Laporan Kuartalan Aktivitas Eksplorasi
Quarterly Report of the Exploration Activities

PT TBS Energi Utama Tbk
Kuartal-III/ the 3rd Quarter of 2024
Page 2
                    KATA PENGANTAR                            INTRODUCTION

     PT TBS Energi Utama Tbk (“Perseroan”)        PT TBS Energi Utama Tbk ("the
     adalah    perusahaan       pertambangan      Company") is a coal mining company
     batubara yang melakukan kegiatan             conducting      mining      activities    in
     penambangan di daerah Sangasanga,            Sangasanga area, Kutai Kartanegara
     Kabupaten Kutai Kartanegara, Propinsi        Regency, East Kalimantan, which the
     Kalimantan Timur, dimana area konsesi        concession area of the three subsidiaries
     ketiga   anak     perusahaan      terletak   is located side by side. All the supporting
     berdampingan.     Seluruh    infrastruktur   infrastructure of mining operations such
     pendukung operasional penambangan            as coal hauling roads, offices, workshop,
     seperti    jalan    angkut      batubara,    coal-only jetty and other infrastructures
     perkantoran, perbengkelan, pelabuhan         are located in Kutai Kartanegara
     khusus batubara dan infrastruktur lainnya    Regency, East Kalimantan.
     berada di daerah Kabupaten Kutai
     Kartanegara, Propinsi Kalimantan Timur.

     Perseroan mempunyai 3 (tiga) anak            The Company has 3 (three) subsidiaries
     perusahaan yang bergerak di bidang           engaged in coal mining sector, located in
     pertambangan batubara, terletak di           Sangasanga area, Kutai Kartanegara
     daerah Sangasanga, Kabupaten Kutai           Regency,    East     Kalimantan.     The
     Kartanegara, Provinsi Kalimantan Timur.      company's subsidiaries are:
     Adapun     ketiga   anak    perusahaan
     Perseroan tersebut adalah:                   1. PT Trisensa Mineral Utama (TMU)
     1. PT Trisensa Mineral Utama (TMU)           2. PT Indomining (IM)
     2. PT Indomining (IM)                        3. PT Adimitra Baratama Nusantara
     3. PT Adimitra Baratama Nusantara               (ABN)
        (ABN)

     Dalam rangka memenuhi Ketentuan              In order to comply with the Provisions
     III.1.6, Peraturan Nomor I-E tentang         III.1.6, Regulation Number I-E concerning
     Kewajiban     Penyampaian   Informasi,       Information       Delivery     Obligations,
     Lampiran Keputusan Direksi PT Bursa          Attachment to the Decree of the Board of
     Efek Jakarta Number Kep-00066/BEI/09-        Directors of PT Bursa Efek Jakarta
     2022 tanggal 30 September 2022, maka         Nomor Kep-00066/BEI/09-2022 dated
     bersama ini kami sampaikan Laporan           September 30, 2022, we here jointly
     Kegiatan Eksplorasi Perseroan untuk          submit the Company's Exploration
     Kuartal-3 2024.                              Activity Report for the 3rd Quarter of 2024.




www.tbsenergi.com
Page 3
                  BAB I                                           CHAPTER I
              PENDAHULUAN                                       INTRODUCTION



I. Latar Belakang                                 I. Background

Batubara merupakan bahan galian yang              Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh         material, so it is in demand by foreign
investor asing maupun investor dalam negeri.      investors as well as domestic investors. Coal
Usaha pertambangan batubara mempunyai             mining business has prospects as a mainstay
prospek sebagai sektor andalan pengganti          sector of oil and gas replacement in building
migas dalam membangun perekonomian                the economy of East Kalimantan in the future.
Kalimantan Timur di masa mendatang. Hal ini       It is based on available coal resources and
didasarkan pada sumber daya dan potensi           potentials, marketing prospects as well as
batubara yang tersedia, prospek pemasaran         local government policy support.
serta dukungan kebijakan pemerintah
daerah.

Pengusahaan pertambangan karena sifat             Strive of the Mining business because of the
kegiatannya      pada      dasarnya      selalu   nature of its activities basically always cause
menimbulkan       perubahan       pada    alam    changes in the nature of its environment.
lingkungannya. Di balik perubahan pada            Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan           environment, it is also a fact that mining
pula bahwa usaha pertambangan telah               businesses have succeeded in improving
berhasil    meningkatkan         kesejahteraan    human welfare by providing raw materials for
manusia dengan menyediakan bahan baku             industry, energy, and others.
untuk industri, energi, dan lain-lain.




                    Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
                       Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
             Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk




    Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
    Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

TMU merupakan perusahaan tambang             TMU is a coal mining company with an
batubara dengan daerah penambangan           administrative mining area including the sub-
secara administratif termasuk wilayah        districts of Loa Janan, Sangasanga, Muara
Kecamatan Loa Janan, Sangasanga, Muara       Jawa, Kutai Kartanegara Regency, East
Jawa, Kabupaten Kutai Kartanegara Propinsi   Kalimantan Province with an area of 3,414 ha
Kalimantan Timur dengan Luas wilayah         and the 2010 KTN area code 3133 OP. TMU
3.414 ha dan kode Wilayah KTN 2010 3133      has received approval to carry out mining
OP. TMU telah mendapat persetujuan untuk     activities and sell excavated products with
melakukan aktivitas penambangan dan          the      Decree    of    the    Minister   of
penjualan hasil galian dengan Keputusan      Investment/Head       of    the   Investment
Menteri Investasi/ Kepala Badan Koordinasi   Coordinating          Board          Number:
Penanaman          Modal     Nomor       :   1098/1/IUP/PMDN/2022              concerning
1098/1/IUP/PMDN/2022              Tentang    approval for granting extensions of mining
persetujuan Pemberian Perpanjangan Ijin      business permits at the production operation
Usaha Pertambangan Pada Tahap Kegiatan       activity stage for coal commodities to PT
Operasi Produksi untuk Komoditas Batubara    Trisensa Mineral Utama (area code
kepada PT Trisensa Mineral Utama (kode       3364023032014055) on September 21,
wilayah 3364023032014055) pada tanggal       2022.
21 September 2022.

Pada Kuartal-3 2024, pelaksanaan pekerjaan   In The 3rd Quarter of 2024, the
yang dilakukan oleh TMU telah menyerap       implementation of work carried out by TMU
tenaga kerja sebanyak 90 orang sedangkan     has absorbed a workforce of 90 people while
untuk kontraktor dan sub-kontraktornya 436   for contractors and sub-contractors 436
orang dan dibagi menjadi 2 shift kerja.      people and divided into 2 shifts of work. The
Kontraktor tambang yang digunakan adalah     mining contractor used PT Multindo Prima
PT    Multindo    Prima    Teknik   (MPT).   Teknik (MPT). Mining is done by surface
Penambangan yang dilakukan dengan            open pit mining system with truck and shovel
sistem tambang terbuka (surface open pit     method.
mining) dengan metode truck dan shovel.

Produk batubara yang dihasilkan TMU          Coal products produced by TMU have an
memiliki kalori rata-rata 4900 GAR dengan    average calorie of 4900 GAR with Total
Total Sulphur (TS) di bawah 1%. Kualitas     Sulphur (TS) below 1%. The quality of this
batubara ini cukup memenuhi permintaan       coal is enough to meet the demand of the
pasar yang menginginkan batubara dengan      market who want low sulphur coal.
sulphur rendah. Pelaksanaan pengelolaan      Implementation of Occupational Safety and
Keselamatan dan Kesehatan Kerja yang         Health management implemented in TMU
diterapkan di TMU mengacu kepada             refers to the program / plan of Occupational
program/rencana Pengelolaan Keselamatan      Safety and Health Management in
dan Kesehatan Kerja sesuai dengan            accordance with applicable laws and
perundang-undangan yang berlaku.             regulations.
Page 6
Kegiatan pengelolaan dan pemantauan           Environmental management and monitoring
lingkungan yang dilakukan TMU meliputi        activities carried out by TMU include
kegiatan penghijauan yang dilakukan di        greening activities carried out at the Road
Tanggul Jalan, Tanggul Stockpile, Tanggul     Embankment, Embankment Stockpile, Front
Depan Timbangan, Settling Pond, Waste         Embankment Scales, Settling Pond, Waste
Dump dan Bench Office Baru. Pada saat ini,    Dump and New Bench Office. Currently,
TMU juga melakukan pengelolaan dan            TMU also manages and monitors water
pemantauan kualitas air, debu, kebisingan,    quality, dust, noise, B3 waste and domestic
limbah B3 dan limbah domestik, serta          waste, as well as monitoring erosion rates.
pemantauan tingkat erosi.


I. 2. PT INDOMINING (“IM”)

Berdasarkan Izin Usaha Produksi Nomor:        Based on Production Business License
540/004/IUP-OP/MB-PBAT/III/2013 tanggal       Nomor: 540/004/IUP-OP/MB-PBAT/III/2013
15 Maret 2013, IM melakukan kegiatan          dated March 15, 2013, IM conducted coal
eksplorasi dan penambangan batubara serta     exploration and mining activities and its
hasil produksinya di daerah Kecamatan         production in Sangasanga District, Kutai
Sangasanga, Kabupaten Kutai Kartanegara,      Kartanegara Regency, East Kalimantan
Propinsi Kalimantan Timur. Tahap produksi     Province. Im's production phase began in
IM dimulai pada bulan Agustus 2007,           August 2007, while commercial production
sedangkan produksi komersial dimulai pada     began in October 2007.
bulan Oktober 2007.

Kegiatan penambangan IM dilakukan             IM mining activities are carried out by mining
kontraktor penambangan yaitu PT RPP           contractor PT RPP Contractors Indonesia
Contractors Indonesia (RCI). Kegiatan         (RCI). Mining activities are surface open pit
penambangan merupakan penambangan             mining with truck and shovel methods.
terbuka (surface open pit mining) dengan
metode truck dan shovel.

Pada Kuartal-3 2024, sumber daya manusia      As of 3rd Quarter 2024, human resources
yang bekerja dalam kegiatan operasional IM    working in IM's operational activities reached
mencapai 338 tenaga kerja termasuk            338 workers including contractors and sub-
kontraktor dan sub-kontraktor. Dari 338       contractors. Of those 338 people, about 80%
orang tersebut sekitar 80% merupakan          are local workers to support community
tenaga kerja lokal sebagai penunjang          development programs with the aim of
program community development dengan          improving the welfare of the communities
tujuan untuk meningkatkan kesejahteraan       around the mine.
masyarakat di sekitar tambang.

Produk batubara IM memiliki kualitas antara   IM coal products have quality between 4200
4200 - 5600 GAR dengan total sulphur antara   - 5600 GAR with total sulphur between 0.2%
0.2% - 2.0%. Produk cukup bersaing di dalam   - 2.0%. The product is quite competitive in the
pasar internasional maupun domestik           international and domestic markets.
Page 7
I. I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

  ABN didirikan pada tahun 2004, dan                ABN was established in 2004, and manages
  mengelola daerah pertambangan dengan              a mining area of about 2,990 ha located in
  luas area sekitar 2.990 Ha yang berlokasi di      Kampung Jawa Village, Sangasanga District
  Desa      Kampung        Jawa,   Kecamatan        and Muara Kembang Village, Muara Jawa
  Sangasanga dan Desa Muara Kembang,                District, Kutai Kartanegara Regency, East
  Kecamatan Muara Jawa, Kabupaten Kutai             Kalimantan. Based on Mining Business
  Kartanegara,         Kalimantan        Timur.     License Production Operation Number:
  Berdasarkan pada Izin Usaha Pertambangan          540/1691/IUP-OP/MB-{BAT/XII/2009 dated
  Operasi Produksi Nomor: 540/1691/IUP-             December 1, 2009, ABN conducts
  OP/MB-{BAT/XII/2009 tanggal 1 Desember            exploration, coal mining, and marketing of
  2009, ABN melakukan kegiatan eksplorasi,          production at its mine site.
  penambangan batubara, dan pemasaran
  hasil produksi di lokasi tambangnya tersebut.

  ABN mulai melakukan kegiatan eksplorasi           ABN began its exploration and infrastructure
  dan pembangunan infrastruktur pada tahun          development activities in 2007, while
  2007, sedangkan produksi komersial dimulai        commercial production began in 2008. ABN
  pada tahun 2008. Produk batubara ABN              coal products belong to thermalcoal group
  termasuk dalam kelompok thermalcoal               with sub-bituminous and bituminous rank,
  dengan rank sub-bituminous dan bituminous,        with 2 types of ABN 42 (CV 4200 GAR & TS < 1)
  dengan 2 jenis tipe yaitu ABN 42 ( CV 4200 gar    and ABN 50 (CV 5000 gar & TS<1)). Thermal
  & TS < 1) dan ABN 50 ( CV 5000 gar & TS < 1).     coal is marketed to several countries in the world,
  Thermal coal dipasarkan ke beberapa negara di     including India, China, Japan, Italy, Thailand, and
  dunia, diantaranya India, Cina, Jepang, Italia,   Korea. ABN also supplies for domestic needs,
  Thailand, dan Korea. ABN juga mensuplai untuk     namely cement industry and several other
  kebutuhan dalam negeri, yaitu industri semen      industries.
  dan beberapa industri lainnya.

  Sistem penambangan yang dilakukan ABN             ABN's mining system is surface open pit
  yaitu sistem penambangan terbuka (surface         mining. Coal ABN has a low ash content, so
  open pit mining). Batubara ABN memiliki           it is not done by washing process, only done
  kandungan abu yang rendah, sehingga tidak         by crushing process. Mining activities of PT.
  dilakukan pencucian (washing), hanya              ABN is carried out by one main contractor, PT
  dilakukan proses peremukan (crushing).            RPP Contractors Indonesia (RCI).
  Kegiatan penambangan PT. ABN dilakukan
  oleh satu kontraktor utama, yaitu PT. RPP
  Contractors Indonesia (RCI).

  Pada Kuartal-3 2024, sumber daya manusia          In The 3rd Quarter of 2024, human resources
  yang terlibat dalam kegiatan operasional          involved in ABN's operational activities
  ABN mencapai sekitar 441 orang, yang terdiri      reached about 441 people, consisting of 203
  dari 203 orang tenaga kerja pada ABN dan          workers in ABN and 238 workers in
  238 orang tenaga kerja pada kontraktor            contractors and sub-contractors.
  maupun sub-kontraktor.
Page 8
Sebagai salah satu wujud pemberdayaan           As the form of empowerment of the
masyarakat sekitar, ABN bersama-sama            surrounding community, ABN along with
dengan kontraktor dan sub-kontraktor saat ini   contractors and sub-contractors currently
telah menampung tenaga kerja lokal              have accommodated local workers in
Kecamatan Sangasanga & Kecamatan                Sangasanga District & Muara Jawa District,
Muara Jawa, Kabupaten Kutai Kartanegara         Kutai Kartanegara Regency approximately
kurang lebih 70% dari kebutuhan tenaga          about 70% of the labor needs, while the
kerja, sedangkan sisanya sekitar 30%            remaining about 30% comes from outside the
berasal dari luar daerah dua kecamatan          area of the two sub-districts.
tersebut.
Page 9
                BAB II                                          CHAPTER II
         KEGIATAN EKSPLORASI                               EXPLORATION ACTIVITY



II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

1. 1. DAERAH EKSPLORASI                           1. 1. EXPLORATION AREA
Pada Kuartal-3 2024 kegiatan eksplorasi           In the 3rd Quarter of 2024, exploration
berupa kegiatan sampling di Pit Aktif yaitu pit   activities will be in the form of sampling
B1WA, B2A, dan pit 5B36.                          activities in Active Pits, namely pit B1WA,
                                                  B2A, and pit 5B36.

Kegiatan sampling batubara di pit aktif guna      Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai      determine the quality value, especially the
total sulphur (TS) dan nilai total kalori.        total sulphur (TS) value and total calorie
kegiatan sampling batubara. Seam target           value. coal sampling activities. The target
adalah seam T, RU, RL, S di pit B1WA.,            seam is the T, RU, RL, S seam seam in pit
sampling di pit B2A dengan seam target            B1WA. sampling in pit B2A with seam target
seam J, H, G20, G. Pit 5B36 pada seam 28,         seam J, H, G20, G. Pit 5B36 with seam 28,
29.                                               29


1. 2. METODE PENGUKURAN                           1. 2. MEASUREMENT METHODS

Trenching                                         Trenching

Secara teknis di lapangan tim geologist           Technically in the field, the geologist team
melakukan trenching dengan membuat                conducted trenching by making an elongated
paritan memanjang memotong strike seam –          trench cutting the strike seam – seam target
seam target sebatas titik plan yang dibuat        to the point plan made earlier. This serves to
sebelumnya. Hal ini berfungsi untuk               cover the entire region so that all seams can
mengcover seluruh wilayah agar semua              be found. The average length of trenching in
seam dapat di temukan. Rata – rata panjang        a day can reach 80 m -100 m depending on
paritan trenching dalam sehari bisa mencapai      the terrain / area of work whether in a ramp,
80 m - 100 m tergantung dari medan/areal          swamp or hilly with a steep slope.
kerjanya apakah di tempat landai, rawa atau
berbukit dengan kemiringan terjal.

Pengambilan sampel untuk di mengetahui            Sampling to find out the values of quality is
nilai–nilai kualitasnya di lakukan per jarak      done per distance of 100 m between
100 m antar lubang trenching.                     trenching holes.
Page 10
Sampling                                           Sampling

Tim geologi juga melakukan sampling seam           Geologies team also sampling seam - seam
–seam di pit guna mengetahui kualitas ter          in the pit to find out the updated quality of the
update dari seam – seam yang akan                  seam - seam that will be mine.
ditambang.
Metode yang digunakan adalah:                      The methods used are:

1. Jarak antar titik sampling maksimal 20 m        1. The distance between sampling points
   per seam searah strike bukaan batubara             maximum 20 m per seam direct strike coal
   yang akan di ambil (getting).                      openings to be taken (getting).

2. Sampling ulang/update pada tiap bukaan          2. Re-sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1             opening on a seam (maximum 1 layer
   bukaan layer setinggi 3 m).                        opening as high as 3 m).

3. Sampling pada seam – seam bukaan                3. Sampling on seam – seam new openings
   baru/seam yang pertama kalinya akan di             / seam the first time will be in getting. The
   getting. Adapun plan penambangan                   mining plan until the end of the year is
   sampai dengan akhir tahun di targetkan             targeted at seam with calorie value (ar)_g
   pada seam dengan nilai Calori (ar)_g di            above 4700.
   atas 4700.


1. 3. BIAYA EKSPLORASI                             1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di           TMU Exploration Costs incurred in the 3rd
Kuartal-3 2024 sebagai berikut:                    Quarter of 2024 as follows:

                                         Q3 2024                 Year To Date
            Biaya Operasional     Anggaran     Realisasi    Anggaran     Realisasi
            Operating Expense      Budget     Realization    Budget      Realization
                                    (IDR)        (IDR)        (IDR)        (IDR)
            Biaya Eksplorasi
                                 105,000,000 35,000,000 360,000,000 224,000,000
            Exploration Costs

Catatan:                                           Note:
Jumlah sampling di Kuartal-3 2024 berjumlah 14     The number of samplings in the 3rd Quarter 2024
sampel.                                            amounted to 14 samples.

Biaya Eksplorasi untuk tahun 2024 yang             Exploration Cost for 2024 in accordance with
sesuai dengan RKAB 2024 bagian geologi             RKAB 2024 geological section in the form of
berupa biaya analisa kualitas batubara di          coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan.             maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang                trenching activities that use PC 200 units is
mengunakan unit PC 200 biayanya                    accommodate to production department for
dimaksukan ke departement produksi untuk           general work with a record of trenching
pekerjaan general dengan catatan kegiatan          activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.
Page 11
1. 4. PELAKSANAAN DAN                           1. 4. IMPLEMENTATION AND
      PENGAWASAN                                      SUPERVISION
Pengawasan     Test     Pit/Trenching  dan      Supervision of Test Pit/ Trenching sampling
sampling batubara di pit TMU dilakukan oleh     of coal in the TMU pit conducted by
Geologist TMU.                                  TMU’geologist.

1. 5. KEMAJUAN EKSPLORASI                       1. 5. EXPLORATION PROGRESS

Kesimpulan Eksplorasi TMU Kuartal-3             Conclusion of TMU Exploration in the 3rd
2024                                            Quarter of 2024

Selain kegiatan trenching kami dari tim         In addition to our trenching activities from the
geologi juga melakukan sampling seam –          geology team also sampling seam-seam in
seam di pit guna mengetahui kualitas ter        the pit to find out the update quality from
update dari seam – seam yang akan di            seam - seam to be getting. The methods used
getting. Metode yang digunakan adalah:          are:

1. Jarak antar titik sampling maksimal 50 m     1. Distance between sampling points
   per seam searah strike bukaan batubara          maximum 50 m per unidirectional strike
   yang akan di ambil (getting).                   coal openings to be taken (getting)

2. Sampling ulang/update pada tiap bukaan       2. Sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1          opening on one seam (maximum 1-layer
   bukaan layer setinggi 3 m).                     aperture as high as 3 m).

3. Sampling pada seam – seam bukaan             3. Sampling on seam - seam new openings
   baru/seam yang pertama kalinya akan di          / seam the first time will be in the getting.
   getting. Adapun plan penambangan                The mining plan until the end of the year
   sampai dengan akhir tahun ditargetkan           is targeted at seam with calorie (ARB)
   pada seam dengan nilai Calori (ARB)             GAR value above 4800.
   GAR di atas 4800.

4. Selama Kuartal-3 2024 kegiatan berupa        4. During Q3 2024, activities in the form of
   sampling pit aktif yaitu di pit B2A dengan      active pit sampling are in pit B2A with
   seam target adalah seam H, G20, G. Pit          target seam are H, G20, G Pit 5B36 seam
   5B36 seam 28, 29. Pit B1WA dengan               28, 29. Pit B1WA with target seam WA,
   seam target WA, WB, T, RU, RL, S.               WB, T, RU, RL, S.

5. Rata – rata hasil analisa kualitas dari      5. The average quality analysis results of
   seam –seam tersebut di atas TM 31.54            the seam -seam above TM 31.54%, ASH
   %, ASH 3.51 %, TS 0.80 % dan nilai CAL          3.51%, TS 0.80 % and CAL (ar) values
   (ar) 4.900.                                     4.900.


1. 6. RENCANA KEGIATAN                          1. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                          EXPLORATION ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-4       The Geological Division Plan for 4th Quarter
2024:                                           2024:
Page 12
1. Melakukan pembaharuan / updating              1. Updating the Geological model based on
   model Geologi berdasarkan data updating          monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit          survey data and cs holes data from coal
   serta cs_holes dari data channel sampling        sampling channel data. The results of this
   batubara. Hasil dari pembaharuan model           model update are then sent to the mine
   ini kemudian di kirim ke bagian mine plan        plan engineering section as a basis for
   engineering sebagai dasar ajuan untuk            submissions for making pit designs for
   pembuatan design pit untuk bulan depan.          next month.

2. Trenching di luar Rencana PIT yang di Plan    2. Trenching outside the PIT Plan that is
   kan oleh tim Engineering di tiadakan dan         planned by the Engineering team is not in
   sebagai penggantinya adalah trenching di         place and in lieu of trenching is done in the
   lakukan di plan pit yang data trenchingnya       plan pit whose trenching data is lacking or
   kurang     atau      tingkat     confidence      confidence level of continuity, seam
   kemenerusan, ketebalan seam di pit               thickness in the pit is still lacking.
   tersebut masih kurang.

3. Memonitoring adanya anomali pada suatu        3. Monitoring the presence of anomalies in
   bukaan PIT yang aktif.                           an active PIT aperture

4. Tim geologist akan melakukan sampling         4. The geological team will be sampling the
   pada bukaan seam seam yang berada di             seam seam openings located in the active
   pit aktif terutama mengontrol perubahan          pit, especially controlling changes in the
   nilai Total Sulfur dan nilai Kalori di seam      value of Total Sulphur and value of
   –seam ber kalori tinggi baik kearah down         Calory in seam -seam with high calories
   dip maupun kearah strike nya.                    both down dip towards the strike.

5. Memonitoring kualitas dari seam –seam         5. Monitoring the quality of seam -seam that
   yang tertambang di bulan Oktober –               is mined in October until December 2024,
   Desember 2024 terutama dalam hal                 especially in terms of changes in TS value
   perubahan nilai TS seiring penurunan             in line with the decrease in elevation of
   elevasi dari masing –masing seam yang            each seam that is mined.
   tertambang.

6. Update    data     kualitas berdasarkan       6. Quality data update based on mining
   kemajuan penambangan pada seam–                  progress on seam–seam target in
   seam target di bulan sebelumnya.                 previous month.

7. Rencana kegiatan pengeboran eksplorasi        7. The plan for exploration drilling activities
   di tahun 2024 sebanyak 78 titik bor atau         in 2024 is 78 drill points or as many as
   sebanyak 9.360 m di wilayah barat pit            9,360 m in the western area of the B3KL
   B3KL dengan seam Target seam R, S, T,            pit with seam Target seam R, S, T, U, WA,
   U, WA, WB, X, Y.                                 WB, X, Y.

8. Rencana kegiatan pengeboran geoteknik         8. The plan for geotechnical drilling activities
   di tahun 2024 sebanyak 5 titik pemboran          in 2024 is 5 drilling points or as much as
   atau sebanyak 600 m di wilayah Barat pit         600 m in the Western area of the B3KL pit.
   B3KL.
Page 13
II. 2. PT INDOMINING (“IM”)

2. 1. DAERAH EKSPLORASI                       2. 1. EXPLORATION AREA
Pada Kuartal-3 2024, IM tidak ada kegiatan    In the 3rd Quarter of 2024, IM had no drilling
pengeboran.                                   activities.

2. 2. METODE PENGUKURAN                       2. 2. MEASUREMENT METHODS
Untuk kegiatan pemboran infill menggunakan    For infill drilling activities using touch coring
metode touch coring, sedangkan untuk          method, while for geotechnical drilling is done
pemboran geoteknik dilakukan dengan           by drilling Full Coring method.
pemboran metode Full Coring.

Pemboran geoteknik dilakukan juga dengan      Geotechnical drilling is also carried out using
menggunakan metode Standart Penetration       the Standard Penetration Test (SPT) method.
Test (SPT). Prinsip kerja SPT adalah dengan   The working principle of SPT is to hit a
memukul sebuah tabung standar ke dalam        standard tube into a drill hole 45 cm deep
lubang bor sedalam 45 cm menggunakan          using a hammer weighing 63.5 kg that falls
palu dengan berat 63.5 kg yang jatuh bebas    freely from a height of 76 cm. What counts is
dari ketinggian 76 cm. Yang dihitung adalah   the number of blows to penetrate as deep as
jumlah pukulan untuk melakukan penetrasi      15 cm. The number of blows used is
sedalam 15 cm. Jumlah pukulan yang            penetration as deep as the last 30 cm.
digunakan adalah penetrasi sedalam 30 cm
terakhir.

2. 3. BIAYA EKSPLORASI                        2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di       IM Exploration Costs incurred in the 3rd
Kuartal-3 2024 sebagai berikut:               Quarter of 2024 as follows:

                                    Q3 2024               Year To Date
          Biaya Operasional  Anggaran Realisasi      Anggaran     Realisasi
          Operating Expense    Budget   Realization   Budget      Realization
                                (IDR)      (IDR)       (IDR)        (IDR)
        Juli/ July           83,333,333       -     583,333,331        -
        Agustus/ August      83,333,333       -     666,666,664        -
        September/ September 83,333,333       -     749,999,997        -


2. 4. PELAKSANAAN DAN                         2. 4. IMPLEMENTATION AND
      PENGAWASAN                                     SUPERVISION
Kegiatan    Pemboran     diawasi     oleh     Drilling activities are supervised by the
Departemen Engineering Section Geologist.     Department of Engineering geologist section.

2. 5. KEMAJUAN EKSPLORASI                     2. 5. EXPLORATION PROGRESS
Pada Kuartal-3 2024 belum ada kegiatan        As of the 3rd Quarter of 2024, there are no
pemboran lanjutan. Namun ada beberapa         further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan,    geological activities that continue to be
diantaranya:                                  carried out, including:
Page 14
1. Melakukan pembaharuan/updating model           1. Updating the Geological model based on
   Geologi berdasarkan data updating                 monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit           survey data and cs_holes data from coal
   serta cs_holes dari data channel sampling         sampling channel data, and supervision in
   batubara, dan pengawasan dalam                    the activities of taking roof/floor
   kegiatan pengambilan data pengukuran              measurement data and cs_holes.
   roof/floor serta cs_holes tersebut.

2. Melakukan kegiatan channel sampling            2. Conducting channel sampling activities as
   serta pengukuran tebal aktual batubara di         well as actual thick measurement of coal
   lokasi Pit AB Blok 13-15 & sekitarnya             at the pit AB location Block 13-15 &
   untuk keperluan pembuatan data channel            surrounding areas for the purposes of
   sampling untuk support pembaharuan/               making data sampling channels to
   updating model Geologi dan variasi                support     the    renewal/updating     of
   kualitas batubara dari coal inventory yang        geological models and variations in the
   akan ditambang.                                   quality of coal from coal inventory to be
                                                     mined.

3. Melakukan analisis kestabilan lereng di        3. Perform slope stability analysis in the pit
   area pit aktif Pit, baik pada sisi low wall,      active pit area, both on the low wall side,
   high wall maupun sidewall serta disposal          high wall and sidewall and disposal IPD
   IPD border Selatan, kaitannya untuk               South border, related to know the value of
   mengetahui nilai safety factor (FoS) untuk        safety factor (FoS) to control the
   kontrol pembentukan desain Pit Aktif              formation of Active Pit design to be stable
   supaya stabil dan aman.                           and safe.

2. 6. RENCANA KEGIATAN                            2. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                            EXPLORATION ACTIVITIES
IM pada periode Kuartal-4 2024 telah              IM for 4th Quarter of 2024 have planned to
merencanakan melakukan aktifitas kembali          resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu          be it infill drilling or Geotechnical drilling in IM
pengeboran infill maupun pengeboran               concession area.
Geoteknik di area konsesi IM.

Adapun untuk rencana kegiatan eksplorasi          As for the IM exploration activity plan in 2024,
IM tahun 2024, Sehubungan dengan rencana          in connection with the mining optimization
pengoptimalan penambangan pada pit utama          plan at the Indomining main pit to a depth of
Indomining hingga kedalaman RL-165 meter          RL-165 meters according to the Mine Plan
sesuai target Mine Plan untuk pit AB dan          target for pit AB and in order to optimize the
dalam rangka mengoptimalkan mineable              mineable reserve potential seams, where
reserve seam-seam potensial, dimana               several potential seams in pit area still needs
beberapa seam-seam potensial di dalam             to be known continuity up to the lower limit
area pit masih perlu diketahui kemenerusan        (down dip) of the pit plan and lateral
hingga sampai batas bawah (down dip) dari         continuity, the company intends to conduct
rencana pit dan kemenerusan lateral, maka         infill drilling activities to increase the accuracy
perusahaan      bermaksud       mengadakan        of drilling data in the pit area to the lower limit
kegiatan pemboran infill untuk menambah           of the pit plan where some potential seams
akurasi data pemboran pada area pit hingga        from roof & floor data indicated that there was
batas bawah rencana pit dimana beberapa           thinning or pinch out laterally and/or down dip
Page 15
seam potensial dari data roof & floor
terindikasi ada yang mengalami penipisan
atau pinchout secara lateral dan atau down
dip.

Sedangkan, tujuan dari kegiatan pemboran        Meanwhile, the purpose of the infill drilling
infill adalah untuk menambah keyakinan          activity is to increase the confidence of the
batas penyebaran lateral dari seam-seam         lateral spreading limit of potential seams that
potensial     yang  mengalami    pinchout,      has been pinch out, increase confidence in
menambah keyakinan kemenerusan serta            continuity and determine the thickness of the
mengetahui ketebalan lapisan ke arah            layer towards the down dip which is indicated
downdip      yang  terindikasi mengalami        to be thinning to the planned lower pit limit,
penipisan hingga rencana batas bawah pit,       and maximize the mineable reserve of
serta memaksimalkan mineable reserve            potential seams, and validate the update of
seam-seam potensial, dan mem-validasi           the Geology model from the update of adding
update model Geologi dari pembaruan             infill drilling data
penambahan data pemboran infill.

Pemboran infill pada area pit AB                Infill drilling in the pit AB area is planned to be
direncanakan dilakukan sebanyak 13 titik bor    carried out as many 13 boreholes with a total
dengan total meter yang diperlukan adalah       required meter of 1000 meters. The work is
sebanyak 1000 meter. Pekerjaan tersebut         planned to be carried out using a minimum of
rencananya     akan     dikerjakan dengan       2 units of Jacro 300 rigs or the like. This infill
menggunakan minimal 2-unit rig tipe Jacro       drilling project will be carried out using the
300 atau yang sejenis. Proyek pemboran infill   vertical touch coring drilling method and
ini akan dilakukan dengan menggunakan           equipped with geophysical logging up to the
metode pemboran touch coring vertikal dan       drilling depth target.
dilengkapi dengan geophysical logging
sampai dengan target kedalaman pemboran.


II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

   3. 1. DAERAH EKSPLORASI                      3. 1. EXPLORATION AREA


Pada Kuartal-3 2024, ABN melakukan              In the 3rd Quarter of 2024, ABN conducted
update model geologi berdasarkan data           geological model updates based on channel
channel sampling serta data roof & floor        sampling data as well as actual roof & floor
aktual dari hasil pengukuran survey, serta      data from survey measurement results, as
melakukan rekonsiliasi model geologi            well as reconciling geological models to
terhadap data survey aktual.                    actual survey data.

Selain kegiatan eksplorasi di dalam konsesi     Apart from exploration activities within the
IUP ABN, tim eksplorasi juga melakukan          ABN IUP concession, the exploration team
studi prospeksi dan review terhadap potensi     also carried out prospecting studies and
pengembangan bahan galian di luar IUP           reviews of the potential for developing
ABN. Pada kuartal-3, tim eksplorasi telah       minerals outside the ABN IUP. In the 3rd
menyelesaikan sebanyak 4 desk studi             quarter, the exploration team completed 4 of
Page 16
prospeksi terhadap potensi bahan galian         prospecting studies on the potential for new
baru meliputi batubara dan emas.                minerals including coal and gold.

3. 2. METODE PENGUKURAN                         3. 2. MEASUREMENT METHODS
Channel     sampling   dilakukan     dengan     Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara          actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip,   exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara          taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas       quality as the basis for geology model update
batubara sebagai dasar untuk update model       in line with the progress of the mine. Channel
geologi seiring dengan kemajuan tambang.        sampling in the 3rd Quarter of 2024 was
Chanel sampling pada Kuartal-3 dilakukan        conducted at seam S42 Pit 6.
pada seam S42 Pit 6.



3. 3. BIAYA EKSPLORASI                          3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di        ABN Exploration Costs issued in The 3rd
Kuartal-3 2024 sebagai berikut:                 Quarter of 2024 as follows:

                                    Q3 2024                  Year To Date
         Biaya Operasional   Anggaran     Realisasi    Anggaran       Realisasi
         Operating Expense     Budget     Realization    Budget      Realization
                                (IDR)       (IDR)         (IDR)         (IDR)
       Juli/ July           399.300.000,-      -      399.300.000,-        -
       Agustus/ August      399.300.000,-      -      399.300.000,-        -
       September/ September 399.300.000,-      -      399.300.000,-        -


3. 4. PELAKSANAAN DAN                           3. 4. IMPLEMENTATION AND
      PENGAWASAN                                      SUPERVISION
Kegiatan dilaksanakan & diawasi oleh            Activities are carried out and supervised by
Departemen Mining section Geotech &             the Department of Mining section Geotech &
Exploration Development.                        Exploration Development.

3. 5. KEMAJUAN EKSPLORASI                       3. 5. EXPLORATION PROGRESS
Pada Kuartal-3 2024 tidak ada kegiatan          In The 3rd Quarter of 2024 there are no
pemboran    eksplorasi, namun  berikut          exploration drilling activities, but the following
kegiatan team geologi selama Kuartal-3          are the activities of the geological team during
2024:                                           the 3rd Quarter of 2024:

1. Melakukan monitoring di area Pit Aktif,      1. Monitoring the Active Pit area, both slope
   baik monitoring kestabilan lereng maupun        stability monitoring and coal monitoring to
   monitoring batubara untuk memantau              monitor the suitability between geological
   kesesuaian antara Model Geologi &               models and actual in the field.
   aktual di lapangan.
Page 17
2. Update Model Geologi berdasarkan data         2. Geological Model Update based on coal
   roof/floor batubara dari data survey actual      roof/floor data from actual survey data and
   dan dari data pemboran.                          drilling data.
3. Analisa kestabilan lereng di area Low         3. Analysis of slope stability in low wall pit
   Wall Pit Aktif & area disposal.                  area active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan    4. Pit and disposal slope stability monitoring
   disposal dengan titik pantau prisma dan          using monitoring point prism and EWS
   ekstensometer EWS.                               ekstensometer.
5. Menindaklanjuti beberapa IUP yang             5. Follow up on several potential IUP for
   potensial untuk dilakukan eksplorasi             detailed exploration.
   detail.


3. 6. RENCANA KEGIATAN                           3. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                           EXPLORATION ACTIVITIES

Rencana ABN pada periode Kuartal-4 2024          In the 4th quarter of 2024, ABN has plans for
ada rencana pemboran geotek di area Pit 6.       geotech drilling at Pit 6. However, exploration
Selain itu kegiatan eksplorasi dan geologi       activities are focused on the following
difokuskan pada kegiatan berikut:                activities:

1. Pengambilan sample untuk update               1. Sampling for coal quality updates &
   kualitas batubara & model geologi di area        geological models in the Active Pit area.
   Pit Aktif.
2. Monitoring di area Pit Aktif untuk            2. Monitoring in the Active Pit area to monitor
   memantau kesesuaian antara Model                 the suitability between actual and
   Geologi dan aktual di lapangan.                  Geological Models in the field.
3. Melakukan update Model Geologi                3. Update geological model based on
   berdasarkan data channel sampling, data          sampling channel, actual survey data, and
   survey actual, dan data pemboran.                drilling data.
4. Rekonsiliasi antara Model Geologi             4. Reconciliation between Geological Model
   terhadap data survey aktual.                     to actual survey data.
5. Monitoring geotek di area Pit & Disposal.     5. Geotech monitoring in Pit & Disposal
                                                    Area.
6. Analisa kestabilan lereng pit dan disposal.   6. Slope stability analysis for Pit and
                                                    Disposal.
7. Pemasangan monitoring point          untuk    7. Monitoring point installation for slope
   pemantauan pergerakan lereng.                    movement monitoring program.

File

File Open PDF
Source IDX
Size0.52 MB
Published10 Oct 2024
Pages17
Characters44,156
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 13 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×26
unresolved org PT Trisensa Mineral Utama p.2 ×5
unresolved org PT Indomining p.2 ×4
unresolved org PT Adimitra Baratama Nusantara p.2 ×4
unresolved org Menteri Investasi p.5
unresolved org Koordinasi p.5
unresolved org PT Multindo Prima p.5
unresolved org PT RPP p.6
unresolved org PT RPP Contractors Indonesia Contractors Indonesia p.6
unresolved org PT. ABN p.7
unresolved org PT. RPP Contractors Indonesia p.7
unresolved org Departemen Engineering Section Geologist. p.13
unresolved org Departemen Mining p.16

Extraction attempts how the parser did, and what it refused