Skip to content
Back to announcement

20260609_SMAR_Pengumuman Jatuh Tempo Obligasi dan Sukuk_32099061_lamp2.pdf

Other Text extracted SMAR

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 1

Page 1 OCR 0.941
smart

agribusiness and food

Jakarta, 12 Mei 2026
No Ref: 053/SMART-IR/V/2026

Kepada Yth.

Direktur Penilaian Perusahaan

PT Bursa Efek Indonesia

Gedung Bursa Efek Indonesia, Tower 1, Lantai 6
Jl. Jend. Sudirman Kav. 52-53

Jakarta Selatan

Perihal: Kesiapan Dana untuk Pelunasan Pokok Obligasi
Berkelanjutan III SMART Tahap I Tahun 2021 Seri C

Dengan hormat,

Merujuk kepada Surat Keputusan Direksi PT Bursa Efek
Indonesia No. Kep-00087/BEI/12-2025 perihal Perubahan
Peraturan Nomor I-E tentang Kewajiban Penyampaian
Informasi, dengan ini disampaikan bahwa PT Sinar Mas Agro
Resources and Technology Tbk (SMART atau Perseroan)
telah menyediakan dana pembayaran pokok Obligasi
Berkelanjutan III SMART Tahap I Tahun 2021 Seri Cyang akan
jatuh tempo pada tanggal 10 Juni 2026 (Obligasi Jatuh
Tempo) sebesar Rp300.000.000.000 (tiga ratus miliar
Rupiah).

Sumber dana untuk pelunasan pokok Obligasi Jatuh Tempo
tersebut berasal dari hasil penerbitan Sukuk Ijarah
Berkelanjutan I SMART Tahap II Tahun 2026.

Dana pelunasan pokok termasuk pembayaran bunga atas
Obligasi Jatuh Tempo tersebut akan disetorkan ke rekening
PT Kustodian Sentral Efek Indonesia secara tepat waktu
sesuai jadwal yang telah ditentukan.

Demikian kami sampaikan. Atas perhatian dan kerja
samanya, kami ucapkan terima kasih.

Hormat kami/Best regards,

Bs

un Jimmy Pramono
Wakil Direktur Utama/Vice President Director

Tembusan Yth/cc:

e Direktur Pengawasan Emiten dan Perusahaan Publik 2 -
Otoritas Jasa Keuangan

@ PT Bank Mega Tbk - Wali Amanat

Jakarta, 12 May 2026
Ref No: 053/SMART-IR/V/2026

Attn:

Direktur Penilaian Perusahaan

Indonesia Stock Exchange

Indonesia Stock Exchange Building, Tower 1, 6" Floor
Jl. Jend. Sudirman Kav. 52-53

South Jakarta

Re: Fund Availability for The Principal Settlement of SMART
Shelf-Registered Bond III Phase I Year 2021 C Series

Dear Sir,

With reference to the Decree of the Board of Directors of the
Indonesia Stock Exchange No. Kep-00087/BEI/12-2025 on
the Amendment to the Regulation Number I-E regarding
Obligation to Submit Information, hereby we would like to
inform that PT Sinar Mas Agro Resources and Technology Tbk
(SMART or the Company) has provided the fund for the
principal settlement of SMART Shelf-Registered Bond III
Phase I Year 2021 C Series which will mature on 10 June 2026
(Matured Bond) amounting to Rp 300,000,000,000 (three
hundred billion Rupiah).

The source of fund for the principal repayment of the
Matured Bond comes from the proceeds of the issuance of
SMART Shelf-Registered Sukuk Ijarah I SMART Phase II
Year 2026.

The fund for the Matured Bond principal settlement including
its interest payment will be deposited into the account of
PT Kustodian Sentral Efek Indonesia on time pursuant to the
specified schedule.

Thank you for your kind attention and cooperation.

PT Sinar Mas Agro Resources and Technology Tbk (PT SMART Tbk)

Sinar Mas Land Plaza, Menara 2 Lt. 28-30, Jl. M.H. Thamrin No. S1, Jakarta 10350 Indonesia

T: 462 21 5033 8899 | F: 462 21 5038 9999
@smart-tbk.com M investor@smart-tbk.com

File

File Open PDF
Source IDX
Size0.26 MB
Published9 Jun 2026
Pages1
Characters3,061
Text sourceOCR
OCR confidence0.941

Names mentioned 12 people and organisations named in the text · linked when the evidence is strong

linked org Bank Mega Tbk p.1 ×2
linked org Sinar Mas p.1
possible org PT Bursa Efek Indonesia p.1 ×3
possible org Otoritas Jasa Keuangan p.1
unresolved org PT Sinar Mas Agro Resources p.1 ×3
unresolved org Technology Tbk p.1 ×3
unresolved org PT Kustodian Sentral Efek Indonesia p.1 ×3
unresolved person un Jimmy Pramono · Wakil Direktur Utama/Vice President Director p.1 ×2
unresolved org Indonesia Stock Exchange p.1 ×3
unresolved org SMART Tbk p.1 ×2
unresolved person H. Thamrin No. S p.1

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result