Back to announcement
20240828_WSKT_Laporan Informasi dan Fakta Material_31719448.pdf
Other Text extracted WSKTSource file signed link, expires in 15 minutes
Extracted text 4
Page 1
Go To English Page
Nomor Surat 112/WK/SEKPER/2024
Nama Perusahaan PT Waskita Karya (Persero) Tbk
Kode Emiten WSKT
Lampiran 1
Restrukturisasi utang
Perihal
Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:
Nama Emiten atau Perusahaan Publik PT Waskita Karya (Persero) Tbk
Bidang Usaha Jasa Konstruksi, Industri, Realty dan Perdagangan
Telepon 021 8508510
Faksimili 21 8508506
Alamat Surat Elektronik (email) waskita@waskita.co.id
Tanggal Kejadian 26 Agustus 2024
Jenis Informasi atau Fakta Material Restrukturisasi utang
Uraian Informasi atau Fakta Material PT Waskita Karya Realty (WSKR) dengan kepemilikan
sebesar 99,99% (sembilan puluh sembilan koma sembilan
persen) telah menerbitkan Medium Term Notes IV Waskita
Karya Realty Tahun 2022 (MTN IV WSKR) dengan cara
penawaran secara terbatas, berdasarkan Akta Perjanjian
Penerbitan dan Penunjukan Agen Pemantau (PPAP) No. 05
Tanggal 08 Juli 2022 Juncto Akta Addendum II PPAP MTN IV
WSKR No. 08 tanggal 16 Agustus 2023 yang seluruhnya
dibuat dihadapan Vita Cahyojati, S.H., M.Hum Notaris di
Jakarta Selatan. (selanjutnya disebut Perjanjian Penerbitan
MTN).
Bahwa WSKR dan PT Bank Pembangunan Daerah Jawa
Barat dan Banten Tbk (BJB) selaku Agen Pemantau telah
menandatangani Akta Addendum III Perjanjian Penerbitan dan
Penunjukan Agen Pemantau dan Agen Jaminan No. 06
Tanggal 26 Agustus 2024 dibuat dihadapan Vita Cahyojati,
S.H., M.Hum Notaris di Jakarta Selatan, dengan rincian
perubahan sebagai berikut:
a.Perubahan jangka waktu MTN IV WSKR semula 2 tahun 10
Hari Kalender (pada tanggal 28 Agustus
2024) menjadi 3 tahun 10 Hari Kalender (pada tanggal 28
Agustus 2025).
b. Pemberian jaminan berupa jaminan fidusia atas piutang
WSKR kepada PT Asiana Senopati senilai
pokok MTN IV WSKR
Page 2
Dampak kejadian, informasi atau fakta Dengan dilakukannya addendum Perjanjian Penerbitan ini
material tersebut terhadap kegiatan diharapkan akan memberikan dampak yang baik bagi kondisi
operasional, hukum, kondisi keuangan, keuangan WSKR.
atau kelangsungan usaha Emiten atau
Perusahaan Publik
Demikian untuk diketahui.
Hormat Kami,
PT Waskita Karya (Persero) Tbk
Ermy Puspa Yunita
SVP Corporate Secretary
PT Waskita Karya (Persero) Tbk
Jln. MT Haryono Kav. 10 Cawang, Jakarta
Telepon : 021 8508510, Fax : 21 8508506, www.waskita.co.id
Nama Pengirim Ermy Puspa Yunita
Jabatan SVP Corporate Secretary
Tanggal dan Waktu 28-08-2024 22:20
Lampiran 1. 112_WK_SEKPER_2024 KI Restru WKR.pdf
Dokumen ini merupakan dokumen resmi PT Waskita Karya (Persero) Tbk yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Waskita Karya (Persero) Tbk bertanggung
jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page
Letter / Announcement No. 112/WK/SEKPER/2024
Issuer Name PT Waskita Karya (Persero) Tbk
Issuer Code WSKT
Attachment 1
Subject Debt restructuring
The company hereby announce the Material Information or Facts Report as follows
Name of Issuer or Public Company PT Waskita Karya (Persero) Tbk
Business Activities Jasa Konstruksi, Industri, Realty dan Perdagangan
Telephone 021 8508510
Faximile 21 8508506
Email Address waskita@waskita.co.id
Date of Event 26 August 2024
Debt restructuring
Type of Material Information or Facts
Description of Material Information or PT Waskita Karya Realty (WSKR), with 99.99% ownership,
Facts has issued Medium Term Notes IV Waskita Karya Realty Year
2022 (MTN IV WSKR) through a limited offering, based on the
Deed of Issuance Agreement and Appointment of Monitoring
Agent (PPAP) No. 05 dated July 8, 2022, in conjunction with
the Deed of Addendum II to PPAP MTN IV WSKR No. 08
dated August 16, 2023, all of which were executed before Vita
Cahyojati, S.H., M.Hum, a Notary in South Jakarta.
(hereinafter referred to as the MTN Issuance Agreement).
WSKR and PT Bank Pembangunan Daerah Jawa Barat dan
Banten Tbk (BJB), as the Monitoring Agent, have signed the
Deed of Addendum III to the Issuance Agreement and
Appointment of Monitoring Agent and Security Agent No. 06
dated August 26, 2024, executed before Vita Cahyojati, S.H.,
M.Hum, a Notary in South Jakarta, with the following
amendments:
a. The term of MTN IV WSKR has been changed from 2 years
and 10 calendar days (on August 28, 2024) to 3 years and 10
calendar days (due on August 28, 2025).
b. The provision of a security interest in the form of fiduciary
collateral over WSKR's receivables to PT Asiana Senopati for
the principal amount of MTN IV WSKR.
Impact of event, material information or With the execution of this addendum to the Issuance
facts towards Issuers or Public Agreement, it is expected to have a positive impact on
Company’s operational activities, legal, WSKR's financial condition
financial condition, or going concern
Thus to be informed accordingly.
Respectfully,
Page 4
PT Waskita Karya (Persero) Tbk
Ermy Puspa Yunita
SVP Corporate Secretary
PT Waskita Karya (Persero) Tbk
Jln. MT Haryono Kav. 10 Cawang, Jakarta
Phone : 021 8508510, Fax : 21 8508506, www.waskita.co.id
Sender Name Ermy Puspa Yunita
Function SVP Corporate Secretary
Date and Time 28-08-2024 22:20
Attachment 1. 112_WK_SEKPER_2024 KI Restru WKR.pdf
This is an official document of PT Waskita Karya (Persero) Tbk that does not require a signature as it was
generated electronically by the electronic reporting system. PT Waskita Karya (Persero) Tbk is fully responsible for
the information contained within this document.
Names mentioned 8 people and organisations named in the text · linked when the evidence is strong
unresolved
person
Vita Cahyojati
· Notaris
p.1 ×7
unresolved
org
PT Bank Pembangunan Daerah Jawa Barat
p.1 ×2
unresolved
org
Banten Tbk
p.1 ×2
unresolved
org
PT Asiana Senopati
p.1 ×2
unresolved
person
Ermy Puspa Yunita
· SVP Corporate Secretary
p.2 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.