Skip to content
Back to announcement

20241008_CBRE_Laporan Informasi dan Fakta Material_31734000.pdf

Other Text extracted CBRE

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 4

Page 1
Go To English Page

 Nomor Surat                           0007/CS-CBRE/JKT/X/2024

 Nama Perusahaan                       PT Cakra Buana Resources Energi Tbk

 Kode Emiten                           CBRE

 Lampiran                              1
                                       Perolehan atau kehilangan kontrak penting
 Perihal


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            PT Cakra Buana Resources Energi Tbk

 Bidang Usaha                                  Angkutan Laut Dalam Negeri Untuk Barang Umum.



 Telepon                                       (021) 25858070

 Faksimili

 Alamat Surat Elektronik (email)               corporate.secretary@cbre.co.id


 Tanggal Kejadian                              04 Oktober 2024
 Jenis Informasi atau Fakta Material           Perolehan atau kehilangan kontrak penting



 Uraian Informasi atau Fakta Material          Perolehan atau Kehilangan Kontrak Penting




 Dampak kejadian, informasi atau fakta         Dampak Operasional :
 material tersebut terhadap kegiatan           Perseroan berfokus kepada perbaikan kapal sehingga utilisasi
 operasional, hukum, kondisi keuangan,         armada dapat optimal dan dengan adanya pengakhiran
 atau kelangsungan usaha Emiten atau           perjanjian kerjasama Time Charter ini, Perseroan dapat
 Perusahaan Publik                             mencari potential client dan memperoleh
                                               keuntungan yang lebih besar dimasa depan.

                                               Dampak Legal :
                                               Pengakhiran perjanjian dengan PT HabcoTrans Maritima Tbk
                                               menyebabkan tidakadanya lagi hak, kewajiban dan tuntutan
                                               apapun yang melekat bagi para pihak dalam perjanjian dan
                                               Para Pihak telah sepakat untuk itu.

                                               Dampak Keuangan:
                                               Pengakhiran perjanjian dengan Perseroan dengan PT Habco
                                               Trans Maritima Tbk cukup berdampak bagi segi keuangan
                                               Perseroan karena adanya kehilangan pendapatan selama
                                               kapal dalam masa perbaikan. Hal
                                               tersebut dikarenakan Perseroan telah dalam upaya utilisasi
                                               armada dapat optimal sehingga Perseroan dapat menerima
                                               keuntungan yang lebih besar di kemudian hari.

                                               Kelangsungan Usaha :
                                               Kelangsungan usaha tetap berlangsung baik dibuktikan
                                               dengan adanya beberapa penawaran kerjasama charter kapal
                                               dengan nilai charter yang lebih tinggi dan kondisi kapal yang
                                               diperkirakan dalam waktu kurang
                                               dari 1 bulan akan dapat beroperasi optimal.
Page 2
Demikian untuk diketahui.


Hormat Kami,
PT Cakra Buana Resources Energi Tbk




Suminto Husin Giman

Direktur Utama




PT Cakra Buana Resources Energi Tbk
Sona Topas Tower Lt. 5A
Telepon : (021) 25858070, Fax : , www.cbre.co.id



Nama Pengirim                      Suminto Husin Giman

Jabatan                            Direktur Utama
Tanggal dan Waktu                  08-10-2024 21:30

Lampiran                          1. 0007.1.CS. CBRE - KI Kehilangan Kontrak Penting.pdf


   Dokumen ini merupakan dokumen resmi PT Cakra Buana Resources Energi Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Cakra Buana Resources Energi Tbk
                   bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page

 Letter / Announcement No.            0007/CS-CBRE/JKT/X/2024

 Issuer Name                          PT Cakra Buana Resources Energi Tbk

 Issuer Code                          CBRE

 Attachment                           1

 Subject                              Acquisition or Lost of Material Contract


The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company              PT Cakra Buana Resources Energi Tbk

 Business Activities                           Angkutan Laut Dalam Negeri Untuk Barang Umum.


 Telephone                                     (021) 25858070

 Faximile

 Email Address                                 corporate.secretary@cbre.co.id


 Date of Event                                 04 October 2024

                                               Acquisition or Lost of Material Contract
 Type of Material Information or Facts

 Description of Material Information or        Disclosure Of Information or Material Facts
 Facts


 Impact of event, material information or      Operational Impact:
 facts towards Issuers or Public               The Company focuses on vessel repairs so that the vessel
 Company’s operational activities, legal,      utilization can be optimal
 financial condition, or going concern         and with the termination of this Time Charter agreement, the
                                               Company can seek potential clients and obtain greater profits
                                               in the future.

                                               Legal Impact:
                                               Termination of agreement with PT Habco Trans Maritima Tbk
                                               means that there are no longer any rights, obligations and
                                               demands attached to the parties to the agreement and the
                                               Parties have agreed to it.

                                               Financial Impact:
                                               The termination of the agreement with the Company and PT
                                               Habco Trans MaritimaTbk, has quite an impact on the
                                               Company's financial aspect due to the loss of income while the
                                               vessel is under repair. This is because the Company has been
                                               to optimize vessel utilization so that the Company can receive
                                               greater profits in the future.

                                               Business Continuity:
                                               Business continuity, continues to run well,as evidenced by
                                               several offers ofcooperation for the charter of our vessel with
                                               higher charter rate and the condition of the vessel is estimated
                                               to be able to operate optimally in less than 1 month.


Thus to be informed accordingly.


Respectfully,
Page 4
PT Cakra Buana Resources Energi Tbk




Suminto Husin Giman

Direktur Utama




PT Cakra Buana Resources Energi Tbk
Sona Topas Tower Lt. 5A
Phone : (021) 25858070, Fax : , www.cbre.co.id



Sender Name                        Suminto Husin Giman

Function                           Direktur Utama

Date and Time                      08-10-2024 21:30

Attachment                        1. 0007.1.CS. CBRE - KI Kehilangan Kontrak Penting.pdf


  This is an official document of PT Cakra Buana Resources Energi Tbk that does not require a signature as it was
     generated electronically by the electronic reporting system. PT Cakra Buana Resources Energi Tbk is fully
                            responsible for the information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published8 Oct 2024
Pages4
Characters8,136
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org Cakra Buana Resources Energi Tbk · Nama Perusahaan p.1 ×36
linked org Habco Trans Maritima Tbk p.1 ×5
linked person Suminto Husin Giman · Direktur Utama p.2 ×5
unresolved org HabcoTrans Maritima Tbk p.1 ×2
unresolved org PT Habco Trans MaritimaTbk p.3
unresolved person Function · Direktur Utama p.4

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result