AMMAN NNNN Exploration Report - Guarter 3 2024 Intr: ion During the period !t July 2024 to 30'" September 2024 (A3 2024), PT Amman Mineral Nusa Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional Tbk (PT AMI), carried out exploration activities on IUPK Blocks I, II, Illand IV located in Sumbawa, Indonesia (Figure 1. Total exploration expenditure for 43 2024 was approximately USD $ 7.28 M. N Ta IP NN 2 ai i 190 . Gto Tano Port 4 Lombok Kayangan Port Mataram | | 2 omar Port 4 Lombok Int'l Airport Sumbawa u IN LA Lunyuk, rs N A Lok INDONESIA 5 Sumbawa AMNT Asset Tatar UNA Ko vrkpramnt @ Batu Hijau Mine Operation Map Loco” Project Area — @ Elang Cu-Au Project Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 2 OCR 0.895
AMMAN amman.co.id Batu Hijau Block | Expenditure: e In pit resource drilling program costs, including core sample assay costs, and mapping program costs, amounted to approximately USD $ 3.41 M. Work areas: e Batu Hijau Cu-Au mine. e Batu Hijau Area of Interest (Aol) - Bersah. Exploration parties: e Manager (Resource drilling) - AMNT Mine Technical Service (MTS). Drilling contractor - PT Minera Nusa Drillindo (PT MND). Assay laboratory - Intertek Utama Service (ITS). Umpire assay laboratory - PT Geoservices. Manager (Mapping) - AMNT Exploration. Assessment methods: e Diamond drilling (12 rigs). e Detailed geological mapping (including rock sampling). e Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer. Objectives: e The aims of the on-going drill program are to increase the confidence level of the ore reserve inphase-8 and the mineral resource classifications below the Batu Hijau Phase-8 pit design. e Detailed geological mapping within the Batu Hijau Aol (Bersah areas) is a follow-up to the previous guarter's mapping program. The aim is to improve geological accuracy prior to the drill testing stage. Exploration Results: » 44 drill holes, completed or in progress, totaling 18,744.9 m (Figure 2). e Core samples submitted to the assay lab amounted to 6,447. e Batu Hijau Aol mappingarea - 29.2 Ha (Figure 3). Forward Plan: » The resource drilling program (7 rigs) will continue in A4 2024. e Continue detailed geological mapping at Batu Hijau Aol (Bersah area). PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 NNNN
Page 3 OCR 0.833
AMMAN NN 487000 E AM .. : AMMAN 9009000 N @ In Progress Drilling A3-2024 O Completed Drilling A3-2024 Phase 8 Boundary Figure 2. Batu Hijau Block 1 @3 2024 - In Pit Drill amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 462215799 4600 F. 462 215296 4136 3
Page 4 OCR 0.784
AMMAN ANN 480000 E 485000 E agoodo E ANN z rAMMAN 87 8 | IUPK PT AMNT z L 2| 8 8 v4 S L s- 3 8 N z L 8 2 A : uas 8 2 Km C3 Batu Hijau Pit 627 Mapping Area @3-2024 h n Figure 3. Batu Hijau Block I 43 2024 - Exploration Mapping Area. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 4
Page 5 OCR 0.880
AMMAN NN Elang Block II Expenditure: e# Exploration activities included drilling and geological mapping. Costs were circa USD S3.74M. Work Areas: e# Elang Cu-Au Project. e Gerbang East Cu-Au Prospect e Penungil Cu-Au Prospect. Exploration Parties: # Manager - AMNT Exploration. e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS). Assessment Methods: e Diamond drilling (6 rigs). » Geological mapping (including rock sampling). e Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer. Objectives: # Geotechnical, hydrogeological and metallurgical drilling programs are supporting the Elang DFS study. New geotechnical and hydrogeological data will be used to guide the final Elang pit designs. New metallurgical data is for Elang South only. e Resource development drilling continued at the Elang Cu-Au deposit (Figure 4). The purpose of this infill program was to explore information gaps, improve the geological model and to increase the confidence level of mineral resource classifications within the latest Elang pit design. # Detailed geological mapping at Gerbang East is testing for Cu-Au porphyry mineralisation indicators within a lithocap (Figure 4). »# Geological mapping at Penungil is testing northern extensions of the Sepekat Cu-Au porphyry trend. Exploration Results: e Elang Cu-Au project diamond drilling (24 holes for 8,378.4 m): o Geotechnical & hydrogeological - 14 holes (5,301.1 m) completed or in progress, o Metallurgical - 1 hole (285.5 m) in progress, o Resource infill & exploration - 9 holes (2,791.8 m) completed or in progress, e Core samples submitted to the assay lab amounted to 1,134. e Geological mapping program - 122 rock and 22 soil samples were submitted to the lab. amman.co.id Forward Plan: e Elang deposit drilling (resource development, geotechnical, hydrogeological & metallurgical), using nine (9) rigs, is planned for A4 2024. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 5
Page 6 OCR 0.597
AMMAN ANNN 549000 E —— IUPK PTAMNT Ld daa z 5 x Ta 8 NAM TN 2 m5 8 AMMAN Ki 1 Tapa s- | £ my 7 ) : 1 5 11 - Na — 5 z 8 &- 8 F4 PA 8 8 | 3 ) | | s 2 ES 2- 8 | — | . $ | / “3 | 5 | Ne P3 Tn | | z | ( | 33 ) 8 / J | @- ) | | | s g PA — | / "£ / “N , / nga | | s ) & In Progress Driling A3-2024 (8 g | & Completed Driling A3-2024 | 8- 2 ran | Previous Holes P Es Aa . 0:27/A Mapping Area @3-2024 E . 538000 £ 542000 E 544000 E Figure 4. Elang Block II @3 2024 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 1 4622157994600 F. 462 215296 4136
Page 7 OCR 0.866
AMMAN NN Rinti Block III Expenditure: » Geological mapping costs, including rock assay costs, amounted to approximately USD $ 102.4 K. Work Areas: e Rinti Cu-Au Project. Exploration Parties: # Manager - AMNT Exploration. e Assay Laboratory (rocks) - Intertek Utama Service (ITS). Assessment Method: e Geological mapping (including rock sampling). Objectives: e Detailed geological mapping was carried out over a significant IP chargeability anomaly in the SW portion of the Rinti Block and South Sane area (Figure 5). Exploration Results: e Geological mapping program - 34 rock samples were submitted to the lab. Forward Plan: e Continue detailed geological mapping at SW Rinti and South Sane. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 7
Page 8 OCR 0.753
AMMAN ANNN 562000 E 564000 E NNN AMMAN 566000 E Bekolarcamp mena Pa r 2 IUPK PT AMNT £ s g- 8 zZ s 2- 8 p, Gan s S 2- 8 -— Guartz Vein — Vuggy Guartz “ Previous Holes 6//Mapping Area A3-2024 (GC) HoisTEM Resistivity at depth 100m — Hydrothermal Breccia ng Argillic Alteration (ES aavance Argillic Alteration | Phyllic Alteration ee Silica Alteration amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID Figure 5. Rinti Block III 03 2024 - Exploration mapping area. BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 8
Page 9 OCR 0.845
AMMAN NN amman.co.id Lampui Block IV Expenditure: e Explorationwas limited to geological mapping. Costs were circa USD $ 27.1 K. Work Areas: e Lampui Prospect (Figure 6). Exploration Parties: # Manager - AMNT Exploration. e Assay Laboratory - Intertek Utama Service (ITS). Assessment Methods: » Geological mapping (including rock sampling). e Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer. Objectives: e Detailed geological mapping, over a significant potassium K-Th anomaly in NW and NE corner of Lampui Block Exploration Results: » Geological mapping program - 12 rock samples were submitted to the lab. Forward Plan: e Review of previous exploration results. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 KJ
Page 10 OCR 0.684
AMMAN NN 532000 E 34000 E N NN CU. I dm ( aa PT AMNT AMMAN / ig Li Lantanon N 2002000.NL 1-—-. Argillic Alteration | -—-. Advanced Argillic Alteration £ y ana: Phyllic Alteration INI -— Silica Alteration IEEE Ouartz Vein 2) fr @ Plan Holes 2024 N 87 .e Previous Holes 8 $ Completed IP Line . £ 12//Mapping Area @3-2024 AN k' / 500 m E Figure 6. Lampui Block IV @3 2024 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 10
Names mentioned 9 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Amman Mineral Nusa Tenggara
p.1
unresolved
org
PT AMNT
p.1 ×3
unresolved
org
PT AMI
p.1
unresolved
org
PT AMNT IUPK
p.1
unresolved
org
PT Minera Nusa Drillindo
p.2 ×2
unresolved
org
PT MND
p.2 ×2
unresolved
org
PT Geoservices. Manager
p.2
unresolved
org
PT AMNT AMMAN
p.10
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.