Back to announcement
20260608_KDTN_Laporan Informasi dan Fakta Material_32098511.pdf
Other Text extracted KDTNSource file signed link, expires in 15 minutes
Extracted text 4
Page 1
Go To English Page
Nomor Surat 058/PSP-CORSEC/LO/VI/2026
Nama Perusahaan PT Puri Sentul Permai Tbk
Kode Emiten KDTN
Lampiran 1
Surat Keterangan Lunas
Perihal
Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:
Nama Emiten atau Perusahaan Publik PT Puri Sentul Permai Tbk
Bidang Usaha Bergerak dibidang jasa penyedia akomodasi berupa hotel dan
jasa penyediaan makan minum berupa restoran
Telepon (021) 8790 5100
Faksimili (021) 8790 5200
Alamat Surat Elektronik (email) corsec@kedaton8.com
Tanggal Kejadian 05 Juni 2026
Jenis Informasi atau Fakta Material Surat Keterangan Lunas
Uraian Informasi atau Fakta Material 1. Pelunasan Pinjaman Jangka Panjang Investasi Angsuran
(PJPI-A) II dengan dasar pemberian kredit yaitu:
a. Perjanjian Kredit Notariil No 69 (25-03-2024)
b. Perubahan Perjanjian Kredit No. PK/PJPI-A II/Prbh/047/25
(26-03-2025)
dengan pagu kredit sebesar Rp. 11.250.000.000,-
2. Pinjaman Jangka Panjang Investasi Angsuran (PJPI-A) III
dengan dasar pemberian kredit yaitu:
a. Perjanjian Kredit Notariil No. 70 925-03-2024)
b. Perubahan Perjanjian Kredit No. PK/PJPI-A III/Prbh/048/25
(26-03-2025)
dengan pagu kredit sebesar Rp. 3.750.000.000,-
Hal ini juga ditegaskan dengan telah diterimanya Surat
Keterangan Lunas dari Bank Pemberi Kredit yang telah
diterima pada hari Jum'at, 5 Juni 2026 dimana perseroan telah
melunasi pinjaman pada tanggal 5 Juni 2026.
Dampak kejadian, informasi atau fakta Pelunasan ini akan berdampak terhadap berkurangnya kas
material tersebut terhadap kegiatan operasional dimana dilaksanakannya pelunasan Pinjaman
operasional, hukum, kondisi keuangan, Jangka Panjang Investasi Angsuran tersebut, namun tidak
atau kelangsungan usaha Emiten atau memiliki dampak terhadap kelancaran usaha operasional
Perusahaan Publik perseroan.
Disisi lain, kedepannya beban perseroan menjadi lebih ringan
karena sudah tidak adanya Beban Bunga dan Cicilan
Pinjaman Jangka Panjang Investasi Angsuran. Pelunasan
Pinjaman Jangka Panjang Investasi Angsuran ini tidak
memiliki dampak hukum dan juga dampak terhadap
operasional perseroan. Pelunasan Pinjaman Jangka Panjang
Investasi Angsuran ini juga menunjukan sehat-nya keuangan
perseroan dan terjaga kelangsungan usaha emiten.
Page 2
Demikian untuk diketahui.
Hormat Kami,
PT Puri Sentul Permai Tbk
Aan Rohanah
Corporate Secretary
PT Puri Sentul Permai Tbk
Jl. Surya Raya, Kav. Commercial Area 1 Olympic CBD Sentul, Desa Sentul
Telepon : (021) 8790 5100, Fax : (021) 8790 5200, www.purisentulpermai.com
Nama Pengirim Aan Rohanah
Jabatan Corporate Secretary
Tanggal dan Waktu 08-06-2026 15:51
Lampiran 1. Surat Keterangan Lunas PT PSP Tbk 05062026.pdf
Dokumen ini merupakan dokumen resmi PT Puri Sentul Permai Tbk yang tidak memerlukan tanda tangan karena
dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Puri Sentul Permai Tbk bertanggung jawab penuh
atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page
Letter / Announcement No. 058/PSP-CORSEC/LO/VI/2026
Issuer Name PT Puri Sentul Permai Tbk
Issuer Code KDTN
Attachment 1
Subject Certificate of Full Payment
The company hereby announce the Material Information or Facts Report as follows
Name of Issuer or Public Company PT Puri Sentul Permai Tbk
Business Activities Bergerak dibidang jasa penyedia akomodasi berupa hotel dan
jasa penyediaan makan minum berupa restoran
Telephone (021) 8790 5100
Faximile (021) 8790 5200
Email Address corsec@kedaton8.com
Date of Event 05 June 2026
Certificate of Full Payment
Type of Material Information or Facts
Description of Material Information or 1. Repayment of the Long-Term Investment Installment Loan
Facts (PJPI-A) II based on the following credit agreements:
a. Notarized Credit Agreement No. 69 (March 25, 2024)
b. Amendment to Credit Agreement No. PK/PJPI-A
II/Prbh/047/25 (March 26, 2025)
with a credit limit of Rp. 11,250,000,000
2. Long-Term Installment Investment Loan (PJPI-A) III based
on the following credit agreements:
a. Notarized Credit Agreement No. 70 (March 25, 2024)
b. Amendment to Credit Agreement No. PK/PJPI-A
III/Prbh/048/25 (March 26, 2025)
with a credit limit of Rp. 3,750,000,000,-
This is further confirmed by the receipt of a Certificate of Full
Payment from the Lending Bank on Friday, June 5, 2026,
indicating that the Company has fully repaid the loan as of
June 5, 2026.
Impact of event, material information or This repayment will result in a decrease in operating cash due
facts towards Issuers or Public to the repayment of the Long Term Investment Installment
Company’s operational activities, legal, Loan, however, it will not impact the smooth operation of the
financial condition, or going concern Company business.
On the other hand, the Company financial burden will be
reduced in the future due to the absence of interest expenses
and installments on the Long-Term Investment Installment
Loan . The repayment of this Long Term Investment
Installment Loan has no legal implications and does not affect
the Company operations. Furthermore, the repayment of this
Long Term Investment Installment Loan demonstrates the
Company financial health and ensures the issuer business
continuity.
Thus to be informed accordingly.
Page 4
Respectfully,
PT Puri Sentul Permai Tbk
Aan Rohanah
Corporate Secretary
PT Puri Sentul Permai Tbk
Jl. Surya Raya, Kav. Commercial Area 1 Olympic CBD Sentul, Desa Sentul
Phone : (021) 8790 5100, Fax : (021) 8790 5200, www.purisentulpermai.com
Sender Name Aan Rohanah
Function Corporate Secretary
Date and Time 08-06-2026 15:51
Attachment 1. Surat Keterangan Lunas PT PSP Tbk 05062026.pdf
This is an official document of PT Puri Sentul Permai Tbk that does not require a signature as it was generated
electronically by the electronic reporting system. PT Puri Sentul Permai Tbk is fully responsible for the information
contained within this document.
Names mentioned 3 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PSP Tbk
p.2 ×4
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.