Skip to content
Back to announcement

20240822_ELSA_Public Expose_31707968_lamp2.pdf

Other Text extracted ELSA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 16

Page 1
 PUBLIC EXPOSE
PT Elnusa Tbk (IDX:ELSA)
    27th August 2024


                     VISI ELNUSA
             PERUSAHAAN JASA ENERGI TERKEMUKA
               YANG MEMBERIKAN SOLUSI TOTAL
Page 2
OUTLINE

  Company Profile


   1H24 Performance


   Company Strategy & Outlook
Page 3
COMPANY PROFILE
Page 4
               Shareholding Structure

                                                                                       99,99%



             Public           48,90%                                                   51,10%




                                           Upstream           EPC & OM
                                            Services           Services




   Integrated Upstream Oil & Gas          Energy Distribution & Logistic        Oil & Gas Support Services
              Services                               Services              • PT Elnusa Trans Samudera
• PT Elnusa Oilfield Services          • PT Elnusa Petrofin                • PT Elnusa Fabrikasi Konstruksi
• PT Elnusa Geosains Indonesia                                             • PT Sigma Cipta Utama
                                                                           • PT Patra Nusa Data
Page 5
Elnusa in Subholding Upstream Pertamina

                                                                 PT Pertamina
                                                                   (Persero)


       Upstream         Refining &
                                           Commercial &                                          Power & NRE    Integrated Marine    AP Service &
                      Petrochemical                                Gas Subholding
      Subholding                        Trading Subholding                                        Subholding   Logistic Subholding    Portfolio
                       Subholding



                   Pembagian Regional Subholding Upstream


      Regional 1

      Regional 2

      Regional 3

      Regional 4

      Regional 5

        PDSI

      ELNUSA

      BADAK NGL




                                                             *) AP Services: 1. PDSI 2. ELNUSA
Page 6
1H24 Performance
Page 7
                Operational Performance


                                         Seismic (vol)                 DWO (well)                 WLI (projects)             EPC-OM (projects)
Upstream                             2D : 198 km                           5 DRS                      37 WLS                           3 EPC
Services                           3D : 1.971 kmsq                        54 HWS                      18 PPS                          19 OM
                                                                           11 H2S                     13 WTS                          1 ENG



                              Transportation           Depo BBM, RBB Depo LPG SPBE                           BBMI                      Chemical
                                (million KL)            (million KL)  (million ton)                      (thousand KL)            (thousand drums)
Dist & Log
Services                                10,47                   0,92                    1,28                       54                       99


Glosary
-   DRS : Drilling Rig Services                 -   WLS : Wireline Services             -   EPC : Engineering, Procurement & Construction
-   HWS : Hydraulic Workover Services           -   PPS : Pressure & Pumping Services   -   OM : Operation Maintenance
-   H2S : H2S Services                          -   WTS : Welltesting Services          -   ENG : Engineering
Page 8
              Financial Performance

      Income Statement (IDR Bn)                                       Revenue Contribution
                      +8%
                                     ▪ Upstream segment grew
                                                                    13%                             9%
                                       aggressively, bringing the
Revenue      5,861          6,317                                              32%
                                       composition of the                                                     41%
                                       upstream and downstream        Jun-23                        Jun-24
                                       segments back into                                    50%
                     +15%              balance.                     55%

 EBITDA       668            769     ▪ Revenue growth in the
                                                                            Upstream   Dist & Log   Support
                                       Upstream segment was
 EBITDA                                driven by GRS/Seismic
 Margin
             11,4%          12,2%
                                       performance, as well as
                     +77%              growth in DWO & WLI.          17%
                                                                                                Pertamina Group
Net Profit                   443     ▪ Profitability margin                                     Third Party
              250                                                         Jun-24
                                       improved further from last
             Jun-23         Jun-24
                                       year in line with improved
   NPM        4,3%           7,0%      performance.                           83%
Page 9
                           Financial Performance by Segmen

        Upstream (IDR Bn)                          Dist & Log (IDR Bn)          Support (IDR Bn)        Consolidation (IDR Bn)

                         +37%                                    -2%                    -17%


  Revenue                       2,613                   3,369          3,306      829            692
                                                                                                              Rp6.317
                 1,902


                         +48%                                   +15%                    -36%

                                304                      343            394       111
                                                                                                               Rp769
   EBITDA         205                                                                            71


                         +337%                                   +27%                     -50%
                                                                                                               Rp443
 Net Profit                     232                      147            186       50
                  53                                                                             25

                Jun-23      Jun-24                      Jun-23         Jun-24    Jun-23      Jun-24
       NPM        2,8%          8,9%                      4,4%          5,6%      6,1%           3,6%           7,0%

*) Revenue, EBITDA, Net Profit by Segmen before elimination
Page 10
       Financial Performance

  Balance Sheet (IDR Bn)
                    +13%                               +14%                             +11%


    Asset   9,286      10.504    Liabilities   5,108          5,847    Equity   4,178          4,658


            Jun-23     Jun-24                  Jun-23     Jun-24                Jun-23     Jun-24


  Cash Flow
                                                                         ▪ Increase in assets, liabilities and
                   +139%                                +36%               equity in line with improved
                                                                           operational performance
                                                                         ▪ The increase in cash came from
                           793       Ending                    2,380
Cash from                                       1,756                      improved operating performance and
             332                      Cash
Operation                                                                  the return of Bank Mega deposits.
            Jun-23     Jun-24                   Jun-23        Jun-24
Page 11
Capex Realization                                              Capex Plan 2H24
   IDR Bn                                                      Upstream Services
                                                               • Workover Rigs, Downhole Equipment (CO-Log), Cementing,
               +19%                                              Unit CTU, Lab Cementing, U-Sit & E-Cutter
                                                               Energy Distribution & Logistic Services
                           483        526       36%
                394                                            • Fuel Tank Vehicles & TLPG Kolaka
      339
                                                 188           Support Services
                                                               • General Warehouse SCU
     2021       2022       2023   2024 Target   Jun-24

Upstream Services
• Geophone & Promax GRS, HWU Drilling OFS, Mobile Welltest &
  Wireline Cable
Energy Distribution & Logistic Services
• Fuel Tank Vehicles & Fuel Terminal Labuan Bajo
Support Services
• Dredging Barge ETSA, HW-PUDC SCUPND & Docking AWB ASLO
Page 12
Company Strategy & Outlook
Page 13
            Company Strategy
                                                   Resilience for Growth

                                                                              Enhance People Development For
                                                                              Long Term Advantages


                                                      People
                                                                              Process Optimization To
Corporate                                                                     Increase Competitiveness
Direction                    TARGET                   Process

                              2024                    Busdev                  Encourage Business
                                                                              Development For More
                                                      Finance                 Aggressive Growth

                                                                              Increased Profitability And
                                                                              Financial Stability


                  Strengthen the Core                               Grow in Adjacent to the Core
                  ➢ Exploration Seismic                              ➢ Development in LNG Transportation & Regasification Business

Portfolio         ➢ Strengthen Operation Excellence (Capability &
                    Partnership)
                                                                     ➢ Partnership in EV Ecosystem Business

Strategy          ➢ Optimization Asset Productivity
                  ➢ Increasing SCM efficiency and capabilities
                  ➢ Penetration to SHU Group & others
                  ➢ Synergy within Pertamina Group
Page 14
                Target Project 2H24


                                           Seismic                         DWO                         WLI                          EPC-OM
                                          (volume)                         (well)                   (projects)                     (projects)
Upstream
                                         2D : 193 km                      3 DRS                      37 WLS                           3 EPC
Services                                3D : 532 kmsq                    94 HWS                      18 PPS                          19 OM
                                                                          16 H2S                     13 WTS                          1 ENG


                              Transportation                Depo                    Depo RBB                BBMI                      Chemical
                                (million KL)             (million KL)              (million KL)         (thousand KL)            (thousand drums)
Dist & Log
Services                                11,2                   2,28                    5,1                        92                       183


Glosary
-   DRS : Drilling Rig Services                -   WLS : Wireline Services             -   EPC : Engineering, Procurement & Construction
-   HWS : Hydraulic Workover Services          -   PPS : Pressure & Pumping Services   -   OM : Operation Maintenance
-   H2S : H2S Services                         -   WTS : Welltesting Services          -   ENG : Engineering
Page 15
     Sales & Marketing Performance


Contract Drainage 2024, as of 1H24    Contract Contribution
                 (IDR Bn)

                            11.562
                            1,478                   13%
             9.567
   Support   1,138

                            6,059       52%     Jun-24
  Dist&Log   5,544                                          35%


                            4,025
 Upstream    2,885
                                     Upstream   Dis & Log     Support
             Jun-23         Jun-24
Page 16

          

File

File Open PDF
Source IDX
Size3.44 MB
Published22 Aug 2024
Pages16
Characters13,306
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 11 people and organisations named in the text · linked when the evidence is strong

linked org Bank Mega p.10
possible org Elnusa Tbk p.1 ×2
possible org PT Pertamina (Persero) p.5
unresolved org PT Elnusa Trans Samudera p.4
unresolved org PT Elnusa Oilfield Services p.4
unresolved org PT Elnusa Petrofin p.4
unresolved org PT Elnusa Geosains Indonesia p.4
unresolved org PT Sigma Cipta Utama p.4
unresolved org PT Patra Nusa Data p.4
unresolved org Capability & Partners p.13

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result