Laporan Kuartalan Aktivitas Eksplorasi Quarterly Report of the Exploration Activities PT TBS Energi Utama Tbk Kuartal-III/ the 3rd Quarter of 2024
Page 2
KATA PENGANTAR INTRODUCTION
PT TBS Energi Utama Tbk (“Perseroan”) PT TBS Energi Utama Tbk ("the
adalah perusahaan pertambangan Company") is a coal mining company
batubara yang melakukan kegiatan conducting mining activities in
penambangan di daerah Sangasanga, Sangasanga area, Kutai Kartanegara
Kabupaten Kutai Kartanegara, Propinsi Regency, East Kalimantan, which the
Kalimantan Timur, dimana area konsesi concession area of the three subsidiaries
ketiga anak perusahaan terletak is located side by side. All the supporting
berdampingan. Seluruh infrastruktur infrastructure of mining operations such
pendukung operasional penambangan as coal hauling roads, offices, workshop,
seperti jalan angkut batubara, coal-only jetty and other infrastructures
perkantoran, perbengkelan, pelabuhan are located in Kutai Kartanegara
khusus batubara dan infrastruktur lainnya Regency, East Kalimantan.
berada di daerah Kabupaten Kutai
Kartanegara, Propinsi Kalimantan Timur.
Perseroan mempunyai 3 (tiga) anak The Company has 3 (three) subsidiaries
perusahaan yang bergerak di bidang engaged in coal mining sector, located in
pertambangan batubara, terletak di Sangasanga area, Kutai Kartanegara
daerah Sangasanga, Kabupaten Kutai Regency, East Kalimantan. The
Kartanegara, Provinsi Kalimantan Timur. company's subsidiaries are:
Adapun ketiga anak perusahaan
Perseroan tersebut adalah: 1. PT Trisensa Mineral Utama (TMU)
1. PT Trisensa Mineral Utama (TMU) 2. PT Indomining (IM)
2. PT Indomining (IM) 3. PT Adimitra Baratama Nusantara
3. PT Adimitra Baratama Nusantara (ABN)
(ABN)
Dalam rangka memenuhi Ketentuan In order to comply with the Provisions
III.1.6, Peraturan Nomor I-E tentang III.1.6, Regulation Number I-E concerning
Kewajiban Penyampaian Informasi, Information Delivery Obligations,
Lampiran Keputusan Direksi PT Bursa Attachment to the Decree of the Board of
Efek Jakarta Number Kep-00066/BEI/09- Directors of PT Bursa Efek Jakarta
2022 tanggal 30 September 2022, maka Nomor Kep-00066/BEI/09-2022 dated
bersama ini kami sampaikan Laporan September 30, 2022, we here jointly
Kegiatan Eksplorasi Perseroan untuk submit the Company's Exploration
Kuartal-3 2024. Activity Report for the 3rd Quarter of 2024.
www.tbsenergi.com
Page 3
BAB I CHAPTER I
PENDAHULUAN INTRODUCTION
I. Latar Belakang I. Background
Batubara merupakan bahan galian yang Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh material, so it is in demand by foreign
investor asing maupun investor dalam negeri. investors as well as domestic investors. Coal
Usaha pertambangan batubara mempunyai mining business has prospects as a mainstay
prospek sebagai sektor andalan pengganti sector of oil and gas replacement in building
migas dalam membangun perekonomian the economy of East Kalimantan in the future.
Kalimantan Timur di masa mendatang. Hal ini It is based on available coal resources and
didasarkan pada sumber daya dan potensi potentials, marketing prospects as well as
batubara yang tersedia, prospek pemasaran local government policy support.
serta dukungan kebijakan pemerintah
daerah.
Pengusahaan pertambangan karena sifat Strive of the Mining business because of the
kegiatannya pada dasarnya selalu nature of its activities basically always cause
menimbulkan perubahan pada alam changes in the nature of its environment.
lingkungannya. Di balik perubahan pada Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan environment, it is also a fact that mining
pula bahwa usaha pertambangan telah businesses have succeeded in improving
berhasil meningkatkan kesejahteraan human welfare by providing raw materials for
manusia dengan menyediakan bahan baku industry, energy, and others.
untuk industri, energi, dan lain-lain.
Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk
Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”) TMU merupakan perusahaan tambang TMU is a coal mining company with an batubara dengan daerah penambangan administrative mining area including the sub- secara administratif termasuk wilayah districts of Loa Janan, Sangasanga, Muara Kecamatan Loa Janan, Sangasanga, Muara Jawa, Kutai Kartanegara Regency, East Jawa, Kabupaten Kutai Kartanegara Propinsi Kalimantan Province with an area of 3,414 ha Kalimantan Timur dengan Luas wilayah and the 2010 KTN area code 3133 OP. TMU 3.414 ha dan kode Wilayah KTN 2010 3133 has received approval to carry out mining OP. TMU telah mendapat persetujuan untuk activities and sell excavated products with melakukan aktivitas penambangan dan the Decree of the Minister of penjualan hasil galian dengan Keputusan Investment/Head of the Investment Menteri Investasi/ Kepala Badan Koordinasi Coordinating Board Number: Penanaman Modal Nomor : 1098/1/IUP/PMDN/2022 concerning 1098/1/IUP/PMDN/2022 Tentang approval for granting extensions of mining persetujuan Pemberian Perpanjangan Ijin business permits at the production operation Usaha Pertambangan Pada Tahap Kegiatan activity stage for coal commodities to PT Operasi Produksi untuk Komoditas Batubara Trisensa Mineral Utama (area code kepada PT Trisensa Mineral Utama (kode 3364023032014055) on September 21, wilayah 3364023032014055) pada tanggal 2022. 21 September 2022. Pada Kuartal-3 2024, pelaksanaan pekerjaan In The 3rd Quarter of 2024, the yang dilakukan oleh TMU telah menyerap implementation of work carried out by TMU tenaga kerja sebanyak 90 orang sedangkan has absorbed a workforce of 90 people while untuk kontraktor dan sub-kontraktornya 436 for contractors and sub-contractors 436 orang dan dibagi menjadi 2 shift kerja. people and divided into 2 shifts of work. The Kontraktor tambang yang digunakan adalah mining contractor used PT Multindo Prima PT Multindo Prima Teknik (MPT). Teknik (MPT). Mining is done by surface Penambangan yang dilakukan dengan open pit mining system with truck and shovel sistem tambang terbuka (surface open pit method. mining) dengan metode truck dan shovel. Produk batubara yang dihasilkan TMU Coal products produced by TMU have an memiliki kalori rata-rata 4900 GAR dengan average calorie of 4900 GAR with Total Total Sulphur (TS) di bawah 1%. Kualitas Sulphur (TS) below 1%. The quality of this batubara ini cukup memenuhi permintaan coal is enough to meet the demand of the pasar yang menginginkan batubara dengan market who want low sulphur coal. sulphur rendah. Pelaksanaan pengelolaan Implementation of Occupational Safety and Keselamatan dan Kesehatan Kerja yang Health management implemented in TMU diterapkan di TMU mengacu kepada refers to the program / plan of Occupational program/rencana Pengelolaan Keselamatan Safety and Health Management in dan Kesehatan Kerja sesuai dengan accordance with applicable laws and perundang-undangan yang berlaku. regulations.
Page 6
Kegiatan pengelolaan dan pemantauan Environmental management and monitoring lingkungan yang dilakukan TMU meliputi activities carried out by TMU include kegiatan penghijauan yang dilakukan di greening activities carried out at the Road Tanggul Jalan, Tanggul Stockpile, Tanggul Embankment, Embankment Stockpile, Front Depan Timbangan, Settling Pond, Waste Embankment Scales, Settling Pond, Waste Dump dan Bench Office Baru. Pada saat ini, Dump and New Bench Office. Currently, TMU juga melakukan pengelolaan dan TMU also manages and monitors water pemantauan kualitas air, debu, kebisingan, quality, dust, noise, B3 waste and domestic limbah B3 dan limbah domestik, serta waste, as well as monitoring erosion rates. pemantauan tingkat erosi. I. 2. PT INDOMINING (“IM”) Berdasarkan Izin Usaha Produksi Nomor: Based on Production Business License 540/004/IUP-OP/MB-PBAT/III/2013 tanggal Nomor: 540/004/IUP-OP/MB-PBAT/III/2013 15 Maret 2013, IM melakukan kegiatan dated March 15, 2013, IM conducted coal eksplorasi dan penambangan batubara serta exploration and mining activities and its hasil produksinya di daerah Kecamatan production in Sangasanga District, Kutai Sangasanga, Kabupaten Kutai Kartanegara, Kartanegara Regency, East Kalimantan Propinsi Kalimantan Timur. Tahap produksi Province. Im's production phase began in IM dimulai pada bulan Agustus 2007, August 2007, while commercial production sedangkan produksi komersial dimulai pada began in October 2007. bulan Oktober 2007. Kegiatan penambangan IM dilakukan IM mining activities are carried out by mining kontraktor penambangan yaitu PT RPP contractor PT RPP Contractors Indonesia Contractors Indonesia (RCI). Kegiatan (RCI). Mining activities are surface open pit penambangan merupakan penambangan mining with truck and shovel methods. terbuka (surface open pit mining) dengan metode truck dan shovel. Pada Kuartal-3 2024, sumber daya manusia As of 3rd Quarter 2024, human resources yang bekerja dalam kegiatan operasional IM working in IM's operational activities reached mencapai 338 tenaga kerja termasuk 338 workers including contractors and sub- kontraktor dan sub-kontraktor. Dari 338 contractors. Of those 338 people, about 80% orang tersebut sekitar 80% merupakan are local workers to support community tenaga kerja lokal sebagai penunjang development programs with the aim of program community development dengan improving the welfare of the communities tujuan untuk meningkatkan kesejahteraan around the mine. masyarakat di sekitar tambang. Produk batubara IM memiliki kualitas antara IM coal products have quality between 4200 4200 - 5600 GAR dengan total sulphur antara - 5600 GAR with total sulphur between 0.2% 0.2% - 2.0%. Produk cukup bersaing di dalam - 2.0%. The product is quite competitive in the pasar internasional maupun domestik international and domestic markets.
Page 7
I. I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)
ABN didirikan pada tahun 2004, dan ABN was established in 2004, and manages
mengelola daerah pertambangan dengan a mining area of about 2,990 ha located in
luas area sekitar 2.990 Ha yang berlokasi di Kampung Jawa Village, Sangasanga District
Desa Kampung Jawa, Kecamatan and Muara Kembang Village, Muara Jawa
Sangasanga dan Desa Muara Kembang, District, Kutai Kartanegara Regency, East
Kecamatan Muara Jawa, Kabupaten Kutai Kalimantan. Based on Mining Business
Kartanegara, Kalimantan Timur. License Production Operation Number:
Berdasarkan pada Izin Usaha Pertambangan 540/1691/IUP-OP/MB-{BAT/XII/2009 dated
Operasi Produksi Nomor: 540/1691/IUP- December 1, 2009, ABN conducts
OP/MB-{BAT/XII/2009 tanggal 1 Desember exploration, coal mining, and marketing of
2009, ABN melakukan kegiatan eksplorasi, production at its mine site.
penambangan batubara, dan pemasaran
hasil produksi di lokasi tambangnya tersebut.
ABN mulai melakukan kegiatan eksplorasi ABN began its exploration and infrastructure
dan pembangunan infrastruktur pada tahun development activities in 2007, while
2007, sedangkan produksi komersial dimulai commercial production began in 2008. ABN
pada tahun 2008. Produk batubara ABN coal products belong to thermalcoal group
termasuk dalam kelompok thermalcoal with sub-bituminous and bituminous rank,
dengan rank sub-bituminous dan bituminous, with 2 types of ABN 42 (CV 4200 GAR & TS < 1)
dengan 2 jenis tipe yaitu ABN 42 ( CV 4200 gar and ABN 50 (CV 5000 gar & TS<1)). Thermal
& TS < 1) dan ABN 50 ( CV 5000 gar & TS < 1). coal is marketed to several countries in the world,
Thermal coal dipasarkan ke beberapa negara di including India, China, Japan, Italy, Thailand, and
dunia, diantaranya India, Cina, Jepang, Italia, Korea. ABN also supplies for domestic needs,
Thailand, dan Korea. ABN juga mensuplai untuk namely cement industry and several other
kebutuhan dalam negeri, yaitu industri semen industries.
dan beberapa industri lainnya.
Sistem penambangan yang dilakukan ABN ABN's mining system is surface open pit
yaitu sistem penambangan terbuka (surface mining. Coal ABN has a low ash content, so
open pit mining). Batubara ABN memiliki it is not done by washing process, only done
kandungan abu yang rendah, sehingga tidak by crushing process. Mining activities of PT.
dilakukan pencucian (washing), hanya ABN is carried out by one main contractor, PT
dilakukan proses peremukan (crushing). RPP Contractors Indonesia (RCI).
Kegiatan penambangan PT. ABN dilakukan
oleh satu kontraktor utama, yaitu PT. RPP
Contractors Indonesia (RCI).
Pada Kuartal-3 2024, sumber daya manusia In The 3rd Quarter of 2024, human resources
yang terlibat dalam kegiatan operasional involved in ABN's operational activities
ABN mencapai sekitar 441 orang, yang terdiri reached about 441 people, consisting of 203
dari 203 orang tenaga kerja pada ABN dan workers in ABN and 238 workers in
238 orang tenaga kerja pada kontraktor contractors and sub-contractors.
maupun sub-kontraktor.
Page 8
Sebagai salah satu wujud pemberdayaan As the form of empowerment of the masyarakat sekitar, ABN bersama-sama surrounding community, ABN along with dengan kontraktor dan sub-kontraktor saat ini contractors and sub-contractors currently telah menampung tenaga kerja lokal have accommodated local workers in Kecamatan Sangasanga & Kecamatan Sangasanga District & Muara Jawa District, Muara Jawa, Kabupaten Kutai Kartanegara Kutai Kartanegara Regency approximately kurang lebih 70% dari kebutuhan tenaga about 70% of the labor needs, while the kerja, sedangkan sisanya sekitar 30% remaining about 30% comes from outside the berasal dari luar daerah dua kecamatan area of the two sub-districts. tersebut.
Page 9
BAB II CHAPTER II
KEGIATAN EKSPLORASI EXPLORATION ACTIVITY
II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)
1. 1. DAERAH EKSPLORASI 1. 1. EXPLORATION AREA
Pada Kuartal-3 2024 kegiatan eksplorasi In the 3rd Quarter of 2024, exploration
berupa kegiatan sampling di Pit Aktif yaitu pit activities will be in the form of sampling
B1WA, B2A, dan pit 5B36. activities in Active Pits, namely pit B1WA,
B2A, and pit 5B36.
Kegiatan sampling batubara di pit aktif guna Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai determine the quality value, especially the
total sulphur (TS) dan nilai total kalori. total sulphur (TS) value and total calorie
kegiatan sampling batubara. Seam target value. coal sampling activities. The target
adalah seam T, RU, RL, S di pit B1WA., seam is the T, RU, RL, S seam seam in pit
sampling di pit B2A dengan seam target B1WA. sampling in pit B2A with seam target
seam J, H, G20, G. Pit 5B36 pada seam 28, seam J, H, G20, G. Pit 5B36 with seam 28,
29. 29
1. 2. METODE PENGUKURAN 1. 2. MEASUREMENT METHODS
Trenching Trenching
Secara teknis di lapangan tim geologist Technically in the field, the geologist team
melakukan trenching dengan membuat conducted trenching by making an elongated
paritan memanjang memotong strike seam – trench cutting the strike seam – seam target
seam target sebatas titik plan yang dibuat to the point plan made earlier. This serves to
sebelumnya. Hal ini berfungsi untuk cover the entire region so that all seams can
mengcover seluruh wilayah agar semua be found. The average length of trenching in
seam dapat di temukan. Rata – rata panjang a day can reach 80 m -100 m depending on
paritan trenching dalam sehari bisa mencapai the terrain / area of work whether in a ramp,
80 m - 100 m tergantung dari medan/areal swamp or hilly with a steep slope.
kerjanya apakah di tempat landai, rawa atau
berbukit dengan kemiringan terjal.
Pengambilan sampel untuk di mengetahui Sampling to find out the values of quality is
nilai–nilai kualitasnya di lakukan per jarak done per distance of 100 m between
100 m antar lubang trenching. trenching holes.
Page 10
Sampling Sampling
Tim geologi juga melakukan sampling seam Geologies team also sampling seam - seam
–seam di pit guna mengetahui kualitas ter in the pit to find out the updated quality of the
update dari seam – seam yang akan seam - seam that will be mine.
ditambang.
Metode yang digunakan adalah: The methods used are:
1. Jarak antar titik sampling maksimal 20 m 1. The distance between sampling points
per seam searah strike bukaan batubara maximum 20 m per seam direct strike coal
yang akan di ambil (getting). openings to be taken (getting).
2. Sampling ulang/update pada tiap bukaan 2. Re-sampling/update on each new layer
layer baru pada suatu seam (maksimal 1 opening on a seam (maximum 1 layer
bukaan layer setinggi 3 m). opening as high as 3 m).
3. Sampling pada seam – seam bukaan 3. Sampling on seam – seam new openings
baru/seam yang pertama kalinya akan di / seam the first time will be in getting. The
getting. Adapun plan penambangan mining plan until the end of the year is
sampai dengan akhir tahun di targetkan targeted at seam with calorie value (ar)_g
pada seam dengan nilai Calori (ar)_g di above 4700.
atas 4700.
1. 3. BIAYA EKSPLORASI 1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di TMU Exploration Costs incurred in the 3rd
Kuartal-3 2024 sebagai berikut: Quarter of 2024 as follows:
Q3 2024 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Biaya Eksplorasi
105,000,000 35,000,000 360,000,000 224,000,000
Exploration Costs
Catatan: Note:
Jumlah sampling di Kuartal-3 2024 berjumlah 14 The number of samplings in the 3rd Quarter 2024
sampel. amounted to 14 samples.
Biaya Eksplorasi untuk tahun 2024 yang Exploration Cost for 2024 in accordance with
sesuai dengan RKAB 2024 bagian geologi RKAB 2024 geological section in the form of
berupa biaya analisa kualitas batubara di coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan. maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang trenching activities that use PC 200 units is
mengunakan unit PC 200 biayanya accommodate to production department for
dimaksukan ke departement produksi untuk general work with a record of trenching
pekerjaan general dengan catatan kegiatan activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.
Page 11
1. 4. PELAKSANAAN DAN 1. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Pengawasan Test Pit/Trenching dan Supervision of Test Pit/ Trenching sampling
sampling batubara di pit TMU dilakukan oleh of coal in the TMU pit conducted by
Geologist TMU. TMU’geologist.
1. 5. KEMAJUAN EKSPLORASI 1. 5. EXPLORATION PROGRESS
Kesimpulan Eksplorasi TMU Kuartal-3 Conclusion of TMU Exploration in the 3rd
2024 Quarter of 2024
Selain kegiatan trenching kami dari tim In addition to our trenching activities from the
geologi juga melakukan sampling seam – geology team also sampling seam-seam in
seam di pit guna mengetahui kualitas ter the pit to find out the update quality from
update dari seam – seam yang akan di seam - seam to be getting. The methods used
getting. Metode yang digunakan adalah: are:
1. Jarak antar titik sampling maksimal 50 m 1. Distance between sampling points
per seam searah strike bukaan batubara maximum 50 m per unidirectional strike
yang akan di ambil (getting). coal openings to be taken (getting)
2. Sampling ulang/update pada tiap bukaan 2. Sampling/update on each new layer
layer baru pada suatu seam (maksimal 1 opening on one seam (maximum 1-layer
bukaan layer setinggi 3 m). aperture as high as 3 m).
3. Sampling pada seam – seam bukaan 3. Sampling on seam - seam new openings
baru/seam yang pertama kalinya akan di / seam the first time will be in the getting.
getting. Adapun plan penambangan The mining plan until the end of the year
sampai dengan akhir tahun ditargetkan is targeted at seam with calorie (ARB)
pada seam dengan nilai Calori (ARB) GAR value above 4800.
GAR di atas 4800.
4. Selama Kuartal-3 2024 kegiatan berupa 4. During Q3 2024, activities in the form of
sampling pit aktif yaitu di pit B2A dengan active pit sampling are in pit B2A with
seam target adalah seam H, G20, G. Pit target seam are H, G20, G Pit 5B36 seam
5B36 seam 28, 29. Pit B1WA dengan 28, 29. Pit B1WA with target seam WA,
seam target WA, WB, T, RU, RL, S. WB, T, RU, RL, S.
5. Rata – rata hasil analisa kualitas dari 5. The average quality analysis results of
seam –seam tersebut di atas TM 31.54 the seam -seam above TM 31.54%, ASH
%, ASH 3.51 %, TS 0.80 % dan nilai CAL 3.51%, TS 0.80 % and CAL (ar) values
(ar) 4.900. 4.900.
1. 6. RENCANA KEGIATAN 1. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-4 The Geological Division Plan for 4th Quarter
2024: 2024:
Page 12
1. Melakukan pembaharuan / updating 1. Updating the Geological model based on model Geologi berdasarkan data updating monthly roof/floor updating data from pit roof/floor bulanan dari data survey Pit survey data and cs holes data from coal serta cs_holes dari data channel sampling sampling channel data. The results of this batubara. Hasil dari pembaharuan model model update are then sent to the mine ini kemudian di kirim ke bagian mine plan plan engineering section as a basis for engineering sebagai dasar ajuan untuk submissions for making pit designs for pembuatan design pit untuk bulan depan. next month. 2. Trenching di luar Rencana PIT yang di Plan 2. Trenching outside the PIT Plan that is kan oleh tim Engineering di tiadakan dan planned by the Engineering team is not in sebagai penggantinya adalah trenching di place and in lieu of trenching is done in the lakukan di plan pit yang data trenchingnya plan pit whose trenching data is lacking or kurang atau tingkat confidence confidence level of continuity, seam kemenerusan, ketebalan seam di pit thickness in the pit is still lacking. tersebut masih kurang. 3. Memonitoring adanya anomali pada suatu 3. Monitoring the presence of anomalies in bukaan PIT yang aktif. an active PIT aperture 4. Tim geologist akan melakukan sampling 4. The geological team will be sampling the pada bukaan seam seam yang berada di seam seam openings located in the active pit aktif terutama mengontrol perubahan pit, especially controlling changes in the nilai Total Sulfur dan nilai Kalori di seam value of Total Sulphur and value of –seam ber kalori tinggi baik kearah down Calory in seam -seam with high calories dip maupun kearah strike nya. both down dip towards the strike. 5. Memonitoring kualitas dari seam –seam 5. Monitoring the quality of seam -seam that yang tertambang di bulan Oktober – is mined in October until December 2024, Desember 2024 terutama dalam hal especially in terms of changes in TS value perubahan nilai TS seiring penurunan in line with the decrease in elevation of elevasi dari masing –masing seam yang each seam that is mined. tertambang. 6. Update data kualitas berdasarkan 6. Quality data update based on mining kemajuan penambangan pada seam– progress on seam–seam target in seam target di bulan sebelumnya. previous month. 7. Rencana kegiatan pengeboran eksplorasi 7. The plan for exploration drilling activities di tahun 2024 sebanyak 78 titik bor atau in 2024 is 78 drill points or as many as sebanyak 9.360 m di wilayah barat pit 9,360 m in the western area of the B3KL B3KL dengan seam Target seam R, S, T, pit with seam Target seam R, S, T, U, WA, U, WA, WB, X, Y. WB, X, Y. 8. Rencana kegiatan pengeboran geoteknik 8. The plan for geotechnical drilling activities di tahun 2024 sebanyak 5 titik pemboran in 2024 is 5 drilling points or as much as atau sebanyak 600 m di wilayah Barat pit 600 m in the Western area of the B3KL pit. B3KL.
Page 13
II. 2. PT INDOMINING (“IM”)
2. 1. DAERAH EKSPLORASI 2. 1. EXPLORATION AREA
Pada Kuartal-3 2024, IM tidak ada kegiatan In the 3rd Quarter of 2024, IM had no drilling
pengeboran. activities.
2. 2. METODE PENGUKURAN 2. 2. MEASUREMENT METHODS
Untuk kegiatan pemboran infill menggunakan For infill drilling activities using touch coring
metode touch coring, sedangkan untuk method, while for geotechnical drilling is done
pemboran geoteknik dilakukan dengan by drilling Full Coring method.
pemboran metode Full Coring.
Pemboran geoteknik dilakukan juga dengan Geotechnical drilling is also carried out using
menggunakan metode Standart Penetration the Standard Penetration Test (SPT) method.
Test (SPT). Prinsip kerja SPT adalah dengan The working principle of SPT is to hit a
memukul sebuah tabung standar ke dalam standard tube into a drill hole 45 cm deep
lubang bor sedalam 45 cm menggunakan using a hammer weighing 63.5 kg that falls
palu dengan berat 63.5 kg yang jatuh bebas freely from a height of 76 cm. What counts is
dari ketinggian 76 cm. Yang dihitung adalah the number of blows to penetrate as deep as
jumlah pukulan untuk melakukan penetrasi 15 cm. The number of blows used is
sedalam 15 cm. Jumlah pukulan yang penetration as deep as the last 30 cm.
digunakan adalah penetrasi sedalam 30 cm
terakhir.
2. 3. BIAYA EKSPLORASI 2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di IM Exploration Costs incurred in the 3rd
Kuartal-3 2024 sebagai berikut: Quarter of 2024 as follows:
Q3 2024 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Juli/ July 83,333,333 - 583,333,331 -
Agustus/ August 83,333,333 - 666,666,664 -
September/ September 83,333,333 - 749,999,997 -
2. 4. PELAKSANAAN DAN 2. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Kegiatan Pemboran diawasi oleh Drilling activities are supervised by the
Departemen Engineering Section Geologist. Department of Engineering geologist section.
2. 5. KEMAJUAN EKSPLORASI 2. 5. EXPLORATION PROGRESS
Pada Kuartal-3 2024 belum ada kegiatan As of the 3rd Quarter of 2024, there are no
pemboran lanjutan. Namun ada beberapa further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan, geological activities that continue to be
diantaranya: carried out, including:
Page 14
1. Melakukan pembaharuan/updating model 1. Updating the Geological model based on
Geologi berdasarkan data updating monthly roof/floor updating data from pit
roof/floor bulanan dari data survey Pit survey data and cs_holes data from coal
serta cs_holes dari data channel sampling sampling channel data, and supervision in
batubara, dan pengawasan dalam the activities of taking roof/floor
kegiatan pengambilan data pengukuran measurement data and cs_holes.
roof/floor serta cs_holes tersebut.
2. Melakukan kegiatan channel sampling 2. Conducting channel sampling activities as
serta pengukuran tebal aktual batubara di well as actual thick measurement of coal
lokasi Pit AB Blok 13-15 & sekitarnya at the pit AB location Block 13-15 &
untuk keperluan pembuatan data channel surrounding areas for the purposes of
sampling untuk support pembaharuan/ making data sampling channels to
updating model Geologi dan variasi support the renewal/updating of
kualitas batubara dari coal inventory yang geological models and variations in the
akan ditambang. quality of coal from coal inventory to be
mined.
3. Melakukan analisis kestabilan lereng di 3. Perform slope stability analysis in the pit
area pit aktif Pit, baik pada sisi low wall, active pit area, both on the low wall side,
high wall maupun sidewall serta disposal high wall and sidewall and disposal IPD
IPD border Selatan, kaitannya untuk South border, related to know the value of
mengetahui nilai safety factor (FoS) untuk safety factor (FoS) to control the
kontrol pembentukan desain Pit Aktif formation of Active Pit design to be stable
supaya stabil dan aman. and safe.
2. 6. RENCANA KEGIATAN 2. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
IM pada periode Kuartal-4 2024 telah IM for 4th Quarter of 2024 have planned to
merencanakan melakukan aktifitas kembali resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu be it infill drilling or Geotechnical drilling in IM
pengeboran infill maupun pengeboran concession area.
Geoteknik di area konsesi IM.
Adapun untuk rencana kegiatan eksplorasi As for the IM exploration activity plan in 2024,
IM tahun 2024, Sehubungan dengan rencana in connection with the mining optimization
pengoptimalan penambangan pada pit utama plan at the Indomining main pit to a depth of
Indomining hingga kedalaman RL-165 meter RL-165 meters according to the Mine Plan
sesuai target Mine Plan untuk pit AB dan target for pit AB and in order to optimize the
dalam rangka mengoptimalkan mineable mineable reserve potential seams, where
reserve seam-seam potensial, dimana several potential seams in pit area still needs
beberapa seam-seam potensial di dalam to be known continuity up to the lower limit
area pit masih perlu diketahui kemenerusan (down dip) of the pit plan and lateral
hingga sampai batas bawah (down dip) dari continuity, the company intends to conduct
rencana pit dan kemenerusan lateral, maka infill drilling activities to increase the accuracy
perusahaan bermaksud mengadakan of drilling data in the pit area to the lower limit
kegiatan pemboran infill untuk menambah of the pit plan where some potential seams
akurasi data pemboran pada area pit hingga from roof & floor data indicated that there was
batas bawah rencana pit dimana beberapa thinning or pinch out laterally and/or down dip
Page 15
seam potensial dari data roof & floor terindikasi ada yang mengalami penipisan atau pinchout secara lateral dan atau down dip. Sedangkan, tujuan dari kegiatan pemboran Meanwhile, the purpose of the infill drilling infill adalah untuk menambah keyakinan activity is to increase the confidence of the batas penyebaran lateral dari seam-seam lateral spreading limit of potential seams that potensial yang mengalami pinchout, has been pinch out, increase confidence in menambah keyakinan kemenerusan serta continuity and determine the thickness of the mengetahui ketebalan lapisan ke arah layer towards the down dip which is indicated downdip yang terindikasi mengalami to be thinning to the planned lower pit limit, penipisan hingga rencana batas bawah pit, and maximize the mineable reserve of serta memaksimalkan mineable reserve potential seams, and validate the update of seam-seam potensial, dan mem-validasi the Geology model from the update of adding update model Geologi dari pembaruan infill drilling data penambahan data pemboran infill. Pemboran infill pada area pit AB Infill drilling in the pit AB area is planned to be direncanakan dilakukan sebanyak 13 titik bor carried out as many 13 boreholes with a total dengan total meter yang diperlukan adalah required meter of 1000 meters. The work is sebanyak 1000 meter. Pekerjaan tersebut planned to be carried out using a minimum of rencananya akan dikerjakan dengan 2 units of Jacro 300 rigs or the like. This infill menggunakan minimal 2-unit rig tipe Jacro drilling project will be carried out using the 300 atau yang sejenis. Proyek pemboran infill vertical touch coring drilling method and ini akan dilakukan dengan menggunakan equipped with geophysical logging up to the metode pemboran touch coring vertikal dan drilling depth target. dilengkapi dengan geophysical logging sampai dengan target kedalaman pemboran. II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”) 3. 1. DAERAH EKSPLORASI 3. 1. EXPLORATION AREA Pada Kuartal-3 2024, ABN melakukan In the 3rd Quarter of 2024, ABN conducted update model geologi berdasarkan data geological model updates based on channel channel sampling serta data roof & floor sampling data as well as actual roof & floor aktual dari hasil pengukuran survey, serta data from survey measurement results, as melakukan rekonsiliasi model geologi well as reconciling geological models to terhadap data survey aktual. actual survey data. Selain kegiatan eksplorasi di dalam konsesi Apart from exploration activities within the IUP ABN, tim eksplorasi juga melakukan ABN IUP concession, the exploration team studi prospeksi dan review terhadap potensi also carried out prospecting studies and pengembangan bahan galian di luar IUP reviews of the potential for developing ABN. Pada kuartal-3, tim eksplorasi telah minerals outside the ABN IUP. In the 3rd menyelesaikan sebanyak 4 desk studi quarter, the exploration team completed 4 of
Page 16
prospeksi terhadap potensi bahan galian prospecting studies on the potential for new
baru meliputi batubara dan emas. minerals including coal and gold.
3. 2. METODE PENGUKURAN 3. 2. MEASUREMENT METHODS
Channel sampling dilakukan dengan Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip, exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas quality as the basis for geology model update
batubara sebagai dasar untuk update model in line with the progress of the mine. Channel
geologi seiring dengan kemajuan tambang. sampling in the 3rd Quarter of 2024 was
Chanel sampling pada Kuartal-3 dilakukan conducted at seam S42 Pit 6.
pada seam S42 Pit 6.
3. 3. BIAYA EKSPLORASI 3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di ABN Exploration Costs issued in The 3rd
Kuartal-3 2024 sebagai berikut: Quarter of 2024 as follows:
Q3 2024 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Juli/ July 399.300.000,- - 399.300.000,- -
Agustus/ August 399.300.000,- - 399.300.000,- -
September/ September 399.300.000,- - 399.300.000,- -
3. 4. PELAKSANAAN DAN 3. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Kegiatan dilaksanakan & diawasi oleh Activities are carried out and supervised by
Departemen Mining section Geotech & the Department of Mining section Geotech &
Exploration Development. Exploration Development.
3. 5. KEMAJUAN EKSPLORASI 3. 5. EXPLORATION PROGRESS
Pada Kuartal-3 2024 tidak ada kegiatan In The 3rd Quarter of 2024 there are no
pemboran eksplorasi, namun berikut exploration drilling activities, but the following
kegiatan team geologi selama Kuartal-3 are the activities of the geological team during
2024: the 3rd Quarter of 2024:
1. Melakukan monitoring di area Pit Aktif, 1. Monitoring the Active Pit area, both slope
baik monitoring kestabilan lereng maupun stability monitoring and coal monitoring to
monitoring batubara untuk memantau monitor the suitability between geological
kesesuaian antara Model Geologi & models and actual in the field.
aktual di lapangan.
Page 17
2. Update Model Geologi berdasarkan data 2. Geological Model Update based on coal
roof/floor batubara dari data survey actual roof/floor data from actual survey data and
dan dari data pemboran. drilling data.
3. Analisa kestabilan lereng di area Low 3. Analysis of slope stability in low wall pit
Wall Pit Aktif & area disposal. area active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan 4. Pit and disposal slope stability monitoring
disposal dengan titik pantau prisma dan using monitoring point prism and EWS
ekstensometer EWS. ekstensometer.
5. Menindaklanjuti beberapa IUP yang 5. Follow up on several potential IUP for
potensial untuk dilakukan eksplorasi detailed exploration.
detail.
3. 6. RENCANA KEGIATAN 3. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
Rencana ABN pada periode Kuartal-4 2024 In the 4th quarter of 2024, ABN has plans for
ada rencana pemboran geotek di area Pit 6. geotech drilling at Pit 6. However, exploration
Selain itu kegiatan eksplorasi dan geologi activities are focused on the following
difokuskan pada kegiatan berikut: activities:
1. Pengambilan sample untuk update 1. Sampling for coal quality updates &
kualitas batubara & model geologi di area geological models in the Active Pit area.
Pit Aktif.
2. Monitoring di area Pit Aktif untuk 2. Monitoring in the Active Pit area to monitor
memantau kesesuaian antara Model the suitability between actual and
Geologi dan aktual di lapangan. Geological Models in the field.
3. Melakukan update Model Geologi 3. Update geological model based on
berdasarkan data channel sampling, data sampling channel, actual survey data, and
survey actual, dan data pemboran. drilling data.
4. Rekonsiliasi antara Model Geologi 4. Reconciliation between Geological Model
terhadap data survey aktual. to actual survey data.
5. Monitoring geotek di area Pit & Disposal. 5. Geotech monitoring in Pit & Disposal
Area.
6. Analisa kestabilan lereng pit dan disposal. 6. Slope stability analysis for Pit and
Disposal.
7. Pemasangan monitoring point untuk 7. Monitoring point installation for slope
pemantauan pergerakan lereng. movement monitoring program.
Names mentioned 13 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Trisensa Mineral Utama
p.2 ×5
unresolved
org
PT Indomining
p.2 ×4
unresolved
org
PT Adimitra Baratama Nusantara
p.2 ×4
unresolved
org
Menteri Investasi
p.5
unresolved
org
Koordinasi
p.5
unresolved
org
PT Multindo Prima
p.5
unresolved
org
PT RPP
p.6
unresolved
org
PT RPP Contractors Indonesia Contractors Indonesia
p.6
unresolved
org
PT. ABN
p.7
unresolved
org
PT. RPP Contractors Indonesia
p.7
unresolved
org
Departemen Engineering Section Geologist.
p.13
unresolved
org
Departemen Mining
p.16
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.