam proses penerbitan                             still in the issuance process amounted to
          saham adalah sebesar Rp5.000.000. Pada tahun                                Rp5,000,000. In 2023, stock subscription from the
          2023, penyertaan modal negara dalam proses                                  Government in the issuance process amounting to
          penerbitan saham sebesar Rp5.000.000 telah                                  Rp5,000,000 has been reclassified to share capital
          direklasifikasi sebagai modal saham (lihat                                  (see Note 21).
          Catatan 21).

23. PENDAPATAN DITANGGUHKAN                                               23. DEFERRED REVENUE

    Akun ini merupakan penerimaan dari pelanggan berupa                         This account represents connection fees received from
    jasa penyambungan dan diakui sepanjang waktu oleh                           customers and recognised over time by the Group.
    Grup dengan rincian sebagai berikut:                                        Details of the deferred revenue are as follows:

                                                         30 September/          31 Desember/
                                                         September 30,          December 31,
                                                              2024                  2023

                   Saldo awal                                   28,686,927            21,203,504           Beginning balance
                   Penambahan                                    7,029,409             8,771,707                     Additions
                   Diakui sebagai                                                                              Recognized as
                     pendapatan tahun berjalan                 (1,261,586)            (1,288,284)    revenue during the year
                   Saldo akhir                                  34,454,750            28,686,927               Ending balance
                   Dikurangi: bagian jangka pendek               1,933,413             1,581,942      Less: current portion
                   Bagian jangka panjang                        32,521,337            27,104,985           Long-term portion



    Biaya penyambungan diamortisasi sejak tanggal                               Connection fees are amortised starting from the
    penyambungan sesuai masa estimasi konsumsi                                  connection date based on the estimated consumption
    pelanggan.                                                                  pattern of the customer.


24. PENERUSAN PINJAMAN                                                    24. TWO-STEP LOANS

    Akun ini merupakan pinjaman luar negeri Pemerintah                          This account represents overseas, collateral-free loans
    Republik Indonesia yang tidak diikat jaminan dan                            of the Government of the Republic of Indonesia which
    diteruskan kepada Perusahaan untuk membiayai                                are passed on to the Company to finance its projects.
    proyek-proyek Perusahaan. Rincian penerusan                                 The details of the two-step loans are as follows:
    pinjaman adalah sebagai berikut:
                                                                        30 September/               31 Desember/        Periode/
                                                                        September 30,               December 31,        Period *)
                                                                             2024                       2023           Tahun/Year
               International Bank for Reconstruction
                  and Development (IBRD)
                  USD
                  IBRD - 7940 IND - 1238                                         2,013,075              2,206,840       2011 - 2034
                  IBRD 8280 ID - 1256                                            1,227,686              1,352,458       2014 - 2034
                  IBRD - 8057 IND - 1244                                           428,676                466,128       2012 - 2035
                  IBRD - 7905 IND - 1235                                           206,652                226,543       2010 - 2034
                  IBRD 9278-1290                                                    14,644                  3,952       2022 - 2027
               Asian Development Bank (ADB)
                  USD
                  ADB - 1982 INO - 1170                                              722,391              937,702       2004 - 2027
                  ADB - 1983 INO - 1171                                              490,663              636,906       2004 - 2027
                  ADB 3015 INO - 1255                                                490,531              521,880       2014 - 2033
                  ADB - 2619 INO - 1236                                              444,638              476,896       2010 - 2035
                  ADB 3083 INO - 1257                                                181,167              200,598       2014 - 2033
                  ADB 8276 INO - 1258                                                 20,057               22,208       2014 - 2033

   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments
Page 106
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                         24. TWO-STEP LOANS (continued)

                                                                             30 September/         31 Desember/       Periode/
                                                                             September 30,         December 31,       Period *)
                                                                                  2024                 2023          Tahun/Year
            Kreditanstalt Fur Wiederaufbau, Jerman (KFW)
               EUR
               KFW F 26180 - 1262                                                      128,131           142,256     2019 - 2029
               KFW - 95.65.136 - 934a                                                                                1996 - 2020
            Japan Bank for International Cooperation (JBIC)
            (d/h The Export-Import Bank of Japan)
                JPY
                JICA IP 515 - 1177                                                    2,789,176         3,165,721    2004 - 2034
                JICA IP 512 - 1163                                                    2,528,172         2,884,663    2004 - 2033
                JICA IP 532 - 1214                                                    2,579,776         2,772,630    2006 - 2048
                JICA IP 538 - 1221                                                    2,033,008         2,180,497    2009 - 2047
                JICA IP 525 - 1197                                                    1,148,545         1,236,983    2005 - 2045
                JICA IP 513 - 1164                                                      771,590           880,390    2004 - 2033
                JICA IP 527 - 1211                                                      677,501           747,267    2007 - 2037
                JICA IP 539 - 1222                                                      651,483           722,533    2009 - 2037
                JICA IP 560 - 1253                                                      364,002           386,912    2013 - 2053
                JICA IP 517 - 1178                                                      328,689           354,842    2004 - 2044
                JICA IP 555 - 1231                                                       93,621            97,410    2013 - 2039
                JICA IP 561 - 1252                                                       62,174            76,248    2013 - 2053
                JBIC IP - 1243                                                               (0)               (0)   2012 - 2022
                JICA IP 526 - 1198                                                       48,419            52,147    2005 - 2045
                JICA IP 516 - 1196                                                       37,962            40,982    2004 - 2044
                JBIC - 1250                                                                  (0)               (0)   2013 - 2025
                JICA IP 572 - 1265                                                       43,019            41,172    2016 - 2055
                JICA IP 537 - 1220                                                        4,416             4,898    2009 - 2037

            Kingdom of Belgium / Kerajaan Belgia
               EUR
               Kerajaan Belgia/ Kingdom of Belgium - 1185                                19,122            19,300    2005 - 2033

            China Exim Bank
               USD
               China Exim Bank 1261                                                   2,633,306         3,172,711    2015 - 2029
               China Exim Bank 1260                                                   1,743,834         2,133,364    2015 - 2029
               China Exim Bank 1248                                                     539,545           707,214    2013 - 2027
            Agence Francaise de Developpement
               USD
               AFD CID 1024 01B - 1254                                                 191,199           250,616     2013 - 2028
               AFD CID 1019 01F - 1237                                                  10,031            30,673     2010 - 2035
               AFD CID 1039 01H - 1259                                                  50,255            65,871     2014 - 2026

            Jumlah                                                                   25,717,152        29,219,411
            Biaya transaksi belum diamortisasi                                         (31,648)          (35,983)

            Jumlah bersih                                                            25,685,504        29,183,428

            Dikurangi bagian jatuh tempo dalam satu tahun
            International Bank for Reconstruction
                and Development (IBRD)
                USD
                IBRD - 7940 IND - 1238                                                 159,319           154,551     2011 - 2034
                IBRD 8280 ID - 1256                                                    104,036           100,857     2014 - 2034
                IBRD - 8057 IND - 1244                                                  30,022            29,102     2012 - 2035
                IBRD - 7905 IND - 1235                                                  16,356            15,866     2010 - 2034
            Asian Development Bank (ADB)
               USD
               ADB - 1982 INO - 1170                                                   106,270           201,238     2004 - 2027
               ADB - 1983 INO - 1171                                                    72,181           136,685     2004 - 2027
               ADB 3015 INO - 1255                                                      44,372            44,133     2014 - 2033
               ADB - 2619 INO - 1236                                                    25,519            23,597     2010 - 2035
               ADB 3083 INO - 1257                                                      16,388            15,902     2014 - 2033
               ADB 8276 INO - 1258                                                       1,814             1,761     2014 - 2033


   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments
Page 107
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                         24. TWO-STEP LOANS (continued)

                                                                           30 September/               31 Desember/         Periode/
                                                                           September 30,               December 31,         Period *)
                                                                                2024                       2023            Tahun/Year
    Kreditanstalt Fur Wiederaufbau, Jerman (KFW)
       EUR
       KFW F 26180 - 1262                                                                  25,626               25,865      2019 - 2029
       KFW - 95.65.136 - 934a                                                                                               1996 - 2020
    Japan Bank for International Cooperation
    (d/h The Export-Import Bank of Japan)
        JPY
        JICA IP 515 - 1177                                                                293,597             301,497       2004 - 2034
        JICA IP 512 - 1163                                                                280,908             288,466       2004 - 2033
        JICA IP 532 - 1214                                                                120,207             123,441       2006 - 2048
        JICA IP 538 - 1221                                                                 90,356              92,787       2009 - 2047
        JICA IP 513 - 1164                                                                 85,732              88,039       2004 - 2033
        JICA IP 525 - 1197                                                                 56,027              57,534       2005 - 2045
        JICA IP 539 - 1222                                                                 52,119              53,521       2009 - 2037
        JICA IP 527 - 1211                                                                 50,185              51,536       2007 - 2037
        JBIC IP - 1243                                                                         (0)                 (0)      2012 - 2022
        JBIC - 1250                                                                            (0)                 (0)      2013 - 2025
        JICA IP 517 - 1178                                                                 16,856              17,309       2004 - 2044
        JICA IP 560 - 1253                                                                 12,772              13,116       2013 - 2053
        JICA IP 561 - 1252                                                                  2,182               2,585       2013 - 2053
        JICA IP 526 - 1198                                                                  2,362               2,425       2005 - 2045
        JICA IP 516 - 1196                                                                  1,947               1,999       2004 - 2044
        JICA IP 555 - 1231                                                                  1,237               1,905       2013 - 2039
        JICA IP 537 - 1220                                                                    353                 363       2009 - 2037
        JICA IP 572 - 1265                                                                      --                  --      2016 - 2055

    Kingdom of Belgium / Kerajaan Belgia
       EUR
       Kerajaan Belgia/ Kingdom of Belgium - 1185                                           1,912                1,930      2005 - 2033

    China Exim Bank
       USD
       China Exim Bank - 1261                                                             478,783             488,109       2015 - 2029
       China Exim Bank - 1260                                                             348,767             355,561       2015 - 2029
       China Exim Bank - 1248                                                             154,156             157,159       2013 - 2027
    Agence Francaise de Developpement
       USD
       AFD CID 1024 01B - 1254                                                             54,628               55,692      2013 - 2028
       AFD CID 1019 01F - 1237                                                             10,031               20,446      2010 - 2035
       AFD CID 1039 01H - 1259                                                             14,358               14,638      2014 - 2026
    Jumlah bagian jatuh tempo
      dalam satu tahun                                                                  2,731,377           2,939,616

    Bagian jangka panjang                                                              22,954,127          26,243,812

   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments

                                                      30 September/                   31 Desember/
                                                      September 30,                   December 31,
                                                          2024                            2024
            Tingkat suku bunga per tahun                                                                   Interest rate per annum
            Rupiah                                          -                                -                               Rupiah
            US$                                       2.88% - 7.71%                  2.88% - 7.6557%                           US$
            JPY                                       0,01% - 2,15%                   0,012% - 2,65%                           JPY
            EUR                                       0.35% - 2.35%                   0.35% - 2.35%                            EUR

    Perusahaan melakukan pembayaran pokok dan                                          The Company made payments of principal and
    bunga penerusan pinjaman sesuai dengan jadwal                                      interest on the two-step loans in accordance with
    pembayaran dalam perjanjian penerusan pinjaman                                     the schedule of payment within the agreements of
    yang berlaku pada tanggal laporan.                                                 the two-step loans as at the reporting date.
Page 108
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                        SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                     24. TWO-STEP LOANS (continued)

    Rincian saldo penerusan pinjaman berdasarkan mata                      Details of the two-step loans balance in currency are as
    uang adalah sebagai berikut:                                           follows:

                                  30 September/ September 30, 2024           31 Desember/ December 31 , 2023
                                 Dalam mata                                  Dalam mata
                                 uang asing/                                  uang asing/
                                   In foreign        Ekuivalen Rp/             In foreign      Ekuivalen/
                                 currencies *)      Equivalent Rp            currencies *)     Equivalent

         USD                         753,324,587          11,408,348            868,745,367              13,412,560         USD
         JPY                     133,166,624,471          14,161,551        143,264,058,836              15,645,295         JPY
         EUR                           8,698,442             147,253              9,455,327                 161,556         EUR
         Jumlah                                           25,717,152                                     29,219,411        Total
                                                                            *)   In full amount
    *)     Dalam jumlah penuh



25. UTANG KEPADA PEMERINTAH DAN LEMBAGA                               25. GOVERNMENT AND NON-BANK GOVERNMENT
    KEUANGAN PEMERINTAH NON-BANK                                          FINANCIAL INSTITUTION LOANS


                                                   30 September/              31 Desember/
                                                   September 30,              December 31,
                                                       2024                       2023
    PT Sarana Multi Infrastruktur                          1,484,722                    2,222,907           PT Sarana Multi Infrastruktur
    Pengembalian kompensasi (Catatan 16)                             --                           --   Excess of compensation (Note 16)

    Jumlah                                                1,484,722                   2,222,907                                     Total
    Dikurangi bagian jatuh tempo dalam
      satu tahun                                             375,000                      750,000               Less current maturities
    Bagian jangka panjang                                  1,109,722                    1,472,907                   Long-term portion


   Tingkat suku bunga per tahun                                                                               Interest rate per annum
      Rupiah                                              5.25%             5.25%___                                         Rupiah


    PT Sarana Multi Infrastruktur                                          PT Sarana Multi Infrastruktur

                                                   30 September/             31 Desember/
                                                   September 30,             December 31,
                                                       2024                      2023
         Pokok pinjaman                                    1,500,000                   2,250,000                                Principal
         Biaya transaksi yang belum diamortisasi             (1,433)                      (2,548)           Unamortized transaction cost
         Perbedaan nilai wajar                              (13,845)                     (24,545)                   Fair value difference
         Jumlah                                            1,484,722                   2,222,907                                   Total

    Pada tanggal 13 Desember 2011, Perusahaan                              On December 13, 2011, the Company obtained a soft
    memperoleh fasilitas pinjaman lunak dari Pusat                         loan facility from the Government Investment Center
    Investasi Pemerintah Kementerian Keuangan                              under the Ministry of Finance of the Republic of
    Republik Indonesia sebesar Rp7.500.000, dengan                         Indonesia amounting to Rp7,500,000 with an annual
    tingkat bunga 5,25% per tahun berjangka waktu 15                       interest rate of 5.25% with a 15-year term.
    tahun.

    Pinjaman ini digunakan untuk membiayai pengadaan                       This loan was used to finance the procurement and
    dan penggantian trafo, instalasi perlengkapan                          replacement of transformers, the equipment installation
    transmisi dan distribusi serta investasi lainnya.                      of transmission distribution and other capital
                                                                           expenditures.
Page 109
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/99 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

25. UTANG KEPADA PEMERINTAH DAN LEMBAGA                        25. GOVERNMENT AND NON-BANK GOVERNMENT
    KEUANGAN PEMERINTAH NON-BANK (lanjutan)                        FINANCIAL INSTITUTION LOANS (continued)

    PT Sarana Multi Infrastruktur (lanjutan)                      PT Sarana Multi Infrastruktur (continued)

    Pada tanggal 23 Desember 2015, telah dilaksanakan             On December 23, 2015, Government Investment Center
    penandatanganan perjanjian pengalihan antara Pusat            and PT Sarana Multi Infrastruktur (“SMI”) signed a
    Investasi Pemerintah dan PT Sarana Multi                      novation agreement which transfers all current and
    Infrastruktur (“SMI”) yang mengalihkan seluruh hak            future rights and obligations of Government Investment
    dan kewajiban Pusat Investasi Pemerintah kepada               Center to SMI, including interest and responsibilities in
    SMI pada saat ini maupun pada masa yang akan                  the Company’s investment agreement.
    datang yang meliputi kepentingan dan tanggung
    jawab dalam perjanjian investasi Perusahaan.

    Sehubungan dengan fasilitas pinjaman tersebut                 In relation to this loan facility, the Company has complied
    Perusahaan telah memenuhi batasan-batasan yang                with the covenants in this agreement.
    diwajibkan dalam perjanjian tersebut.

    Saldo pinjaman yang terutang dari utang kepada                The outstanding balance of this non-bank Government
    Lembaga Keuangan Pemerintah non-bank ini                      Financial Institution Loans is repayable according to the
    dibayarkan dengan jadwal pembayaran sebagai                   following schedule:
    berikut:

                                          30 September/           31 Desember/
                                          September 30,           December 31,
                                              2024                    2023
        Dibayarkan:                                                                                         Payable to:
          Dalam satu tahun                          375,000                 750,000                 Within one year
          Pada tahun kedua                          750,000                 750,000              In the second year
          Pada tahun ketiga                         375,000                 750,000                 In the third year
        Jumlah                                     1,500,000              2,250,000                              Total

    Perusahaan melakukan pembayaran pokok dan                     The Company made payments of principal and interest
    bunga utang kepada Pemerintah sesuai dengan                   on Government loans in accordance with the schedule
    jadwal pembayaran dan memenuhi pembatasan -                   of payments and complied with the restrictions specified
    pembatasan dalam perjanjian utang kepada                      within the agreements of Government loans as at the
    Pemerintah yang berlaku pada tanggal laporan.                 reporting date.

    Pengembalian kompensasi                                       Excess compensation

    Berdasarkan hasil audit BPK atas kompensasi listrik           Based on the audit result of BPK regarding electricity
    tahun 2021 sesuai LHP No. 04/S/IX-XX/01/2023                  compensation for the year 2021 as in LHP No. 04/S/IX-
    tanggal 17 Januari 2023, terdapat kelebihan                   XX/01/2023 dated January 17, 2023, there was excess
    penerimaan kompensasi listrik oleh Perusahaan                 compensation received by the Company amounting to
    sebesar       Rp675.985,       yang     kemudian              Rp675,985, subsequently set-off against compensation
    disalinghapuskan dengan piutang kompensasi                    receivables (Note 16).
    (Catatan 16).

    Lihat Catatan 51 untuk informasi rincian transaksi dan        Refer to Note 51 for information on the details of
    saldo dengan pihak berelasi.                                  transactions and balances with related parties.


26. UTANG SEWA                                                 26. LEASE LIABILITIES

    Akun ini terdiri dari utang Perusahaan kepada                 This account represents the Company’s liabilities to PT
    PT Central Java Power (“CJP”) dalam rangka                    Central Java Power (“CJP”) in relation to the Financial
    Perjanjian Sewa Pembiayaan atas pengadaan                     Lease Agreement on the acquisition of 4x660MW
    pembangkitan tenaga listrik 4x660MW Tanjung Jati B            Tanjung Jati B Units A, B, C, D, and several lease
    Unit A, B, C, D, dan beberapa kontrak sewa                    contracts in relation to the leases of the gas compressors
    sehubungan dengan sewa kompresor gas di berbagai              at the various locations.
    daerah.
Page 110
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/100 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA (lanjutan)                                                       26. LEASE LIABILITIES (continued)

    Nilai kini pembayaran minimum atas utang sewa                                       The present value of minimum lease payments for such
    tersebut pada tanggal 30 September 2024 dan 31                                      lease liabilities as at September 30, 2024 and
    Desember 2023 adalah sebagai berikut:                                               Deecember 31, 2023 is as follows:
    Berdasarkan jatuh tempo                                                             By due date


                                                                30 September/               31 Desember/
                                                                September 30,               December 31,
                                                                    2024                        2023


                  Pembayaran jatuh tempo dalam waktu :                                                             Minimum lease payments due :
                  Tidak lebih dari satu tahun                             2,199,399              3,377,616                  Not later than one year
                  Antara lebih dari satu tahun sampai                                                         Later than one year and not later than
                  tiga tahun                                              7,034,740              4,491,646                              three years
                  Antara lebih dari tiga tahun sampai                                                             Later than three year and not later
                  lima tahun                                              4,994,338              1,736,079                                five years
                  Lebih dari lima tahun                                    5,403,256              9,648,430                   Lather than five years


                  Jumlah                                                  19,631,733            19,253,771                                    Total
                  Dikurangi : bunga                                       (6,466,455)           (6,484,241)                         Less : interest

                  Nilai kini pembayaran                                                                           Present value of future minimum
                     sewa masa datang                                   13,165,278              12,769,530                          lease payments


                  Dikurangi : bagian jatuh tempo dalam                                                                     Less : current portion
                    satu tahun                                             1,580,290             2,267,698

                  Bagian jangka panjang                                   11,584,988            10,501,832                     Long term portion


    Total arus kas keluar untuk seluruh sewa pada tanggal                               The total cash outflow for all leases as at September 30,
    30 September 2024 dan 31 Desember 2023 adalah                                       2024 and December 31, 2023, was Rp2,003,893 and
    masing-masing       sebesar      Rp2.003.893     dan                                Rp8,801,603, respectively.
    Rp8.801.603.

    Berdasarkan pemberi sewa                                                            By lessor

                                                                30 September/               31 Desember/
                                                                September 30,               December 31,
                                                                    2024                        2023

                   Pihak berelasi                                                                                                   Related parties

                     Pelabuhan Indonesia (Persero)                        1,159,843              1,138,625          Pelabuhan Indonesia (Persero)
                     Dana Pensiun PLN - Rupiah                              940,784                926,919            Dana Pensiun PLN - Rupiah
                     PT Perta Daya Gas                                      886,437                990,143                     PT Perta Daya Gas
                     Lain-lain                                              186,250                                                       Others
                     Subjumlah                                            3,173,314              3,055,687                               Subtotal

                   Pihak ketiga                                                                                                     Third parties
                     PT Central Java Power                                1,258,147              1,360,500                                   CJP
                     PT Gas Benoa Terminal                                  570,629                741,444                PT Gas Benoa Terminal
                     PT Batam Trans Gasindo                                 416,826                499,191               PT Batam Trans Gasindo
                     PT Indah Bima Prima                                    375,671                401,745                   PT Indah Bima Prima
                     PT Lumoso Pratama Lines                                560,690                586,541                            PT Lumoso
                     PT Sumber Petrindo Perkasa                             315,617                356,416           PT Sumber Petrindo Perkasa
                     PT Sulawesi Regas Satu                               1,540,083              1,596,225                PT Sulawesi Regas Satu
                     PT Prima Maritim Bahari                                419,862                                       PT Prima Maritim Bahari
                     PT Berkat Samudera Gemilang Line                        51,369                 70,105    PT Baerkat Samudera Gemilang Line
                     PT State Grid Power Indonesia                        1,411,788              1,492,879         PT State Grid Power Indonesia
                     Lain-lain                                            3,071,282              2,608,797                                 Others

                     Subjumlah                                            9,991,964              9,713,843                                  Subtotal

                   Jumlah                                                13,165,278            12,769,530                                      Total

                   Dikurangi: bagian jatuh tempo dalam                    1,580,290              2,267,698                 Less : current portion
                     satu tahun

                   Bagian jangka panjang                                 11,584,988            10,501,832                      Long term portion


   Tingkat suku bunga per tahun:                                                                                                Interest rate per annum:
      Rupiah                                             4.38% - 10.22%         6.51% - 27.67%                                                  Rupiah
      USD                                                    13.19%                 13.19%                                                        USD
      JPY                                                7.64% - 11.02%         7.57% - 18.10%                                                     JPY
Page 111
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/101 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA (lanjutan)                                                             26. LEASE LIABILITIES (continued)

    Rincian utang sewa menurut mata uang adalah                                           Details of the lease liabilities by currency are as follows:
    sebagai berikut:
                               30 September 2024/ September 30, 2024                      31 Desember/ December 31, 2023
                                  Dalam mata                                               Dalam mata
                                 uang original/                                           uang original/
                                  In original          Ekuivalen Rp/                        In original    Ekuivalen Rp/
                                 currencies*)          Rp equivalent                       currencies*)    Rp equivalent

         Rupiah                        11,490,305                   11,490,305                10,909,839                 10,909,839                    Rupiah
         JPY                       11,830,849,503                    1,258,147            12,458,102,846                  1,360,500                      JPY
          USD                          27,524,169                      416,826                32,333,146                    499,191                     USD

         Jumlah                                                     13,165,278                                           12,769,530                      Total

    *)      Dalam jumlah penuh, kecuali Rupiah                                            *)     In full amount, except for Rupiah

    Beban bunga dan keuangan terkait utang sewa pada                                      Interest expense and financial charges related to lease
    tahun      yang    berakhir     pada      tanggal                                     liabilities for the years ended September 30, 2024 and
    30 September 2024 dan 30 September 2023 masing-                                       September 30, 2023, amounted to Rp4,843,261 and
    masing sebesar Rp4.843.261 dan Rp2.454.426                                            Rp2,454,426, respectively (Note 45).
    (Catatan 45).


27. UTANG BANK                                                                                 27. BANK LOANS
                                                                  30 September/            31 Desember/
                                                                  September 30             December 31
                                                                     2024                       2023

   Pinjaman terkait program percepatan                                                                                               Loans related fo fast track program

   Entitas yang berelasi dengan Pemerintah                                                                                                 Government related entities :

   Agen:      Bank Negara Indonesia ("BNI")                                                                                      Agent : Bank Negara Indonesia ("BNI")
   Sindikasi:                                                                                                                                            Syndicated :
          Entitas yang berelasi dengan Pemerintah                                                                                    Government related entities :
              Bank Negara Indonesia ("BNI")                                 109,373                    174,997                  Bank Negara Indonesia ("BNI")
              Bank Rakyat Indonesia ("BRI")                                 109,373                    174,997                  Bank Rakyat Indonesia ("BRI")
              Bank Mandiri                                                  109,373                    174,997                                  Bank Mandiri
              Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                  109,373                    174,997   Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
   Subjumlah                                                                437,493                    699,988                                                    Subtotal


   Agen:      Bank DKI                                                                                                                                    Agent : Bank DKI
   Sindikasi:                                                                                                                                                   Syndicated:
          Entitas yang berelasi dengan Pemerintah                                                                                       Government related entities :
              Bank DKI                                                      164,286                    287,500                                           Bank DKI
              Sarana Multi Infrastruktur ("SMI")                             57,143                    100,000                   Sarana Multi Infrastruktur ("SMI")
              Bank Jateng                                                    28,571                     50,000                                        Bank Jateng
              BPD Aceh                                                       14,286                     25,000                                         BPD Aceh
              Bank Kalteng                                                   14,286                     25,000                                      Bank Kalteng
              Bank Riau                                                      14,286                     25,000                                         Bank Riau
              Bank Kalbar                                                    14,286                     25,000                                        Bank Kalbar
              BPD Bali                                                       10,714                     18,750                                           BPD Bali
   Subjumlah                                                                317,857                    556,250                                                    Subtotal

   Pihak Ketiga                                                                                                                                             Third Parties
   Agen:      Industrial and Commercial Bank of China ("ICBC")                                                   Agent : Industrial and Commercial Bank of China ("ICBC")
   Sindikasi:                                                                                                                                                  Syndicated:
          Pihak ketiga                                                      431,100                    878,996                                      Third Parties


   Subjumlah                                                                431,100                    878,996                                                    Subtotal

   Jumlah Pinjaman terkait program percepatan                           1,186,451                  2,135,234                    Total loans related fo fast track program
Page 112
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/102 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                        27. BANK LOANS (continued)

                                                                 30 September/         31 Desember/
                                                                 September 30          December 31
                                                                    2024                  2023
     Pinjaman tidak terkait program                                                                                       Loans not related fo fast track program
           percepatan

     Entitas yang berelasi dengan Pemerintah                                                                                        Government related entities :

     Agen:      Bank Negara Indonesia ("BNI")                                                                                Agent : Bank Negara Indonesia ("BNI")
     Sindikasi:                                                                                                                                      Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                              Government related entities :
                Bank Negara Indonesia ("BNI")                          1,443,964             1,618,206                      Bank Negara Indonesia ("BNI")
                Bank Rakyat Indonesia ("BRI")                            525,254               588,636                      Bank Rakyat Indonesia ("BRI")
                Bank Mandiri                                           1,181,531             1,324,105                                      Bank Mandiri
            Pihak ketiga                                                       --                    --
     Subjumlah                                                         3,150,750             3,530,947                                                        Subtotal

     Agen:      Bank Rakyat Indonesia ("BRI")                                                                              Agent : Bank Rakyat Indonesia ("BRI")
     Sindikasi:                                                                                                                                      Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                            Government related entities :
                Bank Rakyat Indonesia ("BRI")                          6,718,774             6,346,285                    Bank Rakyat Indonesia ("BRI")
                Bank Negara Indonesia ("BNI")                          2,335,001             1,518,238                    Bank Negara Indonesia ("BNI")
                Bank Mandiri                                           5,584,004             4,661,095                                      Bank Mandiri
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")              89,286               142,857     Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
                Sarana Multi Infrastruktur ("SMI")                       571,429               705,357                 Sarana Multi Infrastruktur ("SMI")
                BPD Papua                                                289,286               337,500                                       BPD Papua
            Pihak ketiga                                               2,696,811             3,234,309                                         Third Parties
     Subjumlah                                                        18,284,590            16,945,641                                                        Subtotal

     Agen:      Bank Mandiri                                                                                                                 Agent : Bank Mandiri
     Sindikasi:                                                                                                                                       Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                            Government related entities :
                Bank Mandiri                                           3,517,234             3,609,199                                      Bank Mandiri
                Bank Negara Indonesia ("BNI")                          1,317,325             1,317,325                    Bank Negara Indonesia ("BNI")
                Bank Rakyat Indonesia ("BRI")                             84,890               113,187                    Bank Rakyat Indonesia ("BRI")
                Bank Tabungan Negara ("BTN")                           2,000,000             2,000,000                  Bank Tabungan Negara ("BTN")
                Sarana Multi Infrastruktur ("SMI")                       169,781               226,375                 Sarana Multi Infrastruktur ("SMI")
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")              42,445                56,594     Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
            Pihak ketiga                                               2,687,010             2,835,568                                         Third Parties
     Subjumlah                                                         9,818,686            10,158,248                                                        Subtotal

     Agen:      Bank Syariah Indonesia ("BSI")                                                                               Agent : Bank Syariah Indonesia ("BSI")
     Sindikasi:                                                                                                                                        Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                              Government related entities :
                Bank Syariah Indonesia ("BSI")                         2,311,948             2,381,567                      Bank Syariah Indonesia ("BSI")
            Pihak ketiga                                                 414,546               425,931                                           Third Parties
     Subjumlah                                                         2,726,494             2,807,498                                                        Subtotal

     Bank Tabungan Negara ("BTN")                                          964,286           1,071,429                             Bank Tabungan Negara ("BTN")


     Subjumlah                                                             964,286           1,071,429                                                        Subtotal

     Pihak Ketiga

     Agen:      Bank Central Asia ("BCA")                                                                                       Agent : Bank Central Asia ("BCA")
     Sindikasi:                                                                                                                                      Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                              Government related entities :
                Bank Mandiri                                           3,625,171             3,625,171                                      Bank Mandiri
                Bank Negara Indonesia ("BNI")                          1,450,068             1,450,068                     Bank Negara Indonesia ("BNI")
                Bank Tabungan Negara ("BTN")                           1,450,068             1,450,068                    Bank Tabungan Negara ("BTN")
            Pihak ketiga                                               4,074,692             4,074,692                                         Third Parties
     Subjumlah                                                        10,600,000            10,600,000                                                        Subtotal



     Agen:      Bank CIMB Niaga                                                                                                           Agent : Bank CIMB Niaga
     Sindikasi:                                                                                                                                         Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                              Government related entities :
                Bank Negara Indonesia ("BNI") Syariah                          --                    --             Bank Negara Indonesia ("BNI") Syariah
                Bank Syariah Indonesia ("BSI")                            96,429               112,500                     Bank Syariah Indonesia ("BSI")
                Sarana Multi Infrastruktur ("SMI")                       482,143               562,500                   Sarana Multi Infrastruktur ("SMI")
            Pihak ketiga                                               4,421,429             4,700,000                                            Third Parties
     Subjumlah                                                         5,000,000             5,375,000                                                        Subtotal

     State Bank of India ("SBI")                                           200,000               200,000                        State Bank of India ("SBI")

     Bank Bukopin                                                          300,000               300,000                                     Bank Bukopin

     Bank BCA Bank
              Syariah
                   BCA("BCA
                        Syariah
                            Syariah")
                                ("BCA Syariah")                            150,000               150,000               Bank BCA Syariah ("BCA Syariah")
Page 113
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                     Lampiran 5/103 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                          SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                               27. BANK LOANS (continued)


                                                                        30 September/          31 Desember/
                                                                        September 30           December 31
                                                                           2024                  2023

     Agen:      Bank Permata                                                                                                                          Agent : Bank Permata
     Sindikasi:                                                                                                                                                   Syndicated :
            Pihak ketiga                                                      2,481,854              2,407,585                                               Third Parties
                                                                                                                                            Government related entities :
     Agen:      Sarana Multi Infrastruktur ("SMI")                                                                                   Agent : Sarana Multi Infrastruktur ("SMI")
     Sindikasi:                                                                                                                                                   Syndicated :
            Entitas yang berelasi dengan Pemerintah
                Sarana Multi Infrastruktur ("SMI")                            1,355,066                       --                    Sarana Multi Infrastruktur ("SMI")


     Bank HSBC Indonesia                                                      1,455,936              1,759,499                                          Bank HSBC Indonesia

     Asian Development Bank ("ADB")                                          24,401,395             23,296,286                              Asian Development Bank ("ADB")

     Asian Infrastructure Investment Bank ("AIIB")                            1,466,444              1,495,010                   Asian Infrastructure Investment Bank ("AIIB")

     Agen:      Credit Agricole CIB Paris                                                                                                   Agent : Credit Agricole CIB Paris
     Sindikasi:                                                                                                                                                   Syndicated :
            Pihak ketiga                                                      2,374,237              2,264,147                                              Third Parties

     Agen:      Bank DBS Indonesia                                                                                                              Agent : Bank DBS Indonesia
     Sindikasi:                                                                                                                                               Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                    308,780                                  Government related entities :
                Bank Tabungan Negara ("BTN")                                                        30,878,000                             Bank Tabungan Negara (BTN)
            Pihak ketiga                                                     24,987,600             31,186,780                                                Third Parties

     Agen:      Export Guarantee and Insurance Corporation ("EGAP")                                                       Agent : Export Guarantee and Insurance Corporation
     Sindikasi:                                                                                                                                                 Syndicated :
            Pihak ketiga                                                          139,558               153,220                                             Third Parties

     Agen:      Servizi Assicurativi del Commercio Estero ("SACE")                                                 Agent : Servizi Assicurativi del Commercio Estero ("SACE")
     Sindikasi:                                                                                                                                                  Syndicated :
            Pihak ketiga                                                          335,555               364,731                                              Third Parties

     Agen:      Korea Exim Bank ("KEXIM")                                                                                                 Agent : Korea Exim Bank ("KEXIM")
     Sindikasi:                                                                                                                                                 Syndicated :
            Pihak ketiga                                                          582,413               639,432                                             Third Parties

     International Bank for Reconstruction and Development ("IBRD")           6,267,849              6,792,886
                                                                                                             International Bank for Reconstruction and Development ("IBRD")

     Islamic Development Bank ("IDB")                                         3,476,870              3,242,430                              Islamic Development Bank ("IDB")

     Agen:      Japan Bank for International Cooperation ("JBIC")                                                    Agent : Japan Bank for International Cooperation ("JBIC")
     Sindikasi:                                                                                                                                                 Syndicated :
            Pihak ketiga                                                      6,723,562              7,856,253                                    8,342,650 Third Parties

     Agen:      MUFG Bank, Ltd.                                                                                                                      Agent : MUFG Bank, Ltd.
     Sindikasi:                                                                                                                                                  Syndicated :
            Pihak ketiga                                                      1,052,812              2,883,038                                               Third Parties

     Agen:      Export Development Canada ("EDC")                                                                                Agent : Export Development Canada ("EDC")
     Sindikasi:                                                                                                                                               Syndicated :
            Pihak ketiga                                                      2,555,550              3,184,294                                            Third Parties

     Agen:      Sumitomo Mitsui Banking Corporation ("SMBC")                                                          Agent : Sumitomo Mitsui Banking Corporation ("SMBC")
     Sindikasi:                                                                                                                                               Syndicated :
            Pihak ketiga                                                          759,691               893,642                                           Third Parties

     Agence Francaise De Development ("AFD")                                      917,832            1,003,546                    Agence Francaise De Development ("AFD")

     Bank Gospodarstwa Krajowego ("BGK")                                          660,913               778,005                       Bank Gospodarstwa Krajowego ("BGK")
Page 114
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/104 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                            27. BANK LOANS (continued)


                                                                     30 September/          31 Desember/
                                                                     September 30           December 31
                                                                        2024                  2023


     Agen:      BNP Paribas SA                                                                                                                  Agent : BNP Paribas SA
     Sindikasi:                                                                                                                                           Syndicated :
            Pihak ketiga                                                   1,013,484              1,091,114

     Agen:      Standard Chartered Bank ("SCB")                                                                                Agent : Standard Chartered Bank (“SCB”)
     Sindikasi:                                                                                                                                           Syndicated :
            Pihak ketiga                                                       658,494               886,165                                          Third Parties

     Kreditanstalt fur Wiederaufbau ("KfW")                                3,246,292              3,403,540                       Kreditanstalt fur Wiederaufbau ("KfW")

     Mizuho Bank                                                               565,880               698,070                                                Mizuho Bank
                                                                                                                                                            Mizuho Bank
     Subjumlah                                                            88,129,285             96,929,673                                                     Subtotal


     Jumlah Pinjaman yang tidak terkait program percepatan               138,674,090            147,418,436               Total loans not related fo fast track program

     Jumlah                                                              139,860,541            149,553,670                                                       Total
     Biaya transaksi belum diamortisasi                                    (549,590)              (731,482)                                Unamortised transaction cost

     Jumlah bersih                                                       139,310,951            148,822,188                                                   Total, Net

     Dikurangi bagian jatuh tempo dalam satu tahun                                                                                            Less : current maturities

     Pinjaman terkait program percepatan                                                                                           Loans related fo fast track program

     Entitas yang berelasi dengan Pemerintah                                                                                             Government related entities :

     Agen:      Bank Negara Indonesia ("BNI")                                                                                  Agent : Bank Negara Indonesia ("BNI")
     Sindikasi:                                                                                                                                        Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                Government related entities :
                Bank Negara Indonesia ("BNI")                                   87,499                87,499                  Bank Negara Indonesia ("BNI")
                Bank Rakyat Indonesia ("BRI")                                   87,499                87,499                  Bank Rakyat Indonesia ("BRI")
                Bank Mandiri                                                    87,499                87,499                                  Bank Mandiri
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                    87,499                87,499   Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
     Subjumlah                                                                 349,995               349,996                                                    Subtotal

     Agen:      Bank DKI                                                                                                                                Agent : Bank DKI
     Sindikasi:                                                                                                                                              Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                   Government related entities :
                Bank DKI                                                       164,286               164,286                                           Bank DKI
                Sarana Multi Infrastruktur ("SMI")                              57,143                57,143                   Sarana Multi Infrastruktur ("SMI")
                Bank Jateng                                                     28,571                28,571                                        Bank Jateng
                BPD Aceh                                                        14,286                14,286                                         BPD Aceh
                Bank Kalteng                                                    14,286                14,286                                      Bank Kalteng
                Bank Riau                                                       14,286                14,286                                         Bank Riau
                Bank Kalbar                                                     14,286                14,286                                        Bank Kalbar
                BPD Bali                                                        10,714                10,714                                           BPD Bali
     Subjumlah                                                                 317,857               317,857                                                    Subtotal

     Pihak Ketiga                                                                                                                                         Third Parties

     Agen:      Industrial and Commercial Bank of China ("ICBC")                                               Agent : Industrial and Commercial Bank of China ("ICBC")
     Sindikasi:                                                                                                                                             Syndicated :
            Pihak ketiga                                                       431,100               878,996                                          Third Parties

     Subjumlah                                                                 431,100               878,996                                                    Subtotal

     Jumlah Pinjaman terkait program percepatan                            1,098,952              1,546,849                   Total loans related fo fast track program
Page 115
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/105 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)


27. UTANG BANK (lanjutan)                                                          27. BANK LOANS (continued)


     Pinjaman tidak terkait program                                                                                             Loans not related fo fast track program
           percepatan

     Entitas yang berelasi dengan Pemerintah                                                                                               Government related entities :

     Agen:      Bank Negara Indonesia ("BNI")                                                                                      Agent : Bank Negara Indonesia ("BNI")
     Sindikasi:                                                                                                                                             Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                    Government related entities :
                Bank Negara Indonesia ("BNI")                                    269,701            242,811                       Bank Negara Indonesia ("BNI")
                Bank Rakyat Indonesia ("BRI")                                     98,106             88,325                       Bank Rakyat Indonesia ("BRI")
                Bank Mandiri                                                     220,684            198,682                                       Bank Mandiri
            Pihak ketiga                                                               --                 --                                          Third Parties
     Subjumlah                                                                   588,491            529,818                                                      Subtotal

     Agen:      Bank Rakyat Indonesia ("BRI")                                                                                    Agent : Bank Rakyat Indonesia ("BRI")
     Sindikasi:                                                                                                                                            Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                Bank Rakyat Indonesia ("BRI")                                   3,315,641          1,787,971                    Bank Rakyat Indonesia ("BRI")
                Bank Negara Indonesia ("BNI")                                   1,759,694            435,963                    Bank Negara Indonesia ("BNI")
                Bank Mandiri                                                    2,837,754          1,068,590                                      Bank Mandiri
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                       71,429             71,429     Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
                Sarana Multi Infrastruktur ("SMI")                                149,868            176,653                 Sarana Multi Infrastruktur ("SMI")
                BPD Papua                                                          47,063             63,135                                       BPD Papua
            Pihak ketiga                                                          551,205            578,163                                         Third Parties
     Subjumlah                                                                  8,732,654          4,181,904                                                     Subtotal

     Agen:      Bank Mandiri                                                                                                                       Agent : Bank Mandiri
     Sindikasi:                                                                                                                                             Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
                Bank Mandiri                                                     122,620            122,620                                       Bank Mandiri
                Bank Rakyat Indonesia ("BRI")                                     37,729             37,729                     Bank Rakyat Indonesia ("BRI")
                Sarana Multi Infrastruktur ("SMI")                                75,458             75,458                  Sarana Multi Infrastruktur ("SMI")
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                      18,865             18,865      Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
            Pihak ketiga                                                         198,078            198,078                                          Third Parties
     Subjumlah                                                                   452,749            452,750                                                      Subtotal

     Agen:      Bank Syariah Indonesia ("BSI")                                                                                     Agent : Bank Syariah Indonesia ("BSI")
     Sindikasi:                                                                                                                                              Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                    Government related entities :
                Bank Syariah Indonesia ("BSI")                                   230,261            155,759                       Bank Syariah Indonesia ("BSI")
            Pihak ketiga                                                          37,655             25,472                                            Third Parties
     Subjumlah                                                                   267,916            181,231                                                      Subtotal


     Bank Tabungan Negara ("BTN")                                                214,286            214,286                               Bank Tabungan Negara ("BTN")

     Subjumlah                                                                   214,286            214,286                                                      Subtotal

     Pihak Ketiga                                                                                                                                          Third Parties


     Agen:      Bank CIMB Niaga                                                                                                                  Agent : Bank CIMB Niaga
     Sindikasi:                                                                                                                                               Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                    Government related entities :
                Bank Syariah Indonesia ("BSI")                                     21,429            21,429                      Bank Syariah Indonesia ("BSI")
                Sarana Multi Infrastruktur ("SMI")                                107,143           107,143                     Sarana Multi Infrastruktur ("SMI")
            Pihak ketiga                                                        1,871,429           371,428                                              Third Parties
     Subjumlah                                                                  2,000,000           500,000                                                      Subtotal


     Bank HSBC Indonesia                                                         269,944            275,202                                         Bank HSBC Indonesia


     Asian Development Bank ("ADB")                                             1,226,756           613,097                             Asian Development Bank ("ADB")

     Agen:      Credit Agricole CIB Paris                                                                                               Agent : Credit Agricole CIB Paris
     Sindikasi:                                                                                                                                              Syndicated :
            Pihak ketiga                                                         284,141            276,790                                             Third Parties

     Agen:      Bank DBS Indonesia                                                                                                           Agent : Bank DBS Indonesia
     Sindikasi:                                                                                                                                             Syndicated :
            Pihak ketiga                                                        5,300,400          7,256,330                                           Third Parties

     Agen:      Export Guarantee and Insurance Corporation ("EGAP")                                                   Agent : Export Guarantee and Insurance Corporation
     Sindikasi:                                                                                                                                              Syndicated :
            Pihak ketiga                                                          21,470             21,889                                             Third Parties

     Agen:      Servizi Assicurativi del Commercio Estero ("SACE")                                             Agent : Servizi Assicurativi del Commercio Estero ("SACE")
     Sindikasi:                                                                                                                                               Syndicated :
            Pihak ketiga                                                          51,624             52,104                                              Third Parties
Page 116
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                     Lampiran 5/106 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                         SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                             27. BANK LOANS (continued)


                                                                           30 September/         31 Desember/
                                                                           September 30          December 31
                                                                              2024                 2023


    Agen:      Korea Exim Bank ("KEXIM")                                                                                                    Agent : Korea Exim Bank ("KEXIM")
    Sindikasi:                                                                                                                                                     Syndicated :
           Pihak ketiga                                                               89,602               91,347                                             Third Parties

    International Bank for Reconstruction and Development ("IBRD")                   331,640              370,521
                                                                                                                International Bank for Reconstruction and Development ("IBRD")

    Islamic Development Bank ("IDB")                                                 224,283                    --

    Agen:      Japan Bank for International Cooperation ("JBIC")                                                       Agent : Japan Bank for International Cooperation ("JBIC")
    Sindikasi:                                                                                                                                                      Syndicated :
           Pihak ketiga                                                              985,689           1,313,550                                               Third Parties

    Agen:      MUFG Bank, Ltd.                                                                                                                        Agent : MUFG Bank, Ltd.
    Sindikasi:                                                                                                                                                     Syndicated :
           Pihak ketiga                                                          1,052,812             1,441,519                                              Third Parties

    Agen:      Export Development Canada ("EDC")                                                                                   Agent : Export Development Canada ("EDC")
    Sindikasi:                                                                                                                                                   Syndicated :
           Pihak ketiga                                                              567,900              578,962                                           Third Parties

    Agen:      Sumitomo Mitsui Banking Corporation ("SMBC")                                                             Agent : Sumitomo Mitsui Banking Corporation ("SMBC")
    Sindikasi:                                                                                                                                                   Syndicated :
           Pihak ketiga                                                              116,876              119,152                                           Third Parties
           Entitas yang berelasi dengan Pemerintah
               Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                                --                   --

    Agence Francaise De Development ("AFD")                                           77,732               78,670                   Agence Francaise De Development ("AFD")

    Bank Gospodarstwa Krajowego ("BGK")                                              114,010              115,071                       Bank Gospodarstwa Krajowego ("BGK")

    Agen:      BNP Paribas SA                                                                                                                          Agent : BNP Paribas SA
    Sindikasi:                                                                                                                                                     Syndicated :
           Pihak ketiga                                                              135,131              136,389                                             Third Parties

    Agen:      Standard Chartered Bank ("SCB")                                                                                        Agent : Standard Chartered Bank ("SCB")
    Sindikasi:                                                                                                                                                    Syndicated :
           Pihak ketiga                                                              219,498              221,541                                            Third Parties

    Kreditanstalt fur Wiederaufbau ("KfW")                                           255,656              251,123                        Kreditanstalt fur Wiederaufbau ("KfW")

    Mizuho Bank                                                                      125,751              126,922                                                  Mizuho Bank


    Jumlah Pinjaman yang tidak terkait program percepatan                       23,707,010            19,400,168                      Loans not related fo fast track program

    Dikurangi : bagian jatuh tempo dalam satu tahun                             24,805,962            20,947,017                                         Less: current portion

    Bagian jangka panjang                                                      114,504,989           127,875,171                                            Long-term portion
Page 117
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/107 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                            27. BANK LOANS (continued)


                                                     30 September/               31 Desember/
                                                     September 30,               December 31,
                                                         2024                        2023


             Tingkat suku bunga per tahun                                                                  Interest rate per annum
             Rupiah                                  5.00% - 9.10%               4.48% - 8.74%             Rupiah
             US$                                     2.56% - 8.06%               2.56% - 8.03%             US$
             JPY                                     0.62% - 1.74%               0.60% - 1.74%             JPY
             EUR                                     0.40% - 5.40%               0.39% - 6.66%             EUR


    Pada tanggal 30 September 2024 dan 31 Desember                        As at September 30, 2024 and December 31, 2023, the
    2023, rincian utang bank berdasarkan mata uang                        details of bank loans by currency are as follows:
    adalah sebagai berikut:

                       30 September/September 30, 2024                 31 Desember/ December 31, 2023
                      Dalam mata                                     Dalam mata
                      uang asing/                                    uang asing/
                       In foreign                Ekuivalen Rp/        In foreign                      Ekuivalen/
                      currencies *)              Equivalent Rp       currencies *)                   Equivalent




   Rupiah                    55,787,076                55,787,076              54,802,587                  54,802,587       Rupiah
   USD                    3,782,925,045                57,288,617        4,112,700,597                     63,495,984         USD
   EUR                      796,282,066                13,480,020          873,294,663                     14,921,375         EUR
   JPY                  125,110,519,627                13,304,828      149,568,004,937                     16,333,724          JPY
   Jumlah                                             139,860,541                                         149,553,670         Total

    *)      Dalam jumlah penuh, kecuali Rupiah                            *)       In full amount, except for Rupiah
Page 118
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/108 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                          27. BANK LOANS (continued)

    Pinjaman terkait program percepatan                                                   Loans related to fast track program

    Perusahaan memperoleh fasilitas pinjaman dari                                         The Company obtained loan facilities from several
    beberapa bank untuk membiayai 85% dari nilai                                          banks to finance 85% of the value of EPC contracts for
    kontrak EPC untuk program percepatan. Pinjaman ini                                    its fast track program. These loans are fully guaranteed
    sepenuhnya dijamin oleh Pemerintah Republik                                           by the Government of the Republic of Indonesia in
    Indonesia sesuai dengan Perpres No. 91 Tahun 2007,                                    accordance with Perpres No. 91 Year 2007, which
    pengganti dari Perpres No. 86 Tahun 2006, tentang                                     superseded Perpres No. 86 Year 2006, regarding the
    Pemberian Jaminan Pemerintah untuk Percepatan                                         Grant of Government Guarantee for Construction of a
    Pembangunan Pembangkit Tenaga Listrik yang                                            Coal-Fired Power Plant. In connection with these loans,
    Menggunakan Batu bara. Sehubungan dengan                                              the Company is restricted by general rules as described
    pinjaman ini, Perusahaan dibatasi oleh ketentuan-                                     in the loan agreements.
    ketentuan umum sebagaimana ditetapkan dalam
    perjanjian pinjaman.

    Pada tanggal 30 September 2024 dan 31 Desember                                        As at September 30, 2024 and December 31, 2023, the
    2023, rincian fasilitas pinjaman tersebut adalah                                      details of such loan facilities are as follows:
    sebagai berikut:
                                                                 Fasilitas
                                                                maksimum/             Jumlah pinjaman/            Pembayaran kembali/
                  Kreditur dan jenis pinjaman/   Mata uang/     Maximum             Outstanding balance*)             Repayment*)                 Periode pinjaman/
    No.            Creditor and type of loan      Currency       facility*)    30 September/ 31 Desember/    30 September/ 31 Desember/
                                                                               September 30, December31,     September30, December31,
                                                                                   2024            2023          2024           2023                  Loan term


      1 China Development Bank/                  Dolar AS/               569             28             57             28             57     14 Oktober/October 2009 -
        PLTU Adipala, Cilacap                    US Dollar                                                                                  2 November/November 2024

      2 Pinjaman sindikasi dikoordinasi/
        Syndicated loan coordinated by
            Bank DKI/                             Rupiah           2,225,000         317,857       556,250         283,393       317,857   12 November/November 2015 -
        PLTU Riau Tenayan                                                                                                                       12 November 2025

      3 Pinjaman sindikasi dikoordinasi/
        Syndicated loan coordinated by
            BNI/                                                                                                                           17 Desember/December 2015 -
        PLTU Kalimantan Timur/East Kalimantan     Rupiah           2,449,963         437,493       699,989         262,496       349,995    16 Desember/December 2025

    *) Dalam jutaan mata uang original                                                                                                     *) In million original currency




                                                              30 September/                       31 Desember/
                                                              September 30                        December 31,
                                                                  2024                                2024
               Tingkat suku bunga per tahun                                                                                      Interest rate per annum
               Rupiah                                         8.13% - 8.68%                       7.58% - 8.45%                                    Rupiah
               USD                                             7.32%-7.74%                        5.92% - 8.02%                                      US$
Page 119
                                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                          Lampiran 5/109 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                        SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                 (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                           27. BANK LOANS (continued)
     Pinjaman tidak terkait program percepatan                                                               Loans not related to fast track program

                                                                                                              Jumlah pinjaman/
                                                                             Fasilitas                                                                    Pembayaran kembali/
                                                                                                             Pembayaran kembali/
                                                                                                            Outstanding balance*)
                                                                            maksimum/                                                                         Repayment*)
                                                                                                                 Repayment
                         Kreditur dan jenis pinjaman/        Mata uang/     Maximum                  30 September/            31 Desember/         30 September/               31 Des/              Periode pinjaman/
     No.                  Creditor and type of loan          Currency       facility*)             September 30, 2024       December 31, 2023    September 30, 2024       December 31, 2023             Loan term

      1    Bank Mandiri
           - Pinjaman Perusahaan 2016/                         Rupiah             12,000,000                 1,131,873               1,358,248             226,375    0          5,498,900    19 Desember/December 2016 -
              Corporate Loan 2016                                                                                                                                                             23 November /November 2026
           - Pinjaman Perusahaan 2020/                         Rupiah               8,800,000                8,800,000               8,800,000                   -    0                  -     4 Desember/December 2020
              Corporate Loan 2020                                                                                                                                                             23 September/September 2030
           - Fasilitas Kredit Modal Kerja Bilateral 2022/      Rupiah                    300,000                        -                    -                   -    0                  -         21 Juni/June 2024
              Bilateral Working Capital loan Facility 2022                                                                                                                                         21 Juni/June 2025

      2    Bank Rakyat Indonesia ("BRI")
           - Kredit Modal Kerja 2011/                          Rupiah             20,000,000                 4,902,411                       -          15,000,000    0         21,200,000          21 Juni/June 2024
              Working Capital Loan 2011                                                                                                                                                             21 Juni/June 2025
           - Pinjaman Perusahaan 2014/                         Rupiah               2,000,000                  71,429                 285,714              214,286    0            285,714    17 Desember/December 2014 -
              Corporate Loan 2014                                                                                                                                                              17 Desember/December 2024
           - Pinjaman Perusahaan 2015/                         Rupiah             12,000,000                 2,142,857               3,428,571           1,285,714    0          1,714,286    17 Desember/December 2015 -
              Corporate Loan 2015                                                                                                                                                              17 Desember/December 2025
           - Pinjaman Sindikasi 2018/                          Rupiah               4,506,787                2,650,036               3,293,855             658,771    0            322,932    14 November/November 2018 -
              Syndicated Loan 2018                                                                                                                                                             14 November/November 2028
           - Pinjaman Perusahaan 2019/                         Rupiah             13,250,000                 8,517,857               9,937,500           1,419,643    0          1,892,857         23 April/April 2019 -
              Corporate Loan 2019                                                                                                                                                                   23 April/April 2029

      3    Bank Negara Indonesia ("BNI")
           - Pinjaman Perusahaan 2019/                         Rupiah               5,071,000                3,150,750               3,530,948             588,491    0            529,818    18 Desember/December 2019 -
              Corporate Loan 2019                                                                                                                                                              18 Desember/December 2029
              Fasilitas Kredit Modal Kerja Bilateral 2022/                               108,607                        -                    -                   -    0          1,300,000          30 Juni/June 2024
              Bilateral Working Capital loan Facility 2022                                                                                                                                          30 Juni/June 2025

      4    Bank Syariah Indonesia (BSI)
           - Pinjaman Perusahaan 2019/                         Rupiah               2,846,000                1,526,494               1,607,498             267,916    0            181,231    18 Desember/December 2019 -
              Corporate Loan 2019                                                                                                                                                              18 Desember/December 2029
           - Pinjaman Perusahaan 2020/                         Rupiah               1,200,000                1,200,000               1,200,000                   -    0                  -      4 Desember/December 2020
              Corporate Loan 2020                                                                                                                                                             23 September /September 2030

      5    Bank Tabungan Negara ("BTN")
           - Pinjaman Perusahaan Bilateral 2019/               Rupiah               1,500,000                 964,286                1,071,429             107,143    0            214,286          24 April/April 2019 -
              Bilateral Corporate Loan 2019                                                                                                                                                          24 April/April 2029

      6    Bank Central Asia ("BCA")
           - Fasilitas Kredit Modal Kerja Bilateral 2019/      Rupiah               3,000,000                           -                    -                   -    0                  -          6 Maret/March 2024
              Bilateral Working Capital loan Facility 2019                                                                                                                                      6 Desember/December 2024
           - Pinjaman Perusahaan 2022/                         Rupiah             10,600,000               10,600,000               10,600,000                   -    0                  -     9 Desember/December 2022 -
              Corporate Loan 2022                                                                                                                                                              23 Desember/December 2032

      7    Bank Danamon Indonesia
           - Fasilitas Kredit Modal Kerja Bilateral 2019/      Rupiah               2,000,000                           -                    -                   -    0                  -    12 Desember/December 2023 -
              Bilateral Working Capital loan Facility 2019                                                                                                                                     12 Desember/December 2024

      8    Bank Maybank Indonesia
           - Pinjaman Perusahaan 2017/                         Rupiah               4,300,000                           -                    -                   -    0                  -     2 November/November 2017 -
              Corporate Loan 2017                                                                                                                                                               2 November/November 2027
           - Fasilitas Kredit Modal Kerja Bilateral 2022/      Rupiah               1,000,000                           -                    -                   -                       -         14 Maret/March 2024
              Bilateral Working Capital loan Facility 2022                                                                                                                                         14 Maret/March 2025

      9    Bank CIMB Niaga
           - Pinjaman Perusahaan 2019/                         Rupiah               3,500,000                2,250,000               2,625,000             375,000    0            500,000         23 April/April 2019 -
              Corporate Loan 2019                                                                                                                                                                   23 April/April 2029
           - Pinjaman Perusahaan 2020/                         Rupiah               1,000,000                1,000,000               1,000,000                   -    0                  -     4 Desember/December 2020 -
              Corporate Loan 2020                                                                                                                                                              23 Desember/December 2026
           - Pinjaman Perusahaan 2020 (syariah)/               Rupiah               1,000,000                1,000,000               1,000,000                   -    0                  -     4 Desember/December 2020 -
              Corporate Loan 2020 (sharia)                                                                                                                                                     23 Desember/December 2026
           - Pinjaman Perusahaan 2022 (syariah)/               Rupiah                    750,000              750,000                 750,000                    -    0                  -     9 Desember/December 2022 -
              Corporate Loan 2022 (sharia)                                                                                                                                                     23 Desember/December 2032

      10   Bank HSBC
           - Fasilitas Kredit Modal Kerja Bilateral 2021/      Rupiah               1,400,000                           -                    -                   -    0                  -           30 Juni/June 2024
              Bilateral Working Capital loan Facility 2021                                                                                                                                           30 Juni/June 2025
           - Fasilitas Kredit untuk Tambak Lorok 2018/       Dolar AS/                      214                    96                     114                   18    0                18       19 Februari/February 2018 -
              Credit Facility for Tambak Lorok 2018          US Dollar                                                                                                                            19 Agustus/August 2032

      11   Bank DBS Indonesia
           - Fasilitas Kredit Berjangka 2019/                Dolar AS/                      970                         -                 270                  270    0               450          25 Juni/June 2019 -
              Term Loan Facilities 2019                      US Dollar                                                                                                                              25 Juni/June 2024
           - Fasilitas Kredit Berjangka MIGA 2020/           Dolar AS/                      500                   400                     500                  100    -                  -    23 Desember/December 2020 -
              MIGA Term Loan Facilities 2020                 US Dollar                                                                                                                        23 Desember/December 2025 -
           - Fasilitas Kredit Berjangka 2021/                Dolar AS/                      500                   500                     500                    -    -                  -    22 Desember/December 2021 -
              Term Loan Facilities 2021                      US Dollar                                                                                                                        22 Desember/December 2026 -
           - Fasilitas Kredit Berjangka 2022/                Dolar AS/                      750                   750                     750                 0.00                       0    23 Desember/December 2022 -
              Term Loan Facilities 2022                      US Dollar                                                                                                                        23 Desember/December 2027 -

      12   MUFG Bank
           - Fasilitas Kredit Berjangka 2020/                   JPY                       33,000                9,900                  26,400               16,500    -              6,600         5 Maret/March 2020 -
             Term Loan Facilities 2020                                                                                                                                                             5 Maret/March 2025 -
           - Fasilitas Kredit Modal Kerja Bilateral 2022/      Rupiah               1,000,000                           -                    -                   -    0                  -    30 September/September 2024 -
             Bilateral Working Capital loan Facility 2022                                                                                                                                      30 September/September 2025

      13   Standard Chartered Bank ("SCB")
           - Fasilitas Arun 2013/                               EUR                          85                    21                      28                    7    0                7.1    11 Desember/December 2013 -
              Arun Facility 2013                                                                                                                                                              30 September/September 2027
           - Fasilitas Bangkanai 2013/                          EUR                          71                    18                      24                    6    0                5.9    23 Desember/December 2013 -
              Bangkanai Facility 2013                                                                                                                                                         30 September/September 2027

      14   Agence Francaise De Development ("AFD")
           - Pinjaman Perusahaan 2015/                          EUR                          70                    54                      59                    5    0                9.0           7 Mei/May 2015 -
              Corporate Loan 2015                                                                                                                                                                     7 Mei/May 2030



   *) Dalam jutaan mata uang original                                                                                                                                           *) In million original currency
Page 120
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                    Lampiran 5/110 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                          (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                                    27. BANK LOANS (continued)

     Pinjaman                 tidak             terkait           program           percepatan                        Loans not related to fast track program (continued)
     (lanjutan)
                                                                                                                       Jumlah pinjaman/
                                                                                       Fasilitas                                                                  Pembayaran kembali/
                                                                                                                      Pembayaran kembali/
                                                                                                                     Outstanding balance*)
                                                                                      maksimum/                                                                       Repayment*)
                                                                                                                          Repayment
                          Kreditur dan jenis pinjaman/                 Mata uang/     Maximum                 30 September/            31 Desember/        30 September/               31 Des/              Periode pinjaman/
     No.                    Creditor and type of loan                  Currency       facility*)            September 30, 2024       December 31, 2023   September 30, 2024       December 31, 2023             Loan term
     15    Kreditanstalt fur Wiederaufbau ("KfW")
           - Fasilitas Kredit untuk Bangkanai Peaker/                     EUR                         83                    35                      39                   4    0                8.3    15 September/September 2017 -
              Credit Facility for Bangkanai Peaker                                                                                                                                                     15 Desember/December 2028
           - Fasiitas Kredit untuk Kumbih 03 2017/                        EUR                         85                     1                     0.1                   0    -                0.3    15 Desember/December 2017 -
              Credit Facility for Kumbih 03 2017                                                                                                                                                       30 Desember/December 2032
           - Fasiitas Kredit untuk Hydropower Programme 2019/             EUR                        295                   1.1                     1.4                   2    -                3.4     5 September/September 2019 -
              Credit Facility for Hydropower Programme 2019                                                                                                                                             15 November/November 2033
           - Fasiitas Kredit untuk Ulumbu&Mataloko 2018/                  EUR                        150                     1                     0.7                   1    -                1.4       11 Oktober/October 2018 -
              Credit Facility for Ulumbu & Mataloko 2018                                                                                                                                                15 November/November 2033
           - Fasiitas Kredit untuk RBL SNT (KfW 27834)/                   EUR                         45                    26                      29                   3    -                6.4           23 Mei/May 2016 -
              Credit Facility for RBL SNT (KfW 27834)                                                                                                                                                        30 Juni/June 2028
           - Fasiitas Kredit untuk RBL SNT (KfW 29069)/                   EUR                        255                   129                     129                   -                       -      8 Desember/December 2020
              Credit Facility for RBL SNT (KfW 29069)                                                                                                                                                         15 Mei/May 2036

      16   Asian Development Bank ("ADB")
           - Fasilitas Kredit Penguatan                                   EUR                        490                   359                     392                  33    -                33      4 Desember/December 2015 -
                                                                       Dolar AS/
               Gardu 2015/                                                                            29                         -                  23                   2    -                1.9    15 September/September 2035
                                                                       US Dollar
               Credit Facility Grid Strengthening 2015                    EUR                         19                    19                      23                   -                       -

           -   Fasilitas Kredit Penguatan                              Dolar AS/                      25                    18                      20                   2    -                1.6    4 Desember/December 2015 -
               Gardu 2015/                                             US Dollar                                                                                                                      15 September/September 2035
               Credit Facility Grid Strengthening 2015
           -   Fasilitas Kredit akses Energi berkelanjutan                                                                                                                                              10 Oktober/October 2017 -
               Di Kawasan Indonesia Timur 2017/                        Dolar AS/                     584                         -                   -                   -    -                78           15 Mei/May 2037
               Credit Facility for Sustainable Energy                  US Dollar
               Access in Eastern Indonesia 2017                          EUR                       78,688               75,774                  78,688               2,914                       0
           -   Fasilitas Kredit akses Energi berkelanjutan                                                                                                                                             8 Desember/December 2020 -
               Di Kawasan Indonesia Timur 2020 (Tahap II)/             Dolar AS/                     112                   488                     326                   -    -                  -       15 Oktober/October 2040
               Credit Facility for Sustainable Energy                  US Dollar
               Access in Eastern Indonesia 2020 (Phase II)
           -   Fasilitasi Kredit Program Akses Energi yang                                                                                                                                            31 Desember/December 2021 -
               Berkelanjutan dan Andal - Jawa Barat dan Jawa Tengah/   Dolar AS/                     600                   150                     150                   -    -                  -       15 Oktober/October 2041
               Credit Facility for Sustainable and Reliable Energy     US Dollar
               Access Program - Western and Central Java

      17   Export Development Canada ("EDC")
           Private Limited Company (“HEXIM”)
           - Fasilitas Kredit untuk Batam Mobile
               Power Plant 2017/                                       Dolar AS/                      14                     5                       6                   1    -                  1          1 Mei/May 2017 -
               Credit Facility for Batam Mobile                        US Dollar                                                                                                                         27 Januari/January 2029
               Powe Plant 2017
           - Fasilitas Kredit untuk Batam Mobile
               Power Plant 2016/                                       Dolar AS/                     436                   163                     200                  36    -                36     2 Desember/December 2016 -
               Credit Facility for Batam Mobile                        US Dollar                                                                                                                         27 Januari/January 2029
               Powe Plant 2016

      18   Japan Bank for International Cooperation ("JBIC")
           - Fasilitas Kredit untuk Pembangunan                          JPY                       16,430                8,677                   9,362                 685    -              1,369
              PLTU Lontar 2016/                                        Dolar AS/                      179                   89                      96                   7    -                 15       14 Maret/March 2016 -
              Credit Facility for Construction of                      US Dollar                                                                                                                         1 Oktober/October 2031
              Lontar Steam Electricity Power Plant 2016/
           - Fasilitas Kredit untuk Pembangunan                          JPY                       30,827               17,592                  18,916               1,323    -              2,647
              PLTU Jawa 2 Priok 2016/                                  Dolar AS/                       45                   26                      28                   2    -                  4      20 Oktober/October 2016 -
              Credit Facility for Construction of Jawa 2               US Dollar                                                                                                                            30 April/April 2031
              Priok Steam Electricity Power Plant 2016/
           - Fasilitas Kredit untuk Pembangunan                          JPY                       14,545                8,346                   8,942                 596    -              1,192
              Fasilitas Muara Karang 2017/                             Dolar AS/                       37                   22                      23                   2    -                  3        10 Maret/March 2017 -
              Credit Facility for Construction of                      US Dollar                                                                                                                             29 Mei/May 2031
              Muara Karang Facility 2017/
           - Fasilitas Kredit untuk Pembangunan                          JPY                       16,939                5,505                   7,260               1,754    -              1,608
              PLTU Kalseteng 2 2017/                                   Dolar AS/                       89                   37                      46                   9    -                  8        20 Juni/June 2017 -
              Credit Facility for Construction of Kalseteng            US Dollar                                                                                                                      15 September/September 2032
              2 Steam Electricity Power Plant 2017/

      19   International Bank for Reconstruction and
           Development ("IBRD")
           - Fasilitas Kredit untuk Membiayai Power                    Dolar AS/                     500                         -                 440                  26    -                25          20 Mei/May 2016 -
               Distribution Development Program 2016/                  US Dollar                                                                                                                          15 Maret/March 2036
               Credit Facility to Finance Power                                                      374                   374                   7,260                   -    -                  -
               Distribution Development Program 2016
           - Fasilitas Kredit akses Energi berkelanjutan               Dolar AS/                     500                         -                   -                   -                       0          7 Mei/May 2024 -
               di Kawasan Indonesia Timur 2024/                        US Dollar                                                                                                                        15 Februari/February 2044
               Credit Facility for Sustainable Energy
               Access in Eastern Indonesia 2024

      20   KEXIM
           - Fasilitas Kredit untuk Membiayai
              PLTGU Grati 2016/                                        Dolar AS/                      71                    38                      41                   3                       6         24 Juni/ June 2016 -
              Credit Facility to Finance                               US Dollar                                                                                                                       23 Desember/December 2030
              PLTGU Grati 2016

      21   Islamic Development Bank ("IDB")
           - Fasilitas Kredit untuk Membiayai Power
               Grid Enhancement Program 2017/                          Dolar AS/                     210                   230                     210                   7    -                  -      10 Januari/January 2017 -
               Credit Facility to Finance Power                        US Dollar                                                                                                                         6 Agustus/August 2033
               Grid Enhancement Program 2017

      22   Sumitomo Mitsui Banking Corporation ("SMBC")
           - Fasilitas Kredit untuk Membiayai
              PLTA Jatigede 2017/                                      Dolar AS/                      73                    50                      58                   8    -                  8        30 Maret/March 2017 -
              Credit Facility to Finance                               US Dollar                                                                                                                           30 Maret/March 2031
              PLTA Jatigede 2017
           - Fasilitas Kredit Berjangka 2018/                          Dolar AS/                    1,320                        -                   -                   -    -               420        1 Agustus/August 2018 -
              Term Loan Facilities 2018                                US Dollar                                                                                                                          1 Agustus/August 2023


   *) Dalam jutaan mata uang original                                                                                                                                                    *) In million original currency
Page 121
                                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                   Lampiran 5/111 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                           (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                                    27. BANK LOANS (continued)

     Pinjaman                  tidak             terkait            program        percepatan                         Loans not related to fast track program (continued)
     (lanjutan)

                                                                                                                       Jumlah pinjaman/
                                                                                      Fasilitas                                                                   Pembayaran kembali/
                                                                                                                      Pembayaran kembali/
                                                                                                                     Outstanding balance*)
                                                                                     maksimum/                                                                        Repayment*)
                                                                                                                          Repayment
                          Kreditur dan jenis pinjaman/                Mata uang/     Maximum                  30 September/            31 Desember/        30 September/               31 Des/             Periode pinjaman/
     No.                   Creditor and type of loan                  Currency       facility*)             September 30, 2024       December 31, 2023   September 30, 2024       December 31, 2023            Loan term

      23    Mizuho
            - Fasilitas Kredit untuk Membiayai
               Lombok Peaker 2017/                                       EUR                          74                    33                      41                   7    -                  7         24 Mei/May 2017 -
               Credit Facility to Finance                                                                                                                                                               24 Januari/January 2029
               Lombok Peaker 2017

      24    Credit Agricole CIB PARIS
            - Fasilitas Kredit untuk Membiayai
               PLTGU Muara Tawar 2017/                                Dolar AS/                      249                   157                     147                  10    -                24     8 November/November 2017 -
               Credit Facility to Finance                             US Dollar                                                                                                                             8 Mei/May 2032
               PLTGU Muara Tawar 2017

      25    BNP Paribas SA
            - Fasilitas Kredit untuk Membiayai
               Sumbagut 2 Peaker 2018/                                   EUR                         108                    60                      64                   4    -                  8     9 Februari/February 2018 -
               Credit Facility to Finance                                                                                                                                                               9 Oktober/October 2031
               Sumbagut 2 Peaker 2018

      26    BGK
            - Fasilitas Kredit untuk Membiayai
              PLTU Lombok FTP-2 2018/                                    EUR                          81                    39                      46                   7    -                  7     21 Februari/February 2018 -
              Credit Facility to Finance                                                                                                                                                                28 Februari/February 2033
              PLTU Lombok FTP-2 2018

      27    SACE
            - Fasilitas Kredit untuk Membiayai
               PLTGU Grati 2016/                                         EUR                          37                    20                      21                   2                       3        24 Juni/June 2016 -
               Credit Facility to Finance                                                                                                                                                             23 Desember/December 2030
               PLTGU Grati 2016

      28    Exportni Garancni
            a Pojistovaci Spolecnost (“EGAP”)
            - Fasilitas Kredit untuk Membiayai
               PLTGU Grati 2016/                                      Dolar AS/                       17                     9                      10                   1                       1        24 Juni/June 2016 -
               Credit Facility to Finance                             US Dollar                                                                                                                       23 Desember/December 2030
               PLTGU Grati 2016

      29    AIIB
            - Fasilitas Kredit untuk Membiayai Proyek Penguatan
                Distribusi Tenaga Listrik Jawa Timur & Bali 2021/     Dolar AS/                      310                    97                      97                   -    -                  -     10 Februari/February 2021 -
                Credit Facility to Finance East Java & Bali           US Dollar                                                                                                                         15 Oktober/October 2040
                Power Distribution Strengthening Project 2021

      30    LPEI
            - Fasilitas Kredit Modal Kerja Bilateral 2021/              Rupiah               3,500,000                           -                   -                   -    -                  -    20 Desember/December 2022
               Bilateral Working Capital loan Facility 2021                                                                                                                                           20 Desember/December 2024

      31    UOB
            - Fasilitas Kredit Modal Kerja Bilateral 2021/              Rupiah               1,000,000                           -                   -                   -    -                  -          31 Mei/May 2024
              Bilateral Working Capital loan Facility 2021                                                                                                                                                  31 Mei/May 2025

      32    Permata
            - Pinjaman Perusahaan 2022/                                 Rupiah               2,750,000                2,481,854              2,407,585                   -                       -    8 Desember/December 2022 -
               Corporate Loan 2022                                                                                                                                                                    8 Desember/December 2032 -
            - Fasilitas Kredit Modal Kerja Bilateral 2024/                                   1,000,000                           -                                       -                             29 Februari/February 2024 -
               Bilateral Working Capital loan Facility 2024                                                                                                                                            28 Februari/February 2025 -

       33   Bank Central Asia Syariah ("BCA Syariah")
            - Pinjaman Perusahaan 2022/                                 Rupiah                    150,000              150,000                 150,000                   -                       -    9 Desember/December 2022 -
               Corporate Loan 2022                                                                                                                                                                    9 Desember/December 2032 -

       34   KB Bukopin
            - Pinjaman Perusahaan 2022/                                 Rupiah                    300,000              300,000                 300,000                   -                       -    9 Desember/December 2022 -
               Corporate Loan 2022                                                                                                                                                                    9 Desember/December 2032 -

       35   Bank SBII
            - Pinjaman Perusahaan 2022/                                 Rupiah                    200,000              200,000                 200,000                   -                       -    9 Desember/December 2022 -
               Corporate Loan 2022                                                                                                                                                                    9 Desember/December 2032 -

       36   Clean Technology Fund "CTF"
            - Fasilitas Kredit akses Energi berkelanjutan             Dolar AS/                       15                         -                   -                   -                                  7 Mei/May 2024 -
               Di Kawasan Indonesia Timur 2024/                       US Dollar                                                                                                                         15 Februari/February 2053
               Credit Facility for Sustainable Energy
               Access in Eastern Indonesia 2024

       37   Canada Clean Energy and Forest Climate Fund "CCEFCF"
            - Fasilitas Kredit akses Energi berkelanjutan             Dolar AS/                       48                         -                   -                   -                                  7 Mei/May 2024 -
               di Kawasan Indonesia Timur 2024/                       US Dollar                                                                                                                         15 Februari/February 2043
               Credit Facility for Sustainable Energy
               Access in Eastern Indonesia 2024

       38   PT SMI (Persero)
            - Bank Loan Capex Bilateral 2023 - Konvensional PT SMI      Rupiah               1,000,000                 661,080                       -                   -                            29 Desember/December 2023 -
               Corporate Loan 2023                                                                                                                                                                    29 Desember/December 2033 -
            - Bank Loan Capex Bilateral 2023 - Syariah PT SMI                                1,000,000                 693,986                       -                   -                            29 Desember/December 2023 -
               Corporate Loan Sharia 2023                                                                                                                                                             29 Desember/December 2033 -

       39   PT Bank QNB Indonesia Tbk
            - Kredit Modal Kerja 2022 - Bank QNB - Revolving                                      500,000                        -                   -                   -                            21 September/September 2024
               Bilateral Working Capital loan Facility 2022                                                                                                                                           21 September/September 2025



   *) Dalam jutaan mata uang original                                                                                                                                                   *) In million original currency
Page 122
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/112 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                         27. BANK LOANS (continued)

    Pinjaman      tidak    terkait     program    percepatan           Loans not related to fast track program (continued)
    (lanjutan)
                                                 30 September/                31 Desember/
                                                 September 30,                December 31,
                                                     2024                            2024
      Tingkat suku bunga per tahun                                                                      Interest rate per annum
      Rupiah                                     5.00% - 9.10%                4.48% - 8.87%                               Rupiah
      USD                                        2.56% - 8.06%                2.56% - 8.03%                                 USD
      JPY                                        0.62% - 1.74%                0.60% - 1.74%                                 JPY
      EUR                                        0.40% - 5.40%                0.40% - 6.66%                                 EUR

    Perusahaan melakukan pembayaran pokok dan                          The Company has made payments of principal and
    bunga pinjaman bank sesuai dengan jadwal                           interest on the bank loans in accordance with the
    pembayaran dalam perjanjian pinjaman bank yang                     schedule of payment specified within the agreements
    berlaku pada tanggal laporan.                                      of the bank loans as at the reporting date.

    Selama periode sembilan bulan yang berakhir pada                   During the nine months periods ended September 30,
    tanggal 30 September 2024 dan 31 Desember 2023,                    2024 and December 31, 2023, the Group made
    Grup melakukan penarikan seluruh pinjaman bank                     withdrawals from all bank loans amounting to
    sebesar     USD182.739.150       (setara   dengan                  USD182.739.150 (equivalent to Rp2,883,462),
    Rp2.883.462), EUR3.097.268 (setara dengan                          EUR3,097,268 (equivalent to Rp53,860), (2023:
    Rp53.860) (2023: USD889.139.834 (setara dengan                     USD889,139,834 (equivalent to Rp13,755,461),
    Rp13.755.461), EUR9.790.783 (setara dengan                         EUR9,790,783       (equivalent    to    Rp161,380),
    Rp161.380), JPY5.010.927.035 (setara dengan                        JPY5,010,927,035 (equivalent to Rp529,788) and
    Rp529.788) dan Rp39.458.930). Pelunasan lebih awal                 Rp39,458,930). The voluntary early repayments of the
    secara sukarela atas pokok pinjaman selama periode                 loan principal during period ended September 30,
    September 2024 dan 31 Desember 2023 adalah                         2024 and December 31, 2023 a amounting to RpNil
    sebesar RpNihil dan Rp4.100.000.                                   and Rp4,100,000.

28. UTANG OBLIGASI DAN SUKUK IJARAH                               28. BONDS PAYABLE AND SUKUK IJARA

    Obligasi dan sukuk ijarah                                          Bonds and sukuk ijara

                                                 31 September/          31 Desember/
                                                 September 31,          December 31,
                                                     2024                    2023

         Obligasi dan Sukuk Ijarah Rupiah                                                          Rupiah Bonds and Sukuk Ijara
          Obligasi Berkelanjutan IV                                                                   Shelf Registration Bonds IV
             PLN Tahap I Tahun 2020                     1,500,000               1,500,000                       PLN I Year 2020
          Sukuk Ijarah Berkelanjutan IV                                                          Shelf Registration Sukuk Ijara IV
             PLN Tahap I Tahun 2020                         376,500                 376,500                     PLN I Year 2020
          Obligasi Berkelanjutan III                                                                Shelf Registration Bonds III
             PLN Tahap VII Tahun 2020                   1,420,435               1,420,435                  PLN VII Year 2020
          Obligasi Berkelanjutan III                                                                Shelf Registration Bonds III
             PLN Tahap VI Tahun 2020                    4,812,430               4,812,430                   PLN VI Year 2020
          Sukuk Ijarah Berkelanjutan III                                                       Shelf Registration Sukuk Ijara III
             PLN Tahap VI Tahun 2020                        115,500                 115,500                 PLN VI Year 2020
          Obligasi Berkelanjutan III                                                                Shelf Registration Bonds III
             PLN Tahap V Tahun 2019                     1,117,200               1,912,900                    PLN V Year 2019
          Sukuk Ijarah Berkelanjutan III                                                       Shelf Registration Sukuk Ijara III
             PLN Tahap V Tahun 2019                         791,000                 797,500                  PLN V Year 2019
          Obligasi Berkelanjutan III                                                                Shelf Registration Bonds III
             PLN Tahap IV Tahun 2019                    2,316,620               2,953,620                   PLN IV Year 2019
          Sukuk Ijarah Berkelanjutan III                                                       Shelf Registration Sukuk Ijara III
             PLN Tahap IV Tahun 2019                        976,000             1,250,000                   PLN IV Year 2019
          Obligasi Berkelanjutan III                                                                Shelf Registration Bonds III
             PLN Tahap III Tahun 2019                       812,000             2,024,000                   PLN III Year 2019
          Sukuk Ijarah Berkelanjutan III                                                       Shelf Registration Sukuk Ijara III
             PLN Tahap III Tahun 2019                       337,000                 600,000                  PLN IIIYear 2019
          Obligasi Berkelanjutan III                                                                Shelf Registration Bonds III
             PLN Tahap II Tahun 2018                        622,000                 622,000                  PLN II Year 2018
Page 123
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/113 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                     28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Obligasi dan sukuk ijarah (lanjutan)                              Bonds and sukuk ijara (continued)


                                              31 September/          31 Desember/
                                              September 31,          December 31,
                                                  2024                   2023

         Sukuk Ijarah Berkelanjutan III                                                      Shelf Registration Sukuk Ijara III
           PLN Tahap II Tahun 2018                       110,000                110,000                    PLN II Year 2018
         Obligasi Berkelanjutan III                                                               Shelf Registration Bonds III
           PLN Tahap I Tahun 2018                    1,200,000               1,200,000                      PLN I Year 2018
         Sukuk Ijarah Berkelanjutan III                                                      Shelf Registration Sukuk Ijara III
           PLN Tahap I Tahun 2018                        623,000                623,000                     PLN I Year 2018
         Obligasi Berkelanjutan II                                                                 Shelf Registration Bonds II
           PLN Tahap III Tahun 2018                  2,078,000               2,078,000                    PLN III Year 2018
         Sukuk Ijarah Berkelanjutan II                                                        Shelf Registration Sukuk Ijara II
           PLN Tahap III Tahun 2018                      594,500                594,500                   PLN III Year 2018
         Obligasi Berkelanjutan II                                                                 Shelf Registration Bonds II
           PLN Tahap II Tahun 2017                   2,094,000               2,094,000                     PLN II Year 2017
         Sukuk Ijarah Berkelanjutan II                                                        Shelf Registration Sukuk Ijara II
           PLN Tahap II Tahun 2017                       611,000                611,000                    PLN II Year 2017
         Obligasi Berkelanjutan II                                                                 Shelf Registration Bonds II
           PLN Tahap I Tahun 2017                    1,217,000               1,386,000                      PLN I Year 2017
         Sukuk Ijarah Berkelanjutan II                                                        Shelf Registration Sukuk Ijara II
           PLN Tahap I Tahun 2017                        214,000                214,000                     PLN I Year 2017

       Surat Utang Jangka                                                                                       Global Medium
         Menengah Global - USD                                                                              Term Notes - USD
       Penerbitan tahun 2020                        22,716,000              23,158,500                           Issued in 2020
       Penerbitan tahun 2019                        36,345,600              37,053,600                           Issued in 2019
       Penerbitan tahun 2018                        45,432,000              46,317,000                           Issued in 2018
       Penerbitan tahun 2017                        30,288,000              30,878,000                           Issued in 2017
       Penerbitan tahun 2012                        15,144,000              15,439,000                           Issued in 2012

       Surat Utang Jangka                                                                                      Global Medium
         Menengah Global - EUR                                                                              Term Notes - EUR
       Penerbitan tahun 2019                         8,464,350               8,543,150                           Issued in 2019
       Penerbitan tahun 2018                         8,464,350               8,543,150                           Issued in 2018

       Obligasi - JPY                                                                                              Obligasi - JPY
       Penerbitan tahun 2019                             106,345             2,129,517                            Issued in 2019

       Obligasi Terjamin - USD                                                                         Guaranteed Notes - USD
       Penerbitan tahun 2007                         4,366,197               4,451,249                          Issued in 2007

       Subjumlah                                   195,265,027             203,808,551                                 Subtotal

       Biaya emisi belum diamortisasi               (5,905,101)             (6,243,718)        Unamortized debt issuance cost
       Jumlah                                      189,359,926             197,564,833                                     Total

       Disajikan di laporan posisi keuangan                                               Presented in consolidated statements
         konsolidasian sebagai:                                                                          of financial position:
         Liabilitas jangka pendek                    1,793,785               5,578,511                       Current liabilities
         Liabilitas jangka panjang                 187,566,141             191,986,322                  Non-current liabilites

       Jumlah                                      189,359,926             197,564,833                                     Total
Page 124
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/114 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                         SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                                         28. BONDS PAYABLE AND SUKUK IJARA (continued)

     Obligasi dan sukuk ijarah (lanjutan)                                                   Bonds and sukuk ijara (continued)

     Obligasi ini diterbitkan sebesar harga nominal dalam                                   The bonds were issued at nominal value and are
     mata uang Rupiah dengan rincian sebagai berikut:                                       denominated in Rupiah, with the following details:
                                                                                       Tingkat kupon/   Periode
                                                                                       Imbalan ijarah pembayaran
                                                                                         per tahun/      bunga/
                                                                                        Coupun rate/    Interest
                                          Pokok/             Periode pinjaman/            Ijara fee    payment     Wali amanat/
                                         Principal               Loan term               per annum       period      Trustee

   Obligasi Berkelanjutan IV                                                                                                             Shelf Registration Bonds IV
     PLN Tahap I Tahun 2020                                                                                                                      PLN I Year 2020
     Seri A                                   312,000        8 September 2020 -            6.70%                                                          Series A
                                                             September 8, 2025
      Seri B                                    28,000       8 September 2020 -            7.25%                                                          Series B
                                                             September 8, 2027
      Seri C                                  158,000        8 September 2020 -            7.90%      Kuartalan/   Bank Tabungan                          Series C
                                                             September 8, 2030                        Quaterly        Negara
      Seri D                                  841,000        8 September 2020 -            8.65%                                                          Series D
                                                             September 8, 2035
      Seri E                                  161,000        8 September 2020 -            8.86%                                                          Series E
                                                             September 8, 2040
      Subtotal                               1,500,000

   Obl Syariah Ijarah Berkelanjutan IV                                                                                             Shelf Registration Sukuk Ijarah IV
     Tahap I Tahun 2020                                                                                                                           PLN I Year 2020
     Seri A                                     39,000       8 September 2020 -            6.70%                                                         Series A
                                                             September 8, 2025
      Seri B                                    35,000       8 September 2020 -            7.25%                                                          Series B
                                                             September 8, 2027
      Seri C                                  200,000        8 September 2020 -            7.90%      Kuartalan/   Bank Tabungan                          Series C
                                                             September 8, 2030                        Quaterly        Negara
      Seri D                                    56,000       8 September 2020 -            8.65%                                                          Series D
                                                             September 8, 2035
      Seri E                                    46,500       8 September 2020 -            8.86%                                                          Series E
                                                             September 8, 2040
      Subtotal                                376,500

   Obligasi Berkelanjutan III                                                                                                             Shelf Registration Bonds III
     PLN Tahap VII Tahun 2020                                                                                                                   PLN VII Year 2020
     Seri A                                                   6 Mei/May 2020 -             7.92%                                                          Series A
                                                               6 Mei/May 2023
      Seri B                                    99,155        6 Mei/May 2020 -             8.25%      Kuartalan/   Bank Tabungan                          Series B
                                                               6 Mei/May 2026                         Quaterly        Negara
      Seri C                                  312,180         6 Mei/May 2020 -             8.55%                                                          Series C
                                                               6 Mei/May 2027
      Seri D                                 1,009,100        6 Mei/May 2020 -             9.10%                                                          Series D
                                                               6 Mei/May 2030
      Subtotal                               1,420,435

   Obligasi Berkelanjutan III                                                                                                            Shelf Registration Bonds III
     PLN Tahap VI Tahun 2020                                                                                                                    PLN VI Year 2020
     Seri A                                   540,630    18 Februari/February 2020 -       7.20%                                                          Series A
                                                          18 Februari/February 2025
      Seri B                                  672,500    18 Februari/February 2020 -       7.70%                                                          Series B
                                                          18 Februari/February 2027
      Seri C                                  544,250    18 Februari/February 2020 -       8.00%      Kuartalan/   Bank Tabungan                          Series C
                                                          18 Februari/February 2030                   Quaterly        Negara
      Seri D                                 1,459,000   18 Februari/February 2020 -       8.70%                                                          Series D
                                                          18 Februari/February 2035
      Seri E                                 1,596,050   18 Februari/February 2020 -       9.05%                                                          Series E
                                                          18 Februari/February 2040
      Subtotal                               4,812,430

   Sukuk Ijarah Berkelanjutan III                                                                                                   Shelf Registration Sukuk Ijarah III
     PLN Tahap VI Tahun 2020                                                                                                                    PLN VI Year 2020
     Seri A                                     40,500   18 Februari/February 2020 -       7.70%                                                         Series A
                                                          18 Februari/February 2027
      Seri B                                     3,500   18 Februari/February 2020 -       8.00%      Kuartalan/   Bank Tabungan                          Series B
                                                          18 Februari/February 2030                   Quaterly        Negara
      Seri C                                     9,000   18 Februari/February 2020 -       8.70%                                                          Series C
                                                          18 Februari/February 2035
      Seri D                                    62,500   18 Februari/February 2020 -       9.05%                                                          Series D
                                                          18 Februari/February 2040
      Subtotal                                115,500

   Obligasi Berkelanjutan III                                                                                                             Shelf Registration Bonds III
     PLN Tahap V Tahun 2019                                                                                                                      PLN V Year 2019
     Seri B                                   445,000     1 Oktober/October, 2019 -        8.40%                                                          Series B
                                                           1 Oktober/October, 2026
      Seri C                                     6,200    1 Oktober/October, 2019 -        8.60%      Kuartalan/   Bank Tabungan                          Series C
                                                           1 Oktober/October, 2029                    Quaterly        Negara
      Seri D                                  166,000     1 Oktober/October, 2019 -        9.40%                                                          Series D
                                                           1 Oktober/October, 2034
      Seri E                                  500,000     1 Oktober/October, 2019 -        9.90%                                                          Series E
                                                           1 Oktober/October, 2039
      Subtotal                               1,117,200
Page 125
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/115 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                                      28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Obligasi dan sukuk ijarah (lanjutan)                                                 Bonds and sukuk ijara (continued)


                                                                                    Tingkat kupon/   Periode
                                                                                    Imbalan ijarah pembayaran
                                                                                      per tahun/      bunga/
                                                                                     Coupun rate/    Interest
                                      Pokok/             Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                     Principal               Loan term                per annum       period      Trustee


   Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
     PLN Tahap V Tahun 2019                                                                                                                  PLN V Year 2019
     Seri B                                 10,000    1 Oktober/October, 2019 -         8.40%                                                        Series B
                                                       1 Oktober/October, 2026
      Seri C                                92,000    1 Oktober/October, 2019 -         8.60%      Kuartalan/   Bank Tabungan                         Series C
                                                       1 Oktober/October, 2029                     Quaterly        Negara
      Seri D                              135,000     1 Oktober/October, 2019 -         9.40%                                                         Series D
                                                       1 Oktober/October, 2034
      Seri E                              554,000     1 Oktober/October, 2019 -         9.90%                                                         Series E
                                                       1 Oktober/October, 2039
      Subtotal                            791,000

   Obligasi Berkelanjutan III                                                                                                        Shelf Registration Bonds III
     PLN Tahap IV Tahun 2019                                                                                                                PLN IV Year 2019
     Seri B                               315,250     1 Agustus/August, 2019 -          8.50%                                                         Series B
                                                       1 Agustus/August, 2026
      Seri C                              549,000     1 Agustus/August, 2019 -          8.70%      Kuartalan/   Bank Tabungan                         Series C
                                                       1 Agustus/August, 2029                      Quaterly        Negara
      Seri D                              395,000     1 Agustus/August, 2019 -          9.50%                                                         Series D
                                                       1 Agustus/August, 2034
      Seri E                             1,057,370    1 Agustus/August, 2019 -          9.98%                                                         Series E
                                                       1 Agustus/August, 2039
      Subtotal                           2,316,620

   Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
     PLN Tahap IV Tahun 2019                                                                                                                PLN IV Year 2019
     Seri B                               368,000     1 Agustus/August, 2019 -          8.50%                                                        Series B
                                                       1 Agustus/August, 2026
      Seri C                                20,000    1 Agustus/August, 2019 -          8.70%      Kuartalan/   Bank Tabungan                         Series C
                                                       1 Agustus/August, 2029                      Quaterly        Negara
      Seri D                                49,000    1 Agustus/August, 2019 -          9.50%                                                         Series D
                                                       1 Agustus/August, 2034
      Seri E                              539,000     1 Agustus/August, 2019 -          9.98%                                                         Series E
                                                       1 Agustus/August, 2039
      Subtotal                            976,000

   Obligasi Berkelanjutan III                                                                                                         Shelf Registration Bonds III
     PLN Tahap III Tahun 2019                                                                                                               PLN III Year 2019
     Seri C                               183,000    19 Februari/February, 2019 -       9.35%      Kuartalan/   Bank Tabungan                         Series C
                                                      19 Februari/February, 2026                   Quaterly        Negara
      Seri D                              211,000    19 Februari/February, 2019 -       9.60%                                                         Series D
                                                      19 Februari/February, 2029
      Seri E                              263,000    19 Februari/February, 2019 -       9.80%                                                         Series E
                                                      19 Februari/February, 2034
      Seri F                              155,000    19 Februari/February, 2019 -       9.95%                                                         Series F
                                                      19 Februari/February, 2039
      Subtotal                            812,000

   Sukuk Ijarah Berkelanjutan III                                                                                               Shelf Registration Sukuk Ijarah III
     PLN Tahap III Tahun 2019                                                                                                               PLN III Year 2019
     Seri C                               204,000    19 Februari/February, 2019 -       9.35%      Kuartalan/   Bank Tabungan                        Series C
                                                      19 Februari/February, 2026                   Quaterly        Negara
      Seri D                                45,000   19 Februari/February, 2019 -       9.60%                                                         Series D
                                                      19 Februari/February, 2029
      Seri E                                60,000   19 Februari/February, 2019 -       9.80%                                                         Series E
                                                      19 Februari/February, 2034
      Seri F                                28,000   19 Februari/February, 2019 -       9.95%                                                         Series F
                                                      19 Februari/February, 2039
      Subtotal                            337,000

   Obligasi Berkelanjutan III                                                                                                         Shelf Registration Bonds III
     PLN Tahap II Tahun 2018                                                                                                                 PLN II Year 2018
     Seri B                               483,000    10 Oktober/October, 2018 -         9.00%                                                         Series B
                                                      10 Oktober/October, 2025
      Seri C                                78,000   10 Oktober/October, 2018 -         9.10%      Kuartalan/   Bank Tabungan                         Series C
                                                      10 Oktober/October, 2028                     Quaterly        Negara
      Seri D                                15,000   10 Oktober/October, 2018 -         9.30%                                                         Series D
                                                      10 Oktober/October, 2033
      Seri E                                46,000   10 Oktober/October, 2018 -         9.65%                                                         Series E
                                                      10 Oktober/October, 2023
      Subtotal                            622,000
Page 126
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/116 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                          (Expressed in millions of Rupiah, unless otherwise stated)


28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                                 28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Obligasi dan sukuk ijarah (lanjutan)                                            Bonds and sukuk ijara (continued)

                                                                                   Tingkat kupon/   Periode
                                                                                   Imbalan ijarah pembayaran
                                                                                     per tahun/      bunga/
                                                                                    Coupun rate/    Interest
                                     Pokok/             Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                    Principal               Loan term                per annum       period      Trustee




   Sukuk Ijarah Berkelanjutan III                                                                                              Shelf Registration Sukuk Ijarah III
     PLN Tahap II Tahun 2018                                                                                                                PLN II Year 2018
     Seri B                                45,000   10 Oktober/October, 2018 -         9.00%      Kuartalan/   Bank Tabungan                        Series B
                                                     10 Oktober/October, 2025                     Quaterly        Negara
      Seri C                               15,000   10 Oktober/October, 2018 -         9.10%                                                         Series C
                                                     10 Oktober/October, 2028
      Seri D                               50,000   10 Oktober/October, 2018 -         9.65%                                                         Series D
                                                     10 Oktober/October, 2023
      Subtotal                           110,000

   Obligasi Berkelanjutan III                                                                                                        Shelf Registration Bonds III
     PLN Tahap I Tahun 2018                                                                                                                 PLN I Year 2018
     Seri B                              442,000        10 Juli/July, 2018 -           8.35%                                                         Series B
                                                         10 Juli/July, 2025
      Seri C                             138,000        10 Juli/July, 2018 -           8.40%      Kuartalan/   Bank Tabungan                         Series C
                                                         10 Juli/July, 2028                       Quaterly        Negara
      Seri D                             281,000        10 Juli/July, 2018 -           8.90%                                                         Series D
                                                         10 Juli/July, 2033
      Seri E                             339,000        10 Juli/July, 2018 -           9.00%                                                         Series E
                                                         10 Juli/July, 2038
      Subtotal                          1,200,000

   Sukuk Ijarah Berkelanjutan III                                                                                              Shelf Registration Sukuk Ijarah III
     PLN Tahap I Tahun 2018                                                                                                                  PLN I Year 2018
     Seri B                              150,000        10 Juli/July, 2018 -           8.35%                                                        Series B
                                                         10 Juli/July, 2025
      Seri C                             258,000        10 Juli/July, 2018 -           8.40%      Kuartalan/   Bank Tabungan                         Series C
                                                         10 Juli/July, 2028                       Quaterly        Negara
      Seri D                             105,000        10 Juli/July, 2018 -           8.90%                                                         Series D
                                                         10 Juli/July, 2033
      Seri E                             110,000        10 Juli/July, 2018 -           9.00%                                                         Series E
                                                         10 Juli/July, 2038
      Subtotal                           623,000

   Obligasi Berkelanjutan II                                                                                                         Shelf Registration Bonds II
     PLN Tahap III Tahun 2018                                                                                                              PLN III Year 2018
     Seri B                                10,000   22 Februari/February, 2018 -       6.80%                                                        Series B
                                                     22 Februari/February, 2025
      Seri C                             341,000    22 Februari/February, 2018 -       7.25%      Kuartalan/   Bank Tabungan                         Series C
                                                     22 Februari/February, 2028                   Quaterly        Negara
      Seri D                             362,000    22 Februari/February, 2018 -       8.20%                                                         Series D
                                                     22 Februari/February, 2033
      Seri E                            1,365,000   22 Februari/February, 2018 -       8.75%                                                         Series E
                                                     22 Februari/February, 2038
      Subtotal                          2,078,000

   Sukuk Ijarah Berkelanjutan II                                                                                               Shelf Registration Sukuk Ijarah II
     PLN Tahap III Tahun 2018                                                                                                              PLN III Year 2018
     Seri B                                88,000   22 Februari/February, 2018 -       7.25%      Kuartalan/   Bank Tabungan                        Series B
                                                     22 Februari/February, 2028                   Quaterly        Negara
      Seri C                               57,500   22 Februari/February, 2018 -       8.20%                                                         Series C
                                                     22 Februari/February, 2033
      Seri D                             449,000    22 Februari/February, 2018 -       8.75%                                                         Series C
                                                     22 Februari/February, 2038
      Subtotal                           594,500

   Obligasi Berkelanjutan II                                                                                                         Shelf Registration Bonds II
     PLN Tahap II Tahun 2017                                                                                                                PLN II Year 2017
     Seri B                              201,000        3 November 2017 -              7.50%      Kuartalan/   Bank Tabungan                         Series B
                                                         3 November 2024                          Quaterly        Negara
      Seri C                             800,000        3 November 2017 -              8.20%                                                         Series C
                                                         3 November 2027
      Seri D                            1,093,000       3 November 2017 -              8.70%                                                         Series D
                                                         3 November 2032
      Subtotal                          2,094,000

   Sukuk Ijarah Berkelanjutan II                                                                                               Shelf Registration Sukuk Ijarah II
     PLN Tahap II Tahun 2017                                                                                                               PLN II Year 2017
     Seri B                              121,000        3 November 2017 -              8.20%      Kuartalan/   Bank Tabungan
                                                         3 November 2027                          Quaterly        Negara                             Series B
      Seri C                             490,000        3 November 2017 -              8.70%
                                                         3 November 2032                                                                             Series C
      Subtotal                           611,000

   Obligasi Berkelanjutan II                                                                                                         Shelf Registration Bonds II
     PLN Tahap I Tahun 2017                                                                                                                 PLN I Year 2017
     Seri C                             1,217,000       11 Juli/July , 2017 -          8,50%                                                         Series C
                                                         11 Juli/July , 2027
      Subtotal                          1,217,000

   Sukuk Ijarah Berkelanjutan II                                                                                               Shelf Registration Sukuk Ijarah II
     PLN Tahap I Tahun 2017                                                                                                                 PLN I Year 2017
Page 127
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/117 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                                      28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Obligasi dan sukuk ijarah (lanjutan)                                               Bonds and sukuk ijara (continued)
                                                                                      Tingkat kupon/   Periode
                                                                                      Imbalan ijarah pembayaran
                                                                                        per tahun/      bunga/
                                                                                       Coupun rate/    Interest
                                           Pokok/           Periode pinjaman/            Ijara fee    payment     Wali amanat/
                                          Principal             Loan term               per annum       period      Trustee


       Sukuk Ijarah Berkelanjutan II                                                                                              Shelf Registration Sukuk Ijarah II
         PLN Tahap II Tahun 2017                                                                                                              PLN II Year 2017
         Seri B                                121,000      3 November 2017 -             8.20%      Kuartalan/   Bank Tabungan
                                                             3 November 2027                         Quaterly        Negara                            Series B
          Seri C                               490,000      3 November 2017 -             8.70%
                                                             3 November 2032                                                                           Series C
          Subtotal                             611,000

       Obligasi Berkelanjutan II                                                                                                       Shelf Registration Bonds II
         PLN Tahap I Tahun 2017                                                                                                               PLN I Year 2017
         Seri C                               1,217,000     11 Juli/July , 2017 -         8,50%                                                        Series C
                                                             11 Juli/July , 2027
          Subtotal                            1,217,000

       Sukuk Ijarah Berkelanjutan II                                                                                              Shelf Registration Sukuk Ijarah II
         PLN Tahap I Tahun 2017                                                                                                                PLN I Year 2017
         Seri B                                 214,000     11 Juli/July , 2017 -         8.50%                                                        Series B
                                                             11 Juli/July , 2027


       Jumlah/Total                          23,938,185


    Seluruh obligasi ini tidak dijamin secara khusus,                                  The bonds are not secured by specific collateral but are
    namun dijamin dengan seluruh aset Perusahaan,                                      secured by all of the Company’s assets and the
    serta hak pemegang obligasi adalah pari passu tanpa                                bondholders’ rights are pari passu without preference to
    hak khusus dengan hak-hak kreditur lain.                                           other creditors.

    Perusahaan    telah   memenuhi       pembatasan-                                   The Company has complied with the restrictions
    pembatasan yang ditentukan dalam perjanjian Wali                                   specified within the agreements with the acting Trustee
    Amanat masing-masing obligasi dan sukuk ijarah.                                    of the corresponding bonds and sukuk ijara.

    Dana yang diperoleh dari penerbitan obligasi dan                                   The proceeds from the issuance of bonds payable and
    sukuk ijarah digunakan untuk mendanai proyek                                       sukuk ijarah are used to finance the transmission
    transmisi, proyek distribusi, dan modal kerja.                                     project, distribution project, and working capital.

    Rincian peringkat untuk seluruh obligasi dan Sukuk                                 Rating details on all outstanding bonds and Sukuk Ijara
    Ijarah yang dimiliki Perusahaan adalah sebagai                                     bonds issued by the Company are as follows:
    berikut:
                                                                                              30 September / September 30, 2024
                                                                                         Peringkat/                   Lembaga pemeringkat
                                                                                          Rating                          Rating agency

   Obligasi/Bonds

   Obligasi/Bonds idAAA

   Obligasi Berkelanjutan II PLN Tahap I Tahun 2017/
   Shelf Registration Bonds II PLN Phase I Year 2017                                        idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan II PLN Tahap II Tahun 2017/
   Shelf Registration Bonds II PLN Phase II Year 2017                                       idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan II PLN Tahap III Tahun 2018/
   Shelf Registration Bonds II PLN Phase III Year 2018                                      idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap I Tahun 2018/
   Shelf Registration Bonds III PLN Phase I Year 2018                                       idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap II Tahun 2018/
   Shelf Registration Bonds III PLN Phase II Year 2018                                      idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap III Tahun 2019/
   Shelf Registration Bonds III PLN Phase III Year 2019                                     idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap IV Tahun 2019/
   Shelf Registration Bonds III PLN Phase IV Year 2019                                      idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap V Tahun 2019/
   Shelf Registration Bonds III PLN Phase V Year 2019                                       idAAA                      PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap VI Tahun 2020/
   Shelf Registration Bonds III PLN Phase VI Year 2020                                      idAAA                      PT Pemeringkat Efek Indonesia
Page 128
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/118 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                                  28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Obligasi dan sukuk ijarah (lanjutan)                                              Bonds and sukuk ijara (continued)

                                                                                              30 September/ September 30, 2024
                                                                                        Peringkat/                   Lembaga pemeringkat
                                                                                         Rating                           Rating agency

   Obligasi/Bonds idAAA (lanjutan/continued)

   Obligasi Berkelanjutan III PLN Tahap VII Tahun 2020/
   Shelf Registration Bonds III PLN Phase VII Year 2020                                    idAAA                    PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan IV PLN Tahap I Tahun 2020/
   Shelf Registration Bonds IV PLN Phase I Year 2020                                       idAAA                    PT Pemeringkat Efek Indonesia

   Sukuk Ijarah/Sukuk Ijara idAAA

   Sukuk Ijarah Berkelanjutan I PLN Tahap II Tahun 2013/
   Shelf Registration Sukuk Ijara I PLN Phase II Year 2013                               idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan II PLN Tahap I Tahun 2017/
   Shelf Registration Sukuk Ijara II PLN Phase I Year 2017                               idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan II PLN Tahap II Tahun 2017/
   Shelf Registration Sukuk Ijara II PLN Phase II Year 2017                              idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan II PLN Tahap III Tahun 2018/
   Shelf Registration Sukuk Ijara II PLN Phase III Year 2018                             idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap I Tahun 2018/
   Shelf Registration Sukuk Ijara III PLN Phase I Year 2018                              idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap II Tahun 2018/
   Shelf Registration Sukuk Ijara III PLN Phase II Year 2018                             idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap III Tahun 2019/
   Shelf Registration Sukuk Ijara III PLN Phase III Year 2019                            idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap IV Tahun 2019/
   Shelf Registration Sukuk Ijara III PLN Phase IV Year 2019                             idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap V Tahun 2019/
   Shelf Registration Sukuk Ijara III PLN Phase V Year 2019                              idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap VI Tahun 2020/
   Shelf Registration Sukuk Ijara III PLN Phase VI Year 2020                             idAAA(sy)                  PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan IV PLN Tahap I Tahun 2020/
   Shelf Registration Sukuk Ijara IV PLN Phase I Year 2020                               idAAA(sy)                  PT Pemeringkat Efek Indonesia


    Surat Utang Jangka                 Menengah         Global         dan            Global Medium-Term Notes and Guaranteed Notes
    Obligasi Terjamin

    Rincian Surat Utang Jangka Menengah Global dan                                    The details of Global Medium-term Notes and
    Obligasi Terjamin dalam Dolar Amerika adalah                                      Guaranteed Notes in US Dollars are as follows:
    sebagai berikut:
                                                          Harga                                      Tingkat
                                      Pokok/            penerbitan/          Periode pinjaman/        bunga/          Wali amanat/
                                    Principal *)       Issuing price            Loan Term          Interest rate       Trustee
                                       USD
     Surat utang                                                                                                                              Global medium
        jangka menengah                                                                                                                  global term notes
     Penerbitan tahun 2020                                                                                                                      Issued in 2020
     Jatuh tempo 2030                 500,000,000         99.15%             30 Juni/June 2020 -      3.00%        Deutsche Bank Trust             Due in 2030
                                                                              30 Juni/June 2030                    Company Americas
     Jatuh tempo 2050               1,000,000,000         98.28%             30 Juni/June 2020 -      4.00%                                       Due in 2050
                                                                              30 Juni/June 2050
     Subjumlah                      1,500,000,000                                                                                                       Total
     Penerbitan tahun 2019                                                                                                                     Issued in 2019
     Jatuh tempo 2029                 700,000,000         99.39%           17 Juli/July 2019 -        3.88%        Deutsche Bank Trust            Due in 2029
                                                                            17 Juli/July 2029                      Company Americas
     Jatuh tempo 2049                 700,000,000         98.83%           17 Juli/July 2019 -        4.88%                                       Due in 2049
                                                                            17 Juli/July 2049
     Jatuh tempo 2030                 500,000,000         99.78%           5 November 2019 -          3.38%        Deutsche Bank Trust            Due in 2030
                                                                        5 Februari/February 2030                   Company Americas
     Jatuh tempo 2050                 500,000,000         99.57%           5 November 2019 -          4.38%                                       Due in 2050
                                                                        5 Februari/February 2050
     Subjumlah                      2,400,000,000                                                                                                       Total
Page 129
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/119 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                               28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Surat Utang Jangka Menengah                     Global          dan            Global Medium-Term Notes and Guaranteed Notes
    Obligasi Terjamin (lanjutan)                                                   (continued)
                                                       Harga                                        Tingkat
                                     Pokok/          penerbitan/          Periode pinjaman/          bunga/          Wali amanat/
                                   Principal *)     Issuing price            Loan Term            Interest rate       Trustee
                                      USD
         Penerbitan tahun 2018                                                                                                                  Issued in 2018
         Jatuh tempo 2028           1,000,000,000      99.62%            21 Mei/May 2018 -            5.45%       Deutsche Bank Trust              Due in 2028
                                                                          21 Mei/May 2028                         Company Americas
         Jatuh tempo 2029            500,000,000       99.00%        25 Oktober/October 2018 -        5.38%                                       Due in 2029
                                                                      25 Januari/January 2029
         Jatuh tempo 2048           1,000,000,000      99.32%            21 Mei/May 2018 -            6.15%       Deutsche Bank Trust             Due in 2048
                                                                          21 Mei/May 2048                         Company Americas
         Jatuh tempo 2049            500,000,000       99.29%        25 Oktober/October 2018 -        6.25%                                       Due in 2049
                                                                      25 Oktober/October 2049
         Subjumlah                  3,000,000,000                                                                                                    Total

         Penerbitan tahun 2017                                                                                                                  Issued in 2017
         Jatuh tempo 2027           1,500,000,000      98.99%             15 Mei/May 2017 -           4.13%       Deutsche Bank Trust              Due in 2027
                                                                           15 Mei/May 2027                        Company Americas
         Jatuh tempo 2047            500,000,000       98.51%             15 Mei/May 2017 -           5.25%                                       Due in 2047
                                                                           15 Mei/May 2047
         Subjumlah                  2,000,000,000                                                                                                    Total

         Penerbitan tahun 2012                                                                                                                  Issued in 2012
         Jatuh tempo 2042           1,000,000,000      98,51%        24 Oktober/October 2012 -        5,25%       Deutsche Bank Trust              Due in 2042
                                                                      24 Oktober/October 2042                     Company Americas
         Obligasi terjamin                                                                                                                 Guaranteed notes
         Penerbitan tahun 2007                                                                                                                Issued in 2007
         Jatuh tempo 2037            288,312,000       98,59%             29 Juni/June 2007 -         7,88%       Deutsche Bank Trust            Due in 2037
                                                                           29 Juni/June 2037                      Company Americas
         Jumlah                    10,188,312,000                                                                                                       Total

   *) dalam jumlah penuh                                                              *) in full amount




    Rincian Surat Utang Jangka Menengah Global dalam                               The details of Global Medium-Term Notes in Euro are as
    Euro adalah sebagai berikut:                                                   follows:

                                                       Harga                                        Tingkat
                                      Pokok/         penerbitan/          Periode pinjaman/          bunga/          Wali amanat/
                                    Principal *)    Issuing price            Loan Term            Interest rate       Trustee
                                       EUR
          Surat utang                                                                                                                        Global medium
             jangka menengah                                                                                                            global term notes
          Penerbitan tahun 2019                                                                                                                Issued in 2019
          Jatuh tempo 2031            500,000,000      99.42%             5 November 2019 -           1.88%       Deutsche Bank Trust             Due in 2031
                                                                           5 November 2031                        Company Americas
          Penerbitan tahun 2018                                                                                                               Issued in 2018
          Jatuh tempo 2025            500,000,000      99.22%        25 Oktober/October 2018 -        2.88%       Deutsche Bank Trust            Due in 2025
                                                                      25 Oktober/October 2025                     Company Americas
          Jumlah                    1,000,000,000                                                                                                       Total

   *) dalam jumlah penuh                                                              *) in full amount
Page 130
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/120 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                          SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI DAN SUKUK IJARAH (lanjutan)                          28. BONDS PAYABLE AND SUKUK IJARA (continued)

    Surat Utang Jangka Menengah                     Global        dan         Global Medium-term Notes and Guaranteed Notes
    Obligasi Terjamin (lanjutan)                                              (continued)

    Rincian Surat Utang Jangka Menengah Global dalam                          The details of Global Medium-Term Notes in Japanese
    Yen Jepang adalah sebagai berikut:                                        Yen are as follows:

                                                     Harga                                     Tingkat
                                    Pokok/         penerbitan/      Periode pinjaman/           bunga/        Wali amanat/
                                  Principal *)    Issuing price        Loan Term             Interest rate     Trustee
                                      JPY
    Surat utang                                                                                                                    Global medium
      jangka menengah                                                                                                         global term notes
    Penerbitan tahun 2019                                                                                                            Issued in 2019
      Jatuh tempo 2029            1,000,000,000      100%           20 September 2019 -          1.05%                                  Due in 2029
                                                                     20 September 2029
    Jumlah                        1,000,000,000       JPY                                                                                     Total

   *) dalam jumlah penuh                                                         *) in full amount



    Perusahaan memenuhi pembatasan-pembatasan                                 The Company complied with the restrictions specified
    yang ditentukan dalam perjanjian Wali Amanat.                             within the agreements with the acting Trustee.

    Dana yang diperoleh dari penerbitan Surat Utang                           The proceeds from the Global Medium-Term Notes and
    Jangka Menengah Global dan Obligasi Terjamin ini                          Guaranteed Notes issued were used to fund the capital
    digunakan untuk mendanai kebutuhan investasi                              expenditure requirements in connection with the fast
    program percepatan pembangunan fasilitas tenaga                           track program, regular construction and for general
    listrik, konstruksi rutin, dan untuk tujuan umum                          corporate purposes.
    korporasi.

    Rincian peringkat untuk seluruh surat utang jangka                        Rating details on all outstanding global medium-term
    menengah global, obligasi terjamin, dan Japanese                          notes, guaranteed notes, and the Japanese Yen bond
    Yen bond yang dimiliki Perusahaan adalah sebagai                          owned by the Company are as follows:
    berikut:

                                                                            Lembaga pemeringkat/Rating agency
                                                    Moody’s Investor          Standard and                                   Japan Credit
                                                     Service, Inc.,              Poor’s           Fitch                         Rating

   Surat utang jangka menengah global
   dalam Dollar Amerika/
   Global medium term notes in US Dollars
   Penerbitan tahun 2020/Issued in 2020                     Baa2                     BBB                     BBB                  n/a
   Penerbitan tahun 2019/Issued in 2019                     Baa2                     BBB                     BBB                  n/a
   Penerbitan tahun 2018/Issued in 2018                     Baa2                     n/a                     BBB                  n/a
   Penerbitan tahun 2017/Issued in 2017                     Baa2                     n/a                     BBB                  n/a
   Penerbitan tahun 2012/Issued in 2012                     Baa2                     BBB                     BBB                  n/a

   Surat utang jangka menengah global
   dalam Euro/
   Global medium term notes in Euro
   Penerbitan tahun 2019/Issued in 2019                     Baa2                     BBB                     BBB                  n/a
   Penerbitan tahun 2018/Issued in 2018                     Baa2                     n/a                     BBB                  n/a

   Obligasi terjamin/Guaranteed notes
   Penerbitan tahun 2007/Issued in 2007                     Baa2                     BBB                     BBB                  n/a

   Obligasi dalam Yen Jepang/
   Japanese Yen Bond
   Penerbitan tahun 2019/Issued in 2019                     Baa2                     BBB                     n/a                BBB+
Page 131
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/121 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)

29. UTANG LISTRIK SWASTA                                                       29. ELECTRICITY PURCHASE PAYABLES

    Akun ini merupakan utang listrik swasta yang                                  This account represents electricity purchase payables,
    direstrukturisasi melalui renegosiasi dengan IPP.                             which were restructured through renegotiation with the
                                                                                  IPPs.

    Rincian  berdasarkan    pemasok     dan                     jadwal            Details according to creditors and payment schedules
    pembayaran pokok adalah sebagai berikut:                                      are as follows:

    a.   Berdasarkan kreditur                                                     a.       By creditor

                                                               30 September/    31 Desember/
                                                               September 30,    December 31,
                                                                   2024             2023

                        PT Paiton Energy                                                                               PT Paiton Energy
                          2024: USD296.102.144                                                               2024: USD296.102.144
                          2023: USD320.915.631                     4,484,171        4,954,616                2023: USD320.915.631
                        PT Jawa Power                                                                                       PT Jawa Power
                          2024: USD43.484.826                                                                 2024: USD43.484.826
                          2023: USD45.416.849                        658,534            701,191               2023: USD45.416.849

                        Jumlah                                     5,142,705        5,655,807                                       Total

                        Dikurangi : bagian jangka pendek             568,375            554,608                  Less : current portion

                        Bagian jangka panjang                      4,574,330        5,101,199                        Long-term portion


    b.   Berdasarkan jadwal pembayaran                                            b.       By instalment schedule
                                                             30 September/       31 Desember/
                                                             September 30,       December 31,
                                                                  2024                 2023

                                 Dibayarkan:                                                                  Payable in:
                                   Dalam satu tahun                 568,375                554,608      Within one year
                                   Pada tahun kedua                 603,288                588,069   In the second year
                                   Pada tahun ketiga                641,314                624,418      In the third year
                                   Pada tahun keempat               682,888                664,045    In the fourth year
                                   Setelah lima tahun              2,646,840            3,224,667       After five years
                                 Jumlah                            5,142,705            5,655,807                   Total


    Utang kepada PT Paiton Energy dan PT Jawa Power                               Payables to PT Paiton Energy and PT Jawa Power bear
    dikenakan bunga sebesar 4,81% dan 18,45% yang                                 annual interest of 4.81% and 18.45%, and are payable
    dibayar dalam 360 kali angsuran bulanan sejak 1                               in 360 monthly installments from January 1, 2002 until
    Januari 2002 sampai dengan 1 Desember 2031.                                   December 1, 2031.

30. UTANG USAHA                                                                30. TRADE PAYABLES

    Akun ini merupakan liabilitas sehubungan dengan                               This account represents payables arising                  from
    pembelian tenaga listrik, bahan bakar, barang jasa.                           purchases of electricity, fuel, goods & services.

    Rincian utang usaha adalah sebagai berikut:                                   Details of trade payables are as follows:
                                                           30 September/         31 Desember/
                                                           September 30,         December 31,
                                                                2024                 2023

                       Pihak berelasi                                                                       Related parties
                         Pembelian bahan bakar,                                                           Purchase of fuel
                           barang dan jasa                     11,526,158               8,842,519     goods and service
                         Pembelian tenaga listrik               7,361,718               6,681,010    Purchase of electricity

                         Subjumlah                             18,887,877              15,523,529                   Subtotal

                       Pihak ketiga                                                                           Third parties
                         Pembelian bahan bakar,                                                           Purchase of fuel
                           barang dan jasa                     29,187,125              24,101,662     goods and service
                         Pembelian tenaga listrik              20,162,548              17,522,336    Purchase of electricity

                         Subjumlah                             49,349,673              41,623,998                   Subtotal
                       Jumlah                                  68,237,550              57,147,527                           Total
Page 132
                                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/122 Schedule

                CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
                KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
                30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
                (Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)


                30. UTANG USAHA (lanjutan)                                                     30. TRADE PAYABLES (continued)

                      Rincian utang usaha berdasarkan mata uang adalah                            Details of trade payables by currency are as follows:
                      sebagai berikut:

                                                         30 September 2024/ September 30, 2024            31 Desember/ December 31, 2023
                                                        Dalam mata                                       Dalam mata
                                                        uang original/                                   uang original/
                                                        In original                 Ekuivalen Rp/        In original            Ekuivalen Rp/
                                                        currencies*)                Rp equivalent        currencies*)           Rp equivalent

                                      Rupiah                         41,430,216          41,430,216           34,893,505             34,893,505
                                      USD                         1,754,537,774          26,570,720        1,432,937,142             22,123,116
                                      Lain - lain **)                15,624,295             236,614            8,478,895                130,906
Purchase of electricity

                                      Jumlah                                           68,237,550                                     57,147,526
                      *)    Dalam jumlah penuh, kecuali Rupiah                                 *)      In full amount, except for Rupiah
                      **)   Utang usaha dalam mata uang lainnya disajikan dalam jumlah         **)     Trade payables in other currencies are presented in USD
                            setara USD, menggunakan kurs tanggal pelaporan                             equivalents using the exchange rate prevailing at the reporting date

                      Lihat Catatan 51 untuk informasi rincian transaksi dan                      Refer to Note 51 for information on the details of
                      saldo dengan pihak berelasi.                                                transactions and balances with related parties.


                31. UTANG LAIN-LAIN                                                            31. OTHER PAYABLES

                                                                           30 September/          31 Desember/
                                                                           September 30,          December 31,
                                                                                2024                  2023
                                                                                                                                    Acquisition of property,
                                   Perolehan aset tetap dan pekerjaan                                                                plant and equipment
                                     dalam pelaksanaan                                                                       and construction in progress
                                     Rupiah                                        5,780,855           4,427,251                                  Rupiah
                                     USD                                           1,095,970           1,782,969                                     USD
                                     EUR                                             230,945             396,655                                     EUR
                                     CHF                                                   -                   -                                     CHF
                                     JPY                                             191,869             369,034                                     JPY
                                     CNY                                                   -                   -                                     CNY
                                   Pemerintah daerah                               2,905,750           2,512,403                          Local government
                                   Uang muka penjualan tenaga listrik              1,837,823           1,622,157     Advances received on sale of electricity
                                   Karyawan                                          171,122              80,143                                 Employees
                                   Lain-lain                                       2,076,467           1,581,575                                     Others
                                   Jumlah                                         14,290,801          12,772,187                                       Total
                                   Dikurangi bagian jangka panjang                  568,295             466,867                       Less long-term portion
                                   Bagian jangka pendek                           13,722,505          12,305,320                            Current portion


                      Pemerintah Daerah                                                          Local Government

                      Utang kepada Pemerintah Daerah merupakan                                   The payables to Local Government represent the amount
                      jumlah yang ditagih Perusahaan dari pelanggan                              collected by the Company from the customers for street
                      untuk pajak penerangan jalan umum. Selanjutnya                             lighting taxes. This is subsequently remitted to the
                      jumlah yang dipungut akan diteruskan kepada                                respective Local Government.
                      Pemerintah Daerah.

                      Uang muka penjualan tenaga listrik                                         Advances received on sale of electricity

                      Akun ini merupakan kas yang diterima atas penjualan                        This account represents cash received from the sale of
                      listrik prabayar.                                                          prepaid electricity.

                      Karyawan                                                                   Employees

                      Utang kepada karyawan terutama merupakan                                   Payable to employees mainly represents receipt of
                      penerimaan di muka atas cicilan penjualan rumah                            advance instalment payments from employees related to
                      dinas.                                                                     house instalments.

                      Lihat Catatan 51 untuk informasi rincian transaksi                         Refer to Note 51 for information on the details of
                      dan saldo dengan pihak berelasi.                                           transactions and balances with related parties.
Page 133
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/123 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)

32. UTANG PAJAK                                                                32. TAXES PAYABLE

                                                          30 September/         31 Desember/
                                                          September 30,         December 31,
                                                              2024                  2023

                       PPN                                   2,700,860                 1,312,139                           VAT
                       PPh Badan                             2,031,397                 1,014,813                            CIT
                       Pajak penghasilan                                                                          Income taxes
                         Pasal 21                              413,299                 1,415,342                  Article 21
                         Pasal 22                              178,363                   191,656                  Article 22
                         Pasal 23 dan 26                        97,866                   138,665         Article 23 and 26
                         Pasal 4(2)                            101,010                   113,958               Article 4 (2)
                         Pasal 15                               27,321                    41,601                  Article 15
                       Lain-lain                                 4,906                     3,771                         Others

                       Jumlah                                5,555,022                 4,231,945                             Total



33. BIAYA MASIH HARUS DIBAYAR                                                33. ACCRUED EXPENSES

                                                            30 September/          31 Desember/
                                                            September 30,          December 31,
                                                                 2024                  2023

              Bunga dan beban keuangan                                                                             Interest and financing charges
              Pihak berelasi                                                                                                        Related parties
                 Utang penerusan pinjaman                           104,738                   323,010                            Two-step loans
                  Utang bank                                        131,501                   397,527                                 Bank loans
                  Utang kepada pemerintah dan                                                                        Government and non bank
                   lembaga keuangan pemerintah non bank                  -                        -       Government financial institution loans

              Jumlah pihak berelasi                                 236,239                   720,537                         Total related parties

              Pihak ketiga                                                                                                               Third parties
                    Utang obligasi dan sukuk ijarah                3,051,525                2,154,153             Bonds payable and sukuk ijara
                    Utang bunga sewa                               1,806,080                  560,948                    Lease liabilities interest
                    Utang bank                                       933,256                1,253,697                                  Bank loans
                    Utang listrik swasta                              38,175                   19,837               Electricity purchase payable

              Jumlah pihak ketiga                                  5,829,036                3,988,635                            Total third parties

              Sub jumlah                                           6,065,275                4,709,172                                       Subtotal

              Biaya operasional                                    4,688,948                3,340,325                          Operational charges

              Jumlah                                              10,754,223                8,049,497                                          Total


    Rincian biaya masih harus dibayar berdasarkan mata                            Details of accrued expenses by currency are as follows:
    uang         adalah         sebagai         berikut:

                              30 September 2024/ September 30, 2024                          31 Desember/ December 31, 2023
                         Dalam mata                                                    Dalam mata
                         uang asing/                                                   uang asing/
                         In foreign                    Ekuivalen Rp/                   In foreign              Ekuivalen Rp/
                         currencies*)                  Rp equivalent                   currencies*)            Rp equivalent

         Rupiah                               5,188,617            5,188,617                    4,191,201                    4,191,201                   Rupiah
         USD                                214,841,860            3,253,565                  200,444,199                    3,094,658                     USD
         JPY                             17,450,128,221            1,855,727                5,802,685,833                      633,711                     JPY
         EUR                                 26,955,010              456,314                    7,604,152                      129,927                     EUR


         Jumlah                                                   10,754,223                                                 8,049,497                    Total

    *)   Dalam jumlah penuh, kecuali Rupiah                                       *)     In full amount, except for Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi dan                        Refer to Note 51 for information on the details of
    saldo dengan pihak berelasi.                                                  transactions and balances with related parties.
Page 134
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/124 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                          SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

34. UANG JAMINAN LANGGANAN                                                34. CUSTOMER SECURITY DEPOSITS

    Akun ini merupakan uang jaminan langganan yang                            This account represents customer security deposits
    ditentukan berdasarkan besar daya dan golongan                            determined based on power supply and electricity tariff.
    tarif. Uang jaminan langganan akan dikembalikan                           Customer security deposits will be refunded, net of
    apabila pelanggan berhenti menjadi pelanggan,                             unpaid electricity bills, upon discontinuation of
    dengan memperhitungkan rekening listrik belum                             customers’ subscriptions.
    dibayar.


35. UTANG BIAYA PROYEK                                                    35. PROJECT COST PAYABLES

    Akun ini merupakan utang kepada kontraktor atas                           This account represents payable to contractors arising
    biaya konstruksi dan pengadaan material. Akun ini                         from construction expenses and purchases of materials.
    akan direklasifikasi ke akun penerusan pinjaman pada                      This account will be reclassified into the two-step loans
    saat penerbitan Withdrawal Authorisation atau                             account at the issuance of the Withdrawal Authorisation
    dokumen lain yang sejenis.                                                or other similar documents.

                                                         30 September/        31 Desember/
                                                         September 30,        December 31,
                                                              2024                2023
                                                             Nilai/               Nilai/
                  Nama Proyek                               Amount               Amount                              Project Name

                   PLTU Kalselteng 2 (2x100 MW)                     -              1,502,488     PLTU Kalselteng 2 (2x100 MW)
                  Lainnya/Others                                 11,254                9,731                            Others

                  Jumlah                                         11,254            1,512,219                                   Total

36. PENJUALAN TENAGA LISTRIK                                              36. SALES OF ELECTRICITY

    Penjualan tenaga listrik berdasarkan pelanggan                            Sales of electricity by customer are as follows:
    adalah sebagai berikut:
                                                            2024                 2023
                                                      (Sembilan Bulan/      Sembilan Bulan/
                                                        Nine Months)         Nine Months)

                        Pihak berelasi (catatan 51)                                             Related parties (note 51)
                        Entitas yang berhubungan                                                 Government related entities
                          dengan pemerintah                 16,911,843           16,420,965
                                                                     -                    -

                        Pihak ketiga                                                                         Third parties
                        Umum                               243,062,001          226,660,990                         Public
                        TNI dan Polri                        1,609,496            1,584,254                  TNI and Polri

                        Subjumlah                          244,671,497          228,245,244                        Subtotal

                        Jumlah                             261,583,340          244,666,209                           Total

                        Masa uji coba                                 -                    --    commisioning test period

                        Jumlah, bersih                     261,583,340          244,666,209                      Total, net


    Pendapatan sebesar Rp261.583.340 (September                               Revenue amounting to Rp261,583,340 (September,
    2023: Rp244.666.209) diakui sepanjang waktu.                              2023: Rp244,666,209) is recognised overtime.

    Pengujian dan masa uji coba (commissioning test)                          Testing and commissioning (commissioning test) are a
    merupakan serangkaian kegiatan pemeriksaan dan                            series of inspection and testing activities for electrical
    pengujian instalasi listrik yang telah selesai dikerjakan                 installations that have been completed and are going
    dan hendak dioperasikan. Sejak 1 Januari 2023,                            into operation. Since January 1, 2023, the cost and
    beban dan pendapatan atas penjualan tenaga listrik                        revenues from the sales of electricity that occurred
    yang terjadi pada masa uji coba diakui ke laba rugi                       during the commissioning test have been recognised in
    berdasarkan Amandemen PSAK No. 16: “Aset Tetap                            profit or loss based on Amendment of SFAS 16:
    – Hasil Sebelum Penggunaan yang Diintensikan”                             “Property, Plant and Equipment – Proceeds Before
    (“Amandemen PSAK 16”). Dampak retrospektif atas                           Intended Use” (“Amendment of SFAS 16”).
    Amandemen PSAK 16 tidak material sehingga                                 Retrospective impact of Amendment of SFAS 16 is
    manajemen tidak melakukan penyajian kembali                               immaterial so management has not restated the prior
    laporan keuangan konsolidasian tahun sebelumnya.                          year’s consolidated financial statements.
Page 135
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/125 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

36. PENJUALAN TENAGA LISTRIK (lanjutan)                      36. SALES OF ELECTRICITY (continued)

    Penjualan tenaga listrik untuk periode 30 September         Sales of electricity for the period September 30, 2024
    2024 dan 2023 didasarkan pada Tarif Dasar Listrik,          and 2023 are based on the Basic Electricity Tariff
    yang ditetapkan oleh Pemerintah dan Pemerintah              determined by the Government and Local Government
    Daerah, sebagai berikut:                                    as follows:

    •    Peraturan Menteri ESDM No. 28 Tahun 2016               •    Regulation of the Ministry of ESDM No. 28 Year
         sebagaimana terakhir diubah dengan Peraturan                2016 most recently amended by Regulation of the
         Menteri ESDM No. 3 Tahun 2020.                              Ministry of ESDM No. 3 Year 2020.
    •    Peraturan Gubernur Kepulauan Riau No. 21 Tahun         •    Regulation of the Governor of Riau Islands No. 21
         2017 tentang tarif tenaga listrik yang disediakan           Year 2017, regarding the tariff of electricity provided
         oleh PLN Batam.                                             by PLN Batam.


    Tidak terdapat penyesuaian tarif sampai dengan 30           There is no electricity tariff adjustment until September
    September 2024 untuk golongan pelanggan non-                30, 2024 for other non-subsidy customers.
    subsidi lainnya.

    Grup tidak memiliki penjualan kepada pelanggan              The Group has no single customer from which it
    dengan jumlah melebihi 10% dari total pendapatan            generates revenue of more than 10% of total revenue.
    usaha.


37. SUBSIDI LISTRIK PEMERINTAH                               37. GOVERNMENT ELECTRICITY SUBSIDY

    Pendapatan subsidi merupakan pendapatan dari                Subsidy revenue represents the revenue from the
    Pemerintah Indonesia atas selisih antara biaya yang         Government of Indonesia for the difference between
    diperbolehkan ditambah margin 7% dengan harga jual          allowable cost plus a 7% margin with actual sales price
    aktual per masing-masing golongan tarif kecuali untuk       for each tariff group except for tariff groups which
    golongan tarif yang telah mendapatkan penyesuaian           received automatic tariff adjustment based on Ministry of
    tarif otomatis menurut Peraturan Menteri ESDM No. 3         ESDM Regulation No. 3 Year 2020 regarding the fourth
    Tahun 2020 tentang perubahan ke-4 atas Peraturan            amendment of Ministry of ESDM Regulation No. 28 Year
    Menteri ESDM No. 28 Tahun 2016 tentang tarif tenaga         2016 regarding electricity tariff for electricity provided by
    listrik untuk listrik yang disediakan oleh PT PLN           PT PLN (Persero).
    (Persero).
Page 136
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/126 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

37. SUBSIDI LISTRIK PEMERINTAH (lanjutan)                          37. GOVERNMENT ELECTRICITY SUBSIDY (continued)

    Pemerintah Republik Indonesia memberikan subsidi                   The Government of the Republic of Indonesia
    listrik kepada pelanggan melalui Perusahaan. Tata                  provides electricity subsidies to customers through the
    cara penghitungan dan pembayaran subsidi listrik                   Company. The procedure for calculation and payment
    tahun anggaran 2024 dan 2023 menggunakan                           of the electricity subsidy for budget years 2023 and
    Peraturan Menteri Keuangan No. 178/PMK.02/2021,                    2022 uses Minister of Finance Regulation No.
    tanggal 7 Desember 2021. Subsidi listrik dihitung dari             178/PMK.02/2021, dated December 7, 2021. The
    selisih negatif antara harga jual tenaga listrik rata-rata         electricity subsidy is calculated from the negative
    (Rp/kWh) dari masing-masing golongan tarif dikurangi               difference between the average sales prices (Rp/kWh)
    biaya pokok penyediaan tenaga listrik (Rp/kWh) pada                of each tariff group less the cost of electricity supplies
    tegangan di masing-masing golongan tarif dikalikan                 (Rp/kWh) on the voltage at each tariff group multiplied
    volume penjualan (kWh) untuk setiap golongan tarif.                by the electricity sales volume (kWh) for each tariff
    Biaya pokok penyediaan tenaga listrik dihitung                     group. The cost of electricity supplies is computed
    berdasarkan formula yang ditetapkan oleh Direktorat                based on the formula determined by the Directorate
    Jenderal Ketenagalistrikan, di bawah Kementerian                   General of Electricity, under the Ministry of ESDM.
    ESDM.

    Berdasarkan Surat Pengesahan Daftar Isian                          Based on Approval Letter of Budget Performance List
    Pelaksanaan Anggaran (“DIPA”) No. SP.DIPA-                         (“DIPA”) No. SP.DIPA-999.07.1.979321/2023 and No.
    999.07.1.979321/2023           dan         SP.DIPA-                SP.DIPA-999.07.1.979321/2022 second revision, the
    999.07.1.979321/2022 revisi ke-2, pagu tertinggi                   electricity subsidy ceiling for the budget years 2024
    subsidi listrik tahun anggaran 2024 dan 2023                       and 2023 amounted to Rp75,831,220 and
    ditetapkan masing-masing sebesar Rp75.831.220 dan                  Rp72,576,859, respectively. The ceiling amount
    Rp72.576.859. Pagu tertinggi tersebut termasuk 7%                  includes a 7% margin above the costs of electricity
    margin di atas biaya pokok penyediaan tenaga listrik.              supply.

    Besarnya subsidi listrik dalam satu tahun anggaran                 The amount of the electricity subsidy within a budget
    secara final ditetapkan berdasarkan hasil audit atas               year is finalised based on the result of the compliance
    ketaatan penggunaan subsidi listrik yang dilakukan oleh            audit of the usage of the electricity subsidy performed by
    auditor yang ditunjuk Direktorat Jenderal Anggaran, di             an auditor assigned by the Directorate General of
    bawah Kementerian Keuangan.                                        Budget under the Ministry of Finance.

    Pendapatan subsidi listrik dirinci selama tahun                    The details of revenue from electricity subsidy during the
    berjalan sebagai berikut:                                          years are as follows:

                                                      2024                  2023
                                                (Sembilan Bulan/       Sembilan Bulan/
                                                  Nine Months)          Nine Months)

    Saldo Awal                                           4,611,800           4,677,328                                 Beginning balance
    Subsidi listrik (Catatan 51)                        58,046,623          49,110,836                      Electricity subsidy (Note 51)
    Realisasi penerimaan subsidi tahun                                                          Realization of subsidy from current year
     anggaran berjalan:                                                                                                         budget:
    Penerimaan tunai                                   (50,829,383)        (42,736,313)                                    Cash received

    Piutang subsidi listrik (Catatan 16)                11,829,041          11,051,851    Receivables for electricity subsidy (Note 16)



38. PENDAPATAN USAHA LAIN-LAIN                                     38. OTHER REVENUES

                                                     2024                  2023
                                               (Sembilan Bulan/       Sembilan Bulan/
                                                 Nine Months)          Nine Months)

         Jaringan dan jasa telekomunikasi              2,803,501            2,027,767     Telecommunication network and service
         Penjualan batu bara                           3,227,058            3,447,969                                   Coal sales
         jasa pemeliharaan                               742,660              501,150                       Maintenance service
         Sewa transformator                              472,132              389,067                         Transformer rental
         Perubahan daya tersambung dan                                                         Upgrading of electricity power and
           administrasi                                    5,122               88,926                      administration fees
         Lain-lain                                     1,796,408              581,573                                      Others

         Jumlah                                        9,046,881            7,036,451                                          Total

    Lihat Catatan 51 untuk informasi rincian transaksi                 Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                   transactions and balances with related parties.
Page 137
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/127 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

39. BEBAN BAHAN BAKAR DAN PELUMAS                                    39. FUEL AND LUBRICANTS EXPENSE

                                                             2024                     2023
                                                       (Sembilan Bulan/          Sembilan Bulan/
                                                         Nine Months)             Nine Months)

                         Bahan bakar minyak                                                                         Fuel
                         High speed diesel                        7,243,461            23,178,523      High speed diesel
                         MFO - Residu                             1,123,174             1,028,789         Fuel marine oil
                         Lain - lain                             24,800,025               231,883                Others

                         Subjumlah                               33,166,661            24,439,195               Subtotal


                         Bahan Bakar - Non Minyak                                                          Non - oil fuel
                         Gas alam                                42,963,469            40,740,470           Natural gas
                         Batu bara                               52,770,266            47,142,601                   Coal
                         Panas bumi                               3,220,714             3,133,385           Geothermal
                         Air                                        296,848               274,611                 Water
                         Biomassa                                   651,562               211,076             Biomassa

                         Subjumlah                               99,902,859            91,502,144               Subtotal

                         Minyak pelumas                            261,633                196,883             Lubricants
                         Jumlah                              133,331,153              116,138,222                  Total

    Tidak ada pembelian dari pemasok tunggal yang                             No purchases from a single supplier exceeded 10% of
    melebihi 10% dari jumlah pendapatan.                                      the total revenues.
    Lihat Catatan 51 untuk informasi rincian transaksi                        Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                          transactions and balances with related parties.


40. BEBAN PEMBELIAN TENAGA LISTRIK                                   40. PURCHASED ELECTRICITY

    Akun ini termasuk pembelian tenaga listrik dari IPP                       This account includes the purchase of electricity from
    terkait PPA dan ESC, pembelian tenaga listrik selama                      certain IPPs in relation to PPAs and ESCs, the purchase
    masa uji coba dan pembelian tenaga listrik dari                           of electricity during the commissioning stage and the
    kelebihan produksi dari IPP tertentu. Rinciannya                          purchase of excess electricity generated by certain IPPs.
    adalah sebagai berikut:                                                   The details are as follows:
                                                    2024                           2023
                                              (Sembilan Bulan/                Sembilan Bulan/
                                                Nine Months)                   Nine Months)

        Pihak berelasi                                                                                                      Related parties
        SSP                                           10,002,468                       10,510,295                                     SSP
        SGPJP                                          9,316,441                        7,719,036                                  SGPJP
        PGE                                            2,872,002                        2,754,607                                     PGE
        BPI                                              887,884                        1,119,808                                      BPI
        Lain lain                                      2,959,305                       3,108,553                                    Others

        Subjumlah                                     26,038,100                      25,212,300                                  Subtotal

        Pihak ketiga                                                                                                         Third parties
        PT Paiton Energy                              11,263,002                       10,597,329                   PT Paiton Energy
        PT Jawa Power                                  7,079,661                        7,283,143                     PT Jawa Power
        PT Bhumi Jati Power                           10,722,122                        9,973,497                PT Bhumi Jati Power
        PT Bhimasena Power Indonesia                   9,648,384                        8,574,491      PT Bhimasena Power Indonesia
        PT Cirebon Energi Prasarana                    5,478,901                        2,365,050        PT Cirebon Energi Prasarana
        PT Lestari Banten Energi                       2,792,279                        3,405,255            PT Lestari Banten Energi
        PT General Energi Bali                         2,705,324                        2,508,003              PT General Energi Bali
        PT Star Energy Geothermal                      2,398,159                        2,213,920         PT Star Energy Geothermal
        PT DSSP Power Sumsel                           1,629,316                        1,682,092            PT DSSP Power Sumsel
        Chevron Geothermal Indonesia Ltd.              1,353,514                        1,599,404   Chevron Geothermal Indonesia Ltd.
        PT Dayabumi Salak Indonesia                    1,610,305                        1,563,067       PT Dayabumi Salak Indonesia
        Lain lain                                     48,289,510                       35,061,830                              Others

        Subjumlah                                    104,970,477                      86,827,081                                  Subtotal

        Jumlah                                       131,008,576                     112,039,381                                      Total
Page 138
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/128 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

41. BEBAN SEWA                                                      41. LEASE EXPENSES


                                                       2024                     2023
                                                 (Sembilan Bulan/          Sembilan Bulan/
                                                   Nine Months)             Nine Months)

      Beban yang berkaitan dengan sewa                                                            Expense relating to variable lease
        dengan pembayaran variabel tidak                                                                   payments not included in
        termasuk dalam kewajiban sewa                         881,870                 831,783                     lease liabilities
      Beban yang berkaitan dengan
        sewa jangka pendek                                    789,242                 527,656 Expense relating to short-term leases
      Beban yang berkaitan dengan                                                                         Expense relating to leases of
        sewa nilai rendah                                     142,905                 103,054                       low value assets

      Jumlah                                               1,814,017                1,462,493                                    Total


42. BEBAN PEMELIHARAAN                                              42. MAINTENANCE EXPENSES

    Akun ini merupakan beban yang timbul dari                             This account represents spare parts used and contractor
    pemakaian material dan jasa borongan untuk                            fees for maintenance purposes. The details of
    keperluan pemeliharaan. Rincian beban pemeliharaan                    maintenance expenses are as follows:
    adalah sebagai berikut:

                                                                    2024                          2023
                                                              (Sembilan Bulan/               Sembilan Bulan/
                                                                Nine Months)                  Nine Months)

                          Jasa borongan                                  17,174,619                  15,325,795
                          Pemakaian material                              4,166,896                   4,012,162
                          Jumlah                                         21,341,516                 19,337,957



43. BEBAN KEPEGAWAIAN                                               43. PERSONNEL EXPENSES

                                                       2024                    2023
                                                (Sembilan Bulan/         Sembilan Bulan/
                                                  Nine Months)            Nine Months)

                 Insentif Kinerja                       4,001,388                2,983,363     performance Incentives
                 Imbalan kerja (catatan 49)             5,242,213                5,257,207 Employee benefits (Note 49)
                 Gaji                                   4,361,895                3,964,936                    Salaries
                 Tunjangan                              6,491,244                6,105,876                 Allowances
                 Lain-lain                              6,208,366                4,581,824                     Others
                 Jumlah                                26,305,105              22,893,206                                 Total

44. BEBAN USAHA LAIN-LAIN                                           44. OTHER OPERATING EXPENSES

                                                    2024                     2023
                                              (Sembilan Bulan/          Sembilan Bulan/
                                                Nine Months)             Nine Months)

           Honorarium                                1,388,394                 1,445,109                             Honorarium
           Pengelolaan pelanggan                       228,451                   167,031                Customer maintenance
           Baca Meter                                1,605,040                 1,417,255                           Meter reading
           Teknologi informasi                         569,879                   150,528              Technological information
            Amortisasi tak berwujud                    633,723                   405,800        Amortisation of intangible assets
           (Pemulihan)/Penyisihan kerugian                                                            (Recoverable)/allowance
              kredit ekspetasian uang                   88,922                   273,881            for accounts receivable
            Lain-lain                                3,296,787                 2,493,407                                  Others

            Jumlah                                   7,811,195                 6,353,011                                      Total
Page 139
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/129 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)


45. BEBAN KEUANGAN                                                          45. FINANCE COSTS

                                                              2024                   2023
                                                        (Sembilan Bulan/        Sembilan Bulan/
                                                          Nine Months)           Nine Months)
         Pihak berelasi                                                                                                       Related parties
         Utang bank                                            2,079,564               1,660,427                                   Bank loans
         Penerusan pinjaman                                      631,476                 670,633                              Two-step loans
         Utang kepada Pemerintah                                  91,768                 125,188                          Government loans
         Instrumen derivatif                                     327,428                 486,119                         Derivatife instrument
         Subjumlah                                             3,130,236               2,942,367                                       Subtotal

         Pihak ketiga                                                                                                            Third parties
         Utang obligasi                                        5,700,099               5,939,779                                Bonds payable
         Utang bank                                            4,180,791               3,716,239                                   Bank loans
         Utang sewa (Catatan 26)                               4,843,261               2,454,426                    Lease liabilities (Note 26)
         Utang listrik swasta                                    272,298                 291,351                 Electricity purchase payable
         Lain-lain                                               161,243                 233,864                                        Others
         Subjumlah                                            15,157,692              12,635,659                                       Subtotal
         Jumlah                                               18,287,928              15,578,025                                            Total

    *)   (Pendapatan)/beban    keuangan    dari   transaksi   instrumen          *)   Finance (income)/expense    from   transaction   of   derivative
         derivatif.                                                                   instrument.



46. PENGHASILAN LAIN-LAIN - BERSIH                                          46. OTHER INCOME - NET

                                                               2024                  2023
                                                         (Sembilan Bulan/       Sembilan Bulan/
                                                           Nine Months)          Nine Months)

           Bagian laba (rugi) bersih entitas                                                                Equity in net income of associates
             asosiasi dan ventura bersama (Catatan 9)            2,860,071            2,575,081              and joint ventures (Note 9)
           Penghasilan denda administrasi                        1,277,213            1,498,823                 Administrative penalty income
           Keuntungan penjualan aset tidak digunakan                                                          Gain on sale of assets not used
             dalam operasi                                          67,014              220,934                                in operations
           Penghasilan jasa dan klaim                               53,254               37,937                      Claim and service income
           Kerugian penurunan nilai                                                                    Loss on impairment og assets not used
             aset tetap tidak digunakan                                                                               in operations (Note 6)
             dalam operasi(Catatan 6)                             (941,219)            (361,436)
           Beban penelitian                                       (177,853)             (72,783)                         Research expenses
           Program pemberdayaan lingkungan                        (357,947)            (308,618)        Community development programs
           Cadangan atas ketidakpastian dalam                                                                       Allowance for uncertainty
             perlakuan pajak                                     (1,179,961)          (1,510,604)                       over tax treatment
           Lain-lain                                               (635,672)          (1,693,612)                                      Others

           Jumlah                                                  964,900              385,722                                             Total




47. PAJAK PENGHASILAN                                                       47. INCOME TAX


                                                          2024                      2023
                                                    (Sembilan Bulan/           Sembilan Bulan/
                                                      Nine Months)              Nine Months)
            Pajak kini                                                                                                        Current tax
              Perusahaan                                                                                                 The Company
                Tahun berjalan                                  422,637                1,285,858                         Current tax

               Entitas anak                                                                                                Subsidiaries
                 Tahun berjalan                               2,161,989                  862,409                         Current year
                 Tahun sebelumnya                                     --                       --                          Prior year
Page 140
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/130 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                    47. INCOME TAX (continued)

                                                       2024                 2023
                                                 (Sembilan Bulan/      Sembilan Bulan/
                                                   Nine Months)         Nine Months)

               Pajak tangguhan                                                                                    Deferred tax
                 Perusahaan                                690,479                995,873                      The Company
                 Entitas anak                            3,298,258              4,193,748                       Subsidiaries

                                                         3,988,738              5,189,621

               Jumlah beban pajak                        6,573,364              7,337,888         Total income tax expenses

    a.    Pajak kini                                                    a.    Current tax

         Rekonsiliasi antara laba sebelum pajak                               The reconciliation between the consolidated profit
         penghasilan konsolidasian dengan estimasi                            before income tax and the estimated taxable
         penghasilan kena pajak adalah sebagai berikut:                       income is as follows:


                                                      2024                 2023
                                                (Sembilan Bulan/      Sembilan Bulan/
                                                  Nine Months)         Nine Months)

         Laba (rugi) sebelum pajak                                                          Income (loss) before tax per consolidated
           menurut laporan laba rugi                                                               statements of profit or loss and
           komprehensif konsolidasian                 31,709,473              33,347,683              other comprehensive income
         Laba sebelum pajak                                                                            Income before tax attributable
           entitas anak                              (29,828,098)            (26,138,666)                            to subsidiaries
         Disesuaikan dengan jurnal                                                                      Adjustment for consolidation
           eliminasi konsolidasian                       (20,602)                      --                       elimination entries

         Laba (rugi) sebelum pajak Perusahaan          1,860,774               7,209,017     Income (loss) before tax - the Company
         Perbedaan temporer:                                                                                 Temporary differences:
           Beban sewa                                  1,218,445               (933,167)                          Lease expenses
           Penyambungan pelanggan                      5,507,961               5,686,493                Customer connection fees
                                                                                                    Depreciation of property, plant
           Penyusutan aset tetap                     (12,817,766)            (12,201,525)                        and equipment
           Imbalan kerja                                2,185,402               1,592,816                      Employee benefits
           Kapitalisasi biaya fiskal                  (1,707,936)             (1,165,529)
           Penyisihan piutang ragu-ragu dan                                                    Allowance for doubtful accounts and
             penurunan nilai persediaan                   38,003                 308,327           decline in value of inventories
           Kesejahteraan karyawan                        192,718                 852,822                          Employee welfare
           Penghasilan bunga telah                                                                                  Interest income
             dikenakan pajak final                      (537,237)              (448,550)                     subjected to final tax
           Bunga obligasi internasional                                                               International bond obligation
           Revaluasi aset                                                                                        Assets revaluation
           Beban lain tidak dapat dikurangkan          5,980,715               4,944,101            Other nondeductible expenses

         Estimasi laba fiskal kena pajak                                                                    The Company's taxable
           Perusahaan tahun berjalan                   1,921,079               5,844,807                      income for the year

         Beban pajak kini - Perusahaan                   422,637               1,285,858                 Current tax - the Company

         Beban pajak kini - Entitas anak               2,161,989                 862,409             Current tax - the Subsidiaries

         Total beban pajak                             2,584,627               2,148,266                      Income tax expenses


          Laba kena pajak hasil rekonsiliasi menjadi dasar                    The taxable income resulting from the reconciliation
          dalam pengisian Surat Pemberitahuan Tahunan                         will become the basis for filing the Annual CIT
          PPh Badan.                                                          Return.
Page 141
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/131 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                                         47. INCOME TAX (continued)

    b.     Pajak tangguhan                                                                     b.     Deferred tax

           Rincian dari aset dan liabilitas pajak tangguhan                                           The details of the Group deferred tax assets and
           Grup adalah sebagai berikut:                                                               liabilities are as follows:

                                                                        30 September 2024/ September 30, 2024
                                                                                                Dikreditkan
                                                                             Dikreditkan       (dibebankan)
                                                                           (dibebankan)       ke pendapatan
                                                                             ke laporan     komprehensif lain/
                                                                             Laba rugi/     Credited (charged)
                                                      1 Januari/              Credited            to other          Saldo akhir/
                                                      January 1,            (charged) to     comprehensive           Ending
                                                         2024                 income              income              balance

              Aset Pajak tangguhan                                                                                                                 Deferred tax assets
               Akumulasi rugi fiskal                              -                     -                      -                 -         Accumulated fiscal losses
               Liabilitas imbalan kerja                     175,591               (63,103)                   608           113,096        Employee benefit liabilities
               Pendapatan ditangguhkan                          427                  (427)                     -                 -                  Deferred incomes
               Aset hak guna                                  2,128                (2,117)                     -                11               Right On Use Asset
               Utang sewa                                    (3,503)               27,711                      -            24,208                   Lease Liabilities
               Aset tetap                                   223,943              (104,390)                     -           119,554     Property, plant and equipment
               Bonus                                         47,654               (47,691)                     -               (37)                            Bonus
               Penyisihan persediaan                         30,646               (11,641)                     -            19,005              Provision inventories
               Penyisihan piutang usaha                      58,598               (22,033)                     -            36,565      Provision Account receivable
               Laba dari entitas asosiasi                         -                     -                      -                 -           Income form associates
               Biaya ditangguhkan                                 -                     -                      -                 -                  Deferred charges
               Lainnya                                        5,210                 7,105                      -            12,315                             Others
              Jumlah                                        540,694              (216,586)                   608           324,717                                 Total

              Liabilitas pajak tangguhan                                                                                                        Deferred tax liabilities
               Akumulasi rugi fiskal                              -                      -                     -                  -        Accumulated fiscal losses
               Liabilitas imbalan kerja                  14,475,297             (1,010,059)            1,740,871         15,206,109       Employee benefit liabilities
               Pendapatan ditangguhkan                    6,293,502              1,260,528                     -          7,554,030                 Deferred revenue
               Aset hak guna                             (5,559,384)               488,025                     -         (5,071,359)             Right On Use Asset
               Utang Sewa                                 1,895,287               (624,490)                    -          1,270,797                   Lease liabilities
               Aset tetap                               (75,622,115)            (3,877,713)                    -        (79,499,828)   Property, plant and equipment
               Bonus                                        173,319               (137,318)                    -             36,001                            Bonus
               Provision inventories                         82,970                  6,582                     -             89,552             Provision Inventories
               Provision Account receivable                   3,276                  2,699                     -              5,975     Provision Account receivable
               Penyertaan pada entitas asosiasi                   -                      -                     -                  -          Income form associates
               Deferred charges                                   -                      -                     -                  -                 Deferred charges
               Lainnya                                       29,109                113,811                     -            142,920                            Others
              Jumlah                                    (58,228,739)            (3,777,935)            1,740,871        (60,265,803)                                Total

                                                                                (3,994,521)            1,741,479        (59,941,086)


                                                                       31 Desember/ December 31, 2023
                                                                                          Dibebankan
                                                                     Dikreditkan/       ke penghasilan
                                                                    (dibebankan)         komprehensif
                                                                      ke laporan              lain/
                                                                       laba rugi/          Charged
                                              Saldo awal/              Credited/            to other               Saldo akhir/
                                              Beginning              (charged) to       comprehensive                Ending
                                               balance              profit or loss          income                   balance

         Aset pajak tangguhan                                                                                                                   Deferred tax assets
         Akumulasi rugi fiskal                         1,709                  (1,709)                       -                   -            Accumulated tax losses
         Liabilitas imbalan kerja                    107,178                  66,623                    1,791             175,592         Employee benefit liabilities
         Liabilitas sewa                               6,446                  (7,820)                       -              (1,374)                     Lease liabilities
         Aset tetap                                  124,192                  99,752                        -             223,944      Property, plant and equipment
         Penyisihan penurunan                                                                                                               Provision for impairment
            nilai piutang                             91,959                  (33,360)                       -              58,599           losses of receivables
         Penyisihan persediaan                        29,064                    1,583                        -              30,647          Provision for inventories
         Bonus                                        57,293                   (9,639)                       -              47,654                            Bonuses
         Bagian laba bersih dari                                                                                                                    Share net income
            entitas asosiasi dan                                                                                                              from associates and
            ventura bersama                                (3)                      3                        -                   -                    joint ventures
         Lainnya                                        9,610                  (3,978)                       -               5,632                            Others

         Jumlah                                      427,448                 111,455                    1,791             540,694                                 Total

         Liabilitas pajak tangguhan                                                                                                          Deferred tax liabilities
         Liabilitas imbalan kerja                  15,042,706                 696,458               (1,263,919)         14,475,245        Employee benefit liabilities
         Pendapatan ditangguhkan                    4,646,551               1,646,951                        -           6,293,502                  Deferred revenue
         Liabilitas sewa                            2,181,801                (286,515)                       -           1,895,286                    Lease liabilities
         Aset hak guna                             (5,515,652)                (43,732)                       -          (5,559,384)               Right-of-use assets
         Aset tetap                               (64,983,639)            (10,562,283)                 (76,177)        (75,622,099)    Property, plant and equipment
         Bonus                                        178,156                  (4,838)                       -             173,318                           Bonuses
         Penyisihan persediaan                         35,956                  47,014                        -              82,970          Provision for inventories
         Penyisihan penurunan                                                                                                               Provision for impairment
            nilai piutang                               1,902                  1,374                        -                3,276           losses of receivables
         Lainnya                                      (15,242)                39,927                    4,462               29,147                             Others

         Jumlah                                   (48,427,461)             (8,465,644)              (1,335,634)        (58,228,739)                               Total

                                                                           (8,354,189)              (1,333,843)        (57,688,045)
Page 142
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/132 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                       (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                                             47. INCOME TAX (continued)

    b.     Pajak tangguhan (lanjutan)                                                            b.     Deferred tax (continued)

           Pajak atas laba sebelum pajak konsolidasian                                                  The tax on the consolidated profit before income tax
           berbeda dengan jumlah teoritis yang dihitung                                                 differs from the theoretical amount that would arise
           menggunakan rata-rata tertimbang tarif pajak                                                 using the weighted average tax rate applicable of
           yang berlaku atas laba/(rugi) masing-masing                                                  profit/(loss) of the consolidated subsidiaries as
           entitas anak yang dikonsolidasi sebagai berikut:                                             follows:

                                                                             2024            2023
                                                                       (Sembilan Bulan/ Sembilan Bulan/
                                                                         Nine Months)    Nine Months)


                   Laba sebelum pajak menurut                                                                                              Profit before tax pe
                     Laporan laba rugi                                                                                           consolidated statements of
                     komprehensif konsolidasian                                31,709,473                33,347,683                 comprehensive income

                   Beban pajak                                                                                                                       Tax expense
                   Pajak sesuai tarif berlaku                                                                                           at prevailing rate of 22%
                     sesuai tarif yang berlaku 22%                               6,976,084                 7,336,490                          at prevailing rate

                   Pengaruh pajak atas:                                                                                                        Tax effect on:
                   Utilitasi rugi fiskal                                                                                          Utilisation of tax loss carry
                     yang dibawa ke masa depan                                                                                         forward in current year
                     Kesejahteraan karyawan                                         444,291                   324,450                     Employee welfare
                   Bagian atas laba bersih                                                                                             Share in net income of
                     entitas asosiasi dan ventura bersama                       (6,006,421)                  (677,241)         associates and joint venture
                     Penghasilan bunga dikenakan                                                                              Interest income subjected to
                        pajak final                                                (190,134)                 (107,186)                                 final tax
                     Revaluasi Aset                                                                                                  Revaluation of Assets
                     Beban lain tidak dapat dikurangkan                          5,349,545                    461,374       Other nondeductible expenses

                   Jumlah                                                        6,573,364                 7,337,887                                                  Total


    c.     Surat ketetapan pajak                                                                 c.     Tax assessment letters


                                                                                                    Jumlah yang        Jumlah yang
                                                                                                    diperkarakan       diperkarakan
                                                       Tahun                                       dalam Rupiah/      dalam Rupiah/
                                                       pajak/       Surat ketetapan pajak/            Dispute            Dispute
                         Jenis pajak/                  Fiscal         Tax assessment               amount in IDR      amount in IDR                          Status/ Status
                          Tax Type                      year                letter              30 September 2024   31 Desember 2023

         PLN
          PPN Pemungut/VAT Collector                   2016     Kurang bayar/Underpayment                     58               19,468     Banding diterima sebagian/Appeal partially granted
          PPh pasal 21/Income tax art 21               2017     Kurang bayar/Underpayment                 35,522               35,522     Banding diterima sebagian/Appeal partially granted
          PPh pasal 22/Income tax art 22               2017     Kurang bayar/Underpayment                364,684              364,684     Banding diterima sebagian/Appeal partially granted
          PPh pasal 23/Income tax art 23               2017     Kurang bayar/Underpayment                 49,274               49,274     Banding diterima sebagian/Appeal partially granted
          PPh pasal 4 ayat (2)/Income tax art 4(2)     2017     Kurang bayar/Underpayment                198,992              198,992     Banding diterima sebagian/Appeal partially granted
          PPN Dalam Negeri/Domestic VAT                2017     Kurang bayar/Underpayment                278,105              278,105     Banding diterima sebagian/Appeal partially granted
          PPN Pemungut/VAT Collector                   2017     Kurang bayar/Underpayment                304,029              304,029     Banding diterima sebagian/Appeal partially granted
          STP PPN dalam negeri/Tax assessment letter   2017     Kurang bayar/Underpayment                 41,383               41,383     Banding diterima sebagian/Appeal partially granted
         domestic VA                                                                                                                      Banding diterima sebagian/Appeal partially granted
          PPN Pemungut/VAT Collector                   2018     Kurang bayar/Underpayment                310,037              310,037     Banding diterima sebagian/Appeal partially granted
Page 143
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                Lampiran 5/133 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                                           47. INCOME TAX (continued)

    c.   Surat ketetapan pajak (lanjutan)                                                      c.     Tax assessment letters (continued)
                                                                                                   Jumlah yang         Jumlah yang
                                                                                                   diperkarakan        diperkarakan
                                                     Tahun                                        dalam Rupiah/       dalam Rupiah/
                                                     pajak/       Surat ketetapan pajak/             Dispute             Dispute
                         Jenis pajak/                Fiscal          Tax assessment               amount in IDR       amount in IDR                          Status/ Status
                          Tax Type                    year                 letter              30 September 2024    31 Desember 2023
         PPh pasal 21/Income tax art 21               2018    Kurang bayar/Underpayment                   336,283              336,283   Peninjauan kembali / judicial review
         PPh pasal 22/Income tax art 22              2018     Kurang bayar/Underpayment                   48,455               176,068    Peninjauan kembali / judicial review
         PPh pasal 23/Income tax art 23              2018     Kurang bayar/Underpayment                2,380,167             2,380,167    Proses peninjauan kembali / judicial review in
                                                                                                                                         progress
         PPh pasal 4 ayat (2)/Income tax art 4(2)    2018     Kurang bayar/Underpayment                2,950,557             2,950,558    Proses peninjauan kembali / judicial review in
                                                                                                                                         progress
         Bea meterai/Stamp duty                      2018     Kurang bayar/Underpayment                  199,341               199,341    Peninjauan kembali / judicial review
         PPh pasal 21/Income tax art 21              2019     Kurang bayar/Underpayment                  114,695               114,695    Banding / Appeal
         PPh pasal 22/Income tax art 22              2019     Kurang bayar/Underpayment                  499,208               499,208    Proses peninjauan kembali / judicial review in
                                                                                                                                         progress
         PPh pasal 4 ayat (2)/Income tax art 4(2)    2019     Kurang bayar/Underpayment                1,064,279             1,064,278    Banding / Appeal
         PPh pasal 26/Income tax art 26              2019     Kurang bayar/Underpayment                  215,145               215,145    Proses peninjauan kembali / judicial review in
                                                                                                                                         progress
         Bea meterai/Stamp Duty                      2019     Kurang bayar/Underpayment                  377,385               188,692    Proses peninjauan kembali / judicial review in
                                                                                                                                         progress
         PPh Badan/Corporate income tax              2019     Kurang bayar/Underpayment                3,061,305             3,061,305    Banding / Appeal
         PPN pemungut/VAT collector                  2019     Kurang bayar/Underpayment                  878,959               878,959    Proses peninjauan kembali / judicial review in
                                                                                                                                         progress
         PPh pasal 4 ayat (2)/ Income tax art 4(2)   2020     Kurang bayar/Underpayment                  477,687               477,687    Keberatan/Objection

         Bea meterai/Stamp duty                      2020     Kurang bayar/Underpayment                   79,048                39,524   Keberatan/Objection
         PPh pasal 21/Income tax art 21              2020     Kurang bayar/Underpayment                   13,981                13,981   Keberatan/Objection
         PPh pasal 22/Income tax art 22              2020     Kurang bayar/Underpayment                  241,613               241,613   Keberatan/Objection
         PPh pasal 23/Income tax art 23              2020     Kurang bayar/Underpayment                1,342,502               671,251   Keberatan/Objection
         PPh Badan/Corporate income tax              2020     Kurang bayar/Underpayment                2,630,836             1,622,641   Keberatan/Objection
         PPh pasal 26/Income tax art 26              2020     Kurang bayar/Underpayment                   46,735                46,735   Keberatan/Objection
         PPN dalam negeri/Domestic VAT               2020     Kurang bayar/Underpayment                   84,257                84,257   Keberatan/Objection
         STP PPN dalam negeri/                       2020     Kurang bayar/Underpayment                   11,847                11,847   Keberatan/Objection
         Tax assessment letter domestic
         VAT

         PNP
         PPh pasal 22/Income Tax Art 22              2019     Kurang bayar/Underpayment                  136,172               136,172   Keberatan/Objection


         PPh Badan/Corporate income tax              2019     Kurang bayar/Underpayment                        -                18,555   Banding diterima sebagian/Appeal partially granted

         PIP
         PPh Badan/Corporate income tax              2016     Kurang bayar/Underpayment                   16,608                16,094   Keberatan/Objection


         PPh pasal 23/Income tax art 23              2018     Kurang bayar/Underpayment                   19,925                19,925   Banding/Appeal
         PPh pasal 4 ayat (2)/ Income tax art 4(2)   2018     Kurang bayar/Underpayment                  136,071               136,071   Banding/Appeal

         PPh pasal 22/Income tax art 22              2019     Kurang bayar/Underpayment                    7,714               108,289   Banding diterima sebagian/Appeal partially granted
         PPh pasal 22/Income tax art 22              2020     Kurang bayar/Underpayment                   31,808                31,808   Keberatan/Objection

         PPh Badan/Corporate income tax              2020     Kurang bayar/Underpayment                   15,863                         Keberatan/Objection

         PPh pasal 22/Income tax art 22              2021     Kurang bayar/Underpayment                   50,122                50,122   Keberatan/Objection

         PPh Badan/Corporate income tax              2022     Kurang bayar/Underpayment                    8,918                         Keberatan/Objection

         PPh pasal 4 ayat (2)/ Income tax art 4(2)   2021     Lebih bayar/Overpayment                        678                         Banding/Appeal
Page 144
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/134 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                           SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                    (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                                          47. INCOME TAX (continued)

    c.   Surat ketetapan pajak (lanjutan)                                                     c.    Tax assessment letters (continued)
                                                                                                 Jumlah yang         Jumlah yang
                                                                                                 diperkarakan        diperkarakan
                                                    Tahun                                       dalam Rupiah/       dalam Rupiah/
                                                    pajak/       Surat ketetapan pajak/            Dispute             Dispute
                          Jenis pajak/              Fiscal         Tax assessment               amount in IDR       amount in IDR                          Status/ Status
                           Tax Type                  year                letter              30 September 2024    31 Desember 2023

         Haleyora Power
         PPh Badan/Corporate income tax             2016     Kurang bayar/Underpayment                 12,680                12,680     Banding/Appeal
         PPh Badan/Corporate income tax             2017     Kurang bayar/Underpayment                 12,655                12,655     Banding/Appeal
         PPh pasal 22/Income tax art 22             2017     Kurang bayar/Underpayment                    122                   122     Banding/Appeal
         PPN pemungut/VAT collector                 2017     Kurang bayar/Underpayment                  4,891                 4,891     Banding/Appeal
         PPh Badan/Corporate income tax             2018     Kurang bayar/Underpayment                  6,660                           Banding/Appeal
         PPN pemungut/VAT collector                 2019     Kurang bayar/Underpayment                      -                  9,887    Banding diterima sebagian/Appeal partially granted
         PPh Badan/Corporate income tax             2022     Lebih bayar/Overpayment                        -                  9,467    Banding diterima sebagian/Appeal partially granted
         PPh Badan/Corporate income tax             2023     Kurang bayar/Underpayment                      -                           Banding/Appeal

         EPI
         PPh Badan/Corporate income tax             2017     Lebih bayar/Overpayment                         -               40,914     Banding/Appeal


         PPN/VAT                                    2020     Lebih bayar/Overpayment                                         12,503     Keberatan/Objection
         PPh Badan/Corporate income tax             2022     Lebih bayar/Overpayment                   12,523                34,823     Pemeriksaan/Inspection
         PPh Badan/Corporate income tax             2023     Lebih bayar/Overpayment                  389,974                           Keberatan/Objection

         TARAKAN
         PPh pasal 21/Income tax art 21             2017     Kurang bayar/Underpayment                                         1,036    Banding diterima sebagian/Appeal partially granted
         PPh pasal 23/Income tax art 23             2017     Kurang bayar/Underpayment                                           108    Banding diterima sebagian/Appeal partially granted
         PPh pasal 4 ayat (2)/Income tax art 4(2)   2017     Kurang bayar/Underpayment                                             4    Banding diterima sebagian/Appeal partially granted
         PPh Badan/Corporate income tax             2017     Kurang bayar/Underpayment                                         8,905    Banding diterima sebagian/Appeal partially granted
         PPh Badan/Corporate income tax             2019     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPh pasal 21/Income tax art 21             2019     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPh pasal 23/Income tax art 23             2019     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPh pasal 4 ayat (2)/Income tax art 4(2)   2019     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPh pasal 23/Income tax art 23             2021     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPh pasal 4 ayat (2)/Income tax art 4(2)   2021     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPN pemungut/VAT collector                 2021     Kurang bayar/Underpayment                       -                          Banding/Appeal
         PPh Badan/Corporate income tax             2022     Kurang bayar/Underpayment                       -                          Banding/Appeal

         COMNET
         PPh Badan/Corporate income tax             2022     Lebih bayar/Overpayment                  152,819                           Keberatan/Objection

         Jumlah/Total                                                                               19,652,571            17,540,761

         Provisi/Provision                                                                          (6,093,564)           (4,908,174)

         Jumlah bersih/Total, net                                                                   13,559,007            12,632,587



         Pada tanggal 11 Januari 2023, Perusahaan telah                                            On January 11, 2023, the Company received the
         menerima Surat Perintah Membayar Kelebihan                                                Tax Overpayment Refund Instruction (“SPMKP”)
         Pajak       (“SPMKP”)          No.      KEP-                                              No.KEP-00001/PPH/KPP.1903/2023 concerning
         00001/PPH/KPP.1903/2023 tentang Keputusan                                                 the decision on SKPKB Income Tax Article 4(2)
         SKPKB PPh Pasal 4(2) dengan keputusan                                                     with the decision of tax refund through
         pengembalian pajak melalui kompensasi                                                     compensating the SPMKP amounting to
         SPMKP sebesar Rp238.979 dan penerimaan                                                    Rp238,979 and cash receipts amounting to
         kas sebesar Rp781.461 untuk masa pajak                                                    Rp781,461 for the fiscal period December 2017.
         Desember 2017. Pada tanggal 16 November                                                   On November 16, 2022, DJP has submitted the
         2022, DJP telah mengajukan Peninjauan                                                     Judicial Review regarding the appeal decision.
         Kembali atas putusan banding. Selama tahun                                                During 2023, the Company has received several
         2023, Perusahaan telah menerima beberapa                                                  Decrees of Supreme Court Judicial Review for
         Putusan atas Peninjauan Kembali Mahkamah                                                  taxes fiscal year 2017 and 2018. Up to the
         Agung untuk pajak tahun 2017 dan 2018.                                                    completion date of these consolidated financial
         Sampai dengan tanggal penyelesaian laporan                                                statements, several tax cases are still in the
         keuangan konsolidasian ini, beberapa kasus                                                process of being examined in the Supreme Court.
         perpajakan masih dalam proses pemeriksaan di
         Mahkamah Agung.


         Selama tahun 2024, Grup telah menerima                                                    During 2024, the Group received tax refunds from
         pengembalian pajak dari hasil keberatan dan                                               the proceeds of the objections and appeals for
         banding untuk tahun fiskal 2016 dan 2018                                                  fiscal years 2016 and 2018 amounted to
         sebesar   Rp220.647     yang    terdiri dari                                              Rp220,647 consisting of tax refunds for
         pengembalian pajak atas kurang bayar PPN                                                  underpayment of VAT amounted to Rp19,469,
         sebesar Rp19.469, PPh Pasal 22 sebesar                                                    Income Tax Article 22 amounted to Rp127,612,
         Rp127.612, dan PPh Pasal 26 sebesar                                                       and Income Tax Article 26 amounted to
         Rp73.566. Grup menerima pengembalian pajak                                                Rp73,566. The Group received those tax refunds
         tersebut melalui penerimaan kas sebesar                                                   through cash receipts amounting to Rp220,589
         Rp220.589 dan melalui pemotongan utang pajak                                              and through a deduction of tax payables
         sebesar Rp58.                                                                             amounting to Rp58.
Page 145
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/135 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                               47. INCOME TAX (continued)

    c.   Surat ketetapan pajak (lanjutan)                          c. Tax assessment letters (continued)

         Pada tanggal 7 November 2023, Perusahaan                    On November 7, 2023, the Company received a
         menerima Surat Hasil Pemeriksaan Pajak                      Tax Audit Result Letter ("SPHP”) from the DJP
         (“SPHP”) dari DJP atas pemeriksaan pajak tahun              regarding the tax audit for fiscal year 2020. The
         fiskal 2020. Perusahaan telah memberikan                    Company has submitted a response towards the
         tanggapan atas SPHP tersebut pada tanggal 16                SPHP on November 16, 2023. Afterwards, the
         November 2023. Kemudian, Perusahaan telah                   Company received a Tax Underpayment
         menerima Surat Ketetapan Pajak Kurang Bayar                 Assessment Letter (“SKPKB”) with a total tax
         (“SKPKB”) dengan jumlah kurang bayar pajak                  underpayment amounting to Rp9,840,654 and
         sebesar Rp9.840.654 dan telah melakukan                     has made a payment amounting to Rp3,209,536.
         pembayaran sebesar Rp3.209.536.

         Pada tanggal 7 Februari 2024, Perusahaan telah              On February 7, 2024, the Company has made an
         melakukan pembayaran tambahan sebesar                       additional payment of Rp1,753,012 for the
         Rp1.753.012 atas SKPKB tahun fiskal 2020.                   SKPKB fiscal year 2020. The Company has
         Perusahaan     telah    menyampaikan     surat              submitted objection letters to DJP regarding
         keberatan atas SKPKB tahun fiskal 2020 kepada               SKPKB for fiscal year 2020 on February 26, 2024.
         DJP pada tanggal 26 Februari 2024.

         Selama periode sembilan bulan yang berakhir 30              During nine months periods ended September
         September 2024, Grup telah menerima                         30, 2024, Group received tax refunds from the
         pengembalian pajak dari hasil keberatan dan                 processed of the objections and appeals for fiscal
         banding untuk tahun fiskal 2016 atas PPN                    years 2016 consisting of VAT amounted
         sebesar Rp19.469, tahun fiskal 2018 atas PPh                Rp19,469, fiscal years 2018 consisting of income
         pasal 22 sebesar Rp127.612 dan PPh pasal 26                 tax art 22 amounted Rp127,612 and income tax
         sebesar Rp73.565.                                           art 26 amounted Rp73,565.

         Manajemen berkeyakinan bahwa provisi atas                   Management believes that the provision against
         ketidakpastian posisi pajak telah mencukupi.                uncertain tax positions is adequate.

    d.   Administrasi                                             d. Administration

         Berdasarkan undang-undang perpajakan yang                    Based on the taxation laws in Indonesia,
         berlaku di Indonesia, perusahaan-perusahaan di               companies within the Group which are domiciled in
         dalam Grup yang berdomisili di Indonesia                     Indonesia calculate and pay tax based on self-
         menghitung dan membayar sendiri besarnya                     assessment. The DJP may assess or amend taxes
         jumlah pajak yang terutang. DJP dapat                        within five years of the time the tax becomes due.
         menetapkan atau mengubah pajak dalam batas
         waktu lima tahun saat terutangnya pajak.


48. LABA PER SAHAM DASAR DAN DILUSIAN                          48. BASIC AND DILUTED EARNINGS PER SHARE

                                              30 September/     30 September/
                                              September 30,     September 30,
                                                   2024              2023

         Laba konsolidasian tahun berjalan
            yang dapat diatribusikan kepada                                          Consolidated profit for the year
            pemilik entitas induk                 25,131,369         25,988,262           attributable to owners
         Rata-rata tertimbang jumlah                                                   Weighted average number of
            saham biasa yang beredar                                                 ordinary shares outstanding
            (dalam ribuan lembar saham)             146,961            145,536            (in thousand of shares)

         Laba bersih per saham dasar                                                         Basic earnings per share
            yang dapat diatribusikan                                                  attributable to the owners
            kepada pemilik entitas induk                                                      of the parent entity
            (dalam Rupiah penuh)                    171,007            178,569            (in Rupiah full amount)

    Perusahaan tidak mempunyai efek berpotensi dilusi              The Company did not have potential dilutive ordinary
    saham, sehingga laba per saham dasar sama dengan               shares, therefore basic earnings per share is the same
    laba per saham dilusian.                                       as the dilutive earnings per share.
Page 146
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/136 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA                                      49. EMPLOYEE BENEFITS LIABILITIES


                                               30 September/         31 Desember/
                                               September 30,         December 31,
                                                    2024                 2023
     Liabilitas imbalan kerja jangka pendek                                                     Short-term employee benefit liabilities
     Bonus dan insentif prestasi kerja                3,153,519            4,250,487                  Bonus and perfomance incentives
     Liabilitas pascakerja jangka pendek              4,226,336            3,631,893    Post-employment benefits liability - current portion
     Jumlah                                           7,379,855            7,882,380                                                  Total


     Liabilitas imbalan kerja jangka panjang                                                      Long-term employee benefit liabilities
     Imbalan pascakerja                                                                                        Post-employment benefits
     Program pensiun                                        -                    -                                     Pension program
     Imbalan pascakerja lainnya                      15,802,475           14,601,989                     Other post-employment benefits
     Imbalan pemeliharaan kesehatan                  60,643,780           51,117,646                                 Health care benefits
     Imbalan jangka panjang lainnya                     632,373              743,296                            Other long-term benefits
     Jumlah                                          77,078,628           66,462,931                                                  Total
     Dikurangi : bagian jangka pendek                 4,226,336            3,631,893                                  Less : current portion
     Bagian jangka panjang                           72,852,292           62,831,038                                   Long-term portion


     Beban diakui di laba rugi:
                                                                                                    Expense recognise in profit or loss:
        (Catatan 43) :
     Imbalan pascakerja                                                                                          Post-employment benefits
     Program pensiun manfaat pasti                       63,361               93,920                      Defined benefit pension program
     Imbalan pascakerja lainnya                       1,568,103            1,955,024                      Other post-employment benefits
     Imbalan pemeliharaan kesehatan                   3,418,306            4,733,796                                  Health care benefits
     Imbalan jangka panjang lainnya                     192,443              308,333                              Other long-term benefits
     Jumlah                                           5,242,213            7,091,073                                                  Total

     Pengukuran kembali program                                                                      Remeasurement on defined benefit
       manfaat pasti diakui di                                                                              plan recognised in other
       penghasilan komprehensif lain:                                                                        comprehensive income:
     Imbalan pascakerja                                                                                       Post-employment benefits
     Program pensiun manfaat pasti                       92,588              334,441                    Defined benefit pension program
     Imbalan pascakerja lainnya                         457,938             (528,416)                   Other post-employment benefits
     Imbalan pemeliharaan kesehatan                   7,365,537           (5,529,833)                               Health care benefits
     Jumlah                                           7,916,063           (5,723,808)                                                 Total



    Kenaikan signifikan pada pengukuran kembali                      The significant increase in remeasurement on defined
    program manfaat pasti yang diakui di penghasilan                 benefit plans which is recognised in other
    komprehensif lain sebagian besar disebabkan karena               comprehensive income is mainly due to changes in the
    perubahan asumsi demografis.                                     demographic assumptions.

    Program pensiun manfaat pasti                                    Defined benefit pension program

    Grup menyelenggarakan program pensiun manfaat                    The Group established a defined benefit pension
    pasti untuk semua karyawan tetap yang memenuhi                   program covering all of its eligible permanent
    syarat. Program pensiun ini memberikan imbalan                   employees. This pension plan provides benefits based
    berdasarkan penghasilan dasar pensiun dan masa                   on basic pension income and the period of employment.
    kerja karyawan.

    Program pensiun ini dikelola oleh Dana Pensiun PLN               This pension plan is managed by Dana Pensiun PLN
    (”DP-PLN”), pihak berelasi, yang akta pendiriannya               (“DP-PLN”), a related party, whose deed of
    telah disahkan oleh Kementerian Keuangan Republik                establishment was approved by the Ministry of Finance
    Indonesia dengan Surat Keputusannya No. KEP-                     of the Republic of Indonesia in its Decision Letter No.
    284/KM.17/1997 tanggal 15 Mei 1997.                              KEP-284/KM.17/1997 dated May 15, 1997.

    Pendanaan DP-PLN terutama berasal dari iuran                     DP-PLN is mainly funded by contributions from both the
    karyawan dan pemberi kerja masing-masing sebesar                 employees and the employer which are 6.00% and
    6,00% dan 19,45% dari penghasilan dasar pensiun.                 19.45% from basic pension income, respectively.
Page 147
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/137 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                      49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Pada tanggal 4 April 2022, DSAK-IAI menerbitkan                 On April 4, 2022, the DSAK-IAI published a press
    siaran pers mengenai “Pengatribusian Imbalan pada               release regarding “Attributing Benefit to Periods of
    Periode Jasa (PSAK No. 24)” sebagai tanggapan atas              Service (SFAS No. 24)” in response to the International
    Standar     Akuntansi     Keuangan      Internasional,          Financial    Accounting       Standards,      Interpretation
    Keputusan Agenda Komite Interpretasi: Standar                   Committee Agenda Decision: International Accounting
    Akuntansi Internasional 19 Imbalan Kerja -                      Standard 19 Employee Benefits - Attributing Benefit to
    Pengatribusian Imbalan pada Periode Jasa, yang                  Periods of Service, published in May 2021. As at
    diterbitkan pada Mei 2021. Per 30 September 2024                September 30, 2024 and December 31, 2023, the
    dan 31 Desember 2023, dampak dari perubahan                     impact of the changes in the calculation is immaterial to
    perhitungan tidak material bagi Grup. Oleh karena itu,          the Group. Therefore, the impact of the changes is
    dampak perubahan tersebut dicatat seluruhnya dalam              recorded fully in the consolidated financial statements for
    laporan keuangan konsolidasian tahun berjalan.                  the current year.

    Imbalan pemeliharaan kesehatan                                  Health care benefits

    Selain program pensiun yang dikelola oleh DP-PLN,               In addition to the pension plan managed by DP-PLN, the
    Grup menyediakan imbalan program kesehatan tanpa                Group also provides unfunded health care benefit plans
    pendanaan bagi pensiunan dan tanggungannya yang                 for pensioners and their eligible dependents.
    memenuhi persyaratan.

    Imbalan pascakerja lainnya                                      Other post-employment benefits

    Selain dari program dana pensiun dan imbalan                    In addition to the pension plan and health care benefits,
    pemeliharaan kesehatan, Grup menyediakan imbalan                the Group also provides unfunded severance benefits
    pesangon dan penghargaan purna jabatan tanpa                    and completion of employment awards for eligible
    pendanaan bagi pegawai yang memenuhi syarat.                    employees.

    Imbalan jangka panjang lainnya                                  Other long-term benefits

    Grup juga memberikan imbalan kerja jangka panjang               The Group also provides other long-term employee
    lainnya seperti uang cuti besar, tunjangan kecelakaan           benefits such as long leave allowance, disability benefit,
    dinas, bantuan kematian, dan penghargaan kesetiaan              death benefit, and loyalty benefits.
    kerja.


    Asumsi-asumsi utama yang digunakan               dalam          The principal assumptions used in the calculations of
    perhitungan liabilitas imbalan kerja                            post employment benefits obligation

    Tabel mortalita                                   CSO-58                                                Mortality table
    Usia pensiun normal                            56 tahun/years                                   Normal retirement age

    Asumsi yang berhubungan dengan pengalaman                       Assumptions regarding future mortality experience are
    mortalitas masa depan ditentukan berdasarkan saran              set based on actuarial advice in accordance with
    aktuaris menurut statistik yang telah diterbitkan dan           published statistics and experience by the Company and
    pengalaman dari perusahaan dan entitas anak setiap              its subsidiaries. The mortality assumptions used are
    wilayah. Asumsi mortalitas yang digunakan adalah                based on the CSO-58 mortality table which is applied in
    tabel mortalita CSO-58 yang diterapkan dalam                    calculating the long-term benefits liability recognised
    penghitungan liabilitas kerja jangka panjang yang               within the consolidated statements of financial position.
    diakui dalam laporan posisi keuangan konsolidasian.

    Perhitungan aktuaria atas program pensiun, imbalan              The actuarial calculations of the pension program, other
    pascakerja lainnya, imbalan pemeliharaan kesehatan,             post-employment benefits, health care benefits, and
    dan imbalan kerja jangka panjang lainnya untuk tahun            other long-term benefits for the years ended December
    yang berakhir pada tanggal 31 Desember 2023                     31, 2023 were calculated by a registered Actuarial
    dihitung oleh Kantor Konsultan Aktuaria (“KKA”) yang            Consulting Firm (“KKA”), KKA Tubagus Syafrial &
    terdaftar, yaitu KKA Tubagus Syafrial & Amran                   Amran Nangasan (formerly PT Binaputera Jaga
    Nangasan (sebelumnya PT Binaputera Jaga Hikmah),                Hikmah), based on its reports dated April 1, respectively.
    dalam laporannya masing-masing tertanggal 1 April
    2024.
Page 148
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/138 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                         SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                            49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Grup melakukan studi pada tahun 2020 untuk melihat                      The Group conducted a study in 2020 to determine
    tabel mortalitas mana yang paling sesuai dengan profil                  which mortality tables best suited most of the Group’s
    mortalitas pegawai dan pensiunan Grup. Dalam                            employees’ and pensioners’ mortality profiles. In the
    melakukan studi, Grup telah mempertimbangkan                            study, the Group considered CSO-58, GAM-71, ANN-
    CSO-58, GAM-71, ANN-49, GAM-83, TMI-2011, dan                           49, GAM-83, TMI-2011, and TMI-2019. Based on the
    TMI-2019. Dari studi tersebut, Grup menemukan                           study, the Group found that the mortality table that best
    bahwa tabel mortalitas yang paling sesuai dengan                        suited the mortality profile of the Group’s employees and
    profil mortalitas pegawai dan pensiunan Grup adalah                     pensioners is CSO-58.
    CSO-58.

    i.   Program pensiun                                                    i.   Pension program

         Jumlah liabilitas yang diakui pada laporan posisi                       The liability recognised in the consolidated
         keuangan konsolidasian ditentukan sebagai                               statements of financial position is determined as
         berikut:                                                                follows:
                                                   30 September/                 31 Desember/
                                                   September 30,                 December 31,
                                                        2024                         2023
           Nilai kini kewajiban yang didanai            10,559,454                     10,408,465         Present value of funded obligations
           Nilai wajar aset program                    (10,922,895)                   (10,919,630)                   Fair value of plan assets
           Jumlah                                         (363,441)                     (511,165)                                        Total
           Dampak batas atas aset                          363,441                       511,165                        Impact of asset ceiling
           Liabilitas pada laporan                                                                             Liability in the consolidated
             posisi keuangan konsolidasian                         -                              -       statement of financial position


         Pergerakan kewajiban program pensiun manfaat                            The movement in the defined benefit pension
         pasti selama tahun berjalan adalah sebagai                              program obligation over the year is as follows:
         berikut:
                                                    30 September/                  31 Desember/
                                                    September 30,                  December 31,
                                                         2024                          2023
           Saldo awal                                     10,408,465                     10,336,245                          Beginning balance
           Dibebankan ke laba rugi:                                                                                   Charged to profit and loss:
             Biaya jasa kini                                 97,563                         134,419                      Current service cost
             Biaya bunga                                    518,519                         696,250                         Interest expense
                                                            616,082                         830,669
           Pengukuran kembali:                                                                                                Remeasurements:
           Kerugian aktuarial yang timbul dari                                                                              Loss from change in
             perubahan asumsi keuangan                             325                       72,094                     financial assumptions
           Kerugian aktuarial dari perubahan                                                                          Actuarial loss from various
             beberapa asumsi                                           -                              -                changes in assumptios
           Kerugian dari penyesuaian
             atas pengalaman                                239,987                         186,210                           Experience Loss
           Kerugian yang timbul dari                                                                                      Loss from change in
             perubahan asumsi demografis                               -                              -             demographic assumptions
                                                            240,312                         258,304
           Pembayaran manfaat                               (705,405)                    (1,016,753)                             Benefit payment
           Saldo akhir                                    10,559,454                     10,408,465                              Ending balance

         Mutasi nilai wajar aset program selama tahun                            The movement in the fair value of plan assets over
         berjalan adalah sebagai berikut:                                        the year is as follows:

                                                    30 September/                   31 Desember/
                                                    September 30,                   December 31,
                                                         2024                           2023

          Saldo awal                                     10,919,630                        9,890,942                          Beginning balance
          Imbal hasil atas aset program                     522,824                          696,520                       Return on plan assets
          Iuran pemberi kerja                               155,949                          873,664                     Employer's contributions
          Iuran pekerja                                      29,897                           40,229                      Employee contributions
          Pembayaran manfaat                               (705,405)                      (1,016,753)                          Benefit payments
          Kerugian aktuarial                                                                                                       Actuarial loss
            pada aset program                                          -                    435,028                             of plan assets
          Saldo akhir                                     10,922,895                 10,919,630                                   Ending balance
Page 149
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/139 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                                         49. EMPLOYEE BENEFITS LIABILITIES (continued)

    i.    Program pensiun (lanjutan)                                                   i.     Pension program (continued)

          Asumsi aktuarial utama yang digunakan adalah                                        The principal actuarial assumptions used were as
          sebagai berikut:                                                                    follows:

                                                                 30 September/                   31 Desember/
                                                                 September 30,                   December 31,
                                                                      2024                            2023
            Tingkat diskonto                                     6,61% - 6,87%                   6,61% - 6,87%                                 Discount rate
            Tingkat kenaikan manfaat pensiun                         5.00%                           5.00%                     Pension benefit increase rate


          Kontribusi yang diharapkan untuk program                                            Expected contributions to post-employment benefit
          imbalan pascakerja untuk tahun yang berakhir                                        plans for the years ended September 30, 2024 and
          pada 30 September 2024 dan Desember 2023                                            December 31, 2023 are Rp708,670 and
          masing-masing adalah sebesar Rp708.670 dan                                          Rp1,610,412, respectively.
          Rp1.610.412.

          Sensitivitas dari kewajiban manfaat pasti                                           The sensitivity of the defined benefit obligation to
          terhadap perubahan asumsi aktuarial utama                                           changes in the weighted principal assumptions is as
          adalah sebagai berikut:                                                             follows:

                                                                  Dampak atas kewajiban manfaat pasti/
                                                                   Impact on defined benefit obligation
                                                    Perubahan                   Kenaikan                   Penurunan
                                                      asumsi/                     asumsi                    asumsi
                                                     Change in                 Increase in                Decrease in
                                                    Assumption                assumptions                 assumptions
           Tingkat diskonto                             1%                              163,805                   (185,467)                           Discount rate
           Tingkat kenaikan gaji                        1%                             (184,961)                   165,750                       Salary growth rate


    ii.   Imbalan pascakerja lainnya                                                   ii.    Other post-employment benefits

          Pergerakan kewajiban imbalan pascakerja                                             The movement in the other post-employment
          lainnya selama tahun berjalan adalah sebagai                                        benefits obligation over the year is as follows:
          berikut:

                                                                 30 September/               31 Desember/
                                                                 September 30,               December 31,
                                                                      2024                       2023
                  Saldo awal                                            14,601,989                14,032,285                           Beginning balance

                  Dibebankan ke laba rugi:                                                                                     Charged to profit and loss:
                    Biaya jasa kini                                       847,183                    935,678                      Current service cost
                    Biaya bunga                                           725,893                  1,010,142                          Interest expense
                    Biaya jasa lalu                                             -                     15,901                         Past service cost
                    Imbal hasil aset aset program                          (4,973)                    (6,697)                    Return on plan assets
                                                                         1,568,103                 1,955,024
                  Pengukuran kembali:                                                                                                  Remeasurements:
                  Kerugian aktuarial yang timbul dari                                                                               Loss from change in
                    perubahan asumsi keuangan                             443,558                    740,177                    financial assumptions
                  Kerugian/(keuntungan) aktuarial yang                                                                   Loss/(gain) from combination of
                    timbul dari kombinasi perubahan asumsi                     (81)                       26                   changes in assumptios
                  Kerugian/(Keuntungan) dari penyesuaian
                    atas pengalaman                                        14,461                 (1,268,632)                     Experience loss/(gain)
                  Kerugian yang timbul dari perubahan                                                                               Loss from change in
                    asumsi demografis                                             -                       13                  demographic assumptions
                                                                          457,938                   (528,416)
                  Pembayaran manfaat                                      (825,555)                 (856,904)                           Benefit Payment
                  Saldo akhir                                          15,802,475                 14,601,989                            Ending balance


          Asumsi aktuarial utama yang digunakan adalah                                        The principal actuarial assumptions used were as
          sebagai berikut:                                                                    follows:

                                                                  30 September/                31 Desember/
                                                                  September 30,                December 31,
                                                                       2024                        2023
                Tingkat diskonto                                  6,56% - 7,37%                6,56% - 7,37%                               Discount rate
                Tingkat kenaikan gaji per tahun                   5,00% - 7,12%                5,00% - 7,12%          Rate of salary increase per annum
Page 150
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/140 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                           SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)


49. LIABILITAS IMBALAN KERJA (lanjutan)                                  49. EMPLOYEE BENEFITS LIABILITIES (continued)

    ii.   Imbalan pascakerja lainnya (lanjutan)                                   ii.   Other post-employment benefits (continued)

          Sensitivitas dari imbalan pascakerja lainnya                                  The sensitivity of the other post-employment
          terhadap perubahan asumsi aktuarial utama                                     benefits to changes in the weighted principal
          adalah sebagai berikut:                                                       assumptions is as follows:

                                                     Dampak atas imbalan pascakerja lainnya/
                                                    Impact on other post-employment benefits
                                         Perubahan                   Kenaikan                 Penurunan
                                           asumsi/                    asumsi                   asumsi
                                         Change in                  Increase in              Decrease in
                                         Assumption                assumptions               assumptions
           Tingkat diskonto                  1%                            1,791,522               (2,159,676)               Discount rate
           Tingkat kenaikan gaji             1%                           (2,182,715)               1,845,816           Salary growth rate



    iii. Imbalan pemeliharaan kesehatan                                           iii. Health care benefit

          Grup memiliki beberapa skema imbalan                                          The Group operates a number of post-employment
          pemeliharaan kesehatan pascakerja. Metode                                     health care benefit schemes. The method of
          akuntansi, asumsi, dan frekuensi penilaian                                    accounting, assumptions, and the frequency of
          adalah sama dengan yang digunakan dalam                                       valuations are similar to those used for defined
          skema pensiun manfaat pasti.                                                  benefit pension schemes.

          Pergerakan kewajiban imbalan pemeliharaan                                     The movement in the health care benefits obligation
          kesehatan selama tahun berjalan adalah sebagai                                over the year is as follows:
          berikut:

                                                             30 September/                31 Desember/
                                                             September 30,                December 31,
                                                                  2024                        2023
             Saldo awal                                             51,117,646                 53,702,837                  Beginning balance

             Dibebankan ke laba rugi:                                                                              Charged to profit and loss:
               Biaya jasa kini                                         867,238                    860,118             Current service cost
               Biaya bunga                                           2,551,068                  3,873,678                Interest expense
                                                                     3,418,306                  4,733,796
             Pengukuran kembali:                                                                                           Remeasurements:
             Kerugian aktuarial yang timbul dari                                                                         Loss from change in
               perubahan asumsi keuangan                             5,675,656                  2,635,442            financial assumptions
             Kerugian aktuarial yang timbul dari kombinasi                                                          Loss from combination of
               perubahan asumsi                                              -                          -           changes in assumptios
             Kerugian/(keuntungan) dari penyesuaian
               atas pengalaman                                       1,689,881                 (8,165,275)            Experience loss/(gain)
             Kerugian yang timbul dari perubahan                                                                        Loss from change in
               asumsi demografis                                             -                          -         demographic assumptions
                                                                     7,365,537                 (5,529,833)
             Pembayaran manfaat                                     (1,257,709)                (1,789,154)                  Benefit Payment
             Saldo akhir                                           60,643,780                  51,117,646                   Ending balance


          Asumsi aktuarial utama yang digunakan adalah                                  The principal actuarial assumptions used were as
          sebagai berikut:                                                              follows:


                                                             30 September/                 31 Desember/
                                                             September 30,                 December 31,
                                                                  2024                          2023
          Tingkat diskonto                                   6,77% - 7,60%                 6,77% - 7,60%                            Discount rate
          Tingkat kenaikan biaya kesehatan                       5.35%                         5.35%                  Future health cost increase
Page 151
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/141 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                                        49. EMPLOYEE BENEFITS LIABILITIES (continued)

    iii. Imbalan pemeliharaan kesehatan (lanjutan)                                      iii. Health care benefit (continued)


         Sensitivitas dari imbalan pemeliharaan kesehatan                                   The sensitivity of the health care benefits to
         terhadap perubahan asumsi aktuarial utama                                          changes in the weighted principal assumptions is as
         adalah sebagai berikut:                                                            follows:

                                                          Dampak atas imbalan pemeliharaan kesehatan/
                                                                Impact on health care benefits
                                                  Perubahan               Kenaikan                Penurunan
                                                    asumsi/                asumsi                   asumsi
                                                  Change in              Increase in             Decrease in
                                                  Assumption            assumptions              assumptions
         Tingkat diskonto                             1%                       7,367,992               (9,177,328)                        Discount rate
         Tingkat kenaikan biaya kesehatan             1%                      (9,170,493)               7,488,920                  Medical inflation rate


    iv. Imbalan kerja jangka panjang lainnya                                            iv. Other long-term benefits

         Pergerakan kewajiban imbalan kerja jangka                                          The movement in the other long-term benefits
         panjang lainnya selama tahun berjalan adalah                                       obligation over the year is as follows:
         sebagai                               berikut:

                                                                  30 September/              31 Desember/
                                                                  September 30,              December 31,
                                                                       2024                      2023
            Saldo awal                                                      743,295                 724,791                         Beginning balance
            Dibebankan ke laba rugi:                                                                                       Charged to profit and loss:
              Beban jasa kini                                              155,687                   188,023                    Current service cost
              Biaya bunga                                                    31,541                    37,200                      Interest expense
              Kerugian aktuarial yang timbul dari                                                                              Loss from change in
                 perubahan asumsi keuangan                                    5,759                    3,965               financial assumptions
              (Keuntungan) aktuarial yang timbul dari kombinasi                                                          (Gain) from combination of
                 perubahan asumsi                                                 -                     (216)             changes in assumptios
              Kerugian/(keuntungan) dari penyesuaian
                 atas pengalaman                                               (544)                  79,361                Experience loss/(gain)
              Kerugian yang timbul dari perubahan                                                                             Loss from change in
                 asumsi demografis                                               -                         -           demographic assumptions
                                                                           192,443                   308,333
            Pembayaran manfaat                                             (303,365)                (289,828)                       Benefit Payments
            Saldo Akhir                                                    632,373                   743,295                         Ending balance



         Asumsi aktuarial utama yang digunakan adalah                                       The principal actuarial assumptions used were as
         sebagai berikut:                                                                   follows:


                                                                  30 September/              31 Desember/
                                                                  September 30,              December 31,
                                                                       2024                       2023
            Tingkat diskonto                                      6,17% - 6,46%              6,17% - 6,46%                               Discount rate
            Tingkat kenaikan gaji per tahun                           7.12%                      7.12%              Rate of salary increase per annum


         Sensitivitas dari imbalan kerja jangka panjang                                     The sensitivity of the other long-term benefits to
         lainnya terhadap perubahan asumsi aktuarial                                        changes in the weighted principal assumptions is as
         utama adalah sebagai berikut:                                                      follows:

                                                        Dampak atas imbalan kerja jangka panjang lainnya/
                                                              Impact on other long-term benefits
                                                  Perubahan                Kenaikan                 Penurunan
                                                    asumsi/                 asumsi                    asumsi
                                                  Change in               Increase in               Decrease in
                                                  Assumption             assumptions               assumptions
         Tingkat diskonto                             1%                           22,078                   (20,814)                      Discount rate
         Tingkat kenaikan gaji                        1%                          (22,284)                   23,841                  Salary growth rate
Page 152
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/142 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                     49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Grup terekspos dengan beberapa risiko melalui              The Group is exposed to a number of risks through its
    program manfaat pasti dan program kesehatan                defined benefit pension program and post-employment
    pascakerja. Risiko yang paling signifikan adalah           medical plans. The most significant risks are as follows:
    sebagai berikut:

    Volatilitas aset                                           Asset volatility

    Kewajiban program dihitung menggunakan tingkat             The plan liabilities are calculated using a discount rate
    diskonto yang merujuk kepada Zero Coupon Bond              set with reference to the Zero Coupon Bond from
    dari Indonesia Government Securities Yield Curve.          Indonesia Government Securities Yield Curve. If plan
    Jika imbal hasil aset program lebih rendah, maka akan      assets underperform this yield, this will create a deficit.
    menghasilkan defisit program.

    Grup menempatkan investasi aset program pada               The Group places its investment plan assets in various
    beragam jenis aset investasi agar dapat                    types of investment assets so that it can be properly
    terdiversifikasi dengan baik sehingga dapat                diversified to minimise the impact of the bad
    meminimalisasi dampak kinerja buruk dari satu aset         performance of one asset on all asset groups. The
    terhadap seluruh kelompok aset. Proporsi terbesar          largest proportion of assets is invested in debt
    aset investasi ditempatkan pada instrumen utang,           instruments, although the Group also invests in savings,
    meskipun Grup juga berinvestasi pada tabungan,             time deposits, equity instruments, and property. The
    deposito, instrumen ekuitas, dan properti. Grup            Group believes that debt instruments offer the best
    meyakini bahwa instrumen utang memberikan imbal            returns over the long term with an acceptable level of
    hasil yang paling baik dalam jangka panjang pada           risk.
    tingkatan risiko yang dapat diterima.

    Harapan umur hidup                                         Life expectancy

    Sebagian besar dari kewajiban program menyediakan          The majority of the plans’ obligations are to provide
    manfaat seumur hidup sehingga kenaikan harapan             benefits for the life of the members, so increases in life
    umur hidup akan mengakibatkan kenaikan liabilitas          expectancy will result in an increase in the plans’
    program.                                                   liabilities.

    Rata-rata durasi kewajiban manfaat pasti untuk             The weighted average duration of the defined benefit
    program pensiun, imbalan pascakerja lainnya,               obligations for the pension program, other post-
    imbalan pemeliharaan kesehatan, dan imbalan kerja          employment benefits program, healthcare benefits, and
    jangka panjang lainnya adalah 13,09 tahun, 16,61           other long-term benefits are 13.09 years, 16.61 years,
    tahun, 19,58 tahun, dan 4,01 tahun secara berurutan.       19.58 years, and 4.01 years, respectively.

    Manajemen Grup berpendapat bahwa liabilitas                The management of the Group believes that the
    imbalan pascakerja cukup untuk menutupi semua              estimated liability provided for post-employment benefits
    imbalan    yang     diatur    dalam  Peraturan             is adequate to cover the requirements of the Manpower
    Ketenagakerjaan dan/atau PKB.                              Regulations and/or CLA.

    Analisis jatuh tempo yang diharapkan dari imbalan          The expected maturity analysis of undiscounted post-
    pascakerja dan imbalan jangka panjang lainnya yang         employment benefits and other long-term benefits is as
    tidak terdiskonto adalah sebagai berikut:                  follows:
Page 153
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/143 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                         (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS                                                                       50. CASH FLOW INFORMATION

    a.   Transaksi non-kas                                                                            a.     Non-cash transactions

         Tabel di bawah ini menjelaskan perubahan dalam                                                      The table below details changes in the Group’s
         liabilitas Grup yang timbul dari aktivitas investasi                                                liabilities arising from investing and financing
         dan pendanaan, termasuk perubahan yang timbul                                                       activities, including both cash and non-cash
         dari arus kas dan perubahan nonkas. Liabilitas                                                      changes. Liabilities arising from financing activities
         yang timbul dari aktivitas pendanaan adalah                                                         are those for which cash flow were, or future cash
         liabilitas yang arus kas, atau arus kas masa                                                        flows will be, classified in the Group’s consolidated
         depannya, diklasifikasikan dalam laporan arus                                                       statements of cash flows as cash flows from
         kas konsolidasian Grup sebagai arus kas dari                                                        financing activities.
         aktivitas pendanaan.

         Pengungkapan tambahan atas aktivitas investasi                                                      Supplemental disclosures on non-cash investing
         dan pendanaan non-kas adalah sebagai berikut:                                                       and financing activities are as follows:

                                                                             30 September/             30 September/
                                                                             September 30,             September 30,
                                                                                  2024                      2023
              Aktivitas investasi dan pendanaan                                                                                                      Non-cash investing and
               yang tidak mempengaruhi kas:                                                                                                               financing activities:
               Perolehan aset tetap dan pekerjaan                                                                                              Additions to property, plant and
                  dalam pelaksanaan melalui                                                                                                       equipment and construction
                  utang lain-lain                                                     7,299,639                  8,809,757                 in progress through other payables
               Penambahan aset hak-guna                                                                                                         Addition of right-of-use assets
                  melalui sewa                                                        2,548,527                  5,291,212                            through finance leases




    b.   Rekonsiliasi liabilitas                      yang         timbul         dari              b.      Reconciliation of                    liabilities         arising          from
         aktivitas pendanaan                                                                                financing activities

         Liabilitas yang timbul dari aktivitas pendanaan                                                    The reconciliation of liabilities arising from financing
         untuk tahun yang berakhir pada tanggal 30                                                          activities for the years ended September 30, 2024
         September 2024 dan 31 Desember 2023 adalah                                                         and December 31, 2023, is as follows:
         sebagai                                  berikut:

                                                                         30 September 2024/September 30, 2024
                                             Saldo 1 Januari
                                                                                                             Perubahan
                                                 2024/             Penerimaan/          Pembayaran/                              Saldo akhir/
                                                                                                              lainnya/
                                             Balance as at 1        Proceeds            Repayments                             Ending balance
                                                                                                           Other changes
                                              January 2024
          Penerusan Pinjaman                       29,183,428                14,378         (2,912,273)           (600,027)            25,685,504                            Two-step loans
          Utang kepada pemerintah dan
                                                                                                                                                               Government and non-bank
         lembaga keuangan pemerintah                 2,222,907                               (750,000)              11,814              1,484,722
                                                                                                                                                      government financial institution loans
         non-bank
          Utang Bank                              148,822,188          24,629,226          (33,428,395)            (712,069)         139,310,951                                Bank Loans
          Utang obligasi dan sukuk                197,564,833                               (5,352,934)          (2,851,973)         189,359,926             Bonds payable and sukuk ijara
          Utang sewa pembiayaan                    12,769,530                                 (189,875)             585,623           13,165,277                             Lease liabilities
          Utang Listrik Swasta                      5,655,807                                 (427,253)             (85,849)           5,142,705               Electricity purchase payable
          Utang KIK - EBA                                 -                                                                                  -                              KIK - EBA loans
          Jumlah                                  396,218,693          24,643,604          (43,060,732)          (3,652,481)         374,149,085                                      Total




         *) Termasuk perubahan selisih kurs dan amortisasi biaya transaksi                                  *)   Including foreign exchange difference and amortisation of transaction costs
Page 154
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/144 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS (lanjutan)                                                              50. CASH FLOW INFORMATION (continued)
     b.        Rekonsiliasi liabilitas yang                           timbul          dari                b.    Reconciliation of liabilities                             arising           from
               aktivitas pendanaan (lanjutan)                                                                   financing activities (continued)
                                                                              31 Desember/ December 31, 2023
                                                                                                       Perubahan
                                                       Saldo awal/                                       lainnya/                 Saldo akhir/
                                                       Beginning        Penambahan/   Pembayaran/         Other                     Ending
                                                        balance           Additions    Repayments       changes*)                  balance

          Penerusan pinjaman                             33,184,714              333,848      (2,855,228)         (1,479,906)       29,183,428                                Two-step loans
          Utang kepada lembaga keuangan                                                                                                                     Non-bank Government financial
             Pemerintah non-bank                          2,952,823                 -           (750,000)             20,084         2,222,907                            institution loans
          Utang bank                                    152,410,118        53,905,559        (56,534,467)           (959,022)      148,822,188                                      Bank loans
          Utang obligasi dan sukuk ijarah               201,334,421                 -         (2,863,200)           (906,388)      197,564,833               Bonds payable and sukuk ijara
          Utang sewa                                     12,862,315         5,572,051         (5,556,021)           (108,815)       12,769,530                                 Lease liabilities
          Utang listrik swasta                            6,240,746                 -           (517,439)            (67,500)        5,655,807                Electricity purchase payables

          Jumlah                                        408,985,137        59,811,458        (69,076,355)         (3,501,547)      396,218,693                                           Total


          *)    Termasuk perubahan selisih kurs dan amortisasi biaya transaksi                      *)    Including foreign exchange difference and amortisation of transaction costs



51. TRANSAKSI                  DAN         SALDO            DENGAN                PIHAK        51. TRANSACTIONS AND BALANCES WITH RELATED
    BERELASI                                                                                       PARTIES

     Sifat hubungan berelasi                                                                              Nature of related parties
     a.        Pemerintah, dalam hal ini adalah Menteri                                                   a.    The Government, in this case is the Minister of
               Keuangan Republik Indonesia yang merupakan                                                       Finance of the Republic of Indonesia, the
               pemegang saham Perusahaan dan BUMN.                                                              shareholder of the Company and SOEs.
     b.        Perusahaan mempunyai hubungan berelasi                                                     b.    The Company is related to other SOEs owned by
               dengan BUMN lainnya yang dimiliki bersama oleh                                                   the Ministry of Finance.
               Kementerian Keuangan.
     c.        Grup mempunyai pengaruh signifikan atas                                                    c.    The Group has significant influence on investments
               investasi pada entitas asosiasi atau ventura                                                     in     associates      or        joint    ventures
               bersama (Catatan 9).                                                                             (Note 9).
     d.        Dewan Komisaris dan Direksi merupakan                                                      d.    The Board of Commissioners and Directors are
               personil manajemen kunci Grup.                                                                   members of the key management of the Group.
     Berikut ini adalah daftar pihak berelasi yang memiliki                                               Below is the list of related parties that engage in
     transaksi dengan Grup:                                                                               transactions with the Group:
                     Pihak-pihak berelasi/                                   Sifat hubungan/                                                     Sifat transaksi/
                        Related parties                                    Nature of relationship                                             Nature of transaction

   Pemerintah Republik Indonesia/                              Pemegang saham akhir/                                  Penerimaan subsidi listrik dan kompensasi, penerimaan
   Government of the Republic of Indonesia                     Ultimate shareholder                                   penerusan pinjaman, dan utang kepada pemerintah/
   ("Pemerintah Republik Indonesia")                                                                                  Receipt of electricity subsidy and compensation, two-step
                                                                                                                      loan and Government loans

   BRI                                                         Pengendalian melalui Pemerintah                        Penempatan rekening bank dan deposito berjangka
                                                               Republik Indonesia/                                    dibatasi penggunaannya, kas dan setara kas, investasi
                                                               Control through the Government of the                  jangka pendek, dan penerimaan utang bank/
                                                               Republic of Indonesia                                  Placement of restricted cash in banks and time deposits,
                                                                                                                      cash and cash equivalents, short-term investments, and
                                                                                                                      receipt of bank loans

   Bank Mandiri                                                Pengendalian melalui Pemerintah                        Penempatan rekening bank dan deposito berjangka
                                                               Republik Indonesia/                                    dibatasi penggunaannya, kas dan setara kas, investasi
                                                               Control through the Government of the                  jangka pendek, dan penerimaan utang bank/
                                                               Republic of Indonesia                                  Placement of restricted cash in banks and time deposits,
                                                                                                                      cash and cash equivalents, short-term investments, and
                                                                                                                      receipt of bank loans

   BNI                                                         Pengendalian melalui Pemerintah                        Penempatan rekening bank dan deposito berjangka
                                                               Republik Indonesia/                                    dibatasi penggunaannya, kas dan setara kas, dan
                                                               Control through the Government of the                  penerimaan utang bank/
                                                               Republic of Indonesia                                  Placement of restricted cash in banks and time deposits,
                                                                                                                      cash and cash equivalents, and receipt of bank loans

   Bank DKI                                                    Entitas yang berhubungan dengan                        Penempatan kas dan setara kas dan penerimaan
                                                               Pemerintah/                                            utang bank/Placement of cash and cash equivalents and
                                                               Government related entity                              receipt of bank loans

   Bank Pembangunan Daerah (“BPD”)                             Entitas yang berhubungan dengan                        Penempatan kas dan setara kas dan penerimaan
                                                               Pemerintah/                                            utang bank/Placement of cash and cash equivalents and
                                                               Government related entity                              receipt of bank loans

   BTN                                                         Pengendalian melalui Pemerintah                        Penempatan kas dan setara kas dan penerimaan utang
                                                               Republik Indonesia/                                    bank/Placement of cash and cash equivalents and
                                                               Control through the Government of the                  receipt of bank loans
                                                               Republic of Indonesia
Page 155
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/145 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO                           DENGAN         PIHAK          51. TRANSACTIONS AND BALANCES WITH RELATED
    BERELASI (lanjutan)                                                             PARTIES (continued)

    Sifat hubungan berelasi (lanjutan)                                               Nature of related parties (continued)
                Pihak-pihak berelasi/                        Sifat hubungan/                                Sifat transaksi dan saldo/
                   Related parties                         Nature of relationship                       Nature of transaction and balance

   BSI                                             Pengendalian melalui Pemerintah           Penempatan kas dan setara kas dan penerimaan utang
                                                   Republik Indonesia/                       bank/Placement of cash and cash equivalents and
                                                   Control through the Government of the     receipt of bank loans
                                                   Republic of Indonesia

   LPEI                                            Pengendalian melalui Pemerintah           Penerimaan utang bank/Receipt of bank loans
                                                   Republik Indonesia/
                                                   Control through the Government of the
                                                   Republic of Indonesia

   PT Indonesia Asahan Aluminium (“Inalum”)        Pengendalian melalui Pemerintah           Transaksi pembelian tenaga listrik/
                                                   Republik Indonesia/                       Purchase of electricity
                                                   Control through the Government of
                                                   the Republic of Indonesia

   PT Pertamina Geothermal Energy (“PGE”)          Pengendalian melalui Pemerintah           Transaksi pembelian tenaga listrik/
                                                   Republik Indonesia/                       Purchase of electricity
                                                   Control through the Government of the
                                                   Republic of Indonesia

   Pertamina                                       Pengendalian melalui Pemerintah           Transaksi pembelian bahan bakar dan minyak pelumas/
                                                   Republik Indonesia/                       Purchase of fuels and lubricants
                                                   Control through the Government of the
                                                   Republic of Indonesia

   PT Pertamina Gas (“Pertagas”)                   Pengendalian melalui Pemerintah           Transaksi pembelian bahan bakar gas/
                                                   Republik Indonesia/                       Purchase of gas
                                                   Control through the Government of the
                                                   Republic of Indonesia

   PT Bukit Asam Tbk (“PTBA”)                      Pengendalian melalui Pemerintah           Transaksi pembelian bahan bakar batu bara/
                                                   Republik Indonesia/                       Purchase of coal
                                                   Control through the Government of the
                                                   Republic of Indonesia

   PT Perusahaan Gas Negara (Persero) Tbk          Pengendalian melalui Pemerintah           Transaksi pembelian bahan bakar gas/
      (“PGN”)                                      Republik Indonesia/                       Purchase of gas
                                                   Control through the Government of the
                                                   Republic of Indonesia

   PT Asuransi Jasa Indonesia (Persero) (“AJI”)    Pengendalian melalui Pemerintah           Asuransi bangunan, instalasi dan mesin pembangkit,
                                                   Republik Indonesia/                       perlengkapan transmisi serta kapal milik Perusahaan/
                                                   Control through the Government of the     Insurance services for the Company's buildings,
                                                   Republic of Indonesia                     installation and power plant, transmission equipment
                                                                                             and vessels

   Perum Jasa Tirta                                Pengendalian melalui Pemerintah           Transaksi pembelian tenaga listrik/
                                                   Republik Indonesia/                       Purchase of electricity
                                                   Control through the Government of the
                                                   Republic of Indonesia

   SMI                                             Pengendalian melalui Pemerintah           Penerimaan utang dari lembaga
                                                   Republik Indonesia/                       keuangan pemerintah nonbank/
                                                   Control through the Government of the     Receipt of non-bank government financial institution loans
                                                   Republic of Indonesia

   GDE                                             Entitas asosiasi/Associate                Transaksi pembelian tenaga listrik/Purchase of electricity

   TJK                                             Entitas asosiasi/Associate                Transaksi pembelian tenaga listrik/Purchase of electricity

   DEB                                             Entitas asosiasi/Associate                Transaksi pembelian tenaga listrik/Purchase of electricity

   MEB                                             Entitas asosiasi/Associate                Transaksi pembelian tenaga listrik/Purchase of electricity

   RDM                                             Entitas asosiasi/Associate                Transaksi pembelian tenaga listrik/Purchase of electricity

   S2P                                             Entitas asosiasi/Associate                Transaksi pembelian tenaga listrik/Purchase of electricity

   IPB                                             Entitas asosiasi/Associate                Pemberian pinjaman jangka panjang/
                                                                                             Issuance of long-term loans

   BDSN                                            Ventura bersama/Joint venture             Transaksi pembelian tenaga listrik/Purchase of electricity

   Komipo PJB                                      Ventura bersama/Joint venture             Transaksi pembelian tenaga listrik/Purchase of electricity

   BPI                                             Ventura bersama/Joint venture             Transaksi pembelian tenaga listrik/Purchase of electricity

   SGPJB                                           Ventura bersama/Joint venture             Pemberian pinjaman jangka panjang dan transaksi
                                                                                             pembelian tenaga listrik/Issuance of long-term loans
                                                                                             and purchase of electricity
Page 156
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/146 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                        SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                 (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO                              DENGAN             PIHAK       51. TRANSACTIONS AND BALANCES WITH RELATED
    BERELASI (lanjutan)                                                                 PARTIES (continued)

    Sifat hubungan berelasi (lanjutan)                                                        Nature of related parties (continued)

                 Pihak-pihak berelasi/                             Sifat hubungan/                                          Sifat transaksi dan saldo/
                    Related parties                              Nature of relationship                                 Nature of transaction and balance

   PDG                                                  Ventura bersama/Joint venture                      Pemberian pinjaman jangka panjang/
                                                                                                           Issuance of long-term loans

   PMSE                                                 Ventura bersama/Joint venture                      Pemberian pinjaman jangka panjang/
                                                                                                           Issuance of long-term loans

   REP                                                  Ventura bersama/Joint venture                      Pemberian pinjaman jangka panjang dan transaksi
                                                                                                           pembelian tenaga listrik/Issuance of long-term loans
                                                                                                           and purchase of electricity

   GCL                                                  Ventura bersama/Joint venture                      Pemberian pinjaman jangka panjang/
                                                                                                           Issuance of long-term loans

   PT Waskita Karya (Persero) Tbk (“Waskita”)           Pengendalian melalui Pemerintah                    Transaksi jasa konstruksi/
                                                        Republik Indonesia/                                Construction services
                                                        Control through the Government of
                                                        the Republic of Indonesia

   PT Wijaya Karya (Persero) Tbk (“Wika”)               Pengendalian melalui Pemerintah                    Transaksi jasa konstruksi/
                                                        Republik Indonesia/                                Construction services
                                                        Control through the Government of
                                                        the Republic of Indonesia

   PT Pelabuhan Indonesia (Persero)                     Pengendalian melalui Pemerintah                    Sewa/
                                                        Republik Indonesia/                                Lease
                                                        Control through the Government of
                                                        the Republic of Indonesia

   Dana Pensiun PLN                                     Pengendalian melalui Pemerintah                    Sewa/
                                                        Republik Indonesia/                                Lease
                                                        Control through the Government of
                                                        the Republic of Indonesia

   PT Djakarta Llyod                                    Pengendalian melalui Pemerintah                    Sewa/
                                                        Republik Indonesia/                                Lease
                                                        Control through the Government of
                                                        the Republic of Indonesia

   Pemerintah Daerah                                    Entitas yang berhubungan dengan                    Utang lain-lain/
                                                        Pemerintah/Government related entity               Other payables

   Pemerintah Pusat                                     Entitas yang berhubungan dengan                    Pendapatan usaha lain-lain/
                                                        Pemerintah/Government related entity               Other revenues


    Rincian transaksi               dan       saldo       dengan           pihak              Details of transactions and balances with related
    berelasi:                                                                                 parties:

    *) Persentase terhadap      jumlah    aset/liabilitas/pendapatan/beban   yang              *)    Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan

                                          Catatan/    30 September 2024/ September 30, 2024         31 Desember/ December 31, 2023
                                           Notes              Rp                % *)                     Rp               % *)

   Piutang pihak berelasi                    10                                                                                                     Receivables from related parties
     SGPJB                                                       337,248              0.00                578,667                   0.00                                   SGPJB
     REP                                                         449,999              0.00                437,855                   0.00                                     REP
     PDG                                                          17,635              0.00                 36,387                   0.00                                     PDG
     PMSE                                                         67,120              0.00                136,437                   0.00                                    PMSE
     GCL                                                          88,415              0.00                 58,923                   0.00                                     GCL
     IPB                                                               -               -                    1,411                   0.00                                      IPB
     Lain lain                                                    64,560              0.00                 29,733                   0.00                                   Others
     Subjumlah                                                 1,024,977              0.00              1,279,413                   0.00                                  Subtotal

   Rekening bank dan deposito berjangka      11
     dibatasi penggunaannya                                                                                                              Restricted cash in banks and time deposits
     Mandiri                                                     87,299               0.00                 91,125                    0.00                                 Mandiri
     BNI                                                             49               0.00                  2,643                    0.00                                     BNI
     BRI                                                         31,804               0.00                 51,089                    0.00                                     BRI
     Subjumlah                                                  119,152               0.00                144,857                   0.00                                  Subtotal
Page 157
                               PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                            DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                            Lampiran 5/147 Schedule

    CATATAN ATAS LAPORAN KEUANGAN                                                                                             NOTES TO THE CONSOLIDATED
    KONSOLIDASIAN                                                                                                                    FINANCIAL STATEMENTS
    30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
    (Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                           (Expressed in millions of Rupiah, unless otherwise stated)

    51. TRANSAKSI DAN SALDO                                     DENGAN               PIHAK      51. TRANSACTIONS AND BALANCES WITH RELATED
        BERELASI (lanjutan)                                                                         PARTIES (continued)

        Rincian transaksi                    dan        saldo        dengan          pihak               Details of transactions and balances with related
        berelasi: (lanjutan)                                                                             parties: (continued)
                                                    Catatan/    30 September 2024/ September 30, 2024      31 Desember/ December 31, 2023
                                                     Notes              Rp                % *)                  Rp               % *)



        Kas dan setara kas                            13                                                                                                 Cash and cash equivalents
          BNI                                                           11,268,445              0.01          15,181,633              0.01                                   BNI
          BRI                                                            7,294,901              0.00          18,128,073              0.01                                   BRI
          Mandiri                                                        6,181,018              0.00          15,456,094              0.01                               Mandiri
          BSI                                                              525,348              0.00           1,178,175              0.00                                   BSI
          BTN                                                              504,748              0.00           1,734,507              0.00                                  BTN
          Bank DKI                                                         154,720              0.00             710,714              0.00                              Bank DKI
          Subjumlah                                                     25,929,180              0.02          52,389,196              0.03                               Subtotal

        Investasi jangka pendek                       14                                                                                                      Short-term investment
          BRI                                                              154,257              0.00            490,407               0.00                                     BRI
          Mandiri                                                        1,394,801              0.00            312,824               0.00                                 Mandiri
          BNI                                                                  219              0.00             86,025               0.00                                     BNI
          PTBA                                                               8,385              0.00                  -                -                                    PT BA
          Subjumlah                                                      1,557,662              0.00            889,256               0.00                                 Subtotal

        Piutang usaha                                 15                                                                                                  Trade accounts receivable
          Entitas yang berelasi dengan Pemerintah                        2,555,392              0.00           2,485,622              0.00                 State-Owned Enterprises

        Piutang Pemerintah                            16                60,982,733              0.04          22,446,998              0.01            Receivables from Government
        Jumlah                                                          92,169,096              0.05          79,635,342              0.05                                   Total

        Penerusan pinjaman                            24                25,685,504              0.04          29,183,428              0.04                             Two-step loans

        Utang kepada Pemerintah dan lembaga                                                                                                  Government and non-bank Government
          keuangan Pemerintah non-Bank                25                                                                                               financial institution loans
          SMI                                                            1,484,722              0.00           2,222,907              0.00                                     SMI
        Subjumlah                                                        1,484,722              0.00           2,222,907              0.00                                   Subtotal

        Utang Sewa                                    26                                                                                                        Lease Liabilities
        PT Pelabuhan Indonesia (Persero)                                 1,159,843              0.00           1,138,625              0.00     PT Pelabuhan Indonesia (Persero)
        Dana Pensiun PLN                                                   940,784              0.00             926,919              0.00                   Dana Pensiun PLN
        PT Perta Daya Gas                                                  886,437              0.00             990,143              0.00
        Lain-lain                                                          186,250              0.00                   -               -
        Subjumlah                                                        3,173,314              0.00           3,055,687              0.00                                     Subtotal

        Utang bank                                    27                                                                                                                   Bank loans
          BNI                                                            6,655,731              0.01           6,078,834              0.01                                      BNI
          Mandiri                                                       14,017,314              0.02          13,394,567              0.02                                   Mandiri
          BSI                                                            2,408,377              0.00           2,494,067              0.00                                      BSI
          BRI                                                            7,438,292              0.01           7,223,106              0.01                                      BRI
          BTN                                                            4,414,354              0.01           4,830,277              0.01                                     BTN
          Bank DKI                                                         164,286              0.00             287,500              0.00                                 Bank DKI
          Bank Jateng                                                       28,571              0.00              50,000              0.00                              Bank Jateng
          BPD Aceh                                                          14,286              0.00              25,000              0.00                                BPD Aceh
          Bank Kalteng                                                      14,286              0.00              25,000              0.00                             Bank Kalteng
          Bank Riau                                                         14,286              0.00              25,000              0.00                                Bank Riau
          Bank Kalbar                                                       14,286              0.00              25,000              0.00                              Bank Kalbar
          BPD Bali                                                          10,714              0.00              18,750              0.00                                 BPD Bali
          SMI                                                              289,286              0.00             337,500              0.00                                      SMI
          LPEI                                                           2,635,562              0.00           1,594,232              0.00                                     LPEI
          BPD Papua                                                        241,104              0.00             374,448              0.00                               BPD Papua
          Subjumlah                                                     38,360,734              0.06          36,783,281              0.06                                  Subtotal
                                                                                                                                       -
        Utang pihak berelasi                          30                                                                               -                   Payable to related parties
          PDG                                                                                                          -               -
          PT Riau Power                                                          -               -                     -               -                             PT Riau Power
          Subjumlah                                                              -               -                     -               -                                   Subtotal

        Utang usaha                                   30                                                                                                     Trade accounts payable
          Pertamina                                                      7,737,570              0.01           5,666,807              0.01                              Pertamina
          S2P                                                            2,113,254              0.00           1,988,917              0.00                                    S2P
          SGPJB                                                          2,185,360              0.00           2,131,439              0.00                                 SGPJB
          Pertagas                                                         632,951              0.00             141,373              0.00                               Pertagas
          PTBA                                                           1,573,024              0.00           1,127,386              0.00                                  PTBA
          PGE                                                            1,958,538              0.00           1,706,341              0.00                                 PGE
          PGN                                                              578,555              0.00             744,577              0.00                                   PGN
          NR                                                               149,537              0.00             126,854              0.00                                     NR
                                                                                                 -                                     -
          Lain-lain (masing - masing dibawah 5%                                                                                                       Others (each below 5% of total
            dari jumlah utang usaha)                                                                                                                      trade accounts payable)
            Pengendalian melalui Pemerintah                                                                                                   Control through the Government of the
            Republik Indonesia                                             730,974              0.00             574,699              0.00                     Republic of Indonesia
            Entitas asosiasi                                               425,078              0.00             333,969              0.00                               Associates
            Ventura Bersama                                                803,035              0.00             981,167              0.00                            Joint ventures
          Subjumlah                                                     18,887,877              0.03          15,523,529              0.02                                   Subtotal

          *) Percentage to related total assets/liabilities/revenues/expenses


\
Page 158
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/148 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                 SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                          (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO                                         DENGAN          PIHAK            51. TRANSACTIONS AND BALANCES WITH RELATED
    BERELASI (lanjutan)                                                                              PARTIES (continued)

    Rincian transaksi                   dan          saldo         dengan         pihak              Details of transactions and balances with related
    berelasi: (lanjutan)                                                                             parties: (continued)

                                                   Catatan/      30 September 2024/ September 30, 2024        31 Desember/ December 31, 2023
                                                    Notes                Rp                % *)                    Rp               % *)



     Utang lain-lain                                  31                                                                                                                          Other payables
       WK                                                                  491,378                0.00               563,090                  0.09                                            WK
       Pemerintah Daerah                                                 2,816,849                0.02             2,512,403                  0.38                              Local Government
       WIKA                                                                369,025                0.00               459,087                  0.07                                          WIKA
       PP                                                                       17                0.00                                         -                                              PP
       Adhi Karya                                                          217,242                0.00                                         -                                       Adhi Karya
       BKI                                                                  19,052                0.00                 7,932                  0.00                                            BKI
       Lainnya                                                             689,627                0.00                21,903                  0.03                                         Others

       Subjumlah                                                         4,603,191                0.03             3,564,415                  0.57                                        Subtotal

     Biaya masih harus dibayar                        33                                                                                                                          Accrued expenses
       Penerusan pinjaman                                                  104,738                0.00               323,010                  0.05                                  Two-step loans
       Utang bank                                                                                                                                                                         Bank loans
         BNI                                                                24,593                0.00                90,685                  0.01                                             BNI
         Mandiri                                                            36,078                0.00               144,535                  0.02                                         Mandiri
         BSI                                                                12,721                0.00                54,975                  0.01                                             BSI
         Bank Syariah Mandiri                                                    -                 -                       -                  0.01                         Bank Syariah Mandiri
         BRI                                                                19,471                0.00                44,705                  0.01                                             BRI
         BTN                                                                29,299                0.00                56,360                  0.01                                            BTN
         Bank DKI                                                              192                0.00                   405                  0.00                                       Bank DKI
         SMI                                                                 7,994                0.00                 4,095                  0.00                                             SMI
         LPEI                                                                  681                0.00                 1,029                  0.00                                            LPEI
         Pihak berelasi lainnya                                                471                0.00                   737                  0.00                          Other related parties
       Utang kepada Pemerintah dan lembaga                                                                                                                  Government and non-bank Government
         keuangan Pemerintah non-bank                                                                                                                                  financial institution loans

       Subjumlah                                                           236,239                0.00               720,537                  0.11                                        Subtotal

     Jumlah                                                            184,592,292                0.21          170,689,127                   0.86                                             Total




                                                                    30 September 2024/ September 30, 2024      30 September 2023/ September 30, 2023
                                                      Catatan/                Rp                   % *)                Rp                % *)
                                                       Notes
     Penjualan tenaga listrik                           36                                                                                                                        Sale of electricity
       Entitas yang berelasi dengan Pemerintah                                      16,911,843       0.06               16,420,965                0.10                    State-Owned Enterprises

     Subsidi listrik Pemerintah                            37                       58,046,623       1.00               49,110,836                   1.53          Government's electricity subsidy

     Pendapatan kompensasi                                 16                       72,624,246       1.00               56,342,345                   1.49                    Compensation income


     Pendapatan usaha lain lain                            38                                                                                                                       Other Revenues
       SGPJB                                                                         1,390,909       0.15                  763,229                   0.19                                  SGPJB
       GCL                                                                            261,046        0.03                  236,339                   0.06                                     GCL
       SSP                                                                            177,698        0.02                  578,831                   0.14                                     SSP
       Lain lain                                                                      394,339        0.04                  264,427                   0.07                                   Others


     Jumlah                                                                          2,223,992       0.25                1,842,827               35.66                                         Total

     Beban bahan bakar dan pelumas                         39                                                                                                           Fuel and lubricants expense
       Pertamina Group                                                              58,400,560       0.44               37,318,677                   0.32                         Pertamina Group
       PTBA                                                                          6,317,281       0.05               10,333,678                   0.14                                    PTBA
       Lainnya                                                                         201,474       0.00                  354,105                   0.00                                   Others

     Jumlah                                                                         64,919,315       0.49               48,006,460                   0.46                                      Total

     Beban pembelian tenaga listrik                        40                                                                                                        Purchased electricity expenses
       SSP                                                                          10,002,468       0.08               10,510,295                   0.14                                     SSP
       SGPJB                                                                         9,316,441       0.07                7,719,036                   0.11                                   SGPJB
       PGE                                                                           2,872,002       0.02                5,414,750                   0.04                                     PGE
       BPI                                                                             887,884       0.01                1,119,808                   0.02                                      BPI
       GDE                                                                             843,476       0.01                  764,321                   0.01                                     GDE
       BDSN                                                                            753,971       0.01                  694,710                   0.01                                    BDSN
       TJK                                                                             389,097       0.00                  381,481                   0.01                                      TJK
       RDM                                                                             203,453       0.00                  252,591                   0.00                                     RDM
       REP                                                                             196,934       0.00                  188,304                   0.00                                     REP
       DEB                                                                             144,959       0.00                  129,393                   0.00                                     DEB
       Perum Jasa Tirta II                                                             135,951       0.00                  202,230                   0.00                      Perum Jasa Tirta II
       MEB                                                                              41,689       0.00                   41,258                   0.00                                     MEB
       Lainnya                                                                         249,774       0.00                  454,265                   0.01                                   Others

     Jumlah                                                                         26,038,100       0.20               27,872,443                   0.35                                      Total

    *) Persentase terhadap         jumlah        aset/liabilitas/pendapatan/beban     yang               *)   Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan
Page 159
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/149 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                       SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO                                DENGAN         PIHAK         51. TRANSACTIONS AND BALANCES WITH RELATED
    BERELASI (lanjutan)                                                                 PARTIES (continued)

    Rincian transaksi                 dan   saldo        dengan         pihak              Details of transactions and balances with related
    berelasi: (lanjutan)                                                                   parties:                              (continued)

                                            Catatan/     30 September 2024/ September 30, 2024      30 September 2023/ September 30, 2023
                                             Notes                 Rp                   % *)                Rp                % *)


    Beban pemeliharaan                        42                                                                                                             Maintenance expenses
      KOMIPO PJB                                                          209,980         0.01                  193,356                0.02                         KOMIPO PJB
      Lainnya                                                             232,594         0.01                  239,577                0.02                               Others

         Jumlah                                                           442,574         0.02                  432,933                0.04                                 Total

    Beban usaha lain-lain                     44                                                                                                          Other operating expenses
      AJI                                                                       -          -                    248,585                0.06                                   AJI
      PT Telkom Indonesia                                                 215,931                                                                            PT Telkom Indonesia
      Lainnya                                                             372,961         0.05                  337,446                0.08                                Others

    Jumlah                                                                588,892         0.05                  586,031                1.14                                   Total

    Beban keuangan                            45                                                                                                                      Financial cost
    Utang Bank                                                          2,079,564         0.11                1,660,427                0.15                               Bank Loans
    Penerusan Pinjaman                                                    631,476         0.03                  670,633                0.06                         Two - Step Loans
    Instrumen derivatif                                                   327,428         0.02                  486,119                0.04                     Derivative Instrumen
    Utang Kepada Pemerintah dan Lembaga                                                                                                        Government and non-bank Government
       Keuangan Pemerintah non - Bank                                      91,768         0.01                  125,188                0.01               inancial institution loans
       Instrumen derivatif                                                                                                                                  Derivative instruments

         Jumlah                                                         3,130,236         0.17                2,942,367                0.27                                 Total


    *)      Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                   *)   Percentage to related total assets/liabilities/revenues/expenses
            bersangkutan



    Jumlah kompensasi Dewan Komisaris Perusahaan                                           Total compensation of the Company’s Board of
    untuk   tahun yang berakhir pada         tanggal                                       Commissioners for the years ended September 30,
    30 September 2024 dan 31 Desember 2023 masing-                                         2024 and December 2023 amounted to Rp145,722 and
    masing adalah sebesar Rp145.722 dan Rp151.759.                                         Rp151,759, respectively.
    Jumlah kompensasi Direksi Perusahaan untuk tahun                                       Total compensation of the Company’s Board of
    yang berakhir pada tanggal 30 September 2024 dan                                       Directors for the years ended September30, 2024 and
    31 Desember 2023 masing-masing adalah sebesar                                          Deecmber 2023 amounted to Rp295,392 and
    Rp295.372 dan Rp298.096.                                                               Rp298,09, respectively.
    Seluruh kompensasi kepada Dewan Komisaris dan                                          All the compensation to the Company’s Boards of
    Direksi Perusahaan merupakan imbalan kerja jangka                                      Commissioners and Directors represents short-term
    pendek.                                                                                employee benefits.

    Informasi mengenai kontribusi yang dilakukan Grup ke                                   Information about the contributions made by the Group
    DP-PLN diungkapkan di Catatan 49.                                                      to DP-PLN is disclosed in Note 49.
Page 160
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                   Lampiran 5/150 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                      (Expressed in millions of Rupiah, unless otherwise stated)

52. ASET DAN LIABILITAS MONETER DALAM MATA                                               52. MONETARY     ASSETS     AND   LIABILITIES
    UANG ASING                                                                               DENOMINATED IN FOREIGN CURRENCIES

     Pada tanggal 30 September 2024 dan 31 Desember                                             As at September 30, 2024 and December 31, 2023, the
     2023, Grup mempunyai aset dan liabilitas moneter                                           Group had monetary assets and liabilities in foreign
     dalam mata uang asing sebagai berikut:                                                     currencies as follows:
                                                                           30 September/September 30, 2024
                                                                                                                              Lain-lain/
                                                 JPY*)                         USD                    EUR*)                   Others**)
    Aset moneter                                                                                                                                                   Monetary assets
    Piutang pihak berelasi                                                      67,682,044                                                          Receivables from related parties
    Rekening bank dan deposito berjangka                                                                                                                   Restricted cash in banks
        dibatasi penggunaannya                   36,455,531,131                  59,634,425                                                                  and time deposits
    Kas dan setara kas                           1,464,409,191                 573,419,358             10,168,109                  2,079,708             Cash and cash equivalents
    Investasi jangka pendek                                                          7,500                                                                   Short term investment
    Jumlah aset moneter                         37,919,940,322                 700,743,327             10,168,109                  2,079,708                 Total monetary assets

    Liabilitas moneter                                                                                                                                           Monetary liabilities
    Penerusan pinjaman                         133,166,624,471                 753,324,587              8,698,442                          -                          Two-step loans
    Utang sewa pembiayaan                           27,524,169              11,830,849,503                                                                            Lease liabilities
    Utang bank                                 125,110,519,627               3,782,925,045            796,282,066                                                         Bank loans
    Utang obligasi dan sukuk ijarah              1,000,000,000              10,188,312,000          1,000,000,000                                     Bonds payable and sukuk ijara
    Utang listrik swasta                                                       339,586,970                                                              Electricity purchase payable
    Utang lain-lain                                      191,869                 1,095,970                230,945                                                     Other payables
    Utang biaya proyek                                       -                     660,040                    -                                                  Project cost payable
    Utang usaha                                                              1,754,537,774                                       15,624,295                           Trade payables
    Biaya yang masih harus dibayar              17,450,128,221                 214,841,860             26,955,010                                                  Accrued expenses
    Jumlah liabilitas moneter                  276,754,988,357              28,866,133,748          1,832,166,463                15,624,295                 Total monetary liabilities

    Liabilitas moneter bersih                  (238,835,048,035)            (28,165,390,420)       (1,821,998,354)               (13,544,587)                 Net monetary labilities
    Ekuivalen Rupiah                                (25,398,818)              (426,536,673)           (30,844,100)                  (205,119)                      Rupiah equivalent
    Jumlah dalam Rupiah - bersih                   (482,984,710)                                                                                               Total in Rupiah - net


                                                                         31 Desember/ December 31, 2023
                                                                                                                         Lain-lain/
                                                       JPY*)                  USD*)                 EUR*)                Others**)

   Aset moneter                                                                                                                                               Monetary assets
   Kas dan setara kas                                 2,478,548,665             992,515,957            32,499,673              1,157,691            Cash and cash equivalents
   Piutang pihak berelasi                                         -              80,387,320                     -                      -        Receivables from related parties
   Rekening bank dibatasi penggunaannya              31,519,528,142              61,472,835                     -                      -               Restricted cash in banks
   Investasi jangka pendek                                        -              48,495,744                     -                      -                Short-term investments

   Jumlah aset moneter*)                             33,998,076,807           1,182,871,856            32,499,673              1,157,691                Total monetary assets*)

   Liabilitas moneter                                                                                                                                       Monetary liabilities
   Penerusan pinjaman                              143,264,058,836             868,745,367             9,455,327                       -                         Two-step loans
   Utang sewa pembiayaan                            12,458,102,846              32,333,146                     -                       -                         Lease liabilities
   Utang bank                                      149,568,004,937           4,112,700,597           873,294,663                       -                             Bank loans
   Utang obligasi dan sukuk ijarah                  19,500,000,000          10,188,312,000         1,000,000,000                       -         Bonds payable and sukuk ijara
   Utang listrik swasta                                          -             366,332,480                     -                       -          Electricity purchase payables
   Utang lain-lain                                   3,368,729,242             115,484,762            23,142,706                       -                         Other payables
   Utang biaya proyek                                4,096,684,410              25,754,624             1,596,171                       -                   Project cost payables
   Utang usaha                                                   -           1,432,937,142                     -               8,478,895                         Trade payables
   Biaya masih harus dibayar                         5,802,685,833             200,444,199             7,604,152                       -                      Accrued expenses

   Jumlah liabilitas moneter*)                     338,058,266,104          17,343,044,317         1,915,093,019               8,478,895              Total monetary liabilities*)

   Liabilitas moneter bersih*)                     (304,060,189,297)        (16,160,172,461)      (1,882,593,346)              (7,321,204)             Net monetary liabilities*)

                                                                                                                                                                    Equivalent
   Ekuivalen dalam jutaan Rupiah                          (33,205,197)         (249,496,903)          (32,166,555)               (113,032)             in millions of Rupiah

                                                                                                                                                                     Net total -
   Jumlah bersih - dalam jutaan Rupiah                   (314,981,687)                                                                                 in millions of Rupiah

     *)    Dalam jumlah penuh                                                                    *) In full amount
     **)   Aset dan liabilitas dalam mata uang asing lainnya disajikan setara USD                **) Assets and liabilities denominated in other foreign currencies are presented
           dengan menggunakan kurs tanggal pelaporan                                                 as USD equivalent using the exchange rate prevailing at the reporting date

     Apabila aset dan liabilitas dalam mata uang asing                                           If assets and liabilities in foreign currencies as at
     pada tanggal 30 September 2024 dijabarkan dengan                                            September30, 2024 had been translated using the
     menggunakan kurs penutupan mata uang asing pada                                             closing rates at issuance of October 25, 2024, the total
     tanggal 25 Oktober 2024, maka liabilitas bersih dalam                                       net foreign currency liabilities of the Group would have
     mata uang asing Grup akan mengalami penurunan                                               been decreased by Rp12,812,576 (2023: decreased by
     sebesar Rp12.812.576 (2023: penurunan sebesar                                               Rp9,385,670 at issuance of May 28, 2024).
     Rp9.385.670 pada tanggal 28 Mei 2024).
Page 161
                                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                         Lampiran 5/151 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                            (Expressed in millions of Rupiah, unless otherwise stated)

53. SEGMEN OPERASI                                                                                                53. OPERATING SEGMENTS

     Informasi wilayah geografis                                                                                       Geographical information

     Segmen operasi disusun sesuai dengan kebijakan                                                                    The operating segment information is prepared using
     akuntansi yang dianut dalam penyusunan dan                                                                        the accounting policies adopted for preparing and
     penyajian laporan keuangan konsolidasian.                                                                         presenting the consolidated financial statements.

     Manajemen telah menentukan segmen operasi                                                                         Management has determined the operating segments
     berdasarkan laporan yang ditelaah oleh Direksi, yang                                                              based on reports reviewed by the Board of Directors,
     telah diidentifikasikan sebagai pengambil keputusan                                                               which has been identified as the Group’s chief operating
     operasional utama Grup dalam mengambil keputusan                                                                  decision maker and which makes strategic decisions.
     strategis. Direksi mempertimbangkan operasi bisnis                                                                The Board of Directors considers the business
     dari perspektif operasi geografis yang terdiri dari                                                               operations from the geographical operations consisting
     Sumatera, Jawa Bali dan Nusa Tenggara, Kalimantan,                                                                of Sumatera, Java Bali and Nusa Tenggara, Kalimantan,
     Sulawesi, dan Maluku dan Papua.                                                                                   Sulawesi, and Maluku and Papua.

     Untuk tujuan pelaporan manajemen, pada tanggal 30                                                                 For management reporting purposes, as at September
     September 2024 dan 31 Desember 2023, Grup dibagi                                                                  30, 2024 and December 31, 2023, the Group is divided
     dalam operasi geografis Sumatera, Jawa Bali dan                                                                   into the geographical areas of Sumatera, Java Bali and
     Nusa Tenggara, Kalimantan, Sulawesi, dan Maluku                                                                   Nusa Tenggara, Kalimantan, Sulawesi, and Maluku and
     dan Papua. Operasi geografis tersebut menjadi dasar                                                               Papua. These geographical operations are the basis on
     pelaporan informasi segmen Grup, rinciannya adalah                                                                which the Group reports segment information, with the
     sebagai berikut:                                                                                                  following details:

                                                                                              30 September / September 30, 2024

                                                                  Jawa Bali & Nusa
                                          Sumatera                                           Kalimantan               Sulawesi                   Maluku & Papua                   Jumlah
                                                                     Tenggara
                                            Rp                          Rp                      Rp                      Rp                             Rp                          Rp
    Pendapatan usaha                                                                                                                                                                                                     Revenue
    Pendapatan eksternal                      30,945,760                 347,629,772              10,952,984                 10,103,813                     2,930,349               402,562,677                   External revenue
    Pendapatan antar segmen                                                                                                                                       -                           -             Inter-segment revenue
    Jumlah                                    30,945,760                 347,629,772              10,952,984                 10,103,813                     2,930,349               402,562,677                      Total revenue


    Hasil segmen                                                                                                                                                                                                 Segment results
    Beban usaha                               26,305,931                 270,109,541           10,437,100.99            10,302,380.62                  4,607,269.76                 321,762,223               Operating expenses
    Beban penyusutan                           4,345,099                  28,719,900            1,408,097.16             1,322,413.12                    801,989.86                  36,597,499             Depreciation expenses
    Laba (Rugi) usaha                          4,639,829                  77,520,231                 515,883                 (198,568)                   (1,676,921)                 44,202,954              Operating profit/(loss)
    Penghasilan (beban) lain-lain tidak                                                                                                                                                                               Unallocated
      dapat dialokasikan                         1,102,745                 3,575,010                  (367,620)                   516,964                     103,099                   4,930,199             (expenses)/revenue
    Bagian atas laba bersih entitas                                                                                                                                                                         Share in net income of
      asosiasi dan ventura bersama                   -                           -                         -                                                                                   -     associates and joint ventures
    Penghasilan keuangan                          45,908                     817,662                       677                        0                           -                      864,247                   Finance income
    Beban keuangan                            (2,342,966)                (14,492,795)                 (652,402)                (458,078)                     (341,687)               (18,287,928)                    Finance costs
    Penurunan nilai aset tetap                       -                           -                         -                        -                             -                            -       Provision for impairment of
                                                                                                                                                                                                     property plant and equipment
    Cadangan atas ketidakpastian dalam                                                                                                                                                                   Allowance for uncertainty
      perlakuan pajak                                                            -                                                                                                            -                 over tax treatment
    Beban pajak                                   (128,281)               (6,385,515)                  (59,568)                       -                            -                 (6,573,364)              Income tax expense
    Laba (Rugi) bersih                           5,614,292                74,709,726                    88,696                    318,397                   (1,573,823)              25,136,109           Profit/(loss) for the year

    Aktiva segmen                                                                                                                                                                                                Segment assets
    Aset                                     158,666,286               1,407,495,292              53,817,265                 51,676,540                    27,402,981              1,699,058,365                             Asset
    Jumlah aktiva konsolidasi                158,666,286               1,407,495,292              53,817,265                 51,676,540                    27,402,981              1,699,058,365        Total consolidation assets

    Kewajiban segmen                                                                                                                                                                                           Segment liabilities
    Liabilitas dialokasikan                   21,325,183                 628,091,933                 6,809,747                6,336,057                     4,150,016               666,712,936
    Jumlah kewajiban konsolidasi              21,325,183                 628,091,933                 6,809,747                6,336,057                     4,150,016               666,712,936       Total consolidation liabilities

                                                                                          31 Desember/ December 31, 2023
                                                                    Jawa Bali &                                                             Maluku &               Jumlah/
                                             Sumatera              Nusa Tenggara           Kalimantan             Sulawesi                   Papua                  Total

   Pendapatan usaha                                                                                                                                                                                                   Revenue
   Pendapatan eksternal                           82,223,685         1,006,804,631            27,592,951           28,013,641                 8,355,466         1,152,990,374                                  External revenue
   Pendapatan antar segmen                       (47,466,662)         (581,215,186)          (15,929,051)         (16,171,910)               (4,823,501)         (665,606,310)                           Inter-segment revenue

   Jumlah pendapatan usaha                       34,757,023            425,589,445           11,663,900            11,841,731                 3,531,965           487,384,064                                        Total revenue

   Hasil segmen                                                                                                                                                                                              Segment results
   Beban usaha                                   (32,263,019)         (331,837,971)          (11,468,392)         (11,319,529)               (5,980,832)          (392,869,743)                            Operating expenses
   Beban penyusutan                               (4,779,066)          (38,173,494)           (1,719,322)          (1,630,242)               (1,012,123)           (47,314,247)                           Depreciation expense
   Laba/(rugi) usaha                              (2,285,062)           55,577,980            (1,523,814)          (1,108,040)               (3,460,990)            47,200,074                            Operating profit/(loss)
   (Beban)/penghasilan lain-lain
      tidak dapat dialokasikan                       269,479              6,386,258             148,615              (244,686)                 328,760               6,888,426                Unallocated (expenses)/revenue
   Bagian atas laba bersih entitas                                                                                                                                                                       Share in net income of
      asosiasi dan ventura bersama                   370,572             2,880,413                 5,453                    -                         -              3,256,438                associates and joint ventures
   Penghasilan keuangan                                    -               953,515                     -                    -                         -                953,515                                  Finance income
   Beban keuangan                                 (2,835,235)          (16,288,937)             (765,344)            (739,674)                 (381,165)           (21,010,355)                                   Finance costs
                                                                                                                                                                                           Provision for impairment of property
   Penurunan nilai aset tetap                                 -                      -                    -                   -                        -                     -                         plant and equipment
   Cadangan atas ketidakpastian dalam                                                                                                                                                                 Allowance for uncertainty
      perlakuan pajak                                         -         (4,908,174)                       -                   -                        -            (4,908,174)                           over tax treatment
   Beban pajak                                                -        (10,308,466)                       -                   -                        -           (10,308,466)                            Income tax expense

   Laba/(rugi) bersih                             (4,480,246)           34,292,589            (2,135,090)          (2,092,400)               (3,513,395)            22,071,458                        Profit/(loss) for the year

   Aset segmen                                                                                                                                                                                                Segment assets
   Jumlah aset konsolidasian                  140,494,179            1,402,769,965           50,637,493            50,287,299                26,450,768         1,670,639,704                         Total consolidated assets

   Liabilitas segmen                                                                                                                                                                                       Segment Liabilities
   Jumlah liabilitas konsolidasian               13,648,191            626,192,593            5,766,766             6,035,528                          `          655,008,305                       Total consolidated liabilities
Page 162
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/152 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                      (Expressed in millions of Rupiah, unless otherwise stated)


54. PERJANJIAN               PENTING,          IKATAN             DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI                                                                 CONTINGENCIES

    Pada tanggal 30 September 2024, Grup memiliki                               As at September 30, 2024, the Group has significant
    perjanjian penting sebagai berikut:                                         agreements, as follows:

    a.    Perjanjian pengadaan bahan bakar                                      a.     Fuel supply agreements

          Gas                                                                          Gas

                       Sektor/                                   Pemasok/                      Periode/       Satuan/       Kuantitas/
                       Sector                                    Supplier                       Period         Unit          Quantity
          Perusahaan
          Kotogasib, Rengat dan Siberida        PHE Jambi Merang                              2019 - 2026     BBTUD                      5
          PLTGU Riau                            EMP Bentu                                     2021 - 2026     BBTUD                     40
                                                                                                                                 Program
                                                                                                                               pengiriman
                                                                                                                                 tahunan/
                                                                                                                Kargo/
                                                BP Berau (LNG)                                2014 - 2033                          Annual
          Sutami dan MPP Tarahan                                                                                Cargo
                                                                                                                                  Delivery
                                                                                                                                 Program
                                                                                                                                    (ADP)
                                                PNG                                           2019 - 2030     BBTUD                30 - 36
          Purwodadi                             Energasindo Heksa Karya                       2019 - 2024     BBTUD                    1.7
          Luwuk                                 E&P Tomori                                    2021 - 2027     BBTUD                      5
          Melibur                               PT Imbang Tata Alam                           2020 - 2025      BBTU                   711

          PIP
                                                PGN                                           2019 - 2030     BBTUD                  30-36
                                                                                                                                  Program
                                                                                                                               pengiriman
                                                                                                                                  tahunan/
                                                                                                                Kargo/
                                                BP Berau (LNG)                                2014 - 2033                           Annual
                                                                                                                Cargo
                                                                                                                                   Delivery
                                                                                                                                  Program
                                                                                                                                     (ADP)
          Priok                                                                                                                  Lampiran
                                                                                                                Kargo/         konfirmasi/
                                                Pertamina (LNG)                               2017 - 2026
                                                                                                                Cargo        Confirmation
                                                                                                                                    Notice
                                                Pertamina                                                                        Lampiran
                                                ENI East Sepinggan Ltd.                                         Kargo/         konfirmasi/
                                                                                              2023 - 2024
                                                Neptune Energy East Sepinggan B.V.                              Cargo        Confirmation
                                                Pertamina Hulu Energy East Sepinggan                                                Notice
                                                PGN (FSRU Lampung)                            2022 - 2024     BBTUD          s.d/up to 250
                                                PGN                                           2019 - 2030     BBTUD                  30-36
                                                PGN (FSRU Lampung)                            2022 - 2024     BBTUD          s.d/up to 250
          Cilegon                               Pertamina (Gas JTB)                           2021 - 2035     BBTUD                    100
                                                                                                                             (Take or Pay
                                                                                                                            (“TOP”) 90%)
                                                Medco Energy Sampang Pty Ltd.
                                                                                                              BBTUD          s.d./up to 30
                                                Singapore Petroleum Sampang Ltd.              2004 - 2024
                                                                                                                              (TOP 95%)
                                                Cue Sampang Pty. Ltd. (Gas Sampang)
                                                                                                                                      20-50
          Grati                                 Kangean Energy Indonesia Ltd                  2012 - 2028     BBTUD
                                                                                                                               (TOP 90%)
                                                                                                                             s.d/up to 100
                                                PT Pertamina Gas                              2014 - 2033*    MMSCFD         (Take or Pay
                                                                                                                               (“TOP”) 80)
                                                                                                                                  Program
                                                                                                                                pengiriman
                                                                                                                                  tahunan/
                                                                                                                Kargo/
                                                BP Berau (LNG)                                2014 - 2033                           Annual
                                                                                                                Cargo
                                                                                                                                   Delivery
                                                                                                                                  Program
                                                                                                                                     (ADP)
          Bali                                                                                                                   Lampiran
                                                                                                                Kargo/          konfirmasi/
                                                Pertamina (LNG)                               2017 - 2026
                                                                                                                Cargo        Confirmation
                                                                                                                                    Notice
                                                Pertamina                                                                        Lampiran
                                                ENI East Sepinggan Ltd.                                         Kargo/          konfirmasi/
                                                                                              2023 - 2024
                                                Neptune Energy East Sepinggan B.V.                              Cargo        Confirmation
                                                Pertamina Hulu Energy East Sepinggan                                                Notice
                                                PT Medco E&P Lematang dan PT Medco
          UBP Keramasan                                                                       2017 - 2027     BBTUD         20 (TOP 90%)
                                                E&P Indonesia
         *) Kontrak tahunan/Yearly contract
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 163
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/153 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                   IKATAN             DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                      CONTINGENCIES (continued)

    Pada tanggal 30 September 2024, Grup memiliki                                As at September 30, 2024, the Group has significant
    perikatan penting dan kontinjensi sebagai berikut:                           commitments and contingencies, as follows: (continued)
    (lanjutan)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                            a.   Fuel supply agreements (continued)

          Gas (lanjutan)                                                              Gas (continued)
                        Sektor/                                  Pemasok/                       Periode/       Satuan/       Kuantitas/
                         Sector                                  Supplier                        Period         Unit          Quantity
          PIP (lanjutan/continued)
                                                                                                                                  Minimum
                                                                                                                                   Disaster
                                                                                                                                  Recovery
                                                                                                                                      Center
                                                                                                                                    (“DRC”)
                                                PT Pertamina Gas (Pertagas PEP)
                                                                                              2019 - 2024      MMSCFD        2019-2020: 11
                                                                                                                                2020-2021:
                                                                                                                                        6.94
                                                                                                                                 2022: 6.82
                                                                                                                                2023-2024:
          UBP Keramasan
                                                                                                                                        2.23
                                                                                                                             Minimum DRC
                                                                                                                                  Indralaya
                                                                                                                                 2020-2027
                                                                                                                                         :6.6
                                                PT Pertamina Gas (Pertagas Medco)             2020 - 2027      MMSCFD         Borang 2020-
                                                                                                                                 2027: 9.14
                                                                                                                                Keramasan
                                                                                                                                2020-2027:
                                                                                                                                        1.95
                                                                                                                                    2022: 8
                                                                                                                               2023: s.d/up
                                                                                                                                     to 11.7
                                                Pertamina (Persero)                           2022 - 2024      BBTUD           2024: s.d/up
          UBP Mahakam                                                                                                                to 18.3
                                                                                                                                 (TOP 75%
                                                                                                                                       ACQ)
                                                                                                                                 2020-2028
                                                PT Pertamina Gas (Pertagas)                   2018 - 2028      MMSCFD
                                                                                                                               DRC: 5.333

          PNP
                                                Pertamina Hulu Energi WMO                     2002 - 2023**     TBTU             837,692
                                                PT Saka Energi Indonesia                       2011 - 2026       BCF               330.20
                                                Kangean Energy Indonesia Ltd.                  2008 - 2028      TBTU                   371
          UP Gresik                                                                                              BCF                 41.59
                                                Petrogas Jatim Utama                          2016 - 2023**
                                                                                                                TBTU                  7.30
                                                PLN EPI                                        2023 - 2024     BBTUD                25-50
                                                Pertamina Gas Negara JTB                       2022 - 2035      TBTU                   511
                                                Pertamina Hulu Energi ONWJ                       2023**         TBTU                 5,475
                                                PGN                                           2022 - 2023**                          7,227
                                                                                                                                   Sesuai
                                                                                                                               kebutuhan/
                                                Pertamina                                        2023**         BBTU
                                                                                                                              Depends on
                                                                                                                                necessity
          UP Muara Karang
                                                                                                                             Sesuai kargo/
                                                                                                                Kargo/
                                                Nusantara Regas                                  2023**                        Depens on
                                                                                                                Cargo
                                                                                                                                     cargo
                                                                                                                             Sesuai kargo/
                                                BP Berau (LNG)                                2012 - 2034                      Depens on
                                                                                                                                     cargo
                                                PT Pertamina EP                               2018 - 2024                          29,244
                                                                                                                             Sesuai kargo/
                                                                                                                BBTU
                                                Pertamina                                        2023**                        Depens on
                                                                                                                                     cargo
                                                                                                                                   Sesuai
          UP Muara Tawar                                                                                                       kebutuhan/
                                                Nusantara Regas                                  2023**
                                                                                                                              Depends on
                                                                                                                Kargo/
                                                                                                                                necessity
                                                                                                                Cargo
                                                                                                                             Sesuai kargo/
                                                BP Berau (LNG)                                2012 - 2034                     Depends on
                                                                                                                                     cargo
         *) Kontrak tahunan/Yearly contract
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 164
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/154 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                       IKATAN               DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                           AND CONTINGENCIES (continued)

    Pada tanggal 30 September 2024, Grup memiliki                                      As at September 30, 2024, the Group has significant
    perikatan penting dan kontinjensi sebagai berikut:                                 commitments and contingencies, as follows:
    (lanjutan)                                                                         (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                                  a.       Fuel supply agreements (continued)

          Gas (lanjutan)                                                                        Gas (continued)

                        Sektor/                                         Pemasok/                                    Periode/               Satuan/       Kuantitas/
                         Sector                                          Supplier                                    Period                 Unit          Quantity
           PNP (lanjutan/continued)
                                                                                                                                                                Sesuai
                                                                                                                                                            kebutuhan/
                                                      Perta Arun Gas                                              2022 - 2023**            MMSCFD
                                                                                                                                                           Depends on
                                                                                                                                                             necessity
           UP Arun & UPDK Belawan
                                                                                                                                                                Sesuai
                                                                                                                                                            kebutuhan/
                                                      Pertamina                                                      2023**                 BBTU
                                                                                                                                                           Depends on
                                                                                                                                                             necessity
           UPDK Belawan                               PT Pertagas                                                  2015 - 2029             MMSCF            34,675,000
                                                      Energi Mega Persada                                          2021 - 2026                                      40
                                                                                                                                            BBTU
           UPDK Pekanbaru                             PHE Jambi Merang                                             2022 - 2026                                        5
                                                      Transportasi Gas Indonesia                                  2018 - 2023**             MSCF            16,706,050
           UPDK Palangkaraya                          Medco Bangkanai                                              2016 - 2033              BBTU                    20
                                                      Medco E&P Indonesia                                          2022 - 2025                                  2.74-3
           UPDK Tarakan                                                                                                                    BBTUD
                                                      Pertamina EP                                                   2023**                                         6.3
                                                                                                                                           Kargo/
           UPDK Gorontalo                             PLN Energi Gas                                              2022 - 2035                                      104
                                                                                                                                           Cargo
           UP Sengkang                                PLN EPI                                                     2023 - 2024              BBTU                 17,120

           PLN Batam
           Multidestinasi                             PGN                                                         2019 - 2028                                     61.4
                                                                                                                                           BBTUD
           Tanjung Uncang                             Petrochina International Jabung, Ltd.                       2015 - 2024                                       18
         *) Kontrak tahunan/Yearly contract
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension

          Sehubungan dengan perjanjian di atas,                                                   In relation with the above agreements, the
          Perusahaan mempunyai fasilitas stand-by letter                                          Company has stand-by letter of credit facilities with
          of credit dengan rincian sebagai berikut:                                               the following details:
                Bank penerbit/                                   Penerima manfaat/                                            Mata uang/             Jumlah/
                Issuing Bank                                        Beneficiary                                               Currency               Total *)

         BRI                          Ophir Indonesia (Sampang) Pty.                                                            USD                        14,340,950
                                      PT Pertamina                                                                              USD                        39,204,507
                                      PGN                                                                                       USD                            20,700
                                      PT Transportasi Gas Indonesia                                                             USD                        24,140,240
                                      Kangean Energy Indonesia                                                                  USD                        10,495,869
                                      Petrochina international Jabung Ltd.                                                      USD                         5,040,000


         Bank Mandiri                 BP Berau Ltd.                                                                             USD                      118,687,684
         BNI                          PT Petrogas Jatim Utama                                                                   IDR                  103,293,225,000
                                      PT Pertamina                                                                              USD                       43,649,970


         *) dalam jumlah penuh                                                                *) in full amount
Page 165
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/155 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                          SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                   IKATAN          DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                  CONTINGENCIES (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                         a.   Fuel supply agreements (continued)

          Batu bara                                                                Coal

                                                                          Volume kontrak tahunan/
                                                                           Annual contract volume
                              Pemasok/Suppliers                            (dalam/in metric ton) *)         Periode/Period
         Perusahaan
         PT Multi Harapan Utama                                                              600,000          2021 - 2027
         PT Kaltim Prima Coal                                                                500,000          2021 - 2027
         PT Kaltim Prima Coal                                                                500,000          2021 - 2027
         PT Kaltim Prima Coal                                                                800,000          2023 - 2024
         PT Indominco Mandiri                                                                500,000          2022 - 2024
         PT Bharinto Ekatama                                                               1,000,000            2023**
         PT Mahakam Sumber Jaya                                                            1,000,000            2023**
         PT Bukit Baiduri Energi                                                             200,000            2023**
         PT Kaltim Prima Coal                                                              2,000,000          2023 - 2024
         PT Indominco Mandiri                                                                500,000          2019 - 2024
         PT Energi Sinar Bara                                                                257,500            2023**
         PT Kaltim Jaya Bara                                                                 200,000            2023**

         PIP
         PT Bukit Asam                                                                     5,200,000          2013 - 2025
         PT Bukit Asam                                                                    18,000,000          2012 - 2032
         PT Oktasan Baruna Persada                                                         2,100,000          2018 - 2026
         PT Berau Coal                                                                     2,232,000          2009 - 2025
         PT Multi Harapan Utama                                                            1,000,000          2022 - 2026
         PT. Titan Infra Energy                                                            2,920,000          2007 - 2027
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                     5,203,000          2007 - 2027
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                       350,000          2007 - 2027
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                     2,005,000          2008 - 2027
         Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo                           1,350,000          2022 - 2027
         Indobara

         PNP
                                                                                                              2012 - 2032
         PT Bukit Asam                                                                     5,517,994          2004 - 2031
                                                                                                              2012 - 2032
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                     2,763,785          2017 - 2027
         Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara                                   1,443,618          2017 - 2033
         Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo                           1,128,258          2022 - 2027
         Indonesia
         PT PLN Batu bara Niaga                                                            1,046,417             2023
         PT Indexim Coalindo                                                                 844,795          2018 - 2028
         PT Binuang Mitra Bersama Blok Dua                                                   752,991          2022 - 2027
         PT Bhumi Rantau Energi                                                              700,063          2022 - 2024
         PT Kaltim Prima Coal                                                                684,483             2023
         PT Baratabang                                                                       658,007          2022 - 2023

         PLN Batam
         PT Kideco Jaya Agung                                                               300,000           2007 - 2027
         PT PLN Batu bara Niaga                                                             300,000           2023 - 2024

         *) Dalam jumlah penuh/In full amount
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 166
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/156 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,            IKATAN        DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                       CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)            a.   Fuel supply agreements (continued)

         Batu bara (lanjutan)                                        Coal (continued)

         Pada tanggal 9 Juni 2018, Kementerian ESDM                  On June 9, 2018, the Ministry of Energy and Mineral
         menerbitkan Surat Keputusan No. 1395                        Resources                 issued              Decree
         K/30/MEM/2018 mengenai Harga Jual Batu bara                 No. 1395 K/30/MEM/2018 regarding the Coal
         untuk Penyediaan Tenaga Listrik Untuk                       Selling Price for Electricity Supply for The Public
         Kepentingan Umum yang berlaku surut sejak 1                 Interest, which was retroactively valid from January
         Januari 2018. Sesuai surat keputusan tersebut,              1, 2018. According to the decree, the coal price was
         harga batu bara ditetapkan sebesar maksimal                 regulated at a maximum price of USD70/metric ton
         USD70/metrik ton dengan acuan pada kalori                   referenced to coal at 6,322 kcal/kg. The decree also
         6.322 kcal/kg. Surat keputusan tersebut juga                regulated the formula to calculate the price for
         mengatur formula untuk menghitung harga                     different specifications of coal as listed in the
         dengan spesifikasi yang berbeda seperti yang                decree. On December 26, 2019, the Ministry of
         tercantum dalam keputusan tersebut. Pada                    Energy and Mineral Resources issued Decree No.
         tanggal 26 Desember 2019, Kementerian ESDM                  261K/30/MEM/2019 regarding the fulfillment of
         menerbitkan Surat Keputusan No. 261                         domestic coal needs in 2020, which was effective
         K/30/MEM/2019          mengenai     pemenuhan               on January 1, 2020. This decree revokes the
         kebutuhan batu bara dalam negeri tahun 2020                 Decree of the Minister of Energy and Mineral
         yang mulai berlaku pada tanggal 1 Januari 2020.             Resources No. 1395K/30/MEM/2018 regarding the
         Surat keputusan ini mencabut Keputusan Menteri              selling price of coal for the supply of electricity for
         ESDM No. 1395 K/30/MEM/2018 mengenai                        public purposes.
         harga jual batu bara untuk penyediaan tenaga
         listrik untuk kepentingan umum.

         Pada tanggal 2 November 2020, Menteri Hukum                 On November 2, 2020, the Minister of Law and
         dan Hak Asasi Manusia mengeluarkan Undang-                  Human Rights issued Law No. 11 year 2020 on Job
         Undang No. 11 Tahun 2020 tentang Cipta Kerja.               Creation. The main point of the law relating to the
         Poin utama peraturan tersebut yang berkaitan                Group relates to the inclusion of coal mining
         dengan Grup adalah hasil pertambangan batu                  products in the types of goods subject to VAT, and
         bara termasuk dalam jenis barang yang dikenai               therefore all purchases of coal are subject to VAT
         PPN, maka seluruh pembelian batu bara                       at 10%. In accordance with the HPP Law which was
         dikenakan PPN terhitung mulai tanggal tersebut              approved on October 29, 2021, the VAT rate that
         dengan tarif 10%. Sesuai dengan UU HPP yang                 will be applied as at April 1, 2022 is 11%.
         telah disahkan pada tanggal 29 Oktober 2021,
         tarif PPN yang akan berlaku per tanggal 1 April
         2022 adalah sebesar 11%.

         Harga pembelian batu bara pada tahun berjalan               The price of coal purchases for the current year
         setelah disesuaikan dengan nilai kalori, kadar              after being adjusted against calorific value, ash
         abu, sulfur, air, Ash Fusion Temperature (“AFT”)            content, sulfur, water, Ash Fusion Temperature
         dan Hardgrove Grindability Index (“HGI”) berkisar           (“AFT”) and Hardgrove Grindability Index (“HGI”)
         antara Rp340.718 sampai dengan Rp1.680.308                  ranges from Rp340,718 to Rp1,680,308 per ton
         per ton (2023: Rp294.841 sampai dengan                      (2023: Rp294,841 to Rp1,361,082 per ton).
         Rp1.361.082 per ton).
Page 167
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/157 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,            IKATAN        DAN   54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                      CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)           a.   Fuel supply agreements (continued)

         Bahan bakar minyak                                         Fuel

         Perusahaan dan Pertamina mengadakan                        The Company and Pertamina entered into a Fuel
         Perjanjian Induk Jual Beli Bahan Bakar Minyak              Sale       and      Purchase        Agreement       No.
         No. 071.PJ/060/DIR/2001 tanggal 8 Oktober                  071.PJ/060/DIR/2001 dated October 8, 2001. This
         2001. Perjanjian ini telah diamandemen tanggal             agreement was amended on May 16, 2007,
         16 Mei 2007 dimana Perusahaan dan Pertamina                whereby, the Company and Pertamina agreed
         menyepakati antara lain: (i) penggunaan harga              among other things: (i) that the monthly fuel price to
         bahan bakar bulanan ditetapkan oleh Pertamina              be used for the period January 1 until April 30, 2007
         untuk periode 1 Januari sampai dengan 30 April             is determined by Pertamina and the fuel price of
         2007 dan harga bahan bakar 109,5% dari Mean                109.5% from Mean Oil Platts Singapore (“MOPS”)
         Oil Platts Singapore (“MOPS”) ditambah Pajak               plus VAT for the period May 1, 2007 until December
         Pertambahan Nilai untuk periode 1 Mei 2007                 31, 2007; (ii) that the fuel price subsequent to
         sampai dengan 31 Desember 2007; (ii) harga                 December 31, 2007 will be determined by both
         bahan bakar setelah tanggal 31 Desember 2007               parties every year; (iii) that the terms of payment
         akan ditetapkan oleh kedua belah pihak setiap              and penalty charges on late payment use a monthly
         tahun; (iii) jangka waktu pembayaran berikut               rate of Certificate of Bank Indonesia plus 1.3%; (iv)
         pengenaan denda keterlambatan pembayaran                   that effective on May 1, 2007, the unpaid balance of
         sebesar tingkat bunga Sertifikat Bank Indonesia            payable for the purchases of fuel until April 30, 2007
         bulanan ditambah 1,3%; (iv) efektif mulai 1 Mei            will bear interest with a rate per annum of Certificate
         2007, saldo utang yang belum dibayar atas                  of Bank Indonesia plus 1.3%, until settled by
         pembelian bahan bakar sampai dengan 30 April               issuance of PLN bonds, which is no later than
         2007 dikenakan bunga sebesar tingkat bunga                 August 31, 2007; (v) that the maximum payable to
         Sertifikat Bank Indonesia per tahun ditambah               Pertamina, including bonds which will be issued
         1,3%, sampai diselesaikan dengan menerbitkan               amounted to Rp18 trillion; and (vi) that this
         obligasi PLN selambat-lambatnya tanggal 31                 agreement is valid for five years from January 1,
         Agustus 2007; (v) utang kepada Pertamina,                  2007 until December 31, 2011.
         termasuk obligasi yang akan diterbitkan
         maksimum sebesar Rp18 triliun; dan (vi)
         perjanjian ini berlaku untuk lima tahun sejak 1
         Januari 2007 sampai dengan 31 Desember 2011.

         Berdasarkan Surat Kesepakatan Bersama                      Based on the Joint Deal Letter dated May 16, 2007,
         tanggal 16 Mei 2007, PT Sucofindo (Persero)                PT Sucofindo (Persero) is assigned as an
         ditunjuk sebagai surveyor independen.                      independent surveyor.

         Berdasarkan Addendum IV Perjanjian Jual Beli               Based on Amendment IV of the Fuel Sale and
         Bahan Bakar Minyak tanggal 16 Mei 2017, PLN                Purchase Agreement dated May 16, 2017, PLN and
         dan Pertamina menyepakati perpanjangan                     Pertamina agreed to extend the period of supply
         jangka waktu pasokan hingga tahun 2020.                    until 2020.
Page 168
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/158 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                  IKATAN        DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                              CONTINGENCIES (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                    a.   Fuel supply agreements (continued)

          Bahan bakar minyak (lanjutan)                                       Fuel (continued)

          Berdasarkan Addendum VIII tertanggal 17                             Based on Addendum VIII dated December 17,
          Desember 2021, kesepakatan harga jual beli                          2021, the agreement on the sale and purchase
          bahan bakar minyak (HSD dan MFO) sejak                              price of fuel oil (HSD and MFO) from January 1,
          tanggal 1 Januari 2021 sampai dengan 31                             2021 to December 31, 2023 between Pertamina
          Desember 2023 antara Pertamina dan                                  and the Company is as follows:
          Perusahaan adalah sebagai berikut:

          a. Selama masa negosiasi, formula harga baru                        a. During the negotiation period, the new price
             untuk periode tanggal 1 Januari 2021 sampai                         formula for the period of January 1, 2021 to
             dengan 31 Desember 2021, menggunakan                                December 31, 2021, uses the provisional price
             formula harga sementara yang telah                                  formula agreed in the amendment for the period
             disepakati pada addendum untuk periode 1                            of January 1, 2018 to December 31, 2020.
             Januari 2018 sampai dengan 31 Desember
             2020.                                                            b. Based on the above situation, a new price
          b. Sehubungan dengan hal tersebut, formula                             formula will be agreed for the period starting
             harga baru akan disepakati untuk periode                            from January 1, 2022 to December 31, 2023.
             terhitung mulai tanggal 1 Januari 2022 sampai
             dengan 31 Desember 2023.

          Pada 18 Juni 2024, Perusahaan telah                                 On June 18, 2024, the Company signed a new
          menandatangani perjanjian jual beli bahan bakar                     Fuel Sale and Purchase Agreement with
          minyak                baru                  No.                     Pertamina         Patra       Niaga       No.
          0007/DAN.01.01/PLNEPI0100/2024          dengan                      0007/DAN.01.01/PLNEPI0100/2024 for period
          Pertamina Patra Niaga untuk periode 1 Januari                       January 1, 2024 until September30, 2024.
          2024 sampai dengan 30 September 2024. Atas                          Amendments are being made to this agreement to
          perjanjian ini sedang dilakukan amandemen                           extend the Fuel Sales and Purchase Agreement.
          untuk perpanjangan atas Kontrak Perjanjian Jual
          Beli Bahan Bakar Minyak.

          Uap panas bumi                                                      Geothermal steam

          Pada tanggal 30 September 2024 dan 31                               As at September 30, 2024 and December 31, 2023,
          Desember 2023, Grup memiliki perjanjian dengan                      the Group entered into geothermal steam purchase
          beberapa pemasok untuk pengadaan uap panas                          agreements with several suppliers as follows:
          bumi sebagai berikut:

                                                                                                               Periode/
                   Sektor/Sector                                 Pemasok/Supplier                               Period

         Kamojang Unit 1, 2 & 3                 PGE                                                           2012 - 2040
         Lahendong Unit 1                       PGE                                                           2002 - 2032
         Lahendong Unit 2 & 3                   PGE                                                           2007 - 2039
         Lahendong Unit 4                       PGE                                                           2011 - 2041
         Ulubelu Unit 1 & 2                     PGE                                                           2012 - 2042
         Hululais Unit 1 & 2                    PGE                                                         30 tahun/years*)
         Sungai Penuh Unit 1 & 2                PGE                                                         30 tahun/years*)
         Kotamobagu Unit 1,2,3 & 4              PGE                                                         30 tahun/years*)
         Darajat Unit 1                         PGE, Star Energy Geothermal Darajat I                         1994 - 2030
                                                  Ltd., Star Energy, Geothermal Darajat II Ltd.
         Gunung Salak Unit 1,2 & 3              PGE, Star Energy Geothermal Salak Ltd.,
                                                  Ltd., Star Energy Geothermal Salak Pratama Ltd.             1993 - 2040

         *) Sejak Commercial Date/Since Commercial Date
Page 169
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/159 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                            SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                       IKATAN         DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                    CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan kontrak                       b.    Power purchase agreements and energy sales
          penjualan energi                                                            contracts

          Sebelum tahun 1997, Perusahaan mengadakan                                   Prior to 1997, the Company entered into PPAs and
          PPA dan ESC dengan IPP skala besar. Pada                                    ESCs with large-scale IPPs. In 1999, the Company
          tahun 1999, Perusahaan telah melaksanakan                                   entered into renegotiation of the PPAs and ESCs
          renegosiasi terhadap PPA dan ESC melalui                                    through a Working Group on PT PLN (Persero)
          Kelompok Kerja Renegosiasi Kontrak Khusus PT                                Special Contract Renegotiation under the direction
          PLN (Persero) di bawah arahan Pemerintah.                                   of the Government. Such renegotiation includes,
          Renegosiasi tersebut meliputi antara lain                                   among other subjects, equalisation in contract
          keseimbangan kondisi kontrak, kewajaran harga                               conditions, reasonableness of price and disparity of
          dan disparitas harga jual listrik IPP dan harga jual                        selling price between the IPPs and the Company.
          Perusahaan.

          Dalam perjanjian dengan IPP tertentu, disepakati                            Based on the agreements with certain IPPs, the
          bahwa setiap saat selama perjanjian berlaku,                                Group may exercise its option to purchase all of the
          Grup dapat melaksanakan opsi untuk membeli                                  IPP’s rights, title and interest in the projects at any
          hak penjual, milik, dan kepentingan atas proyek                             time during the contract period.
          yang bersangkutan.

          Pada tanggal 30 September 2024, perjanjian                                  As at September 30, 2024, the significant
          signifikan antara Grup dengan IPP adalah                                    agreements between the Group with IPPs are as
          sebagai berikut:                                                            follows:

          Sudah beroperasi                                                            In operation

                                                                                                                              Tanggal Operasi
                                                                                       Kapasitas/C                               komersial/
                                                                    Bahan Bakar/         apacity                 Periode/       Commercial
           Perusahaan/Company                Proyek/Project            Fuel               (MW)        AF (%)      Period       Operation Date


         Perusahaan

         PT Bajradaya Sentranusa     PLTA Asahan                        Tenaga Air/        180         1,175    2011 - 2041    18 Januari 2011/
                                                                          Hydro                        GWh/                    January 18, 2011
                                                                                                        year
         PT Malea Energy             PLTA Malea                         Tenaga Air/         90       474 GWh/   2021 - 2051       2 Juli 2021/
                                                                          Hydro                         year                     July 2, 2021
         PT Poso Energy              PLTA Poso                          Tenaga Air/        315       846 GWh/   2012 - 2042   30 Desember 2012/
                                                                          Hydro                         year                  December 30, 2012
         PT Poso Energy              PLTA Poso Ekstension               Tenaga Air/        200       823 GWh/   2023 - 2053    7 Februari 2023/
                                                                          Hydro                         year                   February 7, 2023
         PT Tanggamus Electric       PLTA Semangka                      Tenaga Air/         56         278.7    2018 - 2048       2 Juli 2018/
          Power                                                           Hydro                        GWh/                      July 2, 2018
                                                                                                        year
         PT UPC Sidrap Bayu Energi   PLTB Sidrap                        Angin/Wind          70        92.5% -   2018 - 2048       5 April 2018/
                                                                                                      107.5%                      April 5, 2018
         PT Energi Bayu Jeneponto    PLTB Tolo                          Angin/Wind          60        92.5% -   2019 - 2049       14 Mei 2019/
                                                                                                      107.5%                      May 14, 2019
         PT Bekasi Power             PLTGU Bekasi Power                  Gas Pipa/         119         90%      2013 - 2033     5 Januari 2013/
                                                                         Gas Pipe                                               January 5, 2013
         PT Cikarang Listrindo       PLTGU Cikarang Ekspansi (150        Gas Pipa/         150         72%      2011 - 2031        1 Juni 2011/
                                     MW)                                 Gas Pipe                                                 June 1, 2011
         PT Metaepsi Pejebe Power    PLTGU Gunung Megang (2x40           Gas Pipa/         110         85%      2007 - 2027   10 November 2007/
          Generation                 MW + 1 x30 MW)                      Gas Pipe                                             November 10,2007
         PT Jawa Satu Power          PLTGU Jawa-1 #2                     Gas Pipa/        1,760        60%      2024 - 2049      29 Maret 2024/
                                                                         Gas Pipe                                               March 29, 2024
         PT Asrigita Prasarana       PLTGU Palembang Timur (150          Gas Pipa/         150         85%      2005 - 2025   16 Desember 2005/
                                     MW)                                 Gas Pipe                                             December 16, 2005
         PT Medco Ratch Power        PLTGU Riau (275 MW)                 Gas Pipa/         275         60%      2022 - 2042    10 Februari 2022/
          Riau                                                           Gas Pipe                                              February 10, 2022
         PT Kertanegara Energi       PLTGU Senipah (117 MW)              Gas Pipa/         117         85%      2015 - 2040       17 Juni 2015/
          Perkasa                                                        Gas Pipe                                                June 17, 2015
         Pertamina dan Star Energy   PLTP Darajat Unit 2 & 3            Panas Bumi/        220         80%      2000 - 2030     1 Februari 2000/
          Geothermal Ltd                                                Geothermal                                             February 1, 2000
         PT Geo Dipa Energi          PLTP Dieng                         Panas Bumi/         55         95%      2002 - 2032    11 Oktober 2002/
                                                                        Geothermal                                             October 11, 2002
Page 170
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/160 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                      IKATAN              DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                        CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan kontrak                           b.    Power purchase agreements and energy sales
          penjualan energi (lanjutan)                                                     contracts (continued)

          Sudah beroperasi (lanjutan)                                                     In operation (continued)

                                                                                                                                                Tanggal Operasi
                                                                                           Kapasitas/C                                             komersial/
                                                                        Bahan Bakar/         apacity                              Periode/        Commercial
           Perusahaan/Company                 Proyek/Project                Fuel              (MW)             AF (%)              Period        Operation Date

         Perusahaan
         (lanjutan/continued)

         PT Pertamina Geothermal      PLTP Kamojang Unit 4                  Panas Bumi/        60               90%              2008 - 2038     26 Januari 2008/
          Energy                                                            Geothermal                                                          January 26, 2008
         PT Pertamina Geothermal      PLTP Lumut Balai                      Panas Bumi/        55               90%              2019 - 2049   1 September 2019/
          Energy                                                            Geothermal                                                         September 1, 2019
         PT Supreme Energy Muara      PLTP Muara Laboh                      Panas Bumi/        80               90%              2019 - 2049   16 Desember 2019/
          Laboh                                                             Geothermal                                                         December 16, 2019
         PT Geo Dipa Energi           PLTP Patuha                           Panas Bumi/        55               95%              2014 - 2054      27 September
                                                                            Geothermal                                                         2014/September 27,
                                                                                                                                                        2014
         PT Supreme Energy Rantau     PLTP Rantau Dedap                     Panas Bumi/        86               90%              2021 - 2051   26 Desember 2021/
          Dedap                                                             Geothermal                                                         December 26, 2021
         Star Energy Geothermal Ltd   PLTP Salak Unit 4-6                   Panas Bumi/        197              85%              2000 - 2030    1 Desember 2000/
                                                                            Geothermal                                                          December 1, 2000
         Sarulla Operations Ltd       PLTP Sarulla 1 Unit 1, 2              Panas Bumi/        220              90%              2017 - 2047     2 Oktober 2017/
                                                                            Geothermal                                                           October 2, 2017
         Sarulla Operations Ltd       PLTP Sarulla 1 Unit 3                 Panas Bumi/        110              90%              2018 - 2048       3 April 2018/
                                                                            Geothermal                                                             April 3, 2018
         PT Sorik Marapi              PLTP Sorik Marapi #3                  Panas Bumi/        50               90%              2022 - 2052     7 Oktober 2022/
            Geothermal Power                                                Geothermal                                                           October 7, 2022
         PT Pertamina Geothermal      PLTP Ulubelu Unit 3                   Panas Bumi/        55               90%              2016 - 2046       26 Juli 2016/
          Energy                                                            Geothermal                                                             July 26, 2016
         PT Pertamina Geothermal      PLTP Ulubelu Unit 4                   Panas Bumi/        55               90%              2017 - 2047      25 Juni 2017/
          Energy                                                            Geothermal                                                            June 25, 2017
         Star Energy Geothermal Ltd   PLTP Wayang Windu Unit 1&2            Panas Bumi/        227              95%              2000 - 2030        1 Juni 2000/
                                                                            Geothermal                                                             June 1, 2000
         PT Pembangkitan Jawa Bali    PLTS Terapung Cirata                  Surya/Solar        145        2024 = 80% - 120%      2023 - 2053   13 November 2023/
                                                                                                         2025 = 92.5% - 102.5%
          Masdar Energy                                                                                                                        November 13, 2023
         PT Lestari Banten Energi     PLTU Banten (1x625 MW)            Batu bara/Coal         625              80%              2017 - 2042      28 Juni 2017/
                                                                                                                                                  June 28, 2017
         PT Tenaga Listrik Bengkulu   PLTU Bengkulu (2x100 MW)          Batu bara/Coal         200              80%              2020 - 2045       27 Juli 2020/
                                                                                                                                                   July 27, 2020
         PT General Energy Bali       PLTU Celukan Bawang (2x125 &      Batu bara/Coal         380              85%              2015 - 2045      23 September
                                      1x130 MW)                                                                                                2015/September 23,
                                                                                                                                                        2015
         PT Sumber Segara             PLTU Cilacap (2x281 MW)           Batu bara/Coal         562              80%              2007 - 2037     1 Februari 2007/
          Primadaya                                                                                                                              February 1, 2007
         PT Sumber Segara             PLTU Cilacap Ekspansi (1x614      Batu bara/Coal         614              80%              2016 - 2046      10 Juni 2016/
          Primadaya                   MW)                                                                                                         June 10, 2016
         PT Cirebon Electric Power    PLTU Cirebon (1x660 MW)           Batu bara/Coal         660              80%              2012 - 2042       27 Juli 2012/
                                                                                                                                                   July 27, 2012
         PT Cahaya Fajar Kaltim       PLTU Embalut Ekspansi (1x50       Batu bara/Coal         50               87%              2014 - 2039    14 Agustus 2014/
                                      MW)                                                                                                       Agustus 14, 2014
         PT Cirebon Energy            PLTU Jawa 1/Cirebon Exp           Batu bara/Coal        1000              86%              2023 - 2048       19 Mei 2023/
          Prasarana                                                                                                                               May 19, 2023
         PT Bhimasena Power           PLTU Jawa Tengah 1 (2x1000        Batu bara/Coal        1900              86%              2022 - 2047    31 Agustus 2022/
          Indonesia                   MW)                                                                                                        August 31, 2022
         PT Bhumi Jati Power          PLTU Jawa-4 (FTP2) (2x1000        Batu bara/Coal        2000              86%              2022 - 2047      17 Juni 2022/
                                      MW)                                                                                                         June 17, 2022
         PT Shenhua Guohua            PLTU Jawa-7 Bojonegara            Batu bara/Coal        2000              86%              2021 - 2046        8 Juli 2021/
          Pembangkitan Jawa Bali      (2x1000 MW)                                                                                                   July 8, 2021
         PT Sumber Segara             PLTU Jawa-8 – Cilacap (1x945      Batu bara/Coal         945              80%              2019 - 2049    9 November 2019/
          Primadaya                   MW)                                                                                                       November 9, 2019
         PT Bosowa Energi             PLTU Jeneponto (2x100 MW)         Batu bara/Coal         200              80%              2012 - 2042    31 Oktober 2012/
                                                                                                                                                October 31, 2012
         PT Bosowa Energi             PLTU Jeneponto Ekspansi           Batu bara/Coal         250              80%              2018 - 2048       1 April 2018/
                                      (2x125 MW)                                                                                                   April 1, 2018
         PT GCL Indo Tenaga           PLTU Kalbar-1 (2x100 MW)          Batu bara/Coal         200              80%              2021 - 2046      25 Juni 2021/
                                                                                                                                                  June 25, 2021
         PT Tanjung Power             PLTU Kalsel-1 (FTP2) (2x100       Batu bara/Coal         200              80%              2019 - 2044   14 Desember 2019/
          Indonesia                   MW)                                                                                                      December 14, 2019
         PT SKS Listrik Kalimantan    PLTU Kalteng-1 / Kalselteng-1     Batu bara/Coal         200              80%              2020 - 2045    4 November 2020/
                                      (2x100 MW)                                                                                                November 4, 2020
         PT Graha Power Kaltim        PLTU Kaltim-2 (FTP2) (2x100       Batu bara/Coal         200              80%              2020 - 2045      30 Juni 2020/
                                      MW)                                                                                                         June 30, 2020
         PT Indonesia Energi          PLTU Kaltim-4 (2x100 MW)          Batu bara/Coal         200              80%              2020 - 2045      14 April 2020/
          Dinamika (INDOEKA)                                                                                                                      April 14, 2020
Page 171
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/161 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                          IKATAN           DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                        CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan kontrak                          b.       Power purchase agreements and energy sales
          penjualan energi (lanjutan)                                                       contracts (continued)

          Sudah beroperasi (lanjutan)                                                       In operation (continued)

                                                                                                                                   Tanggal Operasi
                                                                                             Kapasitas/C                              komersial/
                                                                         Bahan Bakar/          apacity                 Periode/      Commercial
            Perusahaan/Company                  Proyek/Project              Fuel                (MW)       AF (%)       Period      Operation Date

         Perusahaan
         (lanjutan/continued)

         PT DSSP Power Kendari          PLTU Kendari-3 (2x50 MW)         Batu bara/Coal         100         80%     2019 - 2044    28 Oktober 2019/
                                                                                                                                   October 28, 2019
         PT. Lombok Energy Dynamics     PLTU Lombok Timur (2x25 MW)      Batu bara/Coal          50         80%     2017 - 2042      10 April 2017/
                                                                                                                                     April 10, 2017
         PT Rekind Daya Mamuju          PLTU Mamuju (2x25 MW)            Batu bara/Coal          50         80%     2018 - 2043   18 September 2018/
                                                                                                                                  September 18, 2018
         PT Meulaboh Power              PLTU Meulaboh 3 & 4              Batu bara/Coal         400         80%     2023 - 2048       14 Juli 2023/
          Generation                     (2x200 MW)                                                                                  July 14, 2023
         PT Bukit Pembangkit            PLTU MT Banjarsari               Batu bara/Coal         220         80%     2015 - 2045      30 Juni 2015/
          Innovative                     (2x110 MW)                                                                                  June 30, 2015
         PT Indo Ridlatama Power        PLTU MT Kaltim-1 (2x27,5 MW)     Batu bara/Coal          55         80%     2018 - 2048    1 Desember 2018/
                                                                                                                                   December 1, 2018
         PT Priamanaya Energi           PLTU MT Keban Agung              Batu bara/Coal         240         80%     2016 - 2046       1 Mei 2016/
                                         (2x120 MW)                                                                                   May 1, 2016
         PT Gou Hua Energi Musi         PLTU MT Simpang Belimbing        Batu bara/Coal         227         80%     2013 - 2043    27 Februari 2013/
          Makmur Indonesia               (2x113,5 MW)                                                                              February 27, 2013
         PT DSSP Power Sumsel           PLTU MT Sumsel-5                 Batu bara/Coal         300         80%     2016 - 2041   20 Desember 2016/
                                          (2x150 MW)                                                                              December 20, 2016
         PT Huadian Bukit Asam          PLTU MT Sumsel-8                 Batu bara/Coal         1243        80%     2023 - 2048     7 October 2023/
          Power                                                                                                                     October 7, 2023
         PT Paiton Energy               PLTU Paiton 1 (2x615 MW)         Batu bara/Coal         1230        85%     2001 - 2041     1 Januari 2001/
                                                                                                                                    January 1, 2001
         PT Jawa Power                  PLTU Paiton 2 (2x610 MW)         Batu bara/Coal         1220        83%     2000 - 2030    1 November 2020/
                                                                                                                                   November 1, 2020
         PT Paiton Energy               PLTU Paiton 3 (1x815 MW)         Batu bara/Coal         815         85%     2012 - 2042      18 Juni 2012/
                                                                                                                                     June 18, 2012
         PT Gorontalo Listrik Perdana   PLTU Sulbagut-1 (2x50 MW)        Batu bara/Coal         100         80%     2021 - 2046   31 Desember 2021/
                                                                                                                                  December 31, 2021
         PT Minahasa Cahaya Lestari     PLTU Sulut-3 (2x50 MW)           Batu bara/Coal         100         80%     2021 - 2046    11 Februari 2021/
                                                                                                                                   February, 11 2021
         Lainnya                                                                                723

         PLN Batam

         PT Dalle Energy Batam          PLTG Panaran                         Gas/Gas             82         90%     2005 - 2025   1 Desember 2005/
                                                                                                                                  December 1, 2005
         PT Mitra Energy Batam          PLTG Panaran                         Gas/Gas             56         84%     2004 - 2034   29 Oktober 2004/
                                                                                                                                  October 29, 2004
         PT Energi Listrik Batam        PLTG Tanjung Uncang                  Gas/Gas             70         85%     2016 - 2036      1 Mei 2016/
                                                                                                                                     May 1, 2016
         KSO PT Beringin Mas            PLTMG Sewa Kabil 50 MW               Gas/Gas             50         65%     2023 - 2028   4 November 2023/
          Powerindo-PT VPower                                                                                                     November 4, 2023
          Operation Services-PT
          Supreme Energi Indonesia
         PT TJK Power                   PLTU Tanjung Kasam               Batu bara/Coal         110         85%     2012 - 2042    25 Oktober 2012/
                                                                                                                                   October 25, 2012
         PT Maxpower Indonesia          PLTMG Baloi                          Gas/Gas             50         90%     2024 - 2029      25 April 2024/
                                                                                                                                     April 25, 2024/
         KSO PT Bagus Karya-PT          PLTMG Tanjung Uncang                 Gas/Gas             60         90%     2024 - 2029   13 September 2024/
          CNTIC Indonesia                                                                                                         September 13, 2024
         Lainnya a)                                                                             204


         Jumlah                                                                                25,460                                   Total

         a) Meliputi kontrak dengan IPP, yang terdiri dari                                a) Represents contracts with IPPs, consisting of
            IPP berlokasi di berbagai daerah di                                              IPPs which are located in several areas of
            Indonesia, menggunakan bahan bakar batu                                          Indonesia which will use coal, geothermal, and
            bara, panas bumi dan mini hydro dengan                                           mini hydro for generation with each power
            kapasitas masing-masing pembangkit kurang                                        plant’s capacity less than 50 MW.
            dari 50 MW.
Page 172
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                          Lampiran 5/162 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                            (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                                  IKATAN                 DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                                      CONTINGENCIES (continued)

    b.   Perjanjian jual beli tenaga listrik dan kontrak                                               b.       Power purchase agreements and energy sales
         penjualan energi (lanjutan)                                                                            contracts (continued)

         Belum beroperasi (dalam tahap pengembangan)                                                            Not yet in operation (development stage)
                                                                                                                   Kapasitas/
                                                                                                 Bahan bakar/       Capacity     AFb)       Periode/                     Status/
         No.               Perusahaan/Company                       Proyek/Project                  Fuel             (MW)        (%)        Perioda)                     Status
               Perusahaan
          1    PT Indo Raya Tenaga                      PLTU Jawa-9&10                     Batu bara/Coal                2,000   86%    2024 - 2049    Tahap Pembangunan/Construction Stage
          2    PT Shenhua Guohua Lion Power Indonesia   PLTU MT Sumsel -1                  Batu bara/Coal                  600   80%    2023 - 2053    Tahap Pembangunan/Construction Stage
          3    PT North Sumatera Hydro Energy           PLTA Batang Toru                   Tenaga Air/Hydro                510   47%    2026 - 2056    Tahap Pembangunan/Construction Stage
          4    PT Kerinci Merangin Hidro                PLTA Merangin                      Tenaga Air/Hydro                350   41%    2025 - 2055    Tahap Pembangunan/Construction Stage
          5    PT Sumbangselenergi Sakti Pewali         PLTU MT Sumbagsel-1                Batu bara/Coal                  300   80%    2024 - 2049    Tahap Pembangunan/Construction Stage
          6    PT Supreme Energy Rantau Dedap (SERD)    Rantau Dedap #2                    Panas Bumi/Geothermal           134   90%    2025 - 2055    Eksplorasi/Exploration
          7    Star Energy Geothermal Wayang Windu      Wayang Windu #4                    Panas Bumi/Geothermal           120   90%    2028 - 2058    Potensi/Potential
          8    PT Sejahtera Alam Energy (SAE)           Baturaden #1                       Panas Bumi/Geothermal           110   90%    2025 - 2055    Eksplorasi/Exploration
          9    PT Supreme Energy Rajabasa               Rajabasa #1                        Panas Bumi/Geothermal           110   90%    2025 - 2055    Eksplorasi/Exploration
         10    PT Supreme Energy Rajabasa               Rajabasa #2                        Panas Bumi/Geothermal           110   90%    2029 - 2059    Eksplorasi/Exploration
         11    PT Supreme Energy Muara Laboh (SEML)     Muara Laboh #2                     Panas Bumi/Geothermal           140    90%    2025 - 2055   Eksplorasi/Exploration
         12    PT Sintesa Banten Geothermal             Rawadano #2                        Panas Bumi/Geothermal            80   90%    2025 - 2055    Eksplorasi/Exploration
         13    PT Sejahtera Alam Energy (SAE)           Baturaden #2                       Panas Bumi/Geothermal            75   90%    2025 - 2055    Eksplorasi/Exploration
         14    Bali Energy Limited (BEL)                Bedugul #2                         Panas Bumi/Geothermal            55   95%    2030 - 2055    Eksplorasi/Exploration
         15    Star Energy Geothermal Wayang Windu      Wayang Windu #3                    Panas Bumi/Geothermal            60   80%    2026 - 2056    Eksplorasi/Exploration
         16    Geo Dipa Energy                          Dieng #2                           Panas Bumi/Geothermal            55   90%    2025 - 2055    Tahap Pembangunan/Construction Stage
         17    Geo Dipa Energy                          Dieng #3                           Panas Bumi/Geothermal            55   90%    2028 - 2058    Eksplorasi/Exploration
         18    Geo Dipa Energy                          Dieng #4                           Panas Bumi/Geothermal            55   90%    2031 - 2061    Eksplorasi/Exploration
         19    Star Energy Geothermal                   Gunung Salak #7                    Panas Bumi/Geothermal            55   80%    2025 - 2055    Eksplorasi/Exploration
         20    Pertamina Geothermal Energy              Hululais #1                        Panas Bumi/Geothermal            55   85%    2025 - 2055    Pendanaan/Financing
         21    Pertamina Geothermal Energy              Hululais #2                        Panas Bumi/Geothermal            55   85%    2025 - 2055    Pendanaan/Financing
         22    PT Medco Cahaya Geothermal               Ijen #3                            Panas Bumi/Geothermal            50   90%    2026 - 2056    Tahap Pembangunan/Construction Stage
         23    PT Pertamina Geothermal Energy           Lumut Balai #2                     Panas Bumi/Geothermal            55   90%    2024 - 2054    Tahap Pembangunan/Construction Stage
         24    PT Pertamina Geothermal Energy           Lumut Balai #3                     Panas Bumi/Geothermal            55   90%    2024 - 2054    Potensi/Potential
         25    PT Pertamina Geothermal Energy           Lumut Balai #4                     Panas Bumi/Geothermal            55   90%    2024 - 2054    Potensi/Potential
         26    PT Geo Dipa Energi                       Patuha #2                          Panas Bumi/Geothermal            55   75%    2025 - 2055    Tahap Pembangunan/Construction Stage
         27    PT Geo Dipa Energi                       Patuha #3                          Panas Bumi/Geothermal            55   75%    2028 - 2058    Eksplorasi/Exploration
         28    PT Geo Dipa Energi                       Patuha #4                          Panas Bumi/Geothermal            55   75%    2029 - 2059    Potensi/Potential
         29    PT Pertamina Geothermal                  Sungai Penuh #1                    Panas Bumi/Geothermal            55   90%    2028 - 2058    Potensi/Potential
         30    PT Pertamina Geothermal                  Sungai Penuh #2                    Panas Bumi/Geothermal            55   90%    2028 - 2058    Potensi/Potential
         31    PT Bakrie Darmakarya                     Telaga Ngebel #1                   Panas Bumi/Geothermal            55   90%    2027 - 2057    Eksplorasi/Exploration
         32    PT Bakrie Darmakarya                     Telaga Ngebel #2                   Panas Bumi/Geothermal            55   90%    2030 - 2057    Potensi/Potential
         33    PT Bakrie Darmakarya                     Telaga Ngebel #3                   Panas Bumi/Geothermal            55   90%    2030 - 2057    Potensi/Potential
         34    Geo Dipa Energy                          Dieng #5                           Panas Bumi/Geothermal            50   90%    2025 - 2055    Eksplorasi/Exploration
         35    Geo Dipa Energy                          Dieng #6                           Panas Bumi/Geothermal            50   90%    2025 - 2055    Eksplorasi/Exploration
         36    PT Sorik Merapi Geothermal Power         Sorik Marapi #5                    Panas Bumi/Geothermal            50   90%    2022 - 2051    Eksplorasi/Exploration
         37    PT Medcosolar Bali Timur                 Bali Timur                         Surya/Solar                      25   24%    2025-2045      Tahap Pembangunan/Construction Stage
         38    PT Indo Acwa Tenaga                      Terapung Saguling                  Surya/Solar                      60   28%    2026-2051      Tahap Pembangunan/Construction Stage
                Lainnya/Othersc)                                                                                           853
               PLN Batam
          1    KSO PT Bagus Karya -                     PLTMG Sewa Kabil 50 MW             Gas                             60    90%    2024 - 2029    Tahap Pembangunan/Construction Stage
               PT CNTIC Indonesia
          2    Lainnya/Others                                                              Gas                             79

               Jumlah                                                                                                   6,966                          Total



         a) Perjanjian berlaku sejak ditandatangani, dan                                                        a) The agreements are effective from the date of
            jual beli tenaga listrik berlaku antara 20                                                             signing, and buying and selling of electricity is
            sampai dengan 30 tahun sejak tanggal                                                                   valid between 20 to 30 years starting from the
            operasi komersial.                                                                                     commercial operation date.
         b) AF = Faktor pemasokan tenaga yang harus                                                             b) AF = Power supply factor which must be
            diserap Perusahaan.                                                                                    absorbed by the Company.
         c) Meliputi kontrak dengan IPP, yang terdiri dari                                                      c) Represents contracts with IPPs, consisting of
            IPP dalam tahap pembangunan dan IPP                                                                    IPPs under construction and IPPs in the
            dalam tahap pembiayaan PPA berlokasi di                                                                financing stage, and PPAs which are located in
            berbagai daerah di Indonesia, menggunakan                                                              several areas of Indonesia which will use coal,
            bahan bakar batu bara, panas bumi dan mini                                                             geothermal, and mini hydro for generation with
            hydro dengan kapasitas masing-masing                                                                   each power plant’s capacity less than 50 MW.
            pembangkit kurang dari 50 MW.
Page 173
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/163 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                       IKATAN           DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                      CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan kontrak                        b.    Power purchase agreements and energy sales
          penjualan energi (lanjutan)                                                  contract (continued)

          Belum beroperasi (dalam tahap pengembangan)                                  Not yet in          operation       (development           stage)
          (lanjutan)                                                                   (continued)

          Harga tenaga listrik per kWh untuk pembangkitan                              The electricity power price per kWh for gas, MFO,
          bahan bakar gas, MFO dan batu bara ditetapkan                                and coal power plants is determined by certain
          berdasarkan formula tertentu yang ditetapkan                                 formulas as stated in the agreement which
          dalam perjanjian yang antara lain mengatur                                   regulates, among other subjects, capital cost
          pemulihan biaya modal, pembayaran biaya tetap                                recovery, fixed operation and maintenance cost
          operasi dan pemeliharaan, biaya bahan bakar                                  payment, fuel expense and variable operation and
          dan pembayaran biaya variabel operasi, dan                                   maintenance cost payment. For geothermal heat
          biaya pemeliharaan. Untuk pembangkitan yang                                  power plants, the electricity power price is
          menggunakan panas bumi, harga tenaga listrik                                 determined by a certain formula as stated in the
          ditetapkan   berdasarkan      formula   tertentu                             agreement, involving, among other things, Energy
          sebagaimana dinyatakan dalam perjanjian antara                               Charge and Capacity Charge.
          lain Energy Charge dan Capacity Charge.

          Selain dari perjanjian jual beli tenaga listrik di                           In addition to the above PPAs, the Group also
          atas, Grup juga memiliki beberapa perjanjian                                 entered into rental agreements that fall into the
          sewa yang termasuk dalam kategori sewa                                       category of operating leases.
          operasi.

    c.    Perolehan barang modal                                                 c.    Capital expenditures

          Pada tanggal 30 September 2024 dan 31                                        As at September 30, 2024 and December 31, 2023,
          Desember 2023, jumlah ikatan perolehan barang                                total commitments for capital expenditures based
          modal      berdasarkan      kontrak,    terutama                             on contracts, which are related to procurement of
          sehubungan dengan pengadaan pembangkitan,                                    power plants, transmission and distribution are as
          jaringan transmisi dan distribusi adalah sebagai                             follows:
          berikut:
                                                          30 September 2024 / September 30, 2024
                                                                       Jumlah dalam
                                                                     mata uang asing/
                                                   Mata uang/            Amount in           Setara Rupiah/
                                                   Currencies      foreign currencies *) Rupiah equivalent *)

                  Program percepatan                                                                             Fast track program
                    Kontrak pembangkitan     US$                             33,468,474               506,847      Power plant contracts
                                             EUR                                                             -
                                             NZD                                                             -
                                             JPY                                                             -
                                             Rupiah                                                  1,127,135
                                                                                                     1,633,981

                    Kontrak transmisi        US$                                       -                     -     Transmission contracts
                                             Rupiah                                    -                56,123
                                             Lain-lain/Others **) EUR                  -                     -     Transmission contracts
                                                                                                        56,123

                  Kontrak konstruksi rutin   US$                            531,650,900             8,051,321    Regular construction contracts
                                             EUR                            256,724,218             4,346,012
                                             JPY                          5,916,377,371               629,175
                                             Rupiah                                                23,516,795
                                             Lain-lain/Others **)         7,840,329,151                     6
                                             Lain-lain/Others NZD             1,084,200                10,447
                                                                                                   36,553,756

    *)    Dalam jumlah penuh                                                       *)  In full amount
    **)   Perolehan barang modal dalam mata uang asing lainnya                     **) Capital expenditures denominated in other foreign currencies are
          disajikan dalam jumlah setara USD menggunakan kurs tanggal                   presented as USD equivalents using the exchange rates
          pelaporan                                                                    prevailing at the reporting date
Page 174
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/164 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                           SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                   IKATAN            DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                   CONTINGENCIES (continued)

    c.     Perolehan barang modal (lanjutan)                                  c.   Capital expenditures (continued)

                                                            31 Desember/ December 31, 2023
                                                                       Jumlah
                                                                     dalam mata
                                                                    uang original/          Setara
                                                                     Amount in             Rupiah/
                                                 Mata Uang/            original            Rupiah
                                                  Currency           currency*)           equivalent

          Program percepatan                                                                                               Fast track program
             Kontrak pembangkitan          USD                            34,621,335                533,722            Power plant contracts
                                           Rupiah                                                 1,142,144

                                                                                                  1,675,866

            Kontrak transmisi              Rupiah                                                    68,585          Transmission contracts

          Kontrak konstruksi rutin         USD                            587,748,048             9,060,724      Regular construction contracts
                                           EUR                            285,505,302             4,893,424
                                           JPY                          6,843,564,388               749,692

                                           Rupiah                                                27,522,179
                                           Lain-lain/Others**)          7,841,413,351                10,628

                                                                                                 42,236,647

    *)     Dalam jumlah penuh                                                  *) In full amount
    **)    Perolehan barang modal dalam mata uang asing lainnya                **) Capital expenditures denominated in other foreign currencies are
           disajikan dalam jumlah setara USD menggunakan kurs tanggal              presented as USD equivalents using the exchange rates
           pelaporan                                                               prevailing at the reporting date

           Jumlah di atas adalah diluar dari nilai tersisa                         The above amount excludes the remaining
           pembayaran di muka yang sudah dibayarkan oleh                           advance payments that have been paid by the
           Grup sesuai dengan masing-masing kontrak,                               Group in accordance with the respective contracts,
           yang nantinya akan mengurangi pembayaran di                             which then will reduce future payments to be made
           masa depan yang dilakukan oleh Grup.                                    by the Group.

           Program percepatan                                                      Fast track program

           Berdasarkan Peraturan Presiden Republik                                 Based on Presidential Regulation of the Republic of
           Indonesia No. 71 Tahun 2006 tanggal 5 Juli 2006                         Indonesia No. 71 Year 2006 dated July 5, 2006
           yang kemudian diubah melalui Peraturan                                  which was amended by Presidential Regulation of
           Presiden Republik Indonesia No. 59 tanggal 23                           the Republic of Indonesia No. 59 dated December
           Desember 2009, Pemerintah menugaskan                                    23, 2009, the Government mandates the Company
           Perusahaan untuk membangun PLTU berbahan                                to build coal-fired PLTUs at 42 locations in
           bakar batu bara di 42 lokasi di Indonesia, meliputi                     Indonesia, which include ten power plants with
           10 pembangkit dengan jumlah kapasitas 7.490                             aggregate capacity of 7,490 MW in Java - Bali and
           MW di Jawa - Bali dan 32 pembangkit dengan                              32 power plants with aggregate capacity of 2,769
           jumlah kapasitas 2.769 MW di luar Jawa - Bali.                          MW outside Java - Bali.

           Kontrak pembangkitan                                                    Power plant contracts

           Sampai dengan tanggal 30 September 2024,                                Until September 30, 2024 the Company has signed
           Perusahaan telah menandatangani 37 kontrak                              37 EPC contracts, which consist of ten electricity
           EPC meliputi 10 pembangkit tenaga listrik dengan                        power plants with an aggregate capacity of 7,490
           jumlah kapasitas 7.490 MW di Jawa - Bali dan 27                         MW in Java - Bali and 27 electricity power plants
           pembangkit tenaga listrik dengan jumlah                                 with an aggregate capacity of 2,489 MW outside
           kapasitas 2.489 MW di luar Jawa - Bali.                                 Java - Bali. Based on the EPC contracts, the
           Berdasarkan kontrak EPC tersebut, Perusahaan                            Company is required to pay the contractor a down
           diharuskan membayar uang muka sekitar 15%                               payment, which is approximately 15% of the
           dari nilai kontrak dan 85% akan didanai melalui                         contract price and the remaining 85% will be funded
           fasilitas kredit perbankan.                                             through credit facilities from banks.
Page 175
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/165 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                 IKATAN         DAN   54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                            CONTINGENCIES (continued)

    c.    Perolehan barang modal (lanjutan)                           c.      Capital expenditures (continued)

          Program percepatan (lanjutan)                                       Fast track program (continued)

          Kontrak pembangkitan (lanjutan)                                     Power plant contracts (continued)

          Sampai dengan tanggal 30 September 2024,                            Until September 30, 2024, the Company has made
          Perusahaan       telah    membayar         uang                     a down payment amounting to USD876,217,780
          muka sebesar USD876.217.780 (nilai penuh) dan                       (full amount) and Rp4,790,016 for 35 EPC contracts
          Rp4.790.016 untuk 35 kontrak EPC yang dicatat                       which is recorded as construction in progress (Note
          sebagai aset dalam pembangunan (Catatan 6).                         6). The down payments are funded by the proceeds
          Uang muka tersebut didanai dari hasil penerbitan                    of the issued Guaranteed Notes and withdrawal of
          Obligasi Terjamin dan penarikan fasilitas kredit                    credit facilities for the fast track program.
          program percepatan.

          Kontrak transmisi                                                   Transmission contracts

          Kontrak transmisi merupakan kontrak untuk                           Transmission contracts are contracts for upgrading
          peningkatan dan pembangunan transmisi baru                          and constructing new transmission and sub-
          dan gardu induk di Jawa dan luar Jawa. Proyek                       stations in Java and outside Java. These projects
          ini dibiayai melalui dana sendiri dan penarikan                     are financed by the Company’s own funds and
          fasilitas kredit perbankan.                                         withdrawal of credit facilities from banks.

          Kontrak konstruksi rutin                                            Regular construction contracts

          Ikatan pengadaan barang modal untuk konstruksi                      Capital expenditure commitments for regular
          rutin    merupakan        kontrak     yang     telah                construction represent project contracts signed for
          ditandatangani untuk tambahan pembangkit listrik                    additional electricity generating plants and
          dan pengembangan jaringan transmisi dan                             development of the transmission and distribution
          distribusi. Proyek ini dibiayai melalui dana sendiri                network. These projects are financed by the
          Perusahaan dan pihak luar melalui pinjaman luar                     Company’s own funds and other external funding
          negeri, bantuan dan proyek investasi sebagai                        through offshore loans, grants and investment
          bagian dari anggaran belanja negara.                                projects from the state budget.


    d.    Fasilitas pinjaman yang belum digunakan                     d.      Unused loan facilities

          Penerusan pinjaman                                                  Two-step loans

                                                                       Dalam mata uang original/           Ekuivalen Rp/
                                 Mata uang/Currency                      In original currency*)            Rp equivalent

         USD                                                                               609,033,005              9,223,196
         JPY                                                                            13,881,478,886              1,467,220

         Jumlah/Total                                                                                              10,699,416
         *) Dalam jumlah penuh                                             *) In full amounts


          Pada tanggal 30 September 2024 dan 31                               As at September 30, 2024 and December 31, 2023,
          Desember 2023, fasilitas pinjaman belum                             the unused facilities equivalent to Rp10,699,416
          digunakan      setara    Rp10.699.416      dan                      and Rp10,932,783 bear a provision charge of
          Rp10.932.783 dikenakan provisi sebesar 0,10% -                      0.10% - 0.34% per annum. There is no remaining
          0,34% per tahun. Tidak ada lagi fasilitas yang                      facilities that do not bear any provision charge.
          tidak dikenakan provisi. Fasilitas ini berakhir                     These facilities will expire between 2025 and 2028.
          antara tahun 2025 sampai dengan 2028.
Page 176
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/166 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                           IKATAN              DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                              CONTINGENCIES (continued)

    d.    Fasilitas pinjaman belum digunakan (lanjutan)                                d.     Unused loan facilities (continued)

          Perjanjian pinjaman                 tidak      terkait     program                  Loan agreements not related to fast track program
          percepatan

          Sampai dengan tanggal penyelesaian laporan                                          Up to the completion date of the consolidated
          keuangan    konsolidasian,   rincian    fasilitas                                   financial statements, the details of unused loan
          pinjaman belum digunakan tidak terkait program                                      facilities not related to fast track program are as
          percepatan adalah sebagai berikut:                                                  follows:

                                                                                                                  Fasilitas
                                                                                                                  pinjaman
                                                                                             Fasilitas              belum                  Tanggal
                                                                                            maksimum/            digunakan/               perjanjian/
                                        Kreditur dan pembiayaan proyek/                     Maximum             Unused loan                Date of
               No.                         Creditor and project funded                       facility*)          facilities*)             agreement

                          Fasilitas pinjaman dalam ASD/USD loan facilities

                    1     Japan Bank for International Cooperation                                    108                       14   14 Maret 2016/
                          PLTU Lontar Extension Facility Tr. A                                                                       March 14, 2016
                    2     Japan Bank for International Cooperation                                        72                    9    14 Maret 2016/
                          PLTU Lontar Extension Facility Tr. B                                                                       March 14, 2016
                    4     Japan Bank for International Cooperation                                        53                    12   20 Juni 2017/
                          PLTU Kalselteng 2 Facility Tr.A                                                                            June 20, 2017
                    5     Japan Bank for International Cooperation                                        36                    8    20 Juni 2017/
                          PLTU Kalselteng 2 Facility Tr.B                                                                            June 20, 2017
                    7     HSBC                                                                        214                       46   19 Februari 2018/
                          PLTGU Tambak Lorok III                                                                                     February 19, 2018
                    8     Asian Development Bank                                                      600                  112       8 Desember 2020/
                          ADB 4009-INO - RBL KMP                                                                                     December 8, 2020
                    9     Asian Development Bank                                                      600                  450       31 Desember 2021/
                          ADB 4164-INO - SREAP Western and Central Java                                                              December 31, 2021
                10        AIIB                                                                        310                  213       10 Februari 2021/
                          AIIB L0292A - East Java & Bali Power Distribution                                                          February 10, 2021
                11        IBRD                                                                        500                  500       7 Mei 2024/
                          IBRD 9557-ID ISLE-1 Program                                                                                May 7, 2024
                12        Clean Technology Fund                                                           15                    15   7 Mei 2024/
                          CTF Loan TF0C1477                                                                                          May 7, 2024
                13        Canada Clean Energy and Forest Climate Fund                                     48                    48   7 Mei 2024/
                          Canada Clean Energy and Forest Climate TF0C1478                                                            May 7, 2024


                          Jumlah dalam USD/Total in USD                                             2,555                1,426


                        Fasilitas pinjaman dalam EUR/EUR loan facilities

                1       Kreditanstalt fur Wiederaufbau                                                     83                    3   15 September 2017/
                        Bangkanai Peaker                                                                                             September 15, 2017
                2       Kreditanstalt fur Wiederaufbau                                                     85                   83   15 Desember 2017/
                        Power Plant Kumbih                                                                                           December 15, 2017
                3       BGK                                                                                81                   16   21 Februari 2018/
                        PLTU Lombok FTP-2                                                                                            February 21, 2018
                4       Kreditanstalt fur Wiederaufbau                                                    150               147      11 Oktober 2018/
                        Geothermal Energy Program                                                                                    October 11, 2018
                5       Kreditanstalt fur Wiederaufbau                                                    225               219      5 September 2019/
                        Bakaru I + II Hydro Power Project                                                                            September 5, 2019
                6       Kreditanstalt fur Wiederaufbau                                                     70                   69   5 September 2019/
                        1000 Islands Renewable Energy for electrification Program                                                    September 5, 2019
                7       Mizuho Bank                                                                        85                   85   13 Maret 2020/
                        Riau Peaker - Finvera Covered Facility                                                                       March 13, 2020
                8       Kreditanstalt fur Wiederaufbau                                                    255               126      8 Desember 2020/
                        KfW 29069 - RBL SNT                                                                                          December 8, 2020
                9       Kreditanstalt fur Wiederaufbau                                                     58                   58   8 Desember 2020/
                        KfW 30606 - Sawangan Hydropower Plant (HPP)                                                                  December 8, 2020
               10       Kreditanstalt fur Wiederaufbau                                                     64                   64   28 Desember 2023/
                        KfW Loan No.31229 - RBL SREAP Western and Central Java                                                       December 28, 2023


                        Jumlah dalam EUR/Total in EUR                                                 1,155                 869

          *)   Dalam jutaan                                                                                                                        *) In million
         **)   Termasuk masa tenggang                                                                                                 **) Include grace period
Page 177
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/167 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                         IKATAN              DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                                            CONTINGENCIES (continued)

    d.    Fasilitas pinjaman belum digunakan (lanjutan)                              d.     Unused loan facilities (continued)

          Perjanjian pinjaman                tidak     terkait         program              Loan agreements not related to fast track program
          percepatan                                                 (lanjutan)             (continued)
             Fasilitas pinjaman dalam JPY/JPY loan facilities

     1       Japan Bank for International Cooperation                                          16,430                   1,591        14 Maret 2016/
             PLTU Lontar                                                                                                             March 14, 2016
     2       Japan Bank for International Cooperation                                          16,939                   5,248        20 Juni 2017/
             PLTU Kalselteng 2                                                                                                       June 20, 2017
             Jumlah dalam JPY/Total in JPY                                                     33,369                   6,839

            Fasilitas pinjaman dalam Rupiah/Rupiah loan facilities

     1      PT Bank Rakyat Indonesia (Persero) Tbk                                    4,506,787              552,116            14 November 2018/
            Bank Loan Capex Sindikasi 2018 PKS 6 - JBT                                                                          November 14, 2018
     2      PT Bank Rakyat Indonesia (Persero) Tbk                                   20,000,000            15,097,589               4 Juli 2023/
            Kredit Modal Kerja Standby Loan (Revolving)                                                                             July 4, 2023
     3      PT Bank Syariah Mandiri (Persero) Tbk (Agen Sindikasi)                    2,846,000              870,358            18 Desember 2019/
            4 proyek PLTU dan PLTMG Tahap II                                                                                    December 18, 2019
     4      PT BCA Tbk (Bilateral)                                                    3,000,000             3,000,000            6 Desember 2022/
            Corporate Loan Facilities BCA 2019 - Revolving                                                                       December 6, 2022
     5      PT Bank Danamon Indonesia, Tbk                                            2,000,000             2,000,000           12 Desember 2022/
            Kredit Modal Kerja 2019-Danamon-Revolving Syariah                                                                   December 12, 2022
     6      PT Bank UOB Indonesia                                                     1,000,000             1,000,000            11 February, 2021
            Kredit Modal Kerja 2021 - UOB - Revolving                                                                            February 11, 2021
     7      PT Bank HSBC Indonesia                                                    1,400,000             1,400,000              22 April 2021/
            Kredit Modal Kerja 2021 - HSBC - Revolving                                                                             April 22, 2021
     8      PT Bank Maybank Indonesia, Tbk                                            1,000,000             1,000,000              14 Maret 2022/
            Pembiayaan Musyarakah 2022 - Maybank - Revolving                                                                      March 14, 2022
     9      LPEI                                                                      3,500,000             3,500,000           20 Desember 2021/
            Kredit Modal Kerja 2021 - LPEI- Revolving                                                                           December 20, 2021
    10      MUFG                                                                      1,000,000                   -                 6 April 2022/
            Kredit Modal Kerja 2022 - Bank MUFG- Revolving                                                                          April 6, 2022
    11      PT Bank Mandiri, Tbk                                                      1,000,000              300,000             23 Agustus 2022/
            Kredit Modal Kerja 2022 - Bank Mandiri- Revolving                                                                     August 23, 2022
    12      PT Bank QNB Indonesia Tbk                                                     500,000            500,000            21 September 2022/
            Kredit Modal Kerja 2022 - Bank QNB- Revolving                                                                       September 21, 2022
    13      PT Bank Negara Indonesia (Persero) Tbk                                        108,607            108,607            30 November 2022/
            Kredit Modal Kerja 2022 - BNI- Revolving                                                                            November 30, 2022
    14      PT Bank Permata Tbk (Agen Sindikasi)                                      2,750,000              268,146             8 Desember 2022/
            Bank Loan Sindikasi 2022 PKS 4 Syariah - PLTU Timor 2x5 MW Tahap III                                                 December 8,2022
    15      PT Bank Mandiri (Persero) Tbk (Agen Sindikasi)                            9,000,000             9,000,000           29 Desember 2023/
            Bank Loan Capex Sindikasi 2023 - Konvensional                                                                        December 29,2023
    16      PT Bank Syariah Indonesia (Persero) Tbk                                   1,000,000             1,000,000           29 Desember 2023/
            Bank Loan Capex Sindikasi 2023 - Syariah                                                                             December 29,2023
    17      PT SMI (Persero)                                                          1,000,000              338,920            29 Desember 2023/
            Bank Loan Capex Bilateral 2023 - Konvensional PT SMI                                                                 December 29,2023
    18      PT SMI (Persero)                                                          1,000,000              306,014            29 Desember 2023/
            Bank Loan Capex Bilateral 2023 - Syariah PT SMI                                                                      December 29,2023
    19      PT Bank Negara Indonesia (Persero) Tbk                                    5,071,000              801,941            18 Desember 2019/
            Bank Loan Capex Sindikasi 2019 PKS 18 - PLTU dan PLTMG Tahap I                                                       December 18,2019
    20      PT Bank Permata                                                           1,000,000             1,000,000            29 Februari 2024/
            Kredit Modal Kerja 2024 - Bank Permata - Revolving                                                                   February 29 2024

            Jumlah dalam IDR/Total in IDR                                            62,682,394            42,043,691
         *) Dalam jutaan                                                                                                                            *) In million
         **) Termasuk masa tenggang                                                                                                    **) Include grace period




                                                                 30 September/            31 Desember/
                                                                 September 30             December 31,
                                                                        2024                    2024


                  Tingkat suku bunga per tahun                                                                Interest rate per annum
                  Rupiah                                         5.00% - 8.55%             4.48% - 8.87%                           Rupiah
                  USD                                            3.91% - 7.86%             2.56% - 8.03%                              US$
                  JPY                                            0.02% - 1.73%             0.60% - 1.74%                              JPY
                  EUR                                            0.97% - 4.75%             0.40% - 5.40%                              EUR
Page 178
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/168 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,              IKATAN         DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS AND
    KONTINJENSI (lanjutan)                                            CONTINGENCIES (continued)

    e.   Program operasi dan pemeliharaan                            e.   Operation and maintenance programs

         Untuk meningkatkan dan memulihkan daya guna                      In order to improve and restore the performance of
         unit pembangkit sampai pada tingkat tertentu,                    generator units up to a certain level, the Company
         Perusahaan menandatangani Operation and                          has entered into Operation and Maintenance
         Maintenance Agreement dengan beberapa                            Agreements with contractors. The contract
         kontraktor. Nilai kontrak terdiri dari porsi tetap dan           payment comprises fixed and variable portions. The
         tidak tetap. Kontraktor diharuskan memenuhi                      contractors have to meet certain targets and will be
         target tertentu dan akan dikenakan denda jika                    charged a penalty if these targets are not met. The
         target tersebut tidak tercapai. Komitmen dengan                  commitments with the contractors for the fixed
         kontraktor untuk porsi tetap adalah sebagai                      portion are as follows:
         berikut:
                                                                                   Nilai kontrak setara/
                 Pembangkitan/                     Kontraktor/                  Contract amount equivalent        Periode/
                   Power plant                    Contractors                               Rp                     Period
               PLTU Tanjung Jati B   PT Komipo Pembangkitan Jawa Bali                              1,061,082     2011-2032
               PLTU Tanjung Jati B   Konsorsium/consortium of                                        441,719     2005-2029
                                      Fortum Service OY & PT Medco Energy
               Jumlah                                                                              1,502,801            Total

    f.   Kontinjensi                                                 f.   Contingencies

         (i)    Pada tanggal 29 Agustus 2018, Perusahaan                  (i)    On August 29, 2018, the Company faced an
                menghadapi Permohonan Arbitrase yang                             Arbitration Request filed by PT Kalimantan
                diajukan oleh PT Kalimantan Jawa Gas                             Jawa Gas (“KJG”) as the Applicant against PC
                (“KJG”) sebagai Pemohon melawan PC                               Muriah Ltd (“PCML”) as the first defendant and
                Muriah Ltd (“PCML”) sebagai Termohon 1                           the Company as the second defendant in the
                dan Perusahaan sebagai Termohon 2 di                             International Court of Commerce (“ICC”). The
                International Court of Commerce (“ICC”).                         application is related to the Gas Transportation
                Permohonan tersebut terkait sengketa Gas                         Agreement (“GTA”) dispute between PCML as
                Transportation Agreement (“GTA”) antara                          the Shipper/Seller, KJG as the Transporter,
                PCML selaku Shipper/Penjual, KJG selaku                          and the Company as the Offtaker/Buyer
                Transporter, dan Perusahaan selaku                               regarding the underpayment of gas
                Offtaker/Pembeli mengenai kekurangan                             transportation costs to the PLTGU Tambak
                pembayaran atas biaya transportasi gas ke                        Lorok since the volume of gas sent is less than
                PLTGU Tambak Lorok dikarenakan volume                            the minimum gas volume agreed.
                gas yang dikirim kurang dari volume gas
                minimum yang disepakati.

                Pemohon menuntut pengembalian sejumlah                           The Applicant demands a refund of the amount
                uang yang dipotong oleh Perusahaan dari                          deducted by the Company from the Applicant's
                tagihan Pemohon sejak April 2018 dan secara                      invoice since April 2018 and alternatively with
                alternatif dengan PCML bertanggung jawab                         PCML being responsible for Ship or Pay
                atas Ship or Pay (“SOP”) 2016-2019 senilai                       ("SOP") for 2016-2019 amounting to
                USD144.536.677 (nilai penuh) ditambah                            USD144,536,677 (full amount) plus costs (pre-
                biaya-biaya (pre-award dan post-award).                          award and post-award).

                Manajemen meyakini bahwa Perusahaan                              Management believes that the Company has a
                memiliki posisi yang kuat karena berdasarkan                     strong position because based on legal facts,
                fakta hukum, kegagalan pengiriman volume                         the failure to deliver the agreed gas volume
                gas yang disepakati tidak disebabkan oleh                        was not caused by the Company's fault but
                kesalahan dari Perusahaan melainkan                              was PCML's fault due to its failure to supply
                kesalahan dari PCML karena kegagalannya                          gas according to the agreed minimum gas
                dalam menyediakan gas sesuai volume gas                          volume. In addition, KJG and the Company
                minimum yang disepakati. Selain itu, KJG                         have agreed that KJG frees the Company from
                dengan Perusahaan telah menyepakati bahwa                        the responsibility for paying the 2016-2019
                KJG     membebaskan        Perusahaan    dari                    SOP, whatever the decision of the ICC
                tanggung jawab pembayaran SOP 2016-2019,                         Assembly will be.
                apapun putusan Majelis ICC nantinya.
Page 179
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/169 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

 54. PERJANJIAN      PENTING,             IKATAN        DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
     KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)

     f.   Kontinjensi (lanjutan)                                   f.   Contingencies (continued)
              Pada 14 Juni 2024 Majelis ICC telah memutus                      On June 14, 2024, the International Court of
              perkara tersebut yang pada pokok Putusannya                      Commerce ("ICC") issued a verdict essentially
              memenangkan PLN dengan amar putusan                              PLN obtained favourable decision among
              antara lain menolak permohonan pemohon                           other things, rejected request to received
              yang meminta pengembalian sejumlah uang
              yang dipotong oleh Perusahaan dari tagihan                       refund of the amount deducted by the
              Pemohon sejak April 2018 dan secara alternatif                   company from the applicant's invoice since
              dengan PCML bertanggung jawab atas Ship or                       April 2018 and with PCML as an alternative is
              Pay       (“SOP”)      2016-2019       senilai                   responsible for Ship or Pay ("SOP") 2016-
              USD144.536.677.                                                  2019 amounted to USD144.536.677.


            (ii)   Pada tanggal 25 Oktober 2016, Perusahaan             (ii)    On October 25, 2016, the Company faced a
                   menghadapi gugatan yang diajukan oleh                        lawsuit filed by Poe Soe Fang as a Plaintiff
                   Poe Soe Fang sebagai Penggugat,                              and also as a commissioner of PT Barito
                   x`dalam hal ini juga sebagai Komisaris PT                    Jaya, in the District Court of North Jakarta
                   Barito Jaya, di Pengadilan Negeri Jakarta                    with          register     No.       501/Pdt.
                   Utara      dengan        register     No.                    G/2016/PN.JKT.UTR           regarding     the
                   501/Pdt.G/2016/PN.JKT.UTR          terkait                   Procurement of Land for Construction
                   Pengadaan Tanah untuk Pembangunan                            PLTMG Kalsel Peaker 200 MW. The
                   PLMTG Kalsel Peaker 200 MW. Penggugat                        Plaintiff filed for compensation due to the
                   mengajukan ganti rugi atas Pengadaan                         Procurement of Land for Publics amounting
                   Tanah     bagi     Pembangunan      untuk                    to Rp191,386 that had been previously
                   kepentingan umum sebesar Rp191.386                           agreed upon by Defendant I, Edy Kartono
                   yang sebelumnya sudah disetujui oleh                         as President Director of PT Barito Jaya,
                   Tergugat I, Edy Kartono selaku Direktur                      amounting to Rp18,321. The Plaintiff
                   Utama PT Barito Jaya, sebesar Rp18.321.                      submitted the claims in order to obtain the
                   Penggungat mengajukan tuntutan agar                          compensation          from   the    Company
                   Perusahaan dapat mengganti rugi sebesar                      amounting to Rp191,386 instead of Rp18,
                   Rp191.386 bukan sebesar Rp18.321                             321.

                   Pada tanggal 23 Oktober 2018, perkara                         On October 23, 2018, the District Court of
                   tersebut telah diputus oleh Pengadilan                        North Jakarta decided to deny the entire
                   Negeri Jakarta Utara dengan amar putusan                      Plaintiff's claim. On November 1, 2018, the
                   menolak seluruh gugatan Penggugat. Pada                       Plaintiff filed an appeal to the High Court of
                   tanggal 1 November 2018, Penggugat                            DKI Jakarta and sent the Memorandum of
                   mengajukan permohonan Banding ke                              Appeal          on     May       7,     2019.
                   Pengadilan Tinggi DKI Jakarta dan
                   menyerahkan Memori Banding pada
                   tanggal        7        Mei        2019.

                   Perusahaan    menyampaikan          Kontra                    The Company submitted the Counter
                   Memori     Banding    pada         tanggal                    Memorandum of Appeal on November 15,
                   15           November                2019.                    2019.

                   Pada tanggal 5 September 2023, perkara                        On September 5, 2023, the appeal case no.
                   Banding No. 680/PDT/2023/PT.DKI telah                         680/PD T/2023/PT.DKI has been decided
                   diputus oleh Pengadilan Tinggi DKI Jakarta                    by the DKI Jakarta High Court which has
                   yang telah berkekuatan hukum tetap                            permanent inkracht with a ruling that all the
                   dengan amar putusan seluruh gugatan                           claims of the Appellant (Plaintiff) are
                   Pemohon Banding (Penggugat) tidak dapat                       inadmissible and the results of the appeal
                   diterima dan hasil putusan banding telah                      decision have been notified to each party.
                   diberitahukan kepada masing-masing
                   pihak.
Page 180
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/170 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

      54. PERJANJIAN     PENTING,               IKATAN       DAN          54. SIGNIFICANT AGREEMENTS, COMMITMENTS
          KONTINJENSI (lanjutan)                                              AND CONTINGENCIES (continued)

          f.          Kontinjensi (lanjutan)                         f.              Contingencies (continued)

                       Pada tanggal 5 April 2023, perkara tersebut                   On April 5, 2023, the District Court of
                       telah diputus oleh Pengadilan Negeri                          Tondano decided to declare inadmissible
                       Tondano dengan amar putusan gugatan                           the Plaintiff’s claim. On April 26, 2023, the
                       tidak    dapat     diterima.    Penggugat                     Plaintiff filed an appeal to the High Court of
                       mengajukan permohonan Banding ke                              Manado and sent the Memorandum of
                       Pengadilan      Tinggi     Manado       dan                   Appeal on April 26, 2023.
                       menyerahkan Memori Banding pada
                       tanggal 26 April 2023.

                      Pada tanggal 17 Juli 2023, Pengadilan                          On July 17, 2023, the Jakarta High District
                      Tinggi Manado telah menerbitkan Putusan                        Court decided to deny the entire Plaintiff's
                      Banding dengan amar putusan menolak                            claim. On August 15, 2023, the Plaintiff filed
                      gugatan Penggugat untuk seluruhnya.                            a cassation to the Supreme Court and
                      Pada tanggal 15 Agustus 2023, Penggugat                        submitted a Memorandum of Cassation on
                      mengajukan permohonan Kasasi ke                                September 5, 2023.
                      Mahkamah Agung dan menyerahkan
                      Memori Kasasi pada 5 September 2023.

                       Perusahaan     menyampaikan       Kontra                      The Company submitted its Counter
                       Memori Kasasi pada tanggal 18 September                       Memorandum of Cassation on September
                       2023. Pada tanggal 2 Mei 2024, perkara                        18,2023. On May 2, 2024, the Supreme
                       tersebut telah diputus oleh Mahkamah                          Court decided to deny the Plaintiff’s
                       Agung dengan amar putusan menolak                             Cassation Application.
                       permohonan Kasasi dari Penggugat.


               (iv)    Pada tanggal 12 Oktober 2023, salah satu               (iv)   On October 12, 2023, one of the members
                       anggota Konsorsium dalam Perjanjian                           of the Consortium in Agreement Number:
                       Nomor:      1594.PJ/DAN.02.01/DIR/2016                        1594.PJ/DAN.02.01/DIR/2016           regarding
                       terkait Pembangunan PLTU Kalselteng 2                         the Construction of PLTU Kalselteng 2
                       (2x100 MW) yakni Hyundai Engineering                          (2x100 MW), namely Hyundai Engineering
                       Co. Ltd (“Hyundai”) mengajukan gugatan                        Co. Ltd (“Hyundai”) filed a lawsuit against PT
                       perbuatan melawan hukum kepada PT                             PLN (Persero) through the Indonesian
                       PLN (Persero) melalui Badan Arbitrase                         National Arbitration Board (BANI) with case
                       Nasional Indonesia (BANI) dengan perkara                      registration No. 46050/X/ARBBANI/ 2023.
                       register No.46050/X/ARBBANI/ 2023.                            Hyundai is part of a consortium led by PT
                       Hyundai     merupakan      bagian    dari                     Truba Jaya Engineering, with ITOCHU
                       konsorsium yang dipimpin oleh PT Truba                        Corporation and Hyundai as the members.
                       Jaya Engineering, dengan beranggotakan
                       ITOCHU Corporation dan Hyundai.

                       Pada tahun 2022, akibat kesulitan                             In 2022, due to the financial difficulties faced
                       keuangan yang dihadapi oleh Truba,                            by Truba, the Company and the consortium
                       Perusahaan dan pihak konsorsium pun                           agreed to contract amendment No.
                       menyetujui amandemen kontrak No.                              A.04/2022, which states that the remaining
                       A.04/2022, yang menyatakan bahwa sisa                         scope of work for Truba was transferred to
                       lingkup pekerjaan Truba dialihkan kepada                      Hyundai and an extension of time for the
                       Hyundai dan perpanjangan waktu atas                           project was approved from the previous
                       proyek pun disetujui dari yang sebelumnya                     COD target of 20 July and 20 October 2020
                       target COD di tanggal 20 Juli dan 20                          to 31 December 2023. On 17 May 2023, a
                       Oktober 2020 menjadi 31 Desember 2023.                        fire accident occurred at the location
                       Pada 17 Mei 2023, terjadi kebakaran di
                                                                                     project, so that contract amendments were
                       lokasi   proyek,     sehingga    dilakukan
                                                                                     made regarding additional work on
                       amandemen kontrak terkait tambahan
                       pekerjaan     atas      pemulihan      dan                    recovery and maintenance for materials
                       pemeliharaan untuk material dan peralatan                     and equipment affected by the fire incident.
                       yang terkena dampak insiden kebakaran.
Page 181
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/171 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

   54. PERJANJIAN      PENTING,            IKATAN           DAN   54. SIGNIFICANT AGREEMENTS, COMMITMENTS
       KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)
       f.   Kontinjensi (lanjutan)                                   f.   Contingencies (continued)

                   Hyundai beranggapan bahwa Perusahaan                         Hyundai believes that the Company has
                   melakukan perbuatan melawan hukum                            committed an unlawful act, hence in this
                   sehingga dalam gugatan ini, Hyundai                          lawsuit, Hyundai is asking for compensation
                   meminta ganti kerugian terkait biaya yang                    related to costs arising from the transfer of
                   timbul akibat pengalihan ruang lingkup,                      scope, extension of work contract time and
                   perpanjangan waktu kontrak pekerjaan                         costs arising from a fire incident with a total
                   serta biaya yang timbul akibat terjadinya                    demand             of           Rp2,910,782.
                   peristiwa kebakaran dengan total tuntutan
                   sebesar                     Rp2.910.782.

                   Pada tanggal 24 Juni 2024, putusan                           On June 24, 2024, the decision on this case
                   terhadap kasus ini telah dibacakan di BANI                   was read at BANI with the points that OLN
                   dengan poin-poin bahwa PLN telah                             had obtained certainty stating that the EOT-
                   memeroleh kepastian yang menyatakan                          1 value was only ± 36.43% of the total EOT-
                   nilai EOT-1 hanyalah sebesar ±36.43%                         1 claim submitted by Hyundai, so Hyundai
                   dari total klaim EOT-1 yang diajukan                         could not dispute back regarding EOT-1.
                   Hyundai, sehingga Hyundai tidak dapat                        Furthermore, PLN also received certainty
                   mempermasalahkan Kembali terkait EOT-                        based on the BANI decision which stated
                   1. Selanjutnya PLN juga memeroleh                            that the EOT-2 claim submitted by Hyundai
                   kepastian berdasarkan Putusan BANI                           had been included in the contract value, and
                   tersebut yang menyatakan, klaim EOT-2                        this claim could not yet be submitted.
                   yang diajukan Hyundai telah masuk dalam
                   nilai kontrak, dan klaim tersebut belum
                   dapat diajukan.

            (v)     Pada tanggal 8 Agustus 2023, Perusahaan               (v)   On August 8, 2023, the Company received
                    menghadapi         gugatan          Nomor                   a lawsuit Number 46033/VIII/ARB-
                    46033/VIII/ARB-BANI/2023 yang diajukan                      BANI/2023 filed by PT Truba Jaya
                    oleh PT Truba Jaya Engineering (“Truba”)                    Engineering (“Truba”) at BANI regarding
                    di BANI terkait proyek pembangunan                          the PLTMG Package 2 construction
                    PLTMG Paket 2. Truba mengklaim bahwa                        project. Truba claims that the project
                    atas keterlambatan proyek yang terjadi                      delays occurred due to financial difficulties,
                    disebabkan kesulitan keuangan yang salah                    one of which was caused by a delay in
                    satunya disebabkan karena adanya                            payment of invoice by the Company.
                    keterlambatan pembayaran tagihan oleh
                    Perusahaan.
                  Truba mengajukan permohonan arbitrase                         Truba submitted a request for arbitration
                  (konvensi) dan menuntut Perusahaan                            (convention) and sued the Company for
                  sebesar Rp250.980. Di sisi lain, Perusahaan                   Rp250,980. On the other hand, the
                  mengajukan gugatan balik (rekonvensi)                         Company         filed    a       counterclaim
                  kepada      Truba    karena      Perusahaan                   (reconvention) against Truba as the
                  berpandangan Truba telah melakukan                            Company was of the view that Truba had
                  wanprestasi yang ditunjukkan dengan tidak                     committed a breach of contract as
                  dapat terselesaikannya proyek ini. Pada                       demonstrated by the failure to complete this
                  tanggal 31 Januari 2024, putusan terhadap                     project. On January 31, 2024, the decision
                  kasus ini telah dibacakan secara lisan di                     in this case was read orally at BANI with the
                  BANI dengan amar putusan konvensi                             convention ruling stating that the Company
                  menyatakan bahwa Perusahaan harus                             must pay Truba the invoice for payment of
                  membayar kepada Truba atas tagihan                            work progress amounting to Rp39,139. The
                  pembayaran progress pekerjaan sebesar                         reconvention decision stated that the
                  Rp39.139. Amar putusan rekonvensi                             PLTMG Package 2 Agreement ended due
                  menyatakan bahwa Perjanjian PLTMG Paket                       to termination on the grounds that Truba had
                  2 berakhir karena pemutusan dengan alasan                     defaulted and Truba had an obligation to pay
                  Truba telah melakukan wanprestasi serta                       the Company Rp43,332. On 27 February
                  Truba memiliki kewajiban untuk membayar                       2024, this decision had been registered in
                  kepada Perusahaan sebesar Rp43.332.                           South Jakarta District Court with register No.
                  Pada tanggal 27 Februari 2024, putusan ini                    02/ARB/HKM/2024/ PN.Jak.Sel.
                  telah selesai didaftarkan di Pengadilan
                  Negeri Jakarta Selatan dengan register No.
                  02/ARB/HKM/2024/PN.Jak.Sel.
                  Pada tanggal 22 Mei 2024, Truba telah                         On May 22, 2024, Truba has been revoked
                  melakukan      pencabutan     permohonan                      a petition to annul BANI's decision to the
                  pembatalan putusan BANI ke Pengadilan                         South Jakarta District Court with register No.
                  Negeri Jakarta Selatan dengan register No.                    316/Pdt.Sus-Arbt/2024/PN.Jkt.Sel.
                  316/Pdt.Sus-Arbt/2024/PN.Jkt.Sel.
Page 182
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/172 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)



 54. PERJANJIAN      PENTING,            IKATAN        DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
     KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

     f.   Kontinjensi (lanjutan)                                 f.   Contingencies (continued)

            (vi) Grup juga menghadapi gugatan ganti rugi                (vi)   The Group is also facing claims for
                 dalam jumlah yang tidak material di                           compensation in immaterial amounts at
                 beberapa lokasi bangunan jaringan                             several transmission or distribution
                 transmisi atau distribusi, perselisihan                       network building locations, disputes with
                 dengan karyawan, perkara dengan                               employees, cases with customers and
                 pelanggan dan pemasok. Terhadap                               suppliers. Regarding immaterial claims,
                 gugatan yang tidak material tersebut,                         management follows up in accordance
                 manajemen menindaklanjutinya sesuai                           with the provisions of applicable laws and
                 dengan ketentuan peraturan perundang-                         regulations. Management believes that
                 undangan yang berlaku. Manajemen                              these claims are not material and do not
                 berpendapat klaim-klaim tersebut tidak                        affect the Group's business activities.
                 material dan tidak mempengaruhi kegiatan
                 usaha Grup.

                 Sampai dengan tanggal penyelesaian                            As of the completion date of these
                 laporan keuangan konsolidasian ini, atas                      consolidated financial statements, the
                 litigasi-litigasi yang masih dalam proses                     litigation that is still in process cannot be
                 tersebut, belum dapat diestimasikan secara                    estimated reliably and management is of
                 andal dan manajemen berpendapat bahwa                         the opinion that the Group has a strong
                 Grup memiliki dasar yang kuat dalam                           basis in these cases, so that the allowance
                 perkara tersebut, sehingga penyisihan                         for losses recorded in these consolidated
                 kerugian yang dibukukan dalam laporan                         financial statements is sufficient to cover
                 keuangan konsolidasian ini cukup untuk                        possible future losses.
                 menutupi kemungkinan kerugian di masa
                 yang akan datang.
Page 183
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/173 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                       55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL                                      CAPITAL RISK MANAGEMENT

    a.   Kategori dan klasifikasi instrumen keuangan              a.   Categories  and        classes      of    financial
                                                                       instruments

         Pada tanggal 30 September 2024 dan 31                         As at September, 2024 and December 31, 2023,
         Desember 2023, Grup mengklasifikasikan kas                    the Group classified its cash and cash equivalents,
         dan setara kas, piutang usaha, piutang dari                   trade receivables, receivables from Government,
         Pemerintah, piutang lain-lain, piutang pihak                  other receivables, receivables from related parties,
         berelasi,       rekening    bank       dibatasi               restricted cash in banks and short term
         penggunaannya, dan investasi jangka pendek                    investments amounting to Rp130,337,190 (2023:
         sebesar Rp130.337.190 (2023: Rp116.125.129)                   Rp116,125,129) as financial assets at amortised
         sebagai aset keuangan yang diukur pada biaya                  cost and derivative assets were classified by the
         perolehan diamortisasi dan aset derivatif yang                Group as derivative financial instruments through
         diklasifikasikan oleh Grup sebagai instrumen                  profit or loss amounting to Rp6,708 (2023:
         keuangan derivatif yang dicatat pada laba rugi                Rp6,258).
         sebesar Rp6.708 (2023: Rp6.258).

         Pada tanggal 30 September 2024 dan 31                         As at September 30, 2024, the Group classified its
         Desember 2023, Grup mengklasifikasikan utang                  trade payables, accrued expenses, customer
         usaha, biaya masih harus dibayar, uang jaminan                security deposits, project cost payable, accrued
         langganan, utang biaya proyek, utang                          expenses, two-step loans, Government and non-
         penerusan pinjaman, utang kepada Pemerintah                   bank Government financial institution loans, lease
         dan lembaga keuangan Pemerintah non-bank,                     liabilities, bank loans, bonds payable and sukuk
         utang sewa, utang bank, utang obligasi dan                    ijara, electricity purchase payable, and other
         sukuk ijarah, utang listrik swasta, dan utang lain-           payables amounting to Rp485,806,581 (2023:
         lain     sebesar        Rp485.806.581        (2023:           Rp492,945,917) as financial liabilities carried at
         Rp492.945.917) sebagai kewajiban keuangan                     amortised cost and derivative liabilities were
         yang diukur pada biaya perolehan diamortisasi                 classified by the Group as derivative financial
         dan liabilitas derivatif yang diklasifikasikan oleh           instruments through profit or loss amounting to
         Grup sebagai instrumen keuangan derivatif yang                Rp278,837 (2023: Rp201,359).
         dicatat pada laba rugi sebesar Rp278,837 (2023:
         Rp201.359).
Page 184
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/174 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                        55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                            CAPITAL RISK MANAGEMENT (continued)

    b.   Manajemen risiko modal                                    b.   Capital risk management

         Grup mengelola risiko modal untuk memastikan                   The Group manages capital risk to ensure that it will
         bahwa mereka akan mampu untuk melanjutkan                      be able to continue as a going concern and to
         kelangsungan usaha dan untuk memastikan                        ensure compliance with the covenants of the capital
         pemenuhan batasan rasio kecukupan modal.                       adequacy ratio. The Group’s capital structure
         Struktur modal Grup terdiri dari pinjaman (Catatan             consists of debt (Notes 24, 25, 26, 27, 28 and 29)
         24, 25, 26, 27, 28 dan 29) dan ekuitas pemegang                and equity attributable to owners of the parent
         saham induk, yang terdiri dari modal yang                      consisting of capital stock (Note 21), retained
         ditempatkan (Catatan 21), saldo laba, dan                      earnings, and additional paid-in capital (Note 22).
         tambahan modal disetor (Catatan 22).

         Direksi Grup secara berkala melakukan tinjauan                 The Directors of the Group periodically review the
         struktur permodalan Grup. Sebagai bagian dari                  Group’s capital structure. As part of this review, the
         tinjauan ini, Direksi mempertimbangkan biaya                   Board of Directors considers the cost of capital and
         permodalan dan risiko yang berhubungan.                        related risks.

         Batasan pinjaman Grup mensyaratkan antara lain                 The Group’s loan covenants require among other
         pemenuhan rasio pinjaman terhadap ekuitas dan                  things, the fulfillment of a certain debt to equity ratio
         rasio kecukupan modal. Manajemen secara                        and capital adequacy ratio. Management regularly
         berkala memonitor persyaratan tersebut untuk                   monitors such requirements to ensure that there are
         memastikan tidak terdapat pelanggaran dalam                    no defaults on the loans of the Company.
         batasan pinjaman Perusahaan.

         Grup berusaha untuk meminimalkan biaya                         The Group aims to minimise the cost of debt in
         pinjaman sehingga dapat memaksimalkan nilai                    order to maximise its value. Therefore, in its
         Grup. Oleh karena itu, kebijakan Grup dalam                    financing policies, the Group always takes into
         mencari pendanaan melalui utang selalu                         account the financial risk that may arise in the
         memperhitungkan risiko keuangan yang mungkin                   future.
         timbul di masa depan.

    c.   Tujuan dan      kebijakan     manajemen      risiko       c.   Financial risk management objectives and
         keuangan                                                       policies

         Tujuan dan kebijakan manajemen risiko                          The objectives and policies of the Group’s financial
         keuangan Grup adalah untuk memastikan bahwa                    risk management are to ensure that adequate
         sumber daya keuangan yang memadai tersedia                     financial resources are available for the operation
         untuk operasi dan pengembangan bisnis, serta                   and development of their business, while managing
         untuk mengelola risiko pasar (termasuk risiko                  their exposure to market risks (including foreign
         mata uang asing dan risiko tingkat suku bunga),                currency risk and interest rate risk), credit risk and
         risiko kredit dan risiko likuiditas. Grup beroperasi           liquidity risk. The Group operates within defined
         dengan kebijakan yang telah ditentukan oleh                    policies approved by the Directors.
         Direksi.

         Dalam pengelolaan risiko, Grup membentuk                       In managing those risks, the Group established a
         Direktorat Manajemen Risiko yang bertanggung                   Directorate of Risk Management which is
         jawab terhadap penyusunan kebijakan, kerangka                  responsible for the preparation of the policies, the
         kerja, pedoman penerapan manajemen risiko dan                  relevant frameworks, implementation guidelines
         infrastruktur    pengelolaan      risiko,  serta               and the necessary risk management infrastructure
         memastikan implementasi manajemen risiko                       to ensure the implementation of risk management
         tersebut di lingkungan Grup. Direktorat ini juga               in the Group’s environment. The directorate is also
         bertugas untuk memfasilitasi penyusunan profil                 established to facilitate a strategic risk profile as an
         risiko yang bersifat strategis sebagai himbauan                early warning to the Group’s management
         awal kepada manajemen Grup.
Page 185
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/175 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                       55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                           CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan         manajemen       risiko      c.   Financial risk management objectives and
         keuangan (lanjutan)                                           policies (continued)

         Grup telah menetapkan taksonomi risiko dengan                 The Group has established a risk taxonomy by
         membagi risiko menjadi lima kelompok yaitu risiko             dividing risk into five categories, such as strategic
         strategis, risiko keuangan, risiko operasional,               risk, financial risk, operational risk, project risk and
         risiko proyek, dan risiko kepatuhan. Risiko                   compliance risk. Financial risk includes market risk
         keuangan diantaranya adalah risiko pasar                      (including foreign currency risk and interest rate
         (termasuk risiko mata uang asing dan risiko                   risk), credit risk, and liquidity risk. In managing
         tingkat suku bunga), risiko kredit, dan risiko                those risks, the Group considers prioritisation
         likuiditas. Dalam mengelola risiko, Grup                      based on risk level. Risk level is determined by the
         mempertimbangkan       skala    prioritas  yang               level of possibility and scale of potential impact.
         didasarkan pada tingkat risikonya. Tingkat risiko
         ditentukan berdasarkan tingkat kemungkinan
         terjadinya dan skala dampak yang ditimbulkan.

         Terkait dengan risiko keuangan, Grup telah                    Related to financial risks, the Group has established
         menetapkan kebijakan manajemen untuk                          management’s policy related to hedging
         melakukan transaksi lindung nilai. Sebagai salah              transactions. As a SOE, the approved management
         satu BUMN, kebijakan manajemen yang telah                     policy is very important in order to avoid any issues
         disetujui menjadi sangat penting agar tidak timbul            that may arise during the implementation of such
         masalah pada waktu pelaksanaan akuntansi                      hedging programs. All derivative instruments are
         lindung nilai tersebut. Seluruh instrumen derivatif           recognised in the consolidated statement of
         dicatat dalam laporan posisi keuangan                         financial position at their fair values. Fair value is
         konsolidasian berdasarkan nilai wajarnya. Nilai               determined based on market value using the
         wajar tersebut ditentukan berdasarkan harga                   Bloomberg rate at the reporting date. Derivative
         pasar dengan menggunakan kurs Bloomberg                       assets or liabilities are presented as the amount of
         pada tanggal laporan. Aset dan liabilitas derivatif           unrealised gain or loss from derivative contracts.
         disajikan sebesar keuntungan maupun kerugian                  The Group’s derivative contracts are classified as
         yang belum direalisasi dari kontrak derivatif.                financial assets measured at FVTPL. These
         Kontrak derivatif Grup diklasifikasikan sebagai               transactions are solely intended for mitigating
         aset keuangan yang diukur pada FVTPL.                         foreign exchange risk, not for trading and ensuring
         Transaksi ini semata-mata dimaksudkan untuk                   the availability of foreign currency liquidity for
         memitigasi risiko nilai tukar, tidak untuk                    principal and interest payments due in the 1-3
         diperdagangkan, dan memastikan ketersediaan                   months of the Group’s reporting period. Refer to
         likuiditas valas untuk pembayaran sebagian                    Note 3 for the accounting policy of financial assets
         kewajiban valas yang jatuh tempo dalam jangka                 and liabilities for the financial instruments
         waktu 1-3 bulan pada periode pelaporan Grup.                  classification. The Group does not apply hedge
         Lihat Catatan 3 untuk kebijakan akuntansi untuk               accounting on those transactions.
         aset keuangan dan liabilitas keuangan untuk
         klasifikasi instrumen keuangan. Grup tidak
         menerapkan akuntansi lindung nilai atas
         transaksi-transaksi tersebut.

         Manajemen risiko mata uang asing                              Foreign currency risk management

         Grup memiliki banyak transaksi dan sumber                     The Group undertakes many transactions and
         pendanaan dalam mata uang asing. Sebagai                      funding sources denominated in foreign currencies.
         akibatnya timbul eksposur terhadap fluktuasi nilai            Consequently, there are exposures to exchange
         tukar mata uang asing.                                        rate fluctuations.
Page 186
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                    Lampiran 5/176 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                  SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                           (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                                         55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                                                             CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan manajemen risiko                                                                         c.       Financial risk management objectives and
         keuangan (lanjutan)                                                                                                    policies (continued)

         Manajemen risiko mata uang asing (lanjutan)                                                                            Foreign currency risk management (continued)

         Grup telah melakukan diskusi dengan Bank                                                                               The Group holds regular discussions with Bank
         Indonesia (“BI”) untuk mendapatkan pemahaman                                                                           Indonesia (“BI") to get a comprehensive
         komprehensif atas keadaan pasar. Grup                                                                                  understanding of the market outlook. The Group
         kemudian akan mempertimbangkan keadaan                                                                                 then incorporates this outlook into its internal
         pasar ke dalam proyeksi keuangan internal                                                                              financial forecasts and develops a concerted
         mereka dan mengembangkan strategi yang telah                                                                           strategy to mitigate its foreign currency exposure by
         disetujui bersama untuk memitigasi eksposur                                                                            purchasing the required foreign currency
         risiko mata uang asing dengan membeli                                                                                  denominated instruments at the right time.
         instrumen mata uang asing yang dibutuhkan
         disaat yang tepat.

         Jumlah eksposur mata uang asing bersih Grup                                                                            The Group’s foreign currency exposure as at the
         pada tanggal pelaporan diungkapkan dalam                                                                               reporting date is disclosed in Note 52.
         Catatan 52.

         Sensitivitas mata uang asing                                                                                           Foreign currency sensitivity

         Tabel di bawah ini memaparkan rincian                                                                                  The following table explains the details of the
         sensitivitas Grup untuk setiap 10% kenaikan dan                                                                        Group’s sensitivity to a 10% increase and decrease
         penurunan Rupiah terhadap mata uang asing                                                                              in Rupiah against the relevant foreign currencies.
         yang relevan. Kenaikan dan penurunan 10%                                                                               This 10% increase or decrease represents
         menggambarkan penilaian manajemen terhadap                                                                             management’s assessment of the reasonably
         perubahan yang rasional pada nilai tukar dengan                                                                        possible changes in foreign currency rates
         mempertimbangkan kondisi ekonomi saat ini.                                                                             considering the current economic conditions. The
         Analisis sensitivitas ini mencakup saldo item                                                                          sensitivity analysis includes after tax outstanding
         moneter setelah pajak dalam mata uang asing                                                                            foreign denominated monetary items and adjusts
         dan menyesuaikan translasi pada akhir tahun                                                                            their translation at the end of the year for a 10%
         untuk 10% perubahan dalam nilai tukar mata                                                                             change        in     foreign     currency     rates.
         uang                                      asing.
                                                                                                              30 September/September 30, 2024
                                                                              USD                              JPY                           EUR                           Others
                                                                      10%             -10%           10%              -10%            10%            -10%            10%            -10%
           Aset keuangan                                                                                                                                                                                           Financial assets
           Piutang pihak berelasi                                       79,948         (79,948)         -                -                  -             -            -               -            Receivables from related parties
           Rekening dan deposito Berjangka dibatasi penggunaannya       70,442         (70,442)     302,394         (302,394)               -             -            -               - Restricted cash in banks and time deposits
           Kas dan setara kas                                          677,341        (677,341)      12,147          (12,147)            13,426       (13,426)       2,457          (2,457)              Cash and cash equivalents
           Investasi jangka pendek                                           9              (9)                                                                                                               Short term investment
           Jumlah aset keuangan                                        827,740        (827,740)     314,541         (314,541)            13,426       (13,426)       2,457          (2,457)                  Total financial assets

           Liabilitas keuangan                                                                                                                                                                                    Financial liabilities
           Penerusan pinjaman                                          (889,851)       889,851    (1,104,601)      1,104,601             (11,486)      11,486           -              -                               Two-step loans
           Utang sewa                                               (13,974,978)    13,974,978          (228)            228                 -            -             -              -                               Lease liabilities
           Utang bank dan surat utang jangka menengah                (4,468,512)     4,468,512    (1,037,777)      1,037,777          (1,051,443)   1,051,443           -              -          Bank loans and medium term notes
           Utang obligasi                                           (12,034,760)    12,034,760        (8,295)          8,295          (1,320,440)   1,320,440           -              -                                Bonds payable
           Utang listrik swasta                                        (401,131)       401,131           -               -                   -            -             -              -                 Electricity purchase payable
           Utang lain-lain                                               (1,295)         1,295             (2)             2                (305)         305           -              -                               Other payables
           Utang biaya proyek                                              (780)           780           -               -                   -            -             -              -                          Project cost payable
           Utang usaha                                               (2,072,516)     2,072,516           -               -                   -            -         (18,456)        18,456                             Trade payables
           Biaya masih harus dibayar                                   (253,778)       253,778      (144,747)        144,747             (35,592)      35,592           -              -                            Accrued expenses
           Jumlah liabilitas keuangan                               (34,097,601)    34,097,601    (2,295,650)      2,295,650          (2,419,266)   2,419,266       (18,456)        18,456                   Total financial liabilities

           Jumlah - bersih                                          (33,269,861)    33,269,861    (1,981,109)      1,981,109          (2,405,840)   2,405,840       (15,999)        15,999                                   Total-net
         *)    Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                                                      *)      Not considering the effect of borrowing cost capitalisation
         **)   Mata uang asing lainnya disajikan dalam jumlah setara USD menggunakan kurs                                       **)     Other foreign currencies are presented as USD equivalent using the exchange rates
               tanggal pelaporan                                                                                                        prevailing at reporting date
Page 187
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                    Lampiran 5/177 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                         (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                       55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                                           CAPITAL RISK MANAGEMENT (continued)

    c.     Tujuan dan kebijakan manajemen risiko                                                   c.     Financial risk management objectives and
           keuangan (lanjutan)                                                                            policies (continued)

           Sensitivitas mata uang asing (lanjutan)                                                        Foreign currency sensitivity (continued)
                                                                               Dampak terhadap laba setelah pajak/
                                                                                    Effect to profit after tax*)
                                                                                31 Desember/ December 31, 2023
                                            USD                               JPY                            EUR                Lain-lain/Others**)
                                     10%           -10%          10%              -10%            10%            -10%           10%           -10%

         Aset keuangan                                                                                                                                         Financial assets
                                                                                                                                                               Receivables from
         Piutang pihak berelasi        96,806        (96,806)            -                 -              -                -            -              -       related parties
         Rekening bank dibatasi                                                                                                                                        Restricted
             penggunaannya             74,028        (74,028)     268,485           (268,485)             -                -            -              -        cash in banks
                                                                                                                                                                  Cash and cash
         Kas dan setara kas         1,195,229     (1,195,229)      21,112            (21,112)        43,313          (43,313)      1,394          (1,394)          equivalents
         Investasi jangka pendek       58,401        (58,401)           -                  -              -                -           -               - Short-term investments

         Jumlah aset keuangan       1,424,464     (1,424,464)     289,597           (289,597)        43,313          (43,313)      1,394          (1,394)   Total financial assets

         Liabilitas keuangan                                                                                                                                 Financial liabilities
         Penerusan pinjaman         (1,046,180)    1,046,180    (1,220,333)        1,220,333        (12,601)         12,601             -              -          Two-step loans
         Utang sewa                    (38,937)       38,937      (106,119)          106,119              -               -             -              -          Lease liabilities
         Utang bank dan                                                                                                                                                 Bank loans
            surat utang                                                                                                                                           and medium
            jangka menengah         (4,952,687)    4,952,687    (1,274,030)        1,274,030     (1,163,867)     1,163,867              -              -            term notes
         Utang obligasi dan                                                                                                                                   Bonds payable and
            sukuk ijarah           (12,269,193)   12,269,193     (166,102)           166,102     (1,332,731)     1,332,731              -              -             sukuk ijara
                                                                                                                                                              Electricity purchase
         Utang listrik swasta         (441,153)      441,153            -                  -              -               -             -             -               payables
         Utang lain-lain              (139,072)      139,072      (28,695)            28,695        (30,843)         30,843             -             -           Other payables
         Utang biaya proyek            (31,015)       31,015      (34,896)            34,896         (2,127)          2,127             -             -     Project cost payables
         Utang usaha                (1,725,603)    1,725,603            -                  -              -               -       (10,211)       10,211           Trade payables
         Biaya masih harus
            dibayar                  (241,383)      241,383       (49,428)            49,428        (10,134)         10,134             -              -       Accrued expenses

         Jumlah liabilitas                                                                                                                                          Total financial
            keuangan               (20,885,223)   20,885,223    (2,879,603)        2,879,603     (2,552,303)     2,552,303        (10,211)       10,211               liabilities

         Jumlah - bersih           (19,460,759)   19,460,759    (2,590,006)        2,590,006     (2,508,990)     2,508,990         (8,817)        8,817               Total – net


           *)    Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                              *)    Not considering the effect of borrowing cost capitalisation
           **)   Mata uang asing lainnya disajikan dalam jumlah setara USD                                **)   Other foreign currencies are presented as USD equivalent using the
                 menggunakan kurs tanggal pelaporan                                                             exchange rates prevailing at reporting date


           Manajemen risiko tingkat suku bunga                                                            Interest rate risk management

           Grup memiliki transaksi pada tingkat suku bunga                                                The Group has transactions at fixed and floating
           tetap dan tingkat suku bunga mengambang.                                                       interest rates. Transactions at floating interest rates
           Transaksi    dengan     tingkat   suku    bunga                                                are exposed to cash flow interest rate risk.
           mengambang terekspos terhadap risiko suku                                                      Borrowing issued at fixed rates exposes the Group
           bunga arus kas. Pinjaman yang diterbitkan                                                      to fair value interest risk. The Group manages the
           dengan tingkat suku bunga tetap mengekspos                                                     risk by maintaining an appropriate mix of fixed and
           Grup dengan risiko suku bunga nilai wajar. Grup                                                floating rate borrowings.
           mengelola risiko dengan menyeimbangkan porsi
           pinjaman dengan bunga tetap dan bunga
           mengambang.
Page 188
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/178 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                        SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                             55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                 CAPITAL RISK MANAGEMENT (continued)

    c.      Tujuan dan kebijakan manajemen risiko                          c.    Financial risk management objectives and
            keuangan (lanjutan)                                                  policies (continued)

            Sensitivitas tingkat suku bunga                                      Interest rate sensitivity

            Analisis sensitivitas berikut telah ditentukan                       The sensitivity analysis below has been determined
            berdasarkan eksposur Grup terhadap tingkat                           based on the Group’s exposure to interest rates for
            suku bunga untuk saldo instrumen keuangan                            financial instruments after tax outstanding at the
            terutang setelah pajak pada tanggal pelaporan.                       reporting date. The analysis is prepared assuming
            Analisis ini disusun dengan mengasumsikan                            the amount of assets and liabilities outstanding at
            jumlah saldo aset dan liabilitas terutang pada                       the end of the reporting period was outstanding for
            akhir tahun pelaporan, terutang sepanjang tahun.                     the whole year. The sensitivity analysis uses an
            Analisis sensitivitas ini menggunakan asumsi                         assumption of a 50 basis point (“bp”) increase and
            kenaikan dan penurunan sebesar 50 basis poin                         decrease in the relevant interest rates with all other
            (“bp”) pada tingkat bunga yang relevan dengan                        variables held constant. A 50 bp increase or
            variabel lain dianggap konstan. Kenaikan dan                         decrease represents management’s assessment of
            penurunan sebesar 50 bp merupakan penilaian                          the reasonably possible change in interest rates
            manajemen atas kemungkinan perubahan yang                            after considering the current economic conditions.
            rasional terhadap tingkat bunga setelah
            mempertimbangkan kondisi ekonomi saat ini.

                                                           Dampak terhadap
                                                          laba setelah pajak/
                                                        Effect
                                                        Effect to
                                                               to profit
                                                                  profit after
                                                                         after tax
                                                                               tax
                                                 30 September 2024/ September 30, 2024
                                                     +50 bp                     -50bp

         Aset                                                                                                                 Assets
         Rekening dan deposito berjangka                                                                Restricted cash in banks and
         dibatasi penggunaannya                            19,210                     (19,210)                          time deposits
         Kas dan setara kas                               109,479                    (109,479)             Cash & cash equivalents
         Investasi jangka pendek                            6,134                      (6,134)               Short-term investments
         Subjumlah laba/(rugi)                            134,824                    (134,824)                 Subtotal income/(loss)


         Liabilitas                                                                                                      Liabilities
         Penerusan pinjaman                              (100,173)                   100,173                         Two-step loans
         Utang bank                                      (543,313)                   543,313                           Bank loans
         Subjumlah laba (rugi)                           (643,486)                   643,486                  Subtotal income (loss)
         Total (rugi)/laba                               (508,662)                   508,662                    Total (loss)/income

                                                                Dampak terhadap
                                                               laba setelah pajak/
                                                             Effect to profit after tax
                                                                       2023
                                                           + 50 bp               - 50 bp

          Aset keuangan                                                                                               Financial assets
          Kas dan setara kas                                    218,053                 (218,053)          Cash and cash equivalents
          Rekening bank dan deposito berjangka                                                            Restricted cash in banks and
             dibatasi penggunaannya                              17,679                  (17,679)                       time deposits
          Investasi jangka pendek                                 3,563                   (3,563)               Short-term investments

          Subjumlah laba/(rugi)                                 239,295                 (239,295)               Subtotal income/(loss)

          Liabilitas Keuangan                                                                                     Financial Liabilities
          Penerusan pinjaman                                   (113,815)                113,815                        Two-step loans
          Utang bank                                           (580,407)                580,407                            Bank loans

          Subjumlah (rugi)/laba                                (694,222)                694,222                 Subtotal (loss)/income

          Total (rugi)/laba                                    (454,927)                454,927                   Total (loss)/income
Page 189
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/179 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                      55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                          CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan manajemen risiko                   c.   Financial risk management objectives and
         keuangan (lanjutan)                                          policies (continued)

         Manajemen risiko kredit                                      Credit risk management

         Risiko kredit mengacu pada risiko bahwa pihak                Credit risk refers to the risk that the counterparties
         ketiga akan gagal dalam memenuhi kewajiban                   will default on their contractual obligations resulting
         kontraktualnya yang mengakibatkan kerugian                   in a loss to the Group. As a company that performs
         bagi Grup. Sebagai perusahaan yang diberikan                 a public service obligation on behalf of the
         kewajiban untuk melayani publik oleh Pemerintah              Government of the Republic of Indonesia, the
         Republik Indonesia, Grup diwajibkan melayani                 Group is obliged to serve all customers regardless
         semua pelanggan tanpa melihat apakah nantinya                of the ability to pay. To minimise the risk of
         akan bisa membayar atau tidak. Dalam                         uncollected receivables, the Group collects
         meminimalkan risiko tidak tertagihnya piutang,               customer security deposits and will terminate the
         Grup menerapkan uang jaminan pelanggan dan                   electricity connection to the customer if a customer
         melakukan pemutusan sambungan listrik ke                     does not make payment on time after three-months
         pelanggan ditentukan jika pelanggan tidak                    to minimise the Group’s credit risk. For cash and
         membayar lewat dari Enam bulan untuk                         cash equivalents, the Group maintains accounts
         meminimalkan risiko kredit. Untuk kas dan setara             with several banks to avoid a significant
         kas, Grup mengelola rekening pada beberapa                   concentration of cash with one institution.
         bank untuk menghindari konsentrasi kas yang
         signifikan pada satu institusi.

         Nilai tercatat aset keuangan pada laporan                    The carrying amount of financial assets recorded in
         keuangan konsolidasian setelah dikurangi                     the consolidated financial statements, net of any
         dengan        penyisihan      untuk      kerugian            allowance for losses represents the Group’s
         mencerminkan eksposur Grup terhadap risiko                   exposure to credit risk. See Note 55.a for details.
         kredit. Lihat Catatan 55.a untuk rinciannya.

         Pada tanggal 30 September 2024, jumlah                       As at September30, 2024, the total maximum
         maksimum eksposur dari risiko kredit adalah                  exposure from credit risk was Rp123,140,709
         Rp123.140.709 (2023: Rp116.115.590). Risiko                  (2023: Rp116,115,590). Credit risk arises from cash
         kredit terutama berasal dari kas di bank, deposito           in banks, time deposits, trade receivables,
         berjangka, piutang usaha, piutang dari                       receivables from the Government, other
         Pemerintah, piutang lain-lain, piutang pihak                 receivables, receivables from related parties,
         berelasi, rekening bank dibatasi penggunaannya,              restricted cash in banks and short-term
         dan investasi jangka pendek.                                 investments.

         Kualitas kredit piutang usaha                                Credit quality of trade receivables

         Grup berkeyakinan bahwa tidak ada risiko kredit              The Group believes that there is no significant
         kualitas signifikan yang terpusat karena piutang             concentration of credit quality risk because its trade
         usaha Grup tersebar merata atas jumlah                       receivables are spread over a large number of
         pelanggan yang besar yang meliputi berbagai                  customers across diverse industries covering
         jenis pelanggan baik ritel maupun industrial yang            various types of customers, both retail and
         tersebar di setiap wilayah geografis. Grup juga              industrial, which are spread across a number of
         melakukan evaluasi kredit berkelanjutan atas                 geographic areas. The Group also performs
         piutang usaha secara berkala. Lihat Catatan 15               ongoing credit evaluation of its trade receivables.
         untuk rincian umur piutang usaha dan penilaian               See Note 15 for detailed information of the aging of
         penurunan nilai piutang usaha.                               trade receivables and impairment assessment of
                                                                      trade receivables.

         Kualitas kredit piutang dari pemerintah                      Credit quality       of   receivables     from     the
                                                                      Government

         Grup berkeyakinan bahwa piutang dari                         The Group believes that receivables from the
         pemerintah dapat diterima sepenuhnya dalam                   Government can be fully recovered in time from the
         jangka waktu yang telah ditentukan dari                      Government of the Republic of Indonesia. The
         Pemerintah     Republik    Indonesia.      Grup              Group believes there is no risk of default by the
         berkeyakinan bahwa tidak ada risiko gagal bayar              Government.
         oleh Pemerintah.
Page 190
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/180 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                     55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                         CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan manajemen risiko                  c.   Financial risk management objectives and
         keuangan (lanjutan)                                         policies (continued)

         Manajemen risiko kredit (lanjutan)                          Credit risk management (continued)

         Kualitas kredit kas di bank, deposito                       Credit quality of cash in banks, time deposits
         berjangka dan rekening bank yang dibatasi                   and restricted cash in banks
         penggunaannya

         Grup menempatkan kas di bank, deposito                      The Group places cash in banks, time deposits and
         berjangka dan rekening bank yang dibatasi                   restricted cash in banks with reputable
         penggunaannya pada bank yang memiliki                       counterparties that have a good credit rating or
         peringkat kredit yang baik. Oleh karena itu, Grup           standing. Consequently, the Group believes that
         berkeyakinan bahwa risiko kredit atas aset                  the credit risk of such financial assets is minimal.
         keuangan ini adalah minimal. Pihak terkait yang             These counterparties include large financial
         dimaksud termasuk institusi keuangan utama dan              institutions and SOEs.
         BUMN.

         Kualitas kredit piutang lainnya                             Credit quality of other receivables

         Piutang lainnya ditagihkan kepada pihak berelasi            Other receivables are to be collected from the
         dan karyawan Grup. Oleh karena itu, Grup dapat              Group’s related parties and employees. Therefore,
         memonitor kolektibilitas piutang-piutang ini                the Group can closely monitor the collectability of
         dengan seksama. Grup memiliki tingkat                       these receivables. The Group has a good historical
         kolektibilitas yang baik atas piutang-piutang               collection rate of these financial assets.
         terkait.

         Manajemen risiko likuiditas                                 Liquidity risk management

         Risiko likuiditas didefinisikan sebagai risiko              Liquidity risk is defined as the risk that the Group will
         bahwa Grup akan menghadapi kesulitan dalam                  encounter difficulty in meeting its obligations
         memenuhi kewajiban terkait dengan liabilitas                associated with financial liabilities that are settled by
         keuangan        yang    diselesaikan    dengan              delivering cash or another financial asset. Ultimate
         pembayaran kas atau aset keuangan lainnya.                  responsibility for liquidity risk management rests
         Tanggung jawab utama manajemen risiko                       with the Directors, which have built an appropriate
         likuiditas terletak pada Direksi, yang telah                liquidity risk management framework for the
         membangun kerangka manajemen              risiko            management of the Group’s short, medium and
         likuiditas yang sesuai untuk persyaratan                    long-term funding and liquidity management
         manajemen likuiditas dan pendanaan jangka                   requirements. The Group manages liquidity risk by
         pendek, menengah dan panjang Grup. Grup                     maintaining adequate cash, reserves, banking
         mengelola risiko likuiditas dengan menjaga                  facilities and reserve borrowing facilities by
         kecukupan kas, simpanan, fasilitas bank dan                 continuously monitoring forecast and actual cash
         cadangan fasilitas pinjaman dengan terus                    flows and matching the maturity profiles of financial
         menerus memonitor perkiraan dan realisasi arus              liabilities.
         kas dan mencocokkan profil jatuh tempo liabilitas
         keuangan.

         Selanjutnya Grup juga memelihara kecukupan                  In addition, the Group maintains an adequate
         dana dengan cara mempertahankan kecukupan                   amount of cash and cash equivalents and short-
         jumlah kas dan setara kas dan investasi jangka              time investments, which may be readily converted
         pendek yang mudah dikonversi menjadi uang                   to cash should there be any unforeseen interruption
         tunai ketika mengalami gangguan yang tak                    to its cash collections.
         terduga dari penagihan kas.
Page 191
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                       Lampiran 5/181 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                             (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                        55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                                            CAPITAL RISK MANAGEMENT (continued)

    c.     Tujuan dan kebijakan manajemen risiko                                                        c.      Financial risk management objectives and
           keuangan (lanjutan)                                                                                  policies (continued)

           Manajemen risiko likuiditas (lanjutan)                                                               Liquidity risk management (continued)

           Tabel dibawah ini menganalisis liabilitas                                                            The table below analyses the Group’s financial
           keuangan Grup pada tanggal pelaporan                                                                 liabilities at the reporting date into relevant maturity
           berdasarkan kelompok jatuh temponya dari sisa                                                        groupings based on the remaining period to the
           periode hingga tanggal jatuh tempo kontraktual.                                                      contractual maturity date. The amount disclosed in
           Jumlah yang diungkapkan dalam tabel ini adalah                                                       the table represent contractual undiscounted cash
           nilai arus kas kontraktual yang tidak didiskonto                                                     flows including estimated interest payments.
           termasuk estimasi pembayaran bunga.

                                                                                30 September 2024/ September 30, 2024
                                                                                              Lebih dari tiga tahun
                                                                     Lebih dari satu tahun      tetapi tidak lebih
                                                                       tetapi tidak lebih        dari lima tahun/
                                               Kurang lebih             dari tiga tahun/       Over three years but        Lebih dari
                                              dari satu tahun/       Over one year but not     not longer than five       lima tahun/               Jumlah/
                                            less than one year      longer than three years            years          More than five years           Total
          Liabilitas keuangan                                                                                                                                             Financial liabilities

          Penerusan pinjaman                           2,731,377                   8,609,797               10,475,914               4,045,875        25,862,963                  Two-step loans
          Utang kepada pemerintah dan                                                                                                                              Government and non bank
              lembaga keuangan                                                                                                                                           Government financial
              Pemerintah non bank                        375,000                   1,404,322                      -                      -            1,779,322                 institution loans
          Utang sewa pembiayaan                        1,580,290                   1,891,319                1,373,085             10,208,621         15,053,314                 Lease liabilities
          Utang bank                                  24,805,962                  59,652,336               48,130,316              8,412,787        141,001,401                       Bank loans
          Utang obligasi dan sukuk ijarah              1,793,785                  36,834,348               61,342,455             85,141,440        185,112,028                  Bonds payable
          Utang listrik swasta                           568,375                   1,833,997                2,937,669                     16          5,340,056   Electricity purchase payable
          Utang usaha                                        -                           -                        -                      -                  -                     Trade payable
          Utang jaminan langganan                            -                           -                        -                      -                  -       Customer security deposit
          Utang biaya proyek                                 -                           -                        -                      -                  -              Project cost payable
          Biaya yang masih harus dibayar                     -                           -                        -                      -                  -                Accrued expenses
          Utang lain-lain                                    -                           -                        -                      -                  -                     Other payable

          Jumlah                                      31,854,789                110,226,120               124,259,439            107,808,738        374,149,085                            Total


                                                                                        31 Desember/ December 31, 2023
                                                                   Lebih dari satu tahun      Lebih dari tiga tahun
                                                                     tetapi tidak lebih         tetapi tidak lebih
                                                  Kurang dari         dari tiga tahun/           dari lima tahun/
                                                  satu tahun/       More than one year        More than three years      Lebih dari
                                                   Less than        but not longer than        but not longer than      lima tahun/             Jumlah/
                                                   one year             three years                 five years      More than five years         Total

         Liabilitas keuangan                                                                                                                                                 Financial liabilities
         Penerusan pinjaman                           3,879,000              11,152,850                 5,863,507            14,158,231           35,053,588                      Two-step loans
         Utang kepada Pemerintah dan                                                                                                                                Government and non-bank
             lembaga keuangan                                                                                                                                         Government financial
             Pemerintah non-bank                        860,086               1,572,657                         -                     -            2,432,743                  institution loans
         Utang sewa                                   7,755,080              16,465,372                 9,717,289            15,979,902           49,917,643                      Lease liabilities
         Utang bank                                  30,132,625              79,207,058                29,005,608            48,755,197          187,100,488                            Bank loans
         Utang obligasi                                                                                                                                                            Bonds payable
             dan sukuk ijarah                        15,901,038              67,554,314                50,997,451          204,084,612           338,537,415                   and sukuk ijara
         Utang listrik swasta                           904,491               2,771,110                 1,804,735            1,890,337             7,370,673      Electricity purchase payables
         Utang usaha                                 56,560,627                       -                         -                    -            56,560,627                      Trade payables
         Uang jaminan langganan                      17,440,297                       -                         -                    -            17,440,297        Customer security deposits
         Utang biaya proyek                           1,512,219                       -                         -                    -             1,512,219               Project cost payables
         Biaya masih harus dibayar                    8,281,513                       -                         -                    -             8,281,513                   Accrued expenses
         Utang lain-lain                             11,900,979                       -                         -                    -            11,900,979                      Other payables

         Jumlah                                     155,127,955             178,723,361                97,388,590          284,868,279           716,108,185                                Total


           Manajemen berkeyakinan bahwa tidak terdapat                                                              Management believes that there will be no
           masalah likuiditas karena Grup memiliki cadangan                                                         liquidity issue as the Group has sufficient standby
           fasilitas kredit yang memadai, adanya jaminan                                                            credit facilities, government guarantees for
           Pemerintah untuk pembayaran utang bank terkait,                                                          related debt repayment and subsidy revenue
           dan pendapatan subsidi dari Pemerintah Indonesia                                                         from the Government of Indonesia for provision
           atas penyediaan listrik.                                                                                 of electricity.
Page 192
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/182 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                      SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                        55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                            CAPITAL RISK MANAGEMENT (continued)

    d.   Nilai wajar instrumen keuangan                                                  d.    Fair value of financial instruments

         Nilai wajar adalah suatu jumlah dimana suatu                                          The fair value is the amount for which an asset
         aset dapat dipertukarkan atau suatu liabilitas                                        could be exchanged or a liability settled between
         diselesaikan antara pihak yang memahami dan                                           knowledgeable and willing parties in an arm’s
         berkeinginan untuk melakukan transaksi wajar.                                         length transaction.

         Nilai wajar aset dan liabilitas keuangan diestimasi                                   The fair value of financial assets and liabilities is
         untuk keperluan pengakuan, pengukuran atau                                            estimated for recognition and measurement or for
         untuk keperluan pengungkapan.                                                         disclosure purposes.

         PSAK No. 68, “Pengukuran Nilai Wajar”,                                                SFAS No. 68, “Fair Value Measurement”, requires
         mensyaratkan pengungkapan atas pengukuran                                             disclosure of fair value measurements through the
         nilai wajar dengan tingkat hierarki nilai wajar                                       following fair value measurement hierarchy:
         sebagai berikut:

         -    Harga kuotasian (tidak disesuaikan) dalam                                        -    Quoted prices (unadjusted) in active markets for
              pasar aktif untuk aset atau liabilitas yang                                           identical assets or liabilities (Level 1);
              identik (Tingkat 1);
         -    Input selain harga kuotasian dari pasar yang                                     -    Inputs other than quoted prices included within
              termasuk dalam Tingkat 1 yang dapat                                                   Level 1 that are observable for the asset or
              diobservasi untuk aset atau liabilitas, baik                                          liability, either directly (that is, as prices) or
              secara langsung (misalnya harga) atau secara                                          indirectly (that is, derived from prices) (Level 2);
              tidak langsung (misalnya turunan dari harga)                                          and
              (Tingkat 2); dan
         -    Input untuk aset atau liabilitas yang bukan                                      -    Inputs for the asset or liability that are not based
              berdasarkan data pasar yang dapat                                                     on observable market data (that is,
              diobservasi (informasi yang tidak dapat                                               unobservable inputs) (Level 3).
              diobservasi) (Tingkat 3).

         Tabel di bawah ini menggambarkan nilai tercatat                                       The table below describes the carrying amount of
         dan nilai wajar dari liabilitas keuangan yang tidak                                   the financial liabilities that are not presented by the
         disajikan Grup pada nilai wajarnya:                                                   Group at fair value:

                                                  30 September/30 June 2024                        31 Desember/31 December 2023
                                            Nilai Tercatat /          Nilai Wajar/             Nilai Tercatat /         Nilai Wajar/
                                           Carrying amount             Fair value             Carrying amount            Fair value
         Liabilitas pada biaya perolehan
             diamortisasi                                                                                                                  Liabilities at amortised cost
         Penerusan pinjaman                         25,685,504             24,615,112                 29,183,428              28,287,133                 Two-step loans
         Utang kepada Pemerintah dan                                                                                                          Government and non-bank
             lembaga keuangan                                                                                                                   Government financial
             Pemerintah non-bank                     2,022,737              1,927,862                  2,457,019               2,285,989             institution loans
         Utang obligasi dan sukuk ijarah           189,359,926            202,573,537                197,564,833            190,970,657    Bonds payable and sukuk ijara
         Utang bank                                139,310,951            138,894,722                148,822,188            148,080,778                       Bank loans




         Penerusan pinjaman dan utang bank merupakan                                           Two-step loans and bank loans are financial
         liabilitas keuangan dengan tingkat bunga                                              liabilities with floating interest rates, thus the
         mengambang, sehingga nilai tercatat setara                                            carrying amount of the financial liabilities
         dengan nilai wajar.                                                                   approximate their fair values.
Page 193
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/183 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                          55 FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
    KEUANGAN DAN RISIKO MODAL (lanjutan)                             CAPITAL RISK MANAGEMENT (continued)

    d.     Nilai wajar instrumen keuangan (lanjutan)                   d.    Fair value of financial instruments (continued)

           Beberapa pinjaman dengan suku bunga tetap,                        For certain loans with fixed interest rates, the
           nilai tercatat atas liabilitas keuangan tidak                     carrying amount of the financial liabilities does not
           menunjukkan nilai wajarnya, sehingga pada                         represent their fair values, thus as at September30,
           tanggal 30 September 2024 dan 31 Desember                         2024 and December 31, 2023, the fair value of
           2023, nilai wajar atas pinjaman diukur dengan                     loans is measured using discounted cash flows
           mendiskontokan estimasi arus kas masa depan                       based on the interest rate based on credit adjusted
           menggunakan suku bunga pasar dengan                               market interest rates at the reporting date. The fair
           penyesuaian kredit pada tanggal pelaporan. Nilai                  values of the above financial instruments are
           wajar instrumen keuangan di atas diklasifikasikan                 classified as Level 2 fair values in the fair value
           sebagai nilai wajar Tingkat 2 dalam hirarki nilai                 hierarchy.
           wajar.

           Nilai wajar dari utang obligasi, ditentukan dengan                The fair value of bonds payable is determined by
           mengacu pada harga kuotasian dalam pasar aktif                    the quoted market price at the reporting date. The
           pada tanggal pelaporan. Nilai wajar utang obligasi                fair values of the bonds payable is classified as
           di atas diklasifikasikan sebagai nilai wajar Tingkat              Level 1 fair values in the fair value hierarchy.
           1 dalam hirarki nilai wajar.

           Pada tanggal 30 September 2024 dan 31                             As at September 30, 2024 and December 31, 2023,
           Desember 2023, instrumen keuangan derivatif                       the derivative financial instruments are measured
           dihitung menggunakan Tingkat 2. Nilai wajar                       using a Level 2 method. The fair value is measured
           diukur pada nilai tunai estimasi arus kas masa                    as the present value of the estimated future cash
           depan berdasarkan kurva pendapatan yang                           flows based on observable yield curves.
           dapat diobservasi.

           Nilai tercatat dari aset dan liabilitas keuangan                  The carrying amounts of other financial assets and
           lainnya telah berkisar menunjukkan nilai wajarnya                 liabilities approximate their fair values due to the
           karena memiliki sifat jangka pendek dari                          short-term nature of the financial instruments.
           instrumen keuangannya.

           Untuk tahun-tahun yang berakhir pada tanggal 30                   For the years ended September30, 2024 and
           September 2024 dan 31 Desember 2023, tidak                        December 31, 2023, there were no transfers
           terdapat pengalihan antar tingkat.                                between levels.


56. ASET/(LIABILITAS) DERIVATIF                                   56. DERIVATIVE ASSETS/(LIABILITIES)

    Perusahaan melaksanakan hedging terbatas untuk                     The Company has implemented limited hedging on
    memitigasi risiko selisih kurs atas transaksi-transaksi            certain transactions to mitigate its foreign currency
    tertentu. Jenis transaksi hedging yang dilaksanakan                exposure. The type of hedge transaction is a currency
    adalah kontrak-kontrak currency forward dengan                     forward contract with details as at September 30, 2024
    jumlah rincian pada 30 September 2024 dan 31                       and December 31, 2023, as follows:
    Desember 2023 adalah sebagai berikut:
                                                                                                30 September/ September 30, 2024


                       Pihak lawan/        Jangka waktu hedging   Jumlah Nasional/         Aset Derivatif/           Liabilitas Derivatif/
                     Counterparties          Hedging periods       National amount        Derivative Assets         Derivatife Liabilities


         Mandiri                             < 1 Bulan/Months               125,000,000                       -                    35,603
         BRI                                 < 1 Bulan/Months               350,000,000                 2,880                      52,690
         BNI                                 < 1 Bulan/Months                75,000,000                       -                    22,907
         Mandiri                             > 1 Bulan/Months             1,325,000,000              405,016                     147,783
         BRI                                 > 1 Bulan/Months               450,000,000                 2,787                      59,295
         BNI                                 > 1 Bulan/Months               500,000,000              154,630                       80,411
         Jumlah/Total                                                     2,825,000,000              565,313                     398,689

    *) dalam jutaan Rupiah/in Rp million
Page 194
                             PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                          DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/184 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                              SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

56. ASET/(LIABILITAS) DERIVATIF (lanjutan)                                   56. DERIVATIVE ASSETS/(LIABILITIES) (continued)

                                                                                                31 Desember/ December 31, 2023
    Pihak lawan/                 Jangka waktu hedging/   Jumlah nosional (USD)/              Aset derivatif/      Liabilitas derivatif
   Counterparties                   Hedging periods      Notional amount (USD)             Derivative assets*)   Derivative liabilities*)

   BRI                                < 1 Bulan/Month                      10,000,000                         -                               (1,149)
   Mandiri                            < 1 Bulan/Month                     100,000,000                         -                              (12,994)
   Mandiri                            > 1 Bulan/Month                     940,000,000                     3,827                              (96,829)
   BRI                                > 1 Bulan/Month                     625,000,000                     2,383                              (80,539)
   BNI                                > 1 Bulan/Month                      65,000,000                        48                               (9,848)

   Jumlah/Total                                                       1,740,000,000                       6,258                            (201,359)
    *) dalam jutaan Rupiah/in Rp million




57. INFORMASI TAMBAHAN TERKAIT PENERAPAN                                     57. ADDITIONAL  INFORMATION      RELATED                                  TO
    POJK NO. 6                                                                   IMPLEMENTATION OF POJK NO. 6

    Sejak 1 Januari 2016, Perusahaan menerapkan                                   Since January 1, 2016, the Company has implemented
    secara prospektif POJK No. 6 untuk transaksi                                  POJK No. 6 prospectively for transactions based on
    berdasarkan Perjanjian Jual Beli Tenaga Listrik                               Power Purchase Agreements with IPPs. The effect of
    dengan IPP. Dampak penerapan POJK No. 6 telah                                 POJK No. 6 implementation has been accounted for by
    disesuaikan ke saldo laba 1 Januari 2016 (Catatan                             adjustment to retained earnings as at January 1, 2016
    2.a).                                                                         (Note 2.a).

    Sesuai POJK No. 6, setiap transaksi berdasarkan                               In accordance with POJK No. 6, all transactions based
    Perjanjian Jual Beli Tenaga Listrik diperlakukan                              on Power Purchase Agreements are treated as sale and
    sebagai transaksi jual beli, meskipun sebenarnya                              purchase transactions, although containing a substance
    mengandung substansi selain jual beli (Catatan 3.l).                          other than sale and purchase (Note 3.l). The following
    Tabel berikut ini disajikan sebagai informasi tambahan                        tables are presented as additional information on
    jika perjanjian jual beli listrik dianggap mengandung                         whether PPAs were deemed to contain a lease.
    sewa.

    Tabel di bawah ini mengandung sewa, namun belum                               The table below contains leases, but has not yet
    memperhitungkan dampaknya terhadap peritungan                                 considered their impact on subsidy and compensation
    subsidi dan kompensasi.                                                       calculations.


                                                         Dengan / Under          Dengan / Under
                                                           Non POJK 6              Non POJK 6
                                                          30 September/           31 Desember/
                                                          September 30,           December 31,
                                                              2024                    2023

    Laporan posisi keuangan konsolidasian interim                                                        Interm Consolidated statement of financial position

    Aset tidak lancar                                                                                                                    Noncurrent assets
      Aset tetap                                             1,787,796,138           1,734,508,347                         Property plant and equipment

    Ekuitas                                                                                                                                         Equity
      Saldo laba - Tidak ditentukan penggunaannya              52,054,966                30,337,664                  Retained earnings - Unappropriated

    Liabilitas Jangka panjang                                                                                                           Noncurrent liabilities
      Utang sewa pembiayaan                                   441,479,497               382,666,776                                       Lease liabilities
      Utang listrik swasta                                      3,913,856                 4,440,725                         Electricity purchase payable
      Liabilitas pajak tangguhan                               38,073,195                36,520,083

    Liabilitas jangka pendek                                                                                                               Current liabilities
      Utang usaha                                                                                                                          Trade payable
             Pihak berelasi                                    18,887,877                15,153,778                                   Related parties
             Pihak ketiga                                      44,810,388                38,354,041                                      Third parties
      Biaya masih harus dibayar                                14,534,400                11,159,094                                     Accrued expense
      Utang listrik swasta                                        527,659                   513,891                         Electricity purchase payable
      Utang sewa                                               15,932,882                15,781,088                                       Lease liabilities
Page 195
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/185 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

57. INFORMASI TAMBAHAN TERKAIT PENERAPAN                                        57. ADDITIONAL  INFORMATION     RELATED                                 TO
    POJK NO. 6 (lanjutan)                                                           IMPLEMENTATION OF POJK NO. 6 (continued)


                                                           Dengan / Under          Dengan / Under
                                                             Non POJK 6              Non POJK 6
                                                            30 September/           30 September/
                                                            September 30,           September 30,
                                                                2024                    2023
    Laporan laba rugi komprehensif konsolidasian interim                                                    Consolidated statement of comprehensive income

    Beban usaha:                                                                                                                         Operating expense
      Bahan bakar dan pelumas                                   187,851,873             159,998,018                                          Fuel expense
      Pembelian tenaga listrik                                   (1,993,595)             11,738,164                                   Electricity purchase
      Sewa                                                        1,947,035               1,701,738                                                  Lease
      Pemeliharaan                                               32,424,517              28,956,955                                            Maintenace
      Penyusutan                                                 49,114,556              42,028,671                                           Depreciation

    Laba usaha setelah subsidi                                   98,804,184              84,367,715                         Operating income after subsidy
    Penghasilan keuangan                                                                                                                   Financial Income
    Keuntungan (kerugian) kurs mata uang asing - bersih            9,866,766               3,506,935                       Gain (loss) on Foreign Exchange
    Beban Keuangan                                               (72,456,528)            (56,001,662)                                      Finance Expense

    Laba sebelum pajak                                           38,069,210              33,010,271                                        Income before tax
    Beban pajak                                                  (8,064,858)             (7,284,081)                                           Tax expense

    Laba periode berjalan                                        30,004,353              25,726,191                                    Income for the period

    Laporan arus kas konsolidasian interim                                                                  Consolidated statement of comprehensive income

    Arus kas dari aktivitas operasi                                                                                           Cash from operating activities
      Pembayaran kas kepada pemasok                             (229,288,847)           (221,406,161)                             Cash paid to suppliers
      Kas diperoleh dari aktivitas operasi                        23,836,231              12,635,438
      Pembayaran bunga                                           (71,224,165)            (40,359,352)                               Interest expense paid
    Kas bersih dari aktivitas operasi                             42,592,787              50,632,544                Net cash provided by operating activities

    Arus kas dari aktivitas pendanaan                                                                                         Cash from financing activities
      Pembayaran utang listrik swasta                               (386,536)               (347,048)             Payment of electricity purchase payable
      Pembayaran utang sewa pembiayaan                           (10,071,596)             (5,591,359)                           Payment of finance lease
    Kas bersih dari aktivitas pendanaan                          (31,348,135)            (27,715,445)               Net cash provided by financing activities


    Nilai kini pembayaran minimum atas utang sewa pada                               The present value of minimum lease payments on
    tanggal 30 September 2024 dan 31 Desember 2023                                   lease liabilities as at September 30, 2024 and
    jika Grup menerapkan Non POJK 6, “Sewa” adalah                                   December 31, 2023, if the Group applied Non POJK 6,
    sebagai berikut:                                                                 “Leases” are as follows:


                                                           30 September/          31 Desember/
                                                           September 30,          December 31,
                                                               2024                   2023

      Pembayaran jatuh tempo dalam waktu :                                                                           Minimum lease payments due :
         Tidak lebih dari satu tahun                           79,437,189               70,748,871                     Not later than one year
         Antara lebih dari satu tahun sampai                                                            Later than one year and not later than
          lima tahun                                          304,380,812              258,607,953                                   five years
         Lebih dari lima tahun                                905,961,674              771,937,982                        Later than five years
         Jumlah pembayaran minimum
            sewa pembiayaan                                 1,289,779,676            1,101,294,806           Total minimum lease payments
      Dikurangi bunga                                        (832,367,296)            (702,846,942)                                   Less interest
      Nilai tunai pembayaran minimum                                                                              Present value of future minimum
         sewa pembiayaan masa datang                          457,412,380              398,447,864                           lease payments
      Dikurangi bagian jatuh tempo dalam
         satu tahun                                            15,932,882               15,781,088                            Less current maturity
      Bagian jangka panjang                                   441,479,497              382,666,776                               Long-term portion
Page 196
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/186 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

58. INFORMASI KEUANGAN TAMBAHAN                                      59. SUPPLEMENTARY FINANCIAL INFORMATION

    Informasi keuangan tambahan menyajikan informasi                    The supplementary financial information presents
    terkait kontribusi Perusahaan kepada Pemerintah                     information related to the Company’s contribution to
    Indonesia sesuai dengan Surat Edaran Kementerian                    the Government of Indonesia as required by the
    BUMN        Republik     Indonesia    No.       S-                  Circular Letter of Ministry of SOE of the Republic of
    6/DKU.MBU/02/2024. Selama periode sembilan bulan                    Indonesia No. S-6/DKU.MBU/02/2024. During nine
    yang berakhir 30 September 2024, jumlah kontribusi                  months periode ended September 30, 2024, the
    Perusahaan      terkait pendapatan   pajak    dan                   Company’s contribution related to tax revenue and
    Penerimaan Negara Bukan Pajak (“PNBP”) adalah                       non-tax state revenue (“PNBP”) are as follows:
    sebagai berikut:

                                                 30 September/                 31 Desember/
                                                 September 30,                 December 31,
                                                     2024                           2023
                                                      Rp                             Rp


             Pajak penghasilan                        13,373,125                   14,542,004                  Income Tax
             PPN                                      14,205,181                   20,990,951                         VAT
             Bea meterai                                   257,998                     77,471                  Stamp duty
             Bea masuk                                      39,521                    113,906                  Import duty
             Pajak daerah dan retribusi daerah        14,639,671                   16,660,764   Local taxes and retribution
             PNBP                                           57,090                    188,230                       PNBP


             Jumlah                                  42,572,586                    52,573,326                        Total



59. TANGGUNG    JAWAB  MANAJEMEN  DAN                                60. MANAGEMENT’S RESPONSIBILITY FOR AND
    PERSETUJUAN ATAS LAPORAN KEUANGAN                                    APPROVAL OF THE CONSOLIDATED FINANCIAL
    KONSOLIDASIAN                                                        STATEMENTS

    Penyusunan dan penyajian wajar laporan keuangan                     The preparation and fair presentation of the consolidated
    konsolidasian      merupakan     tanggung  jawab                    financial statements is the responsibility of the
    manajemen dan telah disetujui oleh Direksi untuk                    management and the Directors have approved them for
    diterbitkan pada tanggal 25 Oktober 2024.                           issuance on October 25, 2024.

File

File Open PDF
Source IDX
Size3.23 MB
Published28 Oct 2024
Pages196
Characters1,443,107
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 84 people and organisations named in the text · linked when the evidence is strong

linked person Burhanuddin Abdullah · Komisaris Utama p.15
linked person Suahasil Nazara · Wakil Komisaris Utama p.15 ×3
linked person Dadan Kusdiana · Komisaris p.15 ×2
linked person Dudy Purwagandhi p.15 ×2
linked person Mohamad Ikhsan p.15 ×4
linked person Susiwijono Moegiarso p.15 ×2
linked person Nawal Nely p.15 ×2
linked person Arcandra Tahar · Komisaris Independen p.15 ×5
linked person Andi Arief p.15 ×2
linked person Mutanto Juwono p.15 ×2
linked person Darmawan Prasodjo · Direktur Utama p.15 ×2
linked person Sinthya Roesly · Direktur Keuangan p.15 ×2
linked person Hartanto Wibowo p.15 ×2
linked person Yusuf Didi Setiarto p.15 ×2
linked person Edi Srimulyanti p.15 ×2
linked person Evy Haryadi p.15 ×2
linked person Adi Lumakso p.15 ×2
linked person Adi Priyanto · Direktur Distribusi p.15 ×2
linked person Wiluyo Kusdwiharto p.15 ×2
linked person Suroso Isnandar p.15 ×2
linked person Charles Sitorus · Anggota p.15 ×4
linked person Tomi Parisianto Wibowo p.15 ×2
linked person Alois Wisnuhardana · Sekretaris Perusahaan p.15 ×2
linked org Asian Development Bank p.58
linked org Bank Mandiri p.154
possible org Bursa Efek Indonesia p.12 ×33
possible person Agus Dermawan p.15
possible person Tedi Bharata p.15
possible org Otoritas Jasa Keuangan p.18 ×2
possible org Pemerintah Republik Indonesia p.60 ×3
possible org PT Telkom Indonesia p.159 ×3
unresolved org Kementerian Pekerjaan p.11
unresolved org Ministry of Energy and Public Umum dan Tenaga. Perusahaan p.11
unresolved person Sutjipto p.11 ×2
unresolved org PT PLN (Persero) p.11 ×4
unresolved org Menteri Kehakiman p.11
unresolved org Minister of Justice p.11
unresolved org Menteri Hukum dan Hak Asasi Manusia Republik p.11
unresolved org Minister of Law and Human Rights p.11
unresolved org Milik Negara p.12
unresolved org PT Haleyora p.12
unresolved org PT Haleyora Powerindo p.12 ×2
unresolved org PT Haleyora Power p.12
unresolved org Indonesia Stock Exchange p.12 ×33
unresolved org Majapahit Holding B.V. p.14 ×2
unresolved org Menteri BUMN p.15
unresolved org Minister of SOE Republik Indonesia Nomor S- p.15
unresolved org PT PLN Nusantara p.15
unresolved org PT Pembangkitan Jawa-Bali p.15 ×2
unresolved org PT PLN Energi Primer Indonesia p.15 ×3
unresolved org PT PLN Batu p.15 ×2
unresolved org PT Pengembang Listrik Nasional Gas p.15
unresolved org PT Pelayaran Bahtera Adhiguna p.15
unresolved org PT Indonesia Indonesia Comnets Plus p.16
unresolved org PT ICON Plus p.16 ×2
unresolved org Minister of Law and Human p.16
unresolved org Menteri Hukum dan Hak Asasi Manusia p.16
unresolved org Kantor Jasa Penilai Publik Rengganis p.16
unresolved org KJPP RHR p.16 ×6
unresolved person Hanafi p.16 ×2
unresolved person Muhammad Muhammad Hanafi p.16 ×5
unresolved org Direktorat Jenderal Pajak p.17 ×2
unresolved org Directorate General of Taxes p.17 ×2
unresolved org PT PLN Nusantara Power p.17 ×2
unresolved org PT PLN Indonesia p.17
unresolved org Financial Services Authority p.18 ×2
unresolved org Pengawas Pasar Modal p.21
unresolved org Bapepam-LK p.21 ×2
unresolved org Bank Indonesia p.28
unresolved org Government of the Republic of Indonesia p.30 ×2
unresolved org Ministry of Finance p.30
unresolved org Ministry of SOEs Republik Indonesia p.30
unresolved org Kementerian BUMN p.30
unresolved org Minister of Energy and Mineral Peraturan Menteri Energi dan Sumber Daya p.47
unresolved org Menteri ESDM p.47
unresolved org Pemeriksa p.47
unresolved org Pengawasan Keuangan p.48
unresolved org Direktorat Jenderal Pajak. Sebagai p.64
unresolved org Directorate General of Taxation. As p.64
unresolved org Minister of Keuangan Republik Indonesia p.154
unresolved org Ministry of Finance. Kementerian Keuangan. p.154
unresolved org Bank DKI p.154
unresolved org Bank Loans Penerusan Pinjaman p.159
unresolved org Ministry of SOE p.196

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 5

FinancialStatement-2024-III-PPLN.xlsx done
inlineXBRL.zip done
↑↓ select ↵ open ⇧↵ see every result