Skip to content
Back to announcement

LK-PLN Juni 2024.pdf

Financial statement Text extracted PPLN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 196

Page 1
PERUSAHAAN PERSEROAN (PERSERO)
PT PERUSAHAAN LISTRIK NEGARA
DAN ENTITAS ANAK/AND SUBSIDIARIES

LAPORAN KEUANGAN KONSOLIDASIAN/
CONSOLIDATED FINANCIAL STATEMENTS


30 JUNI 2024 DAN 31 DESEMBER 2023
JUNE 30, 2024 AND DECEMBER 31, 2023
Page 2

          
Page 3
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 1/1 Schedule

LAPORAN POSISI KEUANGAN                                                                        CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL                                                                                      FINANCIAL POSITION
30 JUNI 2024 DAN 31 DESEMBER 2023                                                AS AT JUNE 30, 2024 AND DECEMBER 31, 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

                                                                  30 Juni/          31 Desember/
                                             Catatan/             June 30,          December 31,
                                              Notes                 2024                2023
  ASET                                                                                                                                   ASSETS

  ASET TIDAK LANCAR                                                                                                  NON-CURRENT ASSETS
  Aset tetap                                    6             1,450,198,669           1,448,970,621               Property, plant and equipment
  Aset hak-guna                                 7                30,880,965              30,574,504                          Right-of-use assets
  Properti investasi                            8                 5,927,782               5,939,235                       Investment properties
  Investasi pada entitas asosiasi               9                 9,820,968               9,043,512                   Investments in associates
  Investasi pada ventura bersama                9                19,455,468              17,483,269                Investments in joint ventures
  Aset pajak tangguhan                          47                  385,271                 540,694                          Deferred tax assets
  Piutang pihak berelasi                        10                1,156,592               1,028,387             Receivables from related parties
  Rekening bank
    dibatasi penggunaannya                      11                  3,615,857             4,434,080                    Restricted cash in banks
  Piutang lain-lain                             17                    597,232             1,883,832                           Other receivables
  Pajak dibayar di muka                         19                 12,861,095            12,376,005             Prepaid expenses and advances
  Piutang dari Pemerintah                       16                          -                     -               Receivables from Government
  Biaya dibayar di muka dan uang muka           20                     93,533                41,138             Prepaid expenses and advances
  Aset tidak lancar lain                        12                  8,516,581             6,940,941                    Other non-current assets

  Jumlah Aset Tidak Lancar                                    1,543,510,013           1,539,256,218                   Total Non-current Assets

  ASET LANCAR                                                                                                               CURRENT ASSETS
  Kas dan setara kas                            13                 29,909,011            55,920,541                   Cash and cash equivalents
  Rekening bank
    dibatasi penggunaannya                      11                      9,641                99,019                    Restricted cash in banks
  Investasi jangka pendek                       14                    162,639               913,670                      Short-term investments
  Piutang usaha                                                                                                               Trade receivables
    Pihak berelasi                              15                  2,391,926             2,412,928                            Related parties
    Pihak ketiga                                15                 25,650,319            24,428,027                               Third parties
  Piutang dari pemerintah                       16                 58,684,629            22,446,998               Receivables from Government
  Piutang lain-lain                             17                  4,128,808             2,306,621                           Other receivables
  Persediaan                                    18                 18,371,022            17,862,312                                   Inventories
  Pajak dibayar di muka                         19                  5,912,450             3,783,609                                Prepaid taxes
  Biaya dibayar di muka dan uang muka           20                  1,918,439               952,477             Prepaid expenses and advances
  Piutang pihak berelasi                        10                     84,107               251,026             Receivables from related parties
  Aset derivatif                                56                    473,215                 6,258                            Derivative assets

  Jumlah Aset Lancar                                              147,696,206           131,383,486                        Total Current Assets

  JUMLAH ASET                                                 1,691,206,219           1,670,639,704                              TOTAL ASSETS




   Catatan atas laporan keuangan konsolidasian merupakan bagian              The accompanying notes to the consolidated financial statements
     yang tidak terpisahkan dari laporan keuangan konsolidasian               form an integral part of these consolidated financial statements
Page 4
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 1/2 Schedule
LAPORAN POSISI KEUANGAN                                                       CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL                                                                     FINANCIAL POSITION
30 JUNI 2024 DAN 31 DESEMBER 2023                              AS AT JUNE 30, 2024 AND DECEMBER 31, 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)


                                                              30 Juni/             31 Desember/
                                             Catatan/         June 30,             December 31,
                                              Notes             2024                   2023


 LIABILITAS DAN EKUITAS                                                                                              LIABILITIES AND EQUITY
 EKUITAS                                                                                                                                EQUITY
 Ekuitas yang dapat diatribusikan                                                                                Equity attributable to owners
   kepada pemilik entitas induk                                                                                                  of the parent
 Modal saham - nilai nominal Rp1 per saham                                                          Capital stock - par value of Rp1 per share
   Modal dasar - 439.000.000 saham                                                                        Authorized - 439,000,000 shares
   Modal ditempatkan dan disetor penuh                                                                               Subscribed and paid-up
     150.536.096 saham                                                                                                  150,536,096 shares,
     pada 30 Juni 2024 dan                                                                                          as at June 30, 2024 and
     150.536.096 saham pada                                                                                       150,536,096 shares, as at
     31 Desember 2023                          21                 150,536,096         150,536,096                       December 31, 2023.
 Tambahan modal disetor                        22                      34,608              34,608                     Additional paid-in capital
 Penyertaan modal Negara dalam proses                                                                    Stock subscription from Government
   penerbitan saham                            21                           -                    -                       in issuance process
 Selisih transaksi dengan pihak                                                                         Difference in value from transactions
   non-pengendali                                                      (2,100)              (2,100)            with non-controlling interests
 Saldo laba                                                                                                                  Retained earnings
   Ditentukan penggunaannya                    21                  76,803,066          76,803,066                               Appropriated
   Tidak ditentukan penggunaannya              21                 112,530,501         107,538,313                             Unappropriated
 Penghasilan komprehensif lain                                    676,473,065         679,584,024               Other comprehensive income
 Ekuitas yang dapat diatribusikan                                                                                Equity attributable to owners
   kepada pemilik entitas induk                               1,016,375,236          1,014,494,007                               of the parent
 Kepentingan non-pengendali                                      1,146,757              1,137,392                     Non-controlling interests

 Jumlah Ekuitas                                              1,017,521,993           1,015,631,399                                  Total Equity

 LIABILITAS JANGKA PANJANG                                                                                        NON-CURRENT LIABILITIES
 Liabilitas pajak tangguhan                    47                  59,699,479           58,228,739                     Deferred tax liabilities
 Pendapatan ditangguhkan                       23                  30,548,664           27,104,985                         Deferred revenue
 Utang jangka panjang -
   setelah dikurangi bagian
   jatuh tempo                                                                                                             Long-term liabilities -
   dalam satu tahun                                                                                                      net of current portion
   Penerusan pinjaman                          24                  24,485,183           26,243,812                              Two-step loans
   Utang kepada Pemerintah                                                                                                    Government and
      dan lembaga keuangan                                                                                           non-bank Government
      Pemerintah non-bank                      25                   1,105,966            1,472,907                financial institution loans
   Utang sewa                                  26                  10,620,441           10,501,832                             Lease liabilities
   Utang bank                                  27                 117,762,980          127,875,171                                  Bank loans
   Utang obligasi dan sukuk ijarah             28                 201,280,840          191,986,322             Bonds payable and sukuk ijara
   Utang listrik swasta                        29                   5,109,142            5,101,199               Electricity purchase payable
   Liabilitas imbalan kerja                    49                  69,595,366           62,831,038               Employee benefits liabilities
   Utang lain-lain                             31                     653,930              466,867                              Other payables

 Jumlah Liabilitas Jangka Panjang                                 520,861,991          511,812,872                Total Non-current Liabilities




   Catatan atas laporan keuangan konsolidasian merupakan bagian              The accompanying notes to the consolidated financial statements
     yang tidak terpisahkan dari laporan keuangan konsolidasian               form an integral part of these consolidated financial statements
Page 5
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 1/3 Schedule


LAPORAN POSISI KEUANGAN                                                                        CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN PADA TANGGAL                                                                                      FINANCIAL POSITION
30 JUNI 2024 DAN 31 DESEMBER 2023                                                AS AT JUNE 30, 2024 AND DECEMBER 31, 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

                                                               30 Juni/            31 Desember/
                                             Catatan/          June 30,            December 31,
                                              Notes              2024                  2023


 LIABILITAS DAN EKUITAS                                                                                              LIABILITIES AND EQUITY

 LIABILITAS JANGKA PENDEK                                                                                              CURRENT LIABILITIES
 Utang usaha                                                                                                                       Trade payables
   Pihak berelasi                               30                  18,703,494           15,523,529                             Related parties
   Pihak ketiga                                 30                  45,264,074           41,623,998                                 Third parties
 Utang pajak                                    32                   3,872,402            4,231,945                                 Taxes payable
 Biaya masih harus dibayar                      33                   8,419,859            8,049,497                            Accrued expenses
 Uang jaminan langganan                         34                  17,982,000           17,245,794               Customers' security deposits
 Utang biaya proyek                             35                   1,920,836            1,512,219                          Project cost payable
 Pendapatan ditangguhkan                        23                   1,805,969            1,581,942                             Deferred revenue
 Liabilitas derivatif                           56                      28,709              201,359                          Derivative liabilities
 Utang jangka panjang jatuh tempo                                                                                           Current maturities of
   dalam satu tahun                                                                                                        long-term liabilities
   Penerusan pinjaman                           24                   3,008,059            2,939,616                             Two-step loans
   Utang kepada Pemerintah                                                                                        Government and non-bank
     dan lembaga keuangan                                                                                            Government financial
     Pemerintah non-bank                        25                     750,000              750,000                          institution loans
   Utang sewa                                   26                   1,743,412            2,267,698                            Lease liabilities
   Utang bank                                   27                  21,121,317           20,947,017                                  Bank loans
   Utang obligasi dan sukuk ijarah              28                   4,617,880            5,578,511            Bonds payable and sukuk ijara
   Utang listrik swasta                         29                     606,320              554,608              Electricity purchase payable
   Liabilitas imbalan kerja                     49                   8,066,334            7,882,380              Employee benefits liabilities
   Utang lain-lain                              31                  14,911,570           12,305,320                             Other payables

 Jumlah Liabilitas Jangka Pendek                                   152,822,235         143,195,433                      Total Current Liabilities

 JUMLAH LIABILITAS                                                 673,684,226         655,008,305                          TOTAL LIABILITIES

 JUMLAH EKUITAS DAN LIABILITAS                                1,691,206,219          1,670,639,704           TOTAL EQUITY AND LIABILITIES




    Catatan atas laporan keuangan konsolidasian merupakan bagian             The accompanying notes to the consolidated financial statements
      yang tidak terpisahkan dari laporan keuangan konsolidasian              form an integral part of these consolidated financial statements
Page 6
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 2/1 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                           CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN                                                        AND OTHER COMPREHENSIVE INCOME
UNTUK TAHUN YANG BERAKHIR                                                                                  FOR THE YEARS ENDED
30 JUNI 2024 DAN 2023                                                                                       JUNE 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)



                                                             30 Juni/                   30 Juni/
                                           Catatan/          June 30,                   June 30,
                                            Notes              2024                       2023
PENDAPATAN USAHA                                                                                                                       REVENUES
Penjualan tenaga listrik                      36              171,801,960                159,971,563                              Sale of electricity
Penyambungan pelanggan                        23                  812,831                    584,331                     Customer connection fees
Subsidi listrik Pemerintah                    37               37,266,626                 32,069,605                Government's electricity subsidy
Pendapatan kompensasi                         16               46,493,492                 37,857,021                        Compensation income
Lain-lain                                     38                5,688,317                  4,037,185                                          Others

Jumlah Pendapatan Usaha                                       262,063,226                234,519,705                                  Total Revenues

BEBAN USAHA                                                                                                                OPERATING EXPENSES
Bahan bakar dan pelumas                       39               86,442,970                 73,852,882                             Fuel and lubricants
Pembelian tenaga listrik                      40               87,258,578                 73,227,621                           Purchased electricity
Sewa                                          41                1,141,018                    821,787                                          Lease
Pemeliharaan                                  42               12,738,292                 12,040,227                                   Maintenance
Kepegawaian                                   43               16,681,739                 15,658,611                                      Personnel
Penyusutan aset tetap                         6                22,493,076                 21,223,269     Property, plant and equipment depreciation
Penyusutan aset hak-guna                      7                 1,664,980                  1,386,009                Right-of-use assets depreciation
Lain-lain                                     44                5,135,810                  4,023,212                                         Others

Jumlah Beban Usaha                                            233,556,463                202,233,618                       Total Operating Expenses

LABA USAHA                                                     28,506,763                 32,286,087                           OPERATING PROFIT

Penghasilan (beban) lain-lain - bersih        46                   2,649,518                 (118,766)                 Other income (expense) - net
Keuntungan (kerugian)                                                                                                          Gain (loss) on foreign
 kurs mata uang asing - bersih                                (12,109,517)                11,240,422                               exchange - net
Penghasilan keuangan                                              652,286                    642,297                               Financial income
Beban keuangan                                45              (10,464,162)
                                                                        -                (11,031,271)                                  Financial cost

LABA SEBELUM PAJAK                                                 9,234,888              33,018,769                         PROFIT BEFORE TAX

BEBAN PAJAK                                   47                   (4,233,335)             (7,101,933)                              TAX EXPENSES

LABA TAHUN BERJALAN                                                5,001,553              25,916,836                       PROFIT FOR THE YEAR




    Catatan atas laporan keuangan konsolidasian merupakan bagian                 The accompanying notes to the consolidated financial statements
      yang tidak terpisahkan dari laporan keuangan konsolidasian                  form an integral part of these consolidated financial statements
Page 7
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 2/2 Schedule

 LAPORAN LABA RUGI DAN PENGHASILAN                                           CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
 KOMPREHENSIF LAIN KONSOLIDASIAN                                                        AND OTHER COMPREHENSIVE INCOME
 UNTUK TAHUN YANG BERAKHIR                                                                                  FOR THE YEARS ENDED
 30 JUNI 2024 DAN 2023                                                                                       JUNE 30, 2024 AND 2023
 (Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)



                                                                30 Juni/                 30 Juni/
                                               Catatan/         June 30,                 June 30,
                                                Notes             2024                     2023
LABA TAHUN BERJALAN                                                  5,001,553             25,916,836                          PROFIT FOR THE YEAR
Penghasilan komprehensif lain                                                                                           Other comprehensive income
 tahun berjalan                                                                                                                            for the year
Pos-pos yang akan direklasifikasi                                                                                        Items that may be reclassified
 ke laba rugi:                                                                                                          subsequently to profit or loss:
 Bagian penghasilan komprehensif lain dari                                                                     Share of other comprehensive income
    entitas asosiasi dan ventura bersama           9                   857,772                (127,023)          from associates and joint venture
 Lindung nilai arus kas                                                146,057                       -                             Cash flow hedging
Pos-pos yang tidak akan direklasifikasi                                                                               Items that will not be reclassified
 ke laba rugi:                                                                                                                         to profit or loss:
 Perubahan surplus revaluasi                                                                                Changes in property, plant and equipment
    aset tetap                                     6                          -                (83,977)                         revaluation surplus
 Pengukuran kembali                                                                                                                   Remeasurement
    atas program imbalan pasti                    49                 (5,275,369)               (87,574)                    on defined benefit plans
Manfaat (Beban) pajak terkait                     47                  1,160,581                 37,741                      Related income tax benefits
Penghasilan komprehensif lain                                                                                            Other comprehensive income
 tahun berjalan setelah pajak                                        (3,110,959)              (260,833)                         for the year after tax
JUMLAH PENGHASILAN KOMPREHENSIF                                                                                    TOTAL COMPREHENSIVE INCOME
  TAHUN BERJALAN                                                     1,890,594             25,656,003                          FOR THE YEAR

Laba (rugi) tahun berjalan                                                                                                     Income (loss) for the year
  diatribusikan kepada:                                                                                                                attributable to:
  kepada Pemilik entitas induk                                       4,992,188             25,895,393                             Owners of the parent
  Kepentingan non-pengendali                                             9,365-                21,443                          Non-controlling interest

  Jumlah                                                             5,001,553-            25,916,836                                             Total

Jumlah penghasilan komprehensif tahun                                                                                       Total comprehensive income
  berjalan diatribusikan kepada:                                                                                            for the year attributable to:
  Pemilik entitas induk                                              1,881,229             25,634,560                             Owners of the parent
  Kepentingan non-pengendali                                             9,365                 21,443                          Non-controlling interest

  Jumlah                                                             1,890,594             25,656,003                                             Total

LABA PER SAHAM DASAR
 (Dalam Rupiah penuh)                             48                    33,970                180,391                   BASIC EARNINGS PER SHARE




      Catatan atas laporan keuangan konsolidasian merupakan bagian                 The accompanying notes to the consolidated financial statements
        yang tidak terpisahkan dari laporan keuangan konsolidasian                  form an integral part of these consolidated financial statements
Page 8
                                                                                                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                                                                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                                                                                                Lampiran 3/1 Schedule

  LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN                                                                                                                                                                                                         CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
  UNTUK TAHUN YANG BERAKHIR                                                                                                                                                                                                                                                        FOR THE YEARS ENDED
  30 JUNI 2024 DAN 2023                                                                                                                                                                                                                                                            JUNE 30, 2024 AND 2023
  (Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                                                                                                                                          (Expressed in millions of Rupiah, unless otherwise stated)




                                                                                                              Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                                                           Penghasilan komprehensif lain/
                                                                                                                                                                                            Other comprehensive income
                                                                                                                                                                                                           Bagian
                                                                    Penyertaan                                                                                                                         penghasilan
                                                                   modal Negara                                                                                                                       komprehensif
                                                                   dalam proses                                                                          Surplus                                          lain dari                          Selisih transaksi            Ekuitas
                                                   Modal             penerbitan                                                                         revaluasi                                    entitas asosiasi                         dengan pihak             yang dapat
                                               ditempatkan             saham/                                                                              aset                Pengukuran               dan ventura                          non-pengendali/          diatribusikan
                                               dan disetor              Stock         Tambahan                                                            tetap/                 kembali                 bersama/                             Difference in          kepada pemilik
                                                  penuh/           subscription         modal                         Saldo laba/                       Property,             atas program            Share of other                           value from             entitas induk/
                                               Subscribed               from           disetor/                   Retained earnings                     plant and             imbalan pasti/         comprehensive        Lindung nilai       transactions                Equity            Kepentingan
                                               and paid-up         Government         Additional          Ditentukan         Tidak ditentukan          equipment            Remeasurement              income from          arus kas/               with               attributable        non-pengendali/
                                                  capital           in issuance        paid-in          penggunaannya/       penggunaannya/            revaluation              on defined           associates and        Cash flow         non-controlling           to owner of         Non-controlling   Jumlah ekuitas/
                                                   stock              process           capital          Appropriated         Unappropriated             surplus               benefit plans          joint ventures         hegdes              interests              the parent            interests        Total equity


Saldo per 1 Januari 2023                         145,536,096          5,000,000            34,608            64,657,026              99,438,371           688,538,705              (16,929,028)            4,085,359                                    (2,100)          990,359,037             1,091,529       991,450,566              Balance as of January 1, 2022

                                                                                                                                                                                                                                                                                                                                          Reclassification from additional
Cadangan umum tahun berjalan                                                   -                             12,146,040             (12,146,040)                                                                                                                                       -                                        -                        paid-in capital
Penambahan modal                                                                                                                                                                                                                                                                                                                     Stock subscription from Government
  dari penerbitan saham                            5,000,000          (5,000,000)                                                                                                                                                                                                      -                                        -                   in issuence process
Dividen                                                                                                                              (2,188,000)                                                                                                                           (2,188,000)                             (2,188,000)                                  Dividends
Selisih nilai transaksi restrukturisasi                                                                                                                                                                                                                                                -                                        -       Reclassfication of property, plant
  Entitas pengendali                                         -                 -                   -                   -                                                                                                                                                               -                                        -   and equipments revaluation surplus
Reklasifikasi surplus revaluasi aset tetap                                                                                                                                                                                                                                             -                                        -              Acquisition of subsidiaries'
  ke saldo laba                                              -                 -                   -                   -               408,387                (408,387)                       -                    -                                             -                     -                 -                      -   shares from non-controlling interest
Jumlah penghasilan komprehensif                                                                                                                                                                                                                                                                                             -                Total comprehensive income
  tahun berjalan                                               -                  -                 -                     -          22,025,595               264,508                4,464,570              (295,350)            (136,353)                       -         26,322,970               45,863         26,368,833                              for the year

Saldo per 31 Desember 2023                       150,536,096                   -           34,608            76,803,066            107,538,313            688,394,826              (12,464,458)            3,790,009             (136,353)              (2,100)         1,014,494,007            1,137,392      1,015,631,399          Balance as of December 31, 2023




Saldo per 1 Januari 2024                         150,536,096                   -           34,608            76,803,066            107,538,313            688,394,826              (12,464,458)            3,790,009             (136,353)              (2,100)         1,014,494,007            1,137,392      1,015,631,399             Balance as of January 1, 2024



Cadangan umum tahun berjalan                                                   -                                       -                      -                                                                                                                                        -                                        -            Appropriation during the year
Penambahan modal                                                                                                                                                                                                                                                                                                                                     Addition from shares
  dari penerbitan saham                                      -                 -                                                                                                                                                                                                       -                                        -                              issuance
Dividen                                                                                                                                       -                                                                                                                                        -                                        -                               Dividends
Jumlah penghasilan komprehensif                                                                                                                                                                                                                                                                                             -                Total comprehensive income
  tahun berjalan                                               -                  -                 -                     -           4,992,188                      -               (4,114,788)            857,772              146,057                         -          1,881,229                9,365          1,890,594                                for the year

Saldo per 30 Juni 2024                           150,536,096                   -           34,608            76,803,066            112,530,501            688,394,826              (16,579,246)            4,647,781                9,704               (2,100)         1,016,375,236            1,146,757      1,017,521,993                Balance as of Juni 30, 2024




                                             Catatan atas laporan keuangan konsolidasian merupakan bagian                                                                                                                    The accompanying notes to the consolidated financial statements
                                               yang tidak terpisahkan dari laporan keuangan konsolidasian                                                                                                                     form an integral part of these consolidated financial statements
Page 9
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 4/1 Schedule

LAPORAN ARUS KAS KONSOLIDASIAN                                                              CONSOLIDATED STATEMENTS OF
UNTUK TAHUN YANG BERAKHIR                                                             CASH FLOWS FOR THE YEARS ENDED
30 JUNI 2024 DAN 2023                                                                                     JUNE 30, 2024 AND 2023
(Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                      (Expressed in millions of Rupiah, unless otherwise stated)


                                                         30 Juni/         30 Juni/
                                                         June 30,         June 30,
                                                           2024             2023
ARUS KAS DARI                                                                                                          CASH FLOWS FROM
 AKTIVITAS OPERASI                                                                                               OPERATING ACTIVITIES
Penerimaan kas dari pelanggan                              181,810,225      168,651,568                         Cash receipts from customers
Pembayaran kas kepada pemasok                            (188,823,867)    (163,754,473)                                Cash paid to suppliers
Pembayaran kas kepada karyawan                            (15,029,120)     (16,876,479)                              Cash paid to employees
Penerimaan subsidi listrik                                  29,687,289       26,097,738                         Government subsidy received
Penerimaan kompensasi                                       17,835,197       16,094,804                              Compensation received
Pembayaran utang kepada pemerintah                                    -               -                       Payments of Government Loans
Penerimaan bunga                                                652,286         642,297                                      Interest received
Pembayaran bunga                                          (10,149,149)     (10,579,580)                                 Interest expense paid
Penerimaan restitusi pajak lainnya                              284,518       1,733,883                          Cash receipts for other taxes
Pembayaran pajak penghasilan                                (3,237,013)       (590,456)                                       Income tax paid
Kas bersih diperoleh dari                                                                                               Net cash provided by
 aktivitas operasi                                         13,030,367       21,419,301                                  operating activities

ARUS KAS DARI                                                                                                           CASH FLOWS FROM
  AKTIVITAS INVESTASI                                                                                              INVESTING ACTIVITIES
Hasil penjualan aset                                                                                             Proceeds from sale of assets
  tidak digunakan dalam operasi                                 45,372            7,087                              not used in operations
Akuisisi entitas anak                                                -                -                              Acquisition of subsidiary
Perolehan aset tetap                                      (24,247,622)     (21,774,724)             Addition of property, plant and equipment
Perolehan dividen dari                                                                                               Dividends received from
  entitas asosiasi dan ventura bersama                        192,377          151,739                        associates and joint ventures
Perolehan investasi pada                                                                                         Acquisition of investments in
  entitas asosiasi dan ventura bersama                       (184,071)                 -                      associates and joint ventures
Penerimaan (pembayaran) kembali dari                                                                    Proceeds (repayment) of receivables
  piutang kepada pihak berelasi                                       -                -                                from related parties
Penarikan rekening bank dan                                                                                          Withdrawal of restricted
 deposito berjangka dibatasi penggunaannya                    907,601                  -                  cash in banks and time deposits
Penempatan rekening bank dan                                                                                          Placement of restricted
 deposito berjangka dibatasi penggunaannya                           -        (577,992)                   cash in banks and time deposits
Penarikan investasi jangka pendek                              751,031                -                 Withdrawal of short-term investments
Penempatan investasi jangka pendek                                   -        (411,738)                 Placement of short-term investments
Kas bersih digunakan untuk aktivitas investasi            (22,535,312)     (22,605,628)                Net cash used in investing activities




       Catatan atas laporan keuangan konsolidasian merupakan bagian       The accompanying notes to the consolidated financial statements
         yang tidak terpisahkan dari laporan keuangan konsolidasian        form an integral part of these consolidated financial statements
Page 10
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 4/2 Schedule

 LAPORAN ARUS KAS KONSOLIDASIAN                                                             CONSOLIDATED STATEMENTS OF
 UNTUK TAHUN YANG BERAKHIR                                                            CASH FLOWS FOR THE YEARS ENDED
 30 JUNI 2024 DAN 2023                                                                                    JUNE 30, 2024 AND 2023
 (Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)


                                                        30 Juni/         30 Juni/
                                                        June 30,         June 30,
                                                          2024             2023
ARUS KAS DARI                                                                                                          CASH FLOWS FROM
 AKTIVITAS PENDANAAN                                                                                             FINANCING ACTIVITIES
Perolehan penyertaan modal                                                                                       Proceeds from Government
 Pemerintah dalam proses penerbitan saham                            -              -           for stock subscription in issuance process
Pembayaran dividen                                                   -              -                                   Payment of dividends
Penerimaan penerusan pinjaman                                   14,378         89,313                            Proceeds of two-step loans
Pembayaran penerusan pinjaman                              (1,466,403)    (1,446,201)                            Payments of two-step loans
Pembayaran utang kepada Pemerintah dan                                                               Payments of Government and non-bank
 lembaga keuangan Pemerintah non-bank                       (375,000)       (375,000)               Government financial institution loans
Penerimaan utang bank - jangka pendek                               -               -                    Proceeds of bank loans - short-term
Penerimaan utang bank - jangka panjang                        345,172         914,003                     Proceeds of bank loans- long-term
Pembayaran utang bank - jangka pendek                               -               -                     Payment of bank loans- short-term
Pembayaran utang bank - jangka panjang                   (13,527,889)    (16,952,136)                      Payment of bank loans- long-term
Penerimaan utang obligasi dan sukuk ijarah                          -               -            Proceeds of bonds payable and sukuk ijara
Pembayaran utang obligasi dan sukuk ijarah                (1,475,000)       (877,700)             Payment of bonds payable and sukuk ijara
Pembayaran utang KIK-EBA                                            -               -                             Payment of KIK-EBA loans
Pembayaran utang sewa                                        (64,558)     (1,351,919)                           Payments of lease liabilities
Pembayaran utang listrik swasta                             (283,167)       (251,830)              Payments of electricity purchase payable

Kas bersih (digunakan)/diperoleh dari                                                                       Net cash (used in)/provided by
 aktivitas pendanaan                                     (16,832,467)    (20,251,471)                                 financing activities
KENAIKAN (PENURUNAN) BERSIH KAS                                                                    NET INCREASE (DECREASE) IN CASH
 DAN SETARA KAS                                          (26,337,412)    (21,437,798)                      AND CASH EQUIVALENTS
Pengaruh perubahan kurs mata uang asing                       325,890       (171,048)                  Effect of changes in foreign currency
Cadangan kerugian kredit ekspektasian atas                                                             Allowance for expected credit loss of
 kas dan setara kas                                                (8)              (9)                        cash and cash equivalents

                                                                                                         CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AWAL PERIODE                            55,920,541      51,503,096                   AT BEGINNING OF THE PERIOD
                                                                                                         CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AKHIR PERIODE                           29,909,011      29,894,241                         AT END OF THE PERIOD




        Catatan atas laporan keuangan konsolidasian merupakan bagian      The accompanying notes to the consolidated financial statements
          yang tidak terpisahkan dari laporan keuangan konsolidasian       form an integral part of these consolidated financial statements
Page 11
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/1 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM                                         1.   GENERAL INFORMATION

     a.   Pendirian dan informasi lainnya                        a.   Establishment and other information

          Perusahaan        Perseroan     (Persero)    PT             Perusahaan        Perseroan      (Persero)     PT
          Perusahaan Listrik Negara (“PLN” atau                       Perusahaan Listrik Negara (“PLN” or the
          “Perusahaan”) didirikan pada tahun 1961 dalam               “Company”) was established in 1961 as a unit of
          bentuk     jawatan     di   dalam    lingkungan             the Indonesian Ministry of Energy and Public
          Kementerian Pekerjaan Umum dan Tenaga.                      Works. The Company is a business continuation
          Perusahaan merupakan kelanjutan usaha                       of several Dutch electricity companies which
          beberapa perusahaan listrik Belanda yang                    have been taken over by the Government of the
          diambil alih oleh Pemerintah Republik Indonesia             Republic of Indonesia including, among others,
          tersebut meliputi: NV ANIEM, NV SEM, NV                     the following: NV ANIEM, NV SEM, NV OJEM,
          OJEM, NV EMS, NV EMBALOM, NV GEBEO,                         NV EMS, NV EMBALOM, NV GEBEO, NV
          NV OGEM dan NV WEMI. Berdasarkan                            OGEM and NV WEMI. Based on Government
          Peraturan Pemerintah No. 19 tahun 1965, status              Regulation No. 19 year 1965, the status of the
          Perusahaan berubah menjadi perusahaan yang                  Company was changed to that of a legal entity.
          berbadan hukum. Selanjutnya ditetapkan                      Subsequently, based on Government Regulation
          menjadi      Perusahaan      Umum       (Perum)             No. 30 year 1970, as amended by Government
          berdasarkan Peraturan Pemerintah No. 30 tahun               Regulation No. 18 year 1972, the Company
          1970 yang dipertegas dengan Peraturan                       became a Perusahaan Umum (Perum). Based
          Pemerintah No. 18 tahun 1972. Kemudian                      on Notarial Deed No. 169 of Sutjipto, S.H.,
          berdasarkan Akta No. 169 tanggal 30 Juli 1994               Notary in Jakarta, dated July 30, 1994, the
          dari Sutjipto, S.H., Notaris di Jakarta, status             Company’s status was changed to a Limited
          badan hukum Perusahaan berubah menjadi                      Liability Company and it was named Perusahaan
          Perseroan Terbatas dengan nama Perusahaan                   Perseroan PT Perusahaan Listrik Negara or PT
          Perseroan PT Perusahaan Listrik Negara                      PLN (Persero). This change was approved by the
          disingkat PT PLN (Persero). Akta perubahan ini              Minister of Justice in his decision letter No. C2-
          disahkan dengan Keputusan Menteri Kehakiman                 11.519.HT.01.01.Th.94 dated August 1, 1994
          No. C2-11.519.HT.01.01.Th.94 tanggal 1                      and was published in State Gazette of the
          Agustus 1994, serta diumumkan dalam Berita                  Republic of Indonesia No. 73 dated September
          Negara Republik Indonesia No.73 tanggal 13                  13, 1994, Supplement No. 6731.
          September 1994, Tambahan No. 6731.

          Anggaran Dasar Perusahaan telah diubah                      The Articles of Association of the Company have
          beberapa kali dengan perubahan terakhir                     been amended several times, with the most
          berdasarkan Akta Notaris No. 11, tanggal 22                 recent change by Notarial Deed No. 11, dated
          Agustus 2022 dari Lenny Janis Ishak, S.H.,                  August 22, 2022 of Lenny Janis Ishak, S.H.,
          Notaris di Jakarta mengenai perubahan maksud                Notary in Jakarta regarding the purposes and
          dan tujuan serta kegiatan usaha. Perubahan ini              objectives as well as the business activities of the
          telah disetujui oleh Menteri Hukum dan HAM                  Company. This amendment has been approved
          Republik     Indonesia    berdasarkan   Surat               by the Minister of Law and Human Rights based
          Keputusan Menteri No. AHU-0060721.AH.01.02                  on      Ministerial     Decree      No.       AHU-
          tanggal 25 Agustus 2022.                                    0060721.AH.01.02, dated August 25, 2022.

          Perusahaan berdomisili di Jakarta dan memiliki              The Company is domiciled in Jakarta, with 48
          48 unit pelaksana yang tersebar di wilayah                  business unit offices across Indonesia and 11
          Indonesia dan 11 entitas anak. Kantor Pusat                 subsidiaries. The Company’s Head Office is
          Perusahaan beralamat di Jl. Trunojoyo Blok M I              located at Jl. Trunojoyo Blok M I No. 135,
          No. 135, Jakarta.                                           Jakarta.
Page 12
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/2 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                           1.   GENERAL INFORMATION (continued)

     a.     Pendirian dan informasi lainnya (lanjutan)                                        a.     Establishment               and         other            information
                                                                                                     (continued)

            Sesuai dengan Pasal 3 Anggaran Dasar                                                     In accordance with Article 3 of the Company’s
            Perusahaan, Maksud dan Tujuan Perusahaan                                                 Articles of Association, the Purpose and Objective
            adalah     untuk    menyelenggarakan usaha                                               of the Company is to engage in electricity business
            penyediaan tenaga listrik bagi kepentingan                                               for public use of sufficient quantity and quality and
            umum dalam jumlah dan mutu yang memadai                                                  also to earn profit and perform the Government’s
            serta memupuk keuntungan dan melaksanakan                                                assignment in electricity business in order to
            penugasan         Pemerintah     di  bidang                                              support the development of the country with the
            ketenagalistrikan dalam rangka mendukung                                                 application of the principles of a Limited Liability
            pembangunan negara dengan menerapkan                                                     Company.
            prinsip-prinsip Perseroan Terbatas.

            Sesuai dengan Undang-Undang No. 19 tahun                                                 Based on Law No. 19 year 2003, regarding State-
            2003 tentang Badan Usaha Milik Negara                                                    Owned Enterprises (“SOEs”), the Government is
            (“BUMN”), Pemerintah wajib memberikan                                                    obliged to provide compensation to SOEs, that
            kompensasi atas semua biaya yang telah                                                   were appointed to perform special assignments,
            dikeluarkan oleh BUMN termasuk margin                                                    for all expenses which they have incurred,
            tertentu yang diharapkan kepada BUMN yang                                                including a certain expected return (margin). The
            diberikan penugasan khusus. Perusahaan                                                   Company is an SOE, that performs the special
            merupakan BUMN yang sedang melaksanakan                                                  assignment of providing subsidised electricity to
            penugasan khusus berupa penyediaan tenaga                                                the public (Note 37).
            listrik bersubsidi kepada masyarakat (Catatan
            37).

            Pada tanggal 30 Juni 2024, Grup memiliki                                                 As at June 30, 2024 the Group had 51,113
            51.113 karyawan tetap (2023: 51.245 karyawan                                             permanent employees (2023: 51,245 permanent
            tetap) (tidak diaudit). Jumlah karyawan tidak                                            employees) (unaudited). The total number of
            termasuk karyawan dari PT Haleyora Powerindo                                             employees does not include employees of    PT
            yang bergerak dibidang jasa tenaga kerja. PT                                             Haleyora Powerindo whose nature of business is
            Haleyora Powerindo adalah entitas anak dari PT                                           manpower services. PT Haleyora Powerindo is a
            Haleyora Power, entitas anak Perusahaan.                                                 subsidiary of PT Haleyora Power, the Company’s
                                                                                                     subsidiary.

     b.     Penawaran umum efek utang Perusahaan                                              b.     The Company’s public offering of bonds

            Perusahaan telah beberapa kali menerbitkan                                               The Company has issued several PLN Bonds and
            Obligasi dan Surat Utang PLN, sebagai berikut:                                           Notes, as follows:
                                                                                                                      Jumlah yang
                                                                                                    Tanggal            ditawarkan/
                                               Tanggal efektif/      Bursa pencatatan/             pencatatan/       Offered amount
                                                Effective date          Listed on *)               Listed date             Rp

          Obligasi Rupiah                                                                                                                                        Rupiah Bonds

          Obligasi Berkelanjutan IV PLN                                                                                                      Shelf Registration Bonds IV PLN
          Tahap I Tahun 2020                   31 Agustus 2020/     Bursa Efek Indonesia/     8 September 2020/            1,500,000                       Phase I Year 2020
                                               August 31, 2020    Indonesia Stock Exchange    September 8, 2020
          Sukuk Ijarah Berkelanjutan IV PLN                                                                                                Shelf Registration Sukuk Ijara IV PLN
          Tahap I Tahun 2020                   31 Agustus 2020/      Bursa Efek Indonesia/     8 September 2020/             376,500                          Phase I Year 2020
                                               August 31, 2020    Indonesia Stock Exchange     September 8, 2020
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap VII Tahun 2020                  29 Juni 2018/        Bursa Efek Indonesia/         6 Mei 2020/              1,737,135                      Phase VII Year 2020
                                                June 29, 2018     Indonesia Stock Exchange         May 6, 2020
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap VI Tahun 2020                   29 Juni 2018/        Bursa Efek Indonesia/     18 Februari 2020/            4,812,430                       Phase VI Year 2020
                                                June 29, 2018     Indonesia Stock Exchange     February 18, 2020
          Sukuk Ijarah Berkelanjutan III PLN                                                                                               Shelf Registration Sukuk Ijara III PLN
          Tahap VI Tahun 2020                   29 Juni 2018/        Bursa Efek Indonesia/     18 Februari 2020/             115,500                        Phase VI Year 2020
                                                June 29, 2018     Indonesia Stock Exchange     February 18, 2020
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap V Tahun 2019                    29 Juni 2018/        Bursa Efek Indonesia/      1 Oktober, 2019             1,912,900                        Phase V Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      October 1, 2019
          Sukuk Ijarah Berkelanjutan III PLN                                                                                               Shelf Registration Sukuk Ijara III PLN
          Tahap V Tahun 2019                    29 Juni 2018/        Bursa Efek Indonesia/      1 Oktober, 2019               797,500                        Phase V Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      October 1, 2019
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap IV Tahun 2019                   29 Juni 2018/        Bursa Efek Indonesia/      1 Agustus 2019/             2,953,620                       Phase IV Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      August 1, 2019
          Sukuk Ijarah Berkelanjutan III PLN                                                                                               Shelf Registration Sukuk Ijara III PLN
          Tahap IV Tahun 2019                   29 Juni 2018/        Bursa Efek Indonesia/      1 Agustus 2019/             1,250,000                       Phase IV Year 2019
                                                June 29, 2018     Indonesia Stock Exchange      August 1, 2019
          Obligasi Berkelanjutan III PLN                                                                                                        Shelf Registration Bonds III PLN
          Tahap III Tahun 2019                  29 Juni 2018/        Bursa Efek Indonesia/     19 Februari 2019/            2,393,000                       Phase III Year 2019
                                                June 29, 2018     Indonesia Stock Exchange     February 19, 2019

            *)    Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia diakuisisi oleh                  *)   On July 22, 1995 the Indonesia Parallel Exchange was acquired by the
                  Bursa Efek Surabaya. Pada tanggal 30 November 2007, Bursa Efek                          Surabaya Stock Exchange. On November 30, 2007, the Surabaya Stock
                  Surabaya dan Bursa Efek Jakarta digabungkan dan berubah nama                            Exchange and Jakarta Stock Exchange merged and changed their
                  menjadi Bursa Efek Indonesia.                                                           name to the Indonesia Stock Exchange.
Page 13
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                    Lampiran 5/3 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)



1.   INFORMASI UMUM (lanjutan)                                                              1.    GENERAL INFORMATION (continued)

     b.     Penawaran umum efek utang Perusahaan                                                  b.      The Company’s public offering of bonds
            (lanjutan)                                                                                    (continued)

            Perusahaan telah beberapa kali menerbitkan                                                   The Company has issued several PLN Bonds and
            Obligasi dan Surat Utang PLN, sebagai berikut:                                               Notes, as follows: (continued)
            (lanjutan)
                                                                                                                           Jumlah yang
                                                                                                        Tanggal             ditawarkan/
                                                Tanggal efektif/        Bursa pencatatan/              pencatatan/        Offered amount
                                                 Effective date            Listed on *)                Listed date              Rp

          Sukuk Ijarah Berkelanjutan III PLN                                                                                                    Shelf Registration Sukuk Ijara III PLN
          Tahap III Tahun 2019                   29 Juni 2018/         Bursa Efek Indonesia/       19 Februari 2019/              863,000                         Phase III Year 2019
                                                 June 29, 2018      Indonesia Stock Exchange       February 19, 2019
          Obligasi Berkelanjutan III PLN                                                                                                            Shelf Registration Bonds III PLN
          Tahap II Tahun 2018                    29 Juni 2018/         Bursa Efek Indonesia/       10 Oktober 2018/               832,000                        Phase II Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange       October 10, 2018
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                    Shelf Registration Sukuk Ijara III PLN
          Tahap II Tahun 2018                    29 Juni 2018/         Bursa Efek Indonesia/       10 Oktober 2018/               224,000                         Phase II Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange       October 10, 2018
          Obligasi Berkelanjutan III PLN                                                                                                            Shelf Registration Bonds III PLN
          Tahap I Tahun 2018                     29 Juni 2018/         Bursa Efek Indonesia/           10 Juli 2018/             1,278,500                        Phase I Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange           July 10, 2018
          Sukuk Ijarah Berkelanjutan III PLN                                                                                                    Shelf Registration Sukuk Ijara III PLN
          Tahap I Tahun 2018                     29 Juni 2018/         Bursa Efek Indonesia/           10 Juli 2018/              750,000                          Phase I Year 2018
                                                 June 29, 2018      Indonesia Stock Exchange           July 10, 2018
          Obligasi Berkelanjutan II PLN                                                                                                              Shelf Registration Bonds II PLN
          Tahap III Tahun 2018                   21 Juni 2017/         Bursa Efek Indonesia/       23 Februari 2018/             2,535,000                      Phase III Year 2018
                                                 June 21, 2017      Indonesia Stock Exchange       February 23, 2018
          Sukuk Ijara Berkelanjutan II PLN                                                                                                      Shelf Registration Sukuk Ijara II PLN
          Tahap III Tahun 2018                   21 Juni 2017/         Bursa Efek Indonesia/       23 Februari 2018/              698,500                        Phase III Year 2018
                                                 June 21, 2017      Indonesia Stock Exchange       February 23, 2018
          Obligasi Berkelanjutan II PLN                                                                                                              Shelf Registration Bonds II PLN
          Tahap II Tahun 2017                    21 Juni 2017/         Bursa Efek Indonesia/       2 November 2017/              2,545,500                       Phase II Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange       November 2, 2017
          Sukuk Ijarah Berkelanjutan II PLN                                                                                                     Shelf Registration Sukuk Ijara II PLN
          Tahap II Tahun 2017                    21 Juni 2017/         Bursa Efek Indonesia/       2 November 2017/               694,500                         Phase II Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange       November 2, 2017
          Obligasi Berkelanjutan II PLN                                                                                                              Shelf Registration Bonds II PLN
          Tahap I Tahun 2017                     21 Juni 2017/         Bursa Efek Indonesia/           12 Juli 2017/             1,600,000                        Phase I Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange           July 12, 2017
          Sukuk Ijarah Berkelanjutan II PLN                                                                                                     Shelf Registration Sukuk Ijara II PLN
          Tahap I Tahun 2017                     21 Juni 2017/         Bursa Efek Indonesia/           12 Juli 2017/              400,000                         Phase I Year 2017
                                                 June 21, 2017      Indonesia Stock Exchange           July 12, 2017
          Obligasi Berkelanjutan I PLN                                                                                                                Shelf Registration Bonds I PLN
          Tahap II Tahun 2013                    27 Juni 2013/         Bursa Efek Indonesia/      11 Desember 2013/              1,244,000                       Phase II Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange      December 11, 2013
          Sukuk Ijarah Berkelanjutan I PLN                                                                                                       Shelf Registration Sukuk Ijara I PLN
          Tahap II Tahun 2013                    27 Juni 2013/         Bursa Efek Indonesia/      11 Desember 2013/               429,000                         Phase II Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange      December 11, 2013
          Obligasi Berkelanjutan I PLN                                                                                                                Shelf Registration Bonds I PLN
          Tahap I Tahun 2013                     27 Juni 2013/         Bursa Efek Indonesia/           8 Juli 2013/               879,000                         Phase I Year 2013
                                                 June 27, 2013      Indonesia Stock Exchange           July 8, 2013
          Sukuk Ijarah Berkelanjutan I PLN                                                                                                       Shelf Registration Sukuk Ijara I PLN
          Tahap I Tahun 2013                      27 Juni 2013/        Bursa Efek Indonesia/          8 Juli 2013/                121,000                          Phase I Year 2013
                                                  June 27, 2013     Indonesia Stock Exchange          July 8, 2013
          Obligasi PLN XII Tahun 2010             30 Juni 2010/        Bursa Efek Indonesia/          9 Juli 2010/               2,500,000                 PLN XII Bonds Year 2010
                                                  June 30, 2010     Indonesia Stock Exchange          July 9, 2010
          Sukuk Ijarah PLN V Tahun 2010           30 Juni 2010/        Bursa Efek Indonesia/          9 Juli 2010/                500,000              Sukuk Ijara V PLN Year 2010
                                                  June 30, 2010     Indonesia Stock Exchange          July 9, 2010
          Obligasi PLN XI Tahun 2010           31 Desember 2009/       Bursa Efek Indonesia/       13 Januari 2010/              2,703,000                 PLN XI Bonds Year 2010
                                               December 31, 2009    Indonesia Stock Exchange       January 13, 2010
          Sukuk Ijarah PLN IV Tahun 2010       31 Desember 2009/       Bursa Efek Indonesia/       13 Januari 2010/               297,000              Sukuk Ijara IV PLN Year 2010
                                               December 31, 2009    Indonesia Stock Exchange       January 13, 2010
          Obligasi PLN X Tahun 2009            31 Desember 2008/       Bursa Efek Indonesia/       12 Januari 2009/              1,440,000                  PLN X Bonds Year 2009
                                               December 31, 2008    Indonesia Stock Exchange       January 12, 2009
          Sukuk Ijarah PLN III Tahun 2009      31 Desember 2008/       Bursa Efek Indonesia/       12 Januari 2009/               760,000              Sukuk Ijara III PLN Year 2009
                                               December 31, 2008    Indonesia Stock Exchange       January 12, 2009
          Obligasi PLN IX Tahun 2007              29 Juni 2007/        Bursa Efek Surabaya/          11 Juli 2007/               2,700,000                 PLN IX Bonds Year 2007
                                                  June 29, 2007      Surabaya Stock Exchange         July 11, 2007
          Sukuk Ijarah PLN II Tahun 2007          29 Juni 2007/        Bursa Efek Surabaya/          11 Juli 2007/                300,000               Sukuk Ijara II PLN Year 2007
                                                  June 29, 2007      Surabaya Stock Exchange         July 11, 2007
          Obligasi PLN VIII Tahun 2006            12 Juni 2006/        Bursa Efek Surabaya/          22 Juni 2016/               2,200,100                PLN VIII Bonds Year 2006
                                                  June 12, 2006      Surabaya Stock Exchange        June 22, 2016
          Sukuk Ijarah PLN I Tahun 2006           12 Juni 2006/        Bursa Efek Surabaya/          22 Juni 2016/                200,000               Sukuk Ijara I PLN Year 2006
                                                  June 12, 2006      Surabaya Stock Exchange        June 22, 2016
          Obligasi PLN VII Tahun 2004           3 November 2004/       Bursa Efek Surabaya/       12 November 2004/              1,500,000                 PLN VII Bonds Year 2004
                                                November 3, 2004     Surabaya Stock Exchange      November 12, 2004
          Obligasi PLN VI Tahun 1997              27 Juni 1997/        Bursa Efek Surabaya/        12 Agustus 1997/               600,000                  PLN VI Bonds Year 1997
                                                  June 27, 1997      Surabaya Stock Exchange       August 12, 1997
          Obligasi PLN V Tahun 1996               28 Juni 1996/        Bursa Efek Surabaya/        28 Agustus 1996/              1,000,000                  PLN V Bonds Year 1996
                                                  June 28, 1996      Surabaya Stock Exchange       August 28, 1996
          Obligasi PLN IV Tahun 1995              30 Juni 1995/       Bursa Paralel Indonesia/    4 September 1995/               680,000                  PLN IV Bonds Year 1995
                                                  June 30, 1995     Indonesia Parallel exchange   September 4, 1995
          Obligasi PLN III Tahun 1995            30 Januari 1995/     Bursa Paralel Indonesia/       18 April 1995/               318,430                   PLN III Bonds Year 1995
                                                January 30, 1995    Indonesia Parallel exchange      April 18, 1995
          Obligasi PLN II Tahun 1993           28 September 1993/     Bursa Paralel Indonesia/    8 November 1993/                600,000                   PLN II Bonds Year 1993
                                               September 28, 1993   Indonesia Parallel exchange   November 8, 1993
          Obligasi PLN I Tahun 1992            25 September 1992/     Bursa Paralel Indonesia/    10 November 1992/               300,000                    PLN I Bonds Year 1992
                                               September 25, 1992   Indonesia Parallel exchange   November 10, 1992

          Jumlah                                                                                                                51,541,115                                      Total

            *)     Pada tanggal 22 Juli 1995 Bursa Paralel Indonesia diakuisisi oleh                     *)    On July 22, 1995 the Indonesia Parallel Exchange was acquired by the
                   Bursa        Efek         Surabaya.        Pada          tanggal                            Surabaya Stock Exchange. On November 30, 2007, the Surabaya Stock
                   30 November 2007, Bursa Efek Surabaya dan Bursa Efek Jakarta                                Exchange and Jakarta Stock Exchange merged and changed their
                   digabungkan dan berubah nama menjadi Bursa Efek Indonesia.                                  name to the Indonesia Stock Exchange.
Page 14
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/4 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                      1.   GENERAL INFORMATION (continued)

     b.     Penawaran umum efek utang Perusahaan                                         b.     The Company’s public offering of bonds
            (lanjutan)                                                                          (continued)

            Perusahaan telah beberapa kali menerbitkan                                          The Company has issued several PLN Medium-
            Surat Utang Jangka Menengah PLN, sebagai                                            term Notes, as follows:
            berikut:
                                                                                                                  Jumlah yang
                                                                                               Tanggal             ditawarkan/
                                         Tanggal efektif/       Bursa pencatatan/             pencatatan/        Offered amount
                                          Effective date            Listed on                 Listed date             USD *)

          Surat Utang Jangka Menengah                                                                                                    Global Medium Term
          Global - USD                                                                                                                            Notes - USD
          Penerbitan tahun 2020            30 Juni 2020/       Bursa Efek Singapura/         1 Juli 2020/           1,500,000,000               Issued in 2020
                                          June 30, 2020      Singapore Stock Exchange        July 1, 2020
          Penerbitan tahun 2019         5 November 2019/       Bursa Efek Singapura/     7 November 2019/           1,000,000,000               Issued in 2019
                                        November 5, 2019     Singapore Stock Exchange    November 7, 2019
                                           17 Juli 2019/       Bursa Efek Singapura/        18 Juli 2019/           1,400,000,000
                                           July 17, 2019     Singapore Stock Exchange       July 18, 2019
          Penerbitan tahun 2018          25 Oktober 2018/      Bursa Efek Singapura/      26 Oktober 2018/          1,000,000,000               Issued in 2018
                                         October 25, 2018    Singapore Stock Exchange     October 26, 2018
                                           21 Mei 2018/        Bursa Efek Singapura/        16 Mei 2018/            2,000,000,000
                                           May 21, 2018      Singapore Stock Exchange       May 16, 2018
          Penerbitan tahun 2017            15 Mei 2017/        Bursa Efek Singapura/        16 Mei 2017/            2,000,000,000               Issued in 2017
                                           May 15, 2017      Singapore Stock Exchange       May 16, 2017
          Penerbitan tahun 2012          24 Oktober 2012/      Bursa Efek Singapura/      25 Oktober 2012/          1,000,000,000               Issued in 2012
                                         October 24, 2012    Singapore Stock Exchange     October 25, 2012
          Penerbitan tahun 2011         22 November 2011/      Bursa Efek Singapura/     23 November 2011/          1,000,000,000               Issued in 2011
                                        November 22, 2011    Singapore Stock Exchange    November 23, 2011
          Jumlah                                                                                                   10,900,000,000                       Total

          Surat Utang Jangka Menengah                                                                                                    Global Medium Term
          Global - EUR                                                                                                                            Notes - EUR
          Penerbitan tahun 2019         5 November 2019/       Bursa Efek Singapura/      7 November 2019/              500,000,000             Issued in 2019
                                        November 5, 2019     Singapore Stock Exchange     November 7, 2019
          Penerbitan tahun 2018         25 Oktober 2018/       Bursa Efek Singapura/      26 Oktober 2018/              500,000,000             Issued in 2018
                                        October 25, 2018     Singapore Stock Exchange     October 26, 2018
          Jumlah                                                                                                    1,000,000,000                       Total

          Surat Utang Jangka Menengah                                                                                                    Global Medium Term
          Global - JPY                                                                                                                            Notes - JPY
          Penerbitan tahun 2019         20 September 2019/        Tidak tercatat/                N/A               23,200,000,000               Issued in 2019
                                        September 20, 2019          Not listed
          Jumlah                                                                                                   23,200,000,000                       Total


            *)     Dalam jumlah penuh                                                           *)     In full amount

            Majapahit Holding B.V., Belanda, entitas anak                                       Majapahit Holding B.V., the Netherlands, a wholly-
            yang bertujuan khusus yang sepenuhnya milik                                         owned special-purpose subsidiary of the
            Perusahaan, menerbitkan Obligasi Terjamin,                                          Company, issued Guaranteed Notes, as follows:
            sebagai berikut:
                                                                                                                  Jumlah yang
                                                                                               Tanggal             ditawarkan/
                                         Tanggal efektif/       Bursa pencatatan/             pencatatan/        Offered amount
                                          Effective date            Listed on                 Listed date             USD *)

          Obligasi Terjamin - USD                                                                                                     Guaranteed Notes - USD
          Penerbitan 2009               6 November 2009/       Bursa Efek Singapura/      9 November 2009/          1,250,000,000              Issued in 2009
                                        November 6, 2009     Singapore Stock Exchange     November 9, 2009
          Penerbitan 2009                7 Agustus 2009/       Bursa Efek Singapura/      11 Agustus 2009/              750,000,000             Issued in 2009
                                          August 7, 2009     Singapore Stock Exchange      August 11, 2009
          Penerbitan 2007                  28 Juni 2007/       Bursa Efek Singapura/        29 Juni 2007/           1,000,000,000               Issued in 2007
                                          June 28, 2007      Singapore Stock Exchange       June 29, 2007
          Penerbitan 2006               16 Oktober 2006/       Bursa Efek Singapura/      17 Oktober 2006/          1,000,000,000               Issued in 2006
                                        October 16, 2006     Singapore Stock Exchange     October 17, 2006
          Jumlah                                                                                                    4,000,000,000                       Total

            *)     Dalam jumlah penuh                                                             *)    In full amount
Page 15
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/5 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                  JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                                         1.      GENERAL INFORMATION (continued)

     c.    Susunan pengurus dan informasi lain                                                 c.      Management and other information

           Pada tanggal 30 Juni 2024 dan 31 Desember                                                   As at June 30, 2024 and December 31, 2023, the
           2023, susunan pengurus Perusahaan adalah                                                    Company’s management consisted of the
           sebagai berikut:                                                                            following:
                                                        30 Juni 2024 / June 30, 2024        31 Desember 2023 / December 31,2023

          Dewan Komisaris                                                                                                                          Board of Commissioners
          Komisaris Utama                              Agus Dermawan W Martowardojo         Agus Dermawan W Martowardojo                             President Commissioner
          Wakil Komisaris Utama                               Suahasil Nazara                      Suahasil Nazara                              Vice President Commissioner
          Komisaris                                           Dadan Kusdiana                       Dadan Kusdiana                                            Commissioners
                                                            Susiwijono Moegiarso                 Susiwijono Moegiarso
                                                              Mohamad Ikhsan                       Mohamad Ikhsan
                                                             Dudy Purwagandhi                     Dudy Purwagandhi
                                                                Nawal Nely                           Tedi Bharata
                                                                                                     Eko Sulistyo

          Komisaris Independen                                Arcandra Tahar                            Arcandra                                Independent Commissioners
                                                              Charles Sitorus                         Charles Sitorus


          Direksi                                                                                                                                         Board of Directors
          Direktur Utama                                    Darmawan Prasodjo                       Darmawan Prasodjo                                        President Director
          Direktur Keuangan                                   Sinthya Roesly                          Sinthya Roesly                                       Director of Finance
          Direktur Perencanaan Korporat                                                                                                        Director of Corporate Planning
              dan Pengembangan Bisnis                        Hartanto Wibowo                        Hartanto Wibowo                            and Business Development
          Direktur Legal dan Manajemen Human Capital         Yusuf Didi Setiarto                    Yusuf Didi Setiarto   Director of Legal and Human Capital Management
          Direktur Retail dan Niaga                           Edi Srimulyanti                        Edi Srimulyanti                        Director of Retail and Commerce
          Direktur Transmisi dan Perencanaan Sistem            Evy Haryadi                            Evy Haryadi             Director of Transmission and System Planning
          Direktur Manajemen Pembangkitan                      Adi Lumakso                            Adi Lumakso                        Director of Generation Management
          Direktur Distribusi                                  Adi Priyanto                           Adi Priyanto                                      Director of Distribution
          Direktur Manajemen Proyek dan Energi Baru                                                                                     Director of Management Projects and
              Terbarukan                                    Wiluyo Kusdwiharto                      Wiluyo Kusdwiharto                              New Renewable Energy
          Direktur Manajemen Risiko                          Suroso Isnandar                         Suroso Isnandar                             Director of Risk Management

          Komite Audit                                                                                                                                      Audit Committee
          Ketua                                               Arcandra Tahar                        Arcandra Tahar                                                 Chairman
          Anggota                                            Mohamad Ikhsan                        Mohamad Ikhsan                                                  Members
                                                              Charles Sitorus                       Charles Sitorus
                                                          Tomi Parisianto Wibowo                Tomi Parisianto Wibowo
                                                            Nizam Burhanuddin                     Nizam Burhanuddin
                                                             Dwi Siska Susanti                     Dwi Siska Susanti

          Sekretaris Perusahaan                                                                                                                         Corporate Secretary
          Sekretaris Perusahaan                             Alois Wisnuhardana                      Alois Wisnuhardana                                   Corporate Secretary

           Lihat Catatan 58(i) untuk informasi terkait                                                 Refer to Note 58(i) for the information regarding to
           perubahan pada Dewan Komisaris.                                                             the changes in Board of Commissioners.

     d. Pembentukan struktur subholding                                                        d.     Establishment of subholding structure

           Berdasarkan Surat Keputusan Menteri BUMN                                                   Based on Decision Letter of the Minister of SOE
           Republik Indonesia Nomor S-886/MBU/12/2022                                                 of the Republic of Indonesia No. S-
           tanggal 30 Desember 2022 perihal Persetujuan                                               886/MBU/12/2022 dated December 30, 2022,
           Pembentukan Holding dan Subholding PT PLN                                                  regarding the Approval for the Establishment of
           (Persero) Masa/tahap Legal End-State Serta                                                 Holding and Subholding of PT PLN (Persero) for
           Restrukturisasi dan Pengalihan Harta, Perseroan                                            the Legal End-State Period/Stage as well as the
           membentuk Subholding Grup yang berlaku                                                     Restructuring and Transfer of Assets, the
           efektif tanggal 1 Januari 2023 melalui:                                                    Company established Group Subholdings which
                                                                                                      became effective on January 1, 2023, through:

           1.    Pemekaran usaha atau pemisahan tidak                                                1. A partial spin-off of part of the Company’s
                 murni/spin-off atas sebagian aktiva dan                                                assets and liabilities relating to the generation
                 pasiva kegiatan usaha pembangkitan dan                                                 and primary energy business activities to PT
                 energi primer Perusahaan kepada PT PLN                                                 PLN Nusantara Power (“PNP”; previously
                 Nusantara Power (“PNP”; dahulu bernama                                                 named PT Pembangkitan Jawa-Bali) and PT
                 PT Pembangkitan Jawa-Bali) dan PT PLN                                                  PLN Indonesia Power (“PIP”; previously
                 Indonesia Power (“PIP”; dahulu bernama PT                                              named PT Indonesia Power).
                 Indonesia Power).

           2.    Penyertaan modal non-tunai (inbreng)                                                 2. In-kind capital participation (inbreng) to PT
                 kepada PT PLN Energi Primer Indonesia                                                   PLN Energi Primer Indonesia (“EPI”;
                 (“EPI”; dahulu bernama PT PLN Batubara)                                                 previously named PT PLN Batubara) in the
                 berupa seluruh kepemilikan saham Grup                                                   form of the Group’s entire share ownership in
                 pada PT Pengembang Listrik Nasional Gas                                                 PT Pengembang Listrik Nasional Gas dan
                 dan Geothermal (“PLN GG”) dan PT                                                        Geothermal (“PLN GG”) and PT Pelayaran
                 Pelayaran Bahtera Adhiguna (“BAG”).                                                     Bahtera Adhiguna (“BAG”).
Page 16
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/6 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                              1.   GENERAL INFORMATION (continued)

     d. Pembentukan struktur subholding (lanjutan)               d.   Establishment       of   subholding      structure
                                                                      (continued)

        Pembentukan empat Subholding Grup yang                        The formation of four Subholdings of the Group,
        terdiri atas:                                                 consisting of the following:

        1.   Dua Subholding di bidang pembangkitan                    1. Two Subholdings in the power generation
             tenaga listrik, yaitu PNP dan PIP;                          sector, namely PNP and PIP;
        2.   Satu Subholding di bidang penyediaan dan                 2. One Subholding in the primary energy
             logistik energi primer, yaitu EPI; dan                      procurement and logistics sector, namely
                                                                         EPI; and
        3.   Satu Subholding untuk kegiatan usaha di                  3. One Subholding for business activities
             luar pembangkitan, transmisi, dan distribusi                outside of power generation, transmission,
             ketenagalistrikan, yaitu bernama PT                         and distribution, namely PT Indonesia
             Indonesia Comnets Plus (“PT ICON Plus").                    Comnets Plus (“PT ICON Plus”).

         Pada tanggal 30 Desember 2022, sebagai                       On December 30, 2022, as part of the
         bagian dari Pembentukan Holding dan                          Establishment of PLN Holding and Subholdings,
         Subholding       PLN,   Perusahaan       telah               the Company signed the following Deeds that
         menandatangani akta-akta sebagai berikut yang                took effect on January 1, 2023, as approved
         telah berlaku efektif pada 1 Januari 2023                    and/or notified to the Minister of Law and Human
         sebagaimana disetujui dan/atau diberitahukan                 Rights:
         kepada Menteri Hukum dan Hak Asasi Manusia
         sebagai berikut:

        1.   Akta      pemisahan      kegiatan    usaha               1. Deed of spin-off of power generation
             pembangkitan kepada PNP dengan nilai                        business activities to PNP to be
             yang akan ditukar menjadi kepemilikan                       compensated with newly issued shares of
             saham baru Perusahaan pada PNP sebesar                      the Company in PNP amounting to
             Rp151.255.249, sesuai dengan hasil                          Rp151,255,249 as per the independent
             penilaian Kantor Jasa Penilai Publik                        appraisal of Kantor Jasa Penilai Publik
             Rengganis, Hamid, & Rekan (“KJPP RHR”),                     Rengganis, Hamid, & Rekan (“KJPP RHR”),
             yang tertuang dalam Akta Notaris No. 70                     as stated in the Notarial Deeds No. 70 and
             dan No. 76 tanggal 30 Desember 2022 dari                    No. 76 dated December 30, 2022 of
             Muhammad Hanafi, S.H.                                       Muhammad Hanafi, S.H.
        2.   Akta      pemisahan      kegiatan     usaha              2. Deed of spin-off of power generation
             pembangkitan dengan PIP dengan nilai                        business activities to PIP to be compensated
             yang akan ditukar menjadi kepemilikan                       with newly issued shares of the Company in
             saham baru Perusahaan pada PIP sebesar                      PIP amounting to Rp175,974,993 as per the
             Rp175.974.993, sesuai dengan hasil                          independent appraisal of KJPP RHR, as
             penilaian KJPP RHR yang tertuang dalam                      stated in Notarial Deeds No. 71 and No. 77
             Akta Notaris No. 71 dan No. 77 dari tanggal                 dated December 30, 2022 of Muhammad
             30 Desember 2022 dari Muhammad Hanafi,                      Hanafi, S.H.
             S.H.
        3.   Akta pemasukan (inbreng) ke dalam EPI                    3.   Deed of in-kind capital participation to EPI in
             berupa     seluruh    kepemilikan    saham                    the form of the Company’s entire share-
             Perusahaan pada PLN GG dan BAG dengan                         ownership in PLN GG and BAG to be
             nilai yang akan ditukar menjadi kepemilikan                   compensated with newly issued shares in
             saham baru sebesar Rp2.273.717, sesuai                        the value of Rp2,273,717 as per the
             dengan hasil penilaian KJPP RHR, yang                         independent appraisal of KJPP RHR, as
             tertuang dalam Akta Notaris No. 72 dan No.                    stated in Notarial Deeds No. 72 and No. 78
             78 tanggal 30 Desember 2022 dari                              dated December 30, 2022 of Muhammad
             Muhammad Hanafi, S.H.                                         Hanafi, S.H.
Page 17
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/7 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

1.   INFORMASI UMUM (lanjutan)                                1.   GENERAL INFORMATION (continued)

     d. Pembentukan struktur subholding (lanjutan)                 d.    Establishment      of    subholding      structure
                                                                        (continued)

        Setelah transaksi tersebut di atas dilaksanakan,                 Upon the consummation of the transaction, the
        Perusahaan akan memiliki tambahan kepemilikan                    Company will have additional share ownership in
        saham pada anak perusahaan terkonsolidasi, yaitu                 consolidated subsidiaries, which are PNP, PIP,
        PNP, PIP, dan EPI dalam nilai masing-masing                      and EPI in the value as mentioned above. This is
        tersebut di atas, di mana hal ini diharapkan akan                expected to provide additional value to the Group
        memberikan nilai tambah bagi Grup serta                          and have a positive impact on the continuity of the
        memberikan dampak positif bagi keberlangsungan                   Group’s business activities.
        kegiatan usaha Grup.

        Berdasarkan Keputusan Direktur Jenderal Pajak                   Based on the Decree of the Director General of
        No. Kep-86/WPJ.19/2023 tanggal 15 Juni 2023,                    Taxes No. Kep-86/WPJ.19/2023 dated June 15,
        Direktorat Jenderal Pajak menyetujui penggunaaan                2023, the Directorate General of Taxes approved
        nilai buku atas pengalihan harta dari Perusahaan ke             the use of book value for the transfer of assets from
        PT PLN Energi Primer Indonesia dalam rangka                     the Company to PT PLN Energi Primer Indonesia
        pengambilalihan usaha yang berlaku mulai tanggal                for the purposes of a business take over which
        1 Januari 2023.                                                 became effective on January 1, 2023.

        Berdasarkan Keputusan Direktur Jenderal Pajak                   Based on the Decree of the Director General of
        No. Kep-87/WPJ.19/2023 tanggal 15 Juni 2023,                    Taxes No. Kep-87/WPJ.19/2023 dated June 15,
        Direktorat Jenderal Pajak menyetujui penggunaaan                2023, the Directorate General of Taxes approved
        nilai buku atas pengalihan harta dari Perusahaan ke             the use of book value for the transfer of assets from
        PT PLN Nusantara Power dan PT PLN Indonesia                     the Company to PT PLN Nusantara Power and PT
        Power dalam rangka pemekaran usaha yang                         PLN Indonesia Power for the purposes of partial
        berlaku mulai tanggal 1 Januari 2023.                           spin-off which became effective on January 1,
                                                                        2023.
Page 18
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/8 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                          2.   IMPLEMENTATION      OF                  INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                             GENERALLY      ACCEPTED                ACCOUNTING
                                                                    PRINCIPLES (“GAAP”)

     a.   Penerapan Peraturan Otoritas Jasa Keuangan                a.   Implementation of Financial Services Authority
          No.6/POJK.04/2017       tentang       Perlakuan                Regulation   No.6/POJK.04/2017      regarding
          Akuntansi atas Transaksi Berdasarkan                           Accounting Treatment for Transactions Based
          Perjanjian Jual Beli Tenaga Listrik (“POJK No.                 on Power Purchase Agreements (“POJK No.
          6”)                                                            6”)

          Grup mengadakan perjanjian jual beli tenaga                    The Group has entered into Power Purchase
          listrik, yakni Perjanjian Jual Beli Tenaga Listrik             Agreements (“PPAs”) and Energy Sales
          (“PPA”) dan Kontrak Penjualan Energi (“ESC”),                  Contracts (“ESCs”), with Independent Power
          dengan Penyedia dan Pengembang Tenaga                          Producers (“IPPs”). Those IPPs are holders of
          Listrik Swasta (“IPP”). IPP tersebut merupakan                 Electricity Business Licences for public use.
          pemegang Izin Usaha Ketenagalistrikan untuk
          kepentingan umum.

          Sebelum 1 Januari 2016, Grup menerapkan                        Before January 1, 2016, the Group applied
          Interpretasi Standar Akuntansi Keuangan                        Interpretation of Financial Accounting Standards
          (“ISAK”) No. 8: “Penentuan Apakah Suatu                        (“IFAS”) No. 8: “Determining Whether an
          Perjanjian Mengandung Suatu Sewa” (“ISAK No.                   Arrangement Contains a Lease” (“IFAS No. 8”) in
          8”) dalam mengevaluasi apakah PPA dan ESC                      evaluating whether PPAs and ESCs with IPPs
          dengan IPP mengandung unsur sewa (Catatan                      contain a lease (Note 3.l).
          3.l).

          Pada tanggal 1 Juni 2017, Otoritas Jasa                        On June 1, 2017, the Financial Services
          Keuangan (“OJK”) menerbitkan POJK No. 6                        Authority (“FSA”) issued POJK No. 6 which is
          yang berlaku bagi Emiten dan Perusahaan                        applicable for listed and public companies.
          Publik. Berdasarkan POJK No. 6, transaksi                      Based on POJK No. 6, transactions based on a
          berdasarkan perjanjian jual beli tenaga listrik                PPA are treated as sale and purchase
          diperlakukan sebagai transaksi jual beli,                      transactions, even though the PPAs contain
          meskipun perjanjian jual beli tenaga listrik                   substances other than that of the sale and
          tersebut mengandung substansi selain jual beli                 purchase of electricity. POJK No. 6 applies
          listrik. POJK No. 6 berlaku secara prospektif                  prospectively for the year beginning on January
          untuk tahun buku yang dimulai sejak                            1, 2017, and early implementation is allowed for
          1 Januari 2017 dan mengizinkan perlakuan lebih                 the year beginning on January 1, 2016. POJK
          awal sejak 1 Januari 2016. POJK No. 6 berlaku                  No. 6 is valid until the end of the assignment on
          sampai akhir tahun buku berakhirnya penugasan                  the acceleration of electricity infrastructure
          untuk percepatan pembangunan infrastruktur                     development in accordance with Presidential
          ketenagalistrikan    berdasarkan     Peraturan                 Regulation No. 14 year 2017.
          Presiden No. 14 tahun 2017.

          Grup memutuskan untuk menerapkan lebih awal                    The Group decided to implement POJK No. 6
          POJK     No.6     secara     prospektif      sejak             early prospectively beginning on January 1,
          1 Januari 2016. Oleh karena itu, transaksi                     2016. Therefore, the electricity sale and
          berdasarkan perjanjian jual beli tenaga listrik                purchase transactions based on PPAs which
          yang mengandung sewa (Catatan 3.l), mulai                      contain a lease (Note 3.l), since January 1, 2016,
          1 Januari 2016 disajikan sebagai pembelian                     are presented as purchases of electricity in the
          tenaga listrik dalam laporan laba rugi dan                     consolidated statement of profit or loss and other
          penghasilan komprehensif lain konsolidasian                    comprehensive income when incurred. On
          pada    tahun    terjadinya.    Pada      tanggal              January 1, 2016, the Group also adjusted the
          1 Januari 2016, Grup juga melakukan                            related assets and liabilities.
          penyesuaian atas aset dan liabilitas terkait.

          Jumlah bersih penyesuaian atas aset dan                        The net adjustments on related assets and
          liabilitas terkait sebesar Rp43.428.454 dan telah              liabilities amounted to Rp43,428,454 and were
          dicatat sebagai penyesuaian saldo laba pada                    recorded as an adjustment to retained earnings on
          tanggal 1 Januari 2016, dengan rincian sebagai                 January 1, 2016, the details of which are as
          berikut:                                                       follows:
Page 19
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/9 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                                2.   IMPLEMENTATION         OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                                   GENERALLY      ACCEPTED         ACCOUNTING
     (lanjutan)                                                           PRINCIPLES (“GAAP”) (continued)

     a.    Penerapan Peraturan Otoritas Jasa Keuangan                     a.      Implementation of Financial Services Authority
           No.6/POJK.04/2017       tentang       Perlakuan                        Regulation      No.6/POJK.04/2017   regarding
           Akuntansi atas Transaksi Berdasarkan                                   Accounting Treatment for Transactions Based
           Perjanjian Jual Beli Tenaga Listrik (“POJK No.                         on Power Purchase Agreements (“POJK No.
           6”) (lanjutan)                                                         6”) (continued)

                                            1 Januari 2016                          1 Januari 2016
                                               sebelum        Penyesuaian               setelah
                                             penyesuaian/      saldo awal/           penyesuaian/
                                            January 1, 2016    Beginning            January 1, 2016
                                                before          balance                  after
                                              adjustment       adjustment             adjustment

          Aset tetap                         1,187,879,590          (72,227,600)     1,115,651,990      Property, plant and equipment
          Aset pajak tangguhan                  29,088,271          (14,787,769)        14,300,502                 Deferred tax assets

                                             1,216,967,861          (87,015,369)     1,129,952,492
          Liabilitas jangka panjang                                                                               Non-current liabilities
             Utang listrik swasta                7,093,280              755,783          7,849,063     Electricity purchase payable
             Utang sewa                        149,621,763         (128,065,144)        21,556,619                  Lease Liabilities

          Liabilitas jangka pendek                                                                                    Current liabilities
             Utang sewa                          6,759,138           (3,313,534)         3,445,604                   Lease liabilities
             Biaya masih harus dibayar          10,627,055           (2,216,084)         8,410,971                Accrued expenses
             Utang listrik swasta                  311,196                9,968            321,164     Electricity purchase payable
             Utang usaha                                                                                             Trade payables
                Pihak berelasi                   8,910,438              380,409          9,290,847                 Related parties
                Pihak ketiga                    17,715,563            1,998,142         19,713,705                   Third parties
             Utang lain-lain                    20,188,608                6,637         20,195,245                   Other payables

                                               221,227,041         (130,443,823)        90,783,218

                                                                                                           The effect of POJK No. 6
          Dampak penerapan POJK No. 6                                                                    application on beginning
            terhadap saldo laba awal                                43,428,454                                  retained earnings

           Mulai 1 Januari 2020, Grup menerapkan                                  Starting January 1, 2020, the Group
           Pernyataan Standar Akuntansi Keuangan                                  implemented Statement of Financial Accounting
           (“PSAK”) 73, “Sewa”. Standar akuntansi ini                             Standards (“SFAS”) 73, “Leases”. This standard
           menggantikan standar akuntansi berikut:                                replaced the previous accounting standards as
                                                                                  follows:
           •     PSAK No. 30: “Sewa”                                              •    SFAS No. 30: “Leases”
           •     ISAK No. 8: “Penentuan apakah Suatu                              •    IFAS No. 8: “Determining Whether an
                 Perjanjian Mengandung Suatu Sewa”                                     Arrangement Contains a Lease”
           •     ISAK No. 23: “Sewa Operasi-Insentif”                             •    IFAS No. 23: “Operating Leases-Incentives”
           •     ISAK No. 24: “Evaluasi Substansi Beberapa                        •    IFAS No. 24: “Evaluating the Substance of
                 Transaksi yang Melibatkan Suatu Bentuk                                Transactions Involving the Legal Form of a
                 Legal Sewa”                                                           Lease”
           •     ISAK No. 25: “Hak atas Tanah”                                    •    IFAS No. 25: “Land Rights”

           Perjanjian jual beli tenaga listrik yang diikuti oleh                  The PPAs entered into by the Group are still
           Grup tetap mengacu pada POJK No. 6 karena                              accounted for under POJK No. 6 because it
           peraturan tersebut masih berlaku sampai                                remains valid until the end of the assignment on
           berakhirnya penugasan untuk percepatan                                 acceleration     of    electricity  infrastructure
           pembangunan infrastruktur ketenagalistrikan                            development in accordance with Presidential
           berdasarkan Peraturan Presiden. Dengan                                 Regulation. Therefore, the accounting treatment
           demikian perlakuan akuntansi untuk PPA dan                             for PPAs and ESCs with IPPs remains the same
           ESC dengan IPP masih tetap sama seperti                                as before the Group implemented SFAS No. 73,
           sebelum Grup menerapkan PSAK No. 73, yaitu                             i.e. treated as sale and purchase transactions;
           diperlakukan sebagai transaksi jual beli dan                           hence, excluded from the scope of SFAS No. 73.
           dikecualikan dari ruang lingkup penerapan PSAK
           No. 73.
Page 20
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/10 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

2.   PENERAPAN PRINSIP AKUNTANSI YANG                        2.   IMPLEMENTATION         OF        INDONESIAN
     BERLAKU UMUM DI INDONESIA (“PABU”)                           GENERALLY      ACCEPTED         ACCOUNTING
     (lanjutan)                                                   PRINCIPLES (“GAAP”) (continued)

     b.   Perubahan pada PSAK dan amandemen yang                  b.   Changes to SFAS and amendments which are
          berlaku efektif untuk tahun buku yang dimulai                effective for years beginning on or after
          pada atau setelah tanggal 1 Januari 2023                     January 1, 2023

          Penerapan dari amandemen yang berlaku efektif                The adoption of the following amendments to
          untuk tahun buku yang dimulai pada atau                      accounting standards which are effective from
          setelah tanggal 1 Januari 2023 tidak                         January 1, 2023 did not result in substantial
          menyebabkan perubahan signifikan atas                        changes to the Group's accounting policies and
          kebijakan akuntansi Grup dan tidak memberikan                had no material effect on the amounts reported
          dampak yang material terhadap jumlah yang                    in the consolidated financial statements for the
          dilaporkan di laporan keuangan konsolidasian                 current year:
          pada tahun berjalan:

          • Amandemen PSAK No. 1: “Penyajian Laporan                   • Amendment to SFAS No. 1, “Presentation of
            Keuangan   -   Pengungkapan      Kebijakan                   Financial Statements - Disclosure of Accounting
            Akuntansi”                                                   Policies”
          • Amandemen PSAK No. 16: “Aset Tetap - Hasil                 • Amendment to SFAS No. 16: “Property, Plant
            Sebelum Penggunaan yang Diintensikan”                        and Equipment - Proceeds Before Intended
                                                                         Use”
          • Amandemen PSAK No. 25: “Kebijakan                          • Amendment to SFAS No. 25: “Accounting
            Akuntansi, Perubahan Estimasi Akuntansi dan                  Policies, Changes in Accounting Estimates and
            Kesalahan - Definisi Estimasi Akuntansi”                     Errors - Definition of Accounting Estimates”
          • Amandemen PSAK No. 46: “Pajak Penghasilan                  • Amendment to SFAS No. 46: “Income Taxes -
            - Pajak Tangguhan terkait Aset dan Liabilitas                Deferred Tax related to Assets and Liabilities
            yang Timbul dari Transaksi Tunggal”                          Arising from a Single Transaction”
          • Amandemen PSAK No. 46: “Pajak Penghasilan                  • Amendment to SFAS No. 46, “Income Taxes -
            - Reformasi Pajak Internasional - Ketentuan                  International Tax Reform - Pillar Two Model
            Model Pilar Dua”                                             Rules”

          Standar baru dan amandemen yang telah                        New standards and amendments issued but not
          diterbitkan, namun belum berlaku efektif untuk               yet effective for the financial year beginning
          tahun buku yang dimulai pada 1 Januari 2023                  January 1, 2023, are as follows:
          adalah sebagai berikut:

          Standar baru dan amandemen di atas berlaku                   The above new standard and amendments are
          efektif mulai 1 Januari 2024, kecuali untuk PSAK             effective beginning January 1, 2024, except for
          No. 74 dan Amandemen PSAK No. 74 yang                        SFAS No. 74 and Amendment to SFAS No. 74
          berlaku efektif mulai 1 Januari 2025, tetapi                 which are effective beginning January 1, 2025, but
          penerapan dini diperkenankan.                                early adoption is permitted.

          Pada tanggal penyelesaian laporan keuangan                   As at the completion date of these consolidated
          konsolidasian ini, Grup sedang mempelajari                   financial statements, the Group is evaluating the
          dampak yang mungkin timbul dari penerapan                    potential impact of these new standards,
          standar baru, amandemen, revisi, dan                         amendments,        revisions,    and       annual
          penyesuaian tahunan pada laporan keuangan                    improvements on the Group’s consolidated
          konsolidasian Grup.                                          financial statements.

          Mulai 1 Januari 2024, referensi terhadap masing-             Starting on January 1, 2024, references to the
          masing PSAK dan ISAK akan diubah                             individual SFAS and IFAS will be changed as
          sebagaimana diterbitkan oleh Dewan Standar                   published by the Financial Accounting Standards
          Akuntansi Keuangan - Ikatan Akuntan Indonesia                Board - Indonesian Institute of Accountants
          (“DSAK-IAI”).                                                (“DSAK-IAI”).
Page 21
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/11 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION

     Berikut ini adalah kebijakan akuntansi material yang         Presented below are the material accounting policies
     diterapkan dalam penyusunan laporan keuangan                 adopted in preparing the consolidated financial
     konsolidasian Grup. Kebijakan ini telah diaplikasikan        statements of the Group. These policies have been
     secara konsisten terhadap semua tahun yang                   consistently applied to all of the years presented,
     disajikan, kecuali dinyatakan lain.                          unless otherwise stated.

     a.   Pernyataan kepatuhan                                    a.   Statement of compliance

          Sejak 1 Januari 2016, laporan keuangan                       Since January 1, 2016, the consolidated financial
          konsolidasian telah disusun dan disajikan sesuai             statements have been prepared and presented
          dengan PABU, yang mencakup sebagai berikut:                  in accordance with Indonesian GAAP, which
                                                                       covers the following:
          (a) Standar     Akuntansi    Keuangan     yang               (a) Financial Accounting Standards issued by
              dikeluarkan oleh DSAK-IAI, yang meliputi                      DSAK-IAI, which cover SFAS and IFAS;
              PSAK dan ISAK;
          (b) Standar Akuntansi Keuangan Syariah yang                  (b) Syariah Financial Accounting Standards
              dikeluarkan oleh Dewan Standar Akuntansi                     issued by the Syariah Accounting Standards
              Syariah - Ikatan Akuntan Indonesia (“DSAS-                   Board - Indonesian Institute of Accountants
              IAI”), yang meliputi Standar Akuntansi                       (“DSAS-IAI”),    which      cover    Syariah
              Syariah (“SAS”); dan                                         Accounting Standards (“SAS”); and
          (c) Ketentuan akuntansi keuangan yang                        (c) Applicable Capital Market Regulations as
              ditetapkan oleh OJK, terdiri dari Peraturan                  stated by the FSA, including FSA Regulation
              OJK No. VIII.G.7 tentang Pedoman                             No. VIII.G.7 consisting of Guidance for the
              Penyajian Laporan Keuangan, Keputusan                        Presentation of Financial Statements,
              Ketua Badan Pengawas Pasar Modal -                           Decree of Chairman of the Capital Market
              Lembaga Keuangan (“Bapepam-LK”) No.                          and Financial Institutions Supervisory Board
              KEP-347/BL/2012 tentang Penyajian dan                        (“CM-FISB”)      No.       KEP-347/BL/2012
              Pengungkapan Laporan Keuangan Emiten                         regarding Presentation and Disclosure of
              atau Perusahaan Publik, dan Peraturan OJK                    Financial Statements of Listed or Public
              No. 6 POJK.04/2017 tentang Perlakuan                         Companies, and FSA Regulation No. 6
              Akuntansi atas Transaksi Berdasarkan                         POJK.04/2017        regarding     Accounting
              Perjanjian Jual Beli Tenaga Listrik.                         Treatment for Transactions Based on Power
                                                                           Purchase Agreements.

     b.   Dasar penyusunan          laporan     keuangan          b.   Basis of preparation of the consolidated
          konsolidasian                                                financial statements

          Dasar     penyusunan        laporan    keuangan              The consolidated financial statements, except for
          konsolidasian, kecuali untuk laporan arus kas                the consolidated statements of cash flows, have
          konsolidasian adalah dasar akrual. Mata uang                 been prepared using the accrual basis of
          penyajian yang digunakan untuk penyusunan                    accounting. The presentation currency used in
          laporan keuangan konsolidasian adalah mata                   the preparation of the consolidated financial
          uang Rupiah (“Rp”), yang juga merupakan mata                 statements is the Rupiah (“Rp”), which is also the
          uang fungsional Grup. Laporan keuangan                       functional currency of the Group. The
          konsolidasian disusun dan disajikan berdasarkan              preparation and presentation of the consolidated
          asumsi kelangsungan usaha dan dengan                         financial statements are based on the going
          pengukuran nilai historis, kecuali beberapa akun             concern assumption and the measurement basis
          tertentu disusun berdasarkan pengukuran lain                 is historical cost, except for certain accounts
          sebagaimana diuraikan dalam kebijakan                        which are measured on the basis described in
          akuntansi masing-masing akun tersebut.                       the related accounting policies.
Page 22
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/12 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     b.   Dasar penyusunan laporan              keuangan          b.   Basis of preparation of the consolidated
          konsolidasian (lanjutan)                                     financial statements (continued)

          Penyusunan laporan keuangan konsolidasian                    The preparation of consolidated financial
          sesuai dengan Standar Akuntansi Keuangan di                  statements in conformity with Indonesian Financial
          Indonesia mengharuskan penggunaan estimasi                   Accounting Standards requires the use of certain
          dan asumsi. Hal tersebut juga mengharuskan                   critical accounting estimates and assumptions. It
          manajemen untuk membuat pertimbangan dalam                   also requires management to exercise its
          proses penerapan kebijakan akuntansi Grup. Area              judgement in the process of applying the Group’s
          yang kompleks atau memerlukan tingkat                        accounting policies. The areas involving a higher
          pertimbangan yang lebih tinggi atau area di mana             degree of judgement or complexity, or areas where
          asumsi dan estimasi dapat berdampak signifikan               assumptions and estimates are significant to the
          terhadap laporan keuangan konsolidasian                      consolidated financial statements are disclosed in
          diungkapkan di Catatan 4.                                    Note 4.

     c.   Prinsip-prinsip konsolidasian                           c.   Principles of consolidation

          i. Entitas anak                                              i.   Subsidiaries

             i.1. Konsolidasi                                               i.1. Consolidation

                 Entitas anak merupakan semua entitas                          Subsidiaries are all entities (including
                 (termasuk entitas bertujuan khusus), di                       structured entities) over which the Group
                 mana Grup memiliki pengendalian. Grup                         has control. The Group controls an entity
                 mengendalikan suatu entitas ketika Grup                       when the Group is exposed to, or has
                 memiliki hak atas imbal hasil variabel                        rights to, variable returns from its
                 dari keterlibatannya dengan suatu                             involvement with the entity and has the
                 entitas dan memiliki kemampuan untuk                          ability to affect those returns through its
                 mempengaruhi imbal hasil tersebut                             power over the entity.
                 melalui kekuasaannya atas entitas
                 tersebut.

                 Entitas anak dikonsolidasi sejak tanggal                      Subsidiaries are consolidated from the
                 pengendalian beralih kepada Grup dan                          date on which control is transferred to the
                 tidak lagi dikonsolidasi sejak tanggal                        Group and are de-consolidated from the
                 hilangnya pengendalian.                                       date on which that control ceases.

                 Saldo, transaksi, penghasilan, dan                            Intragroup    balances,     transactions,
                 beban intra kelompok usaha dieliminasi.                       income and expenses are eliminated.
                 Keuntungan dan kerugian hasil dari                            Profits and losses resulting from
                 transaksi intra kelompok usaha yang                           intragroup    transactions     that   are
                 diakui dalam aset juga dieliminasi.                           recognised in assets are also eliminated.
                 Kebijakan akuntansi entitas anak telah                        The accounting policies of subsidiaries
                 diubah seperlunya untuk memastikan                            have been amended where necessary to
                 konsistensi penerapan kebijakan oleh                          ensure consistency with the policies
                 Grup.                                                         adopted by the Group.
Page 23
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/13 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                        POLICY
     (lanjutan)                                                     INFORMATION (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                  c.   Principles of consolidation (continued)

          i. Entitas anak (lanjutan)                                     i.   Subsidiaries (continued)

             i.2. Akuisisi                                                    i.2. Acquisition

                Grup menerapkan metode akuisisi untuk                            The Group applies the acquisition
                mencatat setiap kombinasi bisnis.                                method to account for business
                Imbalan       yang       dialihkan    untuk                      combinations.        The       consideration
                mengakuisisi entitas anak adalah nilai                           transferred for the acquisition of a
                wajar seluruh aset yang dialihkan,                               subsidiary is the fair value of the assets
                liabilitas yang diakui oleh pihak                                transferred, the liabilities incurred to the
                pengakuisisi kepada pemilik sebelumnya                           former owners of the acquiree and the
                dari entitas yang diakuisisi dan                                 equity interests issued by the Group. The
                kepentingan ekuitas yang diterbitkan oleh                        consideration transferred includes the
                Grup. Imbalan yang dialihkan termasuk                            fair value of any asset or liability resulting
                nilai wajar setiap aset dan liabilitas yang                      from       a   contingent      consideration
                dihasilkan dari suatu kesepakatan                                arrangement. The identifiable assets
                imbalan kontinjensi. Aset teridentifikasi,                       acquired, liabilities and contingent
                liabilitas dan liabilitas kontinjensi yang                       liabilities assumed in a business
                diambil alih, yang diperoleh dalam                               combination are measured initially at
                kombinasi bisnis diukur pada awalnya                             their fair values as at the acquisition date
                sebesar nilai wajar pada tanggal akuisisi.

                Grup mengakui kepentingan non-                                   The Group recognises any non-
                pengendali pada pihak yang diakuisisi                            controlling interest in the acquiree on an
                baik sebesar nilai wajar atau sebesar                            acquisition-by-acquisition basis, either at
                bagian proporsional kepentingan non-                             fair value or at the non-controlling
                pengendali atas aset neto teridentifikasi                        interest’s proportionate share of the
                pihak yang diakuisisi. Kepentingan non-                          acquiree’s identifiable net assets. Non-
                pengendali disajikan di ekuitas dalam                            controlling interests are reported as
                laporan posisi keuangan konsolidasian,                           equity in the consolidated statements of
                terpisah dari ekuitas pemilik entitas induk.                     financial position, separate from the
                                                                                 owner of the parent entity.

                Biaya terkait akuisisi dibebankan pada                           Acquisition-related costs are expensed
                saat terjadinya.                                                 as incurred.

                Jika kombinasi bisnis diperoleh secara                           If the business combination is achieved
                bertahap,     Grup      akan    mengukur                         in stages, the Group will remeasure its
                kepentingan ekuitas yang sebelumnya                              previously held equity interest in the
                dimiliki pada pihak yang diakuisisi                              acquiree at its fair value at its acquisition
                sebesar nilai wajar pada tanggal akuisisi                        date and recognise the resulting gain or
                dan mengakui keuntungan atau kerugian                            loss, if any, in profit or loss. Any
                yang dihasilkan, jika ada, dalam laba rugi.                      contingent      consideration       to     be
                Imbalan kontinjensi yang masih harus                             transferred by the Group is recognised at
                dialihkan oleh Grup diakui sebesar nilai                         its fair value as at the acquisition date.
                wajar pada tanggal akuisisi. Perubahan                           Subsequent changes to the fair value of
                selanjutnya atas nilai wajar imbalan                             the contingent consideration that is
                kontinjensi yang diakui sebagai aset atau                        deemed to be an asset or a liability are
                liabilitas dan dicatat dalam laba rugi.                          recognised in profit or loss. A contingent
                Imbalan kontinjensi yang diklasifikasikan                        consideration that is classified as equity
                sebagai ekuitas tidak diukur kembali dan                         is not remeasured and its subsequent
                penyelesaian selanjutnya diperhitungkan                          settlement is accounted for within equity.
                dalam ekuitas.
Page 24
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/14 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          i. Entitas anak (lanjutan)                                    i.   Subsidiaries (continued)

             i.2. Akuisisi (lanjutan)                                        i.2. Acquisition (continued)

                Selisih lebih antara imbalan yang                               The excess of the consideration
                dialihkan, jumlah setiap kepentingan non-                       transferred, the amount of any non-
                pengendali dalam pihak yang diakuisisi,                         controlling interests in the acquiree and
                dan nilai wajar pada tanggal akuisisi dari                      the acquisition-date fair value of any
                kepemilikan ekuitas yang sebelumnya                             previous equity interest in the acquiree
                dimiliki oleh pihak pengakuisisi pada                           over the fair value of the Group’s share of
                pihak yang diakuisisi, dibandingkan                             the identifiable net assets acquired are
                dengan nilai wajar bagian Grup atas aset                        recorded as goodwill. If these amounts
                bersih teridentifikasi yang diakuisisi,                         are less than the fair value of the net
                dicatat sebagai goodwill. Jika jumlah                           identifiable assets of the subsidiary
                tersebut lebih kecil dari nilai wajar atas                      acquired and the measurement of all
                aset bersih teridentifikasi entitas anak                        amounts has been reviewed, in the case
                yang diakuisisi dan pengukuran atas                             of a bargain purchase, the difference is
                seluruh jumlah tersebut telah ditelaah,                         recognised directly in profit or loss.
                dalam hal pembelian dengan diskon,
                selisih tersebut diakui secara langsung
                dalam laba rugi.

          ii. Perubahan kepemilikan atas entitas anak                   ii. Changes in ownership interest                  in
              tanpa kehilangan pengendalian                                 subsidiaries without loss of control

             Transaksi    dengan      kepentingan     non-                   Transactions with non-controlling interests
             pengendali yang tidak mengakibatkan                             that do not result in a loss of control are
             hilangnya pengendalian dicatat sebagai                          accounted for as equity transactions. The
             transaksi ekuitas. Selisih antara nilai wajar                   difference between the fair value of any
             imbalan yang dibayarkan dan bagiannya atas                      consideration paid and the relevant share
             jumlah tercatat aset neto yang diperoleh                        acquired of the carrying amount of net assets
             dicatat dalam ekuitas. Keuntungan atau                          of the subsidiary is recorded in equity. Gains
             kerugian     atas     pelepasan       kepada                    or losses on disposals to non-controlling
             kepentingan non-pengendali juga dicatat                         interests are also recorded in equity.
             pada ekuitas.

          iii. Pelepasan entitas anak                                   iii. Disposal of subsidiaries

             Ketika Grup kehilangan pengendalian atas                        When the Group loses control of a
             entitas anak, Grup menghentikan pengakuan                       subsidiary, the Group derecognises the
             aset (termasuk setiap goodwill) dan liabilitas                  assets (including any goodwill) and liabilities
             entitas anak pada nilai tercatatnya ketika                      of the subsidiary at their carrying amounts as
             pengendalian       hilang.   Jumlah      yang                   at the date on which control is lost. Amounts
             sebelumnya diakui dalam penghasilan                             previously      recognised         in    other
             komprehensif lain juga direklasifikasi ke laba                  comprehensive income are also reclassified
             rugi atau dialihkan secara langsung ke saldo                    to profit or loss, or transferred directly to
             laba jika disyaratkan oleh PSAK lain.                           retained earnings if required under other
                                                                             SFAS.

             Sisa investasi pada entitas anak terdahulu                      Any investment retained in the former
             diakui sebesar nilai wajarnya. Setiap                           subsidiary is recognised at its fair value. The
             perbedaan antara nilai tercatat sisa investasi                  difference between the carrying amount of
             pada tanggal hilangnya pengendalian dan                         the investment retained on the date when the
             nilai wajarnya diakui dalam laba rugi.                          control is lost and its fair value is recognised
                                                                             in profit or loss.
Page 25
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/15 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas       asosiasi   dan               iv. Accounting for associates and joint
              ventura bersama                                               ventures

             Entitas asosiasi adalah suatu entitas dimana                  An associate is an entity over which the
             Grup mempunyai pengaruh signifikan, tetapi                    Group has significant influence, but not
             tidak mengendalikan, dan biasanya Grup                        control, and is generally accompanied by a
             memiliki 20% atau lebih hak suara, tetapi                     shareholding giving rise to voting rights of
             tidak melebihi 50% hak suara. Investasi pada                  20% or greater but not exceeding 50%.
             entitas asosiasi dicatat pada laporan                         Investment in associates is accounted for in
             keuangan     konsolidasian     menggunakan                    the consolidated financial statements using
             metode     ekuitas      dikurangi   kerugian                  the equity method less impairment losses, if
             penurunan nilai, jika ada.                                    any.

             Ventura bersama merupakan pengaturan                          A joint venture is a joint arrangement in which
             bersama antara beberapa pihak yang                            the parties that share joint control have rights
             melakukan    kesepakatan        pengendalian                  to the net assets of the arrangement. Joint
             bersama yang memiliki hak atas aset neto                      ventures are accounted for using the equity
             pengaturan tersebut. Ventura bersama ini                      method less impairment losses, if any.
             menggunakan metode ekuitas dikurangi
             kerugian penurunan nilai, jika ada.

             - Akuisisi                                                    - Acquisitions

              Investasi pada entitas asosiasi atau ventura                   Investment in an associate or a joint
              bersama pada awalnya diakui sebesar                            venture is initially recognised at cost. The
              biaya perolehan. Biaya perolehan diukur                        cost of an acquisition is measured at the
              berdasarkan nilai wajar aset yang                              fair value of the assets transferred, equity
              diserahkan, instrumen ekuitas yang                             instruments issued or liabilities incurred or
              diterbitkan atau liabilitas yang timbul atau                   assumed as at the date of exchange, plus
              diambil alih pada tanggal akuisisi, ditambah                   costs directly attributable to the acquisition.
              biaya yang berhubungan langsung dengan
              akuisisi.

              Goodwill pada akuisisi entitas asosiasi atau                   Goodwill on the acquisition of an associate
              ventura bersama merupakan selisih lebih                        or a joint venture represents the excess of
              yang terkait dengan biaya perolehan                            the cost of acquisition of the associate or
              investasi pada entitas asosiasi atau ventura                   joint venture over the Group’s share of the
              bersama dengan bagian Grup atas nilai                          fair value of the identifiable net assets of
              wajar neto aset teridentifikasi dari entitas                   the associate or joint venture and is
              asosiasi atau ventura bersama dan                              included in the carrying amount of the
              dimasukkan      dalam     jumlah     tercatat                  investment.
              investasi.

             - Metode ekuitas                                              - Equity method of accounting

              Dalam menerapkan metode ekuitas,                               In applying the equity method of
              bagian Grup atas laba rugi entitas asosiasi                    accounting, the Group’s share of its
              atau ventura Bersama setelah perolehan                         associate’s or joint venture’s post-
              diakui dalam laba rugi, dan bagian Grup                        acquisition profit or loss is recognised in
              atas penghasilan komprehensif lain setelah                     profit or loss and its share of post-
              tanggal    perolehan     diakui      dalam                     acquisition other comprehensive income is
              penghasilan komprehensif lain.                                 recognised in other comprehensive
                                                                             income.
Page 26
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/16 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                 c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas asosiasi dan                       iv. Accounting for associates and joint
              ventura bersama (lanjutan)                                    ventures (continued)

             - Metode ekuitas (lanjutan)                                   - Equity method of accounting (continued)

              Perubahan dan penerimaan distribusi dari                       These post-acquisition movements and
              entitas asosiasi atau ventura bersama                          distributions received from an associate or
              setelah tanggal perolehan disesuaikan                          a joint venture are adjusted against the
              terhadap nilai tercatat investasi.                             carrying amounts of the investment.

              Jika bagian Grup atas rugi entitas asosiasi                    When the Group’s share of the losses of an
              atau ventura bersama sama dengan atau                          associate or a joint venture equals or
              melebihi kepentingannya pada entitas                           exceeds its interest in the associate or joint
              asosiasi atau ventura bersama, termasuk                        venture, including any other unsecured
              piutang tidak lancar tanpa jaminan, maka                       non-current receivables, the Group does
              Grup menghentikan pengakuan bagiannya                          not recognise further losses, unless it has
              atas rugi lebih lanjut, kecuali Grup memiliki                  obligations to make or has made payments
              kewajiban untuk melakukan pembayaran                           on behalf of the associate or joint venture.
              atau telah melakukan pembayaran atas
              nama entitas asosiasi atau ventura
              bersama.

              Keuntungan yang belum direalisasi atas                         Unrealised gains on transactions between
              transaksi antara Grup dengan entitas                           the Group and its associates or joint
              asosiasi atau ventura bersama dieliminasi                      ventures are eliminated to the extent of the
              sebesar bagian Grup dalam entitas                              Group’s interest in the associate or joint
              asosiasi atau ventura bersama tersebut.                        venture. Unrealised losses are also
              Kerugian yang belum direalisasi juga                           eliminated unless the transaction provides
              dieliminasi kecuali transaksi tersebut                         evidence of the impairment of the asset
              memberikan bukti penurunan nilai atas aset                     being transferred. The accounting policies
              yang ditransfer. Kebijakan akuntansi                           of the associate or joint venture have been
              entitas asosiasi atau ventura bersama akan                     changed where necessary to ensure
              disesuaikan, apabila diperlukan, agar                          consistency with the accounting policies
              konsisten dengan kebijakan akuntansi                           adopted by the Group.
              Grup.

              Dividen yang akan diterima dari entitas                        Dividend receivables from an associate or
              asosiasi atau ventura bersama diakui                           a joint venture are recognised as
              sebagai pengurang jumlah       tercatat                        reductions in the carrying amount of the
              investasi.                                                     investment.

              Pada setiap tanggal pelaporan, Grup                            At each reporting date, the Group
              menentukan apakah terdapat bukti objektif                      determines whether there is any objective
              bahwa telah terjadi penurunan nilai atas                       evidence that the investment in an
              investasi pada entitas asosiasi atau ventura                   associate or joint venture is impaired. If any
              bersama. Jika bukti tersebut ada, maka                         such evidence exists, the Group calculates
              Grup menghitung besarnya penurunan nilai                       the amount of impairment as the difference
              sebagai selisih antara jumlah yang                             between the recoverable amount of the
              terpulihkan dan nilai tercatat atas investasi                  associate or the joint venture and its
              pada entitas asosiasi atau ventura bersama                     carrying amount and recognises the
              dan mengakui selisih tersebut pada laba                        amount in profit or loss.
              rugi.
Page 27
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/17 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     c.   Prinsip-prinsip konsolidasian (lanjutan)                c.   Principles of consolidation (continued)

          iv. Akuntansi atas entitas asosiasi         dan              iv. Accounting for associates and joint
              ventura bersama (lanjutan)                                   ventures (continued)

             - Pelepasan                                                   - Disposals

               Investasi pada entitas asosiasi atau                          An investment in an associate or a joint
               ventura bersama dihentikan pengakuannya                       venture is derecognised when the Group
               apabila Grup tidak lagi memiliki pengaruh                     loses significant influence and any retained
               signifikan. Grup mengukur investasi yang                      equity interest in the entity is remeasured
               tersisa sebesar nilai wajar. Selisih antara                   at its fair value. The difference between the
               jumlah tercatat investasi yang tersisa pada                   carrying amount of the retained interest at
               tanggal hilangnya pengaruh signifikan dan                     the date when significant influence is lost
               nilai wajarnya diakui dalam laba rugi.                        and its fair value is recognised in profit or
                                                                             loss.

               Keuntungan dan kerugian yang timbul dari                      Gains and losses arising from partial
               pelepasan sebagian atau dilusi yang timbul                    disposal or dilution of an investment in an
               pada investasi pada entitas asosiasi dan                      associate and a joint venture in which
               ventura bersama dimana pengaruh                               significant influence is retained are
               signifikan masih dipertahankan diakui                         recognised in profit or loss, and only a
               dalam laba rugi dan hanya suatu bagian                        proportionate share of the amount
               proporsional atas jumlah yang telah diakui                    previously      recognised      in    other
               sebelumnya         pada       penghasilan                     comprehensive income is reclassified to
               komprehensif lain yang direklasifikasi ke                     profit or loss where appropriate.
               laba rugi.

     d.   Goodwill                                                d.   Goodwill

          Goodwill timbul dari akuisisi entitas anak dan               Goodwill arises from the acquisition of
          merupakan selisih imbalan yang ditransfer                    subsidiaries and represents the excess of the
          terhadap kepemilikan dalam nilai wajar neto atas             consideration transferred over the interest in the
          aset, liabilitas, dan liabilitas kontinjensi                 net fair value of the net identifiable assets,
          teridentifikasi dan nilai wajar kepentingan non-             liabilities and contingent liabilities of the acquiree
          pengendali pada pihak diakuisisi.                            and the fair value of the non-controlling interest
                                                                       in the acquiree.

          Untuk pengujian penurunan nilai, goodwill yang               For the purposes of impairment testing, goodwill
          diperoleh dalam kombinasi bisnis dialokasikan                acquired in a business combination is allocated
          pada setiap Unit Penghasil Kas (“UPK”), atau                 to each Cash-Generating Unit (“CGU”), or group
          kelompok UPK, yang diharapkan dapat                          of CGUs, that is expected to benefit from the
          memberikan manfaat dari sinergi kombinasi                    synergies of the combination. Each CGU or
          bisnis tersebut. Setiap unit atau kelompok unit              group of CGUs to which the goodwill is allocated
          yang memperoleh alokasi goodwill menunjukkan                 represents the lowest level within the entity at
          tingkat terendah dalam entitas yang goodwill-nya             which goodwill is monitored for internal
          dipantau untuk tujuan manajemen internal.                    management purposes. Goodwill is monitored at
          Goodwill dipantau pada level segmen operasi.                 the operating segment level.
Page 28
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/18 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                       3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                        (continued)

     e.   Penjabaran mata uang asing                                   e.        Foreign currency translation

          i.     Mata uang fungsional dan penyajian                              i.       Functional and presentation currency

                 Akun-akun yang disertakan dalam laporan                                  Items included in the financial statements of
                 keuangan setiap entitas anggota Grup                                     each of the Group’s entities are measured
                 diukur menggunakan mata uang dari                                        using the currency of the primary economic
                 lingkungan ekonomi utama dimana entitas                                  environment in which the relevant entity
                 tersebut      beroperasi    (“mata    uang                               operates (the “functional currency”). The
                 fungsional”).      Laporan        keuangan                               consolidated financial statements are
                 konsolidasian disajikan dalam Rp, yang                                   presented in Rp, which is the Company’s
                 merupakan       mata     uang    fungsional                              functional currency and the Group’s
                 Perusahaan dan penyajian Grup.                                           presentation currency.

          ii.    Transaksi dan saldo                                             ii.      Transactions and balances

                 Transaksi dalam mata uang asing                                          Foreign currency transactions are translated
                 dijabarkan menjadi mata uang fungsional                                  into the functional currency using the
                 menggunakan kurs yang berlaku pada                                       exchange rates prevailing as at the date of
                 tanggal transaksi. Pada tanggal pelaporan,                               the transactions. As at the reporting date,
                 setiap aset dan liabilitas moneter dalam                                 monetary assets and liabilities denominated
                 mata uang asing disesuaikan untuk                                        in foreign currency were adjusted to reflect
                 mencerminkan kurs yang berlaku pada                                      the exchange rates prevailing at this date.
                 tanggal tersebut. Keuntungan dan kerugian                                Foreign exchange gains and losses
                 selisih kurs yang timbul dari penyelesaian                               resulting from the settlement of such
                 transaksi dalam mata uang asing dan dari                                 transactions and from the translation at
                 penjabaran aset dan liabilitas moneter                                   year-end exchange rates of monetary
                 dalam mata uang asing menggunakan kurs                                   assets and liabilities denominated in foreign
                 yang berlaku pada akhir tahun pelaporan                                  currencies are recognised in profit or loss.
                 diakui dalam laba rugi.

                 Kurs yang digunakan pada tanggal laporan                                 As at the consolidated statement of financial
                 posisi keuangan konsolidasian, berdasarkan                               position dates, the exchange rates used,
                 kurs penutup yang berlaku pada tanggal                                   based on the exchange rates prevailing at
                 laporan posisi keuangan konsolidasian yang                               the date of the consolidated statement of
                 diterbitkan Bank Indonesia, adalah sebagai                               financial position published by Bank
                 berikut:                                                                 Indonesia were as follows:

                                                    30 Juni/           31 Desember/
                                                    June 30,           December 31,
                                                      2024                   2023
                                                  Kurs tengah/           Kurs tengah/
                                                  Middle rate*)          Middle rate*)

                Yen Jepang (JPY)                               102                           109                     Japan Yen (JPY)
                Ringgit Malaysia (MYR)                       3,475                         3,364              Malaysian Ringgit (MYR)
                Dolar AS (USD)                              16,394                        15,439                    US Dollars (USD)
                Euro (EUR)                                  17,533                        17,086                          Euro (EUR)
                Franc Swiss (CHF)                           18,225                        18,374                   Swiss Franc (CHF)
                Dolar Kuwait (KWD)                          53,436                        50,220                Kuwait Dollars (KWD)

                 *)   dalam jumlah penuh                                    *)        in full amount
Page 29
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/19 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.     MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                        (continued)

     e.   Penjabaran mata uang asing (lanjutan)                        e.     Foreign currency translation (continued)

          iii. Entitas dalam Grup                                             iii. Group companies

              Hasil usaha operasi dan posisi keuangan                              The results of the operations and financial
              dari seluruh entitas anak Grup (tidak ada                            position of all of the Group’s subsidiaries
              yang mata uang fungsionalnya mata uang                               (none of which has the currency of a
              dari suatu ekonomi hiperinflasi) yang                                hyperinflationary economy) that have a
              memiliki mata uang fungsional yang                                   functional currency different from the
              berbeda dengan mata uang penyajian                                   Company’s presentation currency are
              Perusahaan, ditranslasikan dalam mata                                translated into the Company’s presentation
              uang penyajian Perusahaan sebagai                                    currency as follows:
              berikut:

              (a) Aset dan liabilitas yang disajikan pada                          (a) The assets and liabilities presented in
                  laporan posisi keuangan konsolidasian,                               the consolidated statement of financial
                  dijabarkan pada kurs penutup tanggal                                 position are translated at the closing
                  laporan posisi keuangan konsolidasian                                rate at the date of the consolidated
                  tersebut;                                                            statement of financial position;

              (b) Penghasilan dan beban untuk setiap                               (b) The income and expenses for each
                  laba rugi dijabarkan menggunakan kurs                                item of profit or loss are translated at
                  rata-rata (kecuali jika rata-rata tersebut                           the average exchange rates (unless
                  bukan perkiraan wajar efek kumulatif                                 this average is not a reasonable
                  dari kurs yang berlaku pada tanggal                                  approximation of the cumulative effect
                  transaksi, maka penghasilan dan beban                                of the rates prevailing on the
                  dijabarkan menggunakan kurs tanggal                                  transaction dates, in which case the
                  transaksi); dan                                                      income and expenses are translated at
                                                                                       the rates in force on the dates of the
                                                                                       transactions); and

                                                     30 Juni /              31 Desember /
                                                     June 30,               December 31,
                                                       2024                      2023
                                                   Kurs rata-rata/          Kurs rata-rata/
                                                   Average rate*)           Average rate*)

                   Dolar AS (USD)                             15,910                 15,254                     US Dollars (USD)

                   *)   dalam jumlah penuh                                              *)    in full amount

              (c) Seluruh selisih kurs yang timbul diakui                          (c) All of the resulting exchange
                  dalam penghasilan komprehensif lain.                                 differences are recognised in other
                                                                                       comprehensive income.

     f.   Transaksi-transaksi dengan pihak berelasi                  f.      Transactions with related parties

          Grup melakukan transaksi dengan pihak-pihak                        The Group has transactions with related parties
          berelasi sesuai yang didefinisikan oleh PSAK                       as defined under SFAS No. 7: “Related Party
          No. 7: “Pengungkapan Pihak-Pihak Berelasi”                         Disclosures” and OJK Regulation No. VIII.G.7:
          dan Peraturan OJK No. VIII.G.7:
          (a) Orang atau anggota keluarga dekatnya                           (a) A person or a close member of that
              mempunyai relasi dengan entitas pelapor                            person's family is related to a reporting
              jika orang tersebut:                                               entity if that person:
              (i) Memiliki        pengendalian        atau                       (i) Has control or joint control over the
                    pengendalian bersama atas entitas                                 reporting entity;
                    pelapor;
              (ii) Memiliki pengaruh signifikan atas                              (ii) Has significant influence over the
                    entitas pelapor; atau                                               reporting entity; or
              (iii) Merupakan personil manajemen kunci                            (iii) Is a member of the key management
                    entitas pelapor atau entitas induk dari                             personnel of the reporting entity or of
                    entitas pelapor.                                                    a parent of the reporting entity.
Page 30
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/20 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     f.   Transaksi-transaksi dengan pihak berelasi               f.    Transactions with related parties (continued)
          (lanjutan)

          (b) Suatu entitas berelasi dengan entitas                    (b) An entity is related to a reporting entity if
              pelapor jika memenuhi salah satu hal                         any of the following conditions apply:
              berikut:
              (i) Entitas dan entitas pelapor adalah                       (i)  The entity and the reporting entity are
                    anggota dari kelompok usaha yang                            members of the same group (which
                    sama (artinya entitas induk, entitas                        means that each parent, subsidiary
                    anak dan entitas anak berikutnya                            and fellow subsidiary is related to each
                    saling berelasi dengan entitas lain);                       other);
              (ii) Satu entitas adalah entitas asosiasi                    (ii) One entity is an associate or joint
                    atau ventura bersama dari entitas lain                      venture of the other entity (or an
                    (atau entitas asosiasi atau ventura                         associate or joint venture of a member
                    bersama yang merupakan anggota                              of a group of which the other entity is
                    suatu kelompok usaha, yang mana                             a member);
                    entitas     lain    tersebut    adalah
                    anggotanya);
              (iii) Kedua entitas tersebut adalah ventura                  (iii) Both entities are joint ventures of the
                    bersama dari pihak ketiga yang sama;                         same third party;
              (iv) Satu entitas adalah ventura bersama                     (iv) One entity is a joint venture of a third
                    dari entitas ketiga dan entitas yang                         entity and the other entity is an
                    lain adalah entitas asosiasi dari                            associate of the third entity;
                    entitas ketiga;
              (v) Entitas tersebut adalah suatu program                    (v) The entity is a post-employment
                    imbalan pascakerja untuk imbalan                           benefit plan for the benefit of the
                    kerja dari salah satu entitas pelapor                      employees of either the reporting
                    atau entitas yang terkait dengan                           entity or an entity related to the
                    entitas pelapor. Jika entitas pelapor                      reporting entity. If the reporting entity
                    adalah entitas yang menyelenggarakan                       is itself such a plan, the sponsoring
                    program tersebut, maka entitas                             employers are also related to the
                    sponsor juga berelasi dengan entitas                       reporting entity;
                    pelapor;
              (vi) Entitas yang dikendalikan atau
                    dikendalikan bersama oleh orang                        (vi) The entity is controlled or jointly
                    yang diidentifikasi dalam huruf (a);                        controlled by a person identified in (a);
              (vii) Orang yang diidentifikasi dalam huruf
                    (a) (i) memiliki pengaruh signifikan                   (vii) A person identified in (a) (i) has
                    atas entitas atau personil manajemen                         significant influence over the entity or
                    kunci entitas (atau entitas induk dari                       is a member of the key management
                    entitas).                                                    personnel of the entity (or of a parent
                                                                                 of the entity).

          Entitas yang berelasi dengan Pemerintah                      A Government-related entity is an entity that is
          adalah entitas yang dikendalikan, dikendalikan               controlled, jointly controlled or significantly
          bersama, atau dipengaruhi oleh Pemerintah.                   influenced by a Government. Government
          Pemerintah mengacu kepada Pemerintah,                        refers to the Government of the Republic of
          instansi Pemerintah dan badan yang serupa                    Indonesia, Government agencies and similar
          baik lokal, nasional maupun internasional.                   bodies whether local, national or international.

          Entitas yang berelasi dengan Pemerintah                      Government-related entities include entities
          termasuk entitas yang dikendalikan atau                      which are controlled or significantly influenced
          dipengaruhi     secara     signifikan   oleh                 by the Ministry of Finance or Local
          Kementerian Keuangan atau Pemerintah                         Governments being the shareholders of the
          Daerah yang merupakan pemegang saham                         entity or an entity controlled by the Government
          entitas, atau entitas yang dikendalikan oleh                 of the Republic of Indonesia, represented by
          Pemerintah Republik Indonesia melalui                        the Ministry of SOEs as the shareholder’s
          Kementerian BUMN sebagai kuasa pemegang                      representative.
          saham.
Page 31
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/21 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                       POLICY
     (lanjutan)                                                     INFORMATION (continued)

     f.   Transaksi-transaksi dengan pihak berelasi                 f.   Transactions with related parties (continued)
          (lanjutan)

          Seluruh transaksi dan saldo yang signifikan                    All significant transactions and balances with
          dengan pihak berelasi diungkapkan dalam                        related parties are disclosed in the relevant
          Catatan yang relevan.                                          Notes.

     g.   Aset keuangan                                             g.   Financial assets

          i.   Klasifikasi, pengakuan dan pengukuran                     i.   Classification,        recognition         and
                                                                              measurement

               Grup mengklasifikasikan aset keuangannya                       The Group classifies its financial assets in
               dalam kategori pengukuran berikut:                             the following measurement categories:
               •   aset keuangan yang diukur pada nilai                       •    financial assets measured at fair value
                   wajar melalui laba rugi atau melalui                            either through profit or loss (“FVTPL”) or
                   penghasilan komprehensif lain; dan                              through other comprehensive income
                                                                                   (“FVOCI”); and
               •   aset keuangan yang diukur pada biaya                       •    those to be measured at amortised
                   perolehan diamortisasi.                                         cost.

               Klasifikasi tersebut tergantung pada model                     The classification depends on the Group’s
               bisnis Grup dan persyaratan kontraktual                        business model and the contractual terms of
               arus kas - apakah penentuan arus kasnya                        the cash flows of the cash flows when
               semata dari pembayaran pokok dan bunga.                        determining whether their cash flows are
                                                                              solely payments of principal and interest
                                                                              (“SPPI”).

               Untuk aset yang diukur pada nilai wajar,                       For assets measured at fair value, gains and
               keuntungan dan kerugian akan dicatat                           losses will either be recorded in profit or loss
               dalam laporan laba rugi atau penghasilan                       or other comprehensive income. For
               komprehensif lain. Untuk investasi pada                        investments in debt instruments, this will
               instrumen utang, hal ini akan bergantung                       depend on the business model in which the
               pada model bisnis dimana investasi tersebut                    investment is held. For investments in equity
               diadakan. Untuk investasi pada instrumen                       instruments that are not held for trading, this
               ekuitas    yang     tidak    dimiliki  untuk                   will depend on whether the Group has made
               diperdagangkan, hal ini akan tergantung                        an irrevocable election at the time of initial
               pada apakah Grup telah memilih tidak dapat                     recognition to account for the equity
               dibatalkan pada saat pengakuan awal untuk                      investment at fair value through other
               mencatat           investasi          ekuitas                  comprehensive income.
               pada nilai wajar melalui penghasilan
               komprehensif lain.

               Grup mereklasifikasi investasi utang jika dan                  The Group reclassifies debt investments
               hanya jika model bisnis untuk mengelola                        when and only when its business model for
               aset tersebut berubah.                                         managing such assets changes.
Page 32
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/22 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     g.   Aset keuangan (lanjutan)                                   g.   Financial assets (continued)

          i.   Klasifikasi, pengakuan dan pengukuran                      i.   Classification,   recognition             and
               (lanjutan)                                                      measurement (continued)

               Pada pengakuan awal, Grup mengukur aset                         At initial recognition, the Group measures a
               keuangan pada nilai wajarnya ditambah,                          financial asset at its fair value plus, in the
               dalam hal aset keuangan tidak diukur pada                       case of a financial asset not at fair value
               nilai wajar melalui laba rugi, biaya transaksi                  through profit or loss, transaction costs that
               yang dapat diatribusikan secara langsung                        are directly attributable to the acquisition of
               dengan perolehan aset keuangan. Biaya                           the financial asset. Transaction costs of
               transaksi dari aset keuangan yang dicatat                       financial assets carried at fair value through
               pada nilai wajar melalui laba rugi                              profit or loss are expensed in profit or loss.
               dibebankan pada laba rugi.

               Aset keuangan dengan derivatif melekat                          Financial assets with embedded derivatives
               dipertimbangkan secara keseluruhan saat                         are considered in their entirety when
               menentukan apakah arus kasnya hanya                             determining whether their cash flows are
               merupakan pembayaran pokok dan bunga.                           SPPI.

               Instrumen utang                                                 Debt instruments

               Pengukuran selanjutnya instrumen utang                          Subsequent     measurement       of   debt
               bergantung pada model bisnis Grup dalam                         instruments depends on the Group’s
               mengelola aset dan karakteristik arus kas                       business model for managing the asset and
               dari aset tersebut. Ada tiga kategori                           the cash flow characteristics of the asset.
               pengukuran yang Grup mengklasifikasikan                         There are three measurement categories
               instrumen utangnya:                                             into which the Group classifies its debt
                                                                               instruments:

               -   Biaya perolehan diamortisasi: Aset                          -   Amortised cost: Assets that are held for
                   yang dimiliki untuk mengumpulkan arus                           the collection of contractual cash flows
                   kas kontraktual dimana arus kas                                 in cases where such cash flows
                   tersebut hanya mewakili pembayaran                              represent SPPI are measured at
                   pokok dan bunga diukur dengan biaya                             amortised cost. A gain or loss on a debt
                   perolehan diamortisasi. Keuntungan                              investment that is subsequently
                   atau kerugian dari investasi utang yang                         measured at amortised cost and that is
                   selanjutnya     diukur   pada     biaya                         not part of a hedging relationship is
                   perolehan diamortisasi dan bukan                                recognised in profit or loss when the
                   merupakan bagian dari hubungan                                  asset is derecognised or impaired.
                   lindung nilai, diakui dalam laba rugi                           Interest income from these financial
                   pada saat aset tersebut dihentikan                              assets is included in finance income
                   pengakuannya        atau     penurunan                          using the effective interest rate method.
                   nilainya. Pendapatan bunga dari aset
                   keuangan tersebut dimasukkan ke
                   dalam pendapatan keuangan dengan
                   menggunakan metode suku bunga
                   efektif.
Page 33
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/23 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     g.   Aset keuangan (lanjutan)                                 g.   Financial assets (continued)

          i.   Klasifikasi, pengakuan dan pengukuran                    i.   Classification,   recognition             and
               (lanjutan)                                                    measurement (continued)

               Instrumen utang (lanjutan)                                    Debt instruments (continued)

               -   Nilai wajar melalui penghasilan                           -   Fair       value        through      other
                   komprehensif lain: Aset yang dimiliki                         comprehensive income: Assets that are
                   untuk     mendapatkan      arus    kas                        held for the collection of contractual
                   kontraktual dan untuk menjual aset                            cash flows and for selling the financial
                   keuangan, di mana arus kas aset                               assets, in cases where the assets’ cash
                   tersebut hanya atas pembayaran pokok                          flows represent SPPI, are measured at
                   dan bunga, diukur pada nilai wajar                            FVOCI. Movements in the carrying
                   melalui penghasilan komprehensif lain.                        amount are taken through other
                   Perubahan nilai tercatat dilakukan                            comprehensive income, except for the
                   melalui penghasilan komprehensif lain,                        recognition of impairment gains or
                   kecuali untuk pengakuan keuntungan                            losses, interest revenue and foreign
                   atau    kerugian    penurunan     nilai,                      exchange gains and losses which are
                   pendapatan bunga dan keuntungan                               recognised in profit or loss. When the
                   dan kerugian selisih kurs yang diakui                         financial asset is derecognised, the
                   dalam laba rugi. Ketika aset keuangan                         cumulative gain or loss previously
                   dihentikan pengakuannya, keuntungan                           recognised in OCI is reclassified from
                   atau     kerugian    kumulatif    yang                        equity to profit or loss and recognised in
                   sebelumnya diakui di penghasilan                              other income and expenses. Interest
                   komprehensif lain direklasifikasi dari                        income from these financial assets is
                   ekuitas ke laba rugi dan diakui dalam                         included in finance income using the
                   penghasilan atau beban lain-lain.                             effective interest rate method. Foreign
                   Pendapatan bunga dari aset keuangan                           exchange gains and losses are
                   tersebut    dimasukkan     ke    dalam                        presented in other gains and losses on
                   pendapatan       keuangan       dengan                        foreign exchanges, net and impairment
                   menggunakan metode suku bunga                                 expenses in other expenses.
                   efektif. Keuntungan dan kerugian
                   selisih    kurs    disajikan     dalam
                   penghasilan dan beban kurs mata uang
                   asing dan beban penurunan nilai pada
                   beban lain-lain.

               -   Nilai wajar melalui laba rugi: Aset yang                  -   Fair value through profit or loss: Assets
                   tidak memenuhi kriteria untuk biaya                           that do not meet the criteria for
                   perolehan diamortisasi atau nilai wajar                       amortised cost or FVOCI are measured
                   melalui penghasilan komprehensif lain                         at fair value through profit or loss. A
                   diukur pada nilai wajar melalui laporan                       gain or loss on a debt investment that is
                   laba rugi. Keuntungan atau kerugian                           subsequently measured at fair value
                   dari investasi utang yang selanjutnya                         through profit or loss and that is not part
                   diukur pada nilai wajar melalui laporan                       of a hedging relationship, is recognised
                   laba rugi dan bukan merupakan bagian                          in profit or loss and presented net in
                   dari hubungan lindung nilai, diakui                           profit or loss.
                   dalam laba rugi dan disajikan bersih
                   dalam laba rugi.
Page 34
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/24 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     g.   Aset keuangan (lanjutan)                                   g.   Financial assets (continued)

          i.    Klasifikasi, pengakuan, dan pengukuran                    i.    Classification,   recognition             and
                (lanjutan)                                                      measurement (continued)

                Instrumen ekuitas                                               Equity instruments

                Grup      selanjutnya  mengukur     semua                       The Group subsequently measures all
                investasi ekuitas pada nilai wajar. Jika                        equity investments at fair value. In cases
                manajemen Grup telah memilih untuk                              where the Group’s management has elected
                menyajikan keuntungan dan kerugian nilai                        to present fair value gains and losses on
                wajar atas investasi ekuitas dalam                              equity investments in other comprehensive
                penghasilan komprehensif lain, tidak ada                        income,      there      is   no    subsequent
                reklasifikasi keuntungan dan kerugian nilai                     reclassification of fair value gains and losses
                wajar ke laba rugi setelah penghentian                          to profit or loss following the derecognition
                pengakuan investasi tersebut. Dividen dari                      of the investment. Dividends from such
                investasi semacam itu tetap diakui dalam                        investments continue to be recognised in
                laba rugi sebagai pendapatan lainnya ketika                     profit or loss as other income when the
                hak Grup untuk menerima pembayaran                              Group’s right to receive payments is
                ditetapkan.                                                     established.

                Perubahan nilai wajar aset keuangan yang                        Changes in the fair value of financial assets
                diukur pada nilai wajar melalui laporan laba                    at fair value through profit or loss are
                rugi diakui dalam keuntungan/(kerugian)                         recognised in other gains/(losses) in the
                lain-lain    dalam    laporan    laba    rugi                   consolidated statement of profit or loss as
                konsolidasian      sebagaimana      berlaku.                    applicable. Impairment losses (and the
                Kerugian penurunan nilai (dan pemulihan                         reversal of impairment losses) on equity
                kerugian penurunan nilai) atas investasi                        investments measured at FVOCI are not
                ekuitas yang diukur pada nilai wajar melalui                    reported separately from other changes in
                penghasilan komprehensif lain tidak                             fair value.
                dilaporkan secara terpisah dari perubahan
                nilai wajar lainnya.

          ii.   Penghentian pengakuan                                     ii.   Derecognition

                Aset keuangan dihentikan pengakuannya                           Financial assets are derecognised when the
                ketika hak untuk menerima arus kas dari                         rights to receive cash flows from the
                investasi tersebut telah jatuh tempo atau                       investments have expired or have been
                telah ditransfer dan Grup telah mentransfer                     transferred and the Group has transferred
                secara substansial seluruh risiko dan                           substantially all the risks and rewards of
                manfaat atas kepemilikan aset.                                  ownership.

          iii. Saling hapus antar instrumen keuangan                      iii. Offsetting financial instruments

                Aset keuangan dan liabilitas keuangan                           Financial assets and liabilities are offset and
                disalinghapuskan dan jumlah netonya                             the net amount is reported in the
                dilaporkan pada laporan posisi keuangan                         consolidated statement of financial position
                konsolidasian ketika terdapat hak yang                          when there is a legally enforceable right to
                berkekuatan hukum untuk melakukan saling                        offset the recognised amounts and there is
                hapus atas jumlah yang telah diakui                             an intention to settle on a net basis, or
                tersebut      dan    adanya  niat  untuk                        realise the asset and settle the liability
                menyelesaikan secara neto, atau untuk                           simultaneously.
                merealisasikan aset dan menyelesaikan
                liabilitas secara bersamaan.
Page 35
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/25 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.        MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                        (continued)

     h.   Penurunan nilai aset keuangan                                h.    Impairment of financial assets

          Pada setiap tahun pelaporan, Grup menilai                         At each reporting date, the Group assesses
          apakah risiko kredit dari instrumen keuangan                      whether the credit risk on a financial instrument
          telah meningkat secara signifikan sejak                           has increased significantly since initial
          pengakuan awal. Ketika melakukan penilaian,                       recognition. When making the assessment, the
          Grup menggunakan perubahan atas risiko                            Group uses the change in the risk of a default
          gagal bayar yang terjadi sepanjang perkiraan                      occurring over the expected life of the financial
          usia instrumen keuangan daripada perubahan                        instrument instead of the change in the amount
          atas jumlah kerugian kredit ekspektasian.                         of expected credit losses. To make that
          Dalam       melakukan       penilaian,   Grup                     assessment, the Group compares the risk of a
          membandingkan antara risiko gagal bayar yang                      default occurring on the financial instrument as
          terjadi atas instrumen keuangan pada saat                         at the reporting date with the risk of a default
          tahun pelaporan dengan risiko gagal bayar                         occurring on the financial instrument as at the
          yang terjadi atas instrumen keuangan pada                         date of initial recognition and considers
          saat pengakuan awal dan mempertimbangkan                          reasonable and supportable information, which
          kewajaran serta ketersediaan informasi yang                       is available without undue cost or effort at the
          tersedia pada saat tanggal pelaporan terkait                      reporting date about past events, current
          dengan kejadian masa lalu, kondisi terkini dan                    conditions and forecasts of future economic
          perkiraan atas kondisi ekonomi di masa depan,                     conditions, that is indicative of significant
          yang mengindikasikan kenaikan risiko kredit                       increases in credit risk since initial recognition.
          sejak pengakuan awal.

          Grup      menerapkan       “pendekatan      yang                  The Group applies the “simplified approach” to
          disederhanakan” untuk mengukur kerugian                           measuring expected credit losses which uses a
          kredit ekspektasian yang menggunakan                              lifetime expected credit loss allowance for all
          cadangan kerugian kredit ekspektasian seumur                      trade receivables, other receivables and
          hidup untuk seluruh saldo piutang usaha, dan                      contract assets without significant financing
          piutang lain-lain, dan aset kontrak tanpa                         components and the “general approach” for
          komponen pendanaan yang signifikan, dan                           other financial assets. The general approach
          “pendekatan umum” untuk aset keuangan                             incorporates a review for any significant
          lainnya.     Pendekatan      umum       termasuk                  increase in counterparty credit risk since initial
          penelaahan perubahan signifikan risiko kredit                     recognition. The expected credit loss reviews
          sejak pengakuan awal. Penelaahan kerugian                         include assumptions about the risk of default
          kredit     ekspektasian     termasuk      asumsi                  and expected loss rates. To measure the
          mengenai risiko gagal bayar dan tingkat                           expected credit losses, trade receivables have
          kerugian ekspektasian. Untuk mengukur                             been grouped based on similar credit risk
          kerugian kredit ekspektasian, piutang usaha                       characteristics and the days past due, with the
          telah dikelompokkan berdasarkan karakteristik                     exception of the receivables which can be
          risiko kredit dan jatuh tempo yang serupa,                        assessed at their own rating of expected credit
          terkecuali kepada piutang-piutang yang dapat                      losses.
          dinilai sendiri kerugian kredit ekspektasiannya.
     i.   Aset tetap                                              i.        Property, plant and equipment
          Pada tanggal akuisisi, Grup menganalisis fakta                    At the acquisition date, the Group analyses the
          dan keadaan untuk masing-masing jenis tanah                       facts and circumstances for each type of land
          dan hak atas tanah dalam menentukan                               and land rights in determining the accounting
          akuntansi untuk masing-masing tanah dan hak                       for each of these land and land rights so that it
          atas    tanah    tersebut    sehingga    dapat                    can accurately represent an underlying
          merepresentasikan dengan tepat suatu                              economic event or transaction. If the land and
          kejadian atau transaksi ekonomis yang                             land rights do not transfer control of the
          mendasarinya. Jika tanah dan hak atas tanah                       underlying assets to the Group, but give the
          tersebut tidak mengalihkan pengendalian atas                      rights to use the underlying assets, the Group
          aset pendasar kepada Grup, melainkan                              accounts for these transactions as leases under
          mengalihkan hak untuk menggunakan aset                            SFAS No. 73, “Leases”. If the land and land
          pendasar, Grup menerapkan perlakuan                               rights are substantially similar to land
          akuntansi atas transaksi tersebut sebagai sewa                    purchases, the Group applies SFAS No. 16,
          berdasarkan PSAK No. 73, “Sewa”. Jika tanah                       “Fixed Assets” under which land and land rights
          dan hak atas tanah secara substansi                               are recognised at cost and not depreciated.
          menyerupai pembelian tanah, maka Grup
          menerapkan PSAK No. 16, “Aset Tetap” yaitu
          tanah dan hak atas tanah diakui sebesar harga
          perolehan dan tidak disusutkan.
Page 36
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/26 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     i.   Aset tetap (lanjutan)                                     i.   Property, plant and equipment (continued)

          Aset tetap pada awalnya diakui sebesar biaya                   Property, plant and equipment are initially
          perolehan yang meliputi harga perolehannya dan                 recognised at cost, which comprises the
          setiap biaya yang dapat diatribusikan langsung                 purchase price and any cost directly attributable
          untuk membawa aset ke kondisi dan lokasi yang                  to bringing the asset to the location and condition
          diinginkan agar aset siap digunakan sesuai intensi             necessary for it to be capable of operating in the
          manajemen.                                                     manner intended by management.

          Setelah pengakuan awal, kelas-kelas aset                       After initial recognition, the following classes of
          berikut ini yang diukur menggunakan metode                     assets are measured using the revaluation
          revaluasi:                                                     method:
          •    Tanah dan hak atas tanah;                                 •    Land and land rights;
          •    Bangunan umum, waduk, dan prasarana;                      •    Buildings, reservoirs and infrastructure;
          •    Instalasi dan mesin pembangkit;                           •    Installations and power plants;
          •    Perlengkapan transmisi;                                   •    Transmission equipment;
          •    Perlengkapan distribusi;                                  •    Distribution equipment;
          •    Perlengkapan pengolahan data dan                          •    Telecommunications and data processing
               telekomunikasi yang digunakan dalam                            equipment used for electricity supply; and
               penyediaan listrik; dan
          •    Material cadangan utama.                                  •   Major spare parts.

          Kelas aset di atas, disajikan sebesar nilai wajar              The classes of asset above are shown at fair
          dikurangi penyusutan dan penurunan nilai.                      value less subsequent depreciation and
          Tanah tidak disusutkan. Tanah dan hak atas                     impairment losses. Land and land rights are not
          tanah tidak didepresiasi. Penilaian terhadap                   depreciated. Valuation of those assets is
          aset-aset tersebut dilakukan oleh penilai                      performed by external independent valuers
          independen eksternal yang terdaftar di OJK.                    which are registered with the FSA. Valuations
          Penilaian atas aset tersebut dilakukan secara                  are performed with sufficient regularity to ensure
          berkala untuk memastikan bahwa nilai wajar                     that the fair value of a revalued asset does not
          aset yang direvaluasi tidak berbeda secara                     differ materially from its carrying amount. Assets
          material dengan nilai tercatatnya. Aset yang                   that do not change significantly in fair value must
          tidak mengalami perubahan nilai wajar secara                   be re-evaluated at least every 3 (three) years.
          signifikan wajib direvaluasi paling kurang setiap              Any accumulated depreciation at the date of
          3 (tiga) tahun. Akumulasi penyusutan pada                      revaluation is eliminated against the gross
          tanggal revaluasi dieliminasi terhadap nilai                   carrying amount of the asset and the net amount
          tercatat bruto aset, dan nilai netonya disajikan               is restated to the revalued amount of the
          kembali sebesar nilai revaluasi aset tetap.                    property, plant and equipment.

          Kenaikan nilai tercatat yang timbul dari revaluasi             Increases in the carrying amount arising on
          aset tetap yang menggunakan model revaluasi                    revaluation of property, plant and equipment that
          dikreditkan pada “surplus revaluasi aset”                      use a revaluation model are credited to “asset
          sebagai bagian dari penghasilan komprehensif                   revaluation surplus” as part of other
          lain. Penurunan yang menghapus nilai kenaikan                  comprehensive income. Decreases that offset
          sebelumnya atas aset yang sama dibebankan                      previous increases of the same asset are debited
          terhadap “surplus revaluasi aset” sebagai bagian               against “asset revaluation surplus” as part of
          dari penghasilan komprehensif lain termasuk                    other comprehensive income including the
          aset tersebut ditransfer ke aset tidak digunakan               assets that are transferred to assets not used in
          dalam operasi; penurunan lainnya dibebankan                    operations; all other decreases are charged to
          pada laba rugi.                                                profit or loss.
Page 37
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/27 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     i.    Aset tetap (lanjutan)                                      i.    Property, plant and equipment (continued)

           Aset tetap disusutkan hingga mencapai              Property, plant and equipment are depreciated
           estimasi nilai sisa dengan menggunakan             to their residual values using the straight-line
           metode garis lurus selama masa manfaatnya          method over their expected useful lives as
           sebagai berikut:                                   follows:
                                                    Tahun/Years

          Bangunan umum, waduk, dan prasarana                  10 - 50                    Buildings, reservoirs, and infrastructure
          Instalasi dan mesin pembangkit                       12 - 40                             Installations and power plants
          Perlengkapan transmisi                                 40                                      Transmission equipment
          Perlengkapan distribusi                              10 - 40                                     Distribution equipment
          Perlengkapan umum                                      5                                             General equipment
          Kendaraan bermotor                                     5                                                 Motor vehicles
          Material cadangan utama                              10 - 40                                           Major spare parts
          Perlengkapan pengolahan data dan                                                              Telecommunications and
             telekomunikasi yang digunakan                                                                        Data processing
             dalam penyediaan listrik                            10                                     used for electricity supply
          Perlengkapan pengolahan data dan                                                   Other telecommunications and data
             telekomunikasi lainnya                              10                                     processing equipmentAA
          Kapal dan perlengkapan                               10 - 25                                    Vessels and equipment

           Masa manfaat ekonomis, nilai sisa, dan metode                   The useful lives, residual values and
           penyusutan aset tetap ditelaah, jika diperlukan,                depreciation methods of property, plant and
           setidaknya disesuaikan, pada setiap akhir tahun                 equipment are reviewed and adjusted if
           buku. Dampak dari setiap revisi diakui dalam laba               appropriate, at the end of each financial year.
           rugi, ketika perubahan terjadi.                                 The effects of any revisions are recognised in
                                                                           profit or loss, when the changes arise.

           Nilai tercatat aset segera diturunkan sebesar                   An asset’s carrying amount is written down
           jumlah yang dapat dipulihkan apabila nilai                      immediately to its recoverable amount if the
           tercatat aset lebih besar daripada estimasi                     asset’s carrying amount is greater than its
           jumlah yang dapat dipulihkan (Catatan 3.j).                     estimated recoverable amount (Note 3.j).

           Beban      perbaikan     dan    pemeliharaan                    The costs of repairs and maintenance are
           dibebankan pada laba rugi pada saat                             charged to profit or loss as incurred.
           terjadinya. Biaya-biaya lain yang terjadi                       Subsequent costs incurred to add to, replace
           selanjutnya yang timbul untuk menambah,                         part of, or service an item of property, plant and
           mengganti atau memperbaiki aset tetap diakui                    equipment, are recognised as assets if and only
           sebagai biaya perolehan aset jika dan hanya                     if it is probable that future economic benefits
           jika besar kemungkinan manfaat ekonomis di                      associated with the item will flow to the entity
           masa depan berkenaan dengan aset tersebut                       and the cost of the item can be measured
           akan mengalir ke entitas dan biaya perolehan                    reliably.
           aset dapat diukur secara andal.

           Aset tetap yang tidak digunakan lagi atau dijual,               For property, plant and equipment which can no
           nilai tercatatnya dikeluarkan dari kelompok aset                longer be utilised or sold, the carrying amount
           tetap. Keuntungan atau kerugian dari penjualan                  is eliminated from the group of property, plant
           aset tetap tersebut diakui dalam laba rugi.                     and equipment. The resulting gains or losses
                                                                           on disposals of property, plant and equipment
                                                                           are recognised in profit or loss.

           Jika aset yang direvaluasi tidak digunakan lagi                 When revalued assets are no longer utilised or
           atau dijual, jumlah yang dicatat di dalam ekuitas               sold, the amounts included in equity are
           dipindahkan ke saldo laba.                                      transferred to retained earnings.

           Aset tidak digunakan dalam operasi terdiri dari                 Assets not used in operations consist of
           aset tetap yang akan direlokasi/ditransfer,                     property, plant and equipment that will be
           sedang diperbaiki, dan akan dihapus. Aset                       relocated/transferred, repaired, and disposed.
           yang tidak digunakan dalam operasi, kecuali                     Assets not used in operations, except for
           aset yang akan dihapus, disusutkan dengan                       assets to be disposed, are depreciated using
           metode garis lurus dan berdasarkan taksiran                     the same method and based on the economic
           masa manfaat ekonomis yang sama dengan                          useful lives of the property, plant and
           aset tetap.                                                     equipment.
Page 38
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/28 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)


3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.        MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                          (continued)

     i.   Aset tetap (lanjutan)                                          i.    Property, plant and equipment (continued)

          Aset dalam pembangunan merupakan biaya-                              Construction in progress represents costs
          biaya yang berhubungan langsung dengan                               directly attributable to the construction of
          pembangunan aset tetap. Aset dalam                                   property, plant and equipment. Construction in
          pembangunan dinyatakan sebesar biaya                                 progress is stated at cost, which includes
          perolehan, termasuk biaya pinjaman selama                            borrowing costs during construction on debts
          masa pembangunan dari pinjaman yang                                  incurred to finance the construction, depreciation
          digunakan       untuk    pembangunan,        beban                   of property, plant and equipment used in the
          penyusutan aset tetap yang digunakan dalam                           construction and cost of testing whether the
          pekerjaan pembangunan dan biaya pengujian                            asset is functioning properly after deducting
          ketika aset dapat berfungsi setelah dikurangi                        sales of electricity during the commissioning
          penjualan listrik ketika masa uji coba. Aset dalam                   period. Construction in progress is transferred to
          pembangunan akan dipindahkan ke masing-                              the respective property, plant and equipment
          masing aset tetap yang bersangkutan pada saat                        account when completed and ready for use.
          selesai dan siap digunakan. Penyusutan dimulai                       Depreciation is charged from the date on which
          pada saat aset tersebut siap untuk digunakan                         the assets are ready for use in the manner
          sesuai dengan tujuan yang diinginkan                                 intended by management.
          manajemen.

     j.   Penurunan nilai aset non-keuangan                         j.        Impairment of non-financial assets

          Aset yang memiliki masa manfaat yang tidak                          Assets that have an indefinite useful life - for
          terbatas, misalnya goodwill, tidak diamortisasi                     example, goodwill - are not subject to
          namun diuji penurunan nilainya setiap tahun                         amortisation but are tested annually for
          atau lebih sering apabila terdapat peristiwa                        impairment, or more frequently if events or
          atau      perubahan    pada     kondisi   yang                      changes in circumstances indicate that they
          mengindikasikan kemungkinan penurunan                               might be impaired. Assets that are subject to
          nilai. Aset yang diamortisasi diuji ketika                          amortisation are reviewed for impairment
          terdapat indikasi bahwa nilai tercatatnya                           whenever events or changes in circumstances
          mungkin tidak dapat dipulihkan. Penurunan                           indicate that the carrying amount may not be
          nilai diakui jika nilai tercatat aset melebihi                      recoverable. An impairment loss is recognised
          jumlah terpulihkan. Jumlah terpulihkan adalah                       for the amount by which the asset’s carrying
          yang lebih tinggi antara nilai wajar aset                           amount exceeds its recoverable amount. The
          dikurangi biaya pelepasan dan nilai pakai aset.                     recoverable amount is the higher of an asset’s
          Dalam menentukan penurunan nilai, aset                              fair value less costs of disposal and value-in-
          dikelompokkan pada tingkat yang paling                              use. For the purposes of assessing impairment,
          rendah dimana terdapat arus kas yang dapat                          assets are grouped at the lowest levels for
          diidentifikasi. Aset non-keuangan selain                            which there are separately identifiable cash
          goodwill yang mengalami penurunan nilai diuji                       flows. Non-financial assets other than goodwill
          setiap tanggal pelaporan untuk menentukan                           that suffer impairment are reviewed for a
          apakah terdapat kemungkinan pemulihan                               possible reversal of the impairment at each
          penurunan nilai.                                                    reporting date.

          Pembalikan rugi penurunan nilai untuk aset                          Reversal of impairment losses for assets other
          selain goodwill, diakui jika dan hanya jika,                        than goodwill would be recognised, if and only
          terdapat perubahan estimasi yang digunakan                          if, there has been a change in the estimates
          dalam menentukan jumlah terpulihkan aset                            used to determine the asset’s recoverable
          sejak pengujian penurunan nilai terakhir kali                       amount since the last impairment testing was
          dilakukan. Pembalikan rugi penurunan nilai                          carried out. Reversal of impairment losses will
          tersebut diakui langsung dalam laba rugi. Rugi                      be immediately recognised in profit or loss.
          penurunan nilai yang diakui atas goodwill tidak                     Impairment losses relating to goodwill would
          dibalik lagi.                                                       not be reversed.
Page 39
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/29 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     k.   Utang usaha                                             k.   Trade payables

          Utang usaha adalah kewajiban untuk membayar                  Trade payables are obligations to pay for goods
          barang atau jasa yang telah diterima dalam                   or services that have been acquired in the
          kegiatan usaha normal dari pemasok. utang                    ordinary course of business from suppliers.
          usaha diklasifikasikan sebagai liabilitas jangka             Trade payables are classified as current liabilities
          pendek apabila pembayarannya jatuh tempo                     if payment is due within one year of the reporting
          dalam waktu satu tahun atau kurang setelah                   date. If not, they are presented as non-current
          tanggal pelaporan. jika tidak, utang usaha                   liabilities.
          tersebut disajikan sebagai liabilitas jangka
          panjang.

          Utang usaha pada awalnya diakui sebesar nilai                Trade payables are recognised initially at fair
          wajar dan selanjutnya diukur pada biaya                      value and subsequently measured at amortised
          perolehan diamortisasi dengan menggunakan                    cost using the effective interest method.
          metode suku bunga efektif.

     l.   Sewa                                                    l.   Leases

          Grup sebagai pesewa                                          The Group as a lessor

          Ketika Grup bertindak sebagai pesewa, Grup                   When the Group acts as a lessor, it will classify
          akan mengklasifikasi masing-masing sewanya                   each of its leases as either an operating lease or
          baik sewa operasi atau sewa pembiayaan.                      a finance lease.

          Untuk mengklasifikasi masing-masing sewa,                    To classify each lease, the Group makes an
          Grup membuat penilaian secara keseluruhan                    overall assessment of whether the lease
          atas apakah sewa mengalihkan secara                          transfers substantially all of the risks and rewards
          substansial seluruh risiko dan manfaat yang                  incidental to ownership of the underlying asset. If
          terkait dengan kepemilikan aset pendasar. Jika               this is the case, then the lease is classified as a
          penilaian membuktikan hal tersebut, maka sewa                finance lease; if not, then it is an operating lease.
          diklasifikasikan sebagai sewa pembiayaan; jika
          tidak, maka merupakan sewa operasi.

          Pendapatan sewa dari operasi sewa dimana                     Lease income from operating leases where the
          Grup bertindak sebagai pesewa diakui sebagai                 Group is a lessor is recognised as revenue on a
          pendapatan secara garis lurus selama masa                    straight-line basis over the lease term. Initial
          sewa. Biaya langsung awal yang terjadi saat                  direct costs incurred in obtaining an operating
          mendapatkan sewa operasi ditambahkan pada                    lease are added to the carrying amount of the
          nilai tercatat aset pendasar dan diakui sebagai              underlying asset and recognised as expense
          beban selama masa sewa dengan basis yang                     over the lease term on the same basis as lease
          sama dengan pendapatan sewa. Aset terkait                    income. The respective leased assets are
          yang disewakan ditampilkan di laporan posisi                 included in the statement of financial position
          keuangan berdasarkan sifatnya.                               based on their nature.

          Grup sebagai penyewa                                         The Group as a lessee

          Penentuan apakah suatu perjanjian merupakan,                 Determination of whether an arrangement is, or
          atau mengandung, sewa dibuat berdasarkan                     contains, a lease is made based on the
          substansi perjanjian itu sendiri dan penilaian               substance of the arrangement and assessment
          apakah pemenuhan atas perjanjian bergantung                  of whether fulfilment of the arrangement is
          dari penggunaan aset tertentu atau aset, dan                 dependent on the use of a specific asset or
          apakah perjanjian memberikan hak untuk                       assets, and the arrangement conveys a right to
          menggunakan aset.                                            use the asset.

          Grup menyewa aset tetap tertentu. Kontrak sewa               The Group leases certain property, plant and
          biasanya dibuat untuk periode tetap dari 2                   equipment. Rental contracts are typically made
          hingga 20 tahun tetapi mungkin memiliki opsi                 for fixed periods of 2 to 20 years but may have
          ekstensi. Kontrak dapat berisi komponen sewa                 extension options. Contracts may contain both
          dan non-sewa berdasarkan harga relatif yang                  lease and non-lease components based on their
          berdiri sendiri.                                             relative stand-alone prices.

          Sewa diakui sebagai aset hak guna dan liabilitas             Leases are recognised as a right-of-use asset
          terkait pada tanggal di mana aset sewaan                     and a corresponding liability at the date on which
          tersedia untuk digunakan oleh Grup.                          the leased asset is available for use by the
                                                                       Group.
Page 40
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/30 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     l.   Sewa (lanjutan)                                           l.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

          Aset dan liabilitas yang timbul dari sewa pada                 Assets and liabilities arising from a lease are
          awalnya diukur dengan basis nilai kini. Liabilitas             initially measured on a present value basis.
          sewa termasuk nilai bersih sekarang dari                       Lease liabilities include the net present value of
          pembayaran sewa berikut:                                       the following lease payments:
          -   pembayaran tetap (termasuk pembayaran                      -     fixed payments (including in-substance fixed
              tetap secara substansi), dikurangi piutang                       payments), less any lease incentives
              insentif sewa;                                                   receivables;
          -   pembayaran sewa variabel yang didasarkan                   -     variable lease payments that are based on
              pada indeks atau tingkat, pada awalnya                           an index or a rate, initially measured using
              diukur menggunakan indeks atau tingkat                           the index or rate as at the commencement
              pada tanggal mulai;                                              date;
          -   jumlah yang diperkirakan akan dibayarkan                   -     amounts expected to be payable by the
              oleh penyewa berdasarkan jaminan nilai                           lessee under residual value guarantees;
              residu;
          -   harga pelaksanaan dari opsi pembelian jika                 -   the exercise price of a purchase option if the
              penyewa cukup yakin untuk menggunakan                          lessee is reasonably certain to exercise that
              opsi tersebut; dan                                             option; and
          -   pembayaran penalti untuk penghentian                       -   payments of penalties for terminating the -
              sewa, jika masa sewa mencerminkan                              lease, if the lease term reflects the lessee
              penyewa yang melaksanakan opsi tersebut.                       exercising that option.

          Pembayaran sewa yang harus dilakukan                           Lease payments to be made under reasonably
          berdasarkan opsi perpanjangan tertentu juga                    certain extension options are also included in the
          termasuk dalam pengukuran liabilitas.                          measurement of the liability.

          Pembayaran sewa didiskontokan dengan                           The lease payments are discounted using the
          menggunakan suku bunga implisit dalam sewa.                    interest rate implicit in the lease. If the rate
          Jika tarif tidak dapat segera ditentukan, di mana              cannot be readily determined, which is generally
          hal tersebut secara umum terjadi pada sewa                     the case for leases in the Group, the lessee’s
          dalam Grup, suku bunga pinjaman inkremental                    incremental borrowing rate is used, being the
          penyewa digunakan, yaitu tarif yang harus                      rate that the individual lessee would have to pay
          dibayar oleh penyewa untuk meminjam dana                       to borrow the funds necessary to obtain an asset
          yang diperlukan untuk memperoleh aset dengan                   of similar value to the right-of-use asset in a
          nilai yang sama dengan aset hak guna dalam                     similar economic environment with similar terms,
          lingkungan ekonomi serupa dengan syarat dan                    security and conditions.
          ketentuan yang serupa.

          Untuk menentukan suku bunga pinjaman                           To determine the incremental borrowing rate, the
          inkremental, Grup:                                             Group:
          -    jika     memungkinkan,       menggunakan                  -   where possible, uses recent third-party
               pembiayaan pihak ketiga terkini yang                          financing received by the individual lessee
               diterima oleh penyewa individu sebagai titik                  as a starting point, adjusted to reflect
               awal, disesuaikan untuk mencerminkan                          changes in financing conditions since third
               perubahan kondisi pembiayaan sejak                            party financing was received;
               pembiayaan pihak ketiga diterima;
          -    menggunakan pendekatan build-up yang                      -   uses a build-up approach that starts with a
               dimulai dengan suku bunga bebas risiko                        risk free interest rate adjusted for credit risk
               yang disesuaikan dengan risiko kredit untuk                   for leases held by the Group, where there is
               sewa yang dimiliki oleh Grup, yang tidak                      no recent third-party financing; and
               memiliki pembiayaan pihak ketiga baru-baru
               ini; dan
          -    membuat penyesuaian spesifik untuk sewa,                  -   makes adjustments specific to the lease,
               misalnya jangka waktu, mata uang, dan                         e.g., term, currency and security.
               jaminan.
Page 41
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/31 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     l.   Sewa (lanjutan)                                         l.   Leases (continued)

          Grup sebagai penyewa (lanjutan)                              The Group as a lessee (continued)

          Grup dihadapkan pada potensi kenaikan di masa                The Group is exposed to potential future
          depan dalam pembayaran sewa variabel                         increases in variable lease payments based on
          berdasarkan indeks atau tarif, yang tidak                    an index or rate, which are not included in the
          termasuk dalam liabilitas sewa sampai                        lease liability until they take effect. When
          diberlakukan. Ketika penyesuaian pembayaran                  adjustments to lease payments based on an
          sewa berdasarkan indeks atau suku bunga mulai                index or rate take effect, the lease liability is
          berlaku, liabilitas sewa dinilai kembali dan                 reassessed and adjusted against the right-of-use
          disesuaikan dengan aset hak guna.                            asset.

          Pembayaran sewa dialokasikan antara biaya                    Lease payments are allocated between principal
          pokok dan keuangan. Biaya keuangan                           and finance cost. The finance cost is charged to
          dibebankan pada laporan laba rugi selama masa                profit or loss over the lease period so as to
          sewa sehingga menghasilkan suku bunga                        produce a constant periodic rate of interest on
          periodik yang konstan atas sisa saldo liabilitas             the remaining balance of the liability for each
          untuk setiap periode.                                        period.

          Aset hak guna diukur pada biaya perolehan yang               Right-of-use assets are measured at cost
          terdiri dari berikut ini:                                    comprising the following:
          -    jumlah pengukuran awal liabilitas sewa;                 -   the amount of the initial measurement of
                                                                           lease liability;
          -   pembayaran sewa yang dilakukan pada                      -   any lease payments made at or before the
              atau sebelum tanggal dimulainya dikurangi                    commencement date less any lease
              insentif sewa yang diterima; dan                             incentives received; and
          -   biaya langsung awal, dan biaya restorasi.                -   any initial direct costs, and restoration costs.

          Aset hak guna umumnya disusutkan sepanjang                   Right-of-use assets are generally depreciated
          waktu yang lebih pendek antara lama masa                     over the shorter of the asset’s useful life and the
          manfaat aset dan jangka waktu sewa                           lease term on a straight-line basis. If the Group
          menggunakan metode garis lurus. Jika Grup                    is reasonably certain to exercise a purchase
          cukup yakin untuk melaksanakan opsi                          option, the right-of-use assets are depreciated
          pembelian, aset hak guna disusutkan selama                   over the underlying assets’ useful life.
          masa manfaat aset yang mendasarinya.

          Aset hak guna juga mengalami penurunan nilai                 The right-of-use assets are also subject to
          (Catatan 3.j).                                               impairment (Note 3.j).

          Pembayaran terkait dengan sewa jangka pendek                 Payments associated with short-term leases and
          dan sewa aset bernilai rendah diakui atas dasar              leases of low-value assets are recognised on a
          garis lurus sebagai beban dalam laporan laba                 straight-line basis as an expense in profit or loss.
          rugi. Sewa jangka pendek adalah sewa dengan                  Short-term leases are leases with a lease term of
          masa sewa 12 bulan atau kurang. Aset bernilai                12 months or less. Low-value assets comprise
          rendah terdiri dari peralatan umum.                          general equipment.

          Opsi ekstensi dan terminasi                                  Extension and termination options

          Opsi ekstensi dan terminasi termasuk dalam                   Extension and termination options are included
          sejumlah sewa properti dan peralatan di seluruh              in a number of property and equipment leases
          Grup. Istilah-istilah ini digunakan untuk                    across the Group. These terms are used to
          memaksimalkan fleksibilitas operasional dalam                maximise operational flexibility in terms of
          hal pengelolaan kontrak. Mayoritas opsi ekstensi             managing contracts. The majority of extension
          dan terminasi yang dimiliki hanya dapat                      and termination options held are exercisable only
          dilaksanakan oleh Grup dan bukan oleh pemberi                by the Group and not by the respective lessor.
          sewa masing-masing.
Page 42
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/32 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                             POLICY
     (lanjutan)                                                     INFORMATION (continued)

     l.       Sewa (lanjutan)                                       l.       Leases (continued)

              Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

              Jaminan nilai residu                                           Residual value guarantees

              Untuk mengoptimalkan biaya sewa selama                         To optimise lease costs during the contract
              periode kontrak, Grup terkadang memberikan                     period, the Group sometimes provides residual
              jaminan nilai residu sehubungan dengan sewa                    value guarantees in relation to equipment
              peralatan.                                                     leases.

              Modifikasi sewa                                                Lease modification

              Penyewa mencatat modifikasi sewa sebagai                       A lessee shall account for a lease modification
              sewa terpisah jika:                                            as a separate lease if both:

          -      modifikasi meningkatkan ruang lingkup                   -      the modification increases the scope of the
                 sewa dengan menambahkan hak untuk                              lease by adding the right to use one or
                 menggunakan satu aset pendasar atau                            more underlying assets; and
                 lebih; dan
          -      imbalan sewa meningkat sebesar jumlah                   -      the consideration for the lease increases
                 yang setara dengan harga tersendiri untuk                      by an amount commensurate with the
                 peningkatan dalam ruang lingkup dan                            stand-alone price for the increase in scope
                 penyesuaian yang tepat pada harga                              and any appropriate adjustments to that
                 tersendiri tersebut untuk merefleksikan                        stand-alone    price     to    reflect   the
                 kondisi kontrak tertentu.                                      circumstances of the particular contract.

          Untuk modifikasi sewa yang tidak dicatat                       For a lease modification that is not accounted
          sebagai sewa terpisah, pada tanggal efektif                    for as a separate lease, at the effective date of
          modifikasi sewa, penyewa:                                      the lease modification, a lessee shall:

          -      mengalokasikan        imbalan       kontrak             -      allocate the consideration in the modified
                 modifikasian;                                                  contract;
          -      menentukan masa sewa dari sewa                          -      determine the lease term of the modified
                 modifikasian; dan                                              lease; and
          -      mengukur kembali liabilitas sewa dengan                 -      remeasure the lease liability by discounting
                 mendiskontokan pembayaran sewa revision                        the revised lease payments using a revised
                 menggunakan tingkat diskonto revisian.                         discount rate. The revised discount rate is
                 Tingkat diskonto revisian ditentukan                           determined as the interest rate implicit in
                 sebagai suku bunga implisit dalam sewa                         the lease for the remainder of the lease
                 untuk sisa masa sewa, jika dapat                               term, if that rate can be readily determined,
                 ditentukan; atau suku bunga pinjaman                           or the lessee’s incremental borrowing rate
                 inkremental penyewa pada tanggal efektif                       at the effective date of the modification, if
                 modifikasi, jika suku bunga implisit dalam                     the interest rate implicit in the lease cannot
                 sewa tidak dapat ditentuka                                     be readily determined.

          Untuk modifikasi sewa yang tidak dicatat                       For a lease modification that is not accounted
          sebagai sewa terpisah, penyewa mencatat                        for as a separate lease, the lessee shall
          pengukuran kembali liabilitas sewa dengan:                     account for the measurement of the lease
                                                                         liability by:

          -      menurunkan jumlah tercatat aset hak guna                -      decreasing the carrying amount of the
                 untuk merefleksikan penghentian parsial                        right-of-use asset to reflect the partial or full
                 atau penuh sewa untuk modifikasi sewa                          termination of the lease for lease
                 yang menurunkan ruang lingkup sewa.                            modifications that decrease the scope of
                 Penyewa mengakui dalam laba rugi setiap                        the lease. The lessee shall recognise in
                 keuntungan atau kerugian yang terkait                          profit or loss any gain or loss relating to the
                 dengan penghentian parsial atau penuh                          partial or full termination of the lease.
                 sewa tersebut.
          -      membuat penyesuaian terkait dengan aset                 -      making a corresponding adjustment to the
                 hak guna untuk seluruh modifikasi sewa                         right-of-use asset for all other lease
                 lainnya.                                                       modifications.
Page 43
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/33 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL       ACCOUNTING                      POLICY
     (lanjutan)                                                     INFORMATION (continued)

     m. Biaya pinjaman                                              m. Borrowing costs

          Biaya bunga dan biaya pinjaman lainnya, seperti                Interest and other borrowing costs, such as
          biaya diskonto pinjaman baik yang secara                       discount fees on loans either directly or indirectly
          langsung atau tidak langsung digunakan untuk                   used in financing the construction of a qualifying
          pendanaan konstruksi aset kualifikasian,                       asset, are capitalised up to the date when
          dikapitalisasi hingga aset tersebut selesai                    construction is complete. For borrowings that are
          dikonstruksi. Untuk biaya pinjaman yang dapat                  directly attributable to a qualifying asset, the
          diatribusikan secara langsung pada aset                        amount to be capitalised is determined as the
          kualifikasian,    jumlah    yang    dikapitalisasi             actual borrowing cost incurred during the year,
          ditentukan dari biaya pinjaman aktual yang                     less any income earned on the temporary
          terjadi selama tahun berjalan, dikurangi                       investment of such borrowings. For borrowings
          penghasilan yang diperoleh dari investasi                      that are not directly attributable to a qualifying
          sementara atas dana hasil pinjaman tersebut.                   asset, the amount to be capitalised is determined
          Untuk pinjaman yang tidak dapat diatribusikan                  by applying a capitalisation rate to the amount
          secara langsung pada suatu aset kualifikasian,                 expended on the qualifying assets. The
          jumlah yang dikapitalisasi ditentukan dengan                   capitalisation rate is the weighted average of the
          mengalikan tingkat kapitalisasi terhadap jumlah                total borrowing costs applicable to the total
          yang dikeluarkan untuk memperoleh aset                         borrowings outstanding during the period, other
          kualifikasian. Tingkat kapitalisasi dihitung                   than borrowings made specifically for the
          berdasarkan rata-rata tertimbang biaya pinjaman                purpose of obtaining a qualifying asset.
          yang dibagi dengan jumlah pinjaman yang
          tersedia selama periode, selain pinjaman yang
          secara spesifik diambil untuk tujuan memperoleh
          suatu aset kualifikasian.

     n.   Properti investasi                                        n.   Investment properties

          Properti investasi adalah properti (tanah dan hak              Investment properties are properties (land and
          atas tanah atau bangunan atau bagian dari suatu                land rights or a building or part of a building or
          bangunan atau kedua-duanya) yang dikuasai                      both) held by the owner or the lessee under a
          oleh pemilik atau penyewa melalui sewa                         finance lease to earn rentals or for capital
          pembiayaan untuk menghasilkan sewa atau                        appreciation or both, rather than for use in the
          untuk kenaikan nilai atau kedua-duanya, dan                    production or supply of goods or services or for
          tidak untuk digunakan dalam produksi atau                      administrative purposes; or sale in the daily
          penyediaan barang atau jasa atau untuk tujuan                  business activities.
          administratif; atau dijual dalam kegiatan usaha
          sehari-hari.

          Properti investasi diakui sebagai aset jika dan                Investment property is recognised as an asset
          hanya jika besar kemungkinan manfaat                           when, and only when it is probable that the future
          ekonomis masa depan yang terkait dengan                        economic benefits that are associated with the
          properti investasi akan mengalir ke entitas; dan               investment property will flow to the entity; and the
          biaya perolehan properti investasi dapat diukur                cost of the investment property can be measured
          dengan andal.                                                  reliably.

          Properti investasi pada awalnya diukur sebesar                 An investment property shall be measured
          biaya perolehan, meliputi harga pembelian dan                  initially at its cost, comprising its purchase price
          setiap pengeluaran yang dapat diatribusikan                    and any directly attributable expenditure
          secara langsung (biaya jasa hukum, pajak                       (professional fees for legal services, property
          pengalihan properti, dan biaya transaksi lain).                transfer taxes and other transaction costs).
          Biaya transaksi termasuk dalam pengukuran                      Transaction costs are included in the initial
          awal tersebut.                                                 measurement.
Page 44
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/34 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     n.   Properti investasi (lanjutan)                            n.    Investment properties (continued)

          Setelah pengakuan awal, Grup memilih                          After initial recognition, the Group chooses to
          menggunakan model nilai wajar dan mengukur                    use the fair value model and measure all of its
          seluruh properti investasi berdasarkan nilai                  investment properties at fair value. Any gain or
          wajar. Keuntungan atau kerugian yang timbul                   loss arising from a change in the fair value of
          dari perubahan nilai wajar properti investasi                 investment property is recognised in profit or
          diakui dalam laba rugi pada tahun terjadinya.                 loss for the year in which it arises.

          Nilai wajar didasarkan kepada harga pasar                     Fair value is based on active market prices,
          aktif, disesuaikan, jika perlu, dengan                        adjusted, if necessary, for differences in the
          perbedaan alam, lokasi atau kondisi dari aset                 nature, location or condition of the specific
          tersebut. Jika informasi tersebut tidak tersedia,             asset. If this information is not available, the
          Grup      menggunakan       metode     penilaian              Group uses alternative valuation methods,
          alternatif, seperti harga terbaru di pasar yang               such as recent prices on less active markets or
          kurang aktif atau proyeksi arus kas yang                      discounted cash flow projections.
          didiskontokan.

          Penentuan nilai wajar investasi dilakukan pada                The fair value of investment property as at the
          tanggal posisi keuangan didasarkan pada                       financial position date is based on an annual
          penilaian oleh penilai independen yang                        valuation by an independent valuer who holds
          mempunyai kualifikasi profesional yang telah                  a recognised and relevant professional
          diakui dan relevan serta memiliki pengalaman                  qualification and has recent experience in the
          terkini di lokasi dan kategori properti investasi             location and category of the investment
          yang dinilai. Penilaian ini membentuk dasar                   property being valued. These valuations form
          untuk nilai tercatat pada laporan keuangan                    the basis for the carrying amounts in the
          konsolidasian.                                                consolidated financial statements.

          Properti investasi dihentikan pengakuannya                    Investment properties are derecognised either
          pada saat dilepaskan (pada tanggal penerima                   when they have been disposed of (i.e., at the
          mendapatkan kontrol) atau ketika tidak                        date the recipient obtains control) or when they
          digunakan lagi secara permanen dan tidak                      are permanently withdrawn from use and no
          memiliki manfaat ekonomi masa depan yang                      future economic benefit is expected from their
          diperkirakan dari pelepasannya. Selisih antara                disposal. The difference between the net
          hasil neto pelepasan dan jumlah tercatat aset                 disposal proceeds and the carrying amount of
          diakui dalam laba rugi pada tahun terjadinya                  the asset is recognised in profit or loss in the
          penghentian      atau    pelepasan.     Dalam                 year of derecognition. In determining the
          menentukan nilai pertimbangan dari pelepasan                  amount of consideration from the derecognition
          properti investasi, Grup mempertimbangkan                     of investment property, the Group considers the
          dampak dari variabel pertimbangan, adanya                     effects of variable consideration, the existence
          komponen pembiayaan yang signifikan, dan                      of a significant financing component, non-cash
          pertimbangan utang ke pembeli (jika ada).                     consideration, and consideration payable to the
                                                                        buyer (if any).

          Pengalihan dilaksanakan ke (atau dari) properti               Transfers are made to (or from) investment
          investasi hanya ketika adanya perubahan                       property only when there is a change in use.
          pemakaian. Untuk pengalihan dari properti                     For a transfer from investment property to
          investasi menjadi properti yang ditempati                     owner-occupied property, the deemed cost for
          pemilik, biaya yang dianggap untuk akuntansi                  subsequent accounting is the fair value at the
          selanjutnya adalah nilai wajar pada tanggal                   date of change in use. If owner-occupied
          perubahan pemakaian tersebut. Jika properti                   property becomes an investment property, the
          yang ditempati pemilik menjadi properti                       Group accounts for such property in
          investasi, Grup mengakui properti tersebut                    accordance with the policy stated under
          sesuai dengan kebijakan yang tercantum pada                   property, plant and equipment up to the date of
          aset tetap sampai tanggal perubahan                           change in use.
          pemakaian.
Page 45
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/35 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     o.   Aset tak berwujud                                          o.    Intangible assets

          Piranti lunak komputer                                           Computer software

          Biaya yang terkait dengan pemeliharaan                           Costs associated with maintaining computer
          program piranti lunak komputer diakui sebagai                    software programs are recognised as an
          beban      pada     saat    terjadinya.     Biaya                expense as incurred. Development costs that are
          pengembangan yang dapat secara langsung                          directly attributable to the design and testing of
          diatribusikan kepada desain dan pengujian                        identifiable and unique software products
          produk piranti lunak yang dapat diidentifikasi dan               controlled by the Group are recognised as
          unik yang dikendalikan oleh Grup diakui sebagai                  intangible assets. Directly attributable costs are
          aset     takberwujud.    Biaya     yang     dapat                capitalised as part of the software product
          diatribusikan secara langsung dikapitalisasi                     include the software development employee
          sebagai bagian produk piranti lunak mencakup                     costs and an appropriate portion of relevant
          beban pekerja pengembang piranti lunak dan                       overheads. Computer software development
          bagian     overhead yang relevan. Biaya                          costs recognised as assets are amortised using
          pengembangan piranti lunak komputer diakui                       the straight-line method over their estimated
          sebagai aset yang diamortisasi dengan metode                     useful lives of between four to five years.
          garis lurus berdasarkan estimasi masa
          manfaatnya antara 4 sampai dengan 5 tahun.

          Biaya legal terkait pembaruan tanah dan hak                     Legal costs to renew land and land rights
          atas tanah

          Biaya legal terkait dengan pembaruan tanah                      Legal costs related to the renewal of land and
          dan hak atas tanah diakui sebagai aset                          land rights are recognised as intangible assets
          takberwujud dan diamortisasi sepanjang umur                     and amortised over the period of the land or
          hukum tanah dan hak atas tanah antara 20                        land rights between 20 to 30 years.
          sampai dengan 30 tahun.

     p.   Biaya dibayar di muka                                     p.    Prepaid expenses

          Biaya dibayar di muka diamortisasi selama                       Prepaid expenses are amortised over the
          periode manfaat dengan menggunakan                              periods benefited using the straight-line
          metode garis lurus.                                             method.

     q.   Kas dan setara kas                                        q     Cash and cash equivalents

          Kas dan setara kas termasuk kas, kas di bank,                   Cash and cash equivalents consist of cash on
          dan deposito berjangka yang jatuh tempo                         hand, cash in banks and time deposits with
          dalam jangka waktu Enam bulan atau kurang                       maturity periods of six months or less at the time
          pada saat penempatan yang tidak digunakan                       of placement that are not used as collateral or are
          sebagai   jaminan     atau   tidak   dibatasi                   not restricted.
          penggunaannya.

          Laporan arus kas konsolidasian disusun                          The consolidated statements of cash flows
          menggunakan metode langsung dengan                              have been prepared using the direct method by
          mengklasifikasikan arus kas berdasarkan                         classifying the cash flows on the basis of
          aktivitas operasi, investasi, dan pendanaan.                    operating, investing, and financing activities.

     r.   Persediaan                                                r.    Inventories

          Persediaan suku cadang, bahan bakar, minyak                     Spare parts, fuel, lubricants, tools and supplies
          pelumas, perlengkapan, dan bahan pendukung                      are valued at cost less a provision for obsolete
          dinilai dengan harga perolehan dikurangi                        and slow-moving inventory. Cost is determined
          dengan provisi persediaan usang dan bergerak                    based on the moving average method. A
          lambat. Harga perolehan ditentukan dengan                       provision for obsolete and slow-moving
          metode rata-rata bergerak. Provisi persediaan                   inventory is determined on the basis of
          usang dan bergerak lambat ditentukan                            estimated future usage of individual inventory
          berdasarkan estimasi penggunaan jenis                           items.
          persediaan pada masa mendatang.
Page 46
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/36 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     s.   Pengakuan pendapatan dan beban                             s.    Revenue and expense recognition

          Pendapatan dari kontrak dengan pelanggan                         Revenue from contracts with customers

          Pengakuan pendapatan harus memenuhi 5                            Revenue recognition has to fulfil 5 (five) steps of
          (lima) langkah penilaian sebagai berikut:                        assessment as follows:

          i.   identifikasi kontrak dengan pelanggan;                      i.     identify contract(s) with a customer;
          ii.  identifikasi kewajiban pelaksanaan dalam                    ii.    identify the performance obligations in the
               kontrak.         Kewajiban      pelaksanaan                        contract. Performance obligations are
               merupakan janji-janji dalam kontrak untuk                          promises in a contract to transfer to a
               menyerahkan barang atau jasa yang                                  customer goods or services that are distinct;
               memiliki       karakteristik  berbeda       ke
               pelanggan;                                                  iii.   determine the transaction price. The
          iii. penetapan harga transaksi. Harga transaksi                         transaction price is the amount of
               merupakan jumlah imbalan yang berhak                               consideration to which an entity expects to
               diperoleh suatu entitas sebagai kompensasi                         be entitled in exchange for transferring
               atas diserahkannya barang atau jasa yang                           promised goods or services to a customer.
               dijanjikan ke pelanggan. Jika imbalan yang                         If the consideration promised in a contract
               dijanjikan di kontrak mengandung suatu                             includes a variable amount, the Group
               jumlah yang bersifat variabel, maka Grup                           estimates the amount of consideration to
               membuat estimasi jumlah imbalan tersebut                           which it expects to be entitled in exchange
               sebesar jumlah yang diharapkan berhak                              for transferring the promised goods or
               diterima atas diserahkannya barang atau                            services to a customer less the estimated
               jasa yang dijanjikan ke pelanggan dikurangi                        amount of service level guarantee which will
               dengan estimasi jumlah jaminan kinerja jasa                        be paid during the contract period;
               yang akan dibayarkan selama periode
               kontrak;                                                    iv. allocate the transaction price to each
          iv. alokasi harga transaksi ke setiap kewajiban                      performance obligation on the basis of the
               pelaksanaan dengan menggunakan dasar                            relative stand-alone selling prices of each
               harga jual berdiri sendiri relatif dari setiap                  distinct good or service promised in the
               barang atau jasa berbeda yang dijanjikan di                     contract. Where these are not directly
               kontrak. Ketika tidak dapat diamati secara                      observable, the relative stand-alone selling
               langsung, harga jual berdiri sendiri relatif                    prices are estimated based on expected
               diperkirakan berdasarkan biaya yang                             cost-plus margin; and
               diharapkan ditambah margin; dan                             v. recognise revenue when the performance
          v. pengakuan pendapatan ketika kewajiban                             obligation is satisfied by transferring a
               pelaksanaan telah dipenuhi dengan                               promised good or service to a customer
               menyerahkan barang atau jasa yang                               (which is when the customer obtains control
               dijanjikan ke pelanggan (ketika pelanggan                       of that good or service).
               telah memiliki kendali atas barang atau jasa
               tersebut).

          Kewajiban pelaksanaan dapat dipenuhi dengan                     A performance obligation may be satisfied at
          cara sebagai berikut:                                           the following:
          -   Pada waktu tertentu (umumnya janji untuk                    -    A point in time (typically for promises to
              menyerahkan barang ke pelanggan); atau                           transfer goods to a customer); or
          -   Sepanjang waktu (umumnya janji untuk                        -    Over time (typically for promises to transfer
              menyerahkan jasa ke pelanggan). Untuk                            services to a customer). For a performance
              kewajiban pelaksanaan yang dipenuhi                              obligation satisfied over time, the Group
              sepanjang waktu, Grup memilih ukuran                             selects an appropriate measure of
              penyelesaian      yang     sesuai    untuk                       progress to determine the amount of
              penentuan jumlah pendapatan yang harus                           revenue that should be recognised as the
              diakui    karena     telah    terpenuhinya                       performance obligation is satisfied.
              kewajiban pelaksanaan.
Page 47
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/37 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     s.   Pengakuan pendapatan dan beban (lanjutan)                s.   Revenue and expense recognition (continued)

          Penjualan tenaga listrik                                      Sale of electricity

          Pendapatan penjualan listrik diakui berdasarkan               Revenue from the sale of electricity is recognised
          pemakaian energi listrik (kWh). Umumnya,                      based on customers’ electricity usage (kWh).
          pelanggan dapat membeli token mereka sendiri                  Generally, customers can buy their own token
          ("prabayar")   atau   ditagih setiap      bulan               (“prepaid”) or are billed monthly (“postpaid”). For
          ("pascabayar"). Untuk pelanggan pascabayar,                   postpaid customers, revenue from the sale of
          pendapatan dari penjualan listrik diakui setiap               electricity is recognised monthly based on the
          bulan berdasarkan hasil baca meter atas                       meter reading result of each customer. For
          pemakaian pelanggan. Untuk pelanggan                          prepaid customers, the Group recognises the
          prabayar,    Grup     mengakui      pendapatan                revenue based on the estimated usage of the
          berdasarkan estimasi jumlah penggunaan token                  customer during the period. The prepayment
          pelanggan pada periode tertentu. Penerimaan                   from customers received is recorded under other
          dimuka dari pelanggan telah dicatat pada utang                payables.
          lain-lain.

          Subsidi listrik Pemerintah                                    The Government’s electricity subsidy

          Pendapatan subsidi merupakan pendapatan dari                  Subsidy revenue represents the revenue from
          Pemerintah Indonesia atas selisih antara biaya                the Government of Indonesia for the difference
          yang diperbolehkan ditambah margin 7%                         between allowable cost plus a 7% margin and
          dengan harga jual aktual per masing-masing                    the actual sales price for each tariff group except
          golongan tarif kecuali untuk golongan tarif yang              for tariff groups for which tariff adjustments were
          diberlakukan     penyesuaian      tarif  menurut              applied based on Minister of Energy and Mineral
          Peraturan Menteri Energi dan Sumber Daya                      Resources (“ESDM”) Regulation No. 28 Year
          Alam Mineral (“ESDM”) No. 28 Tahun 2016                       2016 on tariff for electricity provided          by
          tentang tarif tenaga listrik yang disediakan oleh             Perusahaan         Perseroan        (Persero)   PT
          Perusahaan       Perseroan       (Persero)    PT              Perusahaan Listrik Negara with the latest
          Perusahaan Listrik Negara sebagaimana                         amendment by Regulation of the Minister of
          terakhir diubah dengan Peraturan Menteri ESDM                 ESDM No. 8 Year 2023 (together referred as
          No. 8 Tahun 2023 (bersama-sama disebut                        “ESDM Regulation on tariff for electricity”).
          “Peraturan ESDM tentang tarif tenaga listrik”).

          Subsidi listrik Pemerintah diakui sebagai                     The Government’s electricity subsidy is
          pendapatan berdasarkan berita acara verifikasi                recognised as revenue based on a monthly
          bulanan dimana tertera berapa jumlah subsidi                  verification report where the amount of subsidy
          yang akan dibayarkan oleh Pemerintah dan telah                to be paid by the Government is stated and has
          diakui sebagai kewajiban oleh Pemerintah                      been recognised as an obligation by the
          Indonesia. Nilai subsidi listrik Pemerintah pada              Government of Indonesia. The Government’s
          akhir tahun perlu diaudit oleh Badan Pemeriksa                electricity subsidy value at the end of the year is
          Keuangan (“BPK”).                                             subjected to the Supreme Audit Agency (“BPK”)
                                                                        audit.
Page 48
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/38 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     s.   Pengakuan pendapatan dan beban (lanjutan)               s.   Revenue and expense recognition (continued)

          Pendapatan kompensasi                                        Compensation income

          Pendapatan       kompensasi         merupakan                Compensation income is income from the
          pendapatan dari Pemerintah Indonesia atas tarif              Government of Indonesia for non-subsidy tariff
          golongan non-subsidi yang tidak mengalami                    groups which have not experienced a tariff
          perubahan kenaikan tarif berdasarkan Peraturan               adjustment based on ESDM Regulation on tariff
          ESDM tentang tarif tenaga listrik. Kompensasi                for electricity. Compensation from the
          dari Pemerintah diakui sebagai pendapatan                    Government is recognised as income based on
          berdasarkan Laporan Hasil Pemeriksaan                        the Audit Report (“LHP”) of the State
          (“LHP”) Badan Pengawasan Keuangan dan                        Development Audit Agency (“BPKP”) and/or
          Pembangunan (“BPKP”) dan/atau BPK Republik                   BPK of the Republic of Indonesia and the amount
          Indonesia dan jumlahnya telah diakui sebagai                 has been recognised as an obligation by the
          kewajiban oleh Pemerintah Indonesia.                         Government of Indonesia.

          Nilai  kompensasi    merupakan     estimasi                  The compensation value is a management
          manajemen yang pada akhir tahun akan direviu                 estimate which at the end of the year will be
          oleh BPKP dan/atau BPK.                                      reviewed by BPKP and/or BPK.

          Biaya penyambungan pelanggan                                 Customer connection fees

          Grup menganggap biaya penyambungan yang                      The Group views connection fees received from
          diterima dari pelanggan yang digunakan untuk                 customers that are used to construct or acquire
          membangun atau mengakuisisi aset tetap untuk                 property, plant and equipment to connect the
          menghubungkan pelanggan secara tidak                         customers as indirectly related to the promise of
          langsung berkaitan erat dengan pasokan listrik               providing a supply of electricity to the customers.
          kepada pelanggan. Pasokan listrik dan biaya                  Supply of electricity and connection fees are not
          penyambungan merupakan satu kesatuan                         distinct because the customers cannot benefit
          karena pelanggan tidak dapat memperoleh                      from these two services on their own. The
          manfaat dari kedua layanan ini sendiri.                      purpose of the connection infrastructure is to fulfil
          Infrastruktur penyambungan berfungsi untuk                   the obligation to supply electricity to the
          memenuhi kewajiban penyediaan tenaga listrik                 customers. Both the supply of electricity and
          kepada pelanggan. Pasokan listrik dan biaya                  connection fees are substantially the same and
          penyambungan pada dasarnya sama, dan                         have the same pattern of transfer to the
          memiliki pola transfer yang sama ke pelanggan.               customers. Therefore, connection fees and the
          Oleh karena itu, biaya penyambungan dan                      supply of electricity are one performance
          pasokan tenaga listrik merupakan satu                        obligation. As such, connection fees are
          kewajiban pelaksanaan. Dengan demikian,                      recognised as deferred revenue and amortised
          biaya      penyambungan       diakui   sebagai               at the rate of 5% per annum starting from the
          pendapatan ditangguhkan dan diamortisasi                     connection date.
          dengan tarif 5% per tahun terhitung sejak
          tanggal koneksi.

          Penjualan batubara                                           Sales of coal

          Pendapatan penjualan diakui pada setiap                      Sales revenue is recognised on each individual
          penjualan individu ketika mengontrol transfer ke             sale when control transfers to the customer.
          pelanggan. Kontrol beralih ke pelanggan dan                  Control passes to the customer and sales
          pendapatan penjualan diakui ketika batu bara                 revenue is recognised when the coal is loaded
          dimuat ke kapal dimana batubara akan dikirim ke              onto the vessel on which the coal will be shipped
          pelabuhan tujuan atau tempat pelanggan.                      to the destination port or the customer’s
                                                                       premises.
Page 49
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/39 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     s.   Pengakuan pendapatan dan beban (lanjutan)                 s.   Revenue and expense recognition (continued)

          Penjualan batubara (lanjutan)                                  Sales of coal (continued)

          Grup menjual batubara dengan syarat Free on                    The Group generally sells its coal products under
          Board (“FOB”), di mana Grup tidak memiliki                     Free on Board (“FOB”) terms, where the Group
          tanggung jawab untuk pengangkutan atau                         has no responsibility for freight or insurance once
          asuransi setelah kontrol barang telah berlalu di               control of the goods has passed at the loading
          pelabuhan muat. Untuk jangka waktu ini hanya                   port. For this term there is only one performance
          ada satu kewajiban pelaksanaan, yaitu untuk                    obligation, which is for the provision of a product
          penyediaan produk pada titik di mana kontrol                   at the point where control passes. In addition, the
          lewat. Selain itu, Grup menjual batubara dengan                Group also sells coal under Cost, Insurance and
          syarat Cost, Insurance and Freight (“CIF”), tetapi             Freight (“CIF”) terms, but under the sales
          berdasarkan perjanjian penjualan, kepemilikan                  agreement, the title and risk of loss of coal shall
          dan risiko kerugian atas batubara akan tetap                   remain with the Group until such coal passes at
          berada pada Grup sampai batubara melewati                      the discharging port. As such, the Group
          pelabuhan bongkar. Oleh karena itu, Grup                       considers that the insurance and freight costs are
          menganggap bahwa biaya asuransi dan                            not separate performance obligations but one
          pengangkutan bukan merupakan kewajiban                         performance obligation with the sale of coal,
          pelaksanaan terpisah melainkan satu kesatuan                   because the control over coal supplies passes to
          dengan     kewajiban     pelaksanaan     dengan                the buyer when the coal has arrived at the
          penjualan batubara dikarenakan kontrol atas                    buyer’s location. Accordingly, the Group does
          persediaan batubara berpindah ke pembeli pada                  not have any separate performance obligations
          saat batubara tersebut sudah sampai di lokasi                  for the transportation and insurance services
          pembeli. Oleh karena itu Grup tidak memiliki                   provided.
          kewajiban pelaksanaan terpisah untuk jasa
          pengangkutan dan asuransi yang disediakan.

          Pendapatan usaha lainnya                                       Other revenues

          Pendapatan       usaha      lainnya   merupakan                Other revenues consist of telecommunications
          pendapatan yang berasal dari pelayanan                         network and services, transformer rental and
          jaringan dan jasa telekomunikasi, sewa trafo dan               other administrative services. Revenue from
          jasa-jasa administratif lainnya. Pendapatan dari               providing services is recognised in the
          pemberian jasa diakui pada periode akuntansi                   accounting period in which the services are
          saat jasa tersebut telah diberikan. Untuk kontrak              rendered. For fixed-price contracts, revenue is
          harga tetap, pendapatan diakui berdasarkan                     recognised based on the actual service provided
          servis aktual yang diberikan hingga akhir periode              to the end of the reporting period as a proportion
          pelaporan sebagai proporsi dari total servis yang              of the total services to be provided because the
          akan diberikan karena pelanggan telah                          customers received and consumed the benefit
          menerima dan menggunakan manfaat secara                        simultaneously.
          simultan.

          Komponen pembiayaan                                            Financing component

          Grup tidak memperkirakan adanya kontrak di                     The Group does not expect to have any contracts
          mana jangka waktu antara pengalihan barang                     where the period between the transfer of the
          atau jasa yang dijanjikan kepada pelanggan dan                 promised goods or services to the customer and
          pembayaran oleh pelanggan melebihi satu                        payment by the customer exceeds one year.
          tahun. Akibatnya, Grup tidak menyesuaikan                      Consequently, the Group does not adjust any of
          harga transaksi apa pun dengan nilai waktu                     the transaction prices for the time value of
          uang.                                                          money.

          Beban                                                          Expenses

          Beban diakui pada saat terjadinya dengan dasar                 Expenses are recognised as incurred on an
          akrual.                                                        accrual basis.
Page 50
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/40 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     t.   Imbalan kerja                                            t.   Employee benefits

          Imbalan pascakerja                                            Post-employment benefits

          Skema pensiun diklasifikasikan sebagai program                Pension schemes are classified as either defined
          iuran pasti atau program manfaat pasti,                       contribution plans or defined benefit plans,
          tergantung pada substansi ekonomi dari syarat                 depending on the economic substance of the
          dan kondisi utama program tersebut. Program                   plan as derived from its principal terms and
          iuran pasti adalah program pensiun yang                       conditions. A defined contribution plan is a
          mewajibkan Grup membayar sejumlah iuran                       pension plan under which the Group pays fixed
          tertentu kepada entitas terpisah. Grup tidak                  contributions into a separate entity. The Group
          memiliki kewajiban hukum atau konstruktif untuk               has no legal or constructive obligations to pay
          membayar iuran lebih lanjut jika entitas tersebut             further contributions if the fund does not hold
          tidak memiliki aset yang cukup untuk membayar                 sufficient assets to pay all employees the
          seluruh imbalan atas jasa yang diberikan pekerja              benefits relating to employee service in the
          pada     tahun    berjalan   dan     tahun-tahun              current period and prior years. A defined benefit
          sebelumnya. Program manfaat pasti adalah                      plan is a pension plan that is not a defined
          program pensiun yang bukan merupakan                          contribution plan. Typically, defined benefit plans
          program iuran pasti. Program manfaat pasti                    define an amount of pension benefit that an
          adalah program pensiun yang menentukan                        employee will receive upon retirement, usually
          jumlah imbalan pensiun yang akan diterima                     dependent on one or more factors such as age,
          seorang pekerja pada saat pensiun, biasanya                   years of service and compensation.
          berdasarkan pada satu atau lebih faktor seperti
          usia, masa kerja, dan kompensasi.

          Grup harus mencadangkan jumlah minimal                        The Group is required to provide a minimum
          imbalan pensiun sesuai dengan Peraturan                       amount of pension benefit in accordance with
          Ketenagakerjaan atau Perjanjian Kerja Bersama                 Manpower Regulations or the Group’s Collective
          (“PKB”), mana yang lebih tinggi. Karena                       Labour Agreement (the “CLA”), whichever is
          Peraturan     Ketenagakerjaan     atau    PKB                 higher. Since the Manpower Regulations or the
          menentukan rumus tertentu untuk menghitung                    CLA set the formula for determining the minimum
          jumlah minimal imbalan pensiun, pada dasarnya,                amount of benefits, in substance pension plans
          program pensiun berdasarkan Peraturan                         under the Manpower Regulations or the CLA
          Ketenagakerjaan atau PKB adalah program                       represent defined benefit plans.
          manfaat pasti.

          Sehubungan dengan program manfaat pasti,                      The liability recognised in the consolidated
          liabilitas diakui pada laporan posisi keuangan                statement of financial position in respect of
          konsolidasian setara dengan nilai kini kewajiban              defined benefit pension program is equivalent to
          manfaat pasti pada akhir tahun pelaporan                      the present value of the defined benefit obligation
          dikurangi nilai wajar aset program. Kewajiban                 at the end of the reporting year less the fair value
          manfaat pasti dihitung setiap tahun oleh aktuaris             of plan assets. The defined benefit obligation is
          independen dengan menggunakan metode                          calculated annually by independent actuaries
          Projected Unit Credit. Imbalan pascakerja terdiri             using the Projected Unit Credit method. Post-
          dari imbalan pesangon dan penghargaan purna                   employment benefits consist of severance
          jabatan.                                                      benefits and employment awards.

          Nilai kini kewajiban manfaat pasti ditentukan                 The present value of the defined benefit
          dengan mendiskontokan arus kas keluar yang                    obligation is determined by discounting the
          diestimasi dengan menggunakan tingkat bunga                   estimated future cash outflows using the interest
          obligasi korporat berkualitas tinggi dalam                    rates of high-quality corporate bonds that are
          denominasi mata uang dimana imbalan akan                      denominated in the currency in which the
          dibayarkan dan memiliki jangka waktu jatuh                    benefits will be paid and that have terms of
          tempo mendekati jangka waktu kewajiban                        maturity approximating the terms of the related
          pensiun. Apabila tidak terdapat pasar aktif untuk             pension obligations. When there is no deep
          obligasi korporat tersebut, digunakan imbal hasil             market for such bonds, the yields of Government
          obligasi Pemerintah.                                          bonds are used.
Page 51
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/41 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     t.   Imbalan kerja (lanjutan)                                 t.   Employee benefits (continued)

          Imbalan pascakerja (lanjutan)                                 Post-employment benefits (continued)

          Biaya jasa lalu diakui segera dalam laba rugi.                Past service costs are recognised immediately in
          Keuntungan dan kerugian atas kurtailmen atau                  profit or loss. Gains or losses on the curtailment
          penyelesaian suatu program manfaat pasti                      or settlement of a defined benefit plan are
          diakui pada saat kurtailmen atau penyelesaian                 recognised when the curtailment or settlement
          tersebut terjadi.                                             occurs.

          Pengukuran kembali yang        timbul dari                    Remeasurements arising from experience
          penyesuaian pengalaman dan perubahan                          adjustments and changes in actuarial
          asumsi-asumsi aktuarial dibebankan atau                       assumptions are charged or credited to equity in
          dikreditkan pada ekuitas dalam laporan                        the    consolidated     statement     of  other
          penghasilan komprehensif lain konsolidasian                   comprehensive income in the year in which they
          pada tahun dimana beban tersebut terjadi.                     arise. The accumulated remeasurements
          Akumulasi saldo pengukuran kembali dilaporkan                 balance is reported in retained earnings.
          di saldo laba.

          Untuk program iuran pasti, Grup membayar                      For defined contribution plans, the Group pays
          iuran kepada dana pensiun yang dikelola oleh                  contributions to publicly or privately managed
          publik atau swasta. Grup tidak memiliki                       pension plans. The Group has no further
          kewajiban membayar lebih lanjut jika iuran                    payment obligations once the contributions have
          tersebut telah dibayarkan. Iuran tersebut diakui              been paid. The contributions are recognised as
          sebagai beban imbalan kerja ketika jatuh tempo.               employee benefit expenses when they become
          Iuran dibayar di muka diakui sebagai aset                     due. Prepaid contributions are recognised as an
          sepanjang      pengembalian       dana      atau              asset to the extent that a cash refund or
          pengurangan      pembayaran     masa      depan               reduction in the future payments is available.
          dimungkinkan.

          Pesangon pemutusan kontrak kerja                              Termination benefits

          Pesangon pemutusan kontrak kerja dibayarkan                   Termination benefits are payable when
          ketika pekerja diberhentikan, atau ketika pekerja             employment is terminated by the Group before
          menerima penawaran mengundurkan diri secara                   the normal retirement date, or when an employee
          sukarela. Grup mengakui pesangon pemutusan                    accepts voluntary redundancy in exchange for
          kontrak kerja pada tanggal yang lebih dahulu                  certain benefits. The Group recognises
          dari: (i) ketika Grup tidak bisa lagi membatalkan             termination benefits at the earlier of the following
          penawaran pesangon; dan (ii) ketika Grup                      dates: (i) when the Group can no longer withdraw
          mengakui biaya untuk restrukturisasi yang                     the offer of those benefits; and (ii) when the
          berada dalam lingkup PSAK No. 57, “Provisi,                   Group recognises costs for a restructuring that is
          Liabilitas Kontinjensi dan Aset Kontinjensi” dan              within the scope of SFAS No. 57, “Provisions,
          melibatkan pembayaran pesangon pemutusan                      Contingent Liabilities and Contingent Assets”
          kontrak      kerja.   Dalam      hal   penawaran              and involves the payment of termination benefits.
          pengunduran diri secara sukarela, pesangon                    In the case of an offer made to encourage
          pemutusan kontrak kerja diukur berdasarkan                    voluntary redundancy, the termination benefits
          ekspektasi jumlah karyawan yang menerima                      are measured based on the number of
          penawaran tersebut. Pesangon pemutusan                        employees expected to accept the offer. Benefits
          kontrak kerja yang jatuh tempo lebih dari 12                  falling due more than 12 months after the
          bulan setelah tanggal pelaporan didiskontokan                 reporting date are discounted to their present
          ke nilai kini.                                                value.
Page 52
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/42 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                 FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                            JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)        (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                      3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     t.   Imbalan kerja (lanjutan)                                    t.   Employee benefits (continued)

          Imbalan pemeliharaan kesehatan                                   Health care benefits

          Grup menyediakan imbalan pemeliharaan                            The Group provides health care benefits to its
          kesehatan untuk karyawan yang berhak atas                        employees who are entitled to these benefits.
          imbalan tersebut. Hak atas imbalan ini pada                      The entitlement to these benefits is usually
          umumnya diberikan pada karyawan aktif dan                        granted to both active and retired employees
          pensiunan yang memenuhi masa kerja minimum                       who have fulfilled the minimum service period or
          tertentu atau berhenti bekerja karena cacat atau                 ceased working due to disability or death. The
          meninggal dunia. Perkiraan biaya imbalan ini                     expected costs of these benefits are accrued
          dicadangkan sepanjang masa kerja karyawan                        over the years of employment using the same
          dengan menggunakan metode akuntansi yang                         accounting method as used for defined benefit
          sama dengan yang digunakan untuk program                         pension plans. Actuarial gains and losses arising
          pensiun imbalan pasti. Keuntungan dan kerugian                   from experience adjustments and changes in
          aktuarial yang timbul dari penyesuaian                           actuarial assumptions are charged or credited to
          pengalaman dan perubahan asumsi aktuarial                        equity in other comprehensive income in the
          dibebankan atau dikreditkan ke                                   period they arise.
          ekuitas di penghasilan komprehensif lain pada
          periode saat terjadinya.

          Imbalan kerja jangka panjang lainnya                             Other long-term benefits

          Grup memberikan imbalan pascakerja lainnya                       The Group provides other long-term employee
          seperti uang cuti besar, tunjangan kecelakaan                    benefits such as a long leave allowance,
          dinas, bantuan kematian, dan penghargaan                         disability benefit, death benefit, and loyalty
          kesetiaan kerja. Nilai imbalan yang diberikan                    benefit. The benefits paid are based on the
          didasari pada Perjanjian Kerja Bersama.                          Group’s CLA.

          Cuti besar diberikan kepada karyawan yang                        The long leave allowance is given to employees
          telah bekerja sekurang-kurangnya enam tahun                      who have worked for at least six years
          terus menerus. Tunjangan kecelakaan dinas                        continuously. The disability benefit is provided to
          diberikan kepada karyawan yang mengalami                         employees who have a work accident. The death
          kecelakaan dinas. Bantuan kematian diberikan                     benefit is provided to the heirs whether or not the
          kepada ahli waris bagi karyawan yang                             employee passes away as a result of a work
          meninggal dunia akibat kecelakaan kerja                          accident. The loyalty benefit is given every eight
          maupun tidak. Penghargaan kesetiaan kerja                        years for employees who have worked for 16
          diberikan setiap delapan tahun bagi pegawai                      years continuously.
          yang telah bekerja selama 16 tahun terus
          menerus.

          Perhitungan imbalan kerja jangka panjang                         Long-term benefits are determined using the
          ditentukan dengan menggunakan metode                             Projected Unit Credit Method. The long-term
          Projected Unit Credit. Jumlah yang diakui                        employee benefits liabilities recognised in the
          sebagai liabilitas imbalan kerja jangka panjang di               consolidated statement of financial position
          laporan     posisi    keuangan       konsolidasian               represent the present value of the defined benefit
          merupakan nilai kini liabilitas imbalan kerja pasti.             obligation.
Page 53
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/43 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     u.   Provisi                                                   u.   Provisions

          Provisi diakui ketika Grup memiliki kewajiban kini             Provisions are recognised when the Group has a
          (baik bersifat hukum maupun konstruktif)                       present obligation (legal or constructive) as a
          sebagai akibat peristiwa masa lalu dan                         result of a past event and it is probable that the
          kemungkinan         besar   Grup      diharuskan               Group will be required to settle the obligation and
          menyelesaikan kewajiban dan estimasi andal                     a reliable estimate can be made of the amount of
          mengenai jumlah kewajiban tersebut dapat                       the obligation.
          dibuat.

          Provisi diukur sebesar nilai kini dari estimasi                The provisions are measured at the present
          terbaik manajemen atas pengeluaran yang                        value of the management’s best estimate of the
          diperlukan untuk menyelesaikan kewajiban kini                  expenditure required to settle the present
          pada akhir periode pelaporan. Tingkat diskonto                 obligation at the end of the reporting period. The
          yang digunakan untuk menentukan nilai kini                     discount rate used to determine the present
          adalah tingkat diskonto sebelum pajak, yang                    value is a pre-tax rate that reflects current market
          mencerminkan penilaian pasar kini atas nilai                   assessments of the time value of money and the
          waktu uang dan risiko yang terkait dengan                      risks specific to the liability. The increase in the
          liabilitas  tersebut.   Peningkatan     provisi                provision due to the passage of time is
          sehubungan dengan berlalunya waktu diakui                      recognised as interest expense.
          sebagai beban keuangan.

          Ketika beberapa atau seluruh manfaat ekonomi                   When some or all of the economic benefits
          untuk penyelesaian provisi yang diharapkan                     required to settle a provision are expected to be
          dapat dipulihkan dari pihak ketiga, piutang diakui             recovered from a third party, a receivable is
          sebagai aset apabila terdapat kepastian bahwa                  recognised as an asset if it is virtually certain that
          penggantian akan diterima dan jumlah piutang                   reimbursement will be received, and the amount
          dapat diukur secara andal.                                     of the receivable can be measured reliably.

     v.   Piutang                                                   v.   Receivables

          Piutang usaha merupakan jumlah yang dapat                      Trade receivables represent amounts due from
          diterima dari pelanggan atas penjualan tenaga                  customers for sales of electricity, primary energy
          listrik, energi primer dan jasa dalam kegiatan                 and services in the normal course of business.
          usaha normal. Piutang lain-lain merupakan saldo                Other receivables represent receivables that are
          piutang yang tidak terkait dengan kegiatan                     not related to the normal business activities of
          usaha normal Grup. Jika piutang diperkirakan                   the Group. If receivables are expected to be
          dapat ditagih dalam waktu satu tahun atau                      collected within one year or less, they are
          kurang, piutang diklasifikasikan sebagai aset                  classified as current assets. Otherwise, the
          lancar. Jika tidak, piutang disajikan sebagai aset             receivables are presented as non-current assets
          tidak lancar pada laporan posisi keuangan                      in the consolidated statement of financial
          konsolidasian.                                                 position

          Piutang usaha pada awalnya diakui sebesar nilai                Trade receivables are recognised initially at fair
          wajar dan kemudian diukur sebesar biaya                        value and subsequently measured at amortised
          perolehan diamortisasi dengan menggunakan                      cost using the effective interest method, if the
          metode suku bunga efektif, jika efek                           impact of discounting is significant, less any loss
          pendiskontoan signifikan, dikurangi dengan                     allowance.
          cadangan kerugian.

          Kerugian penurunan nilai piutang disajikan                     Impairment losses on receivables are presented
          sebagai bagian dari beban usaha pada laba rugi.                as part of operating expenses in profit or loss.
          Jumlah yang selanjutnya dapat dipulihkan                       Subsequent recoveries of amounts previously
          kembali atas piutang yang sebelumnya telah                     written off are credited against the same line
          dihapusbukukan, dikreditkan terhadap item baris                item.
          yang sama.
Page 54
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/44 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     v.   Piutang (lanjutan)                                       v.   Receivables (continued)

          Piutang pihak berelasi pada awalnya disajikan                 Receivables from related parties are initially
          sebagai aset tidak lancar kecuali jika ada alasan             presented as non-current assets unless there
          tertentu untuk disajikan sebagai aset lancar pada             are specific reasons for them to be presented as
          laporan posisi keuangan konsolidasian.                        current assets in the consolidated statements of
                                                                        financial position.

          Lihat Catatan 3h untuk informasi lebih lanjut                 See Note 3h for further information regarding the
          mengenai     kebijakan   penentuan    jumlah                  policy on the determination of the amount for the
          cadangan kerugian piutang Grup.                               loss allowance on the Group’s receivables.

     w. Pajak penghasilan                                          w. Income tax

          Beban pajak terdiri dari pajak kini dan pajak                 Tax expense comprises current and deferred
          tangguhan. Pajak diakui dalam laba rugi, kecuali              tax. Tax is recognised in profit or loss, except to
          jika pajak itu terkait dengan kejadian atau                   the extent that it relates to items recognised in
          transaksi   yang    diakui   di    penghasilan                other comprehensive income or directly in equity.
          komprehensif lain atau langsung diakui ke                     In this case, the tax expense is recognised in
          ekuitas. Dalam hal ini, beban pajak tersebut                  other comprehensive income or directly in equity,
          masing-masing diakui pada penghasilan                         respectively.
          komprehensif lain atau secara langsung dicatat
          ke ekuitas.

          Beban pajak kini dihitung berdasarkan peraturan               The current income tax charge is calculated on
          perpajakan yang berlaku pada tanggal                          the basis of the tax laws enacted as at the
          pelaporan keuangan, di negara dimana Grup                     reporting date, in the countries where the Group
          beroperasi dan menghasilkan penghasilan kena                  operates and generates taxable income.
          pajak.      Manajemen       secara     periodik               Management periodically evaluates the positions
          mengevaluasi posisi yang diambil dalam Surat                  taken in Annual Tax Returns with respect to
          Pemberitahuan Tahunan sehubungan dengan                       situations in which the applicable tax regulations
          situasi dimana aturan pajak yang berlaku                      are subject to interpretation. It establishes a
          membutuhkan interpretasi atas peraturan pajak                 provision where appropriate on the basis of the
          yang     berlaku.   Jika   perlu,   manajemen                 amounts expected to be paid to the tax
          menentukan provisi dibentuk berdasarkan                       authorities.
          jumlah yang diharapkan akan dibayar pada
          otoritas pajak.

          Untuk pendapatan yang menjadi subjek pajak                    For income which is subject to final tax, tax
          penghasilan final, beban pajak diakui secara                  expenses are recognised proportionally with the
          proporsional dengan jumlah pendapatan                         accounting revenue recognised and presented
          akuntansi yang diakui dan disajikan dalam                     as part of the operating expenses account in the
          sebagai bagian dari akun beban operasional                    current year as such tax does not satisfy the
          pada tahun berjalan dikarenakan pajak tersebut                criteria of income tax.
          tidak memenuhi kriteria sebagai pajak
          penghasilan.
Page 55
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/45 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     w. Pajak penghasilan (lanjutan)                                 w. Income tax (continued)

          Pajak penghasilan tangguhan diakui, dengan                      Deferred income tax is recognised, using the
          menggunakan metode liabilitas untuk semua                       liability method, on temporary differences arising
          perbedaan temporer antara dasar pengenaan                       between the tax bases of assets and liabilities
          pajak aset dan liabilitas dengan nilai tercatatnya              and their carrying amounts in the consolidated
          pada laporan keuangan konsolidasian. Namun,                     financial statements. However, deferred tax
          liabilitas pajak tangguhan tidak diakui jika timbul             liabilities are not recognised if they arise from the
          dari pengakuan awal goodwill; atau pada saat                    initial recognition of goodwill; or deferred income
          pengakuan awal suatu aset atau liabilitas yang                  tax is not accounted for if it arises from the initial
          timbul dari transaksi selain kombinasi bisnis                   recognition of an asset or liability in a transaction
          yang pada saat transaksi tersebut tidak                         other than a business combination that at the
          mempengaruhi laba rugi akuntansi maupun laba                    time of the transaction affects neither accounting
          rugi kena pajak. Pajak penghasilan tangguhan                    nor taxable profit or loss. Deferred income tax is
          ditentukan menggunakan tarif dan peraturan                      determined using the tax rates and laws that
          pajak yang berlaku atau yang secara substansial                 have been enacted or substantially enacted at
          telah berlaku pada akhir tahun pelaporan dan                    the end of the reporting year and are expected to
          diharapkan diterapkan jika aset pajak                           apply when the related deferred income tax asset
          penghasilan tangguhan direalisasikan atau                       is realised or the deferred income tax liability is
          liabilitas pajak tangguhan diselesaikan.                        settled.

          Aset pajak penghasilan tangguhan diakui hanya                   Deferred income tax assets are recognised only
          jika besar kemungkinan jumlah penghasilan                       to the extent that it is probable that future taxable
          kena pajak di masa depan akan memadai untuk                     profits will be available against which the
          dikompensasi dengan perbedaan temporer yang                     temporary differences can be utilised.
          masih dapat digunakan.

          Aset dan liabilitas pajak tangguhan tidak diakui                Deferred tax assets and liabilities are not
          untuk perbedaan temporer antara nilai tercatat                  recognised for temporary differences between
          dan dasar pengenaan pajak atas dalam ventura                    the carrying amount and tax bases of
          bersama dan asosiasi dimana Grup dapat                          investments in joint ventures and associates
          mengendalikan waktu pembalikan perbedaan                        where the Group is able to control the timing of
          temporer dan kemungkinan perbedaan tersebut                     the reversal of the temporary differences and it is
          tidak akan dibalik di masa mendatang.                           probable that the differences will not be reversed
                                                                          in the foreseeable future.

          Aset dan liabilitas pajak penghasilan tangguhan                 Deferred income tax assets and liabilities are
          dapat saling hapus jika terdapat hak yang                       offset when there is a legally enforceable right to
          berkekuatan secara hukum untuk melakukan                        offset current tax assets against current tax
          saling hapus antara aset pajak kini dengan                      liabilities.
          liabilitas pajak kini.

     x.   Aset donasi dari Pemerintah                                x.   Government-contributed assets

          Aset donasi dari Pemerintah Indonesia, dalam                    Assets contributed by the Government of
          kapasitasnya sebagai pemegang saham                             Indonesia, in its capacity as a shareholder of the
          Perusahaan, diakui sebagai transaksi ekuitas                    Company, are accounted for as an equity
          dengan pemegang saham. Aset yang                                transaction with the shareholder. The assets are
          didonasikan tersebut dicatat sesuai dengan nilai                recorded at the transaction costs agreed upon
          transaksi yang telah disepakati dengan                          with the Government. The Company records the
          Pemerintah. Perusahaan mencatat aset donasi                     Government contributed asset as an addition to
          dari Pemerintah sebagai penambahan aset tetap                   property, plant and equipment with a
          dan peningkatan tambahan modal disetor oleh                     corresponding increase to additional paid-in
          pemegang saham.                                                 capital by the shareholder.
Page 56
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/46 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     y.   Laba per saham                                             y.   Earnings per share

          Laba per saham dasar dihitung dengan                            Basic earnings per share is calculated by dividing
          membagi laba yang dapat diatribusikan kepada                    the profit attributable to the equity holders of the
          pemegang saham Perusahaan dengan jumlah                         Company by the weighted average number of
          rata-rata tertimbang saham biasa yang beredar                   ordinary shares outstanding for the year.
          pada tahun berjalan.

          Laba per saham dilusian dihitung dengan                         Diluted earnings per share is calculated by
          menyesuaikan rata-rata tertimbang jumlah                        adjusting the weighted average number of
          saham      biasa    yang    beredar     untuk                   ordinary shares outstanding to assume the
          mengasumsikan konversi seluruh potensi saham                    conversion of all dilutive potential ordinary
          biasa yang dilutif.                                             shares.

     z.   Informasi segmen                                           z.   Segment information

          Segmen operasi diidentifikasi berdasarkan                       Operating segments are identified on the basis of
          laporan internal mengenai komponen dari Grup                    internal reports about components of the Group
          yang secara reguler direviu oleh “pengambil                     and are regularly reviewed by the “chief operating
          keputusan     operasional”   dalam   rangka                     decision maker” in order to allocate resources to
          mengalokasikan sumber daya dan menilai                          the segments and to assess their segment
          kinerja segmen operasi.                                         operation performance.

          Informasi yang digunakan oleh pengambil                         Information reported to the chief operating
          keputusan operasional dalam rangka alokasi                      decision maker for the purposes of resource
          sumber daya dan penilaian kinerja mereka                        allocation and assessment of their performance
          dikategorikan berdasarkan lokasi geografis di                   is grouped based on the geographical location
          mana penjualan tenaga listrik dilakukan.                        where electricity sales are made.

     aa. Properti pertambangan                                       aa. Mining properties

          Biaya pengembangan yang dikeluarkan oleh atau                   Development expenditure incurred by or on
          atas nama Grup diakumulasikan secara terpisah                   behalf of the Group is accumulated separately for
          untuk setiap area of interest pada saat cadangan                each area of interest in which economically
          terpulihkan yang secara ekonomis dapat                          recoverable resources have been identified.
          diidentifikasi. Biaya tersebut termasuk biaya yang              Such expenditure includes costs directly
          dapat diatribusikan secara langsung pada                        attributable to the construction of mines and
          konstruksi tambang dan infrastruktur terkait dan                related infrastructure and excludes physical
          tidak termasuk biaya aset berwujud dan hak atas                 assets and land rights (i.e., right to build, right to
          tanah (seperti hak guna bangunan, hak guna                      cultivate and right to use), which are recorded as
          usaha, dan hak pakai) yang dicatat sebagai aset                 fixed assets.
          tetap.

     ab. Kombinasi bisnis entitas sepengendali                       ab. Business combinations of entities under
                                                                         common control

          Kombinasi bisnis entitas sepengendali dicatat                   Business combinations of entities under common
          menggunakan metode penyatuan kepemilikan                        control are accounted for using the pooling-of-
          (pooling-of-interest).   Selisih   antara    harga              interest method. The difference between the
          pengalihan dengan nilai buku setiap transaksi                   transfer price and the book value of each
          restrukturisasi antara entitas sepengendali dicatat             restructuring transaction between entities under
          sebagai bagian dari tambahan modal disetor                      common control is recorded as part of additional
          dalam bagian ekuitas di laporan posisi keuangan                 paid-in capital in the equity section of the
          konsolidasian.                                                  consolidated statement of financial position.
Page 57
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/47 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    3.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     ac. Pinjaman                                                   ac. Borrowings

         Pada saat pengakuan awal, pinjaman diakui                      Borrowings are recognised initially at fair value,
         sebesar nilai wajar, dikurangi dengan biaya-                   net of transaction costs incurred. Borrowings are
         biaya transaksi yang terjadi. Selanjutnya,                     subsequently carried at amortised cost; any
         pinjaman diukur sebesar biaya perolehan                        difference between the proceeds (net of
         diamortisasi;   selisih   antara    penerimaan                 transaction costs) and the redemption value is
         (dikurangi biaya transaksi) dan nilai pelunasan                recognised in the profit or loss over the period of
         dicatat pada laporan laba rugi selama periode                  the borrowings using the effective interest
         pinjaman dengan menggunakan metode bunga                       method.
         efektif.

         Biaya yang dibayar untuk memperoleh fasilitas                  Fees paid on the establishment of loan facilities
         pinjaman diakui sebagai biaya transaksi                        are recognised as transaction costs of the loan
         pinjaman sepanjang besar kemungkinan                           to the extent that it is probable that some or all of
         sebagian atau seluruh fasilitas akan ditarik.                  the facility will be drawn down. In this case, the
         Dalam hal ini, biaya memperoleh pinjaman                       fee is deferred until the draw-down occurs. To
         ditangguhkan sampai penarikan pinjaman                         the extent that there is no evidence that it is
         terjadi. Sepanjang tidak terdapat bukti bahwa                  probable that some or all of the facility will be
         besar kemungkinan sebagian atau seluruh                        drawn down, the fee is capitalised as a pre-
         fasilitas akan ditarik, biaya memperoleh                       payment for liquidity services and amortised
         pinjaman dikapitalisasi sebagai pembayaran di                  over the period of the facility to which it relates.
         muka untuk jasa likuiditas dan diamortisasi
         selama periode fasilitas yang terkait.

         Biaya pinjaman akan dihentikan pengakuannya                    Borrowings are derecognised from the
         dari laporan posisi keuangan ketika kewajiban                  statement of financial position when the
         yang tertulis pada kontrak diselesaikan,                       obligation specified in the contract is discharged,
         dibatalkan, atau sudah tidak berlaku. Selisih                  cancelled or expired. The difference between the
         antara nilai tercatat dari liabilitas keuangan yang            carrying amount of a financial liability that has
         sudah berakhir atau dialihkan ke pihak lain dan                been extinguished or transferred to another
         imbalan yang dibayarkan, termasuk aset non kas                 party and the consideration paid, including any
         yang dialihkan atau liabilitas yang ditanggung,                non-cash assets transferred or liabilities
         diakui dalam laba rugi sebagai pendapatan lain-                assumed, is recognised in profit or loss as other
         lain atau biaya keuangan.                                      income or finance costs.

         Ketika liabilitas keuangan dinegosiasikan                      Where the terms of a financial liability are
         kembali dan entitas mengeluarkan instrumen                     renegotiated and the entity issues equity
         ekuitas kepada kreditor untuk menyelesaikan                    instruments to a creditor to extinguish all or part
         seluruh atau sebagian liabilitas (debt for equity              of the liability (debt for equity swap), a gain or
         swap), keuntungan atau kerugian diakui dalam                   loss is recognised in profit or loss, which is
         laporan laba rugi yang dicatat sebagai selisih                 measured as the difference between the
         antara jumlah tercatat dari liabilitas keuangan.               carrying amount of the financial liability and the
                                                                        fair value of the equity instruments issued.

         Pinjaman diklasifikasikan sebagai liabilitas                   Loans are classified as current liabilities unless
         jangka pendek kecuali Grup memiliki hak tanpa                  the Group has an unconditional right to defer
         syarat untuk menunda pembayaran liabilitas                     payment of the liability for at least 12 months
         selama paling tidak 12 bulan setelah tanggal                   after the reporting date.
         pelaporan.
Page 58
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/48 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

3.   INFORMASI       KEBIJAKAN             AKUNTANSI        3.   MATERIAL       ACCOUNTING                    POLICY
     MATERIAL (lanjutan)                                         INFORMATION (continued)

     ac. Pinjaman (lanjutan)                                     ac. Borrowings (continued)

         Dampak reformasi acuan suku bunga                           IBOR reform impact

         Kebijakan praktis berlaku untuk pinjaman.                   A practical guidance applies to borrowings.
         Panduan praktis ini hanya berlaku untuk                     This practical guidance only applies to changes
         perubahan yang diperlukan oleh reformasi                    required by interest rate benchmark reform,
         acuan tingkat suku bunga, yang terjadi jika, dan            which occur if, and only if, the modification is
         hanya jika, modifikasi diperlukan sebagai                   required as a direct result of the interest rate
         akibat langsung dari reformasi acuan suku                   benchmark reform and the new basis for
         bunga dan dasar baru untuk menentukan arus                  determining contractual cash flows is
         kas kontraktual yang secara ekonomis setara                 economically equivalent to the previous basis
         dengan dasar sebelumnya (yaitu, dasar yang                  (that is, the basis that precedes the change).
         mendahului perubahan).

         Jika sebagian atau seluruh perubahan dalam                  If some or all of the changes in the basis for
         dasar penentuan arus kas kontraktual liabilitas             determining the contractual cash flows of
         keuangan tidak memenuhi kriteria di atas,                   financial liabilities do not meet the above
         panduan praktis di atas pertama-tama                        criteria, the above practical guidance is first
         diterapkan pada perubahan yang disyaratkan                  applied to the changes required by the interest
         oleh reformasi acuan tingkat suku bunga,                    rate benchmark reform, including updating the
         termasuk memperbarui instrumen suku bunga                   effective interest rate instrument. Any additional
         efektif. Setiap perubahan tambahan dicatat                  changes are recorded in the normal manner
         dengan cara normal (yaitu, dinilai untuk                    (i.e.,    assessed       for   modification     or
         modifikasi atau penghentian pengakuan,                      derecognition, with modification gains/losses
         dengan keuntungan/kerugian modifikasian                     recognised immediately in profit or loss if the
         langsung diakui dalam laba rugi jika instrumen              instrument is not derecognised).
         tidak dihentikan pengakuannya).

         Grup telah menerapkan panduan praktis yang                  The Group has applied the practical guidance
         diberikan dalam reformasi acuan suku bunga -                provided in the interest rate benchmark reform
         tahap 2 terhadap utang bank dan penerusan                   - stage 2 to its bank loans and two-step loans,
         pinjaman, kecuali untuk pinjaman dari Asian                 except for loans from Asian Development Bank
         Development Bank (“ADB”), International Bank                (“ADB”), International Bank for Reconstruction
         for Reconstruction and Development (“IBRD”)                 and Development (“IBRD”) and Asian
         dan Asian Infrastructure Investment Bank                    Infrastructure Investment Bank (“AIIB”). the
         (“AIIB”). Grup menyimpulkan bahwa dasar                     Group has concluded that the basis for
         penentuan arus kas kontraktual untuk pinjaman               determining contractual cash flows for loans
         dari ADB, IBRD, dan AIIB tidak berubah karena               from ADB, IBRD and AIIB remains unchanged
         ADB, IBRD, dan AIIB menggunakan pass                        since the ADB, IBRD and AIIB use a pass
         through policy untuk biaya pendanaannya                     through policy for their funding cost to the
         kepada peminjam. Oleh karena itu, tidak                     borrower. Therefore, there is no IBOR reform
         terdapat dampak reformasi acuan suku bunga                  impact on loans from ADB, IBRD and AIIB.
         pada pinjaman dari ADB, IBRD, dan AIIB.
Page 59
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/49 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN                                SIGNIFICANT ACCOUNTING ESTIMATES

     Dalam rangka penerapan kebijakan akuntansi Grup,             In the application of the Group’s accounting policies,
     sebagaimana dijelaskan dalam Catatan 3,                      which are described in Note 3, the management is
     manajemen         diharuskan      untuk    membuat           required to make judgements, estimates, and
     pertimbangan, estimasi, dan asumsi tentang nilai             assumptions about the carrying amounts of assets
     aset dan liabilitas yang tidak tersedia dari sumber          and liabilities that are not readily apparent from
     lain. Estimasi dan asumsi berdasarkan pengalaman             other sources. The estimates and associated
     historis dan faktor lain yang dianggap relevan. Hasil        assumptions are based on historical experience and
     aktual dapat berbeda dari estimasi tersebut.                 other factors that are considered relevant. Actual
                                                                  results may differ from these estimates.

     Estimasi dan asumsi yang mendasari direviu secara            The estimates and underlying assumptions are
     berkelanjutan. Revisi terhadap estimasi akuntansi            reviewed on an ongoing basis. Revisions to
     akan diakui pada tahun dimana estimasi tersebut              accounting estimates are recognised in the year in
     direvisi, jika revisi tersebut hanya berpengaruh             which the estimate is revised if the revision affects
     terhadap tahun tersebut, atau pada tahun revisi dan          only that year, or in the year of the revision and
     tahun berikutnya jika revisi tersebut mempengaruhi           future years if the revision affects both current and
     tahun tersebut.                                              future years.

     Pertimbangan    penting       dalam      penerapan           Critical judgements in applying accounting
     kebijakan akuntansi                                          policies

     Dalam proses penerapan kebijakan akuntansi yang              In the process of applying the accounting policies
     dijelaskan dalam Catatan 3, Grup telah menentukan            described in Note 3, the Group has identified the
     hal-hal berikut yang memerlukan pertimbangan                 following matters under which significant
     signifikan:                                                  judgements are made:

     Penentuan umur sewa                                          Determining lease term

     Penentuan apakah suatu perjanjian mengandung                 Determining whether an arrangement is or contains
     unsur sewa membutuhkan pertimbangan yang                     a lease requires careful judgement to assess
     cermat untuk menilai apakah perjanjian tersebut              whether the arrangement conveys a right to obtain
     memberikan hak untuk mendapatkan secara                      substantially all the economic benefits from use of
     substansial seluruh manfaat ekonomis dari                    the asset throughout the period of use and right to
     penggunaan aset identifikasian dan hak untuk                 direct the use of the asset, even if the right is not
     mengarahkan penggunaan aset identifikasian,                  explicitly specified in the arrangement.
     bahkan jika hak tersebut tidak dijabarkan secara
     eksplisit di perjanjian.

     Dalam menentukan jangka waktu sewa, Grup                     In determining the lease term, Group considers all
     mempertimbangkan semua fakta dan keadaan yang                facts and circumstances that create an economic
     menimbulkan insentif ekonomi untuk menggunakan               incentive to exercise an extension option, or not
     opsi perpanjangan, atau tidak menggunakan opsi               exercise a termination option. Extension options (or
     penghentian. Opsi perpanjangan (atau tahun                   years after termination options) are only included in
     setelah opsi penghentian kontrak kerja) hanya                the lease term if the lease is reasonably certain to
     termasuk dalam jangka waktu sewa jika cukup pasti            be extended (or not terminated). The lease term is
     akan diperpanjang (atau tidak dihentikan). Umur              reassessed if an option is actually exercised (or not
     sewa dinilai kembali ketika opsi sebenarnya diambil          exercised) or the group becomes obliged to exercise
     (atau tidak diambil) atau grup menjadi berkewajiban          (or not exercise) it. The assessment of reasonable
     untuk mengambil (atau tidak mengambil) opsi                  certainty is only revised if a significant event or a
     tersebut. Penilaian kepastian yang wajar hanya               significant change in circumstances occurs, which
     direvisi ketika peristiwa signifikan atau perubahan          affects this assessment, and that is within the
     signifikan terjadi, yang mempengaruhi penilaian ini,         control of the lessee.
     dan hal tersebut dalam pengendalian penyewa.
Page 60
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/50 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Pertimbangan    penting     dalam       penerapan           Critical judgements in applying accounting
     kebijakan akuntansi (lanjutan)                              policies (continued)

     Pendapatan dari jasa penyambungan pelanggan                 Revenues from customer connection fees

     Sebagai bagian dari implementasi PSAK No. 72,               As a result of the implementation of SFAS No. 72,
     Grup telah menilai kembali perlakuan yang                   the Group has reassessed its treatment of revenue
     diterapkan pendapatan dari penyambungan                     from customer connection fees. The Group has
     pelanggan. Grup mempertimbangkan semua fakta                considered all relevant facts and circumstances to
     dan kondisi yang relevan untuk menentukan                   determine the exact timing of revenue recognition
     pengakuan       pendapatan       terkait    biaya           pertaining to connection fees paid by customers. To
     penyambungan pelanggan. Untuk itu, Grup perlu               do so, the Group needs to determine what
     menentukan kewajiban pelaksanaan yang timbul                performance obligations it has as a result of
     sehubungan       dengan     penerimaan      biaya           receiving connection fees. The Group considered
     penyambungan        dari     pelanggan.     Grup            the fact that the obligation to provide an ongoing
     mempertimbangkan fakta bahwa kewajiban untuk                supply of electricity is regulated by the 2009
     menyediakan tenaga listrik secara berkelanjutan             Electricity Law and that the Group charges all
     diatur dalam Undang-Undang Ketenagalistrikan                customers the same regulated tariff for electricity
     tahun 2009 dan semua pelanggan dikenakan tarif              usage prescribed by the Government of the
     listrik yang telah ditentukan oleh Pemerintah               Republic of Indonesia. The receipt of connection
     Republik Indonesia untuk penggunaan tenaga                  fees creates an obligation for the Group to provide
     listrik.  Penerimaan     biaya     penyambungan             ongoing electricity supply to its customers. The
     menimbulkan kewajiban bagi Grup untuk                       Group has concluded that connecting the customers
     menyediakan akses listrik secara berkelanjutan              to its network is an obligation which cannot be
     kepada pelanggan. Grup menyimpulkan bahwa                   separated from the delivery of electricity.
     menghubungkan pelanggan ke jaringan listrik
     Perusahaan merupakan kewajiban yang tidak
     terpisah dengan penyediaan tenaga listrik kepada
     pelanggan.

     Kepentingan dalam pengaturan bersama                        Interest in joint arrangements

     Pertimbangan diperlukan untuk menentukan ketika             Judgement is required to determine when the Group
     Grup memiliki pengendalian bersama, yang                    has joint control, which requires an assessment of
     membutuhkan penilaian mengenai aktivitas yang               the relevant activities and when the decisions in
     relevan dan ketika keputusan yang berkaitan                 relation to those activities require unanimous
     dengan     aktivitas   tersebut    membutuhkan              consent. The Group has determined that the
     persetujuan dengan suara bulat. Grup menentukan             relevant activities for its joint arrangements are
     bahwa aktivitas yang relevan untuk pengaturan               those relating to the operating and capital decisions
     bersama adalah aktivitas yang berkaitan dengan              of the arrangement.
     operasi dan pengambilan keputusan dalam
     pengaturan tersebut.

     Pertimbangan       juga       diperlukan      untuk         Judgement is also required to classify a joint
     mengklasifikasikan pengaturan bersama sebagai               arrangement as either a joint operation or a joint
     pengendalian bersama atau ventura bersama.                  venture. Classifying the arrangement requires the
     Pengklasifikasian       pengaturan         tersebut         Group to assess its rights and obligations arising
     mengharuskan Grup untuk menilai hak dan                     from the arrangement. Specifically, it considers:
     kewajiban yang timbul dari pengaturan tersebut.
     Secara khusus, Grup mempertimbangkan:
     • Struktur dari pengaturan bersama - apakah                 •   The structure of the joint arrangement - whether
        dibentuk melalui kendaraan terpisah;                         it is structured through a separate vehicle;
     • Ketika pengaturan tersebut terstruktur melalui            •   When the arrangement is structured through a
        kendaraan        terpisah,       Grup       juga             separate vehicle, the Group also considers the
        mempertimbangkan hak dan kewajiban yang                      rights and obligations arising from:
        timbul dari:
        - bentuk legal dari kendaraan terpisah;                      -   the legal form of the separate vehicle;
        - persyaratan dari perjanjian kontraktual; dan               -   the terms of the contractual arrangement;
        - fakta dan kondisi lain (ketika relevan).                       and
                                                                     -   other facts and circumstances (when relevant).
Page 61
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/51 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                     SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                  (continued)

     Pertimbangan    penting     dalam        penerapan           Critical judgements in applying accounting
     kebijakan akuntansi (lanjutan)                               policies (continued)

     Kepentingan      dalam     pengaturan      bersama           Interest in joint arrangements (continued)
     (lanjutan)

     Penilaian ini sering membutuhkan pertimbangan                This assessment often requires significant
     yang signifikan. Kesimpulan yang berbeda                     judgement. A different conclusion on joint control
     mengenai pengendalian bersama dan apakah suatu               and also whether the arrangement is a joint
     pengaturan adalah sebuah operasi bersama atau                operation or a joint venture, may materially impact
     ventura bersama, dapat memiliki dampak material              the consolidated financial statements.
     terhadap laporan keuangan konsolidasian.

     Grup memiliki pengaturan bersama yang terstruktur            The Group has joint arrangements which are
     melalui ventura bersama, lihat Catatan 9 untuk               structured through joint ventures, see Note 9 for the
     daftar ventura bersama tersebut. Struktur dan                list of joint ventures. These structures and the terms
     persyaratan       dari     perjanjian     kontraktual        of the contractual arrangements indicate that the
     mengindikasikan bahwa Grup memiliki hak atas                 Group has rights to the net assets of the
     aset bersih dari pengaturan bersama tersebut. Grup           arrangements. The Group has also assessed the
     menilai fakta dan kondisi lain yang berkaitan dengan         other facts and circumstances relating to these
     pengaturan ini dan menyimpulkan bahwa                        arrangements and concluded that the arrangements
     pengaturan tersebut merupakan ventura bersama.               are joint ventures.

     Sumber ketidakpastian estimasi                               Sources of estimation uncertainty

     Asumsi utama mengenai masa depan dan sumber                  The key assumptions concerning future and other
     estimasi lainnya pada akhir tahun pelaporan, yang            key sources of estimation at the end of the reporting
     memiliki risiko signifikan yang mengakibatkan                year, which have a significant risk of causing a
     penyesuaian material terhadap jumlah tercatat aset           material adjustment to the carrying amounts of
     dan liabilitas dalam tahun pelaporan berikutnya              assets and liabilities within the next financial year,
     dijelaskan dibawah ini:                                      are discussed below:

     Provisi atas kerugian kredit ekspektasian                    Provision for expected credit losses of trade
     piutang usaha dan aset keuangan lainnya                      receivables and other financial assets

     Grup menggunakan matriks provisi untuk                       The Group uses a provision matrix to calculate
     menghitung kerugian kredit ekspektasian piutang              expected credit losses for trade receivables. The
     usaha. Tingkat provisi adalah berdasarkan hari               provision rates are based on days past due for
     jatuh tempo atas kelompok segmen pelanggan                   groupings of various customer segments that have
     yang mempunyai karakteristik risiko kredit yang              similar credit risk characteristics (e.g., by product
     serupa (misalnya berdasarkan tipe produk dan tipe            type and customer type and/or customer rating).
     dan/atau peringkat pelanggan).

     Matriks provisi pada mulanya didasarkan pada                 The provision matrix is initially based on the Group’s
     tingkat gagal bayar historis Grup yang diobservasi.          historical observed default rates. The Group will
     Grup akan memperbaharui matriks untuk                        calibrate the matrix to adjust the historical credit loss
     menyesuaikan pengalaman kerugian kredit historis             experience with forward-looking information. For
     dengan informasi forward-looking. Sebagai contoh,            instance, if forecast economic conditions are
     jika perkiraan atas kondisi ekonomi diperkirakan             expected to deteriorate over the next year, which
     memburuk selama tahun depan, yang dapat                      can lead to an increased number of defaults, the
     menyebabkan meningkatnya jumlah gagal bayar,                 historical default rates are adjusted. At every
     tingkat gagal bayar historis disesuaikan. Pada               reporting date, the historical observed default rates
     setiap tanggal pelaporan, tingkat gagal bayar                are updated and changes in the forward-looking
     historis diperbaharui dan perubahan estimasi                 estimates are analysed.
     forward-looking dianalisis.
Page 62
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/52 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Sumber ketidakpastian estimasi (lanjutan)                   Sources of estimation uncertainty (continued)

     Provisi atas kerugian kredit ekspektasian                   Provision for expected credit losses of trade
     piutang usaha dan aset keuangan lainnya                     receivables and other financial assets
     (lanjutan)                                                  (continued)

     Penilaian atas korelasi antara tingkat gagal bayar          The assessment of the correlation between
     historis yang diobservasi, perkiraan atas kondisi           historical observed default rates, forecast economic
     ekonomi, dan kerugian kredit ekspektasian                   conditions, and expected credit losses is a
     merupakan estimasi yang signifikan. Jumlah                  significant estimate. The amount of expected credit
     kerugian kredit ekspektasian paling dipengaruhi             losses is sensitive to changes in circumstances and
     oleh perubahan keadaan dan perkiraan kondisi                forecast economic conditions. The Group’s
     ekonomi. Pengalaman kerugian kredit historis Grup           historical credit loss experience and forecast of
     dan perkiraan kondisi ekonomi juga mungkin tidak            economic conditions may also not be representative
     menggambarkan gagal bayar aktual pelanggan di               of a customer’s actual default in the future.
     masa yang akan datang.

     Pengakuan pendapatan                                        Revenue recognition

     Penjualan tenaga listrik prabayar                           Prepaid sales of electricity

     Penjualan tenaga listrik prabayar mencakup                  Prepaid sales of electricity includes an estimate of
     estimasi atas listrik yang dikonsumsi oleh                  electricity consumed by customers between the
     pelanggan antara tanggal pembelian token terakhir           date of the last token purchased and the financial
     dan akhir tahun keuangan Grup. Estimasi dilakukan           year end of the Group. An estimate is made by
     dengan memproratakan jumlah hari antara tanggal             prorating the total days between the date of the last
     terakhir pembelian token yang dibeli dengan tanggal         token purchased and the date of the Group’s
     laporan keuangan Grup dengan konsumsi historis              financial statement using the historical consumption
     pelanggan.                                                  of the customers.

     Biaya penyambungan pelanggan                                Customer connection fees

     Jasa koneksi yang diserahkan kepada pelanggan               A connection service which is provided to the
     tidak merepresentasikan nilai yang berdiri sendiri          customer does not represent a stand-alone value for
     (stand-alone value) untuk pelanggan tersebut.               that customer. Consequently, the Group recognises
     Sebagai     hasilnya,  Grup     mencatat    biaya           connection fees received from customers to connect
     penyambungan yang diterima dari pelanggan untuk             the customers to its network as revenue over time
     menghubungkan pelanggan ke jaringan listrik Grup            and amortises it starting from the connection date
     sebagai pendapatan yang diakui sepanjang waktu              based on the estimated consumption pattern of the
     dan diamortisasi sejak tanggal penyambungan                 customer. The customers’ consumption is estimated
     sesuai masa estimasi konsumsi pelanggan.                    based on the average useful life of the distribution
     Konsumsi pelanggan diestimasi berdasarkan rata-             assets. Given the wide variety of distribution assets
     rata masa manfaat aset distribusi. Dengan                   and remaining useful lives, the Group has applied
     mempertimbangkan banyaknya variasi aset                     an average life of 20 years, which the Group
     distribusi dan masa manfaat atas aset-aset                  believes to be representative of the useful lives of
     tersebut, Grup telah menerapkan rata-rata masa              the assets. A change in the estimated useful lives of
     manfaat 20 tahun yang dipercaya telah                       distribution assets would result in a change in the
     merepresentasikan keseluruhan masa manfaat.                 revenue recognised from connection fees.
     Perubahan estimasi atas masa manfaat aset
     distribusi akan mengakibatkan perubahan pada
     pengakuan pendapatan dari biaya penyambungan.
Page 63
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/53 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                     4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                    SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                 (continued)

     Sumber ketidakpastian estimasi (lanjutan)                   Sources of estimation uncertainty (continued)

     Taksiran masa manfaat ekonomis aset tetap                   Estimated useful lives of property, plant and
                                                                 equipment

     Masa manfaat setiap aset tetap yang dimiliki Grup           The useful life of each item of the Group’s property,
     ditentukan berdasarkan periode aset tersebut                plant and equipment is estimated based on the
     diharapkan masih dapat digunakan. Estimasi ini              period over which the asset is expected to be
     ditentukan berdasarkan evaluasi teknis internal dan         available for use. Such estimation is based on
     pengalaman atas aset sejenis. Masa manfaat setiap           internal technical evaluation and experience with
     aset direviu secara periodik dan disesuaikan                similar assets. The estimated useful life of each
     apabila prakiraan berbeda dengan estimasi                   asset is reviewed periodically and updated if
     sebelumnya karena keausan, keusangan teknis                 expectations differ from previous estimates due to
     atau komersial, dan hukum atau keterbatasan                 physical wear and tear, technical or commercial
     lainnya atas pemakaian aset. Namun terdapat                 obsolescence, and legal or other limits on the use of
     kemungkinan bahwa hasil operasi dimasa                      the asset. It is possible, however, that future results
     mendatang dapat dipengaruhi secara signifikan               of operations could be materially affected by
     oleh perubahan atas jumlah serta tahun pencatatan           changes in the amounts and timing of recorded
     beban yang diakibatkan karena perubahan faktor              expenses brought about by changes in the factors
     yang disebutkan di atas.                                    mentioned above.

     Perubahan masa manfaat aset tetap dapat                     A change in the estimated useful life of any item of
     mempengaruhi jumlah biaya penyusutan yang                   property, plant and equipment would affect the
     diakui dan nilai tercatat aset tetap.                       recorded depreciation expense and the carrying
                                                                 values of property, plant and equipment.

     Nilai wajar   properti    investasi            yang         Fair value of investment properties that use the
     menggunakan model revaluasi                                 revaluation model

     Dalam proses revaluasi properti investasi,                  In the process of investment properties revaluation,
     manajemen, dengan bantuan penilai publik                    management, with the assistance of an independent
     independen, menentukan data dan asumsi,                     public valuer, determines the data inputs and
     menelaah metode penilaian serta berdiskusi                  assumptions, assesses valuation methods, and
     dengan penilai. Pendekatan dan metode yang                  holds discussions with the valuers as part of the
     digunakan dalam melakukan revaluasi tergantung              valuation process. The approaches and methods
     pada kelas aset. Walaupun data dan asumsi Grup              used in the revaluation depend on the asset class.
     dianggap tepat dan wajar, namun perubahan                   While it is believed that the Group’s data and
     signifikan pada data input atau asumsi yang                 assumptions are reasonable and appropriate,
     digunakan dapat berpengaruh secara signifikan               significant changes in data inputs or significant
     terhadap nilai aset yang menggunakan model                  changes in assumptions may materially affect the
     revaluasi.                                                  value of assets that use the revaluation model.

     Rincian dari pendekatan dan data input signifikan           Details of the valuation approach and significant
     yang digunakan dalam melakukan revaluasi                    data inputs used in the revaluation of investment
     properti investasi diungkapkan dalam Catatan 8.             properties are disclosed in Notes 8.
Page 64
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/54 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                      4.   CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                     SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                  (continued)

     Sumber ketidakpastian estimasi (lanjutan)                    Sources of estimation uncertainty (continued)

     Imbalan pascakerja                                           Post-employment benefits

     Penentuan liabilitas imbalan pascakerja tergantung           The determination of post-employment benefits is
     pada pemilihan asumsi tertentu yang digunakan                dependent on the selection of certain assumptions
     oleh aktuaris dalam menghitung jumlah liabilitas             used by actuaries when calculating such amounts.
     tersebut. Asumsi tersebut termasuk antara lain               Those assumptions include, among others, the
     tingkat diskonto dan tingkat kenaikan gaji. Realisasi        discount rate and rate of salary increase. Actual
     yang berbeda dari asumsi Grup diakumulasi dan                results that differ from assumptions are
     diamortisasi selama periode mendatang dan                    accumulated and amortised over future periods and
     akibatnya akan berpengaruh terhadap jumlah biaya             therefore, generally affect the recognised expenses
     serta liabilitas yang diakui di masa mendatang.              and liabilities recorded in such future periods. While
     Walaupun asumsi Grup dianggap tepat dan wajar,               it is believed that the assumptions are reasonable
     namun perubahan signifikan pada kenyataannya                 and appropriate, significant differences in actual
     atau perubahan signifikan dalam asumsi yang                  experience or significant changes in assumptions
     digunakan dapat berpengaruh secara signifikan                may materially affect the post-employment benefits
     terhadap liabilitas imbalan pascakerja Grup.                 liability of the Group.

     Asumsi yang digunakan untuk perhitungan liabilitas           Assumptions used in the calculation of post-
     imbalan pascakerja diungkapkan dalam Catatan 49.             employment benefits are disclosed in Note 49.

     Pajak penghasilan                                            Income taxes

     Perhitungan beban pajak penghasilan Grup                     The calculations of income tax expenses for the
     memerlukan pertimbangan dan asumsi dalam                     Group require judgements and assumptions in
     menentukan pengurangan beban tertentu selama                 determining the deductibility of certain expenses
     proses pengestimasian. Semua pertimbangan dan                during the estimation process. All judgements and
     estimasi   yang     dibuat    manajemen      dapat           estimates made by management may be
     dipertanyakan oleh Direktorat Jenderal Pajak.                challenged by the Directorate General of Taxation.
     Sebagai akibatnya, terjadi ketidakpastian dalam              As a result, the ultimate tax determination becomes
     penentuan pajak. Resolusi posisi pajak yang diambil          uncertain. The resolution of tax positions taken by
     oleh Grup, melalui negosiasi dengan otoritas pajak           the Group, through negotiations with the relevant tax
     yang relevan dapat berlangsung bertahun-tahun                authorities can take several years to complete and
     dan sangat sulit untuk memprediksi hasil akhirnya.           in some cases it is difficult to predict the ultimate
     Apabila terdapat perbedaan perhitungan pajak                 outcome. Where the final outcome of these matters
     dengan jumlah yang telah dicatat, perbedaan                  is different from the amounts initially recorded, such
     tersebut akan berdampak pada pajak penghasilan               differences will have an impact on the income tax
     dan pajak tangguhan dalam tahun dimana                       and deferred income tax provision in the year in
     penentuan pajak tersebut dibuat.                             which this determination is made.

     Aset pajak tangguhan, termasuk yang timbul dari              Deferred tax assets, including those arising from tax
     rugi fiskal dan perbedaan temporer, diakui apabila           losses carried forward and temporary differences,
     dianggap lebih mungkin daripada tidak bahwa                  are recognised only where it is considered more
     mereka dapat diterima kembali, dimana hal ini                likely than not that they will be recovered, which is
     tergantung pada kecukupan pembentukan laba                   dependent on the generation of sufficient future
     kena pajak di masa depan. Asumsi atas                        taxable profits. The assumptions about the
     pembentukan laba kena pajak sangat dipengaruhi               generation of future taxable profits are heavily
     oleh estimasi dan asumsi manajemen atas tingkat              affected by management’s estimation and
     penjualan dan biaya-biaya terkait yang terdapat              assumption regarding the level of sales and the
     risiko ketidakpastian, sehingga ada kemungkinan              associated costs which are subject to risk and
     perubahan estimasi dan asumsi tersebut akan                  uncertainty and hence there is a possibility that
     mengubah proyeksi laba kena pajak di masa                    changes in circumstances will alter the projected
     mendatang.                                                   future taxable profits.
Page 65
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                  Lampiran 5/55 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                 FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                            JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                        (Expressed in millions of Rupiah, unless otherwise stated)

4.   PERTIMBANGAN AKUNTANSI PENTING DAN                                                                       4.         CRITICAL ACCOUNTING JUDGEMENTS AND
     ESTIMASI AKUNTANSI SIGNIFIKAN (lanjutan)                                                                            SIGNIFICANT  ACCOUNTING   ESTIMATES
                                                                                                                         (continued)

     Sumber ketidakpastian estimasi (lanjutan)                                                                           Sources of estimation uncertainty (continued)

     Sewa-estimasi                                   suku                 bunga    pinjaman                              Leases-estimation of the incremental borrowing
     inkremental                                                                                                         rate

     Karena Grup tidak dapat dengan mudah                                                                                Since the Group cannot readily determine the
     menentukan suku bunga implisit, manajemen                                                                           implicit rate, management uses the Group’s
     menggunakan suku bunga pinjaman inkremental                                                                         incremental borrowing rate as a discount rate. There
     Grup sebagai tingkat diskonto. Ada beberapa faktor                                                                  are a number of factors to consider in determining
     yang perlu dipertimbangkan dalam menentukan                                                                         an incremental borrowing rate, many of which need
     suku bunga pinjaman inkremental, yang banyak di                                                                     estimation in order to be able to reliably quantify any
     antaranya memerlukan estimasi untuk dapat secara                                                                    necessary adjustments to arrive at the final discount
     andal mengukur penyesuaian yang diperlukan                                                                          rates.
     untuk sampai pada tingkat diskonto akhir.

     Dalam menentukan suku bunga pinjaman                                                                                In determining the incremental borrowing rate,
     inkremental, Grup mempertimbangkan faktor-faktor                                                                    the Group considers the following main factors:
     utama berikut: risiko kredit korporat Grup, jangka                                                                  the Group’s corporate credit risk, the lease term,
     waktu sewa, jangka waktu pembayaran sewa,                                                                           the lease payment term, the economic environment,
     lingkungan ekonomi, waktu di mana sewa                                                                              the time at which the lease is entered into, and the
     dimasukkan, dan mata uang di mana pembayaran                                                                        currency in which the lease payments are
     sewa ditentukan.                                                                                                    denominated.


5.   ENTITAS ANAK                                                                                             5.         SUBSIDIARIES
     Perusahaan memiliki saham entitas anak baik                                                                         The Company has ownership interests, directly or
     langsung maupun tidak langsung sebagai berikut:                                                                     indirectly, in the following subsidiaries:

                                                                                                                                                                                                       Jumlah aset
                                                                                                                                                                                                  sebelum eliminasi **)/
                                                                                                                                            Persentase pemilikan/           Tahun                  Total assets before
                                                                                                                                          Percentage of ownership          operasi                   elimination **)
                                                                                                                                        30 Juni/         31 Desember/     komersial/          30 Juni/           31 Desember/
                                                                                                                                        June 30,         December 31,      Year of            June 30,           December 31,
                                           Entitas Anak/                          Domisili/                Jenis usaha/                   2024                2023       commercial             2024                 2023
                                           Subsidiaries                           Domicile              Nature of business                 %                   %          operation              Rp                   Rp
     PT Indonesia Power (IP) / PT PLN Indonesia Power (PLN IP) *****)              Jakarta    Pembangkitan tenaga listrik/                    99.99              99.99            1995            418,632              400,904
            dan entitas anak/ and subsidiaries                                                Power generation

           PT Cogindo DayaBersama                                                  Jakarta    Kogenerasi, pemasok energi,                     99.99              99.99            1999              1,201                1,146
             (CDB) *)                                                                         jasa pelayanan dan manajemen/
                                                                                              Cogeneration, energy distribution,
                                                                                              energy service and management

           PT Artha Daya Coalindo (ADC) *)                                         Jakarta    Perdagangan batu bara/                          80.00              80.00            1998                841                  719
                                                                                              Coal trading

           PT Indo Ridlatama Power (IRP) *)                                         Kutai     Pembangkitan tenaga listrik/                    90.00              90.00            2018              1,520                1,538
                                                                                              Power generation

           PT PLN Indonesia Power Renewables (IPRen) dan entitas anak/             Jakarta    Ketenagalistrikan dan energi/                   99.99              99.99            2016              9,544                8,341
             and its subsidiary *)                                                            Electricity and energy

              PT PLN Indonesia Geothermal (IPGeo) *)                               Jakarta    Pengembangan energi baru                        96.04              95.81                 ***)           188                  203
                                                                                              dan terbarukan/
                                                                                              Development of new and renewable energy

              PT Suralaya Indo Tenaga (SIT) dan entitas anak/                      Jakarta    Ketenagalistrikan dan energi/                   99.99              99.99                 ***)         7,606                6,531
                and its subsidiary ***)                                                       Electricity and energy

                 PT Putra Suralaya Indo Tenaga (PSI) ***)                          Jakarta    Ketenagalistrikan dan energi/                   99.99              99.99                 ***)         7,606                6,531
                                                                                              Electricity and energy

     PT Pembangkitan Jawa-Bali / PT PLN Nusantara Power (PLN NP) *****)           Surabaya    Pembangkitan tenaga listrik/                    99.99              99.99            1995            357,868              343,072
          (PJB) dan entitas anak/ and subsidiaries                                            Power generation

           PT PLN Nusantara Power Services (PLN NPS) *****)                       Surabaya    Jasa/ Service                                   99.00              99.00            2001              1,852                2,046
             dan entitas anak/ and subsidiaries

              PT Mitra Karya Prima (MKP) *)                                       Surabaya    Jasa/ Service                                   92.00              92.00            2005                183                  183
Page 66
                                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                             Lampiran 5/56 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                                         (Expressed in millions of Rupiah, unless otherwise stated)

5.     ENTITAS ANAK (lanjutan)                                                                                               5.          SUBSIDIARIES (continued)

       Perusahaan memiliki saham entitas anak baik                                                                                       The Company has ownership interests, directly or
       langsung maupun tidak langsung sebagai berikut:                                                                                   indirectly, in the following subsidiaries: (continued)
       (lanjutan)
                                                                                                                                                                                                                     Jumlah aset
                                                                                                                                                                                                                sebelum eliminasi **)/
                                                                                                                                                          Persentase pemilikan/           Tahun                  Total assets before
                                                                                                                                                        Percentage of ownership          operasi                   elimination **)
                                                                                                                                                      30 Juni/         31 Desember/     komersial/          30 Juni/           31 Desember/
                                                                                                                                                      June 30,         December 31,      Year of            June 30,           December 31,
                                              Entitas Anak/                                Domisili/                   Jenis usaha/                     2024                2023       commercial             2024                 2023
                                              Subsidiaries                                 Domicile                 Nature of business                   %                   %          operation              Rp                   Rp

            PT PLN Nusantara Power Construction (PT PLN NPC) *****)                         Jakarta       Jasa listrik dan enjiniring/                      99.00              98.90            2004              2,147                2,278
              dan entitas anak/ and subsidiary                                                            Electricity and engineering

            PT Prima Power Nusantara (PPN) ******)                                          Jakarta       Jasa enjiniring, pengadaan                        99.99             100.00            2017                199                  199
                                                                                                          dan konstruksi/
                                                                                                          Engineering, procurement and
                                                                                                          construction

            PT Navigat Innovative Indonesia (NII) *)                                      Palembang       Perdagangan, konstruksi,                          72.97              72.97            2002                529                  483
                                                                                                          pertambangan dan pertanian/
                                                                                                          Trading, construction,
                                                                                                          mining and agriculture

            PT PLN Nusantara Renewables (PLN NR) *****)                                     Jakarta       Investasi/                                        99.99              99.99            2015              9,341                8,672
                                                                                                          Investment

            PT Pembangkitan Jawa-Bali Investindo                                            Jakarta       Investasi/                                        99.99              99.99            2020                 260                 260
              (PJB Investindo) *)                                                                         Investment

              PT Pembangkitan Jawa Baskara Investasi Cirata                                 Jakarta       Investasi/                                        99.99              99.99            2020                 258                 258
                (PJBIC)                                                                                   Investment

            PT Prima Layanan Niaga                                                          Jakarta       Perdagangan barang dan jasa enjiniring           100.00             100.00            2018              1,106                  925
              Suku Cadang (PLN SC) *)                                                                     supply chain dan konsultasi dibidang
                                                                                                          ketenagalistrikan/ Operation and services
                                                                                                          trading, engineering supply chain and
                                                                                                          consultation in the electricity sector

     PT Pelayanan Listrik Nasional Batam (PLN Batam)                                        Batam         Penyedia tenaga listrik/                          99.99              99.99            2000             21,558               21,022
           dan entitas anak/ and subsidiary                                                               Electricity supplier

            PT Pelayanan Energi Batam (PEB)                                                 Batam         Pembangunan pipa gas dan                          99.99              99.99            2016                939                1,139
                                                                                                          energi lainnya/
                                                                                                          Construction of gas pipeline and
                                                                                                          other energy sector

     PT Indonesia Comnets Plus / PT PLN ICON Plus (PLN ICON+) *****)                        Jakarta       Jasa penyedia jaringan                            99.99              99.99            2000             10,979               11,036
           (ICON)                                                                                         telekomunikasi/
                                                                                                          Telecommunication provider

            PT Rekadaya                                                                     Jakarta       Investasi/                                        99.99              99.80            2010                 107                 107
              Elektrika Consult (REC) ******)                                                             Investment

     PT Prima Layanan Nasional Enjiniring (PLNE)                                            Jakarta       Jasa enjiniring, pengadaan                        99.90              99.90            2003              1,512                1,546
           dan entitas anak/ and subsidiary                                                               dan konstruksi/
                                                                                                          Engineering, procurement and
                                                                                                          construction

     PT Pelayanan Listrik Nasional                                                         Tarakan        Jasa pemeliharaan dan operasi/                    99.97              99.97            2004              1,597                1,074
           Nusa Daya (PLN Nusa Daya)                                                                      Maintenance and operation
           dan entitas anak/ and subsidiary

            PT Paguntaka Cahaya Nusantara (PCN) *)                                        Balikpapan      Jasa pemeliharaan dan operasi/                    99.96              99.96            2018                  2                   2
                                                                                                          Maintenance and operation

     Majapahit Holding B.V. (MH)                                                            Belanda/      Lembaga keuangan/                                100.00             100.00            2006              6,114                5,736
           dan entitas anak/ and its subsidiary                                         The Netherlands   Financial Institution

            Majapahit Finance B.V. (MF) *)                                                  Belanda/      Lembaga keuangan/                                100.00             100.00            2006               6,114               5,736
                                                                                        The Netherlands   Financial Institution

     PT PLN Batubara (PLN Batubara) / PT PLN Energi Primer Indonesia (PLN EPI) *****)       Jakarta       Perdagangan batu bara/                            99.99              99.99            2009             22,504               17,892
          dan entitas anak/ and subsidiaries                                                              Coal trading

            PT Jambi Prima Coal (JPC)                                                       Jambi         Pertambangan batu bara/                           60.00              60.00            2010                282                  282
                                                                                                          Coal mining

            PT PLN Batubara Investasi (BBI)                                                 Jakarta       Investasi/                                        99.96              99.96            2018              2,800                2,800
            dan entitas anak/ and subsidiaries                                                            Investment

            PT Bangun Persada Jambi Energi (BPJE)*)                                         Jambi         Pertambangan batu bara/                           80.00              80.00                 ***)            37                   37
                                                                                                          Coal mining

            PT Mahakarya Abadi Prima (MAP)*)                                                Jambi         Pertambangan batu bara/                           80.00              80.00                 ***)             3                       3
                                                                                                          Coal mining

            PT Bayan Koalindo Lestari *)                                                  Palembang       Pertambangan batu bara/                           51.00              51.00            2018                706                  706
                                                                                                          Coal mining
Page 67
                                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                           Lampiran 5/57 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                     (Expressed in millions of Rupiah, unless otherwise stated)

5.     ENTITAS ANAK (lanjutan)                                                                             5.          SUBSIDIARIES (continued)

       Perusahaan memiliki saham entitas anak baik                                                                     The Company has ownership interests, directly or
       langsung maupun tidak langsung sebagai berikut:                                                                 indirectly, in the following subsidiaries: (continued)
       (lanjutan)
                                                                                                                                                                                                 Jumlah aset
                                                                                                                                                                                            sebelum eliminasi **)/
                                                                                                                                      Persentase pemilikan/           Tahun                  Total assets before
                                                                                                                                    Percentage of ownership          operasi                   elimination **)
                                                                                                                                  30 Juni/         31 Desember/     komersial/          30 Juni/           31 Desember/
                                                                                                                                  June 30,         December 31,      Year of            June 30,           December 31,
                                              Entitas Anak/              Domisili/                   Jenis usaha/                   2024                2023       commercial             2024                 2023
                                              Subsidiaries               Domicile                 Nature of business                 %                   %          operation              Rp                   Rp

           PT Prima Bara Indonesia *)                                Kalimantan Tengah/ Pertambangan batu bara/                         51.00              51.00                 ***)           187                  187
                                                                     Central Kalimantan Coal mining

           PT PLN Batubara Niaga (BBN)                                    Jakarta       Perdagangan batu bara/                         100.00             100.00                 ***)         3,038                3,038
                                                                                        Coal trading

           PT PLN Energi Gas                                              Jakarta       Pembangkitan tenaga listrik/                    99.99              99.99            2010              2,562                2,562
           (d/h PT Pengembang Listrik Negara Geothermal)                                Power generation


           PT Pelayaran Bahtera Adhiguna (BAG)                            Jakarta       Pelayaran/                                      99.99              99.99            2011              5,670                5,670
                                                                                        Shipping

     PT Haleyora Power (HP)                                               Jakarta       Jasa pemeliharaan dan operasi/                  99.99              99.99            2013              1,676                1,554
           dan entitas anak/ and subsidiary                                             Maintenance and operation

           PT Haleyora Powerindo (HPI) *)                                 Jakarta       Jasa/ Service                                   95.00              95.00            2013                641                  641

     PT Energy Management Indonesia (EMI) ****)                           Jakarta       Jasa konservasi energi dan lingkungan           99.99              99.99            1987                 60                  126
           dan entitas anak/and subsidiary                                              serta energi baru terbarukan/Energy and
                                                                                        environmental conservation service
                                                                                        and renewable energy

           PT Energi Biomassa Indonesia (EBI)                             Jakarta       Jasa konservasi energi dan lingkungan           99.00              99.00            2015                  4                       4
                                                                                        serta energi baru terbarukan/Energy and
                                                                                        environmental conservation service
                                                                                        and renewable energy

           PT Energi Biomassa Indonesia (EBI 2)                           Jakarta       Jasa perdagangan ekspor dan impor,              99.87              80.00                 ***)              1                      1
                                                                                        perindustrian, pembangunan
                                                                                        Export and import trading, industry,
                                                                                        construction

     PT PLN Mandau Cipta Tenaga Nusantara (MCTN) ****)                    Jakarta       Jasa pengelolaan energi/                        95.00              95.00            2000              1,681                1,247
                                                                                        Energy Service




     *) Pemilikan tidak langsung/Indirect ownership
     **) Dalam miliaran Rupiah/Stated in billions of Rupiah
     ***) Dalam tahap pengembangan/Under development stage
     ****) Sub holding PT PLN (Persero) yang telah disahkan pada Legal End-state Holding Subholding PT PLN (Persero) pada tanggal 30 Desember 2022/
           Sub holding of PT PLN (Persero) which has been approved in the Legal End-state Holding Subholding of PT PLN (Persero) on December 30, 2022
     *****) Diakuisisi pada tahun berjalan (sesama PLN Grup)/Acquired during the year (within PLN Group)



       Berdasarkan Akta Notaris No. 38 tanggal 27 April                                                                Based on Notarial Deed No. 38 dated April 27, 2022
       2022 dari Lenny Janis Ishak, S.H., Notaris di                                                                   of Lenny Janis Ishak, S.H., Notary in Jakarta, PLN
       Jakarta, PLN NP mengadakan perjanjian jual beli                                                                 NP entered into a share sale and purchase
       saham untuk membeli saham PJBS dari YK PJB, di                                                                  agreement to purchase shares of PJBS of YK PJB
       mana Perusahaan membeli sebagian kepemilikan                                                                    under which the Company purchased a part of PJBS
       saham PJBS atau setara dengan 1% kepemilikan                                                                    shares or equivalent to 1% ownership of PJBS with
       atas PJBS dengan nilai pengalihan sebesar                                                                       a total transaction value of Rp11,184.
       Rp11.184.
Page 68
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                           Lampiran 5/58 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                (Expressed in millions of Rupiah, unless otherwise stated)

6.       ASET TETAP                                                                                     6.   PROPERTY, PLANT AND EQUIPMENT


                                                                                        30 Juni 2024/ June 30, 2024

                                              Saldo awal/        Penambahan/           Pengurangan/ Penurunan nilai/    Reklasifikasi/          Saldo akhir/
                                           Beginning balance       Additions            Deductions    Impairment       Reclassifications       Ending balane

     Biaya perolehan
     Pemilikan langsung                                                                                                                                                             Direct acquisitions
       Tanah                                      168,127,620                  189                  -                             2,312,268            170,440,077                             Land
       Bangunan umum, waduk                                                                                                                                                 Buildings, reservoir and
         dan prasarana                             83,884,900              51,083                   -                             2,070,762             86,006,745                  infrastructure
       Instalasi dan mesin                                                                                                                                                   Installation and power
         pembangkit                               590,572,905             386,919                   -                             8,555,971            599,515,795                           plant
       Perlengkapan transmisi                     265,057,265               1,926                   -                            15,732,038            280,791,229         Transmission equipment
       Perlengkapan distribusi                    267,255,807              19,128                   -                             8,094,155            275,369,090           Distribution equipment
       Perlengkapan umum                           21,674,868              67,534                   -                               221,329             21,963,731               General equipment
       Kendaraan bermotor                           3,156,177              27,555                   -                               105,782              3,289,514                    Motor vehicles
       Material cadang                              3,316,055              45,429                   -                             (141,146)              3,220,338                       Spare parts
       Perlengkapan pengolahan                                                                                                                                        Telecommunication and data
         data dan telekomunikasi                     8,655,541              5,103                   -                               571,726              9,232,370          processing equipment
       Perlengkapan pengolahan                                                                                                                                       Others telecommunication and
         data dan telekomunikasi lainnya             9,328,873              1,939                   -                               617,977              9,948,789     data processing equipment
       Kapal dan perlengkapan                        2,681,505             31,386                   -                                     1              2,712,892           Vessels and equipment

      Sub-jumlah                                 1,423,711,516            638,191                   -             -              38,140,863          1,462,490,570                         Subtotal


     Aset dalam pembangunan                       128,753,555          23,628,300                   -                          (38,860,006)            113,521,848           Construction in progress
     Aset tidak digunakan dalam operasi            16,077,131                   -           (459,404)             -                 679,373             16,297,100        Assets not used in operation

     Jumlah                                    1,568,542,201          24,266,491           (459,404)                              (39,770)         1,592,309,518                                Total


     Akumulasi penyusutan
     Pemilikan langsung                                                                                                                                                             Direct acquisitions
       Bangunan umum, waduk                                                                                                                                                 Buildings, reservoir and
         dan prasarana                               5,434,440          1,372,651                   -                               127,445              6,934,536                  infrastructure
       Instalasi dan mesin                                                                                                                                                   Installation and power
         pembangkit                                39,593,908           9,885,500                   -                             (190,236)             49,289,172                           plant
       Perlengkapan transmisi                      13,649,962           3,743,761                   -                               (7,735)             17,385,988         Transmission equipment
       Perlengkapan distribusi                     19,558,835           5,441,368                   -                              (28,305)             24,971,898           Distribution equipment
       Perlengkapan umum                           18,548,886             751,288                   -                             (138,157)             19,162,017               General equipment
       Kendaraan bermotor                           2,575,549              28,093                   -                                91,849              2,695,491                    Motor vehicles
       Material cadang                                188,461              50,827                   -                              (19,818)                219,470                Major spare parts
       Perlengkapan pengolahan                                                                                                                                         Telecommunication and data
         data dan telekomunikasi                     2,301,142            554,616                   -                              (17,695)              2,838,063          processing equipment
       Perlengkapan pengolahan                                                                                                                                       Others telecommunication and
         data dan telekomunikasi lainnya             3,793,630            573,129                   -                                19,063              4,385,822    data processimg equipment
       Kapal dan perlengkapan                        1,117,064            107,399                   -                                    (1)             1,224,462           Vessels and equipment

      Sub-jumlah                                  106,761,877          22,508,632                   -             -               (163,590)            129,106,919                         Subtotal


     Aset tidak digunakan dalam operasi              8,999,229            572,653           (486,585)             -                 184,264              9,269,561        Assets not used in operation

     Jumlah                                       115,761,106         23,081,285            (486,585)                               20,674            138,376,480                                Total

     Penyisihan penurunan nilai                      3,810,473                     -                -                              (76,104)              3,734,369         Provision for impairment

     Jumlah Tercatat                           1,448,970,622                                                                                        1,450,198,669                Net carriying value
Page 69
                            PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                         DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/59 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                      (Expressed in millions of Rupiah, unless otherwise stated)

6.     ASET TETAP (lanjutan)                                                  6.    PROPERTY,                     PLANT            AND         EQUIPMENT
                                                                                    (continued)
                                                            31 Desember 2023 / December 31, 2023
                                      Saldo awal/                                                                 Saldo akhir/
                                      Beginning       Penambahan/       Pengurangan/        Reklasifikasi/          Ending
                                       balance          Additions         Disposals        Reclassifications       balance

     Biaya perolehan                                                                                                                                                At cost
     Pemilikan langsung                                                                                                                                Direct acquisitions
     Tanah dan hak atas tanah           165,722,533          44,296                    -            2,360,791       168,127,620                     Land and land rights
     Bangunan umum, waduk                                                                                                                      Buildings, reservoirs and
         dan prasarana                   80,241,862         189,350             (1,176)             3,454,864         83,884,900                         infrastructure
     Instalasi dan mesin                                                                                                                         Installations and power
         pembangkit                     576,903,905        2,928,906          (635,018)            11,375,112       590,572,905                                   plants
     Perlengkapan transmisi             242,370,927           19,316                 -             22,667,022       265,057,265                Transmission equipment
     Perlengkapan distribusi            248,760,910          112,344                 -             18,382,553       267,255,807                   Distribution equipment
     Perlengkapan umum                   20,255,166          326,228                 -              1,093,474        21,674,868                      General equipment
     Kendaraan bermotor                   2,862,730          256,039                 -                  37,408        3,156,177                            Motor vehicles
     Material cadangan utama              3,194,857          209,561                 -                 (88,363)       3,316,055                         Major spare parts
     Perlengkapan                                                                                                                                  Telecommunications
         pengolahan data dan                                                                                                                                  and data
         telekomunikasi yang                                                                                                                  processing equipment
         digunakan dalam                                                                                                                                       used for
         penyediaan listrik               7,274,300          40,843                    -            1,340,398          8,655,541                     electricity supply
     Perlengkapan pengolahan data                                                                                                        Other telecommunications and
         Dan telekomunikasi lainnya       5,795,912           4,034                    -            3,528,927          9,328,873         data processing equipment
     Kapal dan perlengkapan               1,912,780         422,303                    -              346,422          2,681,505                Vessels and equipment

     Subjumlah                        1,355,295,882        4,553,220          (636,194)            64,498,608      1,423,711,516                                 Subtotal

     Aset dalam pembangunan             135,756,415       57,878,648          (468,031)           (64,413,477)      128,753,555                 Construction in progress

     Aset tidak digunakan                                                                                                                                Assets not used
        dalam operasi                    19,283,887                 -       (2,699,613)              (507,144)        16,077,130                         in operations

     Jumlah                           1,510,336,184       62,431,868        (3,803,838)              (422,013)     1,568,542,201                                     Total

     Akumulasi penyusutan                                                                                                                  Accumulated depreciation
         dan penurunan nilai                                                                                                                        and impairment
     Pemilikan langsung                                                                                                                                Direct acquisitions
     Bangunan umum, waduk                                                                                                                      Buildings, reservoirs and
         Dan prasarana                    2,703,562        2,676,431               (63)                54,510          5,434,440                         infrastructure
     Instalasi dan mesin                                                                                                                         Installations and power
         pembangkit                      19,968,790       20,140,221           (36,470)              (478,633)        39,593,908                                  plants
     Perlengkapan transmisi               6,298,086        7,073,908                 -                277,968         13,649,962               Transmission equipment
     Perlengkapan distribusi              9,470,612       10,166,288                 -                (78,065)        19,558,835                  Distribution equipment
     Perlengkapan umum                   17,033,001        1,579,007                 -                (63,122)        18,548,886                     General equipment
     Kendaraan bermotor                   2,313,026          103,494                 -                159,029          2,575,549                           Motor vehicles
     Material cadangan utama                 97,143          102,082                 -                (10,764)           188,461                        Major spare parts
     Perlengkapan                                                                                                                                  Telecommunications
         pengolahan data dan                                                                                                                                  and data
         telekomunikasi yang                                                                                                                  processing equipment
         digunakan dalam                                                                                                                                       used for
         penyediaan listrik               1,127,653        1,167,405                   -                6,084          2,301,142                     electricity supply
     Perlengkapan pengolahan data                                                                                                        Other telecommunications and
         Dan telekomunikasi lainnya       2,978,984         835,349                    -              (20,703)         3,793,630         data processing equipment
     Kapal dan perlengkapan                 948,992         175,441                    -               (7,369)         1,117,064                Vessels and equipment

     Subjumlah                           62,939,849       44,019,626           (36,533)              (161,065)      106,761,877                                  Subtotal

     Aset tidak digunakan                                                                                                                                Assets not used
        dalam operasi                    10,594,605        1,052,915        (2,628,824)               (19,466)         8,999,230                         in operations

     Jumlah                              73,534,454       45,072,541        (2,665,357)              (180,531)      115,761,107                                      Total

     Penyisihan penurunan nilai           3,752,747          30,219                    -               27,507          3,810,473                Provision for impairment

     Jumlah tercatat                  1,433,048,983                                                                1,448,970,621                     Net carrying value




       Beban penyusutan dialokasikan sebagai berikut:                               Depreciation expense was allocated as follows:

                                                           2024                             2023
                                                      (Enam Bulan/                     (Enam Bulan/
                                                       Six Months)                      Six Months)

          Beban usaha                                       22,493,076                         21,223,269                  Operating expenses
          Pekerjaan dalam pelaksanaan                           15,555                             21,951             Construction in progress
          Beban lain-lain                                      572,653                            166,687                               Others

                                                            23,081,284                         21,411,907
Page 70
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/60 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                  6.   PROPERTY,         PLANT        AND       EQUIPMENT
                                                                 (continued)

     Grup memiliki beberapa bidang tanah dengan hak              The Group owns several pieces of land with Rights
     legal berupa Hak Pakai dan Hak Guna Bangunan                to Use and Building Use Rights (“HGB”). Rights to
     (“HGB”). Hak Pakai tidak mempunyai jangka waktu             Use have no expiration date while HGB will expire
     sedangkan HGB Perusahaan jatuh tempo antara                 from 2024 to 2051, but they are renewable by the
     tahun 2024 sampai dengan 2051, tetapi dapat                 Group. The Group also has several pieces of land
     diperpanjang oleh Grup. Grup juga mempunyai                 and land rights, which are still in an extension
     beberapa bidang tanah yang sedang dalam proses              process and in the process of transfer of certificates
     perpanjangan HGB dan pengurusan balik nama                  to the name of the Group.
     menjadi atas nama Grup.

     Pada tanggal 30 Juni 2024, bangunan, instalasi dan          As at June 30, 2024, the buildings, installations and
     mesin pembangkit, perlengkapan transmisi,                   power plants, transmission equipment, other
     perlengkapan pengolahan data dan telekomunikasi             telecommunications and data processing equipment
     lainnya serta kapal diasuransikan kepada beberapa           and vessels were insured with several insurance
     perusahaan asuransi yaitu PT Asuransi Central Asia          companies, with PT Asuransi Central Asia and
     dan lainnya, dengan jumlah pertanggungan sebesar            others, with total insurance coverage of
     USD23.612.862.467 (nilai penuh) atau setara                 USD23,612,862,467 (full amount) or equivalent to
     dengan Rp387.109.267 (2023: PT Asuransi Central             Rp387,109,267 (2023: PT Asuransi Central Asia
     Asia dan lainnya, dengan jumlah pertanggungan               and others, with total insurance coverage of
     sebesar USD23.379.863.502 (nilai penuh) atau                USD23,379,863,502 (full amount) or equivalent to
     setara dengan Rp360.961.713) dan PT Asuransi                Rp360,961,713) and          PT Asuransi Tugu Kresna
     Tugu Kresna Pratama, PT Asuransi Asei Indonesia,            Pratama, PT Asuransi Asei Indonesia, PT Asuransi
     PT Asuransi Perisai Listrik Nasional, PT Asuransi           Perisai Listrik Nasional, PT Asuransi Dayin Mitra,
     Dayin Mitra, Tbk. dan PT Asuransi Wahana Tata               Tbk. and PT Asuransi Wahana Tata acting as the
     sebagai penanggung risiko kebakaran dan                     insurer against fire and other possible risks with total
     kemungkinan risiko lainnya dengan jumlah                    insurance coverage of Rp11,581,200 (2023:
     pertanggungan sebesar Rp11.581.200 (2023:                   Rp10,857,070). The Group does not insure property,
     Rp10.857.070). Grup tidak mengasuransikan aset              plant and equipment other than buildings,
     tetap selain bangunan, instalasi dan mesin                  installations and power plants, transmission
     pembangkit, perlengkapan transmisi, perlengkapan            equipment, other telecommunications and data
     pengolahan data dan telekomunikasi lainnya serta            processing equipment and vessels. Management
     kapal. Manajemen berpendapat bahwa risiko                   believes that the risks of losses related to the
     kerugian yang berkaitan dengan aset yang tidak              uninsured assets can be managed by the Group in
     diasuransikan tersebut dapat dikelola oleh Grup             consideration of the costs that would be spent and
     sehubungan dengan pertimbangan biaya yang akan              the benefits that would be obtained. Management
     dikeluarkan dan manfaat yang akan diperoleh.                believes that the insurance coverage is adequate to
     Manajemen        berpendapat       bahwa       nilai        cover possible losses on the assets insured.
     pertanggungan tersebut cukup untuk menutup
     kemungkinan      kerugian     atas    aset   yang
     dipertanggungkan.

     Jumlah tercatat dari aset tetap yang telah                  The carrying amount of property, plant and
     disusutkan penuh dan masih digunakan pada                   equipment that has been fully depreciated but is still
     tanggal 30 Juni 2024 dan 31 Desember 2023                   in use as at June 30, 2024 and December 31, 2023
     masing-masing   sebesar  Rp22.128.502 dan                   amounted to Rp22,128,502 and Rp17,699,061
     Rp17.699.061.                                               respectively.

     Pada tahun 2021, manajemen mempekerjakan                    In   2021,     management        engaged     external
     penilai eksternal independen dan berkualifikasi             independent and qualified valuers, KJPP RHR to
     untuk menentukan nilai wajar aset tetap yaitu KJPP          determine the fair value of fixed assets, based on its
     RHR, berdasarkan laporannya No. 00142/2.0012-               report No. 00142/2.0012-00/PI/02/0006/1/IV/2022,
     00/PI/02/0006/1/IV/2022, tertanggal 26 April 2022.          dated April 26, 2022. KJPP RHR is an independent
     KJPP RHR merupakan penilai independen yang                  valuer registered with the Ministry of Finance and
     telah terdaftar di Kementerian Keuangan dan OJK.            FSA.
Page 71
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/61 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                      JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                           6.      PROPERTY,           PLANT            AND         EQUIPMENT
                                                                              (continued)

      Manajemen      tidak     mengidentifikasi adanya                        Management did not identify any significant
      perubahan     signifikan   yang      mengharuskan                       changes in circumstances which would require a
      dilakukannya revaluasi untuk tahun 2023.                                revaluation exercise to be performed for 2023.

      Tabel di bawah ini menganalisis aset tetap yang                         The table below analyses fixed assets recorded at
      dicatat pada nilai wajar berdasarkan hierarki nilai                     fair value, based on the fair value hierarchy in SFAS
      wajar sesuai dengan PSAK No. 68 dan berdasarkan                         No. 68 and based on valuation as at December 31,
      valuasi pada tanggal 31 Desember 2021 sebagai                           2021 as follows:
      berikut:

                                           Tingkat pengukuran nilai wajar 31 Desember 2021 menggunakan/
                                                  Fair value measurement at December 31, 2021 using
                                        Level 1/             Level 2/             Level 3/          Jumlah/
                                        Level 1               Level 2             Level 3             Total

     Pengukuran nilai wajar                                                                                                     Recurring fair value
         berulang                                                                                                                  measurement
     Tanah dan hak atas tanah                      -          36,735,664           126,806,369       163,542,033                Land and land rights
     Bangunan umum, waduk                                                                                                   Buildings, reservoirs and
         dan prasarana                             -           6,988,067            69,138,909        76,126,976                     infrastructure
     Instalasi dan mesin                                                                                                     Installations and power
         pembangkit                                -                   -           556,182,532       556,182,532                             plants
     Perlengkapan transmisi                        -                   -           204,873,601       204,873,601            Transmission equipment
     Perlengkapan distribusi                       -                   -           235,012,113       235,012,113              Distribution equipment
     Perlengkapan pengolahan
         data dan telekomunikasi data                                                                                       Telecommunications and
         yang digunakan dalam                                                                                               processing equipment
         penyediaan listrik                        -                   -             6,134,499         6,134,499         used for electricity supply
     Material cadang utama                         -                   -             3,090,753         3,090,753                    Major spare parts

     Jumlah                                        -          43,723,731          1,201,238,776    1,244,962,507                               Total


      -       Harga dikutip (tidak disesuaikan) dari pasar                    -     Quoted prices (unadjusted) in active markets
              yang aktif untuk aset atau liabilitas yang identik                    for identical assets or liabilities (Level 1);
              (Tingkat 1);
      -       Input selain harga yang dikutip dari pasar yang                 -     Inputs other than quoted prices included within
              disertakan pada Tingkat 1 yang dapat                                  Level 1 that are observable for the asset or
              diobservasi untuk aset dan liabilitas, baik                           liability, either directly (that is, as prices) or
              secara langsung (yaitu sebagai sebuah harga)                          indirectly (that is, derived from prices) (Level 2);
              atau secara tidak langsung (yaitu sebagai                             and
              turunan dari harga) (Tingkat 2); dan
      -       Input untuk aset atau liabilitas yang tidak                     -     Inputs for the asset or liability that are not based
              didasarkan pada data pasar yang dapat                                 on observable market data (that is,
              diobservasi (informasi yang tidak dapat                               unobservable inputs) (Level 3).
              diobservasi) (Tingkat 3).

      Tidak terdapat aset tetap yang bisa digolongkan ke                      There were no fixed assets which could be classified
      dalam nilai wajar Tingkat 1.                                            at Level 1 fair value.

      Tidak terdapat transfer antara Tingkat 1 dan Tingkat                    There were no transfers between Level 1 and Level
      2 selama tahun berjalan.                                                2 during the year.

      Nilai wajar Tingkat 2 dari tanah dan hak atas tanah                     The Level 2 fair value of land and land rights is
      dihitung dengan menggunakan pendekatan pasar                            calculated using the market approach and income
      dan pendekatan pendapatan, sedangkan untuk                              approach, while the value of building is calculated
      bangunan menggunakan pendekatan biaya. Input                            using the cost approach. Data inputs were obtained
      yang diperoleh dari pendekatan pasar yaitu:                             from the market approach that consists of the
                                                                              following:
      a.      Harga jual atau harga sewa per meter persegi;                   a. Sale or rental price per square metre;
      b.      Tingkat hunian;                                                 b. Occupancy rate;
      c.      Tingkat pertumbuhan;                                            c. Growth rate;
      d.      Tingkat diskonto dan kapitalisasi;                              d. Discount and capitalisation rate;
      e.      Biaya pembuatan baru per meter persegi;                         e. Replacement cost new per square metre;
      f.      Tingkat depresiasi;                                             f. Depreciation rate;
      g.      Biaya operasional;                                              g. Operational expense;
      h.      Keuntungan pengembangan; dan                                    h. Developers margin; and
      i.      Indeks kemahalan konstruksi.                                    i. Construction cost index.
Page 72
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/62 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                                                6.        PROPERTY,                PLANT               AND       EQUIPMENT
                                                                                                     (continued)

      Rekonsiliasi atas saldo awal terhadap saldo akhir                                              Reconciliation of the beginning balances to the closing
      dari pengukuran nilai wajar dengan menggunakan                                                 balances of the fair value measurements using
      informasi signifikan yang tidak dapat diobservasi                                              significant unobservable inputs (Level 3) is as follows:
      (Tingkat 3) adalah sebagai berikut:
                                                                                                                        Jumlah yang
                                                                                                                          diakui pada
                                                                                     Jumlah yang diakui pada             penghasilan
                                                                                             laba rugi/                 komprehensif
                                                                                      Amount recognised in               lain/Amount
                                                                                           profit or loss                 recognised
                                 1 Januari/                                                            Penurunan            in other       31 Desember/
                                  January       Penambahan/     Reklasifikasi/      Depresiasi/           nilai/       comprehensive        December
                                    2021          Additions    Reclassification    Depreciation       Impairment            income             2021

     Tanah                       120,748,069             90             344,881                  -        (233,550)          5,946,879      126,806,369                           Land
     Bangunan umum,                                                                                                                                                Building, reservoirs
         waduk dan prasarana      68,575,318          11,935          1,396,506       (2,075,199)         (326,876)          1,557,225       69,138,909        and infrastructures
     Instalasi dan                                                                                                                                                        Installations
         mesin pembangkit        569,627,746       1,307,825          9,073,213      (18,644,822)        (1,098,687)         (4,082,743)    556,182,532         and power plants
     Perlengkapan transmisi      186,216,183          86,471         17,752,609       (5,481,988)          (688,075)          6,988,401     204,873,601     Transmissions equipment
     Perlengkapan distribusi     222,243,033          93,123         12,051,446       (8,336,371)           (21,800)          8,982,682     235,012,113       Distributions equipment
     Perlengkapan
         pengolahan data                                                                                                                                        Telecommunications
         dan telekomunikasi                                                                                                                                  and data processing
         yang digunakan dalam                                                                                                                                 equipment used for
         penyediaan listrik        5,997,253          20,142            711,983           (960,551)        (58,427)            424,099         6,134,499         electricity supply
     Material cadangan utama       4,063,814          29,766         (1,137,411)           (96,006)         (4,179)            234,769         3,090,753            Major spare parts

     Jumlah                     1,177,471,416      1,549,352         40,193,227      (35,594,937)        (2,431,594)        20,051,312     1,201,238,776                         Total


      Nilai wajar Tingkat 3 dihitung dengan menerapkan                                               The Level 3 fair value is calculated through the market
      pendekatan pasar, pendekatan pendapatan, dan                                                   approach, income approach, and cost approach by
      pendekatan biaya dengan menggunakan input yang                                                 using unobservable inputs.
      tidak dapat diobservasi.

      Perubahan surplus revaluasi, dikurangi dengan                                                  The changes in revaluation surplus, net of final income
      penghasilan final dan penghasilan pajak tangguhan                                              tax and applicable deferred income taxes, were
      yang terkait, yang dibebankan pada penghasilan                                                 charged to other comprehensive income and are
      komprehensif lain dan disajikan sebagai surplus                                                presented in property, plant and equipment
      revaluasi aset tetap dalam laporan perubahan ekuitas                                           revaluation surplus in the consolidated statements of
      konsolidasian.                                                                                 changes in equity.

      Tidak terdapat perbedaan yang signifikan antara nilai                                          There is no significant difference between the fair
      wajar aset tetap dengan nilai tercatatnya selain aset                                          value and carrying value of fixed assets other than
      yang menggunakan model revaluasi.                                                              assets that have applied the revaluation model.

      Mutasi surplus revaluasi aset tetap adalah sebagai                                             The movements of property, plant and equipment
      berikut:                                                                                       revaluation surplus are as follows:

                                                                      30 Juni/                   31 Desember/
                                                                     June 30                      December 31
                                                                       2024                          2023

     Saldo awal                                                      688,394,826                      688,538,705                                          Beginning balance

     Kenaikan surplus revaluasi                                                       -                    346,260             Increase on revaluation surplus
     Penghapusan aset tetap                                                           -                     (7,147) Disposals of property, plant and equipment

                                                                                     -                     339,113
     Reklasifikasi surplus revaluasi                                                                                             Reclassification of revaluation surplus
       ke saldo laba atas aset tetap                                                                                              to retained earnings from disposals
       yang telah dijual                                                              -                  (408,387)                   of property, plant and equipment
     Beban pajak terkait                                                              -                   (74,605)                         Related income tax expense

     Saldo akhir                                                     688,394,826                      688,394,826                                           Ending balance
Page 73
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                        Lampiran 5/63 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                         (Expressed in millions of Rupiah, unless otherwise stated)

6.     ASET TETAP (lanjutan)                                                                                    6.       PROPERTY,                     PLANT                      AND           EQUIPMENT
                                                                                                                         (continued)

       Selain menggunakan input yang berasal dari pasar,                                                                 Other than the data inputs observed from the market,
       KJPP RHR juga menggunakan input yang tidak                                                                        KJPP RHR also used unobservable market data
       dapat diobservasi dari pasar dan menggunakan                                                                      inputs and used special assumptions related to the
       asumsi khusus terkait dengan jenis aset yang                                                                      assets classified as specialised property, such as
       tergolong sebagai properti khusus, seperti                                                                        power plants and others.
       pembangkit listrik dan lainnya.

       Penyesuaian dilakukan berdasarkan ukuran,                                                                         Adjustments were made based on size, capacity, age,
       kapasitas, usia, lokasi, bentuk dan spesifikasi, hak                                                              location, shapes and specifications, land rights and
       atas tanah, dan elemen perbandingan lainnya.                                                                      other comparison elements.

       Informasi mengenai pengukuran nilai wajar yang                                                                    Information about fair value measurements using
       menggunakan informasi signifikan yang tidak dapat                                                                 significant unobservable inputs (Level 3) are as
       diobservasi (Tingkat 3) adalah sebagai berikut:                                                                   follows:
                                                                                                                                   Kisaran input
                                                                                                                                    yang tidak
                                            Nilai wajar                                                                                 dapat                    Hubungan
                                           pada tanggal                                                   Informasi                 diobservasi             informasi yang tidak
                                           31 Desember                                                    yang tidak               yang dipakai/              dapat diobservasi
                                               2021/                         Teknik                          dapat                   Range of               terhadap nilai wajar/
                                          Fair value as at                 penilaian/                    diobservasi/              unobservable                Relationship of
                                           31 December                     Valuation                    Unobservable                   inputs                   unobservable
                                                2021                       technique                        inputs                      used                 inputs to fair value

     Tanah                                                                                                                                                                                                               Land

     Tapak Tower                            51,471,076          Pendekatan biaya               - Luas Right of Way (“ROW”)/       60.00% - 70.00%*     -   Semakin tinggi luas dan                          Land for tower site
                                                                dengan metode                     ROW area                                                 kompensasi ROW
                                                                penjumlahan/                                                                               maka semakin
                                                                The cost approach                                                                          tinggi nilai wajar/
                                                                with the summation                                                                         The higher the ROW area
                                                                method                                                                                     and compensation
                                                                                                                                                           the higher the fair value
                                                                                               - Kompensasi ROW/
                                                                                                  Compensation ROW

     Tanah gardu dan pembangkit              75,335,293          Pendekatan pendapatan         - Peruntukan sesuai                60.00% - 80.00%*     -   Semakin tinggi koefisien                        Land for substation
                                                                dengan metode                     pengembangan/                                            luas bangunan (“KLB”)                           and power plant
                                                                pengembangan lahan/               Adjustment of parameter                                  maka semakin
                                                                The income approach               development                                              tinggi nilai wajar/
                                                                with the land                                                                              The higher the KLB,
                                                                development method                                                                         the higher the fair value
                                                                                               - Data luas dan aspek legal/                            -   Tanah bersertifikat akan
                                                                                                  Land area and legal                                      memiliki nilai wajar
                                                                                                  aspects                                                  lebih tinggi/
                                                                                                                                                           Certified land will have
                                                                                                                                                           higher fair value
                                                                                               - Perubahan peruntukan/                                 -   Peruntukan tanah sekitar
                                                                                                  Zoning changes                                           mengindikasikan nilai wajar
                                                                                                                                                           yang lebih tinggi/
                                                                                                                                                           Zoning of neighboring land
                                                                                                                                                           might have higher fair value

     Bangunan                                                                                                                                                                                                       Buildings

     Bangunan umum                          52,306,552          Pendekatan biaya/              - Indeks koefisien/                   0.45 - 5.46       -   Semakin besar                                     General buildings
                                                                Cost approach                     Index coefficient                                        indeks koefisien maka
                                                                                                                                                           semakin tinggi nilai wajar/
                                                                                                                                                           The higher the index coefficient,
                                                                                                                                                           the higher the fair value
                                                                                               - Volume bangunan/                 60.00% - 70.00%*     -   Semakin besar volume
                                                                                                  Building volumes                                         maka semakin tinggi
                                                                                                                                                           nilai wajar/
                                                                                                                                                           The higher building
                                                                                                                                                           volumes, the higher the fair value

     Waduk dan prasarana                     16,832,357        Tren/                           - Indeks koefisien/                   1.00 - 2.27       -   Semakin besar tingkat                 Reservoirs and infrastructures
                                                                Trending                          Index coefficient                                        indeks maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the index coefficient,
                                                                                                                                                           the higher the fair value

     Instalasi dan mesin                    556,182,532        Pendekatan biaya/               - Tingkat kemunduran                1.00% - 30.00%      -   Semakin besar tingkatnya,                         Installations and
       pembangkit                                               Cost approach                      fungsional/                                             maka semakin                                        power plants
                                                                                                   Functional                                              rendah nilai wajar/
                                                                                                   obsolescence rate                                       The higher the rate,
                                                                                                                                                           the lower the fair value
                                                                                               - Tingkat kemunduran                1.00% - 3.00%       -   Semakin besar tingkatnya,
                                                                                                  ekonomis/                                                maka semakin
                                                                                                  Economic                                                 rendah nilai wajar/
                                                                                                  obsolescence rate                                        The higher the rate,
                                                                                                                                                           the lower the fair value
                                                                                               - Tingkat indeks PPI/                 1.00 - 2.00       -   Semakin besar tingkat
                                                                                                  PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher the fair value

     Perlengkapan transmisi                 204,873,601        Pendekatan biaya/               - Tingkat indeks PPI/                 1.00 - 3.00       -   Semakin besar tingkat                  Transmissions equipment
                                                                Cost approach                     PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher the fair value

     Perlengkapan distribusi                235,012,113        Pendekatan biaya/               - Tingkat indeks PPI/                 1.00 - 1.65       -   Semakin besar tingkat                    Distributions equipment
                                                                Cost approach                     PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher the fair value

     Perlengkapan pengolahan                  6,134,499        Pendekatan biaya/               - Tingkat indeks PPI/                 1.01 - 1.02       -   Semakin besar tingkat                        Telecommunications
       data dan telekomunikasi                                  Cost approach                     PPI index rate                                           indeks PPI maka semakin                    and data processing
       yang digunakan dalam                                                                                                                                tinggi nilai wajar/                         equipment used for
       penyediaan listrik                                                                                                                                  The higher the PPI index rate,         electricity supply
                                                                                                                                                           the higher the fair value

     Material cadang utama                   3,090,753         Pendekatan biaya/               - Tingkat indeks PPI/                 1.00 - 3.00       -   Semakin besar tingkat                            Major spare parts
                                                                Cost approach                     PPI index rate                                           indeks PPI maka semakin
                                                                                                                                                           tinggi nilai wajar/
                                                                                                                                                           The higher the PPI index rate,
                                                                                                                                                           the higher fair value

     *) Terdapat banyak input yang tidak dapat diobservasi. Hal ini merepresentasikan kisaran bobot dari input yang tidak dapat diobservasi./There are too many unobservable inputs. This represents the weights of the
        unobservable inputs.
Page 74
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/64 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                  6.    PROPERTY,             PLANT      AND          EQUIPMENT
                                                                  (continued)

     Surplus revaluasi, dikurangi dengan penghasilan              The revaluation surplus, net of applicable deferred
     pajak tangguhan yang terkait, telah dikreditkan pada         income taxes, was credited to other comprehensive
     pendapatan komprehensif lain dan disajikan                   income and is shown in “property, plant and
     sebagai “surplus revaluasi aset tetap” pada laba             equipment     revaluation   surplus”    in    other
     komprehensif lain.                                           comprehensive income.

     Jika Grup tidak menerapkan model revaluasi, nilai            If the Group did not apply the revaluation model, the
     tercatat bersih aset tetap Perusahaan pada tanggal           net carrying value of property, plant and equipment as
     30 Juni 2024 dan 31 Desember 2023 masing-                    at June 30, 2024 and December 31, 2023 would have
     masing        sebesar       Rp697.246.536     dan            amounted to Rp697,246,536 and Rp688,378,882
     Rp688.378.882.                                               respectively.

     Aset dalam pembangunan                                       Construction in progress

     Akun ini merupakan biaya-biaya yang terjadi                  This account represents costs incurred in relation to
     sehubungan dengan pembangunan dan renovasi/                  the construction and renovation/betterment of power
     perbaikan sarana kelistrikan, sebagai berikut:               supply facilities, as follows:

                                            30 Juni/             31 Desember/
                                            June 30,             December 31,
                                              2024                   2023

               Proyek penugasan -                                                         Mandatory project -
                   Program percepatan                                                   Fast track program
                   Pembangkitan                4,742,774                4,689,759              Power plants
                   Transmisi                   5,108,398                5,108,398              Transmission

                   Sub Jumlah                  9,851,172                9,798,158                Sub Total

               Konstruksi Rutin                                                          Regular construction
                  Pembangkitan                65,623,831            70,020,323               Power plants
                  Transmisi                   27,916,979            38,440,674               Transmission
                  Distribusi                   9,776,625             9,881,967                Distribution
                  Perlengkapan                   353,241               612,434                 Equipment

                   Sub Jumlah                103,670,676           118,955,398                   Sub Total

                   Jumlah                    113,521,848           128,753,556                       Total



     (i)   Program percepatan                                     (i)    Fast track program

           Program percepatan (fast track program)                       The fast track program represents projects which
           merupakan       proyek    yang    ditugaskan                  are mandated by the Government to the Group.
           Pemerintah kepada Grup. Aset dalam                            Construction in progress under the fast track
           pembangunan untuk program percepatan                          program includes advance payments made to the
           termasuk pembayaran uang muka kepada                          contractors, borrowing costs and other
           kontraktor, biaya pinjaman serta pengeluaran                  capitalised expenditures.
           lain yang dikapitalisasi.

           Pembangkitan                                                  Power plants

           Program percepatan aset dalam pembangunan                     The fast track program of power plants under
           pembangkitan terutama merupakan PLTU 1                        construction consists mainly of PLTU 1
           Kalimantan Barat – Parit Baru 2x50 MW dan                     Kalimantan Barat – Parit Baru 2x50 MW and
           PLTU 2 Kalimantan Barat Bengkayang 2x27,5                     PLTU 2 West Kalimantan Bengkayang 2x27.5
           MW.                                                           MW.

           Transmisi                                                     Transmission

           Program percepatan aset dalam pembangunan                     The fast track program of transmission and
           transmisi dan gardu induk antara lain proyek                  substation under construction mainly consists of
           SUTT 275 kV Meulaboh – Sigli dan SUTT 150                     projects such as Overhead Powerline 275 kV
           kV Blang Pidie – Tapak Tuan.                                  Meulaboh – Sigli and Overhead Powerline 150
                                                                         kV Blang Pidie – Tapak Tuan.
Page 75
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/65 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.   ASET TETAP (lanjutan)                                  6.   PROPERTY,          PLANT        AND     EQUIPMENT
                                                                 (continued)

     Aset dalam pembangunan (lanjutan)                           Construction in progress (continued)

     (ii) Konstruksi rutin                                       (ii) Regular construction

         Pembangkitan                                                Power plants

         Aset dalam pembangunan untuk pembangkitan                   Power plants under construction consist mainly of
         terutama merupakan PLTU Sulut 1 2x50 MW,                    PLTU Sulut 1 2x50 MW, PLTU Kalselteng 2
         PLTU Kalselteng 2 2x100 MW dan PLTA                         2x100 MW and PLTA Peusangan 2x88 MW.
         Peusangan 2x88 MW.

         Transmisi                                                   Transmission

         Aset dalam pembangunan transmisi terutama                   Transmission under construction consists mainly
         merupakan proyek jaringan transmisi 500 kV                  of projects of transmission lines of 500 kV in
         untuk Sumatera, Jawa - Bali, 150 kV untuk luar              Sumatera, Java - Bali, 150 kV outside Sumatera,
         Sumatera, Jawa - Bali, proyek gardu induk                   Java - Bali, substations of 150 kV and
         150 kV serta proyek interkoneksi jaringan.                  interconnection of transmission projects.

         Distribusi                                                  Distribution

         Aset dalam pembangunan distribusi terutama                  Distribution under construction consists mainly of
         merupakan proyek jaringan distribusi tegangan               projects of mid and low voltage distribution lines
         menengah dan rendah 20 kV serta proyek                      of 20 kV and distribution substation projects.
         gardu distribusi.

         Perlengkapan                                                Equipment

         Perlengkapan untuk aset dalam pembangunan                   Equipment under construction consists of
         termasuk materi dan perlengkapan khusus                     specialised materials and equipment used to
         yang digunakan untuk menunjang fungsi                       support the generation and distribution of
         pembangkitan dan distribusi listrik.                        electricity.

         Pada tanggal 30 Juni 2024, estimasi                     As at June 30, 2024, the estimated percentage of
         persentase jumlah tercatat aset dalam                   completion of the Group’s construction in progress
         pembangunan Grup terhadap nilai kontrak                 projects was as follows:
         adalah sebagai berikut:


                                                                                                       Persentase
                                                                                                       penyelesaian/
                                                                                        Nilai/         Percentage
                                 Nama Proyek/Project Name                              Amount          of completion

          PLTA PEUSANGAN                                                                8,439,754          95%
          PLTA ASAHAN III                                                               7,683,373          99%
          PLTU KALSELTENG 2 - 2X100 MW (ASAM-ASAM)                                      5,403,717          99%
          PLTU SULUT-1 (2x50 MW)                                                        4,734,426          99%
          PLTA UPPER CISOKAN PUMPED STORAGE                                             4,671,438           6%
          PLTU PALU-3 (2x50 MW)                                                         4,535,097          98%
          PLTA JATIGEDE                                                                   159,687          99%
          PLTU LOMBOK FTP2 (2x50 MW)                                                    3,429,559          84%
          PLTU TIMOR 1                                                                  2,563,887          96%
          PLTU KALBAR 1 - PARIT BARU (2 x 50 MW)                                        1,713,498          86%
          Transmisi lainnya/Various transmission line                                  33,025,378         2%-98%
          Pembangkitan lainnya /other power plants                                     27,032,167         2%-98%
          Lainnya/Others                                                               10,129,866         2%-98%

          Jumlah Umum                                                                 113,521,848
Page 76
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/66 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

6.    ASET TETAP (lanjutan)                                 6.   PROPERTY,         PLANT       AND       EQUIPMENT
                                                                 (continued)

      Aset dalam pembangunan (lanjutan)                          Construction in progress (continued)

      Pada tanggal 31 Desember 2023, estimasi                    As at December 31, 2023, the estimated percentage
      persentase     jumlah tercatat   aset    dalam             of completion of the Group’s construction in progress
      pembangunan Grup terhadap nilai kontrak adalah             projects was as follows:
      sebagai berikut:
                                                                                                        Persentase
                                                                                                       penyelesaian/
                                                                                 Nilai/                 Percentage
                        Nama Proyek/Project Name                                Amount                 of completion

     PLTU Kalselteng 2 (2x100 MW)                                                      8,271,637           96%
     PLTA Peusangan (2x88 MW)                                                          7,779,468           94%
     PLTA Asahan III - Sumatera Utara (2x87 MW)                                        6,936,508           96%
     PLTU 1 Sulut (2x50 MW)                                                            4,174,398           94%
     PLTU Palu 3 (2x50 MW)                                                             4,032,968           90%
     PLTA Jatigede (2x55 MW)                                                           3,924,462           98%
     PLTU Lombok FTP-2 (2x50 MW)                                                       3,367,632           82%
     PLTU Timor 1 (2X50 MW)                                                            2,226,187           95%
     PLTU 1 Kalimantan Barat – Parit Baru (2x50 MW)                                    1,741,384           86%
     PLTMG Luwuk (40 MW)                                                                 512,824           80%
     Transmisi lainnya/Various transmission lines                                     43,549,072          2%-98%
     Pembangkitan lainnya/Other power plants                                          31,742,614          2%-98%
     Lainnya/Others                                                                   10,494,401          2%-98%

     Jumlah/Total                                                                    128,753,555

      Setelah penyelesaian suatu proyek, masih perlu             After completion of a project, there are still a number
      dilakukan sejumlah pengujian-pengujian sebelum             of tests that need to be performed during the
      proyek aset dalam pembangunan menerima                     commissioning phase before the projects are Certified
      Sertifikat Laik Operasi.                                   for Operations.

      Selama tahun berjalan, Grup telah mengkapitalisasi         During the year, the Group has capitalised borrowing
      biaya pinjaman mencakup bunga pinjaman dan                 costs including interest expense and foreign
      selisih kurs mata uang asing ke pekerjaan dalam            exchange differences to construction in progress
      pelaksanaan aset dalam pembangunan sebesar                 amounting to Rp3,055,508 (2023: Rp617,235).
      Rp3.055.508 (2023: Rp617.235). Biaya pinjaman              Borrowing costs were capitalised at the weighted
      dikapitalisasi pada tingkat bunga rata-rata                average rate of general borrowings of 5.89% in 2023
      tertimbang dari pinjaman umum yaitu sebesar                (2023: 5.08%).
      5,89% pada tahun 2023 (2023: 5,08%).
Page 77
                                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                    Lampiran 5/67 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                      (Expressed in millions of Rupiah, unless otherwise stated)

6. ASET TETAP (lanjutan)                                                                                     6. PROPERTY,                                 PLANT                      AND             EQUIPMENT
                                                                                                                (continued)


     Aset tidak digunakan dalam operasi                                                                                   Assets not used in operations

     Aset tidak digunakan dalam operasi meliputi aset                                                                     Assets not used in operations comprised property,
     tetap yang akan direlokasi, sementara belum                                                                          plant and equipment to be relocated, those
     digunakan dalam operasi, serta aset akan                                                                             temporarily not in use in operations, and assets to be
     diperbaiki.                                                                                                          repaired.

     Kerugian penurunan nilai dari penghapusan aset                                                                       Loss on impairment of assets not used in operations
     yang tidak digunakan dalam operasi untuk periode                                                                     for the six month periods ended June 30, 2024 and
     Enam bulan yang berakhir pada tanggal 30 Juni                                                                        2023 amounted to Rp572,653 and Rp356,125,
     2024 dan 2023 masing-masing sebesar Rp572.653                                                                        respectively, which are presented as part of the other
     dan Rp356,125 yang disajikan sebagai bagian dari                                                                     income - net (Note 46).
     penghasilan lain-lain - bersih (Catatan 46).

     Keuntungan penjualan aset tertentu yang tidak                                                                        Gain on sale of certain assets not used in operations
     digunakan dalam operasi untuk periode Enam bulan                                                                     for the six month periods ended June 30, 2024 and
     yang berakhir pada tanggal 30 Juni 2024 dan 2023                                                                     2023 amounted to Rp45,372 and Rp7,087
     masing-masing adalah sebesar Rp45,372 dan                                                                            respectively (Note 46).
     Rp7,087 (Catatan 46).

     Berdasarkan penelaahan manajemen, manajemen                                                                          Based on management’s assessment, management
     berpendapat bahwa penyisihan penurunan nilai                                                                         is of the opinion that the provision for impairment is
     Grup adalah cukup untuk menutupi kemungkinan                                                                         adequate to cover the possible impairment losses of
     adanya kerugian yang timbul dari nilai tercatat aset                                                                 the carrying amount of fixed assets as at June 30,
     tetap pada tanggal 30 Juni 2024 dan 31 Desember                                                                      2024 and December 31, 2023.
     2023.


7.   ASET HAK GUNA                                                                                           7.           RIGHT-OF-USE ASSETS

                                                                                                   30 Juni 2024/ June 30, 2024

                                                          Saldo Awal/
                                                                                                    Pengurangan/               Reklasifikasi/       Saldo Akhir/ Ending Balance
                                                       Beginning Balance
                                                                           Penambahan/ Additions     Deductions              Reclassifications


     Biaya Perolehan :                                                                                                                                                                                                            At Cost
     Tanah dan Hak atas Tanah                                  1,490,380                   1,267                (1,374)                1,057,089                         2,547,363                              Land and Rights of Land
     Bangunan umum waduk dan prasarana                         3,023,161                  89,691               (10,384)                  (79,399)                        3,023,070               Buildings, reservoirs, and infrastructure
     Instalasi dan Mesin                                      43,335,756               1,808,495                     -                 1,483,110                        46,627,362                         Installations and Power Plant
     Perlengkapan distribusi                                   1,501,637                       -                     -                         0                         1,501,637                                Distribution equipment
     Perlengkapan Umum                                           157,317                  11,138                  (215)                       (0)                          168,239                                    General Equipment
     Kendaraan Bermotor dan Alat yang Mobil                    3,615,409                 637,396            (1,113,922)                   25,993                         3,164,876                                        Motor Vehicles
     Perlengkapan pengolahan data dan telekomunikasi                   -                     540                     -                         -                               540    Telecommunications and data processing equipment
     Kapal dan perlengkapan                                    2,316,459                       -                     -                (1,734,607)                          581,852                                Vessels and equipment

     Jumlah                                                   55,440,119               2,548,527            (1,125,895)                 752,188                         57,614,938                                                  Total

     Akumulasi Penyusutan                                                                                                                                                                                    Accumulated Depreciation
     Tanah dan Hak atas Tanah                                     96,455                  62,274                  (597)                 101,642                            259,774                              Land and Rights of Land
     Bangunan umum waduk dan prasarana                         1,184,876                 140,805               (15,834)                 (57,507)                         1,252,340               Buildings, reservoirs, and infrastructure
     Instalasi dan Mesin                                      21,429,780                 834,783                     -                  286,260                         22,550,823                         Installations and Power Plant
     Perlengkapan distribusi                                      12,514                  75,082                     -                        -                             87,596                                Distribution equipment
     Perlengkapan Umum                                           106,161                  26,950                     -                   (3,466)                           129,645                                    General Equipment
     Kendaraan Bermotor dan Alat yang Mobil                    1,806,240                 543,367              (172,213)                  10,595                          2,187,989                                        Motor Vehicles
     Perlengkapan pengolahan data dan telekomunikasi                   -                      67                     -                        -                                 67    Telecommunications and data processing equipment
     Kapal dan perlengkapan                                      229,589                  69,571                     -                  (33,421)                           265,739

     Jumlah                                                   24,865,615               1,752,898              (188,644)                 304,103                         26,733,972                                                  Total

     Jumlah tercatat                                          30,574,504                                                                                                30,880,966                                    Net carriying value
Page 78
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/68 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

7.    ASET HAK GUNA (lanjutan)                                               7.     RIGHT-OF-USE ASSETS (continued)
                                                           31 Desember 2023 / December 31, 2023
                                                                                        Selisih kurs
                                                                                              dari
                                                                                         penjabaran
                                                                                            laporan
                                                                                         keuangan/
                                                                                          Exchange
                                                                                         differences
                                                                                             due to
                                      Saldo awal/                                          financial       Saldo akhir/
                                      Beginning       Penambahan/    Pengurangan/        statements          Ending
                                       balance          Additions      Deductions       translations         balance

     Biaya perolehan                                                                                                                               At cost
     Tanah                                1,074,786         416,187               (593)                -       1,490,380                              Land
     Bangunan umum, waduk                                                                                                       Buildings, reservoirs and
         dan prasarana                   2,314,441          760,445           (51,725)               -         3,023,161                  infrastructure
     Instalasi dan mesin pembangkit     43,195,022        1,252,188        (1,101,817)          (9,637)       43,335,756   Installations and power plants
     Perlengkapan distribusi                     -        1,501,637                 -                -         1,501,637           Distribution equipment
     Perlengkapan umum                     127,917           60,399           (30,999)               -           157,317               General equipment
     Kendaraan bermotor                  2,340,694        1,581,183          (306,468)               -         3,615,409                    Motor vehicles
     Perlengkapan pengolahan                                                                                               Telecommunications and data
         data dan telekomunikasi              6,037              12           (6,049)                  -               -        processing equipment
     Kapal dan perlengkapan               2,912,692               -         (596,233)                  -       2,316,459          Vessels and equipment

     Jumlah                             51,971,589        5,572,051        (2,093,884)          (9,637)       55,440,119                            Total


     Akumulasi penyusutan                                                                                                    Accumulated depreciation
     Tanah                                  66,105           30,943               (593)                -          96,455                              Land
     Bangunan umum, waduk                                                                                                       Buildings, reservoirs and
         dan prasarana                     947,658          295,632           (58,414)              -          1,184,876                  infrastructure
     Instalasi dan mesin pembangkit     20,512,269        1,925,852        (1,010,110)          1,769         21,429,780   Installations and power plants
     Perlengkapan distribusi                     -           12,514                 -               -             12,514           Distribution equipment
     Perlengkapan umum                      85,892           49,385           (29,116)              -            106,161               General equipment
     Kendaraan bermotor                  1,112,352        1,060,007          (366,119)              -          1,806,240                    Motor vehicles
     Perlengkapan pengolahan                                                                                               Telecommunications and data
         data dan telekomunikasi             3,393               78           (3,471)                  -               -        processing equipment
     Kapal dan perlengkapan                238,727          139,142         (148,280)                  -         229,589          Vessels and equipment

     Jumlah                             22,966,396        3,513,553        (1,616,103)          1,769         24,865,615                            Total

     Jumlah tercatat                    29,005,193                                                            30,574,504             Net carrying value




      Pada tanggal 30 Juni 2024, aset Pembangkit Listrik                            As at June 30, 2024, assets of Tanjung Jati B Steam
      Tenaga Uap (“PLTU”) Tanjung Jati B    4x660 MW                                Power Plant (“PLTU”) 4x660 MW were insured with PT
      diasuransikan kepada PT Asuransi Mitsui                                       Asuransi Mitsui Sumitomo Indonesia against fire and
      Sumitomo Indonesia terhadap risiko kebakaran dan                              other possible risks with insurance coverage of
      risiko lainnya dengan jumlah pertanggungan                                    JPY45,996,893,134 (full amount) or equivalent to
      masing-masing sebesar JPY45.996.893.134 (nilai                                Rp4,686,448 (2023: JPY216,052,563,775 (full
      penuh) atau setara dengan Rp4.686.448 (2023:                                  amount) or equivalent to Rp23,668,558) and
      JPY216.052.563.775 (nilai penuh) atau setara                                  USD3,924,900,000 (full amount) or equivalent to
      dengan Rp23.668.558) dan USD3.924.900.000                                     Rp64,344,811 (2023: USD1,936,320,000 (full amount)
      (nilai penuh) atau setara dengan Rp64.344.811                                 or equivalent to Rp29,894,844). The Group’s
      (2023: USD1.936.320.000 (nilai penuh) atau setara                             management believes that the right-of-use assets
      dengan     Rp29.894.844).    Manajemen      Grup                              were adequately insured as at June 30, 2024 and
      berpendapat bahwa aset hak guna tersebut telah                                December 31,2023.
      diasuransikan secara memadai pada tanggal 30
      Juni 2024 dan 31 Desember 2023.
Page 79
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/69 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                 JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

7.   ASET HAK GUNA (lanjutan)                                             7.       RIGHT-OF-USE ASSETS (continued)

                                                    2024                       2023
                                               (Enam Bulan/               (Enam Bulan/
                                                Six Months)                Six Months)

      Beban Usaha                                                                                                   Operating expenses
         Penyusutan aset hak guna                     1,664,980                     1,386,009     Right-of-use of assets depreciation
         Bahan bakar dan pelumas                              -                             -                     Fuel and lubricants

      Subjumlah                                       1,664,980                     1,386,009                                 Subtotal

      Persediaan                                         69,571                            -                               Inventories
      Beban lain lain                                         -                            -                          Other expenses
      Aset dalam pembangunan                             18,347                       13,551                  Construction in progress

       Jumlah                                         1,752,898                     1,399,560                                    Total




     Nilai beban penyusutan yang dikapitalisasi sebagai                   The amount of depreciation expense which is
     persediaan, sebagian telah dibebankan pada beban                     capitalised as inventories, has been partially charged
     bahan bakar dan pelumas saat persediaan                              to fuel and lubricants expense when the inventories
     digunakan.                                                           are used.

     Berdasarkan penelaahan manajemen, Grup                               Based on management’s assessment, the Group is
     berpendapat bahwa tidak terdapat indikasi                            of the opinion that there were no indications of
     penurunan nilai aset hak guna pada tanggal 30                        impairment of right-of-use assets as at June 30, 2024
     Juni 2024 dan 31 Desember 2023.                                      and December 31, 2023.



8.   PROPERTI INVESTASI                                              8.   INVESTMENT PROPERTIES



                                                          30 Juni 2024/ June 30, 2024
                                                Perubahan
                               Saldo awal/      nilai wajar/                                       Saldo Akhir/
                               Beginning        Charge in       Pengurangan/ Reklasifikasi/          Ending
                                balance         fair value        Deduction    Reclacification      balance

     Pemilikan langsung                                                                                             Direct acquisition
     Tanah dan Bangunan         5,939,234                 -                -           (11,453)       5,927,781    land and buildings



                                                        31 Desember/ December 31 , 2023
                                                  Perubahan
                                 Saldo awal/      nilai wajar/                                      Saldo Akhir/
                                 Beginning        Charge in     Pengurangan/ Reklasifikasi/           Ending
                                  balance         fair value     Deduction   Reclacification         balance

       Pemilikan langsung                                                                                            Direct acquisition
       Tanah dan Bangunan         5,623,489         207,770                    -        107,976       5,939,235     land and buildings
Page 80
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/70 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

8.   PROPERTI INVESTASI (lanjutan)                           8.   INVESTMENT PROPERTIES (continued)

     Akun ini merupakan tanah milik Grup, yaitu PIP,              This account represents pieces of land owned by
     PNP dan PLN Batam yang terletak di Pademangan                members of the Group comprising of PIP, PNP and
     - Jakarta Utara, Paiton - Jawa Timur, Bekasi - Jawa          PLN Batam, located in Pademangan North Jakarta,
     Barat, Pluit - Jakarta Utara, Asahan - Sumatera              Paiton - East Java, Bekasi - West Java, Pluit - North
     Utara dan Kramatwatu Serang dengan hak legal                 Jakarta, Asahan - North Sumatera and Kramatwatu
     berupa HGB berjangka waktu dari 7 sampai 40                  Serang with HGB for periods between seven to 40
     tahun, jatuh tempo pada 2032, yang disewakan                 years until 2032, which are leased to PT Pertamina
     kepada PT Pertamina (Persero) (“Pertamina”), PT              (Persero) (“Pertamina”), PT Pertamina Hulu Energi
     Pertamina Hulu Energi ONWJ, PT Nusantara                     ONWJ, PT Nusantara Regas, PT Bajradaya
     Regas, PT Bajradaya Sentranusa, PT Karya                     Sentranusa, PT Karya Semesta Gemilang, PT
     Semesta Gemilang, PT Shenhua Guohua                          Shenhua Guohua Pembangkitan Jawa Bali and
     Pembangkitan Jawa Bali dan beberapa tanah yang               several pieces of land that are leased to third parties.
     disewakan ke pihak ketiga.

     Selama periode Enam bulan yang berakhir pada                 During six month periods ended June 30, 2024,
     tanggal 30 Juni 2024, beberapa tanah dan                     certain lands amounting to Rp11.495 have been
     bangunan sejumlah Rp11.495 telah direklasifikasi             reclassified to fixed assets while certain lands and
     ke aset tetap sedangkan beberapa tanah dan                   buildings amounting to Rp42 have been reclassified
     bangunan sejumlah Rp42 telah di reklasifikasi dari           from fixed assets to investment properties
     aset tetap ke property investasi.

     Penghasilan sewa yang diperoleh dari properti                Rental income earned from investment properties
     investasi untuk tahun yang berakhir pada tanggal 30          forthe years ended June 30, 2024 and 2023
     Juni 2024 dan 2023 adalah masing-masing sebesar              amounted to Rp 40,136 and Rp 38,663 respectively
     Rp 40.136 dan Rp 38.663.

     Pada tanggal 31 Desember 2023, Grup melakukan                As at December 31, 2023, the Group performed a
     penilaian kembali atas nilai wajar properti investasi        revaluation of the fair value of its investment properties
     yang dilakukan oleh KJPP RHR berdasarkan                     which was performed by KJPP RHR based on the
     laporannya No. 0008/MBPRU-JKT/E/MT1/2024                     reports No. 0008/MBPRU-JKT/E/MT1/2024 dated
     tanggal 05 Januari 2024 perihal : Executive                  Jan 05, 2024 subject: Executive Summary of
     Summary Penilaian Dalam Rangka Penilaian Wajar               Assessment of Fair Valuation of PT PLN (Persero)
     Properti Investasi PT PLN (Persero) Tahun 2023,              Investment Property in 2023, independent valuers
     penilai independen yang telah terdaftar di                   registered in the Ministry of Finance and OJK..
     Kementerian Keuangan dan OJK.


     Nilai wajar properti investasi diklasifikasikan              The fair values of investment properties are within
     sebagai level 2 dalam hierarki nilai wajar.                  level 2 of the fair value hierarchy.

     Nilai wajar level 2 dari tanah dihitung dengan               The level 2 fair value of land is calculated using the
     menggunakan pendekatan pasar dan pendekatan                  market approach and income approach. Data inputs
     pendapatan. Input yang diperoleh dari pendekatan             were obtained from the market approach and consist
     pasar yaitu:                                                 of the following:
     a. Harga jual atau harga sewa per meter persegi;             a. Sale or rental price per square metre;
     b. Tingkat hunian;                                           b. Occupancy rate;
     c. Tingkat pertumbuhan; dan                                  c. Growth rate; and
     d. Tingkat diskonto dan kapitalisasi.                        d. Discount and capitalisation rate.

     Penyesuaian dilakukan berdasarkan ukuran, lokasi,            Adjustments were made based on size, location,
     bentuk dan spesifikasi, tanah dan hak atas tanah             shapes and specifications, land and land rights and
     dan elemen perbandingan lainnya.                             other comparison elements.

     Berdasarkan    penilaian   manajemen,     Grup               Based on the management’s assessment, the Group
     berpendapat bahwa tidak ada kejadian-kejadian                is of the opinion that there are no events or changes
     atau    perubahan-perubahan   keadaan     yang               in circumstances that indicate any impairment in the
     mengindikasikan adanya penurunan nilai properti              value of investment properties as at June 30, 2024
     investasi pada tanggal 30 Juni 2024 dan 31                   and December 31, 2023
     Desember 2023

     Pada 30 Juni 2024 dan 31 Desember 2023, Grup                 As at June 30, 2024 and December 31, 2023, the
     tidak memiliki kewajiban kontraktual untuk                   Group does not have any contractual obligations for
     perbaikan dan perawatan di masa depan.                       future repairs and maintenance.
Page 81
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/71 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                          (Expressed in millions of Rupiah, unless otherwise stated)

9.    INVESTASI PADA ENTITAS ASOSIASI DAN                                       9.      INVESTMENTS IN ASSOCIATES AND JOINT
      VENTURA BERSAMA                                                                   VENTURES

      Rincian investasi pada entitas asosiasi dan ventura                               The details of investments in associates and joint
      bersama adalah sebagai berikut:                                                   ventures are as follows:

                                                                                                                             Persentase penyertaan/
                                                                                                                 Tahun      Percentage of ownership
                                                                                                                operasi     30 Juni /     31 Desember/
                                                                                                               komersial/   June 30       December 31,
                          Entitas anak/               Domisili/                         Jenis usaha/          Commercial      2024            2023
                          Subsidiaries                Domicile                       Nature of business       operations

     Entitas asosiasi/Associates
     PT Geo Dipa Energi                            Jakarta            Pembangkit tenaga listrik/                 2002           5.50%          5.50%
                                                                      Electricity supplier
     PT Mitra Energi Batam("MEB")                  Batam              Pembangkit tenaga listrik/                 2004          30.00%         30.00%
                                                                      Electricity supplier
     PT Sumber Segara Primadaya ("S2P")            Cilacap            Pembangkit tenaga listrik/                 2006          49.00%         49.00%
                                                                      Electricity supplier
     PT Dalle Energy Batam ("DEB")                 Batam              Pembangkit tenaga listrik/                 2013          20.00%         20.00%
                                                                      Electricity supplier
     PT Energi Pelabuhan Indonesia                 Jakarta            Pembangkit tenaga listrik/                 2013          45.00%         45.00%
                                                                      Electricity supplier
     PT Tanjung Kasam Power ("TJK")                Batam              Pembangkit tenaga listrik/                 2012          10.00%         10.00%
                                                                      Electricity supplier
     PT Indo Pusaka Berau ("IPB")                  Berau              Perdagangan batu bara/                     2005          46.53%         46.53%
                                                                      Coal trading
     PT Perusahaan Bongkar Muat Adhiguna Putera    Jakarta            Pelayaran/                                 1987          25.00%         25.00%
                                                                      Shipping
     PT Musi Mitra Jaya ("MMJ")                    Palembang          Transportasi batubara/                     2011          25.50%         25.50%
                                                                      Coal transportation
     PT Sriwijaya Bara Logistic ("SBL")            Musi Banyuasin     Transportasi batubara/                     2014          25.50%         25.50%
                                                                      Coal transportation
     PT Rekind Daya Mamuju ("RDM")                 Jakarta            Pembangkit tenaga listrik/                 2018          10.00%         10.00%
                                                                      Electricity supplier
     PT Sumbagselenergy Sakti Pewali (SS Pewali)   Sumatera Selatan   Pembangkit tenaga listrik/                   *)          10.00%         10.00%
                                                                      Electricity supplier
Page 82
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/72 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                               9.      INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                                VENTURES (continued)

     Rincian investasi pada entitas asosiasi dan ventura                                       The details of investments in associates and joint
     bersama adalah sebagai berikut: (lanjutan)                                                ventures are as follows: (continued)
                                                                                                                                                  Persentase penyertaan/
                                                                                                                                      Tahun      Percentage of ownership
                                                                                                                                     operasi     30 Juni /     31 Desember/
                                                                                                                                    komersial/   June 30       December 31,
                           Entitas anak/                       Domisili/                        Jenis usaha/                       Commercial      2024            2023
                           Subsidiaries                        Domicile                      Nature of business                    operations

     Ventura bersama/Joint ventures
     PT Unelec Indonesia                                    Jakarta          Penunjang penyedia tenaga listrik/                       1988          32.35%         32.35%
                                                                             Electrical supports
     PT Bajradaya Sentranusa ("BDSN")                       Asahan           Pembangkit tenaga listrik/                               2011          36.61%         36.61%
                                                                             Electricity supplier
     PT Bukit Pembangkit Innovative ("BPI")                 Palembang        Pembangkit tenaga listrik/                               2015          40.25%         40.25%
                                                                             Electricity supplier
     PT Komipo Pembangkitan Jawa Bali ("Komipo PJB")        Jepara           Operasi dan pemeliharaan/                                2010          49.00%         49.00%
                                                                             Operational and maintenance
     PT Indo Raya Tenaga ("IRT")                            Jakarta          Pembangkit tenaga listrik/                                 *)          51.00%         51.00%
                                                                             Electricity supplier
     PT Rajamandala Electric Power ("REP")                  Jakarta          Pembangkit tenaga listrik/                               2019          51.00%         51.00%
                                                                             Electricity supplier
     PT Perta Daya Gas ("PDG")                              Jakarta          Transportasi dan penyimpanan LNG/                        2015          35.00%         35.00%
                                                                             Transportation and storage of LNG
     PT Crompton Prima Switchgear Indonesia ("CPSI")        Jakarta          Peralatan pengontrol dan pendistribusian listrik/        2014          49.00%         49.00%
                                                                             Electricity controller and distribution
     PT Shenhua Guohua                                      Jakarta          Pembangkit tenaga listrik/                               2019          30.00%         30.00%
      Pembangkitan Jawa Bali ("SGPJB")                                       Electricity supplier
     PT GCL Indotenaga                                      Jakarta          Pembangkit tenaga listrik/                               2021          35.00%         35.00%
                                                                             Electricity supplier
     PT Guohua Taidian                                      Jakarta          Pembangkit tenaga listrik/                               2019          30.00%         30.00%
      Pembangkitan Jawa Bali ("GTPJB")                                       Electricity supplier
     PT North Sumatra Hydro Energy                          Sumatera Utara   Pembangkit tenaga listrik/                                 *)          25.00%         25.00%
      Pembangkitan Jawa Bali                                                 Electricity supplier
     PT PMSE (Pembangkitan Jawa Bali Masdar Solar Energi)   Jakarta          Pembangkit tenaga listrik/                                 *)          51.00%         51.00%
                                                                             Electricity supplier
     PT Maxpower Cogindo Batam ("MCB")                      Batam            Pembangkit tenaga listrik, kelistrikan, perdagangan
                                                                             besar mesin kantor dan
                                                                             industri, suku cadang dan perlengkapannya/                 *)          30.00%         30.00%
                                                                             Power generation,
                                                                             supporting activities electricity,
                                                                             wholeseller of office machinery and
                                                                             industry, spare parts and pittings
     PT Industri Baterai Indonesia                          Jakarta          Industri EV Battery dan ESS/                              *)           25.00%         25.00%
     PT Trina Mas Agra Indonesia                            Kendal           Solar PV Manufacture                                     2023          25.00%            -
     PT Nusantara Sembcorp Solar Energi                     Jakarta          Pembangkit tenaga listrik/                                *)           51.00%            -
                                                                             Electricity supplier
     PT Nusantara Tembesi Bayu Energi                       Batam            Pembangkit tenaga listrik/                                 *)          51.00%            -
                                                                             Electricity supplier



     *) Dalam tahap pengembangan                                                            *) In development stage
     **) Terdapat perwakilan PLN                                                            **) PLN has a representative
Page 83
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/73 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

9.     INVESTASI PADA ENTITAS ASOSIASI DAN                                          9.       INVESTMENTS IN ASSOCIATES AND JOINT
       VENTURA BERSAMA (lanjutan)                                                            VENTURES (continued)

      Seluruh entitas asosiasi dan ventura bersama                                          All the associates and joint ventures are recorded by
      dicatat oleh Grup dengan menggunakan metode                                           the Group using the equity method. They are private
      ekuitas. Seluruh entitas adalah entitas tertutup dan                                  entities and there is no quoted market price available
      tidak terdapat harga pasar yang dikutip yang                                          for their shares.
      tersedia untuk sahamnya.

      Pada tanggal 30 Juni 2024 dan 31 Desember 2023,                                       As at June 30, 2024 and December 2023,
      manajemen berpendapat bahwa tidak terdapat                                            management believes that there is no restriction and
      pembatasan dan risiko signifikan yang terkait                                         significant risk regarding the investments in associates
      dengan investasi pada asosiasi dan ventura                                            and joint ventures.
      bersama.

      Mutasi investasi pada entitas asosiasi dan ventura                                    Changes in investments in associates and joint
      bersama adalah sebagai berikut:                                                       ventures are as follows:


                                                                                                                 Bagian atas
                            Jumlah                                                                               pendapatan             Jumlah
                            tercatat                                                     Bagian atas            komprehensif            tercatat
                        1 Januari 2024/                                                   laba (rugi)              lainnya/          30 Juni 2024/
                           Carrying                                                         bersih/            Share of other          Carrying
                            amount             Penambahan/         Dividen/                Share of            comprehensive           amount
                        January 1, 2024         Additions          Dividend              profit (loss)             income            June 30, 2024



     Entitas asosiasi                                                                                                                                        Associates
     GDE                          114,458                    --           (1,202)                        --                     --            113,256              GDE
     MEB                          138,161                    --                --                   10,176                      --            148,337              MEB
     S2P                         7,590,934                   --                --                  839,228                      --           8,430,162             S2P
     DEB                            95,844                   --                --                    (829)                      --              95,015             DEB
     IPB                          126,174                    --                --                   (8,951)                     --            117,223               IPB
     EPI                           57,849                    --                --                       643                     --             58,492               EPI
     TJK                          148,212                   --                 --                     8,659                     --            156,871              TJK
     AGP                           41,292                  (0)                 --                         --                    --             41,292           PBM AP
     MMJ                          263,342             (34,834)                 --                   (1,576)                     --            226,932             MMJ
     SBL                          352,656             (33,164)                 --                     8,461                    --             327,953               SBL
     RDM                           46,588                   --                 --                   (2,782)               (6,285)              37,521              RDM
     SS PEWALI                      68,001                  --                                         (85)                                     67,916      SS PEWALI
                                 9,043,511            (67,999)            (1,202)                  852,943                (6,285)            9,820,968

     Ventura bersama                                                                                                                                      Joint ventures
     UNINDO                               --                 --                --                         --                    --                   --        UNINDO
     IBI                           112,951                   --                                          --                                    112,951              IBI
     BDSN                        1,146,697                   --         (125,165)                   67,779              (59,321)             1,029,990            BDSN
     BPI                         1,803,802                   --          (66,010)                   24,437                49,502             1,811,731              BPI
                                                                                                                                                            Komipo PJB
     Komipo PJB                    78,732                    --                --                   18,901                      --             97,633
     IRT                         6,444,894                   --                --                  410,016               751,929             7,606,839              IRT
     PDG                           79,208                    --                --                   12,143                      --             91,351              PDG
     REP                          146,743                    --                --                   (5,242)                8,755              150,256              REP
                                                                                                                                                                   CPSI
     PDP                           13,673                    --                --                         --                    --             13,673
                                                                                                                                                                 SGPJB
     SGPJB                       4,593,871                   --                --                  323,487                 9,382             4,926,741
     GCL                          854,342                    --                --                   62,832               118,950             1,036,124             GCL
                                                                                                                                                                 GTPJB
     GTPJB                           3,061                   --                --                        148                    1               3,209
     NSHE                        1,984,981                   --                --                  103,488                 3,201             2,091,670           NSHE
     PMSE                          177,557                   --                                     26,901              (18,502)               185,957           PMSE
     MCB                           12,290                   --                                      (1,017)                     --             11,273              MCB
     TMI                           30,468              96,627                                       (1,401)                                   125,694               TMI
     NSSE                                             154,168                                        4,773                   161              159,101             NSSE
     NTBE                                               1,275                                                                                   1,275             NTBE
                               17,483,270             252,070           (191,175)                1,047,245               864,058           19,455,468

     Jumlah                    26,526,781             184,071           (192,377)                1,900,188               857,773           29,276,436              Total
Page 84
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/74 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

9.     INVESTASI PADA ENTITAS ASOSIASI DAN                              9.      INVESTMENTS IN ASSOCIATES AND JOINT
       VENTURA BERSAMA (lanjutan)                                               VENTURES (continued)

       Mutasi investasi pada entitas asosiasi dan ventura                       Changes in investments in associates and joint
       bersama adalah sebagai berikut: (lanjutan)                               ventures are as follows: (continued)
                                                            31 Desember/ December 31, 2023
                                   Jumlah                      Bagian atas    Bagian atas                       Jumlah
                                   tercatat                     laba/(rugi)   penghasilan/                      tercatat
                                  1 Januari                       bersih       (kerugian)                    31 Desember
                                    2023/                         entitas/   komprehensif                        2023/
                                  Carrying                         Share        lainnya/                       Carrying
                                   amount                          in net    Share of other                     amount
                                 January 1,      Penambahan/     income/    comprehensive      Dividen/      December 31,
                                     2023         Additions        (loss)    income/(loss)    Dividends           2023

     Entitas asosiasi                                                                                                            Associates
     S2P                             6,702,401              -    1,189,343         (1,709)       (299,101)        7,590,934            S2P
     SBL                               335,061              -       17,595              -               -           352,656            SBL
     MMJ                               255,178              -        8,164              -               -           263,342           MMJ
     TJK                               139,107              -        9,759              -            (654)          148,212            TJK
     MEB                               133,463              -        6,198              -          (1,500)          138,161           MEB
     IPB                               122,602              -        5,453              -          (1,881)          126,174             IPB
     GDE                               114,458              -            -              -               -           114,458           GDE
     DEB                               107,959              -       (6,115)             -          (6,000)           95,844            DEB
     SS Pewali                          26,787         42,063         (849)             -               -            68,001       SS Pewali
     EPEI                               54,955              -        3,421              -            (527)           57,849           EPEI
     RDM                                57,596              -      (11,008)             -               -            46,588           RDM
     AGP                                36,147              -       13,464           (383)         (7,936)           41,292           AGP

     Subjumlah                       8,085,714         42,063    1,235,425         (2,092)       (317,599)        9,043,511         Subtotal

     Ventura bersama                                                                                                          Joint ventures
     IRT                             5,693,459              -      940,566       (189,131)              -         6,444,894              IRT
     SGPJB                           4,257,899              -      583,291        (37,268)       (210,051)        4,593,871           SGPJB
     NSHE                            1,857,315              -      138,752        (11,086)              -         1,984,981            NSHE
     BPI                             1,766,927              -       60,648        (17,549)         (6,224)        1,803,802              BPI
     BDSN                            1,216,250              -      117,074        (35,415)       (151,212)        1,146,697            BDSN
     GCL                               796,984              -      117,796         (1,469)        (58,969)          854,342             GCL
     PMSE                              149,866              -       27,691              -               -           177,557            PMSE
     REP                               142,903              -        5,180         (1,340)              -           146,743             REP
     IBI                               112,951              -            -              -               -           112,951               IBI
     PDG                                62,992              -       16,216              -               -            79,208             PDG
     Komipo PJB                         76,190              -        9,023              -          (6,481)           78,732     Komipo PJB
     TMAI                                    -         31,000         (532)             -               -            30,468             TMAI
     PDP                                11,409              -        2,264              -               -            13,673             PDP
     MCB                                 9,521              -        2,769              -               -            12,290             MCB
     GTPJB                               3,088              -          275              -            (302)            3,061           GTPJB

     Subjumlah                     16,157,754          31,000    2,021,013       (293,258)       (433,239)       17,483,270         Subtotal

     Jumlah                        24,243,468          73,063    3,256,438       (295,350)       (750,838)       26,526,781            Total
Page 85
                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/75 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                         9.        INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                            VENTURES (continued)

     Berikut ini adalah ringkasan informasi keuangan                                       The following table contains the summarised financial
     entitas asosiasi dan ventura bersama pada                                             information for associates and joint ventures as at
     30 Juni 2024 dan 31 Desember 2023 yang dicatat                                        June 30, 2024 and December 31, 2023 which are
     dengan menggunakan metode ekuitas.                                                    accounted for using the equity method.

     Entitas asosiasi                                                                      Associates


                                                                     30 Juni/ June 30, 2024

                                         S2P            MMJ                  SBL              Lain-lain/ Others   Jumlah


     Lancar
     Kas dan setara kas                   1,415,938        28,673                  7,670             1,941,295     3,393,576                     Cash and cash equivalents
     Aset lancar lainnya                                                                                                                               Other current assets
           (tidak termasuk kas)          15,704,533       314,922               355,011              1,145,730    17,520,196                           (excluding cash)

     Jumlah aset lancar                  17,120,471       343,594               362,681              3,087,025    20,913,772                             Total current assets

     Liabilitas keuangan                                                                                                                                 Financial liabilities
           Utang usaha                    1,859,773       319,147               154,347               346,143      2,679,410                           Trade payables
           Liabilitas lancar lainnya      2,593,135       369,660               126,464               628,906      3,718,165                    Other current liabilities

     Jumlah liabilitas lancar             4,452,908       688,807               280,810               975,049      6,397,575                          Total current liabilities

     Tidak lancar
     Aset                                19,441,862     1,039,247               550,115              7,826,205    28,857,428                      Total non-current liabilities

     Liabilitas                                                                                                                                                    Liabilities
     Liabilitas keuangan                 19,441,862             -                     -              2,306,731    21,748,593                              Financial liabilities
     Liabilitas lainnya                  (3,132,600)      502,447               156,682              1,004,283    (1,469,188)                                Other liabilities

     Jumlah liabilitas tidak lancar      16,309,262       502,447               156,682              3,311,014    20,279,404                      Total non-current liabilities

     Aset bersih                         15,800,162       191,587               475,304              6,627,167    23,094,220                                       Net assets

     % kepemilikan efektif              49.00%         25.50%               25.50%            6.67% - 46.53%                                                  % of ownership

     Bagian Grup atas aset bersih                                                                                                               The Group’s share of the net
          asosiasi                        7,742,080        48,855               121,203               818,456      8,730,593                      assets of associates
     Penyesuaian ISAK 16                                                                                                                             Adjusment of ISAK 16
     Penyesuaian metode ekuitas            688,082        178,077               206,750                 17,466     1,090,375                 Adjustments of equity methods

     Jumlah tercatat                      8,430,162       226,932               327,953               835,922      9,820,968                            Total carrying value



     Pendapatan                          17,076,665       159,843               130,144                762,567     18,129,219                                     Revenue
     Beban pokok penjualan              (13,756,360)     (166,633)              (82,439)              (827,659)   (14,833,091)                              Cost of revenue
     Depresiasi dan amortisasi               26,951             -                     -                (13,673)        13,278                 Depreciation and amortisation
     Pendapatan keuangan                          -             -                     -                     20             20                               Finance income
     Beban keuangan                        (869,387)            -                     -                      -       (869,387)                                Finance costs
     Beban operasi                             (859)       (4,336)               (3,210)              (181,977)      (190,381)                          Operating expenses
     Pendapatan (beban) lain-lain,                -             -                     -                    (94)           (94)                    Other income/(expenses)
         bersih                               2,995         4,944                (1,959)               (80,653)       (74,673)                                     net
     Beban pajak penghasilan               (767,294)            -                (9,358)               (70,110)      (846,762)                          Income tax expense

     Laba/(rugi) periode berjalan         1,712,710        (6,182)               33,179               (411,579)    1,328,128                      Profit/(loss) for the periode

     % kepemilikan efektif              49.00%         25.50%               25.50%            6.67% - 46.53%                                                  % of ownership

     Bagian Grup atas laba/(rugi)                                                                                                  The Group’s share in net income/(loss) for
          asosiasi periode berjalan        839,228         (1,576)                 8,461                 6,830       852,943                     the year of associates



     Laba/(rugi) komprehensif lainnya             -             -                      -               (62,853)       (62,853)                            The Group’s share
     Bagian Grup atas laba/(rugi)                                                                                                              of other comprehensive
          komprehensif asosiasi                   -             -                      -                (6,285)        (6,285) -                  income of associates

     Dividen yang diterima dari                                                                                                                          Dividends received
          perusahaan asosiasi                     -             -                      -                (1,202)        (1,202)                         from associates
Page 86
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/76 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                  JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

9.     INVESTASI PADA ENTITAS ASOSIASI DAN                            9.      INVESTMENTS IN ASSOCIATES AND JOINT
       VENTURA BERSAMA (lanjutan)                                             VENTURES (continued)

       Entitas asosiasi (lanjutan)                                            Associates (continued)
                                                          31 Desember/ December 31, 2023
                                                                                      Lainnya/           Jumlah/
                                        S2P           MMJ              SBL             Others             Total

     Kas dan setara kas                  2,495,233        4,274               4,884         1,721,563      4,225,954       Cash and cash equivalents
     Aset lancar lainnya                                                                                                         Other current assets
        (tidak termasuk kas)             4,395,057      312,278            380,094          1,441,314      6,528,743              (excluding cash)

     Jumlah aset lancar                  6,890,290      316,552            384,978          3,162,877     10,754,697               Total current assets

     Aset tidak lancar                  29,807,788      878,598            429,514         10,703,592     41,819,492                Non-current assets

     Liabilitas keuangan                                                                                                            Financial liabilities
        Utang usaha                      1,693,298      227,889            157,059            264,198      2,342,444               Trade payables
        Liabilitas lancar lainnya        5,589,416      283,541            104,343          1,283,632      7,260,932         Other current liabilities

     Jumlah liabilitas lancar            7,282,714      511,430            261,402          1,547,830      9,603,376             Total current liabilities

     Liabilitas                                                                                                                               Liabilities
     Liabilitas keuangan                 7,650,942            -                  -          4,183,932     11,834,874                 Financial liabilities
     Liabilitas lainnya                  6,272,720      481,536            149,283          1,205,499      8,109,038                    Other liabilities

     Jumlah liabilitas tidak lancar     13,923,662      481,536            149,283          5,389,431     19,943,912        Total non-current liabilities

     Aset bersih                        15,491,702      202,184            403,807          6,929,208     23,026,901                         Net assets

     % kepemilikan                         49.00%       25.50%              25.50%     5.50% - 46.53%                                   % of ownership

     Bagian Grup atas aset bersih                                                                                        The Group’s share of the net
        asosiasi                         7,590,934       51,557            102,971           888,734       8,634,196          assets of associates
     Penyesuaian metode ekuitas                  -      228,950            265,290           (52,155)        442,085    Adjustment of equity methods
     Amortisasi kenaikan nilai wajar             -      (17,165)           (15,605)                -         (32,770)   Amortisation of fair value uplift

     Jumlah tercatat                     7,590,934      263,342            352,656           836,579       9,043,511             Total carrying value

     Pendapatan                         12,962,233      336,402             402,361         2,261,237     15,962,233                        Revenue
     Beban pokok pendapatan             (6,159,683)    (285,514)           (302,745)       (1,872,334)    (8,620,276)                Cost of revenue
     Depresiasi dan amortisasi            (111,687)           -                   -           (30,295)      (141,982)   Depreciation and amortisation
     Pendapatan keuangan                    14,267            -                   -             1,589         15,856                 Finance income
     Beban keuangan                     (1,119,760)           -                   -           (74,770)    (1,194,530)                  Finance costs
     Beban operasi                      (2,520,773)      (6,232)             (6,455)         (445,150)    (2,978,610)            Operating expenses
     Pendapatan/(beban) lain-lain,
        bersih                              46,261       (5,298)             (5,529)         (161,747)      (126,313) Other income/(expenses) - net
     Beban pajak penghasilan              (683,627)      (7,342)            (18,631)         (117,916)      (827,516)           Income tax expense

     Laba/(rugi) tahun berjalan          2,427,231       32,016             69,001           (439,386)     2,088,862           Profit/(loss) for the year

     % kepemilikan                         49.00%       25.50%              25.50%     5.50% - 46.53%                                   % of ownership

                                                                                                                               The Group’s share in
     Bagian Grup atas laba                                                                                                net income for the year
       bersih asosiasi tahun berjalan    1,189,343        8,164             17,595            20,323       1,235,425               of associates

                                                                                                                                 Other comprehensive
     Kerugian komprehensif lainnya          (3,487)           -                   -            (1,534)        (5,021)                         loss

     Bagian Grup atas kerugian                                                                                                   The Group’s share
       komprehensif lainnya                                                                                              of other comprehensive
       asosiasi                             (1,709)           -                   -              (383)        (2,092)          loss of associates

     Dividen yang diterima dari                                                                                                   Dividends received
        perusahaan asosiasi               (299,101)           -                   -           (18,498)      (317,599)             from associates
Page 87
                                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/77 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

9.   INVESTASI PADA ENTITAS ASOSIASI DAN                                                   9.       INVESTMENTS IN ASSOCIATES AND JOINT
     VENTURA BERSAMA (lanjutan)                                                                     VENTURES (continued)

     Ventura bersama                                                                                Joint ventures


                                                                                  30 Juni/ June 30, 2024
                                                                                                                         Lain-lain/
                                        BDSN         BPI           IRT                     SGPJB           NSHE                            Jumlah
                                                                                                                          Others


     Lancar
     Kas dan setara kas                  636,770      198,923       1,210,110                4,157,561        90,739      1,770,532         8,064,635            Cash and cash equivalents
     Aset lancar lainnya                                                                                                                                               Other current assets
           (tidak termasuk kas)          722,515      482,808            27,048              7,291,920        80,684      1,236,598         9,841,573                   (excluding cash)

     Jumlah aset lancar                 1,359,285     681,731       1,237,158               11,449,481       171,423      3,007,130        17,906,208                    Total current assets

     Liabilitas keuangan                                                                                                                                                  Financial liabilities
           Utang usaha                   169,501       87,904         320,983                  550,264      1,596,225       366,791         3,091,667                    Trade payables
           Liabilitas lancar lainnya     105,859      268,539       1,181,636                3,696,733        169,654       875,866         6,298,287             Other current liabilities

     Jumlah liabilitas lancar            275,360      356,443       1,502,619                4,246,997      1,765,879     1,242,656         9,389,954                  Total current liabilities

     Tidak lancar
     Aset                               5,980,164    5,606,177     53,252,999               24,019,343     18,302,311    11,567,279       118,728,272             Total non-current liabilities

     Liabilitas                                                                                                                                                                    Liabilities
     Liabilitas keuangan                2,350,242           -               -               12,294,132      6,977,303     1,744,678        23,366,354                     Financial liabilities
     Liabilitas lainnya                 1,228,571     603,662      38,096,693                1,554,441        896,841     6,230,094        48,610,301                        Other liabilities

     Jumlah liabilitas tidak lancar     3,578,813     603,662      38,096,693               13,848,573      7,874,144     7,974,772        71,976,656             Total non-current liabilities

     Aset bersih                        3,485,277    5,327,802     14,890,845               17,373,255      8,833,711     5,356,980        55,267,871                               Net assets

     % kepemilikan efektif               37%         37%           51%                      30%             25%                                                                % of ownership

     Bagian Grup atas aset bersih                                                                                                                               The Group’s share of the net
          asosiasi                      1,275,960    1,984,606      7,594,331                5,211,976      2,208,428     2,032,543        20,307,845               assets of associates
     Penyesuaian ISAK 16                                                                                                                                              Adjusment of ISAK 16
     Penyesuaian metode ekuitas          (245,970)    (172,875)          12,508               (285,236)      (116,758)       (44,045)        (852,376)        Adjustments of equity methods

     Jumlah tercatat                    1,029,990    1,811,731      7,606,839                4,926,740      2,091,670     1,988,498        19,455,468                   Total carrying value



     Pendapatan                           656,326     136,592       4,027,492                 5,228,943     2,714,928     1,022,860        13,787,142                             Revenue
     Beban pokok penjualan               (210,393)    (49,487)     (1,749,323)               (3,289,282)   (1,934,542)     (707,276)       (7,940,303)                      Cost of revenue
     Depresiasi dan amortisasi               (224)     (1,311)         (2,214)                        -             -       (27,138)          (30,887)        Depreciation and amortisation
     Pendapatan keuangan                    3,405           -             212                         -             -        58,048            61,664                       Finance income
     Beban keuangan                      (170,657)          -      (1,749,332)                        -      (219,557)     (217,947)       (2,357,493)                        Finance costs
     Beban operasi                              -      (7,711)        (48,140)                 (885,188)      (23,196)     (147,929)       (1,112,164)                  Operating expenses
     Pendapatan (beban) lain-lain,              -           -               -                         -             -             -                 -             Other income/(expenses)
         bersih                                 -      (1,220)        590,130                         -             -       350,097           939,007                                net
     Beban pajak penghasilan              (93,318)    (11,262)       (264,872)                   23,818      (123,682)      (34,219)         (503,535)                  Income tax expense

     Laba/(rugi) periode berjalan        185,138       65,602        803,953                 1,078,291       413,952        296,496         2,843,432             Profit/(loss) for the periode

     % kepemilikan efektif               37%         37%           51%                      30%             25%          30%-51%                                               % of ownership

     Bagian Grup atas laba/(rugi)                                                                                                                  The Group’s share in net income/(loss) for
          asosiasi periode berjalan       67,779       24,437        410,016                    323,487      103,488        118,038         1,047,245            the year of associates



     Laba/(rugi) komprehensif lainnya    (162,036)    132,892       1,474,370                    31,274       12,805        321,077         1,810,382                      The Group’s share
     Bagian Grup atas laba/(rugi)                                                                                                                                of other comprehensive
          komprehensif asosiasi           (59,321)     49,502        751,929                      9,382         3,201       109,365          864,058               income of associates

     Dividen yang diterima dari                                                                                                                                           Dividends received
          perusahaan asosiasi            (125,165)     (66,010)               -                       -             -                 -      (191,175)                   from associates
Page 88
                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/78 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

9.     INVESTASI PADA ENTITAS ASOSIASI DAN                                         9.       INVESTMENTS IN ASSOCIATES AND JOINT
       VENTURA BERSAMA (lanjutan)                                                           VENTURES (continued)

       Ventura bersama (lanjutan)                                                           Joint ventures (continued)

                                                                     31 Desember/ December 31, 2023
                                                                                                                  Lainnya/       Jumlah/
                                         BDSN         BPI             IRT          SGPJB            NSHE           Others         Total

     Kas dan setara kas                   599,714      209,818         509,503      3,194,233         233,384        949,926       5,696,578        Cash and cash equivalents
     Aset lancar lainnya                                                                                                                                  Other current assets
        (tidak termasuk kas)              611,023      673,896           28,287     2,477,130         209,434       1,885,437      5,885,207              (excluding cash)

     Jumlah aset lancar                  1,210,737     883,714         537,790      5,671,363         442,818       2,835,363     11,581,785                 Total current assets

     Aset tidak lancar                   5,629,893    4,430,640      45,536,417    28,000,415       14,212,401      9,809,054    107,618,820                 Non-current assets

     Liabilitas keuangan                                                                                                                                      Financial liabilities
         Utang usaha                       65,526       91,815          136,834        25,233               -         322,721        642,129                 Trade payables
         Liabilitas lancar lainnya        198,803      101,541        1,199,738     1,911,154         764,924       1,314,779      5,490,939        Other financial liabilities

     Jumlah liabilitas lancar             264,329      193,356        1,336,572     1,936,387         764,924       1,637,500      6,133,068              Total current liabilities

     Liabilitas                                                                                                                                                        Liabilities
     Liabilitas keuangan                 2,244,129           -                -    13,206,945        5,253,892      6,134,353     26,839,319                  Financial liabilities
     Liabilitas lainnya                  1,189,370     591,295       32,100,588     3,217,640          720,152      1,029,199     38,848,244                     Other liabilities

     Jumlah liabilitas tidak lancar      3,433,499     591,295       32,100,588    16,424,585        5,974,044      7,163,552     65,687,563       Total of non-current liabilities

     Aset bersih                         3,142,802    4,529,703      12,637,047    15,310,806        7,916,251      3,843,365     47,379,974                           Net assets

     % kepemilikan                         36.61%       40.25%          51.00%           30.00%        25.00% 25.00%-51.00%                                      % of ownership

     Bagian Grup atas aset bersih                                                                                                                 The Group’s share of the net
        ventura bersama                  1,150,580    1,823,205       6,444,894     4,593,242        1,979,063      1,425,858     17,416,842          assets of joint ventures
     Penyesuaian metode ekuitas             (3,883)     (19,403)              -           629            5,918         83,167         66,428     Adjustments of equity methods

     Jumlah tercatat                     1,146,697    1,803,802       6,444,894     4,593,871        1,984,981      1,509,025     17,483,270               Total carrying value

     Pendapatan                            632,625    1,056,929      11,016,251    10,028,632        4,372,076      3,978,925     31,085,438                           Revenue
     Beban pokok pendapatan                (21,594)    (783,257)     (7,077,375)   (6,677,829)      (3,381,658)    (2,722,479)   (20,664,192)                   Cost of revenue
     Depresiasi dan amortisasi              (1,650)     (14,013)              -       (16,889)               -        (59,438)       (91,990)     Depreciation and amortisation
     Pendapatan keuangan                     3,681        1,922             336       159,838                -         11,201        176,978                    Finance income
     Beban keuangan                       (170,697)        (140)     (2,589,954)   (1,388,379)        (219,994)      (528,574)    (4,897,738)                  Interest expense
     Beban operasi                         (42,712)     (90,904)        (36,031)     (201,312)         (42,732)      (167,693)      (581,384)              Operating expenses
     Pendapatan/(beban) lain-lain,
        bersih                               8,737       83,638         932,857           75,475           359         74,743      1,175,809      Other income/(expense) - net
     Beban pajak penghasilan               (88,602)    (103,497)       (401,836)         (35,233)     (173,043)       (97,814)      (900,025)              Income tax expense

     Laba tahun berjalan                  319,788      150,678        1,844,248     1,944,303         555,008        488,871       5,302,896                   Profit for the year

     % kepemilikan                         36.61%       40.25%          51.00%           30.00%        25.00% 25.00%-51.00%                                      % of ownership

                                                                                                                                                        The Group’s share of
     Bagian Grup atas laba bersih                                                                                                                           net income for
        ventura bersama tahun berjalan    117,074       60,648         940,566          583,291       138,752        180,682       2,021,013     the year of joint ventures

     Kerugian komprehensif                                                                                                                                 Other comprehensive
        lainnya                            (96,737)     (43,599)       (370,845)        (124,228)      (44,343)        (6,825)      (686,577)                          loss

     Bagian atas kerugian                                                                                                                       Share of other comprehensive
        komprehensif lainnya                                                                                                                                            loss
        ventura bersama                    (35,415)     (17,549)       (189,131)         (37,268)      (11,086)        (2,809)      (293,258)              of joint ventures

     Dividen yang diterima dari                                                                                                                            Dividends received
         perusahaan ventura bersama       (151,212)      (6,224)              -         (210,051)            -        (65,752)      (433,239)           from joint ventures


       Investasi pada entitas di atas diperoleh terutama                                    The investments in the above entities are held
       untuk tujuan potensi pertumbuhan jangka panjang,                                     primarily for long-term growth potential, since these
       karena seluruh entitas tersebut bergerak dalam                                       entities are engaged in the same electricity industry as
       industri ketenagalistrikan yang sama dengan                                          the Group. Management believes that there is no
       industri Grup. Manajemen meyakini bahwa tidak                                        indication of impairment.
       ada indikasi penurunan nilai.


10. PIUTANG PIHAK BERELASI                                                         10. RECEIVABLES FROM RELATED PARTIES
                                                            30 Juni/               31 Desember/
                                                            June 30,               December 31,
                                                              2024                     2023

            SGPJB                                                 575,503                      578,667                                            SGPJB
            REP                                                   479,272                      437,855                                              REP
            PDG                                                    18,781                       36,387                                              PDG
            PMSE                                                  129,912                      136,437                                             PMSE
            GCL                                                     5,189                       58,923                                              GCL
            IPB                                                     2,145                        1,411                                               IPB
            Lain-lain                                              29,897                       29,733                                            Others

            Jumlah                                          1,240,699                       1,279,413                                                  Total

            Dikurangi: bagian lancar                               84,107                      251,026                  Less: current portion

            Bagian tidak lancar                             1,156,592                       1,028,387                        Non-current portion
Page 89
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/79 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES        FROM      RELATED       PARTIES
                                                                (continued)

    SGPJB                                                      SGPJB

    Pada tanggal 20 November 2018, PLN NR, entitas             On November 20, 2018, PLN NR, a PNP subsidiary,
    anak PNP, memberikan pinjaman jangka panjang               granted a long-term loan to SGPJB amounting to
    sebesar USD56.516.733 kepada SGPJB dengan                  USD56,516,733 with an interest rate of LIBOR 6
    suku bunga LIBOR 6 bulan + 4%. Pinjaman akan               months + 4%. The loan will mature on December 15,
    jatuh tempo pada tanggal 15 Desember 2033.                 2033. The interest will be due every January 15 and
    Pelunasan pembayaran bunga dilakukan setiap                July 15. PLN NR and SGPJB obtained approval from
    tanggal 15 Januari dan 15 Juli. PLN NR dan SGPJB           the General Meeting of Shareholders to change the
    telah mendapatkan persetujuan dari Rapat Umum              interest rate benchmark from LIBOR to SOFR,
    Pemegang Saham untuk melakukan perubahan                   effective from May 12, 2023. During period June 30,
    acuan suku bunga dari LIBOR menjadi SOFR,                  2024, SGPJB there was no loan payments (2023:
    berlaku efektif pada tanggal 12 Mei 2023. Selama           USD17,389,764 or equivalent to Rp264,603).
    periode sampai dengan 30 Juni 2024, SGPJB
    belum melakukan pembayaran pinjaman (2023:
    USD17.389.764 atau setara dengan Rp264.603).

    Pada tanggal 30 Juni 2024, saldo piutang pokok             As at June 30, 2024, PNP’s principal outstanding loan
    pinjaman PNP dari SGPJB adalah sebesar                     balance from SGPJB was USD34,776,970
    USD34.776.970 (setara dengan Rp570.133) dan                (equivalent to Rp570,133) and interest receivables
    piutang bunga sebesar USD4.516.878 (setara                 amounted to USD4,516,878 (equivalent to Rp74,050).
    dengan Rp74.050).

    Pada tanggal 31 Desember 2023, saldo piutang               As at December 31, 2023, PNP’s principal
    pokok pinjaman PNP dari SGPJB adalah sebesar               outstanding loan balance from SGPJB was
    USD34.779.528 (setara dengan Rp536.960) dan                USD34,779,528 (equivalent to Rp536,960) and
    piutang bunga sebesar USD2.545.639 (setara                 interest receivables amounted to USD2,545,639
    dengan Rp41.707).                                          (equivalent to Rp41,707).
    REP                                                        REP
    Pada tanggal 4 Juli 2014, PIP, entitas anak,               On July 4, 2014, PIP, a subsidiary, provided a long-
    memberikan pinjaman jangka panjang sebesar                 term loan of USD9,399,962 to REP, an associate, for
    USD9.399.962 kepada REP, entitas asosiasi, untuk           the financing of the 46.6 MW project at Hydroelectric
    membiayai proyek 46,6 MW di Pembangkit Listrik             Power Plant (“HPP”) Citarum River at Cianjur, West
    Tenaga Air (“PLTA”) Sungai Citarum di Cianjur,             Java. This loan bears an interest rate of 10% per
    Jawa Barat. Pinjaman ini dikenakan bunga 10% per           annum with a 17.5 year term of repayment after      a
    tahun dengan jangka waktu 17,5 tahun setelah               grace period during construction. The Commercial
    grace period selama pembangunan. Tanggal                   Operation Date (“COD”) has been amended, most
    operasi komersial PLTA telah diamandemen,                  recently through the First Amendment of PPA dated
    terakhir kali melalui Amandemen Pertama atas               August 10, 2017, to become 57 months after the
    PJBTL tertanggal 10 Agustus 2017, menjadi       57         financial close date. On May 12, 2019, the HPP
    bulan setelah tanggal pendanaan. Pada tanggal 12           Rajamandala 1 x 47 MW was commercially operated
    Mei 2019, PLTA Rajamandala 1 x 47 MW telah                 based on COD certificate No. 188.BA/159/REP/2019.
    beroperasi secara komersial berdasarkan sertifikat         The principal shall be invoiced and due every six
    tanggal operasi komersial No. 188.BA/159                   months starting on COD.
    /REP/2019. Pokok pinjaman akan ditagihkan dan
    terutang setiap enam bulan sejak tanggal operasi
    komersial.

    Pada tanggal 23 November 2016, PIP memberikan              On November 23, 2016, PIP provided additional loans
    tambahan pinjaman sebesar USD5.724.490 kepada              of USD5,724,490 to REP with similar terms and
    REP dengan persyaratan dan kondisi yang sama               conditions to the previous loan.
    dengan pinjaman sebelumnya.
Page 90
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/80 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES        FROM      RELATED       PARTIES
                                                                (continued)

    REP (lanjutan)                                             REP (continued)

    Pada tanggal 30 Juni 2024, saldo pokok pinjaman            As at June 30, 2024, PIP’s principal amounts due from
    PIP kepada REP adalah sebesar USD15.124.452                REP is USD15,124,452 or equivalent to Rp247,950
    atau     setara   dengan    Rp247.950     (2023:           (2023: USD15,124,452 or equivalent to Rp233,057)
    USD15.124.452 atau setara dengan Rp233.507)                and interest receivables amounted to USD13,753,711
    dan piutang bunga sebesar USD13.753.711 atau               or equivalent to Rp225,478 (2023: USD12,999,569 or
    setara dengan Rp225.478 (2023: USD12.999.569               equivalent to Rp200,700). Other receivables of
    atau setara dengan Rp200.700). Piutang lainnya             Rp5,843 (2023: Rp3,648) represent costs of
    sebesar Rp5.843 (2023: Rp3.648) merupakan biaya            employee relocation and operation and maintenance
    relokasi pegawai dan pendapatan jasa operasi dan           services revenue.
    pemeliharaan.

    Pada periode yang berakhir 30 Juni 2024,                   During the period ended June 30, 2024, interest
    penghasilan bunga masing-masing adalah sebesar             income amounted to USD1,512,445 or equivalent to
    USD1.512.445 atau setara dengan Rp24.795                   Rp24,795 (2023: USD1,512,445 or equivalent to
    (2023: USD1.512.445 atau setara dengan                     Rp23,350) which is presented in the consolidated
    Rp23.350) yang disajikan dalam laporan laba rugi           statements of profit or loss.
    konsolidasian.

    Pada periode yang berakhir 30 Juni 2024 dan 31             During period ended June 30, 2024 and December
    Desember 2023, tidak ada pembayaran kembali                31, 2023, there was no repayment of the loan
    pokok pinjaman dan bunga yang dibayarkan oleh              principal and interest paid by REP. PIP is not
    REP. PIP tidak berhak untuk meminta pembayaran             entitled to request repayment of loan principal
    kembali atas pokok pinjaman yang diberikan                 provided to REP before the Senior Facility Release
    kepada REP sebelum Tanggal Pembebasan                      Date, while interest paid by REP should fulfil several
    Fasilitas Senior, namun untuk pembayaran bunga             terms and conditions as stated in the shareholder
    yang dilakukan oleh REP harus memenuhi syarat              agreement as follows:
    dan kondisi yang tertuang dalam perjanjian
    pemegang saham sebagai berikut:
    - Uang yang ada pada kredit dari Rekening                  - The monies stand to the credit of the Distribution
      Distribusi; atau                                           Accounts; or
    - Sumber - sumber lain yang dapat disetujui secara         - Other sources as may be approved in writing by
      tertulis oleh Agen Antar Kreditur.                         the Intercreditor Agent.

    PDG                                                        PDG
    Pada tanggal 12 Juni 2013, PIP, entitas anak,              On June 12, 2013, PIP, a subsidiary, granted a long-
    memberikan pinjaman jangka panjang sebesar                 term loan amounting to USD18,837,112 to PDG, a
    USD18.837.112 kepada PDG, ventura bersama,                 joint venture, for financing the PLTU Tambak Lorok,
    untuk membiayai proyek PLTU Tambak Lorok,                  Semarang. On November 30, 2015, PIP made an
    Semarang. Pada tanggal 30 November 2015, PIP               amendment to the long-term loan given to PDG which
    melakukan amandemen atas pinjaman jangka                   resulted in the revision of the total loan granted to
    panjang yang diberikan kepada PDG sehingga                 become USD18,191,529 in accordance with the funds
    jumlah pinjaman berubah menjadi USD18.191.529              transferred up to January 9, 2014, and the tenor of the
    sesuai dengan jumlah seluruh pencairan hingga              loan was amended to eight years and will be due on
    tanggal terakhir yakni 9 Januari 2014 dan jangka           December 1, 2023. This loan bears an interest of rate
    waktu pinjaman berubah menjadi delapan tahun               6.5% per annum.
    yang akan jatuh tempo pada 1 Desember 2023.
    Pemberian pinjaman ini dikenakan bunga 6,5%
    per tahun.
    Jumlah bunga atas pokok pinjaman terutang selama           The total interest on the principal during the
    masa pembangunan proyek (Interest During                   construction of the project (Interest During
    Construction) dihitung sejak tanggal pencairan dana        Construction) is effective from the date of cash
    sampai tanggal 30 Mei 2014 dan dibayarkan secara           withdrawal until May 30, 2014 and was fully paid on
    penuh pada tanggal 1 Juni 2016. Pokok pinjaman             June 1, 2016. The principal shall be collected every
    akan ditagihkan setiap 6 bulan dari tanggal 1 Juni         six months from June 1, 2016 until December 1, 2023.
    2016 sampai dengan 1 Desember 2023.

    Pada periode sampai dengan 30 Juni 2024, PDG               Durind period ended June 30, 2024, PDG has made
    melakukan pembayaran pokok pinjaman sebesar                a principal loan repayment of USD1,136,971
    USD1.136.971 (setara dengan Rp18.639) dan                  (equivalent to Rp18,636) and interest amounting to
    bunga sebesar USD8.622 (setara dengan Rp141)               USD8,622 (equivalent to Rp141) (2023: principal
    (2023: pokok USD2.273.941 (setara dengan                   USD2,273,941 (equivalent to Rp34,681) and interest
    Rp34.681) dan bunga sebesar USD680.250 (setara             amounting to USD680,250 (equivalent to Rp10,361)).
    dengan Rp10.361)).
Page 91
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/81 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                       10. RECEIVABLES        FROM      RELATED       PARTIES
                                                                (continued)

    PDG (lanjutan)                                             PDG (continued)

    Pada tanggal 30 Juni 2024 dan 31 Desember 2023,            As at June 30, 2024 and December 31, 2023, other
    piutang lainnya sebesar RpNihil dan Rp754,                 receivables amounted to RpNihil and Rp754
    merupakan piutang atas bunga dan biaya pegawai.            respectively, representing interest receivables and
                                                               employee costs.

    GCL                                                        GCL

    Pada tanggal 27 Juni 2023, GCL, entitas asosiasi           On June 27, 2023, GCL, the associates of PIP,
    PIP, melalui Rapat Umum Pemegang Saham                     through the General Meeting of Shareholders (“GMS”)
    (“RUPS”)   No.    005/GMS-GCLIT/2023       telah           No. 005/GMS-GCLIT/2023, declared its dividends to
    mengumumkan dividen kepada IPRen, entitas anak             IPRen, the subsidiary of PIP, which amounted to
    PIP, sebesar USD3.500.000 (setara dengan                   USD3,500,000 (equivalent to Rp52,591).
    Rp52.591).

    Pada tanggal 30 Juni 2024 dan 31 Desember 2023,            As at June 30, 2024 and December 31, 2023, PIP’s
    saldo piutang PIP dari GCL masing-masing adalah            principal outstanding loan balance from GCL was
    sebesar USD316.530 (setara dengan Rp5.189) dan             USD316,530       (equivalent to   Rp5,189)     and
    USD3.816.530 (setara dengan Rp58.923)                      USD3,816,530 (equivalent to Rp58,923) respectively.

    GCL      telah  membayar     IPRen    sebesar              GCL has paid IPRen for USD4,200,000 (equivalent to
    USD4.200.000 (setara dengan Rp68.855) dan sisa             Rp68,855) and the remaining amount that has not
    saldo yang belum dibayar sebesar USD316.530                been paid amounted to USD316,530 (equivalent to
    (setara dengan Rp5.189).                                   Rp5,189).

    PMSE                                                       PMSE

    Pada tanggal 30 Juni 2024, saldo piutang pokok             As at June 30, 2024, PMSE’s principal outstanding
    pinjaman PMSE dari PJBIC adalah sebesar                    loan balance from PJBIC was USD8,588,400
    USD8.588.400 (setara dengan Rp140.798) dan                 (equivalent to Rp140,798), and the balance of interest
    piutang bunga sebesar USD257.010 (setara                   receivables amounted to USD257,010 (equivalent to
    dengan Rp4.213).                                           Rp4,213).

    Pada tanggal 31 Desember 2023, , saldo piutang             As at December 31, 2023, PMSE’s principal
    pokok pinjaman PMSE dari PJBIC adalah sebesar              outstanding loan balance from PJBIC was
    USD8.588.400 (setara dengan Rp132.396) dan                 USD8,588,400 (equivalent to Rp132,396), and the
    piutang bunga sebesar USD225.193 (setara                   balance of interest receivables amounted to
    dengan Rp4.041).                                           USD225,193 (equivalent to Rp4,041).

    IPB                                                        IPB

    Pada tanggal 25 Oktober 2023, IPB melalui Rapat            On October 25, 2023, IPB through the General
    Umum Pemegang Saham (“RUPS”) telah                         Meeting of Shareholders (“GMS”), declared its
    mengumumkan dividen kepada PIP sebesar                     dividends to PIP, which amounted to Rp1,881. IPB
    Rp1.881. IPB telah membayar kepada PIP sebesar             has paid PIP Rp470, and the remaining amount that
    Rp470 dan sisanya yang belum dibayarkan sebesar            has not been paid amounted to Rp1,411.
    Rp1.411.
Page 92
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/82 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

10. PIUTANG PIHAK BERELASI (lanjutan)                             10. RECEIVABLES        FROM       RELATED         PARTIES
                                                                      (continued)

    Manajemen Grup berpendapat bahwa penyisihan                      Management of the Group is of the opinion that the
    atas kerugian kredit ekspektasian atas piutang                   provision for expected credit losses of receivables
    pihak berelasi tidak material, sehingga penyisihan               from related parties is not material, therefore, a
    atas kerugian kredit ekspektasian dianggap tidak                 provision for expected credit losses is not considered
    diperlukan pada 30 Juni 2024 dan 31 Desember                     necessary as at June 30, 2024 and December 31,
    2023.                                                            2023.

    Lihat Catatan 51 untuk informasi rincian transaksi               Refer to Note 51 for the information on the details of
    dan saldo dengan pihak berelasi.                                 transactions and balances with related parties.


11. REKENING BANK DIBATASI                                        11. RESTRICTED CASH IN BANKS
    PENGGUNAANNYA
                                                  30 Juni/          31 Desember/
                                                  June 30,          December 31,
                                                    2024                2023

   Angsuran sewa pembiayaan dan                                                                       Lease installments and
    jaminan operasi                                                                                    operation guarantee
    Rekening bank                                                                                               Cash in bank
      Sumitomo Mitsui                                                                                     Sumitomo Mitsui
        Banking Corporation, Singapura                                                    Banking Corporation, Singapore
        JPY                                          2,494,443           3,442,122                                 JPY
        USD                                            937,336             878,677                                USD

   Jaminan bank garansi                                                                                        Bank guarantee
     Pihak berelasi:                                                                                             Related parties:
       PT Bank Rakyat Indonesia (Persero) Tbk                                         PT Bank Rakyat Indonesia (Persero) Tbk
       (“Bank Rakyat Indonesia”)                                                                   (“Bank Rakyat Indonesia”)
         Rupiah                                        86,819               20,057                                 Rupiah
         USD                                                -               31,032                                   USD
       PT Bank Mandiri (Persero) Tbk                                                           PT Bank Mandiri (Persero) Tbk
       (“Bank Mandiri”)                                                                                      (“Bank Mandiri”)
         Rupiah                                        90,105               51,756                                 Rupiah
         USD                                                -               39,369                                   USD
       PT Bank Negara Indonesia (Persero) Tbk                                         PT Bank Negara Indonesia (Persero) Tbk
       (“Bank Negara Indonesia”)                                                                   (“Bank Negara Indonesia”)
         Rupiah                                              49              2,643                                 Rupiah
       PT Bank Pembangunan Daerah                                                             PT Bank Pembangunan Daerah
       ("Bank Jatim")                                                                                           ("Bank Jatim")
         Rupiah                                                               459                                    Rupiah
     Pihak ketiga:                                                                                                 Third parties:
       PT Bank KB Bukopin Tbk                                                                        PT Bank KB Bukopin Tbk
       (“Bank Bukopin”)                                                                                     (“Bank Bukopin”)
         Rupiah                                        16,749               16,749                                 Rupiah
       PT Bank CIMB Niaga Tbk                                                                        PT Bank CIMB Niaga Tbk
       ("CIMB Niaga")                                                                                          ("CIMB Niaga")
         Rupiah                                               -             50,236                                 Rupiah
   Subjumlah                                         3,625,501           4,533,100                                     Subtotal
   Cadangan kerugian kredit ekspektasian                    (2)                 (2)           Allowance for expected credit loss

   Jumlah                                            3,625,499           4,533,098                                         Total

   Dikurangi: bagian lancar                              9,641              99,019                        Less: current portion

   Bagian tidak lancar                               3,615,858           4,434,079                        Non - current portion



   Tingkat bunga deposito                                                                             Interest rate per annum
      berjangka per tahun                                                                                    on time deposits
      Rupiah                                    1.50% - 5.42%       1.50% - 5.42%                                       Rupiah
      USD                                               3.61%       3.80% - 4.50%                                         USD

    Perusahaan menempatkan dana cadangan pada                        The Company established a reserve account with
    Sumitomo Mitsui Banking Corporation, Singapura                   Sumitomo Mitsui Banking Corporation, Singapore
    sebesar JPY24.482.636.563 dan USD57.175.525                      amounting     to     JPY24,482,636,563        and
    pada tanggal 30 Juni 2024 (2023: JPY31.519.528.142               USD57,175,525 as at June 30, 2024 (2023:
    dan USD56.912.835) untuk memenuhi persyaratan                    JPY31,519,528,142 and USD56,912,835) to fulfil the
    Financial Lease Agreement (Catatan 26).                          requirements of the Financial Lease Agreement
                                                                     (Note 26).
Page 93
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/83 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)


11. REKENING        BANK                        DIBATASI       11. RESTRICTED CASH IN BANKS (continued)
    PENGGUNAANNYA (lanjutan)

    Jaminan bank garansi merupakan rekening bank                   Bank guarantees represent cash in banks and were
    yang digunakan untuk jaminan pelaksanaan proyek                used as collateral for projects and services provided
    dan pemberian jasa oleh Grup.                                  by the Group.
    Rincian rekening bank dibatasi penggunaannya                   Details of restricted cash in banks by currency are as
    berdasarkan mata uang adalah sebagai berikut:                  follows:

                              30 Juni 2024/ June 30, 2024              31 Desember/ December 31, 2023
                           Dalam mata                                   Dalam mata
                           uang original/                              uang original/
                            In original        Ekuivalen Rp/             In original     Ekuivalen/
                           currencies *)       Equivalent Rp           currencies *)     Equivalent

     Rupiah                          193,720           193,720                  141,901                          141,901        Rupiah
     JPY                     24,482,636,563         2,494,443           31,519,528,142                        3,442,122           JPY
     USD                         57,175,525           937,336               61,472,835                          949,078           USD
     Jumlah                                         3,625,498                                                 4,533,101           Total
   *) Dalam jumlah penuh, kecuali Rupiah                               *) In full amount, except for Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi             Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                               transactions and balances with related parties.


12. ASET TIDAK LANCAR LAIN                                     12. OTHER NON-CURRENT ASSETS
                                                    30 Juni/                    31 Desember/
                                                    June 30,                    December 31,
                                                      2024                          2023

     Properti pertambangan                              1,813,180                       1,832,596                     Mining properties

     Uang muka                                                                                                               Advances
        Pengembangan proyek                             4,350,634                       2,702,707               Project development
        Pembelian batubara                                125,314                         103,254                  Purchase of coal

     Subjumlah                                          4,475,949                       2,805,961                              Subtotal


     Biaya dibayar di muka                                                                                           Prepaid expenses
        Pembelian gas                                       167,295                        76,902                    Gas purchased
        Lain-lain                                           297,636                       225,991                            Others
     Subjumlah                                              464,931                       302,893                              Subtotal

     Aset takberwujud                                                                                                  Intangible assets
        Piranti lunak                                       532,724                       547,829                            Software
        Biaya legal terkait perpanjangan                                                                      Legal costs for renewal
            tanah dan hak atas tanah                        260,801                       371,794                    land of rights



     Subjumlah                                              793,525                       919,623                              Subtotal

     Biaya kontrak                                          966,170                     1,060,056                          Contract cost

     Lain-lain                                                 2,826                        19,811                               Others
     Jumlah                                             8,516,581                       6,940,940                                 Total




    Manajemen Grup meyakini bahwa properti                         Management of the Group believes that the mining
    pertambangan, uang muka, dan biaya dibayar di                  properties, advances, and prepayments are
    muka dapat dipulihkan.                                         recoverable.
    Beban amortisasi aset tak berwujud dan biaya                   Amortisation of intangible assets and contract cost for
    kontrak untuk tahun yang berakhir pada tanggal 30              the years ended June 30, 2024 and 2023, amounting
    Juni 2024 dan 2023, masing-masing sebesar                      to Rp489,077 and Rp252,002 respectively, is
    Rp489.077 dan Rp252.002 disajikan sebagai beban                presented as part of other operating expenses (Note
    usaha lain-lain (Catatan 44).                                  44).
Page 94
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/84 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS                                        13. CASH AND CASH EQUIVALENTS

                                             30 Juni/         31 Desember/
                                             June 30,         December 31,
                                               2024               2023


 Kas                                              16,357              9,539                               Cash on hand
 Bank                                                                                                     Cash in banks
   Entitas yang berelasi dengan
     Pemerintah                                                                           Government related entities
       Bank Rakyat Indonesia                                                                Bank Rakyat Indonesia
        Rupiah                                  3,384,427         8,464,570                              Rupiah
        USD                                     3,004,911         8,561,088                                USD
        EUR                                       134,735           130,260                                EUR
        JPY                                        21,199            18,189                                 JPY
       Bank Negara Indonesia                                                               Bank Negara Indonesia
        Rupiah                                  8,256,298        10,324,109                              Rupiah
        USD                                     1,257,875         4,484,442                                USD
        EUR                                         4,016            14,700                                EUR
        JPY                                        47,500            49,760                                 JPY
        MYR                                         2,860             3,058                                MYR
       Bank Mandiri                                                                                 Bank Mandiri
        Rupiah                                  6,935,842        14,225,085                              Rupiah
        USD                                     1,535,966           941,420                                USD
        EUR                                        32,205            39,425                                EUR
        JPY                                        48,979           169,555                                 JPY
        MYR                                         4,590             4,459                                MYR
        GBP                                             -                                                  GBP
       PT Bank DKI (“Bank DKI”)                                                          PT Bank DKI (“Bank DKI”)
        Rupiah                                   224,370            665,609                             Rupiah
        USD                                            -             44,274                                USD
        JPY                                            -                831                                 JPY
       Bank Tabungan Negara                                                                Bank Tabungan Negara
        Rupiah                                   591,987          1,689,507                              Rupiah
       Bank Syariah Indonesia                                                              Bank Syariah Indonesia
        Rupiah                                   465,100          1,048,175                              Rupiah
   Subjumlah                                   25,952,860        50,878,516                                   Subtotal
   Cadangan kerugian kredit ekspektasian                (6)             (16)        Allowance for expected credit loss
   Jumlah entitas yang berelasi                                                                     Total Government
       dengan Pemerintah                       25,952,854        50,878,500

   Pihak ketiga                                                                                        Third parties
     Bank Bukopin                                                                                   Bank Bukopin
       Rupiah                                     17,556             13,904                              Rupiah
       JPY                                        30,171             32,337                                 JPY
       USD                                         7,632              7,185                                 USD
       EUR                                                                                                  EUR
     PT Bank Central Asia Tbk                                                            PT Bank Central Asia Tbk
       (“Bank Central Asia”)                                                                (“Bank Central Asia”)
       Rupiah                                    226,485            200,950                              Rupiah
     PT Bank Danamon Indonesia Tbk                                               PT Bank Danamon Indonesia Tbk
       (“Bank Danamon”)                                                                       (“Bank Danamon”)
       Rupiah                                    313,814            716,187                              Rupiah
     PT Bank OCBC NISP Tbk                                                               PT Bank OCBC NISP Tbk
       (“Bank OCBC NISP”)                                                                  (“Bank OCBC NISP”)
       Rupiah                                     88,266            583,337                              Rupiah
       PT Bank Maybank Indonesia Tbk                                               PT Bank Maybank Indonesia Tbk
         (“Bank Maybank Indonesia”)                                                  (“Bank Maybank Indonesia”)
         (dahulu Bank Internasional                                                  (formerly Bank Internasional
         Indonesia)                                                                                    Indonesia)
         Rupiah                                   62,747            260,418                              Rupiah
       Lain-lain (masing-masing                                                                            Others
         dibawah 5% dari jumlah)                                                        (each below 5% of total)
         Rupiah                                   135,736           349,974                              Rupiah
         USD                                    1,437,468           953,748                                 USD
         EUR                                        8,403           370,915                                 EUR
         Dinar Kuwait                              18,846            10,356                                KWD
   Subjumlah                                    2,347,124         3,499,311                                   Subtotal
   Cadangan kerugian kredit ekspektasian               (2)               (3)        Allowance for expected credit loss
   Jumlah pihak ketiga                          2,347,122         3,499,308                         Total third parties
 Jumlah kas dan bank                           28,316,333        54,387,347           Total cash on hand and in banks
Page 95
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/85 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

13. KAS DAN SETARA KAS (lanjutan)                                  13. CASH AND CASH EQUIVALENTS (continued)

                                                  30 Juni/          31 Desember/
                                                  June 30,          December 31,
                                                    2024                2023

   Setara kas - deposito berjangka                                                                    Cash equivalents - time deposits
    Pihak berelasi                                                                                                  Related parties
       Bank Negara Indonesia                                                                              Bank Negara Indonesia
         Rupiah                                         25,776               135,735                                     Rupiah
         USD                                                 -               169,829                                        USD
       Bank Mandiri                                                                                                 Bank Mandiri
         Rupiah                                         11,700                76,150                                     Rupiah
         USD                                                 -                     -                                         USD
       Bank Tabungan Negara                                                                               Bank Tabungan Negara
         Rupiah                                               -               45,000                                     Rupiah
       Bank Rakyat Indonesia                                                                              Bank Rakyat Indonesia
         Rupiah                                      1,464,483               792,500                                     Rupiah
         USD                                             8,197               161,466                                        USD
       Bank Syariah Indonesia                                                                             Bank Syariah Indonesia
         Rupiah                                         60,010               130,000                                     Rupiah
     Jumlah pihak berelasi                           1,570,166              1,510,680                               Total related parties

     Pihak ketiga                                                                                                            Third parties
       Bank Bukopin                                                                                                    Bank Bukopin
         Rupiah                                         22,400                22,400                                        Rupiah
       Lain-lain (masing-masing                                                                                                  Others
         dibawah 5% dari jumlah)                                                                             (each below 5% of total)
         Rupiah                                            112                   112                                          Rupiah
     Jumlah pihak ketiga                                22,512                22,512                                Total third parties
     Jumlah deposito berjangka                       1,592,678              1,533,192                               Total time deposits
   Jumlah kas dan setara kas                       29,909,011           55,920,539                   Total cash and cash equivalent


   Tingkat bunga deposito berjangka                                                                             Interest rate per annum on
      per tahun                                                                                                             time deposits
      Rupiah                                     0.25% - 6.50%         3.73% - 4.92%                                               Rupiah
      USD                                                      -       2.98% - 3.75%                                                 USD
   Jangka waktu                               1 - 3 Bulan/Months    1 - 3 Bulan/Months                                              Maturity

    Rincian kas dan setara kas berdasarkan mata uang                   Details of cash and cash equivalents by currency are
    adalah sebagai berikut:                                            as follows:

                            30 Juni 2024/ June 30, 2024              31 Desember/ December 31, 2023
                         Dalam mata                                   Dalam mata
                         uang original/                              uang original/
                          In original        Ekuivalen Rp/             In original     Ekuivalen/
                         currencies *)      Equivalent Rp            currencies *)     Equivalent

    Rupiah                    22,303,459          22,303,459              39,753,262                    39,753,262                 Rupiah
    USD                      442,358,946           7,252,049             992,515,957                    15,323,453                   USD
    EUR                       10,229,550             179,359              32,499,596                       555,299                   EUR
    JPY                    1,451,109,606             147,848           2,478,548,665                       270,672                    JPY
    Lain-lain **)              2,496,602              26,297               1,157,691                        17,873               Others **)
    Jumlah                                        29,909,012                                            55,920,559                    Total

    *)   Dalam jumlah penuh, kecuali Rupiah                            *)    In full amount, except Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi                 Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                   transactions and balances with related parties.
Page 96
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/86 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

14. INVESTASI JANGKA PENDEK                                      14. SHORT-TERM INVESTMENTS

                                                 30 Juni/             31 Desember/
                                                 June 30,             December 31,
                                                   2024                   2023

    Deposito berjangka                                                                                         Time deposits
     Pihak berelasi                                                                                        Related parties
       Bank Rakyat Indonesia                                                                     Bank Rakyat Indonesia
         Rupiah                                       135,057                135,000                      Rupiah
         USD                                           19,200                355,407                           USD
       Bank Mandiri                                                                                      Bank Mandiri
         Rupiah                                          1,500                   303                      Rupiah
         USD                                                                 312,521                           USD
       Bank Negara Indonesia                                                                     Bank Negara Indonesia
         Rupiah                                             106                 5,227                     Rupiah
         USD                                                106                80,798                         USD
      Jumlah pihak berelasi                           155,969                889,256                    Total related parties


    Investasi lain-lain                                                                                     Other investments
      Rupiah                                             6,670                 24,414                                Rupiah
    Jumlah investasi jangka pendek                    162,639                913,670             Total short-term investments


   Tingkat bunga deposito berjangka                                                                   Interest rate per annum on
      per tahun                                                                                                   time deposits
      Rupiah                                   0.25% - 5.10%        4.42% - 5.04%                                       Rupiah
      USD                                      0.25% - 5.10%        2.04% - 3.57%                                         USD
   Jangka waktu                                                                                                           Maturity
      Rupiah                                    6 - 12 Bulan/         6 - 12 Bulan/                                     Rupiah
                                                     Months                Months
     USD                                        6 - 12 Bulan/         6 - 12 Bulan/                                       USD
                                                     Months                Months

    Lihat Catatan 51 untuk informasi rincian transaksi               Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                 transactions and balances with related parties.


15. PIUTANG USAHA                                                15. TRADE RECEIVABLES

                                                 30 Juni/           31 Desember/
                                                 June 30,           December 31,
                                                   2024                 2023



   Pihak berelasi                                                                                              Related parties
   Entitas berelasi dengan pemerintah               2,453,340            2,485,622                 Government related entities
   Cadangan kerugian kredit ekspektasian              (61,414)             (72,694)        Allowance for expected credit losses

   Subjumlah                                        2,391,926            2,412,928                                    Subtotal

   Pihak ketiga                                                                                                  Third parties
   Umum                                            28,772,085           27,639,793                                       Public
   Tentara Nasional Indonesia dan Kepolisian                                                   Tentara Nasional Indonesia and
     Negara Republik Indonesia                                                        Kepolisian Negara Republik Indonesia
     (TNI dan POLRI)                                 938,001               622,856                        (TNI dan POLRI)
   Lainnya                                                                                                Other institutions
   Sub jumlah                                      29,710,086           28,262,649                                    Sub total
   Cadangan kerugian kredit ekspektasian           (4,059,767)          (3,834,622)       Allowance for expected credit losses

   Subjumlah                                       25,650,319           24,428,027                                    Subtotal

   Jumlah, bersih                                  28,042,245           26,840,955                                   Total, net
Page 97
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/87 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

15. PIUTANG USAHA (lanjutan)                                   15. TRADE RECEIVABLES (continued)

    Analisis umur piutang usaha adalah sebagai                    The aging analysis of trade receivables is as follows:
    berikut:

                                                 30 Juni/         31 Desember/
                                                 June 30,         December 31,
                                                   2024               2023


     Belum jatuh tempo                            26,501,956          25,244,818                               Not yet due
     Lewat jatuh tempo                                                                                            Past due
       1 s/d 30 hari                                 570,183             542,714                          1 to 30 days
       31 s/d 60 hari                                320,273             370,391                          31 to 60 days
       61 s/d 360 hari                             1,206,589           1,563,547                       61 to 360 days
       Lebih dari 360 hari                         3,564,425           3,026,801                   More than 360 days
     Jumlah                                       32,163,426          30,748,271                                    Total




    Pergerakan    perubahan     cadangan        kerugian          The movement of changes in the allowance for
    penurunan nilai adalah sebagai berikut:                       impairment losses is as follows:
                                                30 Juni/         31 Desember/
                                                June 30,         December 31,
                                                  2024               2023


   Saldo awal                                     3,907,316          3,559,350                      Balance at beginning
   Penambahan                                       215,590            348,870                                 Additions
   Penghapusan                                       (1,725)              (904)                                 Write-off
   Saldo akhir                                    4,121,181          3,907,316                          Ending Balance



    Piutang usaha Perusahaan dan PLN Batam dijamin                The Company and PLN Batam’s trade receivables are
    sebagian dengan uang jaminan langganan jika                   partially secured by customer security deposits in
    terjadi kegagalan pembayaran (Catatan 34).                    case of default (Note 34).

    Pada tanggal 30 Juni 2024 dan 31 Desember 2023,               As at June 30, 2024 and December 31, 2023, all
    seluruh nilai tercatat piutang usaha Grup                     carrying amounts of the Group’s trade receivables
    berdominasi Rupiah.                                           were dominated in Rupiah.

    Pada tanggal 30 Juni 2024, sebagian dari piutang              As at June 30, 2024, some of the trade receivables of
    usaha      sebesar    Rp32.163.426     mengalami              Rp32,163,426 were impaired and have been
    penurunan nilai dan telah diprovisikan sebesar                provisioned by Rp4,121,181. The impaired trade
    Rp4.121.181. Piutang usaha yang diturunkan                    receivables mainly relate to public customers who
    nilainya terutama terkait dengan pelanggan umum               have not paid the receivables for more than six
    yang belum melakukan pembayaran piutang lebih                 months.
    dari Enam bulan.

    Manajemen berkeyakinan bahwa tidak ada risiko                 Management believes there is no heightened risk of
    kredit kualitas yang buruk atas piutang usaha                 poor credit quality of trade receivables because the
    karena Grup memiliki jumlah pelanggan yang besar,             Group has a broad customer base, dispersed across
    tersebar mencakup segmen pasar dan area                       varying market segments and geographic locations
    geografis yang luas di seluruh Indonesia.                     throughout Indonesia. This assessment is also
    Kesimpulan ini didukung juga oleh data historis               supported by the Group’s good historical collection
    kolektibilitas Grup atas piutang usaha yang baik              rates of trade receivables across the periods.
    selama beberapa periode. Oleh karena itu,                     Therefore, management is of the opinion that the
    manajemen berpendapat bahwa cadangan atas                     allowance for expected credit loss of trade receivables
    kerugian kredit ekspektasian atas piutang usaha               is adequate.
    adalah cukup.

    Lihat Catatan 51 untuk informasi rincian transaksi            Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                              transactions and balances with related parties.
Page 98
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/88 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH                                       16. RECEIVABLES FROM GOVERNMENT

    Piutang dari Pemerintah terdiri atas piutang                     Receivables from the Government consist of
    kompensasi dan piutang subsidi listrik kepada Grup.              compensation receivables and electricity subsidy
                                                                     receivables to the Group.
                                                 30 Juni/                 31 Desember/
                                                 June 30,                 December 31,
                                                   2024                       2023

   Piutang Kompensasi                                   46,493,492             17,835,197                      Compensation receivables

   Piutang subsidi listrik (catatan 37)                 12,191,137              4,611,801     Receivables on electricity subsidy (note 37)

   Total                                                58,684,629             22,446,998                                           Total

   Dikurangi: bagian lancar                             58,684,629             22,446,998                            Less: current portion

   Bagian tidak lancar                                        -                          -                            Non-current portion




    Piutang kompensasi                                               Compensation receivables

    Piutang kompensasi merupakan piutang atas                        Compensation receivables represent receivables of
    pendapatan kompensasi dari Pemerintah yang                       compensation revenue from the Government that
    belum diterima untuk penggantian perbedaan tarif                 have not yet been received for the difference between
    aktual dan tarif yang dihitung oleh Grup. Grup selalu            the actual tariffs charged versus the tariffs calculated
    menerima keputusan tarif tetap dari Pemerintah.                  by the Group. The Group has always accepted the
    Dengan kata lain, perhitungan yang dilakukan oleh                fixed electricity tariff decision from the Government. In
    Grup terkait tarif listrik tidak disetujui oleh                  other words, the calculation of the electricity tariff
    Kementerian        ESDM.        Grup      diharuskan             proposed by the Group was not approved by the
    menggunakan tarif listrik tetap yang sudah disetujui             Ministry of ESDM. The Group was required to use a
    atau tarif aktual.                                               fixed electricity tariff that had been approved or the
                                                                     actual tariff.

    Berdasarkan       PMK        No.    159/PMK.02/2022,             Based on PMK No. 159/PMK.02/2022, the Company
    Perusahaan mencatat pendapatan dan piutang                       records compensation income and receivables in
    kompensasi sesuai dengan asersi manajemen dan                    accordance with management estimates and they will
    akan ditetapkan sebagai kebijakan               dana             be finally determined based on the compensation fund
    kompensasi oleh Menteri Keuangan berdasarkan                     policy by the Minister of Finance based on the results
    hasil reviu oleh BPKP. Finalisasi kebijakan dana                 of the review by BPKP. Finalisation of the
    kompensasi tersebut akan dilakukan berdasarkan                   compensation fund policy will be made based on the
    LHP BPK. Perbedaan yang timbul dari hasil audit                  LHP of the BPK. Any differences from the audit of BPK
    BPK akan mempengaruhi laba rugi pada tahun audit                 will impact profit or loss in the year the audit is
    tersebut difinalisasi. Nilai piutang kompensasi pada             finalised. The amount of compensation receivables
    tanggal 31 Desember 2022 dan 2023 diakui                         as at December 31, 2022 and 2023 was recognised
    berdasarkan estimasi terbaik manajemen yang                      based on management’s best estimate which will be
    akan direviu oleh BPKP dan/atau BPK.                             reviewed by BPKP and/or BPK.
Page 99
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/89 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

16. PIUTANG DARI PEMERINTAH (lanjutan)                      16. RECEIVABLES FROM GOVERNMENT (continued)

    Piutang kompensasi (lanjutan)                              Compensation receivables (continued)

    Berdasarkan surat BPKP No. PE.12.03/S-                     Based on letter from BPKP No. PE.12.03/S-
    133/D4/04/2024 tanggal 13 Februari 2024,                   133/D4/04/2024 dated February 13, 2024, the
    disampaikan penggantian biaya pokok penyediaan             reimbursement of cost of sales in the form of
    dalam bentuk kompensasi dari Pemerintah atas               compensation from the Government for potential loss
    kehilangan potensi pendapatan tenaga listrik untuk         of electricity income for the 2023 non-subsidised tariff
    golongan tarif non-subsidi tahun 2023 sebesar              group is amounting to Rp74,170,900 (2022:
    Rp74.170.900 (2022: Rp64.325.806). Namun,                  Rp64,325,806). However, based on the Government
    berdasarkan       Kebijakan     Pemerintah    atas         Policy regarding PT PLN (Persero)'s Revenue
    Kekurangan Penerimaan PT PLN (Persero) akibat              Shortfall due to the 2023 Electricity Tariff
    Penetapan Tarif Tenaga Listrik Tahun 2023 yang             Determination issued by the Ministry of Finance on
    diterbitkan oleh Kementerian Keuangan tanggal 13           June 13, 2024, the value of the compensation fund in
    Juni 2024, nilai dana kompensasi pada tahun 2023           2023 is Rp74,014,279. During 2023, the Group has
    sebesar Rp74.014.279. Selama tahun 2023, Grup              received compensation payments for 2023 amounting
    telah menerima pembayaran kompensasi tahun                 to Rp56,179,082 and during the period ending 31
    2023 sebesar Rp56.179.082 dan selama periode               December 2023, the Group has received a shortfall in
    yang berakhir pada tanggal 31 Desember 2023,               compensation payments for 2022 amounting to
    Grup telah menerima kekurangan pembayaran                  Rp16,770,789 with details received in cash amounting
    kompensasi tahun 2022 sebesar Rp16.770.789                 to Rp16,094,804 and set-off with excess
    dengan      rinciannya   diterima  kas     sebesar         compensation received in 2022 from the Government
    Rp16.094.804 dan disalinghapuskan dengan                   amounting to Rp675,985 the balance compensation
    kelebihan penerimaan kompensasi tahun 2022 dari            receivables at 2023 Rp17,835,197.
    Pemerintah sebesar Rp675.985 sehingga saldo
    piutang kompensasi tahun 2023 Rp17.835.197.

    Selama tahun 2024 grup telah menerima                      During 2024 group has received payments of 2023
    pembayaran kompensasi sebesar Rp17.835.197                 compensation amounting to Tp17,835,197. The
    sehingga saldo piutang kompensasi pada tanggal             balance compensation receivables at June 30, 2024
    30 Juni 2024 sebesar Rp46.493.492                          were amounted Rp46,493,492

    Lihat Catatan 37 untuk informasi rincian piutang           Refer to Note 37 for information on the details of
    subsidi listrik.                                           receivables for electricity subsidy.

    Lihat Catatan 51 untuk informasi rincian transaksi         Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                           transactions and balances with related parties.
Page 100
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/90 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

17. PIUTANG LAIN-LAIN                                       17. OTHER RECEIVABLES


                                                 30 Juni/           31 Desember/
                                                 June 30,           December 31,
                                                   2024                 2023

    Karyawan                                        1,167,841             1,437,587                          Employees
    Pekerjaan Untuk Pihak Ketiga                    3,627,642             2,041,178
    Lain-lain                                         (69,443)              711,688                              Others
    Jumlah                                          4,726,040             4,190,453                                Total
    Dikurangi bagian jangka pendek                  4,128,808             2,306,621                Less current portion
    Bagian jangka panjang                            597,232              1,883,832                  Long-term portion




    Piutang    karyawan      merupakan  pinjaman                   Receivables from employees represent housing
    kepemilikan rumah yang pelunasannya dilakukan                  loans, which are paid monthly through salary
    melalui pemotongan gaji.                                       deduction.

    Piutang pekerjaan pihak ketiga sebagian besar                  Work for third party receivables mostly consist of
    terdiri dari piutang atas penjualan LNG kepada                 receivables from LNG sales to Jawa Satu Power.
    Jawa Satu Power.
    Piutang untuk lain-lain sebagian besar terdiri dari            Other receivables mostly consist of non-electricity
    piutang non-listrik yang akan dilunasi dengan                  receivables which will be repaid by cash payments
    pembayaran tunai dan piutang dari vendor yang                  and receivables from vendor which will be settled
    akan dilunasi dengan pemotongan tagihan vendor.                through cash payments or deduction of vendor
                                                                   invoices.
Page 101
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/91 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)



18. PERSEDIAAN                                               18. INVENTORIES

                                             30 Juni/        31 Desember/
                                             June 30,        December 31,
                                               2024              2023

   Batubara bahan bakar dan pelumas           11,654,655        12,872,697                      Coal fuel and lubricants
   Biomassa                                       58,518            26,468                                     Biomassa
   Persediaan umum                             3,757,154         3,249,222                              General supplies
   Switchgear dan jaringan                     1,845,086         1,228,771                   Switchgear and networking
                                                                                             Meter recording device and
   Alat ukur, pembatas dan kontrol             1,155,613          789,539                         control equipment
   Transformator                                 262,555          130,681                                   Transformers
   Kabel                                         184,754          113,497                                           Wire
   Jumlah                                     18,918,334        18,410,876                                          Total
   Cadangan kerugian penurunan nilai                                                     Allowance for decline in value of
     dan persediaan usang                       (547,313)         (548,565)   inventories and inventory obsolescence
   Jumlah bersih                              18,371,022        17,862,312                                      Total, net



    Pergerakan     perubahan cadangan   kerugian                The movement of changes in allowance for decline in
    penurunan nilai dan persediaan usang adalah                 value of inventories and inventory obsolescence is as
    sebagai berikut:                                            follows:

                                              30 Juni/        31 Desember/
                                              June 30,        December 31,
                                                2024              2023

    Saldo awal tahun                              548,565           379,628                   Balance at beginning of year
    Penambahan                                     (1,252)          168,937                                      Addition
    Saldo akhir tahun                             547,313           548,565                        Balance at end of year


    Grup tidak mengasuransikan persediaan untuk                 The Group does not have any insurance to cover the
    menutup risiko atas kemungkinan kerugian yang               possible losses on inventories except for coal stock in
    timbul pada persediaan kecuali persediaan                   Unit Tanjung Jati B which were insured with PT
    batubara di Unit Tanjung Jati B yang diasuransikan          Asuransi Mitsui Sumitomo Indonesia against fire and
    kepada PT Asuransi Mitsui Sumitomo Indonesia                other possible risks with insurance coverage of
    terhadap risiko kebakaran dan risiko lainnya dengan         USD62,000,000 (full amount) or equivalent to
    jumlah pertanggungan sebesar USD62.000.000                  Rp1,016,428 (2023: USD31,000,000 (full amount) or
    (nilai penuh) atau setara dengan Rp1.016.428                equivalent to Rp478,609 and JPY3,000,000,000 (full
    (2023: USD31.000.000 (nilai penuh) atau setara              amount) or equivalent to Rp328,650). The Group’s
    dengan Rp478.609 dan JPY3.000.000.000 (nilai                management believes that the inventories were
    penuh)     atau    setara   dengan      Rp328.650).         adequately insured as at June 30, 2024 and
    Manajemen Grup berpendapat bahwa persediaan                 December 31, 2023.
    tersebut telah diasuransikan secara memadai pada
    tanggal 30 Juni 2024 dan 31 Desember 2023.

    Jumlah persediaan yang diakui sebagai beban                 The total amount of inventories recognised as
    untuk periode Enam bulan yang berakhir pada                 expenses for the six month periods ended June 30,
    tanggal 30 Juni 2024 dan 2023 adalah masing-                2024 and 2023 amounted to Rp58,955,584 and
    masing sebesar Rp58.955.584 dan Rp51.101.113                Rp51,101,113 respectively.


    Manajemen berpendapat bahwa penyisihan yang                 Management believes that the allowance is adequate
    ditetapkan memadai untuk menutup risiko                     to cover possible losses on the decline in the value of
    penurunan nilai persediaan dan persediaan usang.            inventories and inventory obsolescence.
Page 102
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/92 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

19. PAJAK DIBAYAR DI MUKA                                           19. PREPAID TAXES

    Pada tahun 2022, Perusahaan menerima surat                         In 2022, The Company received a letter of approval
    persetujuan pemindahbukuan kelebihan bayar PPh                     for the offset of overpayment of income tax Article 26
    Pasal 26 sebesar Rp678.532 dari Direktorat                         amounting to Rp678,532 from the Directorate General
    Jenderal Pajak (“DJP”) untuk pembayaran pajak di                   of Taxation (“DJP”) for tax payments in 2023.
    2023.

    Pada tahun 2023, Grup telah melakukan                              In 2023, the Group has written off the 2019 corporate
    penghapusan atas kelebihan bayar PPh Badan                         income tax overpayment amounting Rp210,830.
    tahun 2019 sebesar Rp210.830. Kemudian, Grup                       Then, the Group has also received refund for the
    juga telah mendapatkan pembayaran atas                             overpayment of corporate income tax for 2021
    kelebihan bayar PPh Badan untuk tahun 2021                         amounting to Rp325,592.
    sebesar Rp325.592.

    Lihat Catatan 47 untuk informasi mengenai beban                    Refer to Note 47 for income tax expense information
    pajak penghasilan dan surat ketetapan pajak.                       and tax assessment letters.
                                             30 Juni/                     31 Desember/
                                             June 30,                     December 31,
                                               2024                           2023

      Pajak pertambahan nilai (PPN)                   2,042,571                   2,247,953                     Value-Added Tax ("VAT")
      Pajak penghasilan badan                                                                           Overpayment of Corporate Income
         lebih bayar                                                                                                      Tax ("CIT")
         2024                                           1,690,745                      -                                        2024
         2023                                            112,128                   820,122                                      2023
         2022                                                   -                  368,005                                      2022
         2021                                                   -                    4,753                                      2021
      Bea materai                                         86,077                    86,193                                   Stamp duty
      PPh Pasal 25                                       125,801                       -                                      Article 25
      Pembayaran dimuka atas                                                                       Prepayments of Tax Assessment Letters
         Surat Ketetapan Pajak                                                                            for Underpayment (Note 48)
         Kurang Bayar (Catatan 48)                   19,544,121                  17,540,761

      Jumlah                                         23,601,442                  21,067,788                                         Total
      Cadangan atas ketidakpastian                                                                              Allowance for uncertainty
         dalam perlakuan pajak                        (4,827,897)                (4,908,174)                        over tax treatment

      Jumlah, bersih                                 18,773,546                  16,159,614                                     Total, net

      Dikurangi, bagian lancar                        5,912,450                   3,783,609                          Less: current portion

      Bagian tidak lancar                            12,861,095                  12,376,005                           Non-current portion




20. BIAYA DIBAYAR DI MUKA DAN UANG MUKA                             20. PREPAID EXPENSES AND ADVANCES
                                         30 Juni/                           31 Desember/
                                        June 30,                            December 31,
                                          2024                                  2023
     Biaya dibayar di muka                                                                                         Prepaid expenses
        Premi asuransi                          321,657                                  178,545                      Insurance
        sewa                                    205,161                                   44,138                           Rent

     Subjumlah                                  526,819                                  222,683                          Subtotal

     Uang muka                                                                                                                Advances
        Proyek                                  806,242                                  318,673                 Projects
        Pembelian barang                        343,232                                  223,069      Purchases of goods
        Pembelian bahan bakar                       759                                      503        Purchases of fuel
        Lain-lain                                39,905                                   39,791                  Others

     Subjumlah                                1,190,139                                  582,037                          Subtotal

     Aset kontrak                               295,015                                  188,896                      Contract assets

     Jumlah                                   2,011,972                                  993,616                                     Total

     Dikurangi jangka pendek                  1,918,439                                  952,477             Less : Current portion

     Bagian jangka panjang                          93,533                                41,139                Non Current Portion
Page 103
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/93 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA                               21. CAPITAL STOCK AND RETAINED EARNINGS

    Modal saham                                                 Capital stock

    Seluruh saham       Perusahaan         dimiliki   oleh      The Company’s shares of stock are fully owned by the
    Pemerintah Republik Indonesia.                              Government of the Republic of Indonesia.

    Pada tanggal 30 Juni 2024 dan 31 Desember 2023,             As at June 30, 2024 and December 31, 2023, the
    Perusahaan mempunyai modal dasar masing-                    Company has authorised capital amounted to
    masing sebesar Rp150.536.096 yang terbagi atas              Rp150,536,096, consisting of 439,000,000 shares,
    439.000.000 saham dengan nilai nominal Rp1 per              with par value of Rp1 per share.
    saham.

    Berdasarkan        surat    Menteri    BUMN       S-        Based on letter of the Minister of SOE No. S-
    106MBU/02/2022 tanggal 14 Februari 2022,                    106/MBU/02/2022 dated February 14, 2022 the
    pernyataan Keputusan Menteri BUMN sebagai                   decision of the Minister of SOE as the GMS approved
    RUPS menyetujui penambahan penyertaan modal                 additional Government equity participation of
    Negara sebesar 10.075.210 saham dengan nilai                10,075,210 shares for a value of Rp10,075,210,
    Rp10.075.210 sehingga meningkatkan modal                    thereby increasing the subscribed and paid-up capital
    ditempatkan dan disetor menjadi Rp145.536.096.              to Rp145,536,096. Following the approval of the
    Atas persetujuan Penyertaan Modal Negara                    Government Participation, the stock subscription from
    tersebut, maka penyertaan modal Negara dalam                the Government in the issuance process (Note 22b)
    proses      penerbitan   saham      (Catatan   22b)         has therefore been reclassified to subscribed and
    direklasifikasi ke modal ditempatkan dan disetor.           paid-in capital.

    Berdasarkan Akta Notaris Muhammad Hanafi, S.H.              Based on the Notarial Deed of Notary Muhammad
    tanggal 19 September 2023 No. 37 mengesahkan                Hanafi, S.H. dated September 19, 2023 No. 37 had
    penambahan penyertaan modal negara sebesar                  authorised an increase in state capital participation of
    5.000.000 saham dengan nilai Rp5.000.000                    5,000,000 shares with a value of Rp5,000,000.
    sehingga meningkatkan modal ditempatkan dan                 Thereby increasing the issued and paid-up capital to
    disetor menjadi Rp150.536.096. Atas persetujuan             Rp150,536,096. Upon approval of state capital
    penyertaan modal negara tersebut, maka saldo                participation, the balance of state capital participation
    penyertaan modal negara dalam proses penerbitan             in the share issuance process (Note 22b) is
    saham (Catatan 22b) direklasifikasi ke modal                reclassified to issued and paid-up capital.
    ditempatkan dan disetor.

    Saldo laba                                                  Retained earnings

    Saldo laba terdiri dari sebagai berikut:                    Retained earnings consist of the following:

    i.   Saldo laba yang ditentukan penggunaannya               i.   Appropriated retained earnings

         Berdasarkan    Undang-Undang        Perseroan               Under Indonesian Limited Company Law, the
         Terbatas, Perusahaan diharuskan untuk                       Company is required to establish a statutory
         membuat penyisihan cadangan wajib hingga                    reserve amounting to at least 20% of the
         sekurang-kurangnya 20% dari jumlah modal                    Company’s subscribed and paid-up capital.
         yang ditempatkan dan disetor penuh.

         Berdasarkan        RUPS       tahun       2022              Based on RUPS for the year 2022
         No.0164.K/DIR/2023 pada tanggal 7 Juni 2023,                No.0164.K/DIR/2023 dated June 7, 2023, an
         terdapat saldo laba tahun 2022 yang ditetapkan              appropriation from the 2022 retained earnings
         sebagai      cadangan       umum       sebesar              amounted to Rp12,146,040 was approved.
         Rp12.146.040.
Page 104
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

21. MODAL SAHAM DAN SALDO LABA (lanjutan)                         21. CAPITAL STOCK AND RETAINED EARNINGS
                                                                      (continued)

    Saldo laba (lanjutan)                                             Retained earnings (continued)

    ii. Saldo   laba  yang                 belum    ditentukan        ii.   Unappropriated retained earnings
        penggunaannya

         Pada tanggal 30 Juni 2024 dan 31 Desember                          As at June 30, 2024 and December 31, 2023, the
         2023, saldo laba yang belum ditentukan                             balance of the unappropriated retained earnings
         penggunaannya     masing-masing    sebesar                         amounted        to     Rp112,530,501        and
         Rp112.530.501 dan Rp107.538.313.                                   Rp107,538,313, respectively.

    Dividen                                                           Dividends

    Berdasarkan hasil keputusan RUPS tahun 2022                       Based on the decision of the GMS for the year 2022
    0164.K/DIR/2023 yang diadakan pada tanggal 7                      0164.K/DIR/2023 on June 7, 2023, the shareholders
    Juni 2023, pemegang saham menyetujui                              agreed to distribute cash dividends from 2022 net
    pembagian dividen tunai final untuk tahun 2022                    income amounting to Rp2,188,000 (dividend per
    sejumlah Rp2.188.000 (dividen per saham                           share Rp15,034). The cash dividends for 2022 were
    Rp15.034). Dividen tunai final tahun 2022 telah                   paid on July 6, 2023.
    dibayarkan pada tanggal 6 Juli 2023.

    Berdasarkan hasil keputusan RUPS tahun 2021                       Based on the decision of the GMS for the year 2021
    No. 0223.K/DIR2022 yang diadakan pada tanggal                     No. 0223.K/DIR2022 on June 27, 2022, the
    27 Juni 2022, pemegang saham menyetujui                           shareholders agreed to distribute cash dividends from
    pembagian dividen tunai final untuk tahun 2022                    2021 net income amounting to Rp750,000 (dividend
    sejumlah Rp750.000 (dividen per saham Rp5.153).                   per share Rp5,153). The cash dividends for 2021
    Dividen tunai final tahun 2021 telah dibayarkan                   were paid on July 27, 2022.
    pada tanggal 27 Juli 2022.


22. TAMBAHAN    MODAL     DISETOR DAN                             22. ADDITIONAL PAID-IN CAPITAL AND STOCK
    PENYERTAAN MODAL NEGARA DALAM                                     SUBSCRIPTION FROM     GOVERNMENT   IN
    PROSES PENERBITAN SAHAM                                           ISSUANCE PROCESS

    a.   Tambahan modal disetor                                       a.    Additional paid-in capital
         Tambahan modal disetor pada tanggal 30 Juni                        Additional paid-in capital as at June 30, 2024
         2024 terdiri dari selisih nilai transaksi                          consists of the difference in restructuring
         restrukturisasi entitas sepengendali dan aset                      transactions between entities under common
         yang     dibukukan     dan   sebagai    akibat                     control and the assets booked as a result of the
         keikutsertaan         Perusahaan        dalam                      Company’s participation in the tax amnesty
         pengampunan pajak, dengan rincian sebagai                          program with the following details:
         berikut:


                                                       30 Juni/         31 Desember/
                                                       June 30,         December 31,
                                                         2024               2023


          Selisih nilai transaksi restrukturisasi                                           Difference in restructuring transactions
            entitas sepengendali                         (106,753)            (106,753) between entities under common control
          Aset pengampunan pajak                            141,361             141,361                        Tax amnesty assets
          Jumlah                                             34,608              34,608                                       Total
Page 105
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

22. TAMBAHAN    MODAL     DISETOR      DAN                              22. ADDITIONAL PAID-IN CAPITAL AND STOCK
    PENYERTAAN MODAL NEGARA DALAM                                           SUBSCRIPTION FROM GOVERNMENT       IN
    PROSES PENERBITAN SAHAM (lanjutan)                                      ISSUANCE PROCESS (continued)

    b. Penyertaan modal negara dalam proses                                  b.      Stock subscription from Government in
       penerbitan saham                                                              issuance process

          Berdasarkan Peraturan Pemerintah Republik                                  Based on Government Regulation No. 27 year
          Indonesia No. 27 tahun 2022, tanggal 31                                    2022, dated August 31, 2022, the additions of
          Agustus 2022, penambahan penyertaan modal                                  stock subscription from the Government in cash
          negara secara tunai yang masih dalam proses                                which is still in the issuance process amounted to
          penerbitan    saham      adalah      sebesar                               Rp5,000,000. In 2023, stock subscription from
          Rp5.000.000. Pada tahun 2023, penyertaan                                   the Government in the issuance process
          modal negara dalam proses penerbitan saham                                 amounting to Rp5,000,000 has been reclassified
          sebesar Rp5.000.000 telah direklasifikasi                                  to share capital (see Note 21).
          sebagai modal saham (lihat Catatan 21).

23. PENDAPATAN DITANGGUHKAN                                             23. DEFERRED REVENUE

    Akun ini merupakan penerimaan dari pelanggan                             This account represents connection fees received
    berupa jasa penyambungan dan diakui sepanjang                            from customers and recognised over time by the
    waktu oleh Grup dengan rincian sebagai berikut:                          Group. Details of the deferred revenue are as follows:

                                                       30 Juni/             31 Desember/
                                                       June 30,             December 31,
                                                         2024                   2023

   Saldo awal                                             28,686,927                 21,203,504                      Beginning balance
   Penambahan                                              4,480,537                  8,771,707                                Additions
   Diakui sebagai                                                                                                        Recognized as
     pendapatan tahun berjalan                              (812,831)                (1,288,284)               revenue during the year
   Saldo akhir                                            32,354,633                 28,686,927                         Ending balance
   Dikurangi: bagian jangka pendek                          1,805,969                 1,581,942                 Less: current portion
   Bagian jangka panjang                                  30,548,664                 27,104,985                      Long-term portion




    Biaya penyambungan diamortisasi sejak tanggal                            Connection fees are amortised starting from the
    penyambungan sesuai masa estimasi konsumsi                               connection date based on the estimated consumption
    pelanggan.                                                               pattern of the customer.


24. PENERUSAN PINJAMAN                                                  24. TWO-STEP LOANS

    Akun ini merupakan pinjaman luar negeri                                  This account represents overseas, collateral-free
    Pemerintah Republik Indonesia yang tidak diikat                          loans of the Government of the Republic of Indonesia
    jaminan dan diteruskan kepada Perusahaan untuk                           which are passed on to the Company to finance its
    membiayai proyek-proyek Perusahaan. Rincian                              projects. The details of the two-step loans are as
    penerusan pinjaman adalah sebagai berikut:                               follows:
                                                                          30 Juni/                 31 Desember/        Periode/
                                                                          June 30,                 December 31,        Period *)
                                                                            2024                       2023           Tahun/Year
        International Bank for Reconstruction
            and Development (IBRD)
            USD
            IBRD - 7940 IND - 1238                                                2,262,337             2,206,840     2011 - 2034
            IBRD 8280 ID - 1256                                                   1,383,259             1,352,458     2014 - 2034
            IBRD - 8057 IND - 1244                                                  479,688               466,128     2012 - 2035
            IBRD - 4712 & 7758 IND - 1165                                                (0)                   (0)    2004 - 2023
            IBRD - 7905 IND - 1235                                                  232,240               226,543     2010 - 2034
            IBRD 9278-1290                                                           15,853                 3,952                   -
        Asian Development Bank (ADB)
           USD
           ADB - 1982 INO - 1170                                                     891,506             937,702      2004 - 2027
           ADB - 1983 INO - 1171                                                     605,529             636,906      2004 - 2027
           ADB 3015 INO - 1255                                                       531,019             521,880      2014 - 2033
           ADB - 2619 INO - 1236                                                     494,173             476,896      2010 - 2035
           ADB 3083 INO - 1257                                                       204,667             200,598      2014 - 2033
           ADB 8276 INO - 1258                                                        22,659              22,208      2014 - 2033



   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments
Page 106
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)


24. PENERUSAN PINJAMAN (lanjutan)                                      24. TWO-STEP LOANS (continued)

                                                                         30 Juni/               31 Desember/         Periode/
                                                                         June 30,               December 31,         Period *)
                                                                           2024                     2023            Tahun/Year
 Kreditanstalt Fur Wiederaufbau, Jerman (KFW)
    EUR
    KFW F 26180 - 1262                                                               132,708           142,256       2017 - 2027
 Japan Bank for International Cooperation (JBIC)
 (d/h The Export-Import Bank of Japan)
     JPY
     JICA IP 515 - 1177                                                         2,812,886            3,165,721       2004 - 2034
     JICA IP 512 - 1163                                                         2,556,746            2,884,663       2004 - 2033
     JICA IP 538 - 1221                                                         1,991,060            2,180,497       2009 - 2047
     JICA IP 525 - 1197                                                         1,127,232            1,236,983       2005 - 2045
     JICA IP 513 - 1164                                                           780,311              880,390       2004 - 2033
     JICA IP 532 - 1214                                                         2,529,204            2,772,630       2006 - 2048
     JICA IP 527 - 1211                                                           673,138              747,267       2007 - 2037
     JICA IP 539 - 1222                                                           649,137              722,533       2009 - 2037
     JICA IP 517 - 1178                                                           322,983              354,842       2004 - 2044
     JICA IP 560 - 1253                                                           354,859              386,911       2013 - 2053
     JICA IP 555 - 1231                                                            90,289               97,410       2013 - 2039
     JICA IP 561 - 1252                                                            60,613               76,248       2013 - 2053
     JICA IP 526 - 1198                                                            47,520               52,147       2005 - 2045
     JICA IP 516 - 1196                                                            37,303               40,982       2004 - 2044
     JICA IP 572 - 1265                                                            41,215               41,172       2016 - 2055
     JICA IP 537 - 1220                                                             4,400                4,898       2009 - 2037

 Kingdom of Belgium / Kerajaan Belgia
    EUR
    Kerajaan Belgia/ Kingdom of Belgium - 1185                                        19,806            19,300       2005 - 2033
 China Exim Bank
    USD
    China Exim Bank 1261                                                        3,109,812            3,172,711       2015 - 2029
    China Exim Bank 1260                                                        2,076,548            2,133,363       2015 - 2029
    China Exim Bank 1248                                                          667,520              707,214       2013 - 2027
 Agence Francaise de Developpement
    USD
    AFD CID 1024 01B - 1254                                                          236,549           250,616       2013 - 2028
    AFD CID 1019 01F - 1237                                                           21,714            30,673       2010 - 2035
    AFD CID 1039 01H - 1259                                                           62,174            65,871       2014 - 2026

 Jumlah                                                                        27,528,659           29,219,411
 Biaya transaksi belum diamortisasi                                                  (35,417)          (35,983)

 Jumlah bersih                                                                 27,493,242           29,183,428

 Dikurangi bagian jatuh tempo dalam satu tahun
 International Bank for Reconstruction
     and Development (IBRD)
     USD
     IBRD - 7940 IND - 1238                                                          168,291           154,551       2011 - 2034
     IBRD 8280 ID - 1256                                                             109,859           100,857       2014 - 2034
     IBRD - 8057 IND - 1244                                                           31,671            29,102       2012 - 2035
     IBRD - 7905 IND - 1235                                                           17,277            15,866       2010 - 2034
 Asian Development Bank (ADB)
    USD
    ADB - 1982 INO - 1170                                                            224,529           201,238       2004 - 2027
    ADB - 1983 INO - 1171                                                            152,505           136,685       2004 - 2027
    ADB 3015 INO - 1255                                                               48,034            44,133       2014 - 2033
    ADB - 2619 INO - 1236                                                             26,310            23,597       2010 - 2035
    ADB 3083 INO - 1257                                                               17,308            15,902       2014 - 2033
    ADB 8276 INO - 1258                                                                1,916             1,761       2014 - 2033

   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments
Page 107
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                      24. TWO-STEP LOANS (continued)

                                                                         30 Juni/              31 Desember/          Periode/
                                                                         June 30,              December 31,          Period *)
                                                                           2024                    2023             Tahun/Year
 Kreditanstalt Fur Wiederaufbau, Jerman (KFW)
    EUR
    KFW F 26180 - 1262                                                                26,542            25,865       2017 - 2027
 Japan Bank for International Cooperation
 (d/h The Export-Import Bank of Japan)
     JPY
     JICA IP 515 - 1177                                                              281,289           301,497       2004 - 2034
     JICA IP 512 - 1163                                                              269,131           288,466       2004 - 2033
     JICA IP 538 - 1221                                                               86,568            92,787       2009 - 2047
     JICA IP 513 - 1164                                                               82,138            88,039       2004 - 2033
     JICA IP 525 - 1197                                                               53,678            57,534       2005 - 2045
     JICA IP 539 - 1222                                                               49,934            53,521       2009 - 2037
     JICA IP 527 - 1211                                                               48,081            51,536       2007 - 2037
     JICA IP 555 - 1231                                                                1,777             1,905       2013 - 2039
     JICA IP 517 - 1178                                                               16,149            17,309       2004 - 2044
     JICA IP 526 - 1198                                                                2,263             2,425       2005 - 2045
     JICA IP 516 - 1196                                                                1,865             1,999       2004 - 2044
     JICA IP 537 - 1220                                                                  338               363       2009 - 2037
     JICA IP 532 - 1214                                                              115,167           123,441       2006 - 2048
     JICA IP 560 - 1253                                                               12,237            13,116       2013 - 2053
     JICA IP 561 - 1252                                                                2,090             2,585       2013 - 2053
 Kingdom of Belgium / Kerajaan Belgia
    EUR
    Kerajaan Belgia/ Kingdom of Belgium - 1185                                         1,981              1,930      2005 - 2033
 China Exim Bank
    USD
    China Exim Bank - 1261                                                           518,302           488,109       2015 - 2029
    China Exim Bank - 1260                                                           377,554           355,561       2015 - 2029
    China Exim Bank - 1248                                                           166,880           157,159       2013 - 2027
 Agence Francaise de Developpement
    USD
    AFD CID 1024 01B - 1254                                                           59,137            55,692       2013 - 2028
    AFD CID 1019 01F - 1237                                                           21,714            20,446       2010 - 2035
    AFD CID 1039 01H - 1259                                                           15,544            14,638       2014 - 2026
 Jumlah bagian jatuh tempo
   dalam satu tahun                                                             3,008,059            2,939,616

 Bagian jangka panjang                                                         24,485,183           26,243,812

   *) Termasuk masa tenggang pembayaran/Include grace periods in terms of payments

                                                     30 Juni/                31 Desember/
                                                     June 30,                December 31,
                                                       2024                      2023

      Tingkat suku bunga per tahun                                                                 Interest rate per annum
      USD                                         2.88% - 7.68%            2.88% - 7.6557%                             USD
      JPY                                         0,01% - 2,15%            0,012% - 2,65%                              JPY
      EUR                                         0.35% - 2.35%             0.35% - 2.35%                              EUR

    Perusahaan melakukan pembayaran pokok dan                                The Company made payments of principal and
    bunga penerusan pinjaman sesuai dengan jadwal                            interest on the two-step loans in accordance with the
    pembayaran dalam perjanjian penerusan pinjaman                           schedule of payment within the agreements of the
    yang berlaku pada tanggal laporan.                                       two-step loans as at the reporting date.
Page 108
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

24. PENERUSAN PINJAMAN (lanjutan)                                   24. TWO-STEP LOANS (continued)

    Rincian saldo penerusan pinjaman berdasarkan                       Details of the two-step loans balance in currency are
    mata uang adalah sebagai berikut:                                  as follows:

                             30 Juni/ June 30, 2024                    31 Desember/ December 31 , 2023
                      Dalam mata                                        Dalam mata
                       uang asing/                                      uang asing/
                       In foreign          Ekuivalen Rp/                 In foreign      Ekuivalen/
                      currencies *)        Equivalent Rp               currencies *)     Equivalent

    USD                  811,104,538             13,297,248                868,745,367             13,412,560                USD
    JPY              138,182,576,485             14,078,898            143,264,058,829             15,645,295                JPY
    EUR                    8,698,442                152,513                  9,455,327                161,556                EUR

    Jumlah                                       27,528,659                                        29,219,411              Total


    *)    Dalam jumlah penuh                                             *)     In full amount



25. UTANG KEPADA PEMERINTAH DAN LEMBAGA                             25. GOVERNMENT AND NON-BANK GOVERNMENT
    KEUANGAN PEMERINTAH NON-BANK                                        FINANCIAL INSTITUTION LOANS

                                               30 Juni/                 31 Desember/
                                               June 30,                 December 31,
                                                 2024                       2023
   PT Sarana Multi Infrastruktur                    1,855,966                      2,222,907          PT Sarana Multi Infrastruktur
   Pengembalian kompensasi (Catatan 16)                        --                           --   Excess of compensation (Note 16)

   Jumlah                                          1,855,966                      2,222,907                                   Total
   Dikurangi bagian jatuh tempo dalam
     satu tahun                                       750,000                        750,000              Less current maturities
   Bagian jangka panjang                            1,105,966                      1,472,907                  Long-term portion



   Tingkat suku bunga per tahun                                                                          Interest rate per annum
      Rupiah                                            5.25%                 5.25%___                                  Rupiah

    PT Sarana Multi Infrastruktur                                      PT Sarana Multi Infrastruktur

                                               30 Juni/                 31 Desember/
                                               June 30,                 December 31,
                                                 2024                          2023
    Pokok pinjaman                                  1,875,000                      2,250,000                             Principal
    Biaya transaksi yang belum diamortisasi               (1,786)                      (2,547)        Unamortized transaction cost
    Perbedaan nilai wajar                               (17,248)                      (24,546)                Fair value difference
    Jumlah                                          1,855,966                      2,222,907                                 Total



    Pada tanggal 13 Desember 2011, Perusahaan                          On December 13, 2011, the Company obtained a soft
    memperoleh fasilitas pinjaman lunak dari Pusat                     loan facility from the Government Investment Center
    Investasi Pemerintah Kementerian Keuangan                          under the Ministry of Finance of the Republic of
    Republik Indonesia sebesar Rp7.500.000, dengan                     Indonesia amounting to Rp7,500,000 with an annual
    tingkat bunga 5,25% per tahun berjangka waktu 15                   interest rate of 5.25% with a 15-year term.
    tahun.

    Pinjaman ini digunakan untuk membiayai                             This loan was used to finance the procurement and
    pengadaan dan penggantian trafo, instalasi                         replacement of transformers, the equipment
    perlengkapan transmisi dan distribusi serta                        installation of transmission distribution and other
    investasi lainnya.                                                 capital expenditures.
Page 109
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/99 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

25. UTANG KEPADA PEMERINTAH DAN LEMBAGA                       25. GOVERNMENT AND NON-BANK GOVERNMENT
    KEUANGAN PEMERINTAH NON-BANK (lanjutan)                       FINANCIAL INSTITUTION LOANS (continued)

    PT Sarana Multi Infrastruktur (lanjutan)                     PT Sarana Multi Infrastruktur (continued)

    Pada tanggal 23 Desember 2015, telah                         On December 23, 2015, Government Investment
    dilaksanakan     penandatanganan       perjanjian            Center and PT Sarana Multi Infrastruktur (“SMI”)
    pengalihan antara Pusat Investasi Pemerintah dan             signed a novation agreement which transfers all
    PT Sarana Multi Infrastruktur (“SMI”) yang                   current and future rights and obligations of
    mengalihkan seluruh hak dan kewajiban Pusat                  Government Investment Center to SMI, including
    Investasi Pemerintah kepada SMI pada saat ini                interest and responsibilities in the Company’s
    maupun pada masa yang akan datang yang meliputi              investment agreement.
    kepentingan dan tanggung jawab dalam perjanjian
    investasi Perusahaan.

    Sehubungan dengan fasilitas pinjaman tersebut                In relation to this loan facility, the Company has
    Perusahaan telah memenuhi batasan-batasan yang               complied with the covenants in this agreement.
    diwajibkan dalam perjanjian tersebut.

    Saldo pinjaman yang terutang dari utang kepada               The outstanding balance of this non-bank
    Lembaga Keuangan Pemerintah non-bank ini                     Government Financial Institution Loans is repayable
    dibayarkan dengan jadwal pembayaran sebagai                  according to the following schedule:
    berikut:

                                          30 Juni/                 31 Desember/
                                          June 30,                 December 31,
                                             2024                        2023

     Dibayarkan:                                                                                           Payable to:
       Dalam satu tahun                             750,000                     750,000             Within one year
       Pada tahun kedua                             750,000                     750,000          In the second year
       Pada tahun ketiga                            375,000                     750,000             In the third year
     Jumlah                                      1,875,000                   2,250,000                            Total




    Perusahaan melakukan pembayaran pokok dan                    The Company made payments of principal and
    bunga utang kepada Pemerintah sesuai dengan                  interest on Government loans in accordance with the
    jadwal pembayaran dan memenuhi pembatasan -                  schedule of payments and complied with the
    pembatasan dalam perjanjian utang kepada                     restrictions specified within the agreements of
    Pemerintah yang berlaku pada tanggal laporan.                Government loans as at the reporting date.

    Pengembalian kompensasi                                      Excess compensation

    Berdasarkan hasil audit BPK atas kompensasi listrik          Based on the audit result of BPK regarding electricity
    tahun 2021 sesuai LHP No. 04/S/IX-XX/01/2023                 compensation for the year 2021 as in LHP No.
    tanggal 17 Januari 2023, terdapat kelebihan                  04/S/IX-XX/01/2023 dated January 17, 2023, there
    penerimaan kompensasi listrik oleh Perusahaan                was excess compensation received by the Company
    sebesar       Rp675.985,      yang     kemudian              amounting to Rp675,985, subsequently set-off
    disalinghapuskan dengan piutang kompensasi                   against compensation receivables (Note 16).
    (Catatan 16).

    Lihat Catatan 51 untuk informasi rincian transaksi           Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                             transactions and balances with related parties.


26. UTANG SEWA                                                26. LEASE LIABILITIES

    Akun ini terdiri dari utang Perusahaan kepada                This account represents the Company’s liabilities to
    PT Central Java Power (“CJP”) dalam rangka                   PT Central Java Power (“CJP”) in relation to the
    Perjanjian Sewa Pembiayaan atas pengadaan                    Financial Lease Agreement on the acquisition of
    pembangkitan tenaga listrik 4x660MW Tanjung Jati             4x660MW Tanjung Jati B Units A, B, C, D, and several
    B Unit A, B, C, D, dan beberapa kontrak sewa                 lease contracts in relation to the leases of the gas
    sehubungan dengan sewa kompresor gas di                      compressors at the various locations.
    berbagai daerah.
Page 110
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/100 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                   JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA (lanjutan)                                           26. LEASE LIABILITIES (continued)

    Nilai kini pembayaran minimum atas utang sewa                          The present value of minimum lease payments for
    tersebut pada tanggal 30 Juni 2024 dan 31                              such lease liabilities as at June 30, 2024 and
    Desember 2023 adalah sebagai berikut:                                  Deecember 31, 2023 is as follows:
    Berdasarkan jatuh tempo                                                By due date

                                                 30 Juni/                      31 Desember/
                                                 June 30,                      December 31,
                                                   2024                            2023


    Pembayaran jatuh tempo dalam waktu :                                                                       Minimum lease payments due :
    Tidak lebih dari 1 tahun                                 2,612,651               3,377,616                            Not later than 1 year
    Antara lebih dari 1 tahun sampai 3 tahun                 7,028,561              4,491,646    Later than 1 year and not later than 3 years
    Antara lebih dari 3 tahun sampai 5 tahun                 5,063,180              1,736,079    Later than 3 year and not later than 5 years
    Lebih dari 5 tahun                                        4,218,676              9,648,430                          lather than 5 years
                                                                                                                          Later than 5 years
      Lebih dari 5 tahun
    Jumlah                                                  18,923,068              19,253,771                                            Total
    Dikurangi bunga                                          6,559,215               6,484,241                                   Less: interest

    Nilai kini pembayaran                                                                                    Present value of future minimum
                                                            12,363,853             12,769,530                              lease payments
      sewa masa datang
    Dikurangi : bagian jatuh tempo dalam
      satu tahun                                             1,743,412               2,267,698                            Less: current portion

    Bagian jangka panjang                                   10,620,441              10,501,832                              Long-term portion



    Total arus kas keluar untuk seluruh sewa pada                          The total cash outflow for all leases as at June 30,
    tanggal 30 Juni 2024 dan 31 Desember 2023 adalah                       2024 and December 31, 2023, was Rp8,801,603 and
    masing-masing      sebesar    Rp8.801.603   dan                        Rp8,775,560, respectively.
    Rp8.775.560.

    Berdasarkan pemberi sewa                                               By lessor

                                                 30 Juni/                     31 Desember/
                                                 June 30,                     December 31,
                                                   2024                           2023

     Pihak berelasi
                                                                                                                          Related Parties
       Pelabuhan Indonesia (Persero)                        1,174,510              1,138,625              Pelabuhan Indonesia (Persero)
       Dana Pensiun PLN - Rupiah                              895,133                926,919                Dana Pensiun PLN - Rupiah

                                                            2,069,643              2,065,544                                     Subtotal
       Subjumlah
     Pihak ketiga                                                                                                           Third Parties
       PT Central Java Power                                1,205,400              1,360,500                                      CJP
       PT Gas Benoa Terminal                                  628,582                741,444                   PT Gas Benoa Terminal
       PT Perta Daya Gas                                      921,622                990,143                       PT Perta Daya Gas
       PT Batam Trans Gasindo                                 478,377                499,191                  PT Batam Trans Gasindo
       PT Indah Bima Prima                                    388,898                401,745                     PT Indah Bima Prima
       PT Lumoso                                              582,365                586,541                               PT Lumoso
       PT Sumber Petrindo Perkasa                             329,459                356,416              PT Sumber Petrindo Perkasa
       PT Sulawesi Regas Satu                               1,555,601              1,596,225                   PT Sulawesi Regas Satu
       PT Bahtera Samudera Gemilang Line                       56,947                 70,105       PT Bahtera Samudera Gemilang Line
       PT State Grid Power Indonesia                        1,439,280              1,492,879             PT State Grid Power Indonesia
       Lain-lain                                            2,707,679              2,608,797                                    Others

                                                        10,294,210                10,703,986                                     Subtotal
       Subjumlah
     Jumlah                                             12,363,853                12,769,530                                          Total

     Dikurangi: bagian jatuh tempo dalam                    1,743,412              2,267,698                          Less: current maturity

       satu tahun
     Bagian jangka panjang                              10,620,441                10,501,832                              Long-term portion



   Tingkat suku bunga per tahun:                                                                                 Interest rate per annum:
      Rupiah                                   6.51% - 27.67%            4.55% - 27.67%                                          Rupiah
      USD                                          13.19%                    13.19%                                                USD
      JPY                                      7.57% - 18.10%            7.57% - 18.10%                                             JPY
Page 111
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                Lampiran 5/101 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                  JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

26. UTANG SEWA (lanjutan)                                                          26. LEASE LIABILITIES (continued)

    Rincian utang sewa menurut mata uang adalah                                           Details of the lease liabilities by currency are as
    sebagai berikut:                                                                      follows:

                                                30 Juni 2024/ June 30, 2024                       31 Desember/ December 31, 2023
                                       Dalam mata                                               Dalam mata
                                       uang asing/                                              uang asing/
                                       In foreign                Ekuivalen Rp/                  In foreign        Ekuivalen Rp/
                                       currencies*)              Rp equivalent                  currencies*)      Rp equivalent

    Rupiah                                         10,680,076           10,680,076                   10,909,839               10,909,839                         Rupiah
     USD                                           29,179,994              478,377                   32,333,146                  499,191                           JPY
    JPY                                        11,830,849,503            1,205,400               12,458,102,846                1,360,500                           USD


     Jumlah                                                             12,363,853                                            12,769,530                            Total


    *)     Dalam jumlah penuh, kecuali Rupiah                                             *)     In full amount, except for Rupiah

    Beban bunga dan keuangan terkait utang sewa                                           Interest expense and financial charges related to
    pada tahun yang berakhir pada tanggal                                                 lease liabilities for the years ended June 30, 2024
    30 Juni 2024 dan 2023 masing-masing sebesar                                           and 2023, amounted to Rp3,019,997 and
    Rp3.019.997 dan Rp1.322.598 (Catatan 45).                                             Rp1,322,598, respectively (Note 45).


27. UTANG BANK                                                                     27. BANK LOANS


                                                                     30 Juni/              31 Desember/
                                                                     June 30               December 31
                                                                      2024                     2023

     Pinjaman terkait program percepatan                                                                                              Loans related fo fast track program

     Entitas yang berelasi dengan Pemerintah                                                                                                 Government related entities :

     Agen:      Bank Negara Indonesia ("BNI")                                                                                      Agent : Bank Negara Indonesia ("BNI")
     Sindikasi:                                                                                                                                             Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                     Government related entities :
                Bank Negara Indonesia ("BNI")                                131,248                  174,997                     Bank Negara Indonesia ("BNI")
                Bank Rakyat Indonesia ("BRI")                                131,248                  174,997                      Bank Rakyat Indonesia ("BRI")
                Bank Mandiri                                                 131,248                  174,997                                      Bank Mandiri
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                 131,248                  174,997       Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
     Subjumlah                                                               524,992                  699,989                                                      Subtotal

     Agen:      Bank DKI                                                                                                                                   Agent : Bank DKI
     Sindikasi:                                                                                                                                                  Syndicated:
            Entitas yang berelasi dengan Pemerintah                                                                                      Government related entities :
                Bank DKI                                                     205,357                  287,500                                             Bank DKI
                Sarana Multi Infrastruktur ("SMI")                            71,429                  100,000                     Sarana Multi Infrastruktur ("SMI")
                Bank Jateng                                                   35,714                   50,000                                         Bank Jateng
                BPD Aceh                                                      17,857                   25,000                                           BPD Aceh
                Bank Kalteng                                                  17,857                   25,000                                        Bank Kalteng
                Bank Riau                                                     17,857                   25,000                                           Bank Riau
                Bank Kalbar                                                   17,857                   25,000                                          Bank Kalbar
                BPD Bali                                                      13,393                   18,750                                             BPD Bali
     Subjumlah                                                               397,321                  556,250                                                      Subtotal
Page 112
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/102 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                       27. BANK LOANS (continued)

                                                                   30 Juni/            31 Desember/
                                                                   June 30             December 31
                                                                   2024                   2023

    Pinjaman terkait program percepatan                                                                                        Loans related fo fast track program

    Pihak Ketiga                                                                                                                                     Third Parties

    Agen: Industrial and Commercial Bank of China ("ICBC")                                                 Agent : Industrial and Commercial Bank of China ("ICBC")
    Sindikasi:                                                                                                                                           Syndicated:
           Pihak ketiga                                                   466,684                878,996                                      Third Parties


    Subjumlah                                                             466,684                878,996                                                   Subtotal

    Jumlah Pinjaman terkait program percepatan                        1,388,997             2,135,235                     Total loans related fo fast track program


    Pinjaman tidak terkait program                                                                                         Loans not related fo fast track program
          percepatan

    Entitas yang berelasi dengan Pemerintah                                                                                           Government related entities :

    Agen: Bank Negara Indonesia ("BNI")                                                                                       Agent : Bank Negara Indonesia ("BNI")
    Sindikasi:                                                                                                                                        Syndicated :
           Entitas yang berelasi dengan Pemerintah                                                                                Government related entities :
               Bank Negara Indonesia ("BNI")                          1,483,355             1,618,206                        Bank Negara Indonesia ("BNI")
               Bank Rakyat Indonesia ("BRI")                            539,583               588,636                        Bank Rakyat Indonesia ("BRI")
               Bank Mandiri                                           1,213,763             1,324,105                                        Bank Mandiri
           Pihak ketiga                                                       --                    --
    Subjumlah                                                         3,236,702             3,530,948                                                      Subtotal

    Agen: Bank Rakyat Indonesia ("BRI")                                                                                    Agent : Bank Rakyat Indonesia ("BRI")
    Sindikasi:                                                                                                                                       Syndicated :
           Entitas yang berelasi dengan Pemerintah                                                                             Government related entities :
               Bank Rakyat Indonesia ("BRI")                          5,400,942             6,346,285                     Bank Rakyat Indonesia ("BRI")
               Bank Rakyat Indonesia ("BRI") Agro                             --                    --               Bank Rakyat Indonesia ("BRI") Agro
               Bank Negara Indonesia ("BNI")                          1,259,271             1,518,238                    Bank Negara Indonesia ("BNI")
               Bank Mandiri                                           4,080,700             4,661,095                                      Bank Mandiri
               Lembaga Pembiayaan Ekspor Indonesia ("LPEI")             107,143               142,857      Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
               Sarana Multi Infrastruktur ("SMI")                       616,071               705,357                  Sarana Multi Infrastruktur ("SMI")
               BPD Papua                                                305,357               337,500                                        BPD Papua
           Pihak ketiga                                               2,900,342             3,234,309                                          Third Parties
    Subjumlah                                                        14,669,826            16,945,640                                                      Subtotal

    Agen: Bank Mandiri                                                                                                                      Agent : Bank Mandiri
    Sindikasi:                                                                                                                                       Syndicated :
           Entitas yang berelasi dengan Pemerintah                                                                             Government related entities :
               Bank Mandiri                                           3,547,889             3,609,199                                      Bank Mandiri
               Bank Negara Indonesia ("BNI")                          1,317,325             1,317,325                     Bank Negara Indonesia ("BNI")
               Bank Rakyat Indonesia ("BRI")                             94,323               113,187                     Bank Rakyat Indonesia ("BRI")
               Bank Tabungan Negara ("BTN")                           2,000,000             2,000,000                    Bank Tabungan Negara ("BTN")
               Sarana Multi Infrastruktur ("SMI")                       188,646               226,375                  Sarana Multi Infrastruktur ("SMI")
               Lembaga Pembiayaan Ekspor Indonesia ("LPEI")              47,161                56,594      Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
           Pihak ketiga                                               2,736,529             2,835,568                                          Third Parties
    Subjumlah                                                         9,931,873            10,158,248                                                      Subtotal
Page 113
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/103 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                27. BANK LOANS (continued)


                                                           30 Juni/              31 Desember/
                                                           June 30               December 31
                                                            2024                   2023

     Pinjaman tidak terkait program                                                                            Loans not related fo fast track program
           percepatan

     Entitas yang berelasi dengan Pemerintah                                                                             Government related entities :

     Agen:      Bank Syariah Indonesia ("BSI")                                                                   Agent : Bank Syariah Indonesia ("BSI")
     Sindikasi:                                                                                                                            Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                  Government related entities :
                Bank Syariah Indonesia ("BSI")                2,266,437               2,381,567                 Bank Syariah Indonesia ("BSI")
            Pihak ketiga                                        407,103                 425,931                                      Third Parties
     Subjumlah                                                2,673,540               2,807,498                                                    Subtotal

     Bank Tabungan Negara ("BTN")                                  964,286            1,071,429                         Bank Tabungan Negara ("BTN")


     Subjumlah                                                     964,286            1,071,429                                                    Subtotal

     Pihak Ketiga

     Agen:      Bank Central Asia ("BCA")                                                                            Agent : Bank Central Asia ("BCA")
     Sindikasi:                                                                                                                           Syndicated :
                Bank Mandiri                                  3,625,171               3,625,171                                 Bank Mandiri
                Bank Negara Indonesia ("BNI")                 1,450,068               1,450,068                 Bank Negara Indonesia ("BNI")
                Bank Tabungan Negara ("BTN")                  1,450,068               1,450,068                Bank Tabungan Negara ("BTN")
            Pihak ketiga                                      4,074,692               4,074,692                                     Third Parties
     Subjumlah                                               10,600,000              10,600,000                                                    Subtotal



     Agen:      Bank CIMB Niaga                                                                                               Agent : Bank CIMB Niaga
     Sindikasi:                                                                                                                             Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                  Government related entities :
                Bank Syariah Indonesia ("BSI")                  101,786                 112,500                 Bank Syariah Indonesia ("BSI")
                Sarana Multi Infrastruktur ("SMI")              508,929                 562,500               Sarana Multi Infrastruktur ("SMI")
            Pihak ketiga                                      4,514,286               4,700,000                                       Third Parties
     Subjumlah                                                5,125,000               5,375,000                                                    Subtotal


     State Bank of India ("SBI")                                   200,000                200,000                    State Bank of India ("SBI")

     Bank Bukopin                                                  300,000                300,000                                 Bank Bukopin

     Bank BCABank
             Syariah
                  BCA("BCA
                       Syariah
                           Syariah")
                               ("BCA Syariah")                     150,000                150,000           Bank BCA Syariah ("BCA Syariah")

     Agen:      Bank Permata                                                                                                      Agent : Bank Permata
     Sindikasi:                                                                                                                            Syndicated :
            Pihak ketiga                                      2,407,585               2,407,585                                      Third Parties



     Bank HSBC Indonesia                                      1,722,222               1,759,499                                   Bank HSBC Indonesia



     Asian Development Bank ("ADB")                          22,778,308              23,296,286                        Asian Development Bank ("ADB")

     Asian Infrastructure Investment Bank ("AIIB")            1,587,485               1,495,010             Asian Infrastructure Investment Bank ("AIIB")
Page 114
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                    Lampiran 5/104 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                          FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                     JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                 (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                 27. BANK LOANS (continued)


                                                                         30 Juni/            31 Desember/
                                                                         June 30             December 31
                                                                         2024                  2023

   Pinjaman tidak terkait program                                                                                                     Loans not related fo fast track program
         percepatan

   Pihak Ketiga

   Agen:      Credit Agricole CIB Paris                                                                                                       Agent : Credit Agricole CIB Paris
   Sindikasi:                                                                                                                                                       Syndicated :
          Pihak ketiga                                                      2,570,209             2,264,147                                                   Third Parties

   Agen:      Bank DBS Indonesia                                                                                                                  Agent : Bank DBS Indonesia
   Sindikasi:                                                                                                                                                   Syndicated :
          Entitas yang berelasi dengan Pemerintah                                                   308,780                                       Government related entities :
              Bank Tabungan Negara ("BTN")                                                       30,878,000                                  Bank Tabungan Negara (BTN)
          Pihak ketiga                                                     27,050,100            31,186,780                                                     Third Parties

   Agen:      Export Guarantee and Insurance Corporation ("EGAP")                                                           Agent : Export Guarantee and Insurance Corporation
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                          151,077               153,220                                                 Third Parties

   Agen:      Servizi Assicurativi del Commercio Estero ("SACE")                                                     Agent : Servizi Assicurativi del Commercio Estero ("SACE")
   Sindikasi:                                                                                                                                                      Syndicated :
          Pihak ketiga                                                          347,541               364,731                                                  Third Parties

   Agen:      Korea Exim Bank ("KEXIM")                                                                                                     Agent : Korea Exim Bank ("KEXIM")
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                          630,486               639,432                                                 Third Parties

   International Bank for Reconstruction and Development ("IBRD")           7,001,595             6,792,886      International Bank for Reconstruction and Development ("IBRD")

   Islamic Development Bank ("IDB")                                         3,446,364             3,242,430                                   Islamic Development Bank ("IDB")

   Agen:      Japan Bank for International Cooperation ("JBIC")                                                        Agent : Japan Bank for International Cooperation ("JBIC")
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                      7,110,730             7,856,253                                          8,342,650Third Parties

   Agen:      MUFG Bank, Ltd.                                                                                                                          Agent : MUFG Bank, Ltd.
   Sindikasi:                                                                                                                                                      Syndicated :
          Pihak ketiga                                                      2,017,347             2,883,038                                                    Third Parties

   Agen:      Export Development Canada ("EDC")                                                                                    Agent : Export Development Canada ("EDC")
   Sindikasi:                                                                                                                                                   Syndicated :
          Pihak ketiga                                                      3,073,875             3,184,294                                                 Third Parties

   Agen:      Sumitomo Mitsui Banking Corporation ("SMBC")                                                              Agent : Sumitomo Mitsui Banking Corporation ("SMBC")
   Sindikasi:                                                                                                                                                   Syndicated :
          Pihak ketiga                                                          885,658               893,642                                               Third Parties
          Entitas yang berelasi dengan Pemerintah
              Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                           --                     --

   Agence Francaise De Development ("AFD")                                      950,618           1,003,546                          Agence Francaise De Development ("AFD")

   Bank Gospodarstwa Krajowego ("BGK")                                          739,322               778,005                           Bank Gospodarstwa Krajowego ("BGK")

   Agen:      BNP Paribas SA                                                                                                                           Agent : BNP Paribas SA
   Sindikasi:                                                                                                                                                    Syndicated :
          Pihak ketiga                                                      1,049,686             1,091,114
Page 115
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/105 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                            27. BANK LOANS (continued)


                                                                       30 Juni/              31 Desember/
                                                                       June 30               December 31
                                                                        2024                   2023

    Pinjaman tidak terkait program                                                                                              Loans not related fo fast track program
          percepatan

    Pihak Ketiga

    Agen:      Standard Chartered Bank ("SCB")                                                                                  Agent : Standard Chartered Bank (“SCB”)
    Sindikasi:                                                                                                                                             Syndicated :
           Pihak ketiga                                                        795,684                886,165                                          Third Parties

    Kreditanstalt fur Wiederaufbau ("KfW")                                3,336,801               3,403,540                        Kreditanstalt fur Wiederaufbau ("KfW")

    Mizuho Bank                                                                651,215                698,069                                               Mizuho Bank


    Jumlah Pinjaman yang tidak terkait program percepatan               138,155,136             147,418,434                Total loans not related fo fast track program

    Jumlah                                                              139,544,133             149,553,669                                                        Total
    Biaya transaksi belum diamortisasi                                    (659,836)               (731,482)                                 Unamortised transaction cost

    Jumlah bersih                                                       138,884,297             148,822,188                                                    Total, Net

    Dikurangi bagian jatuh tempo dalam satu tahun                                                                                              Less : current maturities

    Pinjaman terkait program percepatan                                                                                             Loans related fo fast track program

    Entitas yang berelasi dengan Pemerintah                                                                                                Government related entities :

    Agen:      Bank Negara Indonesia ("BNI")                                                                                   Agent : Bank Negara Indonesia ("BNI")
    Sindikasi:                                                                                                                                          Syndicated :
           Entitas yang berelasi dengan Pemerintah                                                                                  Government related entities :
               Bank Negara Indonesia ("BNI")                                    87,499                 87,499                 Bank Negara Indonesia ("BNI")
               Bank Rakyat Indonesia ("BRI")                                    87,499                 87,499                  Bank Rakyat Indonesia ("BRI")
               Bank Mandiri                                                     87,499                 87,499                                  Bank Mandiri
               Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                     87,499                 87,499   Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
    Subjumlah                                                                  349,995                349,995                                                    Subtotal

    Agen:      Bank DKI                                                                                                                                  Agent : Bank DKI
    Sindikasi:                                                                                                                                                Syndicated :
           Entitas yang berelasi dengan Pemerintah                                                                                     Government related entities :
               Bank DKI                                                        164,286                164,286                                           Bank DKI
               Sarana Multi Infrastruktur ("SMI")                               57,143                 57,143                   Sarana Multi Infrastruktur ("SMI")
               Bank Jateng                                                      28,571                 28,571                                       Bank Jateng
               BPD Aceh                                                         14,286                 14,286                                         BPD Aceh
               Bank Kalteng                                                     14,286                 14,286                                      Bank Kalteng
               Bank Riau                                                        14,286                 14,286                                         Bank Riau
               Bank Kalbar                                                      14,286                 14,286                                        Bank Kalbar
               BPD Bali                                                         10,714                 10,714                                           BPD Bali
    Subjumlah                                                                  317,857                317,857                                                    Subtotal

    Pihak Ketiga                                                                                                                                           Third Parties

    Agen:      Industrial and Commercial Bank of China ("ICBC")                                                 Agent : Industrial and Commercial Bank of China ("ICBC")
    Sindikasi:                                                                                                                                               Syndicated :
           Pihak ketiga                                                        466,684                878,996                                          Third Parties


    Subjumlah                                                                  466,684                878,996                                                    Subtotal

    Jumlah Pinjaman terkait program percepatan                            1,134,535               1,546,848                    Total loans related fo fast track program
Page 116
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/106 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                 JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                             27. BANK LOANS (continued)


                                                                    30 Juni/             31 Desember/
                                                                    June 30              December 31
                                                                    2024                    2023

     Pinjaman tidak terkait program                                                                                          Loans not related fo fast track program
           percepatan

     Entitas yang berelasi dengan Pemerintah                                                                                           Government related entities :

     Agen:      Bank Negara Indonesia ("BNI")                                                                                  Agent : Bank Negara Indonesia ("BNI")
     Sindikasi:                                                                                                                                         Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                Government related entities :
                Bank Negara Indonesia ("BNI")                              269,701                 242,811                    Bank Negara Indonesia ("BNI")
                Bank Rakyat Indonesia ("BRI")                               98,106                  88,325                    Bank Rakyat Indonesia ("BRI")
                Bank Mandiri                                               220,684                 198,682                                    Bank Mandiri
            Pihak ketiga                                                         --                      --                                       Third Parties
     Subjumlah                                                             588,491                 529,818                                                  Subtotal

     Agen:      Bank Rakyat Indonesia ("BRI")                                                                                 Agent : Bank Rakyat Indonesia ("BRI")
     Sindikasi:                                                                                                                                         Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                               Government related entities :
                Bank Rakyat Indonesia ("BRI")                          1,556,470              1,787,971                      Bank Rakyat Indonesia ("BRI")
                Bank Negara Indonesia ("BNI")                            517,933                435,963                     Bank Negara Indonesia ("BNI")
                Bank Mandiri                                           1,007,704              1,068,590                                       Bank Mandiri
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")              71,429                 71,429       Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
                Sarana Multi Infrastruktur ("SMI")                       149,868                176,653                   Sarana Multi Infrastruktur ("SMI")
                BPD Papua                                                 47,063                 63,135                                         BPD Papua
            Pihak ketiga                                                 551,205                578,163                                           Third Parties
     Subjumlah                                                         3,901,671              4,181,904                                                     Subtotal

     Agen:      Bank Mandiri                                                                                                                   Agent : Bank Mandiri
     Sindikasi:                                                                                                                                         Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                               Government related entities :
                Bank Mandiri                                               122,620                 122,620                                    Bank Mandiri
                Bank Rakyat Indonesia ("BRI")                               37,729                  37,729                   Bank Rakyat Indonesia ("BRI")
                Sarana Multi Infrastruktur ("SMI")                          75,458                  75,458                Sarana Multi Infrastruktur ("SMI")
                Lembaga Pembiayaan Ekspor Indonesia ("LPEI")                18,865                  18,865    Lembaga Pembiayaan Ekspor Indonesia ("LPEI")
            Pihak ketiga                                                   198,078                 198,078                                        Third Parties
     Subjumlah                                                             452,749                 452,750                                                  Subtotal

     Agen:      Bank Syariah Indonesia ("BSI")                                                                                 Agent : Bank Syariah Indonesia ("BSI")
     Sindikasi:                                                                                                                                          Syndicated :
            Entitas yang berelasi dengan Pemerintah                                                                                Government related entities :
                Bank Syariah Indonesia ("BSI")                             230,261                 155,759                    Bank Syariah Indonesia ("BSI")
            Pihak ketiga                                                    37,655                  25,472                                         Third Parties
     Subjumlah                                                             267,916                 181,231                                                  Subtotal


     Bank Tabungan Negara ("BTN")                                          214,286                 214,286                            Bank Tabungan Negara ("BTN")

     Subjumlah                                                             214,286                 214,286                                                  Subtotal
Page 117
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                    Lampiran 5/107 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                          FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                     JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                 (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                 27. BANK LOANS (continued)


                                                                        30 Juni/             31 Desember/
                                                                        June 30              December 31
                                                                         2024                  2023

   Pinjaman tidak terkait program                                                                                                    Loans not related fo fast track program
         percepatan

   Pihak Ketiga                                                                                                                                                 Third Parties


   Agen:      Bank CIMB Niaga                                                                                                                        Agent : Bank CIMB Niaga
   Sindikasi:                                                                                                                                                      Syndicated :
          Entitas yang berelasi dengan Pemerintah                                                                                           Government related entities :
              Bank Syariah Indonesia ("BSI")                                  21,429                   21,429                          Bank Syariah Indonesia ("BSI")
              Sarana Multi Infrastruktur ("SMI")                             107,143                  107,143                        Sarana Multi Infrastruktur ("SMI")
          Pihak ketiga                                                     1,371,429                  371,429                                                 Third Parties
   Subjumlah                                                               1,500,000                  500,000                                                         Subtotal


   Bank HSBC Indonesia                                                          292,225               275,202                                           Bank HSBC Indonesia



   Asian Development Bank ("ADB")                                          1,224,977                  613,097                                Asian Development Bank ("ADB")

   Agen:      Credit Agricole CIB Paris                                                                                                      Agent : Credit Agricole CIB Paris
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                          307,594               276,790                                                Third Parties

   Agen:      Bank DBS Indonesia                                                                                                                  Agent : Bank DBS Indonesia
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                     5,737,900              7,256,330                                                  Third Parties

   Agen:      Export Guarantee and Insurance Corporation ("EGAP")                                                          Agent : Export Guarantee and Insurance Corporation
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                           23,243                21,889                                                Third Parties

   Agen:      Servizi Assicurativi del Commercio Estero ("SACE")                                                    Agent : Servizi Assicurativi del Commercio Estero ("SACE")
   Sindikasi:                                                                                                                                                      Syndicated :
          Pihak ketiga                                                           53,468                52,104                                                 Third Parties

   Agen:      Korea Exim Bank ("KEXIM")                                                                                                    Agent : Korea Exim Bank ("KEXIM")
   Sindikasi:                                                                                                                                                     Syndicated :
          Pihak ketiga                                                           96,998                91,347                                                Third Parties

   International Bank for Reconstruction and Development ("IBRD")               378,686               370,521   International Bank for Reconstruction and Development ("IBRD")

   Agen:      Japan Bank for International Cooperation ("JBIC")                                                       Agent : Japan Bank for International Cooperation ("JBIC")
   Sindikasi:                                                                                                                                                      Syndicated :
          Pihak ketiga                                                     1,227,015              1,313,550                                                   Third Parties

   Agen:      MUFG Bank, Ltd.                                                                                                                         Agent : MUFG Bank, Ltd.
   Sindikasi:                                                                                                                                                      Syndicated :
          Pihak ketiga                                                     2,017,347              1,441,519                                                   Third Parties

   Agen:      Export Development Canada ("EDC")                                                                                   Agent : Export Development Canada ("EDC")
   Sindikasi:                                                                                                                                                   Syndicated :
          Pihak ketiga                                                          614,775               578,962                                              Third Parties

   Agen:      Sumitomo Mitsui Banking Corporation ("SMBC")                                                             Agent : Sumitomo Mitsui Banking Corporation ("SMBC")
   Sindikasi:                                                                                                                                                   Syndicated :
          Pihak ketiga                                                          126,523               119,152                                              Third Parties
Page 118
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/108 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                        FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                   JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                               (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                           27. BANK LOANS (continued)
                                                                      30 Juni/              31 Desember/
                                                                      June 30               December 31
                                                                       2024                      2023

    Pinjaman tidak terkait program                                                                                                 Loans not related fo fast track program
          percepatan

    Pihak Ketiga                                                                                                                                               Third Parties

    Agence Francaise De Development ("AFD")                                    80,508                    78,670                  Agence Francaise De Development ("AFD")

    Bank Gospodarstwa Krajowego ("BGK")                                       118,082                   115,071                        Bank Gospodarstwa Krajowego ("BGK")

    Agen:      BNP Paribas SA                                                                                                                         Agent : BNP Paribas SA
    Sindikasi:                                                                                                                                                    Syndicated :
           Pihak ketiga                                                       139,958                   136,389                                              Third Parties

    Agen:      Standard Chartered Bank ("SCB")                                                                                     Agent : Standard Chartered Bank ("SCB")
    Sindikasi:                                                                                                                                                 Syndicated :
           Pihak ketiga                                                       227,338                   221,541                                           Third Parties

    Kreditanstalt fur Wiederaufbau ("KfW")                                    264,789                   251,123                         Kreditanstalt fur Wiederaufbau ("KfW")

    Mizuho Bank                                                               130,243                   126,922                                                  Mizuho Bank


    Jumlah Pinjaman yang tidak terkait program percepatan               19,986,782                 19,400,170                      Loans not related fo fast track program

    Dikurangi : bagian jatuh tempo dalam satu tahun                     21,121,317                 20,947,018                                          Less: current portion

    Bagian jangka panjang                                              117,762,980                127,875,170                                             Long-term portion




                                                                   30 Juni/                              31 Desember
                                                                  June 30,                              December 31,
                                                                    2024                                          2024


   Tingkat suku bunga per tahun                                                                                                         Interest rate per annum
   Rupiah                                                   5.16% - 9.10%                               4.48% - 8.87%                                            Rupiah
   USD                                                      0.75% - 8.06%                               2.56% - 8.03%                                                USD
   JPY                                                      0.62% - 1.74%                               0.60% - 1.74%                                                 JPY
   EUR                                                      0.40% - 5.40%                               0.40% - 6.66%                                                EUR




    Pada tanggal 30 Juni 2024 dan 31 Desember 2023,                                        As at June 30, 2024 and December 31, 2023, the
    rincian utang bank berdasarkan mata uang adalah                                        details of bank loans by currency are as follows:
    sebagai berikut:


                                         30 Juni/ June 30, 2024                                   31 Desember/ December 31, 2023
                                Dalam mata                                                      Dalam mata
                                uang original/                                                  uang original/
                                 In original                Ekuivalen Rp/                        In original                   Ekuivalen/
                                currencies *)               Equivalent Rp                       currencies *)                  Equivalent




     Rupiah                              51,181,125                51,181,125                             54,802,587                   54,802,587                  Rupiah
     USD                             3,659,399,452                 59,992,195                       4,112,700,597                      63,495,984                     USD
     EUR                               824,482,600                 14,455,983                            873,294,663                   14,921,375                     EUR
     JPY                          136,572,274,627                  13,914,830                     149,568,004,937                      16,333,724                      JPY
     Jumlah                                                       139,544,133                                                          149,553,670                    Total

    *)     Dalam jumlah penuh, kecuali Rupiah                                              *)      In full amount, except for Rupiah
Page 119
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/109 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                       (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                      27. BANK LOANS (continued)

    Pinjaman terkait program percepatan                                              Loans related to fast track program

    Perusahaan memperoleh fasilitas pinjaman dari                                    The Company obtained loan facilities from several
    beberapa bank untuk membiayai 85% dari nilai                                     banks to finance 85% of the value of EPC contracts
    kontrak EPC untuk program percepatan. Pinjaman                                   for its fast track program. These loans are fully
    ini sepenuhnya dijamin oleh Pemerintah Republik                                  guaranteed by the Government of the Republic of
    Indonesia sesuai dengan Perpres No. 91 Tahun                                     Indonesia in accordance with Perpres No. 91 Year
    2007, pengganti dari Perpres No. 86 Tahun 2006,                                  2007, which superseded Perpres No. 86 Year 2006,
    tentang Pemberian Jaminan Pemerintah untuk                                       regarding the Grant of Government Guarantee for
    Percepatan Pembangunan Pembangkit Tenaga                                         Construction of a Coal-Fired Power Plant. In
    Listrik yang Menggunakan Batubara. Sehubungan                                    connection with these loans, the Company is
    dengan pinjaman ini, Perusahaan dibatasi oleh                                    restricted by general rules as described in the loan
    ketentuan-ketentuan       umum       sebagaimana                                 agreements.
    ditetapkan dalam perjanjian pinjaman.

    Pada tanggal 30 Juni 2024 dan 31 Desember 2023,                                  As at June 30, 2024 and December 31, 2023, the
    rincian fasilitas pinjaman tersebut adalah sebagai                               details of such loan facilities are as follows:
    berikut:
                                                                 Fasilitas
                                                                maksimum/            Jumlah pinjaman/          Pembayaran kembali/
                  Kreditur dan jenis pinjaman/   Mata uang/     Maximum            Outstanding balance*)           Repayment*)                Periode pinjaman/
    No.            Creditor and type of loan      Currency       facility*)     30 Juni/     31 Desember/    30 Juni/   31 Desember/
                                                                                June 30,      December31,    June 30,    December31,
                                                                                  2024            2023        2024           2023                 Loan term


      1 China Development Bank/                  Dolar AS/               569            28              57          28             57     14 Oktober/October 2009 -
        PLTU Adipala, Cilacap                    US Dollar                                                                                    2 November 2024

      2 Pinjaman sindikasi dikoordinasi/
        Syndicated loan coordinated by
            Bank DKI/                             Rupiah           2,225,000       397,321         556,250      158,929       317,857        12 November 2015 -
        PLTU Riau Tenayan                                                                                                                     12 November 2025

      3 Pinjaman sindikasi dikoordinasi/
        Syndicated loan coordinated by
            BNI/                                                                                                                        17 Desember/December 2015 -
        PLTU Kalimantan Timur/East Kalimantan     Rupiah           2,449,963       524,992         699,989      174,997       349,995    16 Desember/December 2025

    *) Dalam jutaan mata uang original                                                                                                  *) In million original currency




                                                                  30 Juni/                   31 Desember/
                                                                  June 30,                   December 31,
                                                                    2024                         2023
                Tingkat suku bunga per tahun                                                                               Interest rate per annum
                Rupiah                                          8.13% - 8.68%                7.58% - 8.45%                                  Rupiah
                USD                                               7.74%-7.63                 5.92% - 8.02%                                     USD
Page 120
                              PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                           DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/110 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                         (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                        27. BANK LOANS (continued)
     Pinjaman tidak terkait program percepatan                                                           Loans not related to fast track program
                                                                                                           Jumlah pinjaman/
                                                                           Fasilitas                                                               Pembayaran kembali/
                                                                                                         Pembayaran kembali/
                                                                                                        Outstanding balance*)
                                                                          maksimum/                                                                    Repayment*)
                                                                                                             Repayment
                        Kreditur dan jenis pinjaman/        Mata uang/    Maximum                   30 Juni/             31 Desember/          30 Jun/             31 Des/                  Periode pinjaman/
    No.                  Creditor and type of loan          Currency       facility*)            June 30, 2024         December 31, 2023     Jun 30, 2024        Des 31, 2023                  Loan term

    1     Bank Mandiri
          - Pinjaman Perusahaan 2016/                        Rupiah             12,000,000              1,131,873                1,358,248          226,375              5,498,900    19 Desember/December 2016 -
             Corporate Loan 2016                                                                                                                                                           23 November 2026
          - Pinjaman Perusahaan 2020/                        Rupiah               8,800,000             8,800,000                8,800,000                  -                    -     4 Desember/December 2020
             Corporate Loan 2020                                                                                                                                                           23 September 2030
          - Fasilitas Kredit Modal Kerja Bilateral 2022/     Rupiah               1,000,000                        -                     -                  -                    -          21 Juni/June 2024
             Bilateral Working Capital loan Facility 2022                                                                                                                                    31 Juli/July 2024

    2     Bank Rakyat Indonesia ("BRI")
          - Kredit Modal Kerja 2011/                         Rupiah             20,000,000                         -                     -                  -        21,200,000            21 Juni/June 2023 -
             Working Capital Loan 2011                                                                                                                                                      21 Juni/June 2024
          - Pinjaman Perusahaan 2014/                        Rupiah               2,000,000               142,857                 285,714           142,857               285,714     17 Desember/December 2014 -
             Corporate Loan 2014                                                                                                                                                       17 Desember/December 2024
          - Pinjaman Perusahaan 2015/                        Rupiah             12,000,000              2,571,429                3,428,571          857,143              1,714,286    17 Desember/December 2015 -
             Corporate Loan 2015                                                                                                                                                       17 Desember/December 2025
          - Pinjaman Sindikasi 2018/                         Rupiah               4,506,787             2,964,469                3,293,855          329,385               322,932          14 November 2018 -
             Syndicated Loan 2018                                                                                                                                                               14-Nov-28
          - Pinjaman Perusahaan 2019/                        Rupiah             13,250,000              8,991,071                9,937,500          946,429              1,892,857           23 April 2019 -
             Corporate Loan 2019                                                                                                                                                              23 April 2029

    3     Bank Negara Indonesia ("BNI")
          - Pinjaman Perusahaan 2019/                        Rupiah               5,071,000             3,236,702                3,530,948          294,246               529,818     18 Desember/December 2019 -
             Corporate Loan 2019                                                                                                                                                       18 Desember/December 2029
             Fasilitas Kredit Modal Kerja Bilateral 2022/                              108,607                     -                     -                  -            1,300,000          30 Juni/June 2023
             Bilateral Working Capital loan Facility 2022                                                                                                                                   30 Juni/June 2024

    4     Bank Syariah Indonesia (BSI)
          - Pinjaman Perusahaan 2019/                        Rupiah               2,846,000             1,473,540                1,607,498          133,958               181,231     18 Desember/December 2019 -
             Corporate Loan 2019                                                                                                                                                       18 Desember/December 2029
          - Pinjaman Perusahaan 2020/                        Rupiah               1,200,000             1,200,000                1,200,000                  -                    -     4 Desember/December 2020
             Corporate Loan 2020                                                                                                                                                           23 September 2030

    5     Bank Tabungan Negara ("BTN")
          - Pinjaman Perusahaan Bilateral 2019/              Rupiah               1,500,000               964,286                1,071,429          107,143               214,286            24 April 2019 -
             Bilateral Corporate Loan 2019                                                                                                                                                    24 April 2029

    6     Bank Central Asia ("BCA")
          - Fasilitas Kredit Modal Kerja Bilateral 2019/     Rupiah               3,000,000                        -                     -                  -                    -         6 Maret/March 2024
             Bilateral Working Capital loan Facility 2019                                                                                                                              6 Desember/December 2024
          - Pinjaman Perusahaan 2022/                        Rupiah             10,600,000             10,600,000               10,600,000                  -                    -     9 Desember/December 2022 -
             Corporate Loan 2022                                                                                                                                                       23 Desember/December 2032

    7     Bank Danamon Indonesia
          - Fasilitas Kredit Modal Kerja Bilateral 2019/     Rupiah               2,000,000                        -                     -                  -                    -    12 Desember/December 2023 -
             Bilateral Working Capital loan Facility 2019                                                                                                                              12 Desember/December 2024

    8     Bank Maybank Indonesia
          - Pinjaman Perusahaan 2017/                        Rupiah               4,300,000                        -                     -                  -                    -     2 November/November 2017 -
             Corporate Loan 2017                                                                                                                                                       2 November/November 2027
          - Fasilitas Kredit Modal Kerja Bilateral 2022/     Rupiah               1,000,000                        -                     -                  -                    -         14 Maret/March 2024
             Bilateral Working Capital loan Facility 2022                                                                                                                                  14 Maret/March 2025

    9     Bank CIMB Niaga
          - Pinjaman Perusahaan 2019/                        Rupiah               3,500,000             2,375,000                2,625,000          250,000               500,000          23 April/April 2019 -
             Corporate Loan 2019                                                                                                                                                            23 April/April 2029
          - Pinjaman Perusahaan 2020/                        Rupiah               1,000,000             1,000,000                1,000,000                  -                    -     4 Desember/December 2020 -
             Corporate Loan 2020                                                                                                                                                       23 Desember/December 2026
          - Pinjaman Perusahaan 2020 (syariah)/              Rupiah               1,000,000             1,000,000                1,000,000                  -                    -     4 Desember/December 2020 -
             Corporate Loan 2020 (sharia)                                                                                                                                              23 Desember/December 2026
          - Pinjaman Perusahaan 2022 (syariah)/              Rupiah                    750,000            750,000                 750,000                   -                    -     9 Desember/December 2022 -
             Corporate Loan 2022 (sharia)                                                                                                                                              23 Desember/December 2032

    10    Bank HSBC
          - Fasilitas Kredit Modal Kerja Bilateral 2021/     Rupiah               1,400,000                        -                     -                  -                    -        30 September 2023 -
             Bilateral Working Capital loan Facility 2021                                                                                                                                   30 Juni/June 2024
          - Fasilitas Kredit untuk Tambak Lorok 2018/       Dolar AS/                     214                    105                  114                   9                  18      19 Februari/February 2018 -
             Credit Facility for Tambak Lorok 2018          US Dollar                                                                                                                    19 Agustus/August 2032

    11    Bank DBS Indonesia
          - Fasilitas Kredit Berjangka 2019/                Dolar AS/                     970                      -                  270               270                   450          25Juni/June 2019 -
             Term Loan Facilities 2019                      US Dollar                                                                                                                       25 Juni/June 2024
          - Fasilitas Kredit Berjangka MIGA 2020/           Dolar AS/                     500                    400                  500               100                      -    23 Desember/December 2020 -
             MIGA Term Loan Facilities 2020                 US Dollar                                                                                                                 23 Desember/December 2025 -
          - Fasilitas Kredit Berjangka 2021/                Dolar AS/                     500                    500                  500                   -                    -    22 Desember/December 2021 -
             Term Loan Facilities 2021                      US Dollar                                                                                                                 22 Desember/December 2026 -
          - Fasilitas Kredit Berjangka 2022/                Dolar AS/                     750                    750                  750              0.00                      0    23 Desember/December 2022 -
             Term Loan Facilities 2022                      US Dollar                                                                                                                 23 Desember/December 2027 -

    12    MUFG Bank
          - Pinjaman Perusahaan 2018/                       Dolar AS/                     100                      -                     -                  -                  60     13 Desember/December 2018 -
            Corporate Loan 2018                             US Dollar                                                                                                                  13 Desember/December 2023
          - Fasilitas Kredit Berjangka 2020/                  JPY                       33,000             19,800                  26,400             6,600                 6,600          5 Maret/March 2020 -
            Term Loan Facilities 2020                                                                                                                                                      5 Maret/March 2025 -
          - Fasilitas Kredit Modal Kerja Bilateral 2022/     Rupiah               1,000,000                        -                     -                  -                    -             30-Sep-23
            Bilateral Working Capital loan Facility 2022                                                                                                                                       30-Sep-24




   *) Dalam jutaan mata uang original                                                                                                                                       *) In million original currency
Page 121
                                PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                             DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                  Lampiran 5/111 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                      (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                                    27. BANK LOANS (continued)

     Pinjaman tidak terkait program percepatan                                                                           Loans not related to fast track program (continued)
     (lanjutan)
                                                                                                                   Jumlah pinjaman/
                                                                                  Fasilitas                                                              Pembayaran kembali/
                                                                                                                 Pembayaran kembali/
                                                                                                                Outstanding balance*)
                                                                                  maksimum/                                                                  Repayment*)
                                                                                                                     Repayment
                        Kreditur dan jenis pinjaman/                 Mata uang/   Maximum                   30 Juni/             31 Desember/        30 Jun/             31 Des/                  Periode pinjaman/
    No.                  Creditor and type of loan                   Currency      facility*)            June 30, 2024         December 31, 2023   Jun 30, 2024        Des 31, 2023                  Loan term

    13    Standard Chartered Bank ("SCB")
          - Fasilitas Arun 2013/                                       EUR                         85                     25                  28                   4              7.1       11 Desember/December 2013 -
             Arun Facility 2013                                                                                                                                                                     30-Sep-27
          - Fasilitas Bangkanai 2013/                                  EUR                         71                     21                  24                   3              5.9       23 Desember/December 2013 -
             Bangkanai Facility 2013                                                                                                                                                                30-Sep-27

    14    Agence Francaise De Development ("AFD")
          - Pinjaman Perusahaan 2015/                                  EUR                         70                     54                  59                   5              9.0             7 Mei/May 2015 -
             Corporate Loan 2015                                                                                                                                                                   7 Mei/May 2030

    15    Kreditanstalt fur Wiederaufbau ("KfW")
          - Fasilitas Kredit untuk Bangkanai Peaker/                   EUR                         83                     35                  39                   4              8.3            15 September 2017 -
             Credit Facility for Bangkanai Peaker                                                                                                                                            15 Desember/December 2028
          - Fasiitas Kredit untuk Kumbih 03 2017/                      EUR                         85                      0                 0.1                   0              0.3       15 Desember/December 2017 -
             Credit Facility for Kumbih 03 2017                                                                                                                                              30 Desember/December 2032
          - Fasiitas Kredit untuk Hydropower Programme 2019/           EUR                        295                    0.7                 1.4                   2              3.4       5 September/September 2019 -
             Credit Facility for Hydropower Programme 2019                                                                                                                                        15 November 2033
          - Fasiitas Kredit untuk Ulumbu&Mataloko 2018/                EUR                        150                      -                 0.7                   1              1.4         11 Oktober/October 2018 -
             Credit Facility for Ulumbu & Mataloko 2018                                                                                                                                           15 November 2033
          - Fasiitas Kredit untuk RBL SNT (KfW 27834)/                 EUR                         45                     26                  29                   3              6.4             23 Mei/May 2016 -
             Credit Facility for RBL SNT (KfW 27834)                                                                                                                                              30 Juni/June 2028
          - Fasiitas Kredit untuk RBL SNT (KfW 29069)/                 EUR                        255                    129                129                    -                  -      8 Desember/December 2020
             Credit Facility for RBL SNT (KfW 29069)                                                                                                                                               15 Mei/May 2036

    16    Asian Development Bank ("ADB")
          - Fasilitas Kredit Penguatan                                 EUR                        490                    376                392                   16              33        4 Desember/December 2015 -
             Gardu 2015/                                             Dolar AS/                                            22                 23                    1              1.9               15-Sep-35
             Credit Facility Grid Strengthening 2015                 US Dollar
          - Fasilitas Kredit Penguatan                               Dolar AS/                     25                     19                  20                   1              1.6       4 Desember/December 2015 -
             Gardu 2015/                                             US Dollar                                                                                                                      15-Sep-35
             Credit Facility Grid Strengthening 2015
          - Fasilitas Kredit akses Energi berkelanjutan                                                                                                                                       10 Oktober/October 2017 -
             Di Kawasan Indonesia Timur 2017/                        Dolar AS/                    584                      -                   -                   -              78              15 Mei/May 2037
             Credit Facility for Sustainable Energy                  US Dollar
             Access in Eastern Indonesia 2017                          EUR                      78,688             75,774                 78,688            2,914                     0
          - Fasilitas Kredit akses Energi berkelanjutan                                                                                                                                     8 Desember/December 2020 -
             Di Kawasan Indonesia Timur 2020 (Tahap II)/             Dolar AS/                    600                    326                326                    -                  -        15 Oktober/October 2040
             Credit Facility for Sustainable Energy                  US Dollar
             Access in Eastern Indonesia 2020 (Phase II)
          - Fasilitasi Kredit Program Akses Energi yang                                                                                                                                     31 Desember/December 2021 -
             Berkelanjutan dan Andal - Jawa Barat dan Jawa Tengah/   Dolar AS/                    600                    150                150                    -                  -        15 Oktober/October 2041
             Credit Facility for Sustainable and Reliable Energy     US Dollar
             Access Program - Western and Central Java

    17    Export Development Canada ("EDC")
          Private Limited Company (“HEXIM”)
          - Fasilitas Kredit untuk Batam Mobile
              Power Plant 2017/                                      Dolar AS/                     14                      6                   6                   1                  1           1 Mei/May 2017 -
              Credit Facility for Batam Mobile                       US Dollar                                                                                                                 27 Januari/January 2029
              Powe Plant 2017
          - Fasilitas Kredit untuk Batam Mobile
              Power Plant 2016/                                      Dolar AS/                    436                    182                200                   18              36        2 Desember/December 2016 -
              Credit Facility for Batam Mobile                       US Dollar                                                                                                                 27 Januari/January 2029
              Powe Plant 2016

    18    Japan Bank for International Cooperation ("JBIC")
          - Fasilitas Kredit untuk Pembangunan                         JPY                      16,430              8,677                  9,362              685              1,369
             PLTU Lontar 2016/                                       Dolar AS/                     179                 89                     96                7                 15           14 Maret/March 2016 -
             Credit Facility for Construction of                     US Dollar                                                                                                                 1 Oktober/October 2031
             Lontar Steam Electricity Power Plant 2016/
          - Fasilitas Kredit untuk Pembangunan                         JPY                      30,827             17,592                 18,916            1,323              2,647
             PLTU Jawa 2 Priok 2016/                                 Dolar AS/                      45                 26                     28                2                  4          20 Oktober/October 2016 -
             Credit Facility for Construction of Jawa 2              US Dollar                                                                                                                      30 April 2031
             Priok Steam Electricity Power Plant 2016/
          - Fasilitas Kredit untuk Pembangunan                         JPY                      14,545              8,346                  8,942              596              1,192
             Fasilitas Muara Karang 2017/                            Dolar AS/                      37                 22                     23                2                  3            10 Maret/March 2017 -
             Credit Facility for Construction of                     US Dollar                                                                                                                     29 Mei/May 2031
             Muara Karang Facility 2017/
          - Fasilitas Kredit untuk Pembangunan                         JPY                      16,939              6,382                  7,260              877              1,608
             PLTU Kalseteng 2 2017/                                  Dolar AS/                      89                 42                     46                4                  8             20 Juni/June 2017 -
             Credit Facility for Construction of Kalseteng           US Dollar                                                                                                                       15-Sep-32
             2 Steam Electricity Power Plant 2017/

    19    International Bank for Reconstruction and
          Development ("IBRD")
          - Fasilitas Kredit untuk Membiayai Power
               Distribution Development Program 2016/                Dolar AS/                    500                    427                440                   13              25             20 Mei/May 2016 -
               Credit Facility to Finance Power                      US Dollar                                                                                                                  15 Maret/March 2036
               Distribution Development Program 2016
          - Fasilitas Kredit akses Energi berkelanjutan              Dolar AS/                    500                      -                   -                   -                  0           7 Mei/May 2024 -
               Di Kawasan Indonesia Timur 2024/                      US Dollar                                                                                                                15 Februari/February 2044
               Credit Facility for Sustainable Energy
               Access in Eastern Indonesia 2024

    20    KEXIM
          - Fasilitas Kredit untuk Membiayai
            PLTGU Grati 2016/                                        Dolar AS/                     71                     38                  41                   3                  6          24 Juni/June 2016 -
            Credit Facility to Finance                               US Dollar                                                                                                               23 Desember/December 2030
            PLTGU Grati 2016

   *) Dalam jutaan mata uang original                                                                                                                                                     *) In million original currency
Page 122
                              PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                           DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                               Lampiran 5/112 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                        FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                   JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                               (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                                                              27. BANK LOANS (continued)

     Pinjaman tidak terkait program percepatan                                                                 Loans not related to fast track program (continued)
     (lanjutan)
                                                                                                                 Jumlah pinjaman/
                                                                                 Fasilitas                                                              Pembayaran kembali/
                                                                                                               Pembayaran kembali/
                                                                                                              Outstanding balance*)
                                                                                maksimum/                                                                   Repayment*)
                                                                                                                   Repayment
                        Kreditur dan jenis pinjaman/              Mata uang/    Maximum                   30 Juni/             31 Desember/         30 Jun/             31 Des/                 Periode pinjaman/
    No.                  Creditor and type of loan                Currency       facility*)            June 30, 2024         December 31, 2023    Jun 30, 2024        Des 31, 2023                 Loan term

    21    Islamic Development Bank ("IDB")
          - Fasilitas Kredit untuk Membiayai Power
              Grid Enhancement Program 2017/                      Dolar AS/                     210                    210                 210                    -                  -      10 Januari/January 2017 -
              Credit Facility to Finance Power                    US Dollar                                                                                                                  6 Agustus/August 2033
              Grid Enhancement Program 2017

    22    Sumitomo Mitsui Banking Corporation ("SMBC")
          - Fasilitas Kredit untuk Membiayai
             PLTA Jatigede 2017/                                  Dolar AS/                      73                     54                  58                    4                  8       30 Maret/March 2017 -
             Credit Facility to Finance                           US Dollar                                                                                                                   30 Maret/March 2031
             PLTA Jatigede 2017
          - Fasilitas Kredit Berjangka 2018/                      Dolar AS/                    1,320                     -                    -                   -             420         1 Agustus/August 2018 -
             Term Loan Facilities 2018                            US Dollar                                                                                                                  1 Agustus/August 2023

    23    Mizuho
          - Fasilitas Kredit untuk Membiayai
             Lombok Peaker 2017/                                    EUR                          74                     37                  41                    4                  7         24 Mei/May 2017 -
             Credit Facility to Finance                                                                                                                                                      24 Januari/January 2029
             Lombok Peaker 2017

    24    Credit Agricole CIB PARIS
          - Fasilitas Kredit untuk Membiayai
             PLTGU Muara Tawar 2017/                              Dolar AS/                     249                    157                 147                   10              24            8 November 2017 -
             Credit Facility to Finance                           US Dollar                                                                                                                      8 Mei/May 2032
             PLTGU Muara Tawar 2017

    25    BNP Paribas SA
          - Fasilitas Kredit untuk Membiayai
            Sumbagut 2 Peaker 2018/                                 EUR                         108                     60                  64                    4                  8     9 Februari/February 2018 -
            Credit Facility to Finance                                                                                                                                                       9 Oktober/October 2031
            Sumbagut 2 Peaker 2018

    26    BGK
          - Fasilitas Kredit untuk Membiayai
            PLTU Lombok FTP-2 2018/                                 EUR                          81                     42                  46                    3                  7     21 Februari/February 2018 -
            Credit Facility to Finance                                                                                                                                                      28 Februari/February 2033
            PLTU Lombok FTP-2 2018

    27    SACE
          - Fasilitas Kredit untuk Membiayai
            PLTGU Grati 2016/                                       EUR                          37                     20                  21                    2                  3        24 Juni/June 2016 -
            Credit Facility to Finance                                                                                                                                                    23 Desember/December 2030
            PLTGU Grati 2016

    28    Exportni Garancni
          a Pojistovaci Spolecnost (“EGAP”)
          - Fasilitas Kredit untuk Membiayai
             PLTGU Grati 2016/                                    Dolar AS/                      17                      9                  10                    1                  1        24 Juni/June 2016 -
             Credit Facility to Finance                           US Dollar                                                                                                               23 Desember/December 2030
             PLTGU Grati 2016

    29    AIIB
          - Fasilitas Kredit untuk Membiayai Proyek Penguatan
              Distribusi Tenaga Listrik Jawa Timur & Bali 2021/   Dolar AS/                     310                     97                  97                    -                  -     10 Februari/February 2021 -
              Credit Facility to Finance East Java & Bali         US Dollar                                                                                                                 15 Oktober/October 2040
              Power Distribution Strengthening Project 2021

    30    LPEI
          - Fasilitas Kredit Modal Kerja Bilateral 2021/           Rupiah               3,500,000                        -                    -                   -                  -    20 Desember/December 2022
             Bilateral Working Capital loan Facility 2021                                                                                                                                 20 Desember/December 2024

    31    UOB
          - Fasilitas Kredit Modal Kerja Bilateral 2021/           Rupiah               1,000,000                        -                    -                   -                  -          31 Mei/May 2024
            Bilateral Working Capital loan Facility 2021                                                                                                                                        31 Juli/July 2024

    32    Permata
          - Pinjaman Perusahaan 2022/                              Rupiah               2,750,000             2,407,585               2,407,585                   -                  -    8 Desember/December 2022 -
             Corporate Loan 2022                                                                                                                                                          8 Desember/December 2032 -
          - Fasilitas Kredit Modal Kerja Bilateral 2024/                                1,000,000                        -                                        -                         29 Februari/February 2024 -
             Bilateral Working Capital loan Facility 2024                                                                                                                                   28 Februari/February 2025 -

     33   Bank Central Asia Syariah ("BCA Syariah")
          - Pinjaman Perusahaan 2022/                              Rupiah                    150,000            150,000                150,000                    -                  -    9 Desember/December 2022 -
             Corporate Loan 2022                                                                                                                                                          9 Desember/December 2032 -

     34   KB Bukopin
          - Pinjaman Perusahaan 2022/                              Rupiah                    300,000            300,000                300,000                    -                  -    9 Desember/December 2022 -
             Corporate Loan 2022                                                                                                                                                          9 Desember/December 2032 -

     35   Bank SBII
          - Pinjaman Perusahaan 2022/                              Rupiah                    200,000            200,000                200,000                    -                  -    9 Desember/December 2022 -
             Corporate Loan 2022                                                                                                                                                          9 Desember/December 2032 -

     36   Clean Technology Fund "CTF"
          - Fasilitas Kredit akses Energi berkelanjutan           Dolar AS/                      15                      -                    -                   -                             7 Mei/May 2024 -
             Di Kawasan Indonesia Timur 2024/                     US Dollar                                                                                                                 15 Februari/February 2053
             Credit Facility for Sustainable Energy
             Access in Eastern Indonesia 2024

     37   Canada Clean Energy and Forest Climate Fund "CCEFCF"
          - Fasilitas Kredit akses Energi berkelanjutan           Dolar AS/                      48                      -                    -                   -                             7 Mei/May 2024 -
             Di Kawasan Indonesia Timur 2024/                     US Dollar                                                                                                                 15 Februari/February 2043
             Credit Facility for Sustainable Energy
             Access in Eastern Indonesia 2024




   *) Dalam jutaan mata uang original                                                                                                                                         *) In million original currency
Page 123
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/113 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

27. UTANG BANK (lanjutan)                                    27. BANK LOANS (continued)

    Pinjaman tidak terkait program percepatan                      Loans not related to fast track program (continued)
    (lanjutan)

                                                  30 Juni/               31 Desember/
                                                  June 30,               December 31,
                                                    2024                     2023
     Tingkat suku bunga per tahun                                                                   Interest rate per annum
     Rupiah                                     5.16% - 9.10%             4.48% - 8.87%                              Rupiah
     USD                                        0.75% - 8.06%             2.56% - 8.03%                                 USD
     JPY                                        0.62% - 1.74%             0.60% - 1.74%                                 JPY
     EUR                                        0.40% - 5.40%             0.40% - 6.66%                                 EUR



    Perusahaan melakukan pembayaran pokok dan                      The Company has made payments of principal and
    bunga pinjaman bank sesuai dengan jadwal                       interest on the bank loans in accordance with the
    pembayaran dalam perjanjian pinjaman bank yang                 schedule of payment specified within the
    berlaku pada tanggal laporan.                                  agreements of the bank loans as at the reporting
                                                                   date.

    Selama periode Enam bulan yang berakhir pada                   During the six month periods ended June 30, 2024
    tanggal 30 Juni 2024 dan 31 Desember 2023, Grup                and December 31, 2023, the Group made
    melakukan penarikan seluruh pinjaman bank                      withdrawals from all bank loans amounting to
    sebesar     USD20.176.488      (setara   dengan                USD20,176,488 (equivalent to Rp320,946),
    Rp320.946), EUR1.403.939 (setara dengan                        EUR1,403,939 (equivalent to Rp24,227), (2023:
    Rp24.227) (2023: USD889.139.834 (setara dengan                 USD889,139,834 (equivalent to Rp13,755,461),
    Rp13.755.461), EUR9.790.783 (setara dengan                     EUR9,790,783        (equivalent  to   Rp161,380),
    Rp161.380), JPY5.010.927.035 (setara dengan                    JPY5,010,927,035 (equivalent to Rp529,788) and
    Rp529.788) dan Rp39.458.930). Pelunasan lebih                  Rp39,458,930). The voluntary early repayments of
    awal secara sukarela atas pokok pinjaman selama                the loan principal during 2023 amounting to RpNihil
    periode Juni 2024 dan 31 Desember 2023 adalah                  and Rp4,100,000.
    sebesar RpNihil dan Rp4.100.000.

28. UTANG OBLIGASI DAN SUKUK IJARAH                          28. BONDS PAYABLE AND SUKUK IJARA

    Obligasi dan sukuk ijarah                                      Bonds and sukuk ijara
                                                31 Juni/             31 Desember/
                                                June 31,             December 31,
                                                  2024                   2023

   Obligasi dan Sukuk Ijarah Rupiah                                                            Rupiah Bonds and Sukuk Ijara
    Obligasi Berkelanjutan IV                                                                      Shelf Registration Bonds IV
       PLN Tahap I Tahun 2020                         1,500,000            1,500,000                        PLN I Year 2020
    Sukuk Ijarah Berkelanjutan IV                                                            Shelf Registration Sukuk Ijara IV
       PLN Tahap I Tahun 2020                          376,500               376,500                        PLN I Year 2020
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap VII Tahun 2020                       1,420,435            1,420,435                   PLN VII Year 2020
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap VI Tahun 2020                        4,812,430            4,812,430                    PLN VI Year 2020
    Sukuk Ijarah Berkelanjutan III                                                          Shelf Registration Sukuk Ijara III
       PLN Tahap VI Tahun 2020                         115,500               115,500                    PLN VI Year 2020
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap V Tahun 2019                         1,912,900            1,912,900                     PLN V Year 2019
    Sukuk Ijarah Berkelanjutan III                                                          Shelf Registration Sukuk Ijara III
       PLN Tahap V Tahun 2019                          797,500               797,500                     PLN V Year 2019
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap IV Tahun 2019                        2,953,620            2,953,620                    PLN IV Year 2019
    Sukuk Ijarah Berkelanjutan III                                                          Shelf Registration Sukuk Ijara III
       PLN Tahap IV Tahun 2019                        1,250,000            1,250,000                    PLN IV Year 2019
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap III Tahun 2019                        812,000             2,024,000                     PLN III Year 2019
    Sukuk Ijarah Berkelanjutan III                                                          Shelf Registration Sukuk Ijara III
       PLN Tahap III Tahun 2019                        337,000               600,000                     PLN IIIYear 2019
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap II Tahun 2018                         622,000               622,000                     PLN II Year 2018
Page 124
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                              Lampiran 5/114 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                  DAN   SUKUK    IJARAH      28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                            Bonds and sukuk ijara (continued)


                                                  31 Juni/          31 Desember/
                                                  June 31,          December 31,
                                                    2024                2023

   Obligasi dan Sukuk Ijarah Rupiah                                                            Rupiah Bonds and Sukuk Ijara
    Sukuk Ijarah Berkelanjutan III                                                          Shelf Registration Sukuk Ijara III
       PLN Tahap II Tahun 2018                           110,000            110,000                      PLN II Year 2018
    Obligasi Berkelanjutan III                                                                  Shelf Registration Bonds III
       PLN Tahap I Tahun 2018                          1,200,000          1,200,000                       PLN I Year 2018
    Sukuk Ijarah Berkelanjutan III                                                          Shelf Registration Sukuk Ijara III
       PLN Tahap I Tahun 2018                            623,000            623,000                       PLN I Year 2018
    Obligasi Berkelanjutan II                                                                    Shelf Registration Bonds II
       PLN Tahap III Tahun 2018                        2,078,000          2,078,000                     PLN III Year 2018
    Sukuk Ijarah Berkelanjutan II                                                           Shelf Registration Sukuk Ijara II
       PLN Tahap III Tahun 2018                          594,500            594,500                     PLN III Year 2018
    Obligasi Berkelanjutan II                                                                    Shelf Registration Bonds II
       PLN Tahap II Tahun 2017                         2,094,000          2,094,000                      PLN II Year 2017
    Sukuk Ijarah Berkelanjutan II                                                           Shelf Registration Sukuk Ijara II
       PLN Tahap II Tahun 2017                           611,000            611,000                      PLN II Year 2017
    Obligasi Berkelanjutan II                                                                    Shelf Registration Bonds II
       PLN Tahap I Tahun 2017                          1,386,000          1,386,000                       PLN I Year 2017
    Sukuk Ijarah Berkelanjutan II                                                           Shelf Registration Sukuk Ijara II
       PLN Tahap I Tahun 2017                            214,000            214,000                       PLN I Year 2017

   Surat Utang Jangka                                                                                         Global Medium
    Menengah Global - USD                                                                                 Term Notes - USD
   Penerbitan tahun 2020                              24,591,000         23,158,500                            Issued in 2020
   Penerbitan tahun 2019                              39,345,600         37,053,600                            Issued in 2019
   Penerbitan tahun 2018                              49,182,000         46,317,000                            Issued in 2018
   Penerbitan tahun 2017                              32,788,000         30,878,000                            Issued in 2017
   Penerbitan tahun 2012                              16,394,000         15,439,000                            Issued in 2012

   Surat Utang Jangka                                                                                         Global Medium
    Menengah Global - EUR                                                                                 Term Notes - EUR
   Penerbitan tahun 2019                               8,766,700          8,543,150                            Issued in 2018
   Penerbitan tahun 2018                               8,766,700          8,543,150                            Issued in 2018

   Obligasi - JPY                                                                                               Obligasi - JPY
   Penerbitan tahun 2019                               1,986,781          2,129,517                             Issued in 2019

   Obligasi Terjamin - USD                                                                           Guaranteed Notes - USD
   Penerbitan tahun 2007                               4,726,587          4,451,249                           Issued in 2007

   Subjumlah                                         212,367,753        203,808,552                                   Subtotal

   Biaya emisi belum diamortisasi                     (6,469,033)        (6,243,718)          Unamortized debt issuance cost
   Jumlah                                            205,898,720        197,564,835                                      Total

   Disajikan di laporan posisi keuangan                                                  Presented in consolidated statements
     konsolidasian sebagai:                                                                             of financial position:
     Liabilitas jangka pendek                          4,617,880          5,578,511                         Current liabilities
     Liabilitas jangka panjang                       201,280,840        191,986,324                    Non-current liabilites

   Jumlah                                            205,898,720        197,564,835                                      Total
Page 125
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/115 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                        DAN       SUKUK         IJARAH             28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                                    Bonds and sukuk ijara (continued)

    Obligasi ini diterbitkan sebesar harga nominal                                          The bonds were issued at nominal value and are
    dalam mata uang Rupiah dengan rincian sebagai                                           denominated in Rupiah, with the following details:
    berikut:
                                                                                          Tingkat kupon/   Periode
                                                                                          Imbalan ijarah pembayaran
                                                                                            per tahun/      bunga/
                                                                                           Coupun rate/    Interest
                                            Pokok/              Periode pinjaman/            Ijara fee    payment     Wali amanat/
                                           Principal                Loan term               per annum       period      Trustee

    Obligasi Berkelanjutan IV                                                                                                               Shelf Registration Bonds IV
       PLN Tahap I Tahun 2020                                                                                                                       PLN I Year 2020
       Seri A                                    312,000        8 September 2020 -           6.70%                                                           Series A
                                                                September 8, 2025
       Seri B                                     28,000        8 September 2020 -           7.25%                                                          Series B
                                                                September 8, 2027
       Seri C                                    158,000        8 September 2020 -           7.90%       Kuartalan/   Bank Tabungan                         Series C
                                                                September 8, 2030                        Quaterly        Negara
       Seri D                                    841,000        8 September 2020 -           8.65%                                                          Series D
                                                                September 8, 2035
       Seri E                                    161,000        8 September 2020 -           8.86%                                                          Series E
                                                                September 8, 2040
       Subtotal                                 1,500,000

    Obl Syariah Ijarah Berkelanjutan IV                                                                                               Shelf Registration Sukuk Ijarah IV
      Tahap I Tahun 2020                                                                                                                             PLN I Year 2020
      Seri A                                      39,000        8 September 2020 -           6.70%                                                          Series A
                                                                September 8, 2025
       Seri B                                     35,000        8 September 2020 -           7.25%                                                          Series B
                                                                September 8, 2027
       Seri C                                    200,000        8 September 2020 -           7.90%       Kuartalan/   Bank Tabungan                         Series C
                                                                September 8, 2030                        Quaterly        Negara
       Seri D                                     56,000        8 September 2020 -           8.65%                                                          Series D
                                                                September 8, 2035
       Seri E                                     46,500        8 September 2020 -           8.86%                                                          Series E
                                                                September 8, 2040
       Subtotal                                  376,500

    Obligasi Berkelanjutan III                                                                                                               Shelf Registration Bonds III
       PLN Tahap VII Tahun 2020                                                                                                                    PLN VII Year 2020
       Seri A                                                    6 Mei/May 2020 -            7.92%                                                           Series A
                                                                  6 Mei/May 2023
       Seri B                                     99,155         6 Mei/May 2020 -            8.25%       Kuartalan/   Bank Tabungan                         Series B
                                                                  6 Mei/May 2026                         Quaterly        Negara
       Seri C                                    312,180         6 Mei/May 2020 -            8.55%                                                          Series C
                                                                  6 Mei/May 2027
       Seri D                                   1,009,100        6 Mei/May 2020 -            9.10%                                                          Series D
                                                                  6 Mei/May 2030
       Subtotal                                 1,420,435

    Obligasi Berkelanjutan III                                                                                                              Shelf Registration Bonds III
       PLN Tahap VI Tahun 2020                                                                                                                     PLN VI Year 2020
       Seri A                                    540,630    18 Februari/February 2020 -      7.20%                                                           Series A
                                                             18 Februari/February 2025
       Seri B                                    672,500    18 Februari/February 2020 -      7.70%                                                          Series B
                                                             18 Februari/February 2027
       Seri C                                    544,250    18 Februari/February 2020 -      8.00%       Kuartalan/   Bank Tabungan                         Series C
                                                             18 Februari/February 2030                   Quaterly        Negara
       Seri D                                   1,459,000   18 Februari/February 2020 -      8.70%                                                          Series D
                                                             18 Februari/February 2035
       Seri E                                   1,596,050   18 Februari/February 2020 -      9.05%                                                          Series E
                                                             18 Februari/February 2040
       Subtotal                                 4,812,430

    Sukuk Ijarah Berkelanjutan III                                                                                                    Shelf Registration Sukuk Ijarah III
      PLN Tahap VI Tahun 2020                                                                                                                     PLN VI Year 2020
      Seri A                                      40,500    18 Februari/February 2020 -      7.70%                                                         Series A
                                                             18 Februari/February 2027
       Seri B                                      3,500    18 Februari/February 2020 -      8.00%       Kuartalan/   Bank Tabungan                         Series B
                                                             18 Februari/February 2030                   Quaterly        Negara
       Seri C                                      9,000    18 Februari/February 2020 -      8.70%                                                          Series C
                                                             18 Februari/February 2035
       Seri D                                     62,500    18 Februari/February 2020 -      9.05%                                                          Series D
                                                             18 Februari/February 2040
       Subtotal                                  115,500

    Obligasi Berkelanjutan III                                                                                                               Shelf Registration Bonds III
       PLN Tahap V Tahun 2019                                                                                                                       PLN V Year 2019
       Seri A                                    795,700     1 Oktober/October, 2019 -       7.90%                                                           Series A
                                                              1 Oktober/October, 2024
       Seri B                                    445,000     1 Oktober/October, 2019 -       8.40%                                                          Series B
                                                              1 Oktober/October, 2026
       Seri C                                      6,200     1 Oktober/October, 2019 -       8.60%       Kuartalan/   Bank Tabungan                         Series C
                                                              1 Oktober/October, 2029                    Quaterly        Negara
       Seri D                                    166,000     1 Oktober/October, 2019 -       9.40%                                                          Series D
                                                              1 Oktober/October, 2034
       Seri E                                    500,000     1 Oktober/October, 2019 -       9.90%                                                          Series E
                                                              1 Oktober/October, 2039
       Subtotal                                 1,912,900
Page 126
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/116 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                          (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                   DAN      SUKUK          IJARAH            28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                               Bonds and sukuk ijara (continued)


                                                                                      Tingkat kupon/   Periode
                                                                                      Imbalan ijarah pembayaran
                                                                                        per tahun/      bunga/
                                                                                       Coupun rate/    Interest
                                       Pokok/              Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                      Principal                Loan term                per annum       period      Trustee

    Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
      PLN Tahap V Tahun 2019                                                                                                                   PLN V Year 2019
      Seri A                                  6,500     1 Oktober/October, 2019 -        7.90%                                                         Series A
                                                         1 Oktober/October, 2024
       Seri B                                10,000     1 Oktober/October, 2019 -        8.40%                                                          Series B
                                                         1 Oktober/October, 2026
       Seri C                                92,000     1 Oktober/October, 2019 -        8.60%       Kuartalan/   Bank Tabungan                         Series C
                                                         1 Oktober/October, 2029                     Quaterly        Negara
       Seri D                               135,000     1 Oktober/October, 2019 -        9.40%                                                          Series D
                                                         1 Oktober/October, 2034
       Seri E                               554,000     1 Oktober/October, 2019 -        9.90%                                                          Series E
                                                         1 Oktober/October, 2039
       Subtotal                             797,500

    Obligasi Berkelanjutan III                                                                                                         Shelf Registration Bonds III
       PLN Tahap IV Tahun 2019                                                                                                                PLN IV Year 2019
       Seri A                               637,000     1 Agustus/August, 2019 -         8.00%                                                          Series A
                                                         1 Agustus/August, 2024
       Seri B                               315,250     1 Agustus/August, 2019 -         8.50%                                                          Series B
                                                         1 Agustus/August, 2026
       Seri C                               549,000     1 Agustus/August, 2019 -         8.70%       Kuartalan/   Bank Tabungan                         Series C
                                                         1 Agustus/August, 2029                      Quaterly        Negara
       Seri D                               395,000     1 Agustus/August, 2019 -         9.50%                                                          Series D
                                                         1 Agustus/August, 2034
       Seri E                              1,057,370    1 Agustus/August, 2019 -         9.98%                                                          Series E
                                                         1 Agustus/August, 2039
       Subtotal                            2,953,620

    Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
      PLN Tahap IV Tahun 2019                                                                                                                 PLN IV Year 2019
      Seri A                                274,000     1 Agustus/August, 2019 -         8.00%                                                         Series A
                                                         1 Agustus/August, 2024
       Seri B                               368,000     1 Agustus/August, 2019 -         8.50%                                                          Series B
                                                         1 Agustus/August, 2026
       Seri C                                20,000     1 Agustus/August, 2019 -         8.70%       Kuartalan/   Bank Tabungan                         Series C
                                                         1 Agustus/August, 2029                      Quaterly        Negara
       Seri D                                49,000     1 Agustus/August, 2019 -         9.50%                                                          Series D
                                                         1 Agustus/August, 2034
       Seri E                               539,000     1 Agustus/August, 2019 -         9.98%                                                          Series E
                                                         1 Agustus/August, 2039
       Subtotal                            1,250,000

    Obligasi Berkelanjutan III                                                                                                          Shelf Registration Bonds III
       PLN Tahap III Tahun 2019                                                                                                               PLN III Year 2019
       Seri B                                          19 Februari/February, 2019 -      9.10%                                                          Series B
                                                        19 Februari/February, 2024
       Seri C                               183,000    19 Februari/February, 2019 -      9.35%       Kuartalan/   Bank Tabungan                         Series C
                                                        19 Februari/February, 2026                   Quaterly        Negara
       Seri D                               211,000    19 Februari/February, 2019 -      9.60%                                                          Series D
                                                        19 Februari/February, 2029
       Seri E                               263,000    19 Februari/February, 2019 -      9.80%                                                          Series E
                                                        19 Februari/February, 2034
       Seri F                               155,000    19 Februari/February, 2019 -      9.95%                                                          Series F
                                                        19 Februari/February, 2039
       Subtotal                             812,000

    Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
      PLN Tahap III Tahun 2019                                                                                                                PLN III Year 2019
      Seri B                                           19 Februari/February, 2019 -      9.10%                                                         Series B
                                                        19 Februari/February, 2024
       Seri C                               204,000    19 Februari/February, 2019 -      9.35%       Kuartalan/   Bank Tabungan                         Series C
                                                        19 Februari/February, 2026                   Quaterly        Negara
       Seri D                                45,000    19 Februari/February, 2019 -      9.60%                                                          Series D
                                                        19 Februari/February, 2029
       Seri E                                60,000    19 Februari/February, 2019 -      9.80%                                                          Series E
                                                        19 Februari/February, 2034
       Seri F                                28,000    19 Februari/February, 2019 -      9.95%                                                          Series F
                                                        19 Februari/February, 2039
       Subtotal                             337,000
Page 127
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/117 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                            JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                  DAN     SUKUK         IJARAH            28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                             Bonds and sukuk ijara (continued)
                                                                                     Tingkat kupon/   Periode
                                                                                     Imbalan ijarah pembayaran
                                                                                       per tahun/      bunga/
                                                                                      Coupun rate/    Interest
                                      Pokok/              Periode pinjaman/             Ijara fee    payment     Wali amanat/
                                     Principal                Loan term                per annum       period      Trustee

   Obligasi Berkelanjutan III                                                                                                          Shelf Registration Bonds III
      PLN Tahap II Tahun 2018                                                                                                                 PLN II Year 2018
      Seri A                                          10 Oktober/October, 2018 -        8.65%                                                          Series A
                                                       10 Oktober/October, 2023
      Seri B                               483,000    10 Oktober/October, 2018 -        9.00%                                                          Series B
                                                       10 Oktober/October, 2025
      Seri C                                78,000    10 Oktober/October, 2018 -        9.10%       Kuartalan/   Bank Tabungan                         Series C
                                                       10 Oktober/October, 2028                     Quaterly        Negara
      Seri D                                15,000    10 Oktober/October, 2018 -        9.30%                                                          Series D
                                                       10 Oktober/October, 2033
      Seri E                                46,000    10 Oktober/October, 2018 -        9.65%                                                          Series E
                                                       10 Oktober/October, 2023
      Subtotal                             622,000

   Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
     PLN Tahap II Tahun 2018                                                                                                                  PLN II Year 2018
     Seri A                                           10 Oktober/October, 2018 -        8.65%                                                         Series A
                                                       10 Oktober/October, 2023
      Seri B                                45,000    10 Oktober/October, 2018 -        9.00%       Kuartalan/   Bank Tabungan                         Series B
                                                       10 Oktober/October, 2025                     Quaterly        Negara
      Seri C                                15,000    10 Oktober/October, 2018 -        9.10%                                                          Series C
                                                       10 Oktober/October, 2028
      Seri D                                50,000    10 Oktober/October, 2018 -        9.65%                                                          Series D
                                                       10 Oktober/October, 2023
      Subtotal                             110,000

   Obligasi Berkelanjutan III                                                                                                          Shelf Registration Bonds III
      PLN Tahap I Tahun 2018                                                                                                                  PLN I Year 2018
      Seri A                                              10 Juli/July, 2018 -          7.80%                                                          Series A
                                                           10 Juli/July, 2023
      Seri B                               442,000        10 Juli/July, 2018 -          8.35%                                                          Series B
                                                           10 Juli/July, 2025
      Seri C                               138,000        10 Juli/July, 2018 -          8.40%       Kuartalan/   Bank Tabungan                         Series C
                                                           10 Juli/July, 2028                       Quaterly        Negara
      Seri D                               281,000        10 Juli/July, 2018 -          8.90%                                                          Series D
                                                           10 Juli/July, 2033
      Seri E                               339,000        10 Juli/July, 2018 -          9.00%                                                          Series E
                                                           10 Juli/July, 2038
      Subtotal                            1,200,000

   Sukuk Ijarah Berkelanjutan III                                                                                                Shelf Registration Sukuk Ijarah III
     PLN Tahap I Tahun 2018                                                                                                                    PLN I Year 2018
     Seri A                                               10 Juli/July, 2018 -          7.80%                                                         Series A
                                                           10 Juli/July, 2023
      Seri B                               150,000        10 Juli/July, 2018 -          8.35%                                                          Series B
                                                           10 Juli/July, 2025
      Seri C                               258,000        10 Juli/July, 2018 -          8.40%       Kuartalan/   Bank Tabungan                         Series C
                                                           10 Juli/July, 2028                       Quaterly        Negara
      Seri D                               105,000        10 Juli/July, 2018 -          8.90%                                                          Series D
                                                           10 Juli/July, 2033
      Seri E                               110,000        10 Juli/July, 2018 -          9.00%                                                          Series E
                                                           10 Juli/July, 2038
      Subtotal                             623,000

   Obligasi Berkelanjutan II                                                                                                            Shelf Registration Bonds II
      PLN Tahap III Tahun 2018                                                                                                                PLN III Year 2018
      Seri A                                          22 Februari/February, 2018 -      6.50%                                                          Series A
                                                      22 Februari/February, 2023
      Seri B                                10,000    22 Februari/February, 2018 -      6.80%                                                          Series B
                                                      22 Februari/February, 2025
      Seri C                               341,000    22 Februari/February, 2018 -      7.25%       Kuartalan/   Bank Tabungan                         Series C
                                                      22 Februari/February, 2028                    Quaterly        Negara
      Seri D                               362,000    22 Februari/February, 2018 -      8.20%                                                          Series D
                                                      22 Februari/February, 2033
      Seri E                              1,365,000   22 Februari/February, 2018 -      8.75%                                                          Series E
                                                      22 Februari/February, 2038
      Subtotal                            2,078,000

   Sukuk Ijarah Berkelanjutan II                                                                                                 Shelf Registration Sukuk Ijarah II
     PLN Tahap III Tahun 2018                                                                                                               PLN III Year 2018
     Seri A                                           22 Februari/February, 2018 -      6.50%                                                         Series A
                                                      22 Februari/February, 2023
      Seri B                                88,000    22 Februari/February, 2018 -      7.25%       Kuartalan/   Bank Tabungan                         Series B
                                                      22 Februari/February, 2028                    Quaterly        Negara
      Seri C                                57,500    22 Februari/February, 2018 -      8.20%                                                          Series C
                                                      22 Februari/February, 2033
      Seri D                               449,000    22 Februari/February, 2018 -      8.75%                                                          Series C
                                                      22 Februari/February, 2038
      Subtotal                             594,500

   Obligasi Berkelanjutan II                                                                                                           Shelf Registration Bonds II
      PLN Tahap II Tahun 2017                                                                                                                 PLN II Year 2017
      Seri B                               201,000        3 November 2017 -             7.50%       Kuartalan/   Bank Tabungan                         Series B
                                                           3 November 2024                          Quaterly        Negara
      Seri C                               800,000        3 November 2017 -             8.20%                                                          Series C
                                                           3 November 2027
      Seri D                              1,093,000       3 November 2017 -             8.70%                                                          Series D
                                                           3 November 2032
      Subtotal                            2,094,000
Page 128
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/118 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI                  DAN       SUKUK           IJARAH                 28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                                Bonds and sukuk ijara (continued)
                                                                                       Tingkat kupon/   Periode
                                                                                       Imbalan ijarah pembayaran
                                                                                         per tahun/      bunga/
                                                                                        Coupun rate/    Interest
                                        Pokok/               Periode pinjaman/            Ijara fee    payment     Wali amanat/
                                       Principal                 Loan term               per annum       period      Trustee

    Sukuk Ijarah Berkelanjutan II                                                                                                   Shelf Registration Sukuk Ijarah II
      PLN Tahap II Tahun 2017                                                                                                                   PLN II Year 2017
      Seri B                                121,000          3 November 2017 -            8.20%       Kuartalan/   Bank Tabungan
                                                              3 November 2027                         Quaterly        Negara                             Series B
       Seri C                               490,000          3 November 2017 -            8.70%
                                                              3 November 2032                                                                            Series C
       Subtotal                             611,000

    Obligasi Berkelanjutan II                                                                                                            Shelf Registration Bonds II
       PLN Tahap I Tahun 2017                                                                                                                   PLN I Year 2017
       Seri B                                169,000         11 Juli/July , 2017 -        8,10%       Kuartalan/   Bank Tabungan                         Series B
                                                              11 Juli/July , 2024                     Quaterly        Negara
       Seri C                              1,217,000         11 Juli/July , 2017 -        8,50%                                                          Series C
                                                              11 Juli/July , 2027
       Subtotal                            1,386,000

    Sukuk Ijarah Berkelanjutan II                                                                                                   Shelf Registration Sukuk Ijarah II
      PLN Tahap I Tahun 2017                                                                                                                     PLN I Year 2017
      Seri B                                 214,000         11 Juli/July , 2017 -        8.50%                                                          Series B
                                                              11 Juli/July , 2027
    Obligasi Berkelanjutan I                                                                                                               Shelf Registration Bonds I
       PLN Tahap II Tahun 2013                                                                                                                   PLN II Year 2013
       Seri B                                           10 Desember/December, 2013 -      9,60%       Kuartalan/    Bank Permata                         Series B
                                                         10 Desember/December, 2023                   Quaterly
    Sukuk Ijarah Berkelanjutan I                                                                                                     Shelf Registration Sukuk Ijarah I
      PLN Tahap II Tahun 2013                                                                                                                   PLN II Year 2013
      Seri B                                            10 Desember/December, 2013 -      9.60%       Kuartalan/    Bank Permata                         Series B
                                                         10 Desember/December, 2023                   Quaterly
    Obligasi Berkelanjutan I                                                                                                               Shelf Registration Bonds I
       PLN Tahap I Tahun 2013                                                                                                                    PLN I Year 2013
       Seri B                                      --         5 Juli/July, 2013 -         8,25%       Kuartalan/    Bank Permata                         Series B
                                                              5 Juli/July, 2023                       Quaterly

    Jumlah/Total                          25,820,385




    Seluruh obligasi ini tidak dijamin secara khusus,                                   The bonds are not secured by specific collateral but
    namun dijamin dengan seluruh aset Perusahaan,                                       are secured by all of the Company’s assets and the
    serta hak pemegang obligasi adalah pari passu                                       bondholders’ rights are pari passu without preference
    tanpa hak khusus dengan hak-hak kreditur lain.                                      to other creditors.

    Perusahaan   telah    memenuhi     pembatasan-                                      The Company has complied with the restrictions
    pembatasan yang ditentukan dalam perjanjian Wali                                    specified within the agreements with the acting
    Amanat masing-masing obligasi dan sukuk ijarah.                                     Trustee of the corresponding bonds and sukuk ijara.

    Dana yang diperoleh dari penerbitan obligasi dan                                    The proceeds from the issuance of bonds payable and
    sukuk ijarah digunakan untuk mendanai proyek                                        sukuk ijarah are used to finance the transmission
    transmisi, proyek distribusi, dan modal kerja.                                      project, distribution project, and working capital.

    Rincian peringkat untuk seluruh obligasi dan Sukuk                                  Rating details on all outstanding bonds and Sukuk
    Ijarah yang dimiliki Perusahaan adalah sebagai                                      Ijara bonds issued by the Company are as follows:
    berikut:
                                                                                                            30 Juni/ June31, 2024
                                                                                             Peringkat/                        Lembaga pemeringkat
                                                                                              Rating                              Rating agency

   Obligasi/Bonds

   Obligasi/Bonds idAAA

   Obligasi Berkelanjutan II PLN Tahap I Tahun 2017/
   Shelf Registration Bonds II PLN Phase I Year 2017                                              idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan II PLN Tahap II Tahun 2017/
   Shelf Registration Bonds II PLN Phase II Year 2017                                             idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan II PLN Tahap III Tahun 2018/
   Shelf Registration Bonds II PLN Phase III Year 2018                                            idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap I Tahun 2018/
   Shelf Registration Bonds III PLN Phase I Year 2018                                             idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap II Tahun 2018/
   Shelf Registration Bonds III PLN Phase II Year 2018                                            idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap III Tahun 2019/
   Shelf Registration Bonds III PLN Phase III Year 2019                                           idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap IV Tahun 2019/
   Shelf Registration Bonds III PLN Phase IV Year 2019                                            idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap V Tahun 2019/
   Shelf Registration Bonds III PLN Phase V Year 2019                                             idAAA                     PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan III PLN Tahap VI Tahun 2020/
   Shelf Registration Bonds III PLN Phase VI Year 2020                                            idAAA                     PT Pemeringkat Efek Indonesia
Page 129
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/119 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)


28. UTANG OBLIGASI                  DAN           SUKUK     IJARAH        28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Obligasi dan sukuk ijarah (lanjutan)                                         Bonds and sukuk ijara (continued)

                                                                                                       30 Juni/ June 30, 2024
                                                                                       Peringkat/                          Lembaga pemeringkat
                                                                                        Rating                                Rating agency

   Obligasi/Bonds idAAA (lanjutan/continued)

   Obligasi Berkelanjutan III PLN Tahap VII Tahun 2020/
   Shelf Registration Bonds III PLN Phase VII Year 2020                                     idAAA                    PT Pemeringkat Efek Indonesia
   Obligasi Berkelanjutan IV PLN Tahap I Tahun 2020/
   Shelf Registration Bonds IV PLN Phase I Year 2020                                        idAAA                    PT Pemeringkat Efek Indonesia

   Sukuk Ijarah/Sukuk Ijara idAAA

   Sukuk Ijarah Berkelanjutan I PLN Tahap II Tahun 2013/
   Shelf Registration Sukuk Ijara I PLN Phase II Year 2013                              idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan II PLN Tahap I Tahun 2017/
   Shelf Registration Sukuk Ijara II PLN Phase I Year 2017                              idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan II PLN Tahap II Tahun 2017/
   Shelf Registration Sukuk Ijara II PLN Phase II Year 2017                             idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan II PLN Tahap III Tahun 2018/
   Shelf Registration Sukuk Ijara II PLN Phase III Year 2018                            idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap I Tahun 2018/
   Shelf Registration Sukuk Ijara III PLN Phase I Year 2018                             idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap II Tahun 2018/
   Shelf Registration Sukuk Ijara III PLN Phase II Year 2018                            idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap III Tahun 2019/
   Shelf Registration Sukuk Ijara III PLN Phase III Year 2019                           idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap IV Tahun 2019/
   Shelf Registration Sukuk Ijara III PLN Phase IV Year 2019                            idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap V Tahun 2019/
   Shelf Registration Sukuk Ijara III PLN Phase V Year 2019                             idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan III PLN Tahap VI Tahun 2020/
   Shelf Registration Sukuk Ijara III PLN Phase VI Year 2020                            idAAA(sy)                    PT Pemeringkat Efek Indonesia
   Sukuk Ijarah Berkelanjutan IV PLN Tahap I Tahun 2020/
   Shelf Registration Sukuk Ijara IV PLN Phase I Year 2020                              idAAA(sy)                    PT Pemeringkat Efek Indonesia


    Surat Utang Jangka Menengah Global dan                                       Global Medium-Term Notes and Guaranteed
    Obligasi Terjamin                                                            Notes

    Rincian Surat Utang Jangka Menengah Global dan                               The details of Global Medium-term Notes and
    Obligasi Terjamin dalam Dolar Amerika adalah                                 Guaranteed Notes in US Dollars are as follows:
    sebagai berikut:

                                                        Harga                                     Tingkat
                                     Pokok/           penerbitan/       Periode pinjaman/          bunga/          Wali amanat/
                                   Principal *)      Issuing price         Loan Term            Interest rate       Trustee
                                       USD
    Surat utang                                                                                                                             Global medium
       jangka menengah                                                                                                                global term notes
    Penerbitan tahun 2020                                                                                                                    Issued in 2020
    Jatuh tempo 2030                  500,000,000      99.146%         30 Juni/June 2020 -          3.0000%     Deutsche Bank Trust             Due in 2028
                                                                        30 Juni/June 2030                       Company Americas
    Jatuh tempo 2050                1,000,000,000      98.283%         30 Juni/June 2020 -          4.0000%                                    Due in 2048
                                                                        30 Juni/June 2050
    Subjumlah                       1,500,000,000                                                                                                    Total
    Penerbitan tahun 2019                                                                                                                   Issued in 2019
    Jatuh tempo 2029                  700,000,000      99.385%          17 Juli/July 2019 -         3.8750%     Deutsche Bank Trust            Due in 2029
                                                                         17 Juli/July 2029                      Company Americas
    Jatuh tempo 2049                  700,000,000      98.834%          17 Juli/July 2019 -         4.8750%                                    Due in 2049
                                                                         17 Juli/July 2049
    Jatuh tempo 2030                  500,000,000      99.775%          5 November 2019 -           3.3750%     Deutsche Bank Trust            Due in 2030
                                                                     5 Februari/February 2030                   Company Americas
    Jatuh tempo 2050                  500,000,000      99.567%          5 November 2019 -           4.3750%                                    Due in 2050
                                                                     5 Februari/February 2050
    Subjumlah                       2,400,000,000                                                                                                    Total
Page 130
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/120 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI               DAN           SUKUK        IJARAH          28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Surat Utang Jangka Menengah Global dan                                        Global Medium-Term Notes and Guaranteed
    Obligasi Terjamin (lanjutan)                                                  Notes (continued)
                                                        Harga                                       Tingkat
                                  Pokok/              penerbitan/        Periode pinjaman/           bunga/          Wali amanat/
                                Principal *)         Issuing price          Loan Term             Interest rate       Trustee
                                    USD
     Surat utang                                                                                                                              Global medium
        jangka menengah                                                                                                                 global term notes
     Penerbitan tahun 2018                                                                                                                     Issued in 2018
     Jatuh tempo 2028            1,000,000,000         99.619%           21 Mei/May 2018 -          5.4500%       Deutsche Bank Trust             Due in 2028
                                                                          21 Mei/May 2028                         Company Americas
     Jatuh tempo 2029              500,000,000         99.004%       25 Oktober/October 2018 -      5.3750%                                      Due in 2029
                                                                      25 Januari/January 2029
     Jatuh tempo 2048            1,000,000,000          99.32%           21 Mei/May 2018 -          6.1500%       Deutsche Bank Trust            Due in 2048
                                                                          21 Mei/May 2048                         Company Americas
     Jatuh tempo 2049              500,000,000         99.293%       25 Oktober/October 2018 -      6.2500%                                      Due in 2049
                                                                      25 Oktober/October 2049
     Subjumlah                   3,000,000,000                                                                                                      Total

     Penerbitan tahun 2017                                                                                                                     Issued in 2017
     Jatuh tempo 2027            1,500,000,000         98.990%           15 Mei/May 2017 -           4.125%       Deutsche Bank Trust             Due in 2027
                                                                          15 Mei/May 2027                         Company Americas
     Jatuh tempo 2047              500,000,000         98.514%           15 Mei/May 2017 -            5.25%                                      Due in 2047
                                                                          15 Mei/May 2047
     Subjumlah                   2,000,000,000                                                                                                      Total

     Penerbitan tahun 2012                                                                                                                     Issued in 2012
     Jatuh tempo 2042            1,000,000,000         98,514%       24 Oktober/October 2012 -        5,25%       Deutsche Bank Trust             Due in 2042
                                                                      24 Oktober/October 2042                     Company Americas
     Penerbitan tahun 2011                                                                                                                     Issued in 2011
     Jatuh tempo 2021                           0      99,054%           22 November 2011 -           5,50%       Deutsche Bank Trust             Due in 2021
                                                                          22 November 2021                        Company Americas
     Obligasi terjamin                                                                                                                     Guaranteed notes
     Penerbitan tahun 2007                                                                                                                    Issued in 2007
     Jatuh tempo 2037              288,312,000         98,586%           29 Juni/June 2007 -         7,875%       Deutsche Bank Trust            Due in 2037
                                                                          29 Juni/June 2037                       Company Americas
     Jumlah                     10,188,312,000                                                                                                         Total
                                             -
   *) dalam jumlah penuh                                                                 *) in full amount


    Rincian Surat Utang Jangka Menengah Global                                    The details of Global Medium-Term Notes in Euro are
    dalam Euro adalah sebagai berikut:                                            as follows:

                                                       Harga                                       Tingkat
                                 Pokok/              penerbitan/        Periode pinjaman/           bunga/           Wali amanat/
                               Principal *)         Issuing price          Loan Term             Interest rate        Trustee
                                   EUR
   Surat utang                                                                                                                                Global medium
      jangka menengah                                                                                                                   global term notes
   Penerbitan tahun 2019                                                                                                                       Issued in 2019
   Jatuh tempo 2031               500,000,000         99.416%           5 November 2019 -           1.875%        Deutsche Bank Trust             Due in 2031
                                                                         5 November 2031                          Company Americas
   Penerbitan tahun 2018                                                                                                                      Issued in 2018
   Jatuh tempo 2025               500,000,000         99.221%        25 Oktober/October 2018 -      2.875%        Deutsche Bank Trust            Due in 2025
                                                                      25 Oktober/October 2025                     Company Americas
   Jumlah                       1,000,000,000                                                                                                           Total



   *) dalam jumlah penuh                                                                 *) in full amount
Page 131
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/121 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

28. UTANG OBLIGASI               DAN           SUKUK      IJARAH            28. BONDS PAYABLE AND SUKUK IJARA (continued)
    (lanjutan)

    Surat Utang Jangka Menengah Global dan                                         Global Medium-term Notes and Guaranteed Notes
    Obligasi Terjamin (lanjutan)                                                   (continued)

    Rincian Surat Utang Jangka Menengah Global                                     The details of Global Medium-Term Notes in
    dalam Yen Jepang adalah sebagai berikut:                                       Japanese Yen are as follows:

                                                     Harga                                         Tingkat
                                  Pokok/           penerbitan/           Periode pinjaman/          bunga/       Wali amanat/
                                Principal *)      Issuing price             Loan Term            Interest rate    Trustee
                                    JPY
    Surat utang                                                                                                                       Global medium
      jangka menengah                                                                                                           global term notes
    Penerbitan tahun 2019                                                                                                              Issued in 2019
      Jatuh tempo 2024          18,500,000,000       100%                20 September 2019 -         0.870%                               Due in 2024
                                                                          20 September 2024
      Jatuh tempo 2029           1,000,000,000       100%                20 September 2019 -         1.050%                              Due in 2029
                                                                          20 September 2029
    Jumlah                      19,500,000,000         JPY                                                                                      Total


   *) dalam jumlah penuh                                                                 *) in full amount



    Perusahaan memenuhi pembatasan-pembatasan                                      The Company complied with the restrictions specified
    yang ditentukan dalam perjanjian Wali Amanat.                                  within the agreements with the acting Trustee.

    Dana yang diperoleh dari penerbitan Surat Utang                                The proceeds from the Global Medium-Term Notes
    Jangka Menengah Global dan Obligasi Terjamin ini                               and Guaranteed Notes issued were used to fund the
    digunakan untuk mendanai kebutuhan investasi                                   capital expenditure requirements in connection with
    program percepatan pembangunan fasilitas tenaga                                the fast track program, regular construction and for
    listrik, konstruksi rutin, dan untuk tujuan umum                               general corporate purposes.
    korporasi.

    Rincian peringkat untuk seluruh surat utang jangka                             Rating details on all outstanding global medium-term
    menengah global, obligasi terjamin, dan Japanese                               notes, guaranteed notes, and the Japanese Yen bond
    Yen bond yang dimiliki Perusahaan adalah sebagai                               owned by the Company are as follows:
    berikut:

                                                                                    Lembaga pemeringkat/Rating agency
                                                       Moody’s Investor               Standard and                               Japan Credit
                                                        Service, Inc.,                   Poor’s           Fitch                     Rating

   Surat utang jangka menengah global
   dalam Dollar Amerika/
   Global medium term notes in US Dollars
   Penerbitan tahun 2020/Issued in 2020                           Baa2                         BBB                BBB                   n/a
   Penerbitan tahun 2019/Issued in 2019                           Baa2                         BBB                BBB                   n/a
   Penerbitan tahun 2018/Issued in 2018                           Baa2                         n/a                BBB                   n/a
   Penerbitan tahun 2017/Issued in 2017                           Baa2                         n/a                BBB                   n/a
   Penerbitan tahun 2012/Issued in 2012                           Baa2                         BBB                BBB                   n/a

   Surat utang jangka menengah global
   dalam Euro/
   Global medium term notes in Euro
   Penerbitan tahun 2019/Issued in 2019                           Baa2                         BBB                BBB                   n/a
   Penerbitan tahun 2018/Issued in 2018                           Baa2                         n/a                BBB                   n/a

   Obligasi terjamin/Guaranteed notes
   Penerbitan tahun 2007/Issued in 2007                           Baa2                         BBB                BBB                   n/a

   Obligasi dalam Yen Jepang/
   Japanese Yen Bond
   Penerbitan tahun 2019/Issued in 2019                           Baa2                         BBB                 n/a                BBB+
Page 132
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/122 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

29. UTANG LISTRIK SWASTA`                                         29. ELECTRICITY PURCHASE PAYABLES

    Akun ini merupakan utang listrik swasta yang                         This account represents electricity purchase
    direstrukturisasi melalui renegosiasi dengan IPP.                    payables, which were restructured through
                                                                         renegotiation with the IPPs.

    Rincian berdasarkan pemasok dan jadwal                               Details according to creditors and payment schedules
    pembayaran pokok adalah sebagai berikut:                             are as follows:

    a.   Berdasarkan kreditur                                            a.     By creditor

                                                     30 Juni/                 31 Desember/
                                                     June 30,                 December 31,
                                                       2024                       2023

            PT Paiton Energy                                                                               PT Paiton Energy
              2024: USD304.472.806                                                                2024: USD304.472.806
              2023: USD320.915.631                          4,991,525              4,954,614      2023: USD320.915.631
            PT Jawa Power                                                                                    PT Jawa Power
              2024: USD44.158.523                                                                   2024: USD44.158.523
              2023: USD45.416.849                             723,937               701,193         2023: USD45.416.849

            Jumlah                                          5,715,462              5,655,807                             Total

            Dikurangi : bagian jangka pendek                (606,320)              (554,608)         Less : current portion

            Bagian jangka panjang                           5,109,142              5,101,199              Long-term portion




    b.   Berdasarkan jadwal pembayaran                                   b.     By instalment schedule
                                                    30 Juni/              31 Desember/
                                                    June 30,              December 31,
                                                      2024                       2023

         Dibayarkan:                                                                                              Payable in:
          Dalam satu tahun                                  606,320                 554,608                 Within one year
          Pada tahun kedua                                  643,336                 588,069              In the second year
          Pada tahun ketiga                                 683,617                 624,418                In the third year
          Pada tahun keempat                                727,614                 664,045               In the fourth year
          Setelah lima tahun                               3,054,576              3,224,667                 After five years
         Jumlah                                            5,715,462              5,655,806                              Total




    Utang kepada PT Paiton Energy dan PT Jawa                            Payables to PT Paiton Energy and PT Jawa Power
    Power dikenakan bunga sebesar 4,81% dan                              bear annual interest of 4.81% and 18.45%, and are
    18,45% yang dibayar dalam 360 kali angsuran                          payable in 360 monthly installments from January 1,
    bulanan sejak 1 Januari 2002 sampai dengan 1                         2002 until December 1, 2031.
    Desember 2031.

30. UTANG USAHA                                                   30. TRADE PAYABLES

    Akun ini merupakan liabilitas sehubungan dengan                      This account represents payables arising from
    pembelian tenaga listrik, bahan bakar, barang jasa.                  purchases of electricity, fuel, goods & services.

    Rincian utang usaha adalah sebagai berikut:                          Details of trade payables are as follows:
                                                30 Juni/               31 Desember/
                                               June 30,                December 31,
                                                 2024                      2023

          Pihak berelasi                                                                              Related parties
            Pembelian bahan bakar,                                                                  Purchase of fuel
              barang dan jasa                   10,954,549                    8,842,519         goods and service
            Pembelian tenaga listrik             7,748,945                    6,681,009        Purchase of electricity

            Subjumlah                           18,703,494                15,523,529                        Subtotal

          Pihak ketiga                                                                                   Third parties
            Pembelian bahan bakar,                                                                  Purchase of fuel
              barang dan jasa                   24,045,419                24,101,662            goods and service
            Pembelian tenaga listrik            21,218,655                17,522,336           Purchase of electricity

            Subjumlah                           45,264,074                41,623,998                        Subtotal

          Jumlah                                63,967,568                57,147,527                             Total
Page 133
                                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                Lampiran 5/123 Schedule

             CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
             KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
             30 JUNI 2024 DAN 31 DESEMBER 2023                                                JUNE 30, 2024 AND DECEMBER 31, 2023
             (Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)


             30. UTANG USAHA (lanjutan)                                           30. TRADE PAYABLES (continued)

                 Rincian utang usaha berdasarkan mata uang                           Details of trade payables by currency are as follows:
                 adalah sebagai berikut:

                                              30 Juni 2024/ June 30, 2024            31 Desember/ December 31, 2023
                                           Dalam mata                               Dalam mata
                                           uang original/                           uang original/
                                           In original         Ekuivalen Rp/        In original               Ekuivalen Rp/
                                           currencies*)        Rp equivalent        currencies*)              Rp equivalent

                 Rupiah                       36,751,599            36,751,599           34,893,505               34,893,505                    Rupiah
                 USD                       1,645,559,679            26,977,305        1,432,937,142               22,123,117                      USD
                 Lain - lain **)              14,557,974               238,663            8,478,895                  130,906                  Others **)
lectricity

                 Jumlah                                             63,967,568                                    57,147,527                        Total

                 *)      Dalam jumlah penuh, kecuali Rupiah                          *)    In full amount, except for Rupiah
                 **)     Utang usaha dalam mata uang lainnya disajikan dalam         **)   Trade payables in other currencies are presented in USD
                         jumlah setara USD, menggunakan kurs tanggal pelaporan             equivalents using the exchange rate prevailing at the reporting
                                                                                           date

                 Lihat Catatan 51 untuk informasi rincian transaksi                  Refer to Note 51 for information on the details of
                 dan saldo dengan pihak berelasi.                                    transactions and balances with related parties.


             31. UTANG LAIN-LAIN                                                  31. OTHER PAYABLES

                                                                   30 Juni/          31 Desember/
                                                                   June 30,          December 31,
                                                                     2024                2023
                                                                                                                         Acquisition of property,
                       Perolehan aset tetap dan pekerjaan                                                                 plant and equipment
                         dalam pelaksanaan                                                                        and construction in progress
                         Rupiah                                       5,266,968             4,427,249                                  Rupiah
                         USD                                          1,237,680             1,782,969                                     USD
                         EUR                                            269,523               396,655                                     EUR
                         CHF                                                  -                     -                                     CHF
                         JPY                                            220,608               369,034                                      JPY
                         CNY                                                  -                     -                                     CNY
                       Pemerintah daerah                              2,807,973             2,512,403                          Local government
                       Uang muka penjualan tenaga listrik             1,742,683             1,622,157     Advances received on sale of electricity
                       Karyawan                                         484,047                80,143                                 Employees
                       Lain-lain                                      3,536,019             1,581,575                                     Others
                       Jumlah                                        15,565,501            12,772,186                                            Total
                       Dikurangi bagian jangka panjang                  653,931              466,868                         Less long-term portion
                       Bagian jangka pendek                          14,911,570            12,305,318                               Current portion



                 Pemerintah Daerah                                                  Local Government

                 Utang kepada Pemerintah Daerah merupakan                           The payables to Local Government represent the
                 jumlah yang ditagih Perusahaan dari pelanggan                      amount collected by the Company from the customers
                 untuk pajak penerangan jalan umum. Selanjutnya                     for street lighting taxes. This is subsequently remitted
                 jumlah yang dipungut akan diteruskan kepada                        to the respective Local Government.
                 Pemerintah Daerah.

                 Uang muka penjualan tenaga listrik                                 Advances received on sale of electricity

                 Akun ini merupakan kas yang diterima atas                          This account represents cash received from the sale of
                 penjualan listrik prabayar.                                        prepaid electricity.

                 Karyawan                                                           Employees

                 Utang kepada karyawan terutama merupakan                           Payable to employees mainly represents receipt of
                 penerimaan di muka atas cicilan penjualan rumah                    advance instalment payments from employees related
                 dinas.                                                             to house instalments.

                 Lihat Catatan 51 untuk informasi rincian transaksi                 Refer to Note 51 for information on the details of
                 dan saldo dengan pihak berelasi.                                   transactions and balances with related parties.
Page 134
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/124 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                 JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

32. UTANG PAJAK                                                                       32. TAXES PAYABLE
                                                             30 Juni/                   31 Desember/
                                                            June 30,                    December 31,
                                                               2024                           2023

            PPN                                             1,554,208                         1,312,140                                      VA T
            PPh Badan                                       1,445,486                         1,014,813                                       CIT
            Pajak penghasilan                                                                                            Income taxes
              Pasal 21                                         516,541                        1,415,342                       A rticle 21
              Pasal 22                                         163,374                          138,665                       A rticle 22
              Pasal 23 dan 26                                   86,350                          191,656             A rticle 23 and 26
              Pasal 4(2)                                        87,831                          113,958                    A rticle 4 (2)
              Pasal 15                                          15,398                           41,600                       A rticle 15
            Lain-lain                                            3,213                            3,772                               Others

            Jumlah                                          3,872,401                         4,231,946                                     Total




33. BIAYA MASIH HARUS DIBAYAR                                                    33. ACCRUED EXPENSES
                                                                 30 Juni/                        31 Desember/
                                                                 June 30,                        December 31,
                                                                   2024                              2023

   Bunga dan beban keuangan                                                                                                    Interest and financing charges
   Pihak berelasi                                                                                                                                   Related parties
      Utang penerusan pinjaman                                               321,215                        323,010                            Two-step loans
      Utang bank                                                             417,416                        397,527                                 Bank loans
      Utang kepada pemerintah dan                                                                                                 Government and non bank
        lembaga keuangan pemerintah non bank                                      -                             -       Government financial institution loans

   Jumlah pihak berelasi                                                     738,630                        720,538                           Total related parties

   Pihak ketiga                                                                                                                                         Third parties
         Utang obligasi dan sukuk ijarah                                    2,455,702                     2,154,153               Bonds payable and sukuk ijara
         Utang bunga sewa                                                     270,497                       560,948                     Lease liabilities interest
         Utang bank                                                           723,472                     1,253,697                                   Bank loans
         Utang listrik swasta                                                  42,219                        19,837                 Electricity purchase payable

   Jumlah pihak ketiga                                                      3,491,889                     3,988,635                             Total third parties

   Sub jumlah                                                               4,230,519                     4,709,173                                        Subtotal

   Biaya operasional                                                        4,189,340                     3,340,324                           Operational charges

   Jumlah                                                                   8,419,859                     8,049,498                                          Total




    Rincian biaya masih harus dibayar berdasarkan                                        Details of accrued expenses by currency are as
    mata uang adalah sebagai berikut:                                                    follows:

                                                 30 Juni 2024/ June 30, 2024                31 Desember/ December 31, 2023
                                           Dalam mata                                     Dalam mata
                                           uang asing/                                    uang asing/
                                           In foreign             Ekuivalen Rp/           In foreign          Ekuivalen Rp/
                                           currencies*)           Rp equivalent           currencies*)        Rp equivalent

     Rupiah                                        5,107,048          5,107,048                   4,191,201               4,191,201                          Rupiah
     USD                                         160,627,039          2,633,320                 200,444,199               3,094,658                            USD
     JPY                                       3,397,191,166            346,127               5,802,685,833                 633,711                            JPY
     EUR                                          19,013,123            333,365                   7,604,152                 129,927                            EUR

     Jumlah                                                           8,419,859                                           8,049,497                             Total


    *)   Dalam jumlah penuh, kecuali Rupiah                                              *)   In full amount, except for Rupiah

    Lihat Catatan 51 untuk informasi rincian transaksi                                   Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                                     transactions and balances with related parties.
Page 135
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/125 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                   (Expressed in millions of Rupiah, unless otherwise stated)

34. UANG JAMINAN LANGGANAN                                                34. CUSTOMER SECURITY DEPOSITS

    Akun ini merupakan uang jaminan langganan yang                             This account represents customer security deposits
    ditentukan berdasarkan besar daya dan golongan                             determined based on power supply and electricity
    tarif. Uang jaminan langganan akan dikembalikan                            tariff. Customer security deposits will be refunded, net
    apabila pelanggan berhenti menjadi pelanggan,                              of unpaid electricity bills, upon discontinuation of
    dengan memperhitungkan rekening listrik belum                              customers’ subscriptions.
    dibayar.


35. UTANG BIAYA PROYEK                                                    35. PROJECT COST PAYABLES

    Akun ini merupakan utang kepada kontraktor atas                            This account represents payable to contractors arising
    biaya konstruksi dan pengadaan material. Akun ini                          from construction expenses and purchases of
    akan direklasifikasi ke akun penerusan pinjaman                            materials. This account will be reclassified into the
    pada saat penerbitan Withdrawal Authorisation atau                         two-step loans account at the issuance of the
    dokumen lain yang sejenis.                                                 Withdrawal Authorisation or other similar documents.

                                                            30 Juni/           31 Desember/
                                                            June 30,           December 31,
                                                             2024                  2023
                                                             Nilai/               Nilai/
           Nama Proyek                                      Amount               Amount                                           Project Name

           PLTU KALSELTENG 2 - 2x100 MW (ASAM-ASAM)             1,909,374           1,502,488        PLTU KALSELTENG 2 - 2x100 MW (ASAM-ASAM)
           Lainnya/Others                                          11,462               9,731                                     Lainnya/Others

           Jumlah                                               1,920,836           1,512,219                                             Total



36. PENJUALAN TENAGA LISTRIK                                              36. SALES OF ELECTRICITY

    Penjualan tenaga listrik berdasarkan pelanggan                             Sales of electricity by customer are as follows:
    adalah sebagai berikut:
                                                            2024                   2023
                                                       (Enam Bulan/           (Enam Bulan/
                                                        Six Months)            Six Months)

           Pihak berelasi (catatan 52)                                                                           Related parties (note 52)
           Entitas yang berhubungan                                                                              Government related entities
             dengan pemerintah                            11,087,001              10,704,316
                                                                   -                       -

           Pihak ketiga                                                                                                       Third parties
           Umum                                          159,661,092             148,228,234                                         Public
           TNI dan Polri                                   1,053,867               1,039,013                                  TNI and Polri

           Subjumlah                                     160,714,959             149,267,247                                        Subtotal

           Jumlah                                        171,801,960             159,971,563                                           Total

           Masa uji coba                                              -                         --                commisioning test period

           Jumlah, bersih                                171,801,960             159,971,563                                      Total, net




    Pendapatan sebesar Rp171.801.960                       (2023:              Revenue amounting to Rp171,801,960                              (2023:
    Rp159.971.563) diakui sepanjang waktu.                                     Rp159,971,563) is recognised overtime.

    Pengujian dan masa uji coba (commissioning test)                           Testing and commissioning (commissioning test) are
    merupakan serangkaian kegiatan pemeriksaan dan                             a series of inspection and testing activities for
    pengujian instalasi listrik yang telah selesai                             electrical installations that have been completed and
    dikerjakan dan hendak dioperasikan. Sejak                                  are going into operation. Since January 1, 2023, the
    1 Januari 2023, beban dan pendapatan atas                                  cost and revenues from the sales of electricity that
    penjualan tenaga listrik yang terjadi pada masa uji                        occurred during the commissioning test have been
    coba diakui ke laba rugi berdasarkan Amandemen                             recognised in profit or loss based on Amendment of
    PSAK No. 16: “Aset Tetap – Hasil Sebelum                                   SFAS 16: “Property, Plant and Equipment – Proceeds
    Penggunaan yang Diintensikan” (“Amandemen                                  Before Intended Use” (“Amendment of SFAS 16”).
    PSAK 16”). Dampak retrospektif atas Amandemen                              Retrospective impact of Amendment of SFAS 16 is
    PSAK 16 tidak material sehingga manajemen tidak                            immaterial so management has not restated the prior
    melakukan penyajian kembali laporan keuangan                               year’s consolidated financial statements.
    konsolidasian tahun sebelumnya.
Page 136
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/126 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

36. PENJUALAN TENAGA LISTRIK (lanjutan)                          36. SALES OF ELECTRICITY (continued)

    Penjualan tenaga listrik untuk periode 30 Juni 2024              Sales of electricity for the period June 30, 2024 and
    dan 2023 didasarkan pada Tarif Dasar Listrik, yang               2023 are based on the Basic Electricity Tariff
    ditetapkan oleh Pemerintah dan Pemerintah                        determined by the Government and Local
    Daerah, sebagai berikut:                                         Government as follows:

    •    Peraturan Menteri ESDM No. 28 Tahun 2016                    •    Regulation of the Ministry of ESDM No. 28 Year
         sebagaimana      terakhir  diubah    dengan                      2016 most recently amended by Regulation of
         Peraturan Menteri ESDM No. 3 Tahun 2020.                         the Ministry of ESDM No. 3 Year 2020.
    •    Peraturan Gubernur Kepulauan Riau No. 21                    •    Regulation of the Governor of Riau Islands No.
         Tahun 2017 tentang tarif tenaga listrik yang                     21 Year 2017, regarding the tariff of electricity
         disediakan oleh PLN Batam.                                       provided by PLN Batam.


    Tidak terdapat penyesuaian tarif sampai dengan 30                There is no electricity tariff adjustment until June 30,
    Juni 2024 untuk golongan pelanggan non-subsidi                   2024 for other non-subsidy customers.
    lainnya.

    Grup tidak memiliki penjualan kepada pelanggan                   The Group has no single customer from which it
    dengan jumlah melebihi 10% dari total pendapatan                 generates revenue of more than 10% of total revenue.
    usaha.


37. SUBSIDI LISTRIK PEMERINTAH                                   37. GOVERNMENT ELECTRICITY SUBSIDY

    Pendapatan subsidi merupakan pendapatan dari                     Subsidy revenue represents the revenue from the
    Pemerintah Indonesia atas selisih antara biaya yang              Government of Indonesia for the difference between
    diperbolehkan ditambah margin 7% dengan harga                    allowable cost plus a 7% margin with actual sales
    jual aktual per masing-masing golongan tarif kecuali             price for each tariff group except for tariff groups which
    untuk golongan tarif yang telah mendapatkan                      received automatic tariff adjustment based on Ministry
    penyesuaian tarif otomatis menurut Peraturan Menteri             of ESDM Regulation No. 3 Year 2020 regarding the
    ESDM No. 3 Tahun 2020 tentang perubahan ke-4                     fourth amendment of Ministry of ESDM Regulation
    atas Peraturan Menteri ESDM No. 28 Tahun 2016                    No. 28 Year 2016 regarding electricity tariff for
    tentang tarif tenaga listrik untuk listrik yang disediakan       electricity provided by PT PLN (Persero).
    oleh PT PLN (Persero).
Page 137
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/127 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                     JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

37. SUBSIDI LISTRIK PEMERINTAH (lanjutan)                                37. GOVERNMENT                   ELECTRICITY                  SUBSIDY
                                                                             (continued)

    Pemerintah Republik Indonesia memberikan                                 The Government of the Republic of Indonesia
    subsidi   listrik  kepada     pelanggan      melalui                     provides electricity subsidies to customers through
    Perusahaan. Tata cara penghitungan dan                                   the Company. The procedure for calculation and
    pembayaran subsidi listrik tahun anggaran 2024                           payment of the electricity subsidy for budget years
    dan 2023 menggunakan Peraturan Menteri                                   2023 and 2022 uses Minister of Finance Regulation
    Keuangan No. 178/PMK.02/2021, tanggal 7                                  No. 178/PMK.02/2021, dated December 7, 2021.
    Desember 2021. Subsidi listrik dihitung dari selisih                     The electricity subsidy is calculated from the
    negatif antara harga jual tenaga listrik rata-rata                       negative difference between the average sales
    (Rp/kWh) dari masing-masing golongan tarif dikurangi                     prices (Rp/kWh) of each tariff group less the cost of
    biaya pokok penyediaan tenaga listrik (Rp/kWh) pada                      electricity supplies (Rp/kWh) on the voltage at each
    tegangan di masing-masing golongan tarif dikalikan                       tariff group multiplied by the electricity sales volume
    volume penjualan (kWh) untuk setiap golongan tarif.                      (kWh) for each tariff group. The cost of electricity
    Biaya pokok penyediaan tenaga listrik dihitung                           supplies is computed based on the formula
    berdasarkan formula yang ditetapkan oleh Direktorat                      determined by the Directorate General of Electricity,
    Jenderal Ketenagalistrikan, di bawah Kementerian                         under the Ministry of ESDM.
    ESDM.

    Berdasarkan Surat Pengesahan Daftar Isian                                Based on Approval Letter of Budget Performance
    Pelaksanaan Anggaran (“DIPA”) No. SP.DIPA-                               List (“DIPA”) No. SP.DIPA-999.07.1.979321/2023
    999.07.1.979321/2023         dan        SP.DIPA-                         and No. SP.DIPA-999.07.1.979321/2022 second
    999.07.1.979321/2022 revisi ke-2, pagu tertinggi                         revision, the electricity subsidy ceiling for the budget
    subsidi listrik tahun anggaran 2024 dan 2023                             years 2024 and 2023 amounted to Rp75,831,220
    ditetapkan masing-masing sebesar Rp75.831.220                            and Rp72,576,859,           respectively. The ceiling
    dan Rp72.576.859. Pagu tertinggi tersebut                                amount includes a 7% margin above the costs of
    termasuk 7% margin di atas biaya pokok penyediaan                        electricity supply.
    tenaga listrik.

    Besarnya subsidi listrik dalam satu tahun anggaran                       The amount of the electricity subsidy within a budget
    secara final ditetapkan berdasarkan hasil audit atas                     year is finalised based on the result of the compliance
    ketaatan penggunaan subsidi listrik yang dilakukan                       audit of the usage of the electricity subsidy performed
    oleh auditor yang ditunjuk Direktorat Jenderal                           by an auditor assigned by the Directorate General of
    Anggaran, di bawah Kementerian Keuangan.                                 Budget under the Ministry of Finance.

    Pendapatan subsidi listrik dirinci selama tahun                          The details of revenue from electricity subsidy during
    berjalan sebagai berikut:                                                the years are as follows:

                                                            2024                 2023
                                                       (Enam Bulan/         (Enam Bulan/
                                                        Six Months)          Six Months)

              Saldo Awal                                     4,611,800           4,677,328                                Beginning balance
              Subsidi listrik (Catatan 51)                  37,266,626          32,069,605                     Electricity subsidy (Note 51)
              Realisasi penerimaan subsidi tahun                                                    Realization of subsidy from current year
               anggaran berjalan:                                                                                                  budget:
              Penerimaan tunai                             (29,687,289)        (26,097,738)                                   Cash received

              Piutang subsidi listrik (Catatan 16)          12,191,137          10,649,195    Receivables for electricity subsidy (Note 16)



38. PENDAPATAN USAHA LAIN-LAIN                                        38. OTHER REVENUES
                                                          2024                   2023
                                                     (Enam Bulan/           (Enam Bulan/
                                                      Six Months)            Six Months)

     Jaringan dan jasa telekomunikasi                    1,882,390               1,201,661         Telecommunication network and service
     Penjualan batubara                                  2,395,455               1,694,108                                       Coal sales
     jasa pemeliharaan                                     583,116                 355,153                           Maintenance service
     Sewa transformator                                    321,900                 260,785                             Transformer rental
     Perubahan daya tersambung dan                                                                      Upgrading of electricity power and
       administrasi                                         31,223                  66,254                          administration fees
     Lain-lain                                             474,234                 459,224                                          Others

     Jumlah                                              5,688,317               4,037,185                                                     Total




    Lihat Catatan 51 untuk informasi rincian transaksi                       Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                                         transactions and balances with related parties.
Page 138
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/128 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

39. BEBAN BAHAN BAKAR DAN PELUMAS                            39. FUEL AND LUBRICANTS EXPENSE

                                                    2024                       2023
                                               (Enam Bulan/               (Enam Bulan/
                                                Six Months)                Six Months)

      Bahan bakar minyak                                                                                          Fuel
      High speed diesel                              21,046,855                15,319,675            High speed diesel
      MFO - Residu                                      786,317                   644,891               Fuel marine oil
      Lain - lain                                       126,596                   113,553                      Others

      Subjumlah                                      21,959,768                16,078,119                         Subtotal


      Bahan Bakar - Non Minyak                                                                             Non - oil fuel
      Gas alam                                       27,971,145                22,369,715                   Natural gas
      Batubara                                       33,605,922                32,836,338                           Coal
      Panas bumi                                      2,163,836                 2,095,112                   Geothermal
      Air                                               202,168                   215,464                         Water
      Biomassa                                          371,976                   136,239                    Biomassa

      Subjumlah                                      64,315,046                57,652,869                         Subtotal

      Minyak pelumas                                     168,155                  121,895                      Lubricants
      Jumlah                                         86,442,970                73,852,882                             Total



    Tidak ada pembelian dari pemasok tunggal yang                  No purchases from a single supplier exceeded 10% of
    melebihi 10% dari jumlah pendapatan.                           the total revenues.
    Lihat Catatan 51 untuk informasi rincian transaksi             Refer to Note 51 for information on the details of
    dan saldo dengan pihak berelasi.                               transactions and balances with related parties.


40. BEBAN PEMBELIAN TENAGA LISTRIK                           40. PURCHASED ELECTRICITY

    Akun ini termasuk pembelian tenaga listrik dari IPP            This account includes the purchase of electricity from
    terkait PPA dan ESC, pembelian tenaga listrik                  certain IPPs in relation to PPAs and ESCs, the
    selama masa uji coba dan pembelian tenaga listrik              purchase of electricity during the commissioning stage
    dari kelebihan produksi dari IPP tertentu.                     and the purchase of excess electricity generated by
    Rinciannya adalah sebagai berikut:                             certain IPPs. The details are as follows:
                                                   2024                      2023
                                              (Enam Bulan/              (Enam Bulan/
                                               Six Months)               Six Months)

    Pihak berelasi                                                                                               Related parties
    SSP                                                6,964,459                 6,992,304                                 SSP
    SGPJP                                              6,101,566                 5,065,051                              SGPJP
    PGE                                                1,950,590                 1,818,322                                 PGE
    BPI                                                  693,556                   764,856                                  BPI
    Lain lain                                          2,009,830                1,999,620                                Others

    Subjumlah                                         17,720,001               16,640,154                              Subtotal

    Pihak ketiga                                                                                                  Third parties
    PT Paiton Energy                                   7,031,009                6,622,623                     PT Paiton Energy
    PT Jawa Power                                      4,762,275                4,939,291                       PT Jawa Power
    PT Bhumi Jati Power                                7,056,178                6,508,135                  PT Bhumi Jati Power
    PT Bhimasena Power Indonesia                       7,052,828                5,918,128        PT Bhimasena Power Indonesia
    PT Cirebon Energi Prasarana                        3,549,706                  994,722          PT Cirebon Energi Prasarana
    PT Lestari Banten Energi                           1,702,365                2,194,254              PT Lestari Banten Energi
    PT General Energi Bali                             1,814,196                1,702,257                PT General Energi Bali
    PT Star Energy Geothermal                          1,614,148                1,483,722            PT Star Energy Geothermal
    PT DSSP Power Sumsel                               1,096,564                1,219,368              PT DSSP Power Sumsel
    Chevron Geothermal Indonesia Ltd.                    967,028                1,040,569     Chevron Geothermal Indonesia Ltd.
    PT Dayabumi Salak Indonesia                        1,078,388                1,024,201         PT Dayabumi Salak Indonesia
    Lain lain                                         31,813,891               22,940,198                                Others

    Subjumlah                                         69,538,577               56,587,467                              Subtotal

    Jumlah                                            87,258,578               73,227,621                                  Total
Page 139
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/129 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

41. BEBAN SEWA                                                 41. LEASE EXPENSES

                                                   2024                 2023
                                              (Enam Bulan/         (Enam Bulan/
                                               Six Months)          Six Months)

     Beban yang berkaitan dengan sewa                                                            Expense relating to variable lease
      dengan pembayaran variabel tidak                                                                    payments not included in
      termasuk dalam kewajiban sewa                 911,847               491,237                                 lease liabilities
     Beban yang berkaitan dengan
      sewa jangka pendek                            151,876               267,287             Expense relating to short-term leases
     Beban yang berkaitan dengan                                                                         Expense relating to leases of
      sewa nilai rendah                              77,295                63,263                                   low value assets

     Jumlah                                        1,141,018              821,787                                                 Total




42. BEBAN PEMELIHARAAN                                         42. MAINTENANCE EXPENSES

    Akun ini merupakan beban yang timbul dari                       This account represents spare parts used and
    pemakaian material dan jasa borongan untuk                      contractor fees for maintenance purposes. The details
    keperluan    pemeliharaan.    Rincian beban                     of maintenance expenses are as follows:
    pemeliharaan adalah sebagai berikut:


                                              2024                           2023
                                         (Enam Bulan/                   (Enam Bulan/
                                          Six Months)                    Six Months)

      Jasa borongan                            10,402,986                     9,696,224                    Contractor fees
      Pemakaian material                        2,335,306                     2,344,003                   Spare parts used
      Jumlah                                   12,738,292                   12,040,227                                      Total



43. BEBAN KEPEGAWAIAN                                          43. PERSONNEL EXPENSES

                                                  2024                   2023
                                             (Enam Bulan/           (Enam Bulan/
                                              Six Months)            Six Months)



     Insentif Kinerja                             2,345,476               1,940,488                     performance Incentives
     Imbalan kerja (catatan 49)                   3,494,809               3,504,805                 Employee benefits (Note 49)
     Gaji                                         2,857,522               2,654,363                                    Salaries
     Tunjangan                                    4,574,181               4,304,503                                Allowances
     Lain-lain                                    3,409,751               3,254,452                                     Others
     Jumlah                                      16,681,739              15,658,611                                             Total



44. BEBAN USAHA LAIN-LAIN                                      44. OTHER OPERATING EXPENSES

                                                         2024                   2023
                                                    (Enam Bulan/           (Enam Bulan/
                                                     Six Months)            Six Months)

    Honorarium                                                743,553               855,953                              Honorarium
    Pengelolaan pelanggan                                     135,335                53,432                  Customer maintenance
    Baca Meter                                              1,024,471               450,228                            Meter reading
    Teknologi informasi                                       448,038                90,136               Technological information
     Amortisasi tak berwujud                                  489,077               252,002          Amortisation of intangible assets
    (Pemulihan)/Penyisihan kerugian                                                                       (Recoverable)/allowance
       kredit ekspetasian uang                                215,590               162,860             for accounts receivable
     Lain-lain                                              2,079,746             2,158,601                                    Others

    Jumlah                                                  5,135,810             4,023,212                                    Total
Page 140
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/130 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                     JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)

45. BEBAN KEUANGAN                                                        45. FINANCE COSTS

                                                            2024                     2023
                                                       (Enam Bulan/             (Enam Bulan/
                                                        Six Months)              Six Months)
     Pihak berelasi                                                                                                          Related parties
     Utang bank                                             1,266,575                  1,020,486                                  Bank loans
     Penerusan pinjaman                                       424,828                    448,027                             Two-step loans
     Utang kepada Pemerintah                                   62,856                     84,866                         Government loans
     Instrumen derivatif                                     (965,287)                   951,983                        Derivatife instrument
     Subjumlah                                                788,972                  2,505,362                                        Subtotal

     Pihak ketiga                                                                                                              Third parties
     Utang obligasi                                         3,575,093                  2,550,799                              Bonds payable
     Utang bank                                             2,846,593                  4,299,239                                 Bank loans
     Utang sewa                                             3,019,997                  1,322,598                             Lease liabilities
     Utang listrik swasta                                     183,791                    194,043               Electricity purchase payable
     Lain-lain                                                 49,716                    159,230                                      Others
     Subjumlah                                              9,675,190                  8,525,909                                        Subtotal
     Jumlah                                                10,464,161                11,031,271                                            Total



    *)      (Pendapatan)/beban keuangan dari transaksi instrumen                *)    Finance (income)/expense from transaction of derivative
            derivatif.                                                                instrument.



46. PENGHASILAN LAIN-LAIN - BERSIH                                        46. OTHER INCOME - NET

                                                               2024                   2023
                                                          (Enam Bulan/           (Enam Bulan/
                                                           Six Months)            Six Months)

         Bagian laba (rugi) bersih entitas                                                                       Equity in net income of associates
           asosiasi dan ventura bersama (Catatan 9)             1,900,188             1,650,142                and joint ventures (Note 9)
         Penghasilan denda administrasi                           479,900             1,344,063                      Administrative penalty income
         Keuntungan penjualan aset tidak digunakan                                                                 Gain on sale of assets not used
           dalam operasi                                             45,372               7,087                                     in operations
         Penghasilan jasa dan klaim                                  38,585               8,547                           Claim and service income
         Kerugian penurunan nilai                                                                           Loss on impairment og assets not used
           aset tetap tidak digunakan                                                                                      in operations (Note 6)
           dalam operasi(Catatan 6)                              (572,653)             (356,125)
         Beban penelitian                                        (115,901)              (33,782)                              Research expenses
         Program pemberdayaan lingkungan                         (198,885)             (206,344)             Community development programs
         Cadangan atas ketidakpastian dalam                                                                             Allowance for uncertainty
           perlakuan pajak                                                            (1,510,604)                           over tax treatment
         Lain-lain                                              1,072,850             (1,021,750)                                          Others

         Jumlah                                                 2,649,455              (118,766)                                             Total




47. PAJAK PENGHASILAN                                                     47. INCOME TAX

                                                           2024                    2023
                                                      (Enam Bulan/            (Enam Bulan/
                                                       Six Months)             Six Months)


     Pajak kini                                                                                                                    Current tax
      Perusahaan                                                                                                               The Company
         Tahun berjalan                                              --              2,646,702                                 Current tax

         Entitas anak                                                                                                          Subsidiaries
           Tahun berjalan                                  1,446,590                 1,041,747                                Current year
           Tahun sebelumnya                                        --                        --                                 Prior year
                                                           1,446,590                 3,688,449
Page 141
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/131 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                      FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                 JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)             (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                 47. INCOME TAX (continued)

                                                      2024                    2023
                                                 (Enam Bulan/            (Enam Bulan/
                                                  Six Months)             Six Months)


         Pajak tangguhan                                                                                                Deferred tax
          Perusahaan                                    518,186                  792,009                             The Company
          Entitas anak                                2,268,559                2,621,475                              Subsidiaries

                                                      2,786,745                3,413,484

         Jumlah beban pajak                           4,233,335                7,101,933                 Total income tax expenses




    a.   Pajak kini                                                      a.    Current tax

         Rekonsiliasi antara laba sebelum pajak                                The reconciliation between the consolidated
         penghasilan konsolidasian dengan estimasi                             profit before income tax and the estimated
         penghasilan kena pajak adalah sebagai berikut:                        taxable income is as follows:

                                                       2024                   2023
                                                  (Enam Bulan/           (Enam Bulan/
                                                   Six Months)            Six Months)

          Laba (rugi) sebelum pajak                                                          Income (loss) before tax per consolidated
            menurut laporan laba rugi                                                                statements of profit or loss and
            komprehensif konsolidasian                 9,234,888               33,018,770              other comprehensive income
          Laba sebelum pajak                                                                            Income before tax attributable
            entitas anak                             (18,916,998)             (19,254,730)                            to subsidiaries
          Disesuaikan dengan jurnal                                                                      Adjustment for consolidation
            eliminasi konsolidasian                       95,348                        --                       elimination entries


          Laba (rugi) sebelum pajak Perusahaan        (9,586,762)              13,764,040     Income (loss) before tax - the Company
          Perbedaan temporer:                                                                                 Temporary differences:
            Beban sewa                                 1,169,051               (1,321,957)                         Lease expenses
            Penyambungan pelanggan                     3,552,865                 4,015,063               Customer connection fees
                                                                                                    Depreciation of property, plant
           Penyusutan aset tetap                      (8,250,962)              (8,149,063)                        and equipment
           Imbalan kerja                                1,514,171                  771,829                      Employee benefits
           Kapitalisasi biaya fiskal                  (1,138,624)                (777,019)
           Penyisihan piutang ragu-ragu dan                                                     Allowance for doubtful accounts and
             penurunan nilai persediaan                  161,450                  218,155           decline in value of inventories
           Kesejahteraan karyawan                        125,992                  547,429                          Employee welfare
           Penghasilan bunga telah                                                                                   Interest income
             dikenakan pajak final                     (443,092)                (352,180)                     subjected to final tax
           Bunga obligasi internasional                                                                International bond obligation
           Revaluasi aset                                                                                         Assets revaluation
           Beban lain tidak dapat dikurangkan          6,085,341                3,314,166            Other nondeductible expenses

          Estimas laba fiskal kena pajak                                                                     The Company's taxable
           Perusahaan tahun berjalan                  (6,810,569)              12,030,463                     income for the year

          Beban pajak kini - Perusahaan                          --             2,646,702                 Current tax - the Company

          Beban pajak kini - Entitas anak              1,446,590                1,041,747              Current tax - the Subsidiaries

          Total beban pajak                            1,446,590                3,688,449                       Income tax expenses




         Laba kena pajak hasil rekonsiliasi menjadi                            The taxable income resulting from the
         dasar dalam pengisian Surat Pemberitahuan                             reconciliation will become the basis for filing the
         Tahunan PPh Badan.                                                    Annual CIT Return.
Page 142
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/132 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                    (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                         47. INCOME TAX (continued)

    b.     Pajak tangguhan                                                      b.   Deferred tax

           Rincian dari aset dan liabilitas pajak tangguhan                          The details of the Group deferred tax assets and
           Grup adalah sebagai berikut:                                              liabilities are as follows:

                                                                  30 Juni 2024/ June 30, 2024
                                                                                     Dikreditkan
                                                               Dikreditkan          (dibebankan)
                                                              (dibebankan)         ke pendapatan
                                                               ke laporan        komprehensif lain/
                                                                Laba rugi/       Credited (charged)
                                          1 Januari/            Credited               to other          Saldo akhir/
                                          January 1,          (charged) to        comprehensive           Ending
                                             2024                income                income              balance

    Aset Pajak tangguhan                                                                                                                 Deferred tax assets
     Akumulasi rugi fiskal                            -                    -                      -                   -          Accumulated fiscal losses
     Liabilitas imbalan kerja                   175,591              (29,554)                   201             146,238         Employee benefit liabilities
     Pendapatan ditangguhkan                        427                 (427)                     -                   -                   Deferred incomes
     Aset hak guna                                2,128               18,950                      -              21,078                 Right On Use Asset
     Utang sewa                                  (3,503)             (15,391)                     -             (18,894)                   Lease Liabilities
     Aset tetap                                 223,943              (61,768)                     -             162,175      Property, plant and equipment
     Bonus                                       47,654              (47,477)                     -                 177                              Bonus
     Penyisihan persediaan                       30,646                 (779)                     -              29,867               Provision inventories
     Penyisihan piutang usaha                    58,598              (21,499)                     -              37,099       Provision Account receivable
     Laba dari entitas asosiasi                       -                    -                      -                   -            Income form associates
     Biaya ditangguhkan                               -                    -                      -                   -                   Deferred charges
     Lainnya                                      5,210                2,321                      -               7,531                              Others
    Jumlah                                      540,694             (155,624)                   201             385,271                                  Total

    Liabilitas pajak tangguhan                                                                                                        Deferred tax liabilities
     Akumulasi rugi fiskal                            -                    -                    -                     -          Accumulated fiscal losses
     Liabilitas imbalan kerja                         -                    -                    -                     -         Employee benefit liabilities
     Pendapatan ditangguhkan                 14,475,297              626,614            1,160,380            16,262,291                   Deferred revenue
     Aset hak guna                            6,293,502              802,576                    -             7,096,078                 Right On Use Asset
     Utang Sewa                              (5,559,384)             367,650                    -            (5,191,734)                   Lease liabilities
     Aset tetap                               1,895,287             (591,803)                   -             1,303,484      Property, plant and equipment
     Bonus                                  (75,622,115)          (3,906,250)                   -           (79,528,365)                             Bonus
     Provision inventories                      173,319              (49,117)                   -               124,202               Provision Inventories
     Provision Account receivable                82,970                 (260)                   -                82,710       Provision Account receivable
     Penyertaan pada entitas asosiasi             3,276                2,699                    -                 5,975            Income form associates
     Deferred charges                                 -                    -                    -                     -                   Deferred charges
     Lainnya                                     29,109              116,771                    -               145,880                              Others
    Jumlah                                  (58,228,739)          (2,631,120)           1,160,380           (59,699,479)                                 Total

                                                                  (2,786,744)           1,160,581           (59,314,208)




                                                              31 Desember/ December 31, 2023
                                                                                 Dibebankan
                                                             Dikreditkan/      ke penghasilan
                                                            (dibebankan)        komprehensif
                                                              ke laporan             lain/
                                                               laba rugi/         Charged
                                        Saldo awal/            Credited/           to other           Saldo akhir/
                                        Beginning            (charged) to      comprehensive            Ending
                                         balance            profit or loss         income               balance

         Aset pajak tangguhan                                                                                                       Deferred tax assets
         Akumulasi rugi fiskal                   1,709              (1,709)                   -                    -             Accumulated tax losses
         Liabilitas imbalan kerja              107,178              66,623                1,791              175,592          Employee benefit liabilities
         Liabilitas sewa                         6,446              (7,820)                   -               (1,374)                      Lease liabilities
         Aset tetap                            124,192              99,752                    -              223,944       Property, plant and equipment
         Penyisihan penurunan                                                                                                   Provision for impairment
            nilai piutang                       91,959              (33,360)                    -              58,599            losses of receivables
         Penyisihan persediaan                  29,064                1,583                     -              30,647           Provision for inventories
         Bonus                                  57,293               (9,639)                    -              47,654                             Bonuses
         Bagian laba bersih dari                                                                                                        Share net income
            entitas asosiasi dan                                                                                                  from associates and
            ventura bersama                         (3)                   3                     -                   -                     joint ventures
         Lainnya                                 9,610               (3,978)                    -               5,632                             Others

         Jumlah                                427,448             111,455                1,791              540,694                                 Total

         Liabilitas pajak tangguhan                                                                                              Deferred tax liabilities
         Liabilitas imbalan kerja           15,042,706              696,458          (1,263,919)           14,475,245         Employee benefit liabilities
         Pendapatan ditangguhkan             4,646,551            1,646,951                   -             6,293,502                   Deferred revenue
         Liabilitas sewa                     2,181,801             (286,515)                  -             1,895,286                     Lease liabilities
         Aset hak guna                      (5,515,652)             (43,732)                  -            (5,559,384)                Right-of-use assets
         Aset tetap                        (64,983,639)         (10,562,283)            (76,177)          (75,622,099)     Property, plant and equipment
         Bonus                                 178,156               (4,838)                  -               173,318                            Bonuses
         Penyisihan persediaan                  35,956               47,014                   -                82,970           Provision for inventories
         Penyisihan penurunan                                                                                                   Provision for impairment
            nilai piutang                        1,902               1,374                    -                 3,276            losses of receivables
         Lainnya                               (15,242)             39,927                4,462                29,147                              Others

         Jumlah                            (48,427,461)          (8,465,644)         (1,335,634)          (58,228,739)                               Total

                                                                 (8,354,189)         (1,333,843)          (57,688,045)
Page 143
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/133 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                          (Expressed in millions of Rupiah, unless otherwise stated)


47. PAJAK PENGHASILAN (lanjutan)                                                                  47. INCOME TAX (continued)

    b.    Pajak tangguhan (lanjutan)                                                                      b.      Deferred tax (continued)

          Pajak atas laba sebelum pajak konsolidasian                                                             The tax on the consolidated profit before income
          berbeda dengan jumlah teoritis yang dihitung                                                            tax differs from the theoretical amount that would
          menggunakan rata-rata tertimbang tarif pajak                                                            arise using the weighted average tax rate
          yang berlaku atas laba/(rugi) masing-masing                                                             applicable of profit/(loss) of the consolidated
          entitas anak yang dikonsolidasi sebagai                                                                 subsidiaries as follows:
          berikut:

                                                                                       2024                      2023
                                                                                  (Enam Bulan/              (Enam Bulan/
                                                                                   Six Months)               Six Months)


           Laba sebelum pajak menurut                                                                                                                             Profit before tax pe
             Laporan laba rugi                                                                                                                           consolidated statements of
             komprehensif konsolidasian                                                   9,234,888              33,018,769                                 comprehensive income

           Beban pajak                                                                                                                                                      Tax expense
           Pajak sesuai tarif berlaku                                                                                                                          at prevailing rate of 22%
             sesuai tarif yang berlaku 22%                                                2,031,675                7,264,129                                         at prevailing rate

           Pengaruh pajak atas:                                                                                                                                        Tax effect on:
           Utilitasi rugi fiskal                                                                                                                         Utilisation of tax loss carry
             yang dibawa ke masa depan                                                                                                                       forward in current year
             Kesejahteraan karyawan                                                          286,222                  207,191                                    Employee welfare
           Bagian atas laba bersih                                                                                                                             Share in net income of
             entitas asosiasi dan ventura bersama                                          (418,042)                (728,864)                         associates and joint venture
             Penghasilan bunga dikenakan                                                                                                              Interest income subjected to
                pajak final                                                                (143,503)                  (77,576)                                                final tax
             Revaluasi Aset                                                                                                                                  Revaluation of Assets
             Beban lain tidak dapat dikurangkan                                           2,476,982                   437,053                        Other nondeductible expenses

           Jumlah                                                                       4,233,335                 7,101,933                                                                 Total




    c.    Surat ketetapan pajak                                                                           c.      Tax assessment letters


                                                                                                         Jumlah yang           Jumlah yang
                                                                                                         diperkarakan          diperkarakan
                                                         Tahun                                           dalam Rupiah/         dalam Rupiah/
                                                          pajak/         Surat ketetapan pajak/             Dispute               Dispute
                     Jenis pajak/Tax type              Fiscal year          Tax assessment             amount in Rupiah     amount in Rupiah                       Status/ Status
                                                                                 letter                  30 Juni 2024       31 Desember 2023

         PLN
         PPN Pemungut/VAT Collector                       2016       Kurang bayar/Underpayment                        (0)              19,468      Putusan diterima, menunggu pengembalian/Verdict
                                                                                                                                                              accepted, waiting for refund

         PPh pasal 21/Income tax art 21                   2017       Kurang bayar/Underpayment                   35,522                35,522      Banding diterima sebagian/Appeal partially granted
         PPh pasal 22/Income tax art 22                   2017       Kurang bayar/Underpayment                  364,684               364,684             Peninjauan kembali / judicial review
         PPh pasal 23/Income tax art 23                   2017       Kurang bayar/Underpayment                   49,274                49,274   Permohonan peninjauan kembali dari DJP ditolak/Request
                                                                                                                                                         for judicial review from DJP rejected
          PPh pasal 4 ayat (2)/Income tax art 4(2)        2017       Kurang bayar/Underpayment                  198,992               198,992          Permohonan peninjauan kembali dari DJP
          PPN Dalam Negeri/Domestic VAT                   2017       Kurang bayar/Underpayment                  278,105               278,105      Banding diterima sebagian/Appeal partially granted
          PPN Pemungut/VAT Collector                      2017       Kurang bayar/Underpayment                  304,029               304,029          Permohonan peninjauan kembali dari DJP
          STP PPN dalam negeri/Tax assessment letter      2017       Kurang bayar/Underpayment                   41,383                41,383                        Banding diterima
         domestic VA                                                                                                                                           sebagian/Appeal partially
          PPN Pemungut/VAT Collector                      2018       Kurang bayar/Underpayment                  310,037               310,037                    Permohonan peninjauan
                                                                                                                                                                    kembali dari DJP
                                                                                                                                                               ditolak/Request for judicial
                                                                                                                                                               review from DJP rejected
Page 144
                              PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                           DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                        Lampiran 5/134 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                   (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                                           47. INCOME TAX (continued)

    c.       Surat ketetapan pajak (lanjutan)                                                     c.      Tax assessment letters (continued)


                                                                                             Jumlah yang             Jumlah yang
                                                                                             diperkarakan            diperkarakan
                                                  Tahun                                      dalam Rupiah/           dalam Rupiah/
                                                   pajak/         Surat ketetapan pajak/        Dispute                 Dispute
                 Jenis pajak/Tax type           Fiscal year          Tax assessment        amount in Rupiah       amount in Rupiah         Status/ Status
                                                                          letter             30 Juni 2024         31 Desember 2023

    PLN
    PPh pasal 21/Income tax art 21                 2018       Kurang bayar/Underpayment              336,283                 336,283      Banding / Appeal
    PPh pasal 22/Income tax art 22                 2018       Kurang bayar/Underpayment               48,455                 176,068      Banding / Appeal
    PPh pasal 23/Income tax art 23                 2018       Kurang bayar/Underpayment            2,380,167               2,380,167      Banding / Appeal
    PPh pasal 4 ayat (2)/Income tax art 4(2)       2018       Kurang bayar/Underpayment            2,950,557               2,950,558      Banding / Appeal
    Bea meterai/Stamp duty                         2018       Kurang bayar/Underpayment              125,776                 199,341      Banding / Appeal
    PPh pasal 21/Income tax art 21                 2019       Kurang bayar/Underpayment              114,971                 114,695      Banding / Appeal
    PPh pasal 22/Income tax art 22                 2019       Kurang bayar/Underpayment              499,208                 499,208      Banding / Appeal
    PPh pasal 4 ayat (2)/Income tax art 4(2)       2019       Kurang bayar/Underpayment            1,064,279               1,064,278      Banding / Appeal
    PPh pasal 26/Income tax art 26                 2019       Kurang bayar/Underpayment              215,145                 215,145      Banding / Appeal
    Bea meterai/Stamp Duty                         2019       Kurang bayar/Underpayment              377,385                 188,692      Banding / Appeal
    PPh Badan/Corporate income tax                 2019       Kurang bayar/Underpayment            3,061,305               3,061,305      Banding / Appeal
    PPN pemungut/VAT collector                     2019       Kurang bayar/Underpayment              878,959                 878,959      Banding / Appeal
    PPh pasal 4 ayat (2)/ Income tax art 4(2)      2020       Kurang bayar/Underpayment              477,687                 477,687     Keberatan/Objection

    Bea meterai/Stamp duty                         2020       Kurang bayar/Underpayment               79,048                  39,524     Keberatan/Objection
    PPh pasal 21/Income tax art 21                 2020       Kurang bayar/Underpayment               13,981                  13,981     Keberatan/Objection
    PPh pasal 22/Income tax art 22                 2020       Kurang bayar/Underpayment              241,613                 241,613     Keberatan/Objection
    PPh pasal 23/Income tax art 23                 2020       Kurang bayar/Underpayment            1,342,502                 671,251     Keberatan/Objection
    PPh Badan/Corporate income tax                 2020       Kurang bayar/Underpayment            2,704,402               1,622,641     Keberatan/Objection
    PPh pasal 26/Income tax art 26                 2020       Kurang bayar/Underpayment               46,735                  46,735     Keberatan/Objection
    PPN dalam negeri/Domestic VAT                  2020       Kurang bayar/Underpayment               84,257                  84,257     Keberatan/Objection
    STP PPN dalam negeri/                          2020       Kurang bayar/Underpayment               11,847                  11,847     Keberatan/Objection
    Tax assessment letter domestic
    VAT

    PNP
    PPh pasal 22/Income Tax Art 22                 2019       Kurang bayar/Underpayment             136,172                 136,172      Keberatan/Objection


    PPh Badan/Corporate income tax                 2019       Kurang bayar/Underpayment                       -              18,555      Peninjauan Kembali/
                                                                                                                                           Judicial Review
    Bea meterai/Stamp duty                         2023       Kurang bayar/Underpayment             122,521                          -   Keberatan/Objection

    PIP
    PPh Badan/Corporate income tax                 2016       Kurang bayar/Underpayment                16,608                16,094      Keberatan/Objection


    PPh pasal 23/Income tax art 23                 2018       Kurang bayar/Underpayment              19,925                  19,925        Banding/Appeal
    PPh pasal 4 ayat (2)/ Income tax art 4(2)      2018       Kurang bayar/Underpayment             136,071                 136,071        Banding/Appeal

    PPh pasal 22/Income tax art 22                 2019       Kurang bayar/Underpayment                50,002               108,289        Banding/Appeal
    PPh pasal 22/Income tax art 22                 2020       Kurang bayar/Underpayment                31,808                31,808      Keberatan/Objection

    PPh Badan/Corporate income tax                 2020       Kurang bayar/Underpayment                16,541                            Keberatan/Objection

    PPh pasal 22/Income tax art 22                 2021       Kurang bayar/Underpayment                50,122                50,122      Keberatan/Objection

    PPh Badan/Corporate income tax                 2022       Kurang bayar/Underpayment                 8,918                            Keberatan/Objection

    PPh pasal 4 ayat (2)/ Income tax art 4(2)      2023       Lebih bayar/Overpayment                      74                              Banding/Appeal
Page 145
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/135 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                       (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                                                               47. INCOME TAX (continued)

    c.   Surat ketetapan pajak (lanjutan)                                                           c.       Tax assessment letters (continued)
                                                                                                   Jumlah yang             Jumlah yang
                                                                                                   diperkarakan            diperkarakan
                                                      Tahun                                        dalam Rupiah/           dalam Rupiah/
                                                       pajak/         Surat ketetapan pajak/          Dispute                 Dispute
                     Jenis pajak/Tax type           Fiscal year          Tax assessment          amount in Rupiah       amount in Rupiah         Status/ Status
                                                                              letter               30 Juni 2024         31 Desember 2023

         Haleyora Power
         PPh Badan/Corporate income tax                2016       Kurang bayar/Underpayment                 12,680                 12,680        Banding/Appeal
         PPh Badan/Corporate income tax                2017       Kurang bayar/Underpayment                 12,655                 12,655        Banding/Appeal
         PPh pasal 22/Income tax art 22                2017       Kurang bayar/Underpayment                    122                    122        Banding/Appeal
         PPN pemungut/VAT collector                    2017       Kurang bayar/Underpayment                  4,891                  4,891        Banding/Appeal
         PPh Badan/Corporate income tax                2018       Kurang bayar/Underpayment                  6,660                               Banding/Appeal
         PPN pemungut/VAT collector                    2019       Kurang bayar/Underpayment                  9,887                   9,887     Keberatan/Objection
         PPh Badan/Corporate income tax                2022       Lebih bayar/Overpayment                    9,467                   9,467    Pemeriksaan/Inspection
         PPh Badan/Corporate income tax                2023       Kurang bayar/Underpayment                 15,051                               Banding/Appeal

         EPI
         PPh Badan/Corporate income tax                2017       Lebih bayar/Overpayment                           -              40,914        Banding/Appeal


         PPN/VAT                                       2020       Lebih bayar/Overpayment                   10,445                 12,503      Keberatan/Objection
         PPh Badan/Corporate income tax                2022       Lebih bayar/Overpayment                   34,812                 34,823     Pemeriksaan/Inspection
         PPh Badan/Corporate income tax                2023       Lebih bayar/Overpayment                  106,775                               Banding/Appeal

         TARAKAN
         PPh pasal 21/Income tax art 21                2017       Kurang bayar/Underpayment                                          1,036       Banding/Appeal
         PPh pasal 23/Income tax art 23                2017       Kurang bayar/Underpayment                                            108       Banding/Appeal
         PPh pasal 4 ayat (2)/Income tax art 4(2)      2017       Kurang bayar/Underpayment                                              4       Banding/Appeal
         PPh Badan/Corporate income tax                2017       Kurang bayar/Underpayment                                          8,905       Banding/Appeal

         COMNET
         PPh Badan/Corporate income tax                2023       Lebih bayar/Overpayment                   95,328                               Banding/Appeal

         Jumlah/Total                                                                                    19,544,121             17,540,761

         Provisi/ Provision                                                                              (4,827,897)            (4,908,174)

         Jumlah bersih/ Total, net                                                                       14,716,224             12,632,587


         Pada tanggal 11 Januari 2023, Perusahaan telah                                                      On January 11, 2023, the Company received the
         menerima Surat Perintah Membayar Kelebihan                                                          Tax Overpayment Refund Instruction (“SPMKP”)
         Pajak       (“SPMKP”)          No.      KEP-                                                        No.KEP-00001/PPH/KPP.1903/2023 concerning
         00001/PPH/KPP.1903/2023 tentang Keputusan                                                           the decision on SKPKB Income Tax Article 4(2)
         SKPKB PPh Pasal 4(2) dengan keputusan                                                               with the decision of tax refund through
         pengembalian pajak melalui kompensasi                                                               compensating the SPMKP amounting to
         SPMKP sebesar Rp238.979 dan penerimaan                                                              Rp238,979 and cash receipts amounting to
         kas sebesar Rp781.461 untuk masa pajak                                                              Rp781,461 for the fiscal period December 2017.
         Desember 2017. Pada tanggal 16 November                                                             On November 16, 2022, DJP has submitted the
         2022, DJP telah mengajukan Peninjauan                                                               Judicial Review regarding the appeal decision.
         Kembali atas putusan banding. Selama tahun                                                          During 2023, the Company has received several
         2023, Perusahaan telah menerima beberapa                                                            Decrees of Supreme Court Judicial Review for
         Putusan atas Peninjauan Kembali Mahkamah                                                            taxes fiscal year 2017 and 2018. Up to the
         Agung untuk pajak tahun 2017 dan 2018.                                                              completion date of these consolidated financial
         Sampai dengan tanggal penyelesaian laporan                                                          statements, several tax cases are still in the
         keuangan konsolidasian ini, beberapa kasus                                                          process of being examined in the Supreme Court.
         perpajakan masih dalam proses pemeriksaan di
         Mahkamah Agung.

         Selama tahun 2023, Grup telah menerima                                                              During 2023, the Group received tax refunds from
         pengembalian pajak dari hasil keberatan dan                                                         the proceeds of the objections and appeals for
         banding untuk tahun fiskal 2016 dan 2017                                                            fiscal years 2016 and 2017 amounted to
         sebesar Rp1.254.400 yang terdiri dari                                                               Rp1,254,400 consisting of tax refunds for
         pengembalian pajak atas kurang bayar PPN                                                            underpayment of VAT amounted to Rp55,857,
         sebesar Rp55.857, PPh Pasal 4(2) sebesar                                                            Income Tax Article 4(2) amounted to
         Rp1.020.440, dan PPN DN sebesar Rp178.103.                                                          Rp1,020,440, and Domestic VAT amounted to
         Grup menerima pengembalian pajak tersebut                                                           Rp178,103. The Group received those tax
         melalui penerimaan kas sebesar Rp988.793 dan                                                        refunds through cash receipts amounting to
         melalui pemotongan utang pajak sebesar                                                              Rp988,793 and through a deduction of tax
         Rp265.607.                                                                                          payables amounting to Rp265,607.
Page 146
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/136 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

47. PAJAK PENGHASILAN (lanjutan)                            47. INCOME TAX (continued)

    c.   Surat ketetapan pajak (lanjutan)                       c. Tax assessment letters (continued)

         Pada tanggal 7 November 2023, Perusahaan                    On November 7, 2023, the Company received a
         menerima Surat Hasil Pemeriksaan Pajak                      Tax Audit Result Letter ("SPHP”) from the DJP
         (“SPHP”) dari DJP atas pemeriksaan pajak tahun              regarding the tax audit for fiscal year 2020. The
         fiskal 2020. Perusahaan telah memberikan                    Company has submitted a response towards the
         tanggapan atas SPHP tersebut pada tanggal 16                SPHP on November 16, 2023. Afterwards, the
         November 2023. Kemudian, Perusahaan telah                   Company received a Tax Underpayment
         menerima Surat Ketetapan Pajak Kurang Bayar                 Assessment Letter (“SKPKB”) with a total tax
         (“SKPKB”) dengan jumlah kurang bayar pajak                  underpayment amounting to Rp9,840,654 and
         sebesar Rp9.840.654 dan telah melakukan                     has made a payment amounting to Rp3,209,536.
         pembayaran sebesar Rp3.209.536.

         Pada tanggal 7 Februari 2024, Perusahaan telah              On February 7, 2024, the Company has made an
         melakukan pembayaran tambahan sebesar                       additional payment of Rp1,753,012 for the
         Rp1.753.012 atas SKPKB tahun fiskal 2020.                   SKPKB fiscal year 2020. The Company has
         Perusahaan     telah    menyampaikan     surat              submitted objection letters to DJP regarding
         keberatan atas SKPKB tahun fiskal 2020 kepada               SKPKB for fiscal year 2020 on February 26, 2024.
         DJP pada tanggal 26 Februari 2024.

         Selama periode Enam bulan yang berakhir 30                  During six month periods ended June 30, 2024,
         Juni 2024, Perusahaan telah menerima                        Company received tax refunds from the
         pengembalian pajak dari hasil keberatan dan                 processed of the objections and appeals for fiscal
         banding untuk tahun fiskal 2016 atas PPN                    years 2016 consisting of VAT amounted
         sebesar Rp19.469, tahun fiskal 2018 atas PPh                Rp19,469, fiscal years 2018 consisting of income
         pasal 22 sebesar Rp127.612 dan PPh pasal 26                 tax art 22 amounted Rp127,612 and income tax
         sebesar Rp73.565.                                           art 26 amounted Rp73,565

         Manajemen berkeyakinan bahwa provisi atas                   Management believes that the provision against
         ketidakpastian posisi pajak telah mencukupi.                uncertain tax positions is adequate.

    d.   Administrasi                                           d. Administration

         Berdasarkan undang-undang perpajakan yang                  Based on the taxation laws in Indonesia,
         berlaku di Indonesia, perusahaan-perusahaan                companies within the Group which are domiciled
         di dalam Grup yang berdomisili di Indonesia                in Indonesia calculate and pay tax based on self-
         menghitung dan membayar sendiri besarnya                   assessment. The DJP may assess or amend
         jumlah pajak yang terutang. DJP dapat                      taxes within five years of the time the tax
         menetapkan atau mengubah pajak dalam batas                 becomes due.
         waktu lima tahun saat terutangnya pajak.


48. LABA PER SAHAM DASAR DAN DILUSIAN                       48. BASIC AND DILUTED EARNINGS PER SHARE

                                           30 Juni/             30 Juni/
                                           June 30,             June 30,
                                             2024                 2023

     Laba konsolidasian tahun berjalan
        yang dapat diatribusikan kepada                                           Consolidated profit for the year
        pemilik entitas induk                 4,992,188           25,895,393            attributable to owners
     Rata-rata tertimbang jumlah                                                    Weighted average number of
        saham biasa yang beredar                                                  ordinary shares outstanding
        (dalam ribuan lembar saham)            146,961               143,551           (in thousand of shares)

     Laba bersih per saham dasar                                                          Basic earnings per share
        yang dapat diatribusikan                                                   attributable to the owners
        kepada pemilik entitas induk                                                       of the parent entity
        (dalam Rupiah penuh)                     33,970              180,391           (in Rupiah full amount)



    Perusahaan tidak mempunyai efek berpotensi dilusi           The Company did not have potential dilutive
    saham, sehingga laba per saham dasar sama                   ordinary shares, therefore basic earnings per share
    dengan laba per saham dilusian.                             is the same as the dilutive earnings per share.
Page 147
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/137 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA                                    49. EMPLOYEE BENEFITS LIABILITIES
                                                   30 Juni/              31 Desember/
                                                   June 30,              December 31,
                                                     2024                    2023

     Liabilitas imbalan kerja jangka pendek                                                           Short-term employee benefit liabilities
     Bonus dan insentif prestasi kerja                 4,033,645                4,250,487                  Bonus and perfomance incentives
     Liabilitas pascakerja jangka pendek               4,032,689                3,631,893    Post-employment benefits liability - current portion
     Jumlah                                            8,066,334                7,882,380                                                  Total



     Liabilitas imbalan kerja jangka panjang                                                           Long-term employee benefit liabilities
     Imbalan pascakerja                                                                                             Post-employment benefits
     Program pensiun                                         -                        -                                     Pension program
     Imbalan pascakerja lainnya                       15,434,216               14,601,989                     Other post-employment benefits
     Imbalan pemeliharaan kesehatan                   57,529,925               51,117,646                                 Health care benefits
     Imbalan jangka panjang lainnya                      663,914                  743,296                            Other long-term benefits
     Jumlah                                           73,628,055               66,462,931                                                  Total
     Dikurangi : bagian jangka pendek                  4,032,689                3,631,893                                  Less : current portion
     Bagian jangka panjang                            69,595,366               62,831,038                                    Long-term portion



     Beban diakui di laba rugi:                                                                           Expense recognise in profit or loss:
                                                   30 Juni/              31 Desember/
     Imbalan pascakerja                            June 30,              December 31,                                 Post-employment benefits
                                                     2024                    2023
     Program pensiun manfaat pasti                         42,240                  93,920                      Defined benefit pension program
     Imbalan pascakerja lainnya                         1,045,403               1,955,024                      Other post-employment benefits
     Imbalan pemeliharaan kesehatan                     2,278,870               4,733,796                                  Health care benefits
     Imbalab jangka panjang lainnya                       128,296                 308,333                              Other long-term benefits
     Jumlah                                            3,494,809                7,091,073                                                  Total



     Pengukuran kembali program                                                                           Remeasurement on defined benefit
       manfaat pasti diakui di                                                                                  plan recognised in other
       penghasilan komprehensif lain:                                                                            comprehensive income:
                                                   30 Juni/              31 Desember/
                                                   June 30,              December 31,
     Imbalan pascakerja                              2024                    2023                                    Post-employment benefits
     Program pensiun manfaat pasti                         59,719                 334,441                      Defined benefit pension program
     Imbalan pascakerja lainnya                           305,292                (528,416)                     Other post-employment benefits
     Imbalab pemeliharaan kesehatan                     4,910,358              (5,529,833)                                 Health care benefits
     Jumlah                                            5,275,369               (5,723,808)                                                 Total




    Kenaikan signifikan pada pengukuran kembali                        The significant increase in remeasurement on
    program manfaat pasti yang diakui di penghasilan                   defined benefit plans which is recognised in other
    komprehensif lain sebagian besar disebabkan                        comprehensive income is mainly due to changes in
    karena perubahan asumsi demografis.                                the demographic assumptions.

    Program pensiun manfaat pasti                                      Defined benefit pension program

    Grup menyelenggarakan program pensiun manfaat                      The Group established a defined benefit pension
    pasti untuk semua karyawan tetap yang memenuhi                     program covering all of its eligible permanent
    syarat. Program pensiun ini memberikan imbalan                     employees. This pension plan provides benefits
    berdasarkan penghasilan dasar pensiun dan masa                     based on basic pension income and the period of
    kerja karyawan.                                                    employment.

    Program pensiun ini dikelola oleh Dana Pensiun                     This pension plan is managed by Dana Pensiun PLN
    PLN (”DP-PLN”), pihak berelasi, yang akta                          (“DP-PLN”), a related party, whose deed of
    pendiriannya telah disahkan oleh Kementerian                       establishment was approved by the Ministry of
    Keuangan Republik Indonesia dengan Surat                           Finance of the Republic of Indonesia in its Decision
    Keputusannya No. KEP-284/KM.17/1997 tanggal                        Letter No. KEP-284/KM.17/1997 dated May 15, 1997.
    15 Mei 1997.

    Pendanaan DP-PLN terutama berasal dari iuran                       DP-PLN is mainly funded by contributions from both
    karyawan dan pemberi kerja masing-masing                           the employees and the employer which are 6.00%
    sebesar 6,00% dan 19,45% dari penghasilan dasar                    and 19.45% from basic pension income, respectively.
    pensiun.
Page 148
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/138 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                     49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Pada tanggal 4 April 2022, DSAK-IAI menerbitkan             On April 4, 2022, the DSAK-IAI published a press
    siaran pers mengenai “Pengatribusian Imbalan                release regarding “Attributing Benefit to Periods of
    pada Periode Jasa (PSAK No. 24)” sebagai                    Service (SFAS No. 24)” in response to the
    tanggapan atas Standar Akuntansi Keuangan                   International Financial Accounting Standards,
    Internasional,    Keputusan     Agenda    Komite            Interpretation    Committee      Agenda      Decision:
    Interpretasi: Standar Akuntansi Internasional 19            International Accounting Standard 19 Employee
    Imbalan Kerja - Pengatribusian Imbalan pada                 Benefits - Attributing Benefit to Periods of Service,
    Periode Jasa, yang diterbitkan pada Mei 2021. Per           published in May 2021. As at December 31, 2023 and
    31 Desember 2023 dan 2022, dampak dari                      2022, the impact of the changes in the calculation is
    perubahan perhitungan tidak material bagi Grup.             immaterial to the Group. Therefore, the impact of the
    Oleh karena itu, dampak perubahan tersebut dicatat          changes is recorded fully in the consolidated financial
    seluruhnya dalam laporan keuangan konsolidasian             statements for the current year.
    tahun berjalan.

    Imbalan pemeliharaan kesehatan                              Health care benefits

    Selain program pensiun yang dikelola oleh DP-PLN,           In addition to the pension plan managed by DP-PLN,
    Grup menyediakan imbalan program kesehatan                  the Group also provides unfunded health care benefit
    tanpa     pendanaan     bagi    pensiunan     dan           plans for pensioners and their eligible dependents.
    tanggungannya yang memenuhi persyaratan.

    Imbalan pascakerja lainnya                                  Other post-employment benefits

    Selain dari program dana pensiun dan imbalan                In addition to the pension plan and health care
    pemeliharaan kesehatan, Grup menyediakan                    benefits, the Group also provides unfunded severance
    imbalan pesangon dan penghargaan purna jabatan              benefits and completion of employment awards for
    tanpa pendanaan bagi pegawai yang memenuhi                  eligible employees.
    syarat.

    Imbalan jangka panjang lainnya                              Other long-term benefits

    Grup juga memberikan imbalan kerja jangka                   The Group also provides other long-term employee
    panjang lainnya seperti uang cuti besar, tunjangan          benefits such as long leave allowance, disability
    kecelakaan dinas, bantuan kematian, dan                     benefit, death benefit, and loyalty benefits.
    penghargaan kesetiaan kerja.


    Asumsi-asumsi utama yang digunakan dalam                    The principal assumptions used in the calculations of
    perhitungan liabilitas imbalan kerja                        post employment benefits obligation

   Tabel mortalita                                    CSO-58                                             Mortality table
   Usia pensiun normal                             56 tahun/years                                Normal retirement age

    Asumsi yang berhubungan dengan pengalaman                   Assumptions regarding future mortality experience
    mortalitas masa depan ditentukan berdasarkan                are set based on actuarial advice in accordance with
    saran aktuaris menurut statistik yang telah                 published statistics and experience by the Company
    diterbitkan dan pengalaman dari perusahaan dan              and its subsidiaries. The mortality assumptions used
    entitas anak setiap wilayah. Asumsi mortalitas yang         are based on the CSO-58 mortality table which is
    digunakan adalah tabel mortalita CSO-58 yang                applied in calculating the long-term benefits liability
    diterapkan dalam penghitungan liabilitas kerja              recognised within the consolidated statements of
    jangka panjang yang diakui dalam laporan posisi             financial position.
    keuangan konsolidasian.

    Perhitungan aktuaria atas program pensiun,                  The actuarial calculations of the pension program,
    imbalan pascakerja lainnya, imbalan pemeliharaan            other post-employment benefits, health care benefits,
    kesehatan, dan imbalan kerja jangka panjang                 and other long-term benefits for the years ended
    lainnya untuk tahun yang berakhir pada tanggal 31           December 31, 2023 and 2022 were calculated by a
    Desember 2023 dan 2022 dihitung oleh Kantor                 registered Actuarial Consulting Firm (“KKA”), KKA
    Konsultan Aktuaria (“KKA”) yang terdaftar, yaitu            Tubagus Syafrial & Amran Nangasan (formerly PT
    KKA Tubagus Syafrial & Amran Nangasan                       Binaputera Jaga Hikmah), based on its reports dated
    (sebelumnya PT Binaputera Jaga Hikmah), dalam               April 1, 2024 and April 17, 2023, respectively.
    laporannya masing-masing tertanggal 1 April 2024
    dan 17 April 2023.
Page 149
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/139 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)           (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                            49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Grup melakukan studi pada tahun 2020 untuk                                  The Group conducted a study in 2020 to determine
    melihat tabel mortalitas mana yang paling sesuai                            which mortality tables best suited most of the Group’s
    dengan profil mortalitas pegawai dan pensiunan                              employees’ and pensioners’ mortality profiles. In the
    Grup. Dalam melakukan studi, Grup telah                                     study, the Group considered CSO-58, GAM-71, ANN-
    mempertimbangkan CSO-58, GAM-71, ANN-49,                                    49, GAM-83, TMI-2011, and TMI-2019. Based on the
    GAM-83, TMI-2011, dan TMI-2019. Dari studi                                  study, the Group found that the mortality table that
    tersebut, Grup menemukan bahwa tabel mortalitas                             best suited the mortality profile of the Group’s
    yang paling sesuai dengan profil mortalitas pegawai                         employees and pensioners is CSO-58.
    dan pensiunan Grup adalah CSO-58.

    i.   Program pensiun                                                        i.   Pension program

         Jumlah liabilitas yang diakui pada laporan                                  The liability recognised in the consolidated
         posisi keuangan konsolidasian ditentukan                                    statements of financial position is determined as
         sebagai berikut:                                                            follows:
                                                       30 Juni/                      31 Desember/
                                                       June 30,                      December 31,
                                                         2024                            2023

         Nilai kini kewajiban yang didanai                10,509,126                      10,408,465            Present value of funded obligations
         Nilai wajar aset program                        (10,919,801)                    (10,919,630)                      Fair value of plan assets
         Jumlah                                             (410,675)                       (511,165)                                         Total
         Dampak batas atas aset                              410,675                         511,165                         Impact of asset ceiling
         Liabilitas pada laporan                                                                                     Liability in the consolidated
           posisi keuangan konsolidasian                            -                                -          statement of financial position




         Pergerakan kewajiban program pensiun                                        The movement in the defined benefit pension
         manfaat pasti selama tahun berjalan adalah                                  program obligation over the year is as follows:
         sebagai berikut:
                                                        30 Juni/                     31 Desember/
                                                        June 30,                     December 31,
                                                          2024                           2023

           Saldo awal                                      10,408,465                     10,336,245                           Beginning balance
           Dibebankan ke laba rugi:                                                                                      Charged to profit and loss:
             Biaya jasa kini                                   65,043                        134,419                        Current service cost
             Biaya bunga                                      345,679                        696,250                           Interest expense

                                                              410,722                        830,669
           Pengukuran kembali:                                                                                                  Remeasurements:
           Kerugian aktuarial yang timbul dari                                                                                Loss from change in
             perubahan asumsi keuangan                             217                        72,094                      financial assumptions
           Kerugian aktuarial dari perubahan                                                                            Actuarial loss from various
             beberapa asumsi                                            -                            -                   changes in assumptios
           Kerugian dari penyesuaian
             atas pengalaman                                  159,992                        186,210                             Experience Loss
           Kerugian yang timbul dari                                                                                          Loss from change in
             perubahan asumsi demografis                                -                            -                 demographic assumptions
                                                              160,209                        258,304
           Pembayaran manfaat                                (470,270)                     (1,016,753)                             Benefit payment
           Saldo akhir                                     10,509,126                     10,408,465                               Ending balance



         Mutasi nilai wajar aset program selama tahun                                The movement in the fair value of plan assets
         berjalan adalah sebagai berikut:                                            over the year is as follows:
                                                        30 Juni/                      31 Desember/
                                                        June 30,                      December 31,
                                                          2024                            2023

            Saldo awal                                      10,919,630                      9,890,942                          Beginning balance
            Imbal hasil atas aset program                      348,550                        696,520                        Return on plan assets
            Iuran pemberi kerja                                101,959                        873,664                      Employer's contributions
            Iuran pekerja                                       19,932                         40,229                       Employee contributions
            Pembayaran manfaat                                (470,270)                    (1,016,753)                           Benefit payments
            Kerugian aktuarial                                                                                                       Actuarial loss
               pada aset program                                            -                 435,028                             of plan assets
            Saldo akhir                                    10,919,801                       10,919,630                             Ending balance
Page 150
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/140 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                            JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                                         49. EMPLOYEE BENEFITS LIABILITIES (continued)

    i.     Program pensiun (lanjutan)                                                  i.      Pension program (continued)

           Asumsi aktuarial utama yang digunakan adalah                                        The principal actuarial assumptions used were as
           sebagai berikut:                                                                    follows:

                                                                    30 Juni/                 31 Desember/
                                                                    June 30,                 December 31,
                                                                      2024                       2023

             Tingkat diskonto                                    6,61% - 6,87%                6,61% - 6,87%                                     Discount rate
             Tingkat kenaikan manfaat pensiun                        5.00%                        5.00%                         Pension benefit increase rate




           Kontribusi yang diharapkan untuk program                                            Expected contributions to post-employment
           imbalan pascakerja untuk tahun yang berakhir                                        benefit plans for the years ended June 30, 2024
           pada 30 Juni 2024 dan Desember 2023                                                 and December 31, 2023 are Rp470,441 and
           masing-masing adalah sebesar Rp470.441 dan                                          Rp1,610,412, respectively.
           Rp1.610.412.

           Sensitivitas dari kewajiban manfaat pasti                                           The sensitivity of the defined benefit obligation to
           terhadap perubahan asumsi aktuarial utama                                           changes in the weighted principal assumptions is
           adalah sebagai berikut:                                                             as follows:
                                                                Dampak atas kewajiban manfaat pasti/
                                                                 Impact on defined benefit obligation
                                                     Perubahan                Kenaikan                 Penurunan
                                                       asumsi/                  asumsi                   asumsi
                                                     Change in               Increase in              Decrease in
                                                     Assumption             assumptions               assumptions
             Tingkat diskonto                            1%                          163,805                 (185,467)                               Discount rate
             Tingkat kenaikan gaji                       1%                         (184,961)                 165,750                           Salary growth rate



    ii.    Imbalan pascakerja lainnya                                                  ii.     Other post-employment benefits

           Pergerakan kewajiban imbalan pascakerja                                             The movement in the other post-employment
           lainnya selama tahun berjalan adalah sebagai                                        benefits obligation over the year is as follows:
           berikut:
                                                                  30 Juni/                   31 Desember/
                                                                  June 30,                   December 31,
                                                                    2024                         2023

          Saldo awal                                                   14,601,989                    14,032,285                             Beginning balance

          Dibebankan ke laba rugi:                                                                                                   Charged to profit and loss:
            Biaya jasa kini                                               564,790                       935,678                         Current service cost
            Biaya bunga                                                   483,929                     1,010,142                             Interest expense
            Biaya jasa lalu                                                     -                        15,901                            Past service cost
            Imbal hasil aset aset program                                  (3,316)                       (6,697)                       Return on plan assets
                                                                        1,045,403                     1,955,024
          Pengukuran kembali:                                                                                                                Remeasurements:
          Kerugian aktuarial yang timbul dari                                                                                             Loss from change in
            perubahan asumsi keuangan                                     295,705                       740,177                       financial assumptions
          Kerugian/(keuntungan) aktuarial yang                                                                                 Loss/(gain) from combination of
            timbul dari kombinasi perubahan asumsi                              (54)                          26                     changes in assumptios
          Kerugian/(Keuntungan) dari penyesuaian
            atas pengalaman                                                  9,641                   (1,268,632)                       Experience loss/(gain)
          Kerugian yang timbul dari perubahan                                                                                             Loss from change in
            asumsi demografis                                                     -                           13                   demographic assumptions
                                                                          305,292                      (528,416)
          Pembayaran manfaat                                             (518,468)                     (856,904)                              Benefit Payment
          Saldo akhir                                                  15,434,216                    14,601,989                                Ending balance




           Asumsi aktuarial utama yang digunakan adalah                                        The principal actuarial assumptions used were as
           sebagai berikut:                                                                    follows:

                                                                  30 Juni/                   31 Desember/
                                                                  June 30,                   December 31,
                                                                    2024                         2023

          Tingkat diskonto                                      6,56% - 7,37%                6,56% - 7,37%                                       Discount rate
          Tingkat kenaikan gaji per tahun                       5,00% - 7,12%                5,00% - 7,12%                  Rate of salary increase per annum
Page 151
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/141 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                  JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                                              49. EMPLOYEE BENEFITS LIABILITIES (continued)

    ii.   Imbalan pascakerja lainnya (lanjutan)                                              ii.     Other post-employment benefits (continued)

          Sensitivitas dari imbalan pascakerja lainnya                                               The sensitivity of the other post-employment
          terhadap perubahan asumsi aktuarial utama                                                  benefits to changes in the weighted principal
          adalah sebagai berikut:                                                                    assumptions is as follows:

                                                                     Dampak atas imbalan pascakerja lainnya/
                                                                    Impact on other post-employment benefits
                                                          Perubahan                  Kenaikan                Penurunan
                                                            asumsi/                   asumsi                   asumsi
                                                          Change in                 Increase in              Decrease in
                                                          Assumption              assumptions               assumptions
          Tingkat diskonto                                    1%                           1,791,522              (2,159,676)                          Discount rate
          Tingkat kenaikan gaji                               1%                          (2,182,715)              1,845,816                      Salary growth rate



    iii. Imbalan pemeliharaan kesehatan                                                      iii. Health care benefit

          Grup memiliki beberapa skema imbalan                                                       The Group operates a number of post-
          pemeliharaan kesehatan pascakerja. Metode                                                  employment health care benefit schemes. The
          akuntansi, asumsi, dan frekuensi penilaian                                                 method of accounting, assumptions, and the
          adalah sama dengan yang digunakan dalam                                                    frequency of valuations are similar to those used
          skema pensiun manfaat pasti.                                                               for defined benefit pension schemes.

          Pergerakan kewajiban imbalan pemeliharaan                                                  The movement in the health care benefits
          kesehatan selama tahun berjalan adalah                                                     obligation over the year is as follows:
          sebagai berikut:

                                                                         30 Juni/                   31 Desember/
                                                                         June 30,                   December 31,
                                                                           2024                         2023

          Saldo awal                                                         51,117,646                    53,702,837                       Beginning balance

          Dibebankan ke laba rugi:                                                                                                   Charged to profit and loss:
            Biaya jasa kini                                                      578,158                      860,118                   Current service cost
            Biaya bunga                                                        1,700,712                    3,873,678                      Interest expense
                                                                               2,278,870                    4,733,796
          Pengukuran kembali:                                                                                                                Remeasurements:
          Kerugian aktuarial yang timbul dari                                                                                              Loss from change in
            perubahan asumsi keuangan                                          3,783,770                    2,635,442                  financial assumptions
          Kerugian aktuarial yang timbul dari kombinasi                                                                               Loss from combination of
            perubahan asumsi                                                            -                             -               changes in assumptios
          Kerugian/(keuntungan) dari penyesuaian
            atas pengalaman                                                    1,126,588                    (8,165,275)                Experience loss/(gain)
          Kerugian yang timbul dari perubahan                                                                                             Loss from change in
            asumsi demografis                                                          -                             -             demographic assumptions
                                                                               4,910,358                    (5,529,833)
          Pembayaran manfaat                                                    (776,949)                   (1,789,154)                       Benefit Payment
          Saldo akhir                                                        57,529,925                    51,117,646                          Ending balance




          Asumsi aktuarial utama yang digunakan adalah                                               The principal actuarial assumptions used were as
          sebagai berikut:                                                                           follows:

                                                                          30 Juni/                   31 Desember/
                                                                          June 30,                   December 31,
                                                                            2024                         2023

          Tingkat diskonto                                             6,77% - 7,60%                 6,77% - 7,60%                                  Discount rate
          Tingkat kenaikan biaya kesehatan                                 5.35%                         5.35%                        Future health cost increase
Page 152
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/142 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                     (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                                                     49. EMPLOYEE BENEFITS LIABILITIES (continued)

    iii. Imbalan pemeliharaan kesehatan (lanjutan)                                                 iii. Health care benefit (continued)


         Sensitivitas dari    imbalan pemeliharaan                                                         The sensitivity of the health care benefits to
         kesehatan terhadap perubahan asumsi                                                               changes in the weighted principal assumptions is
         aktuarial utama adalah sebagai berikut:                                                           as follows:

                                                                       Dampak atas imbalan pemeliharaan kesehatan/
                                                                             Impact on health care benefits
                                                               Perubahan                Kenaikan                Penurunan
                                                                 asumsi/                 asumsi                   asumsi
                                                               Change in               Increase in             Decrease in
                                                               Assumption             assumptions              assumptions
         Tingkat diskonto                                          1%                         7,367,992              (9,177,328)                               Discount rate
         Tingkat kenaikan biaya kesehatan                          1%                        (9,170,493)              7,488,920                         Medical inflation rate



    iv. Imbalan kerja jangka panjang lainnya                                                       iv. Other long-term benefits

         Pergerakan kewajiban imbalan kerja jangka                                                         The movement in the other long-term benefits
         panjang lainnya selama tahun berjalan adalah                                                      obligation over the year is as follows:
         sebagai berikut:
                                                                              30 Juni/                   31 Desember/
                                                                              June 30,                   December 31,
                                                                                2024                         2023

        Saldo awal                                                                    743,295                       724,791                           Beginning balance
        Dibebankan ke laba rugi:                                                                                                              Charged to profit and loss:
          Beban jasa kini                                                             103,792                       188,023                        Current service cost
          Biaya bunga                                                                   21,028                        37,200                          Interest expense
          Kerugian aktuarial yang timbul dari                                                                                                     Loss from change in
             perubahan asumsi keuangan                                                    3,839                        3,965                  financial assumptions
          (Keuntungan) aktuarial yang timbul dari kombinasi                                                                                 (Gain) from combination of
             perubahan asumsi                                                                 -                         (216)                changes in assumptios
          Kerugian/(keuntungan) dari penyesuaian
             atas pengalaman                                                               (363)                     79,361                    Experience loss/(gain)
          Kerugian yang timbul dari perubahan                                                                                                    Loss from change in
             asumsi demografis                                                                -                             -             demographic assumptions
                                                                                      128,296                       308,333
        Pembayaran manfaat                                                           (207,677)                     (289,828)                           Benefit Payments
        Saldo Akhir                                                                   663,914                       743,295                             Ending balance




         Asumsi aktuarial utama yang digunakan adalah                                                      The principal actuarial assumptions used were as
         sebagai berikut:                                                                                  follows:

                                                                               30 Juni/                  31 Desember/
                                                                               June 30,                  December 31,
                                                                                 2024                        2023

         Tingkat diskonto                                                   6,17% - 6,46%                 6,17% - 6,46%                                    Discount rate
         Tingkat kenaikan gaji per tahun                                        7.12%                         7.12%                   Rate of salary increase per annum



         Sensitivitas dari imbalan kerja jangka panjang                                                    The sensitivity of the other long-term benefits to
         lainnya terhadap perubahan asumsi aktuarial                                                       changes in the weighted principal assumptions is
         utama adalah sebagai berikut:                                                                     as follows:

                                                                    Dampak atas imbalan kerja jangka panjang lainnya/
                                                                          Impact on other long-term benefits
                                                              Perubahan                Kenaikan                  Penurunan
                                                                asumsi/                 asumsi                     asumsi
                                                              Change in               Increase in                Decrease in
                                                              Assumption             assumptions                assumptions
         Tingkat diskonto                                         1%                            22,078                   (20,814)                            Discount rate
         Tingkat kenaikan gaji                                    1%                           (22,284)                   23,841                        Salary growth rate
Page 153
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/143 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

49. LIABILITAS IMBALAN KERJA (lanjutan)                     49. EMPLOYEE BENEFITS LIABILITIES (continued)

    Grup terekspos dengan beberapa risiko melalui               The Group is exposed to a number of risks through its
    program manfaat pasti dan program kesehatan                 defined benefit pension program and post-
    pascakerja. Risiko yang paling signifikan adalah            employment medical plans. The most significant risks
    sebagai berikut:                                            are as follows:

    Volatilitas aset                                            Asset volatility

    Kewajiban program dihitung menggunakan tingkat              The plan liabilities are calculated using a discount rate
    diskonto yang merujuk kepada Zero Coupon Bond               set with reference to the Zero Coupon Bond from
    dari Indonesia Government Securities Yield Curve.           Indonesia Government Securities Yield Curve. If plan
    Jika imbal hasil aset program lebih rendah, maka            assets underperform this yield, this will create a deficit.
    akan menghasilkan defisit program.

    Grup menempatkan investasi aset program pada                The Group places its investment plan assets in
    beragam jenis aset investasi agar dapat                     various types of investment assets so that it can be
    terdiversifikasi dengan baik sehingga dapat                 properly diversified to minimise the impact of the bad
    meminimalisasi dampak kinerja buruk dari satu aset          performance of one asset on all asset groups. The
    terhadap seluruh kelompok aset. Proporsi terbesar           largest proportion of assets is invested in debt
    aset investasi ditempatkan pada instrumen utang,            instruments, although the Group also invests in
    meskipun Grup juga berinvestasi pada tabungan,              savings, time deposits, equity instruments, and
    deposito, instrumen ekuitas, dan properti. Grup             property. The Group believes that debt instruments
    meyakini bahwa instrumen utang memberikan imbal             offer the best returns over the long term with an
    hasil yang paling baik dalam jangka panjang pada            acceptable level of risk.
    tingkatan risiko yang dapat diterima.

    Harapan umur hidup                                          Life expectancy

    Sebagian     besar     dari  kewajiban program              The majority of the plans’ obligations are to provide
    menyediakan manfaat seumur hidup sehingga                   benefits for the life of the members, so increases in life
    kenaikan harapan umur hidup akan mengakibatkan              expectancy will result in an increase in the plans’
    kenaikan liabilitas program.                                liabilities.

    Rata-rata durasi kewajiban manfaat pasti untuk              The weighted average duration of the defined benefit
    program pensiun, imbalan pascakerja lainnya,                obligations for the pension program, other post-
    imbalan pemeliharaan kesehatan, dan imbalan                 employment benefits program, healthcare benefits,
    kerja jangka panjang lainnya adalah 13,09 tahun,            and other long-term benefits are 13.09 years, 16.61
    16,61 tahun, 19,58 tahun, dan 4,01 tahun secara             years, 19.58 years, and 4.01 years, respectively.
    berurutan.

    Manajemen Grup berpendapat bahwa liabilitas                 The management of the Group believes that the
    imbalan pascakerja cukup untuk menutupi semua               estimated liability provided for post-employment
    imbalan    yang    diatur   dalam    Peraturan              benefits is adequate to cover the requirements of the
    Ketenagakerjaan dan/atau PKB.                               Manpower Regulations and/or CLA.

    Analisis jatuh tempo yang diharapkan dari imbalan           The expected maturity analysis of undiscounted post-
    pascakerja dan imbalan jangka panjang lainnya               employment benefits and other long-term benefits is
    yang tidak terdiskonto adalah sebagai berikut:              as follows:
Page 154
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                           Lampiran 5/144 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                      (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS                                                                       50. CASH FLOW INFORMATION

    a.        Transaksi non-kas                                                                       a.         Non-cash transactions

              Tabel di bawah ini menjelaskan perubahan                                                           The table below details changes in the Group’s
              dalam liabilitas Grup yang timbul dari aktivitas                                                   liabilities arising from investing and financing
              investasi dan pendanaan, termasuk perubahan                                                        activities, including both cash and non-cash
              yang timbul dari arus kas dan perubahan                                                            changes. Liabilities arising from financing
              nonkas. Liabilitas yang timbul dari aktivitas                                                      activities are those for which cash flow were, or
              pendanaan adalah liabilitas yang arus kas, atau                                                    future cash flows will be, classified in the Group’s
              arus kas masa depannya, diklasifikasikan                                                           consolidated statements of cash flows as cash
              dalam laporan arus kas konsolidasian Grup                                                          flows from financing activities.
              sebagai arus kas dari aktivitas pendanaan.

              Pengungkapan tambahan atas aktivitas                                                               Supplemental disclosures on non-cash investing
              investasi dan pendanaan non-kas adalah                                                             and financing activities are as follows:
              sebagai berikut:

                                                                               30 Juni/                        30 Juni/
                                                                               June 30,                        June 30,
                                                                                 2024                            2023
              Aktivitas investasi dan pendanaan                                                                                                         Non-cash investing and
               yang tidak mempengaruhi kas:                                                                                                                  financing activities:
               Perolehan aset tetap dan pekerjaan                                                                                                 Additions to property, plant and
                  dalam pelaksanaan melalui                                                                                                          equipment and construction
                  utang lain-lain                                                 6,994,779                           8,813,889               in progress through other payables
               Penambahan aset hak-guna                                                                                                            Addition of right-of-use assets
                  melalui sewa                                                    2,548,527                           3,426,139                          through finance leases




    b.        Rekonsiliasi liabilitas yang timbul dari                                               b.         Reconciliation of liabilities arising from
              aktivitas pendanaan                                                                               financing activities

              Liabilitas yang timbul dari aktivitas pendanaan                                                   The reconciliation of liabilities arising from
              untuk tahun yang berakhir pada tanggal 30 Juni                                                    financing activities for the years ended June 30,
              2024 dan 31 Desember 2023 adalah sebagai                                                          2024 and December 31, 2023, is as follows:
              berikut:


                                                                                    30 Juni 2024/ June 30, 2024

                                                                                                                          Perubahan
                                                Saldo 1 Januari 2023/         Penerimaan/       Pembayaran/                                     Saldo Akhir/
                                                                                                                           lainnya/
                                            Balance as at 1 January 2023       Additions        Repayments                                    Ending Balance
                                                                                                                        Other changes


          Penerusan Pinjaman                                   29,183,428          14,378            (1,466,403)               (238,160)            27,493,242                      Two-step loans
          Utang kepada pemerintah dan                                                                                                                                   Government and non-bank
         lembaga keuangan pemerintah                            2,222,907                                 (375,000)               8,059              1,855,966      government financial institution
         non-bank                                                                                                                                                                             loans
          Utang Bank                                          148,822,187         345,172           (13,527,889)              3,244,825            138,884,297                         Bank Loans
          Utang obligasi dan sukuk ijarah                     197,564,833                            (1,475,000)              9,808,887            205,898,720      Bonds payable and sukuk ijara
          Utang sewa pembiayaan                                12,769,530                               (64,558)               (341,119)            12,363,853                      Lease liabilities
          Utang Listrik Swasta                                  5,655,807                              (283,167)                342,822              5,715,462        Electricity purchase payable
          Jumlah                                              396,218,692         359,550           (17,192,018)             12,825,314            392,211,540                               Total

         *)     Termasuk perubahan selisih kurs dan amortisasi biaya transaksi                       *)      Including foreign exchange difference and amortisation of transaction costs
Page 155
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/145 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                    (Expressed in millions of Rupiah, unless otherwise stated)

50. INFORMASI ARUS KAS (lanjutan)                                                          50. CASH FLOW INFORMATION (continued)
     b.        Rekonsiliasi liabilitas yang timbul dari                                             b.     Reconciliation of liabilities arising from
               aktivitas pendanaan (lanjutan)                                                              financing activities (continued)
                                                                              31 Desember/ December 31, 2023
                                                                                                       Perubahan
                                                       Saldo awal/                                       lainnya/                Saldo akhir/
                                                       Beginning        Penambahan/   Pembayaran/         Other                    Ending
                                                        balance           Additions    Repayments       changes*)                 balance

          Penerusan pinjaman                             33,184,714              333,848    (2,855,228)          (1,479,906)       29,183,428                                Two-step loans
          Utang kepada lembaga keuangan                                                                                                                    Non-bank Government financial
             Pemerintah non-bank                          2,952,823                 -         (750,000)              20,084         2,222,907                            institution loans
          Utang bank                                    152,410,118        53,905,559      (56,534,467)            (959,022)      148,822,188                                      Bank loans
          Utang obligasi dan sukuk ijarah               201,334,421                 -       (2,863,200)            (906,388)      197,564,833               Bonds payable and sukuk ijara
          Utang sewa                                     12,862,315         5,572,051       (5,556,021)            (108,815)       12,769,530                                 Lease liabilities
          Utang listrik swasta                            6,240,746                 -         (517,439)             (67,500)        5,655,807                Electricity purchase payables

          Jumlah                                        408,985,137        59,811,458      (69,076,355)          (3,501,547)      396,218,693                                           Total


          *)    Termasuk perubahan selisih kurs dan amortisasi biaya transaksi                      *)   Including foreign exchange difference and amortisation of transaction costs



51. TRANSAKSI DAN SALDO DENGAN PIHAK                                                       51. TRANSACTIONS    AND                                    BALANCES                    WITH
    BERELASI                                                                                   RELATED PARTIES

     Sifat hubungan berelasi                                                                        Nature of related parties
     a.        Pemerintah, dalam hal ini adalah Menteri                                             a.     The Government, in this case is the Minister of
               Keuangan      Republik    Indonesia    yang                                                 Finance of the Republic of Indonesia, the
               merupakan pemegang saham Perusahaan dan                                                     shareholder of the Company and SOEs.
               BUMN.
     b.        Perusahaan mempunyai hubungan berelasi                                               b.     The Company is related to other SOEs owned by
               dengan BUMN lainnya yang dimiliki bersama                                                   the Ministry of Finance.
               oleh Kementerian Keuangan.
     c.        Grup mempunyai pengaruh signifikan atas                                              c.     The Group has significant influence on
               investasi pada entitas asosiasi atau ventura                                                investments in associates or joint ventures
               bersama (Catatan 9).                                                                        (Note 9).
     d.        Dewan Komisaris dan Direksi merupakan                                                d.     The Board of Commissioners and Directors are
               personil manajemen kunci Grup.                                                              members of the key management of the Group.
     Berikut ini adalah daftar pihak berelasi yang                                                  Below is the list of related parties that engage in
     memiliki transaksi dengan Grup:                                                                transactions with the Group:
                     Pihak-pihak berelasi/                                   Sifat hubungan/                                                    Sifat transaksi/
                        Related parties                                    Nature of relationship                                            Nature of transaction

   Pemerintah Republik Indonesia/                              Pemegang saham akhir/                                 Penerimaan subsidi listrik dan kompensasi, penerimaan
   Government of the Republic of Indonesia                     Ultimate shareholder                                  penerusan pinjaman, dan utang kepada pemerintah/
   ("Pemerintah Republik Indonesia")                                                                                 Receipt of electricity subsidy and compensation, two-step
                                                                                                                     loan and Government loans

   BRI                                                         Pengendalian melalui Pemerintah                       Penempatan rekening bank dan deposito berjangka
                                                               Republik Indonesia/                                   dibatasi penggunaannya, kas dan setara kas, investasi
                                                               Control through the Government of the                 jangka pendek, dan penerimaan utang bank/
                                                               Republic of Indonesia                                 Placement of restricted cash in banks and time deposits,
                                                                                                                     cash and cash equivalents, short-term investments, and
                                                                                                                     receipt of bank loans

   Bank Mandiri                                                Pengendalian melalui Pemerintah                       Penempatan rekening bank dan deposito berjangka
                                                               Republik Indonesia/                                   dibatasi penggunaannya, kas dan setara kas, investasi
                                                               Control through the Government of the                 jangka pendek, dan penerimaan utang bank/
                                                               Republic of Indonesia                                 Placement of restricted cash in banks and time deposits,
                                                                                                                     cash and cash equivalents, short-term investments, and
                                                                                                                     receipt of bank loans

   BNI                                                         Pengendalian melalui Pemerintah                       Penempatan rekening bank dan deposito berjangka
                                                               Republik Indonesia/                                   dibatasi penggunaannya, kas dan setara kas, dan
                                                               Control through the Government of the                 penerimaan utang bank/
                                                               Republic of Indonesia                                 Placement of restricted cash in banks and time deposits,
                                                                                                                     cash and cash equivalents, and receipt of bank loans

   Bank DKI                                                    Entitas yang berhubungan dengan                       Penempatan kas dan setara kas dan penerimaan
                                                               Pemerintah/                                           utang bank/Placement of cash and cash equivalents and
                                                               Government related entity                             receipt of bank loans

   Bank Pembangunan Daerah (“BPD”)                             Entitas yang berhubungan dengan                       Penempatan kas dan setara kas dan penerimaan
                                                               Pemerintah/                                           utang bank/Placement of cash and cash equivalents and
                                                               Government related entity                             receipt of bank loans

   BTN                                                         Pengendalian melalui Pemerintah                       Penempatan kas dan setara kas dan penerimaan utang
                                                               Republik Indonesia/                                   bank/Placement of cash and cash equivalents and
                                                               Control through the Government of the                 receipt of bank loans
                                                               Republic of Indonesia
Page 156
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                       Lampiran 5/146 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                      (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                      51. TRANSACTIONS    AND      BALANCES                                WITH
    BERELASI (lanjutan)                                                       RELATED PARTIES (continued)

    Sifat hubungan berelasi (lanjutan)                                            Nature of related parties (continued)
                Pihak-pihak berelasi/                       Sifat hubungan/                                 Sifat transaksi dan saldo/
                   Related parties                        Nature of relationship                        Nature of transaction and balance

   BSI                                            Pengendalian melalui Pemerintah            Penempatan kas dan setara kas dan penerimaan utang
                                                  Republik Indonesia/                        bank/Placement of cash and cash equivalents and
                                                  Control through the Government of the      receipt of bank loans
                                                  Republic of Indonesia

   LPEI                                           Pengendalian melalui Pemerintah            Penerimaan utang bank/Receipt of bank loans
                                                  Republik Indonesia/
                                                  Control through the Government of the
                                                  Republic of Indonesia

   PT Indonesia Asahan Aluminium (“Inalum”)       Pengendalian melalui Pemerintah            Transaksi pembelian tenaga listrik/
                                                  Republik Indonesia/                        Purchase of electricity
                                                  Control through the Government of
                                                  the Republic of Indonesia

   PT Pertamina Geothermal Energy (“PGE”)         Pengendalian melalui Pemerintah            Transaksi pembelian tenaga listrik/
                                                  Republik Indonesia/                        Purchase of electricity
                                                  Control through the Government of the
                                                  Republic of Indonesia

   Pertamina                                      Pengendalian melalui Pemerintah            Transaksi pembelian bahan bakar dan minyak pelumas/
                                                  Republik Indonesia/                        Purchase of fuels and lubricants
                                                  Control through the Government of the
                                                  Republic of Indonesia

   PT Pertamina Gas (“Pertagas”)                  Pengendalian melalui Pemerintah            Transaksi pembelian bahan bakar gas/
                                                  Republik Indonesia/                        Purchase of gas
                                                  Control through the Government of the
                                                  Republic of Indonesia

   PT Bukit Asam Tbk (“PTBA”)                     Pengendalian melalui Pemerintah            Transaksi pembelian bahan bakar batubara/
                                                  Republik Indonesia/                        Purchase of coal
                                                  Control through the Government of the
                                                  Republic of Indonesia

   PT Perusahaan Gas Negara (Persero) Tbk         Pengendalian melalui Pemerintah            Transaksi pembelian bahan bakar gas/
      (“PGN”)                                     Republik Indonesia/                        Purchase of gas
                                                  Control through the Government of the
                                                  Republic of Indonesia

   PT Asuransi Jasa Indonesia (Persero) (“AJI”)   Pengendalian melalui Pemerintah            Asuransi bangunan, instalasi dan mesin pembangkit,
                                                  Republik Indonesia/                        perlengkapan transmisi serta kapal milik Perusahaan/
                                                  Control through the Government of the      Insurance services for the Company's buildings,
                                                  Republic of Indonesia                      installation and power plant, transmission equipment
                                                                                             and vessels

   Perum Jasa Tirta                               Pengendalian melalui Pemerintah            Transaksi pembelian tenaga listrik/
                                                  Republik Indonesia/                        Purchase of electricity
                                                  Control through the Government of the
                                                  Republic of Indonesia

   SMI                                            Pengendalian melalui Pemerintah            Penerimaan utang dari lembaga
                                                  Republik Indonesia/                        keuangan pemerintah nonbank/
                                                  Control through the Government of the      Receipt of non-bank government financial institution loans
                                                  Republic of Indonesia

   GDE                                            Entitas asosiasi/Associate                 Transaksi pembelian tenaga listrik/Purchase of electricity

   TJK                                            Entitas asosiasi/Associate                 Transaksi pembelian tenaga listrik/Purchase of electricity

   DEB                                            Entitas asosiasi/Associate                 Transaksi pembelian tenaga listrik/Purchase of electricity

   MEB                                            Entitas asosiasi/Associate                 Transaksi pembelian tenaga listrik/Purchase of electricity

   RDM                                            Entitas asosiasi/Associate                 Transaksi pembelian tenaga listrik/Purchase of electricity

   S2P                                            Entitas asosiasi/Associate                 Transaksi pembelian tenaga listrik/Purchase of electricity

   IPB                                            Entitas asosiasi/Associate                 Pemberian pinjaman jangka panjang/
                                                                                             Issuance of long-term loans

   BDSN                                           Ventura bersama/Joint venture              Transaksi pembelian tenaga listrik/Purchase of electricity

   Komipo PJB                                     Ventura bersama/Joint venture              Transaksi pembelian tenaga listrik/Purchase of electricity

   BPI                                            Ventura bersama/Joint venture              Transaksi pembelian tenaga listrik/Purchase of electricity

   SGPJB                                          Ventura bersama/Joint venture              Pemberian pinjaman jangka panjang dan transaksi
                                                                                             pembelian tenaga listrik/Issuance of long-term loans
                                                                                             and purchase of electricity
Page 157
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/147 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                               51. TRANSACTIONS    AND      BALANCES                                             WITH
    BERELASI (lanjutan)                                                                RELATED PARTIES (continued)

    Sifat hubungan berelasi (lanjutan)                                                    Nature of related parties (continued)

                     Pihak-pihak berelasi/                       Sifat hubungan/                                            Sifat transaksi dan saldo/
                        Related parties                        Nature of relationship                                   Nature of transaction and balance

   PDG                                                 Ventura bersama/Joint venture                        Pemberian pinjaman jangka panjang/
                                                                                                            Issuance of long-term loans

   PMSE                                                Ventura bersama/Joint venture                        Pemberian pinjaman jangka panjang/
                                                                                                            Issuance of long-term loans

   REP                                                 Ventura bersama/Joint venture                        Pemberian pinjaman jangka panjang dan transaksi
                                                                                                            pembelian tenaga listrik/Issuance of long-term loans
                                                                                                            and purchase of electricity

   GCL                                                 Ventura bersama/Joint venture                        Pemberian pinjaman jangka panjang/
                                                                                                            Issuance of long-term loans

   PT Waskita Karya (Persero) Tbk (“Waskita”)          Pengendalian melalui Pemerintah                      Transaksi jasa konstruksi/
                                                       Republik Indonesia/                                  Construction services
                                                       Control through the Government of
                                                       the Republic of Indonesia

   PT Wijaya Karya (Persero) Tbk (“Wika”)              Pengendalian melalui Pemerintah                      Transaksi jasa konstruksi/
                                                       Republik Indonesia/                                  Construction services
                                                       Control through the Government of
                                                       the Republic of Indonesia

   PT Pelabuhan Indonesia (Persero)                    Pengendalian melalui Pemerintah                      Sewa/
                                                       Republik Indonesia/                                  Lease
                                                       Control through the Government of
                                                       the Republic of Indonesia

   Dana Pensiun PLN                                    Pengendalian melalui Pemerintah                      Sewa/
                                                       Republik Indonesia/                                  Lease
                                                       Control through the Government of
                                                       the Republic of Indonesia

   PT Djakarta Llyod                                   Pengendalian melalui Pemerintah                      Sewa/
                                                       Republik Indonesia/                                  Lease
                                                       Control through the Government of
                                                       the Republic of Indonesia

   Pemerintah Daerah                                   Entitas yang berhubungan dengan                      Utang lain-lain/
                                                       Pemerintah/Government related entity                 Other payables

   Pemerintah Pusat                                    Entitas yang berhubungan dengan                      Pendapatan usaha lain-lain/
                                                       Pemerintah/Government related entity                 Other revenues


    Rincian transaksi dan saldo dengan pihak                                              Details of transactions and balances with related
    berelasi:                                                                             parties:

    *) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                    *)   Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan

                                                Catatan/    30 Juni 2024/ June 30, 2024    31 Desember/ December 31, 2023
                                                 Notes          Rp               % *)           Rp              % *)
     Piutang pihak berelasi                       10                                                                                             Receivables from related parties
       SGPJB                                                     575,503           0.00           578,667                0.00                                          SGPJB
       REP                                                       479,272           0.00           437,855                0.00                                            REP
       PDG                                                        18,781           0.00            36,387                0.00                                            PDG
       PMSE                                                      129,912           0.00           136,437                0.00                                           PMSE
       GCL                                                         5,189           0.00            58,923                0.00                                             GCL
       IPB                                                         2,145           0.00             1,411                0.00                                              IPB
       Lain lain                                                  29,897           0.00            29,733                0.00                                           Others

         Subjumlah                                             1,240,699           0.00         1,279,413                0.00                                         Subtotal
     Rekening bank dan deposito berjangka         11
       dibatasi penggunaannya                                                                                                          Restricted cash in banks and time deposits
       Mandiri                                                    90,105           0.00            91,125                 0.00                                         Mandiri
       BNI                                                            49           0.00             2,643                 0.00                                             BNI
       BRI                                                        86,819           0.00            51,089                 0.00                                             BRI

         Subjumlah                                               176,972           0.00           144,857                0.00                                         Subtotal
Page 158
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/148 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                              51. TRANSACTIONS    AND      BALANCES                                             WITH
    BERELASI (lanjutan)                                                               RELATED PARTIES (continued)

    Rincian transaksi dan saldo dengan pihak                                             Details of transactions and balances with related
    berelasi: (lanjutan)                                                                 parties: (continued)

                                                Catatan/   30 Juni 2024/ June 30, 2024    31 Desember/ December 31, 2023
                                                 Notes         Rp               % *)           Rp              % *)
    Kas dan setara kas                            13                                                                                                  Cash and cash equivalents
      BNI                                                     9,594,325           0.01         15,181,633                0.01                                            BNI
      BRI                                                     8,017,952           0.00         18,128,073                0.01                                            BRI
      Mandiri                                                 8,569,282           0.01         15,456,094                0.01                                        Mandiri
      BTN                                                       591,987           0.00          1,734,507                0.00                                           BTN
      Bank DKI                                                  224,370           0.00            710,714                0.00                                      Bank DKI
      BSI                                                       525,110           0.00          1,178,175                0.00                                            BSI

      Subjumlah                                              27,523,025           0.02         52,389,196                0.03                                          Subtotal

    Investasi jangka pendek                       14                                                                                                       Short-term investment
       BRI                                                      154,257           0.00           490,407                 0.00                                              BRI
       Mandiri                                                    1,500           0.00           312,824                 0.00                                          Mandiri
       BNI                                                          211           0.00            86,025                 0.00                                              BNI
       PTBA                                                       6,670           0.00                 -                  -                                             PT BA

      Subjumlah                                                 162,639           0.00           889,256                 0.00                                          Subtotal

    Piutang usaha                                 15                                                                                                  Trade accounts receivable
      Entitas yang berelasi dengan Pemerintah                 2,453,340           0.00          2,485,622                0.00                         State-Owned Enterprises


    Piutang Pemerintah                            16         58,684,629           0.03         22,446,998                0.01                      Receivables from Government

    Jumlah                                                   90,241,305           0.05         79,635,342                0.05                                                Total


    Penerusan pinjaman                            24         27,493,242           0.04         29,183,428                0.04                                      Two-step loans

    Utang kepada Pemerintah dan lembaga                                                                                                   Government and non-bank Government
      keuangan Pemerintah non-Bank                25                                                                                                financial institution loans
      SMI                                                     1,855,966           0.00          2,222,907                0.00                                               SMI

    Subjumlah                                                 1,855,966           0.00          2,222,907                0.00                                            Subtotal


    Utang Sewa                                    26                                                                                                           Lease Liabilities
    PT Pelabuhan Indonesia (Persero)                          1,174,510           0.00          1,138,625                0.00             PT Pelabuhan Indonesia (Persero)
    Dana Pensiun PLN                                            895,133           0.00           926,919                 0.00                            Dana Pensiun PLN


    Subjumlah                                                 2,069,643           0.00          2,065,544                0.00                                            Subtotal


    Utang bank                                    27                                                                                                                  Bank loans
      BNI                                                     5,641,268           0.01          6,078,834                0.01                                              BNI
      Mandiri                                                12,598,771           0.02         13,394,567                0.02                                          Mandiri
      BSI                                                     2,368,222           0.00          2,494,067                0.00                                              BSI
      BRI                                                     6,166,096           0.01          7,223,106                0.01                                              BRI
      BTN                                                     4,414,354           0.01          4,830,277                0.01                                             BTN
      Bank DKI                                                  205,357           0.00            287,500                0.00                                        Bank DKI
      Bank Jateng                                                35,714           0.00             50,000                0.00                                      Bank Jateng
      BPD Aceh                                                   17,857           0.00             25,000                0.00                                       BPD Aceh
      Bank Kalteng                                               17,857           0.00             25,000                0.00                                     Bank Kalteng
      Bank Riau                                                  17,857           0.00             25,000                0.00                                       Bank Riau
      Bank Kalbar                                                17,857           0.00             25,000                0.00                                      Bank Kalbar
      BPD Bali                                                   13,393           0.00             18,750                0.00                                        BPD Bali
      SMI                                                     1,385,074           0.00          1,594,232                0.00                                              SMI
      LPEI                                                      285,552           0.00            374,448                0.00                                             LPEI
      BPD Papua                                                 305,357           0.00            337,500                0.00                                      BPD Papua

      Subjumlah                                              33,490,588           0.05         36,783,281                0.06                                          Subtotal
                                                                                                                          -
    Utang usaha                                   31                                                                                                     Trade accounts payable
      Pertamina                                               7,642,950           0.01          5,666,807                0.01                                      Pertamina
      S2P                                                     2,225,564           0.00          1,988,917                0.00                                            S2P
      SGPJB                                                   1,024,400           0.00          2,131,439                0.00                                         SGPJB
      Pertagas                                                  693,260           0.00            141,373                0.00                                       Pertagas
      PTBA                                                      719,265           0.00          1,127,386                0.00                                          PTBA
      PGE                                                     2,035,388           0.00          1,706,341                0.00                                         PGE
      PGN                                                       813,682           0.00            744,577                0.00                                            PGN
      NR                                                        499,983           0.00            126,854                0.00                                             NR
                                                                                   -                                      -
      Lain-lain (masing - masing dibawah 5%                                                                                                       Others (each below 5% of total
        dari jumlah utang usaha)                                                                                                                     trade accounts payable)
        Pengendalian melalui Pemerintah                                                                                                  Control through the Government of the
        Republik Indonesia                                      707,126           0.00           574,699                 0.00                             Republic of Indonesia
        Entitas asosiasi                                        438,143           0.00           333,969                 0.00                                       Associates
        Ventura Bersama                                       1,903,733           0.00           981,167                 0.00                                    Joint ventures

      Subjumlah                                              18,703,494           0.02         15,523,529                0.02                                          Subtotal




    *) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                   *)   Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan
Page 159
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                               Lampiran 5/149 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                  NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                         FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                    JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                                   51. TRANSACTIONS    AND      BALANCES                                                  WITH
    BERELASI (lanjutan)                                                                    RELATED PARTIES (continued)

    Rincian transaksi dan saldo dengan pihak                                                   Details of transactions and balances with related
    berelasi: (lanjutan)                                                                       parties: (continued)

                                                 Catatan/      30 Juni 2024/ June 30, 2024       31 Desember/ December 31, 2023
                                                  Notes            Rp               % *)              Rp              % *)
    Utang lain-lain                                32                                                                                                                   Other payables
      WK                                                            990,392           0.01                   563,090                0.00                                           WK
      Pemerintah Daerah                                           2,808,637           0.02                 2,512,403                0.02                             Local Government
      WIKA                                                          361,529           0.00                   459,087                0.00                                         WIKA
      PP                                                                 94           0.00                                                                                         PP
      Adhi Karya                                                    111,092           0.00                                                                                  Adhi Karya
      BKI                                                             7,060           0.00                    7,932                 0.00                                           BKI
      Lainnya                                                        55,809           0.00                   21,903                 0.00                                        Others

      Subjumlah                                                   4,334,611           0.03                 3,564,415                0.02                                        Subtotal
    Biaya masih harus dibayar                      34                                                                                                                   Accrued expenses
      Penerusan pinjaman                                            321,215           0.00                  323,010                 0.00                                 Two-step loans
      Utang bank                                                                                                                     -                                       Bank loans
        BNI                                                          96,808           0.00                   90,685                 0.00                                          BNI
        Mandiri                                                     149,764           0.00                  144,535                 0.00                                      Mandiri
        BSI                                                          61,653           0.00                   54,975                 0.00                                          BSI
        BRI                                                          47,496           0.00                   44,705                 0.00                                          BRI
        BTN                                                          56,885           0.00                   56,360                 0.00                                         BTN
        Bank DKI                                                        248           0.00                      405                 0.00                                    Bank DKI
        SMI                                                           3,258           0.00                    4,095                 0.00                                          SMI
        LPEI                                                            781           0.00                    1,029                 0.00                                         LPEI
        Pihak berelasi lainnya                                          523           0.00                      737                 0.00                         Other related parties

      Subjumlah                                                     738,630           0.00                  720,537                 0.00                                       Subtotal

    Jumlah                                                      178,927,479           0.20               169,698,983                0.20                                             Total



                                                                   30 Juni 2024/ June 30, 2024               30 Juni 2023/ June 30 , 2023
                                                    Catatan/            Rp              % *)                       Rp                 % *)
                                                     Notes
     Penjualan tenaga listrik                         37                                                                                                              Sale of electricity
       Entitas yang berelasi dengan Pemerintah                        11,087,001             0.06                  10,704,316         0.07                   State-Owned Enterprises

     Subsidi listrik Pemerintah                         38            37,266,626             1.00                  32,069,605          1.00             Government's electricity subsidy

     Pendapatan kompensasi                              16            46,493,492             1.00                  37,857,021          1.00                      Compensation income


     Pendapatan usaha lain lain                         38                                                                                                              Other Revenues
       SGPJB                                                             728,895             0.13                       308,719        0.08                                   SGPJB
       GCL                                                                 54,788            0.01                       173,754        0.04                                      GCL
       SSP                                                                 64,390                                       204,815        0.05                                      SSP
       Lain lain                                                         302,070             0.05                       312,059        0.08                                    Others


     Jumlah                                                             1,150,143            0.19                       999,347       35.66                                        Total

     Beban bahan bakar dan pelumas                      40                                                                                                  Fuel and lubricants expense
       Pertamina Group                                                31,048,891             0.36                  20,153,802          0.27                         Pertamina Group
       PTBA                                                            4,665,083             0.05                   4,788,681          0.06                                     PTBA
       Lainnya                                                            82,344             0.00                     459,526          0.01                                    Others

     Jumlah                                                           35,796,319             0.41                  25,402,010          0.34                                        Total

     Beban pembelian tenaga listrik                     41                                                                                               Purchased electricity expenses
       SSP                                                              6,964,459            0.08                      6,992,304       0.10                                      SSP
       SGPJB                                                            6,101,566            0.07                      5,065,051       0.07                                    SGPJB
       PGE                                                              1,950,590            0.02                      1,818,322       0.02                                      PGE
       BDSN                                                               514,361            0.01                        437,237       0.01                                     BDSN
       GDE                                                                529,448            0.01                        491,826       0.01                                      GDE
       BPI                                                                693,556            0.01                        764,856       0.01                                        BPI
       TJK                                                                285,925            0.00                        241,007       0.00                                       TJK
       REP                                                                153,748            0.00                        145,126       0.00                                      REP
       Perum Jasa Tirta II                                                 85,265            0.00                         97,953       0.00                      Perum Jasa Tirta II
       MEB                                                                 27,989            0.00                         27,008       0.00                                      MEB
       DEB                                                                 94,858            0.00                         78,293       0.00                                      DEB
       RDM                                                                141,245            0.00                        154,697       0.00                                      RDM
       Lainnya                                                            176,991            0.00                        326,472       0.00                                     Others

     Jumlah                                                           17,720,001             0.20                  16,640,154          0.23                                        Total




    *) Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                             *)     Percentage to related total assets/liabilities/revenues/expenses
       bersangkutan
Page 160
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                              Lampiran 5/150 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                    FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                               JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                           (Expressed in millions of Rupiah, unless otherwise stated)

51. TRANSAKSI DAN SALDO DENGAN PIHAK                                              51. TRANSACTIONS    AND      BALANCES                                               WITH
    BERELASI (lanjutan)                                                               RELATED PARTIES (continued)

    Rincian transaksi dan saldo dengan pihak                                             Details of transactions and balances with related
    berelasi: (lanjutan)                                                                 parties: (continued)
                                                                30 Juni 2024/ June 30, 2024          30 Juni 2023/ June 30 , 2023
                                                   Catatan/          Rp              % *)                  Rp                 % *)
                                                    Notes
    Beban pemeliharaan                               43                                                                                                   Maintenance expenses
      KOMIPO PJB                                                       27,917          0.00                    170,066         0.01                             KOMIPO PJB
      Lainnya                                                         467,323          0.04                  1,553,770         0.13                                    Others

         Jumlah                                                       495,241          0.04                  1,723,837         0.14                                      Total

    Beban usaha lain-lain                             45                                                                                               Other operating expenses
      Asuransi                                                                                                                                                        Insirance
      AJI                                                               5,620          0.00                    148,572         0.04                                         AJI
      Lainnya                                                         273,707          0.05                    243,946         0.06                                     Others

    Jumlah                                                            279,327          0.05                    392,518         0.10                                        Total
    Beban keuangan                                    46                                                                                                           Financial cost
    Utang Bank                                                      1,266,575          0.12                  1,020,486         0.09                                  Bank Loans
    Penerusan Pinjaman                                                424,828          0.04                    448,027         0.04                            Two - Step Loans
    Instrumen derivatif                                              (965,287)        (0.09)                   951,983         0.09                        Derivative Instrumen
    Utang Kepada Pemerintah dan Lembaga                                                                                         -         Government and non-bank Government
       Keuangan Pemerintah non - Bank                               62,856.00          0.01                     84,866         0.01                  inancial institution loans

         Jumlah                                                       788,972          0.08                  2,505,362         0.23                                      Total


    *)      Persentase terhadap jumlah aset/liabilitas/pendapatan/beban yang                  *)   Percentage to related total assets/liabilities/revenues/expenses
            bersangkutan

    Jumlah kompensasi Dewan Komisaris Perusahaan                                         Total compensation of the Company’s Board of
    untuk tahun yang berakhir pada tanggal                                               Commissioners for the years ended June 30, 2024
    30 Juni 2024 dan 31 Desember 2023 masing-                                            and December 2023 amounted to Rp Nihil and
    masing adalah sebesar Rp Nihil dan Rp151.759.                                        Rp151,759, respectively.
    Jumlah kompensasi Direksi Perusahaan untuk                                           Total compensation of the Company’s Board of
    tahun yang berakhir pada tanggal 30 Juni 2024 dan                                    Directors for the years ended June 30, 2024 and
    31 Desember 2023 masing-masing adalah sebesar                                        Deecmber 2023 amounted to Rp Nihil and Rp298,09,
    Rp Nihil dan Rp298.096.                                                              respectively.
    Seluruh kompensasi kepada Dewan Komisaris dan                                        All the compensation to the Company’s Boards of
    Direksi Perusahaan merupakan imbalan kerja                                           Commissioners and Directors represents short-term
    jangka pendek.                                                                       employee benefits.

    Informasi mengenai kontribusi yang dilakukan Grup                                    Information about the contributions made by the
    ke DP-PLN diungkapkan di Catatan 49.                                                 Group to DP-PLN is disclosed in Note 49.
Page 161
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                     Lampiran 5/151 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                      JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

52. ASET DAN LIABILITAS MONETER DALAM                                                    52. MONETARY    ASSETS    AND   LIABILITIES
    MATA UANG ASING                                                                          DENOMINATED IN FOREIGN CURRENCIES

     Pada tanggal 30 Juni 2024 dan 31 Desember 2023,                                             As at Mrach 31, 2024 and December 31, 2023, the
     Grup mempunyai aset dan liabilitas moneter dalam                                            Group had monetary assets and liabilities in foreign
     mata uang asing sebagai berikut:                                                            currencies as follows:
                                                                                  30 Juni/ June 30, 2024
                                                                                                                              Lain-lain/
                                                     JPY*)                      USD                        EUR*)              Others**)
    Aset moneter                                                                                                                                                        Monetary assets
    Piutang pihak berelasi                                                       75,680,057                                                              Receivables from related parties
    Rekening bank dan deposito berjangka                                                                                                                        Restricted cash in banks
        dibatasi penggunaannya                      24,482,636,563                57,175,525                                                                       and time deposits
    Kas dan setara kas                              1,451,109,606               442,358,946                10,229,550             2,496,602                  Cash and cash equivalents
    Inevestasi jangka pendek                                                      1,178,660                                                                       Short term investment
    Jumlah aset moneter                            25,933,746,169               576,393,188                10,229,550             2,496,602                       Total monetary assets

    Liabilitas moneter                                                                                                                                                Monetary liabilities
    Penerusan pinjaman                            138,182,576,485                811,104,538                8,698,442                      -                               Two-step loans
    Utang sewa pembiayaan                          11,830,849,503                 29,179,994                                                                               Lease liabilities
    Utang bank                                    136,572,274,627              3,659,399,452            824,482,600                                                            Bank loans
    Utang obligasi dan sukuk ijarah                19,500,000,000             10,188,312,000          1,000,000,000                                        Bonds payable and sukuk ijara
    Utang listrik swasta                                                         348,631,329                                                                 Electricity purchase payable
    Utang lain-lain                                  2,165,243,142                75,495,883               15,371,993                                                      Other payables
    Utang biaya proyek                               5,516,682,156                32,292,640                2,010,366                                                 Project cost payable
    Utang usaha                                                                1,645,559,679                                     14,557,974                                Trade payables
    Biaya yang masih harus dibayar                   3,397,191,166               160,627,039               19,013,123                                                   Accrued expenses
    Jumlah liabilitas moneter                     317,164,817,079             16,950,602,554          1,869,576,523              14,557,974                      Total monetary liabilities

    Liabilitas moneter bersih                     (291,231,070,910)          (16,374,209,366)        (1,859,346,973)            (12,061,372)                       Net monetary labilities
    Ekuivalen Rupiah                                   (29,672,427)             (268,438,788)              (32,600,674)            (197,734)                            Rupiah equivalent
    Jumlah dalam Rupiah - bersih                      (330,909,623)                                                                                                 Total in Rupiah - net



                                                                            31 Desember/ December 31, 2023
                                                                                                                               Lain-lain/
                                                          JPY*)                   USD*)                      EUR*)             Others**)

   Aset moneter                                                                                                                                                      Monetary assets
   Kas dan setara kas                                    2,478,548,665             992,515,957                 32,499,673             1,157,691            Cash and cash equivalents
   Piutang pihak berelasi                                            -              80,387,320                          -                     -        Receivables from related parties
   Rekening bank dibatasi penggunaannya                 31,519,528,142              61,472,835                          -                     -               Restricted cash in banks
   Investasi jangka pendek                                           -              48,495,744                          -                     -                Short-term investments

   Jumlah aset moneter*)                                33,998,076,807           1,182,871,856                 32,499,673             1,157,691                 Total monetary assets*)

   Liabilitas moneter                                                                                                                                              Monetary liabilities
   Penerusan pinjaman                                 143,264,058,836              868,745,367                  9,455,327                     -                         Two-step loans
   Utang sewa pembiayaan                               12,458,102,846               32,333,146                          -                     -                         Lease liabilities
   Utang bank                                         149,568,004,937            4,112,700,597                873,294,663                     -                             Bank loans
   Utang obligasi dan sukuk ijarah                     19,500,000,000           10,188,312,000              1,000,000,000                     -         Bonds payable and sukuk ijara
   Utang listrik swasta                                             -              366,332,480                          -                     -          Electricity purchase payables
   Utang lain-lain                                      3,368,729,242              115,484,762                 23,142,706                     -                         Other payables
   Utang biaya proyek                                   4,096,684,410               25,754,624                  1,596,171                     -                   Project cost payables
   Utang usaha                                                      -            1,432,937,142                          -             8,478,895                         Trade payables
   Biaya masih harus dibayar                            5,802,685,833              200,444,199                  7,604,152                     -                      Accrued expenses

   Jumlah liabilitas moneter*)                        338,058,266,104           17,343,044,317              1,915,093,019             8,478,895               Total monetary liabilities*)

   Liabilitas moneter bersih*)                       (304,060,189,297)         (16,160,172,461)            (1,882,593,346)           (7,321,204)               Net monetary liabilities*)

                                                                                                                                                                            Equivalent
   Ekuivalen dalam jutaan Rupiah                             (33,205,197)         (249,496,903)                (32,166,555)                (113,032)           in millions of Rupiah

                                                                                                                                                                             Net total -
   Jumlah bersih - dalam jutaan Rupiah                    (314,981,687)                                                                                        in millions of Rupiah

     *)     Dalam jumlah penuh                                                                     *) In full amount
     **)    Aset dan liabilitas dalam mata uang asing lainnya disajikan setara USD                 **) Assets and liabilities denominated in other foreign currencies are presented
            dengan menggunakan kurs tanggal pelaporan                                                  as USD equivalent using the exchange rate prevailing at the reporting date

     Apabila aset dan liabilitas dalam mata uang asing                                             If assets and liabilities in foreign currencies as at
     pada tanggal 30 Juni 2024 dijabarkan dengan                                                   June 30, 2024 had been translated using the closing
     menggunakan kurs penutupan mata uang asing                                                    rates at issuance of July 26, 2024, the total net
     pada tanggal 26 Juli 2024, maka liabilitas bersih                                             foreign currency liabilities of the Group would have
     dalam mata uang asing Grup akan mengalami                                                     been decreased by Rp209,079 (2023: decreased by
     penurunan sebesar Rp209.079 (2023: penurunan                                                  Rp9,385,670 at issuance of May 28, 2024).
     sebesar Rp9.385.670 pada tanggal 28 Mei 2024).
Page 162
                                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                           Lampiran 5/152 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                   (Expressed in millions of Rupiah, unless otherwise stated)

53. SEGMEN OPERASI                                                                                     53. OPERATING SEGMENTS

      Informasi wilayah geografis                                                                              Geographical information

      Segmen operasi disusun sesuai dengan kebijakan                                                           The operating segment information is prepared using
      akuntansi yang dianut dalam penyusunan dan                                                               the accounting policies adopted for preparing and
      penyajian laporan keuangan konsolidasian.                                                                presenting the consolidated financial statements.

      Manajemen telah menentukan segmen operasi                                                                Management has determined the operating segments
      berdasarkan laporan yang ditelaah oleh Direksi,                                                          based on reports reviewed by the Board of Directors,
      yang telah diidentifikasikan sebagai pengambil                                                           which has been identified as the Group’s chief
      keputusan operasional utama Grup dalam                                                                   operating decision maker and which makes strategic
      mengambil      keputusan       strategis.   Direksi                                                      decisions. The Board of Directors considers the
      mempertimbangkan operasi bisnis dari perspektif                                                          business operations from the geographical operations
      operasi geografis yang terdiri dari Sumatera, Jawa                                                       consisting of Sumatera, Java Bali and Nusa
      Bali dan Nusa Tenggara, Kalimantan, Sulawesi, dan                                                        Tenggara, Kalimantan, Sulawesi, and Maluku and
      Maluku dan Papua.                                                                                        Papua.

      Untuk tujuan pelaporan manajemen, pada tanggal                                                           For management reporting purposes, as at June 30,
      30 Juni 2024 dan 31 Desember 2023, Grup dibagi                                                           2024 and December 31, 2023, the Group is divided
      dalam operasi geografis Sumatera, Jawa Bali dan                                                          into the geographical areas of Sumatera, Java Bali
      Nusa Tenggara, Kalimantan, Sulawesi, dan Maluku                                                          and Nusa Tenggara, Kalimantan, Sulawesi, and
      dan Papua. Operasi geografis tersebut menjadi                                                            Maluku and Papua. These geographical operations
      dasar pelaporan informasi segmen Grup, rinciannya                                                        are the basis on which the Group reports segment
      adalah sebagai berikut:                                                                                  information, with the following details:

                                                                                                30 Juni/ June 30, 2024

                                                              JAWA BALI DAN NUSA
                                         SUMATERA                                       KALIMANTAN                SULAWESI                      MALUKU PAPUA                    Jumlah
                                                                 TENGGARA

 Pendapatan usaha                                                                                                                                                                                                       Revenue
 Pendapatan eksternal                        18,396,381               228,569,080              6,578,501                   6,601,239                       1,918,026              262,063,227                    External revenue
 Pendapatan antar segmen                                                                                                                                         -                          -              Inter-segment revenue
 Jumlah                                      18,396,381               228,569,080              6,578,501                   6,601,239                       1,918,026              262,063,227                       Total revenue



 Hasil segmen                                                                                                                                                                                                    Segment results
 Beban usaha                                 16,102,998               177,212,237           6,275,728.59                 6,789,350.28                 3,018,093.33                209,398,407                Operating expenses
 Laba (Rugi) usaha                            2,293,383                51,356,843                302,772                     (188,111)                  (1,100,067)                28,506,763               Operating profit/(loss)
 Penghasilan (beban) lain-lain tidak                                                                                                                                                                                  Unallocated
   dapat dialokasikan                        (1,350,906)               (9,820,842)              (280,199)                       240,016                     (148,256)              (11,360,187)              (expenses)/revenue
 Bagian atas laba bersih entitas                                                                                                                                                                           Share in net income of
   asosiasi dan ventura bersama                     -                   1,900,188                    -                                                                               1,900,188      associates and joint ventures
 Penghasilan keuangan                                 0                   652,286                    -                                 0                         -                     652,286                    Finance income
 Beban keuangan                              (1,353,421)               (8,244,497)              (400,962)                       (253,508)                   (211,774)              (10,464,162)                     Finance costs
 Penurunan nilai aset tetap                         -                         -                      -                               -                           -                           -        Provision for impairment of
                                                                                                                                                                                                    property plant and equipment
 Cadangan atas ketidakpastian dalam                                                                                                                                                                     Allowance for uncertainty
   perlakuan pajak                                                            -                                                                                                              -                  over tax treatment
 Beban pajak                                       -                   (4,233,335)                    -                             -                            -                  (4,233,335)              Income tax expense
 Laba (Rugi) bersih                            942,477                 37,302,666                  22,573                        51,905                   (1,248,324)                5,001,553           Profit/(loss) for the year

 Aktiva segmen                                                                                                                                                                                                  Segment assets
 Aset                                       139,475,231             1,422,778,712             52,066,917                  50,192,788                      26,701,675             1,691,215,323                              Asset
 Jumlah aktiva konsolidasi                  139,475,231             1,422,778,712             52,066,917                  50,192,788                      26,701,675             1,691,215,323         Total consolidation assets

 Kewajiban segmen                                                                                                                                                                                             Segment liabilities
 Liabilitas dialokasikan                     14,501,828               641,566,763              7,086,213                   6,487,248                       4,051,275              673,693,329
 Jumlah kewajiban konsolidasi                14,501,828               641,566,763              7,086,213                   6,487,248                       4,051,275              673,693,329        Total consolidation liabilities




                                                                                     31 Desember/ December 31, 2023
                                                                Jawa Bali &                                                             Maluku &                 Jumlah/
                                           Sumatera            Nusa Tenggara          Kalimantan             Sulawesi                    Papua                    Total

   Pendapatan usaha                                                                                                                                                                                                 Revenue
   Pendapatan eksternal                     82,223,685           1,006,804,631           27,592,951            28,013,641                    8,355,466         1,152,990,374                                 External revenue
   Pendapatan antar segmen                 (47,466,662)           (581,215,186)         (15,929,051)          (16,171,910)                  (4,823,501)         (665,606,310)                          Inter-segment revenue

   Jumlah pendapatan usaha                  34,757,023            425,589,445           11,663,900            11,841,731                     3,531,965           487,384,064                                       Total revenue

   Hasil segmen                                                                                                                                                                                            Segment results
   Beban usaha                             (32,263,019)           (331,837,971)         (11,468,392)          (11,319,529)                  (5,980,832)         (392,869,743)                            Operating expenses
   Beban penyusutan                         (4,779,066)            (38,173,494)          (1,719,322)           (1,630,242)                  (1,012,123)          (47,314,247)                           Depreciation expense
   Laba/(rugi) usaha                        (2,285,062)             55,577,980           (1,523,814)           (1,108,040)                  (3,460,990)           47,200,074                            Operating profit/(loss)
   (Beban)/penghasilan lain-lain
      tidak dapat dialokasikan                 269,479               6,386,258             148,615              (244,686)                     328,760               6,888,426               Unallocated (expenses)/revenue
   Bagian atas laba bersih entitas                                                                                                                                                                     Share in net income of
      asosiasi dan ventura bersama             370,572               2,880,413               5,453                     -                             -             3,256,438                associates and joint ventures
   Penghasilan keuangan                              -                 953,515                   -                     -                             -               953,515                                  Finance income
   Beban keuangan                           (2,835,235)            (16,288,937)           (765,344)             (739,674)                     (381,165)          (21,010,355)                                   Finance costs
                                                                                                                                                                                         Provision for impairment of property
   Penurunan nilai aset tetap                             -                   -                    -                        -                        -                      -                        plant and equipment
   Cadangan atas ketidakpastian dalam                                                                                                                                                               Allowance for uncertainty
      perlakuan pajak                                     -         (4,908,174)                    -                        -                        -            (4,908,174)                           over tax treatment
   Beban pajak                                            -        (10,308,466)                    -                        -                        -           (10,308,466)                            Income tax expense

   Laba/(rugi) bersih                       (4,480,246)             34,292,589           (2,135,090)           (2,092,400)                  (3,513,395)           22,071,458                        Profit/(loss) for the year

   Aset segmen                                                                                                                                                                                              Segment assets
   Jumlah aset konsolidasian               140,494,179           1,402,769,965          50,637,493            50,287,299                    26,450,768         1,670,639,704                        Total consolidated assets

   Liabilitas segmen                                                                                                                                                                                     Segment Liabilities
   Jumlah liabilitas konsolidasian          13,648,191            626,192,593            5,766,766             6,035,528                     3,365,227           655,008,305                      Total consolidated liabilities
Page 163
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                      Lampiran 5/153 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                          FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                     JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                 (Expressed in millions of Rupiah, unless otherwise stated)


54. PERJANJIAN              PENTING,         IKATAN          DAN       54. SIGNIFICANT AGREEMENTS,                COMMITMENTS
    KONTINJENSI                                                            AND CONTINGENCIES

    Pada tanggal 30 Juni 2024, Grup memiliki perjanjian                        As at June 30, 2024, the Group has significant
    penting sebagai berikut:                                                   agreements, as follows:

    a.    Perjanjian pengadaan bahan bakar                                     a.   Fuel supply agreements

          Gas                                                                       Gas

                       Sektor/                                   Pemasok/                     Periode/        Satuan/       Kuantitas/
                       Sector                                    Supplier                      Period          Unit          Quantity
          Perusahaan
          Kotogasib, Rengat dan Siberida        PHE Jambi Merang                             2019 - 2026      BBTUD                     5
          PLTGU Riau                            EMP Bentu                                    2021 - 2026      BBTUD                    40
                                                                                                                                Program
                                                                                                                              pengiriman
                                                                                                                                tahunan/
                                                                                                               Kargo/
                                                BP Berau (LNG)                               2014 - 2033                          Annual
          Sutami dan MPP Tarahan                                                                               Cargo
                                                                                                                                 Delivery
                                                                                                                                Program
                                                                                                                                   (ADP)
                                                PNG                                          2019 - 2030      BBTUD               30 - 36
          Purwodadi                             Energasindo Heksa Karya                      2019 - 2024      BBTUD                   1.7
          Luwuk                                 E&P Tomori                                   2021 - 2027      BBTUD                     5
          Melibur                               PT Imbang Tata Alam                          2020 - 2025       BBTU                  711

          PIP
                                                PGN                                          2019 - 2030      BBTUD                  30-36
                                                                                                                                  Program
                                                                                                                               pengiriman
                                                                                                                                  tahunan/
                                                                                                               Kargo/
                                                BP Berau (LNG)                               2014 - 2033                            Annual
                                                                                                               Cargo
                                                                                                                                   Delivery
                                                                                                                                  Program
                                                                                                                                     (ADP)
          Priok                                                                                                                  Lampiran
                                                                                                               Kargo/          konfirmasi/
                                                Pertamina (LNG)                              2017 - 2026
                                                                                                               Cargo         Confirmation
                                                                                                                                    Notice
                                                Pertamina                                                                        Lampiran
                                                ENI East Sepinggan Ltd.                                        Kargo/          konfirmasi/
                                                                                             2023 - 2024
                                                Neptune Energy East Sepinggan B.V.                             Cargo         Confirmation
                                                Pertamina Hulu Energy East Sepinggan                                                Notice
                                                PGN (FSRU Lampung)                           2022 - 2024      BBTUD          s.d/up to 250
                                                PGN                                          2019 - 2030      BBTUD                  30-36
                                                PGN (FSRU Lampung)                           2022 - 2024      BBTUD          s.d/up to 250
          Cilegon                               Pertamina (Gas JTB)                          2021 - 2035      BBTUD                    100
                                                                                                                             (Take or Pay
                                                                                                                            (“TOP”) 90%)
                                                Medco Energy Sampang Pty Ltd.
                                                                                                              BBTUD          s.d./up to 30
                                                Singapore Petroleum Sampang Ltd.             2004 - 2024
                                                                                                                              (TOP 95%)
                                                Cue Sampang Pty. Ltd. (Gas Sampang)
                                                                                                                                     20-50
          Grati                                 Kangean Energy Indonesia Ltd                 2012 - 2028      BBTUD
                                                                                                                              (TOP 90%)
                                                                                                                            s.d/up to 100
                                                PT Pertamina Gas                             2014 - 2033*    MMSCFD         (Take or Pay
                                                                                                                              (“TOP”) 80)
                                                                                                                                 Program
                                                                                                                               pengiriman
                                                                                                                                 tahunan/
                                                                                                               Kargo/
                                                BP Berau (LNG)                               2014 - 2033                           Annual
                                                                                                               Cargo
                                                                                                                                  Delivery
                                                                                                                                 Program
                                                                                                                                    (ADP)
          Bali                                                                                                                  Lampiran
                                                                                                               Kargo/          konfirmasi/
                                                Pertamina (LNG)                              2017 - 2026
                                                                                                               Cargo        Confirmation
                                                                                                                                   Notice
                                                Pertamina                                                                       Lampiran
                                                ENI East Sepinggan Ltd.                                        Kargo/          konfirmasi/
                                                                                             2023 - 2024
                                                Neptune Energy East Sepinggan B.V.                             Cargo        Confirmation
                                                Pertamina Hulu Energy East Sepinggan                                               Notice
                                                PT Medco E&P Lematang dan PT Medco
          UBP Keramasan                                                                      2017 - 2027      BBTUD        20 (TOP 90%)
                                                E&P Indonesia
         *) Kontrak tahunan/Yearly contract
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 164
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/154 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                   JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                  IKATAN          DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                 AND CONTINGENCIES (continued)

    Pada tanggal 30 Juni 2024, Grup memiliki perikatan                        As at June 30, 2024, the Group has significant
    penting dan kontinjensi sebagai berikut: (lanjutan)                       commitments and contingencies, as follows:
                                                                              (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                         a.    Fuel supply agreements (continued)

          Gas (lanjutan)                                                            Gas (continued)
                        Sektor/                                  Pemasok/                      Periode/      Satuan/      Kuantitas/
                         Sector                                  Supplier                       Period        Unit         Quantity
          PIP (lanjutan/continued)
                                                                                                                              Minimum
                                                                                                                               Disaster
                                                                                                                              Recovery
                                                                                                                                  Center
                                                                                                                                (“DRC”)
                                                PT Pertamina Gas (Pertagas PEP)
                                                                                              2019 - 2024    MMSCFD      2019-2020: 11
                                                                                                                            2020-2021:
                                                                                                                                    6.94
                                                                                                                             2022: 6.82
                                                                                                                            2023-2024:
          UBP Keramasan
                                                                                                                                    2.23
                                                                                                                         Minimum DRC
                                                                                                                              Indralaya
                                                                                                                             2020-2027
                                                                                                                                     :6.6
                                                PT Pertamina Gas (Pertagas Medco)             2020 - 2027    MMSCFD       Borang 2020-
                                                                                                                             2027: 9.14
                                                                                                                            Keramasan
                                                                                                                            2020-2027:
                                                                                                                                    1.95
                                                                                                                                2022: 8
                                                                                                                           2023: s.d/up
                                                                                                                                 to 11.7
                                                Pertamina (Persero)                           2022 - 2024    BBTUD         2024: s.d/up
          UBP Mahakam                                                                                                            to 18.3
                                                                                                                             (TOP 75%
                                                                                                                                   ACQ)
                                                                                                                             2020-2028
                                                PT Pertamina Gas (Pertagas)                   2018 - 2028    MMSCFD
                                                                                                                           DRC: 5.333

          PNP
                                                Pertamina Hulu Energi WMO                    2002 - 2023**    TBTU            837,692
                                                PT Saka Energi Indonesia                      2011 - 2026      BCF              330.20
                                                Kangean Energy Indonesia Ltd.                 2008 - 2028     TBTU                  371
          UP Gresik                                                                                            BCF                41.59
                                                Petrogas Jatim Utama                         2016 - 2023**
                                                                                                              TBTU                 7.30
                                                PLN EPI                                       2023 - 2024    BBTUD               25-50
                                                Pertamina Gas Negara JTB                      2022 - 2035     TBTU                  511
                                                Pertamina Hulu Energi ONWJ                      2023**        TBTU                5,475
                                                PGN                                          2022 - 2023**                        7,227
                                                                                                                                Sesuai
                                                                                                                            kebutuhan/
                                                Pertamina                                       2023**        BBTU
                                                                                                                           Depends on
                                                                                                                             necessity
          UP Muara Karang
                                                                                                                          Sesuai kargo/
                                                                                                             Kargo/
                                                Nusantara Regas                                 2023**                      Depens on
                                                                                                             Cargo
                                                                                                                                  cargo
                                                                                                                          Sesuai kargo/
                                                BP Berau (LNG)                                2012 - 2034                   Depens on
                                                                                                                                  cargo
                                                PT Pertamina EP                               2018 - 2024                       29,244
                                                                                                                          Sesuai kargo/
                                                                                                              BBTU
                                                Pertamina                                       2023**                      Depens on
                                                                                                                                  cargo
                                                                                                                                Sesuai
          UP Muara Tawar                                                                                                    kebutuhan/
                                                Nusantara Regas                                 2023**
                                                                                                                           Depends on
                                                                                                             Kargo/
                                                                                                                             necessity
                                                                                                             Cargo
                                                                                                                          Sesuai kargo/
                                                BP Berau (LNG)                                2012 - 2034                  Depends on
                                                                                                                                  cargo
         *) Kontrak tahunan/Yearly contract
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 165
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                           Lampiran 5/155 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                 FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                            JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                        (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,                       IKATAN               DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                           AND CONTINGENCIES (continued)

    Pada tanggal 30 Juni 2024, Grup memiliki perikatan                                 As at June 30, 2024, the Group has significant
    penting dan kontinjensi sebagai berikut: (lanjutan)                                commitments and contingencies, as follows:
                                                                                       (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                                  a.       Fuel supply agreements (continued)

          Gas (lanjutan)                                                                        Gas (continued)

                        Sektor/                                         Pemasok/                                    Periode/               Satuan/       Kuantitas/
                         Sector                                          Supplier                                    Period                 Unit          Quantity
           PNP (lanjutan/continued)
                                                                                                                                                                Sesuai
                                                                                                                                                            kebutuhan/
                                                      Perta Arun Gas                                              2022 - 2023**            MMSCFD
                                                                                                                                                           Depends on
                                                                                                                                                             necessity
           UP Arun & UPDK Belawan
                                                                                                                                                                Sesuai
                                                                                                                                                            kebutuhan/
                                                      Pertamina                                                      2023**                 BBTU
                                                                                                                                                           Depends on
                                                                                                                                                             necessity
           UPDK Belawan                               PT Pertagas                                                  2015 - 2029             MMSCF            34,675,000
                                                      Energi Mega Persada                                          2021 - 2026                                      40
                                                                                                                                            BBTU
           UPDK Pekanbaru                             PHE Jambi Merang                                             2022 - 2026                                        5
                                                      Transportasi Gas Indonesia                                  2018 - 2023**             MSCF            16,706,050
           UPDK Palangkaraya                          Medco Bangkanai                                              2016 - 2033              BBTU                    20
                                                      Medco E&P Indonesia                                          2022 - 2025                                  2.74-3
           UPDK Tarakan                                                                                                                    BBTUD
                                                      Pertamina EP                                                   2023**                                         6.3
                                                                                                                                           Kargo/
           UPDK Gorontalo                             PLN Energi Gas                                              2022 - 2035                                      104
                                                                                                                                           Cargo
           UP Sengkang                                PLN EPI                                                     2023 - 2024              BBTU                 17,120

           PLN Batam
           Multidestinasi                             PGN                                                         2019 - 2028                                     61.4
                                                                                                                                           BBTUD
           Tanjung Uncang                             Petrochina International Jabung, Ltd.                       2015 - 2024                                       18
         *) Kontrak tahunan/Yearly contract
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension

          Sehubungan dengan perjanjian diatas,                                                In relation with the above agreements, the
          Perusahaan mempunyai fasilitas stand-by                                             Company has stand-by letter of credit facilities
          letter of credit dengan rincian sebagai berikut:                                    with the following details:
                Bank penerbit/                                   Penerima manfaat/                                            Mata uang/             Jumlah/
                Issuing Bank                                        Beneficiary                                               Currency               Total *)

         BRI                          Ophir Indonesia (Sampang) Pty.                                                            USD                        14,340,950
                                      PT Pertamina                                                                              USD                        39,204,507
                                      PGN                                                                                       USD                            20,700
                                      PT Transportasi Gas Indonesia                                                             USD                        24,140,240
                                      Kangean Energy Indonesia                                                                  USD                        10,495,869
                                      Petrochina international Jabung Ltd.                                                      USD                         5,040,000


         Bank Mandiri                 BP Berau Ltd.                                                                             USD                       118,687,684

         BNI                          PT Petrogas Jatim Utama                                                                   IDR                  103,293,225,000
                                      PT Pertamina                                                                              USD                       43,649,970


         *) dalam jumlah penuh                                                                *) in full amount
Page 166
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/156 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                       FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                  JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)              (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                  IKATAN         DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                               AND CONTINGENCIES (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                      a.   Fuel supply agreements (continued)

          Batubara                                                              Coal

                                                                          Volume kontrak tahunan/
                                                                           Annual contract volume
                              Pemasok/Suppliers                            (dalam/in metric ton) *)         Periode/Period
         Perusahaan
         PT Multi Harapan Utama                                                             600,000          2021 - 2027
         PT Kaltim Prima Coal                                                               500,000          2021 - 2027
         PT Kaltim Prima Coal                                                               500,000          2021 - 2027
         PT Kaltim Prima Coal                                                               800,000          2023 - 2024
         PT Indominco Mandiri                                                               500,000          2022 - 2024
         PT Bharinto Ekatama                                                              1,000,000            2023**
         PT Mahakam Sumber Jaya                                                           1,000,000            2023**
         PT Bukit Baiduri Energi                                                            200,000            2023**
         PT Kaltim Prima Coal                                                             2,000,000          2023 - 2024
         PT Indominco Mandiri                                                               500,000          2019 - 2024
         PT Energi Sinar Bara                                                               257,500            2023**
         PT Kaltim Jaya Bara                                                                200,000            2023**

         PIP
         PT Bukit Asam                                                                    5,200,000          2013 - 2025
         PT Bukit Asam                                                                   18,000,000          2012 - 2032
         PT Oktasan Baruna Persada                                                        2,100,000          2018 - 2026
         PT Berau Coal                                                                    2,232,000          2009 - 2025
         PT Multi Harapan Utama                                                           1,000,000          2022 - 2026
         PT. Titan Infra Energy                                                           2,920,000          2007 - 2027
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                    5,203,000          2007 - 2027
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                      350,000          2007 - 2027
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                    2,005,000          2008 - 2027
         Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo                          1,350,000          2022 - 2027
         Indobara

         PNP
                                                                                                             2012 - 2032
         PT Bukit Asam                                                                    5,517,994          2004 - 2031
                                                                                                             2012 - 2032
         Kons. PT Arutmin Indonesia dan PT Darma Henwa                                    2,763,785          2017 - 2027
         Kons. PT Dwi Guna Laksana & PT Borneo Indo Bara                                  1,443,618          2017 - 2033
         Konsorsium PT Exploitasi Energi Indonesia dan PT Borneo                          1,128,258          2022 - 2027
         Indonesia
         PT PLN Batubara Niaga                                                            1,046,417             2023
         PT Indexim Coalindo                                                                844,795          2018 - 2028
         PT Binuang Mitra Bersama Blok Dua                                                  752,991          2022 - 2027
         PT Bhumi Rantau Energi                                                             700,063          2022 - 2024
         PT Kaltim Prima Coal                                                               684,483             2023
         PT Baratabang                                                                      658,007          2022 - 2023

         PLN Batam
         PT Kideco Jaya Agung                                                              300,000           2007 - 2027
         PT PLN Batubara Niaga                                                             300,000           2023 - 2024

         *) Dalam jumlah penuh/In full amount
         **) Sedang dalam proses perpanjangan kontrak/On process of contract extension
Page 167
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/157 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,            IKATAN       DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)           a.   Fuel supply agreements (continued)

         Batubara (lanjutan)                                        Coal (continued)

         Pada tanggal 9 Juni 2018, Kementerian ESDM                 On June 9, 2018, the Ministry of Energy and
         menerbitkan Surat Keputusan No. 1395                       Mineral        Resources         issued       Decree
         K/30/MEM/2018      mengenai     Harga    Jual              No. 1395 K/30/MEM/2018 regarding the Coal
         Batubara Untuk Penyediaan Tenaga Listrik                   Selling Price for Electricity Supply for The Public
         Untuk Kepentingan Umum yang berlaku surut                  Interest, which was retroactively valid from
         sejak 1 Januari 2018. Sesuai surat keputusan               January 1, 2018. According to the decree, the
         tersebut, harga batubara ditetapkan sebesar                coal price was regulated at a maximum price of
         maksimal USD70/metrik ton dengan acuan                     USD70/metric ton referenced to coal at 6,322
         pada kalori 6.322 kcal/kg. Surat keputusan                 kcal/kg. The decree also regulated the formula to
         tersebut juga mengatur formula untuk                       calculate the price for different specifications of
         menghitung harga dengan spesifikasi yang                   coal as listed in the decree. On December 26,
         berbeda seperti yang tercantum dalam                       2019, the Ministry of Energy and Mineral
         keputusan tersebut. Pada tanggal 26                        Resources           issued         Decree          No.
         Desember      2019,    Kementerian    ESDM                 261K/30/MEM/2019 regarding the fulfillment of
         menerbitkan Surat Keputusan No. 261                        domestic coal needs in 2020, which was effective
         K/30/MEM/2019       mengenai     pemenuhan                 on January 1, 2020. This decree revokes the
         kebutuhan batubara dalam negeri tahun 2020                 Decree of the Minister of Energy and Mineral
         yang mulai berlaku pada tanggal 1 Januari                  Resources No. 1395K/30/MEM/2018 regarding
         2020. Surat keputusan ini mencabut Keputusan               the selling price of coal for the supply of electricity
         Menteri ESDM No. 1395 K/30/MEM/2018                        for public purposes.
         mengenai harga jual batubara untuk
         penyediaan tenaga listrik untuk kepentingan
         umum.

         Pada tanggal 2 November 2020, Menteri                      On November 2, 2020, the Minister of Law and
         Hukum dan Hak Asasi Manusia mengeluarkan                   Human Rights issued Law No. 11 year 2020 on
         Undang-Undang No. 11 Tahun 2020 tentang                    Job Creation. The main point of the law relating
         Cipta Kerja. Poin utama peraturan tersebut                 to the Group relates to the inclusion of coal
         yang berkaitan dengan Grup adalah hasil                    mining products in the types of goods subject to
         pertambangan batubara termasuk dalam jenis                 VAT, and therefore all purchases of coal are
         barang yang dikenai PPN, maka seluruh                      subject to VAT at 10%. In accordance with the
         pembelian batubara dikenakan PPN terhitung                 HPP Law which was approved on October 29,
         mulai tanggal tersebut dengan tarif 10%.                   2021, the VAT rate that will be applied as at April
         Sesuai dengan UU HPP yang telah disahkan                   1, 2022 is 11%.
         pada tanggal 29 Oktober 2021, tarif PPN yang
         akan berlaku per tanggal 1 April 2022 adalah
         sebesar 11%.

         Harga pembelian batubara pada tahun berjalan               The price of coal purchases for the current year
         setelah disesuaikan dengan nilai kalori, kadar             after being adjusted against calorific value, ash
         abu, sulfur, air, Ash Fusion Temperature                   content, sulfur, water, Ash Fusion Temperature
         (“AFT”) dan Hardgrove Grindability Index                   (“AFT”) and Hardgrove Grindability Index (“HGI”)
         (“HGI”) berkisar antara Rp441.046 sampai                   ranges from Rp441,046 to Rp1,415,405 per ton
         dengan Rp1.415.405 per ton (2023: Rp320.945                (2023: Rp320,945 to Rp1,434,804 per ton).
         sampai dengan Rp1.434.804 per ton).
Page 168
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/158 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,             IKATAN        DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)

    a.   Perjanjian pengadaan bahan bakar (lanjutan)              a.   Fuel supply agreements (continued)

         Bahan bakar minyak                                            Fuel

         Perusahaan dan Pertamina mengadakan                           The Company and Pertamina entered into a Fuel
         Perjanjian Induk Jual Beli Bahan Bakar Minyak                 Sale     and     Purchase       Agreement       No.
         No. 071.PJ/060/DIR/2001 tanggal 8 Oktober                     071.PJ/060/DIR/2001 dated October 8, 2001.
         2001. Perjanjian ini telah diamandemen                        This agreement was amended on May 16, 2007,
         tanggal 16 Mei 2007 dimana Perusahaan dan                     whereby, the Company and Pertamina agreed
         Pertamina menyepakati antara lain: (i)                        among other things: (i) that the monthly fuel price
         penggunaan harga bahan bakar bulanan                          to be used for the period January 1 until April 30,
         ditetapkan oleh Pertamina untuk periode 1                     2007 is determined by Pertamina and the fuel
         Januari sampai dengan 30 April 2007 dan                       price of 109.5% from Mean Oil Platts Singapore
         harga bahan bakar 109,5% dari Mean Oil Platts                 (“MOPS”) plus VAT for the period May 1, 2007
         Singapore      (“MOPS”)        ditambah       Pajak           until December 31, 2007; (ii) that the fuel price
         Pertambahan Nilai untuk periode 1 Mei 2007                    subsequent to December 31, 2007 will be
         sampai dengan 31 Desember 2007; (ii) harga                    determined by both parties every year; (iii) that
         bahan bakar setelah tanggal 31 Desember                       the terms of payment and penalty charges on late
         2007 akan ditetapkan oleh kedua belah pihak                   payment use a monthly rate of Certificate of Bank
         setiap tahun; (iii) jangka waktu pembayaran                   Indonesia plus 1.3%; (iv) that effective on May 1,
         berikut pengenaan denda keterlambatan                         2007, the unpaid balance of payable for the
         pembayaran sebesar tingkat bunga Sertifikat                   purchases of fuel until April 30, 2007 will bear
         Bank Indonesia bulanan ditambah 1,3%; (iv)                    interest with a rate per annum of Certificate of
         efektif mulai 1 Mei 2007, saldo utang yang                    Bank Indonesia plus 1.3%, until settled by
         belum dibayar atas pembelian bahan bakar                      issuance of PLN bonds, which is no later than
         sampai dengan 30 April 2007 dikenakan bunga                   August 31, 2007; (v) that the maximum payable
         sebesar tingkat bunga Sertifikat Bank                         to Pertamina, including bonds which will be
         Indonesia per tahun ditambah 1,3%, sampai                     issued amounted to Rp18 trillion; and (vi) that this
         diselesaikan dengan menerbitkan obligasi PLN                  agreement is valid for five years from January 1,
         selambat-lambatnya tanggal 31 Agustus 2007;                   2007 until December 31, 2011.
         (v) utang kepada Pertamina, termasuk obligasi
         yang akan diterbitkan maksimum sebesar
         Rp18 triliun; dan (vi) perjanjian ini berlaku untuk
         lima tahun sejak 1 Januari 2007 sampai dengan
         31 Desember 2011.

         Berdasarkan Surat Kesepakatan Bersama                         Based on the Joint Deal Letter dated May 16,
         tanggal 16 Mei 2007, PT Sucofindo (Persero)                   2007, PT Sucofindo (Persero) is assigned as an
         ditunjuk sebagai surveyor independen.                         independent surveyor.

         Berdasarkan Addendum IV Perjanjian Jual Beli                  Based on Amendment IV of the Fuel Sale and
         Bahan Bakar Minyak tanggal 16 Mei 2017, PLN                   Purchase Agreement dated May 16, 2017, PLN
         dan Pertamina menyepakati perpanjangan                        and Pertamina agreed to extend the period of
         jangka waktu pasokan hingga tahun 2020.                       supply until 2020.
Page 169
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/159 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                 IKATAN        DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                            AND CONTINGENCIES (continued)

    a.    Perjanjian pengadaan bahan bakar (lanjutan)                 a.   Fuel supply agreements (continued)

          Bahan bakar minyak (lanjutan)                                    Fuel (continued)

          Berdasarkan Addendum VIII tertanggal 17                          Based on Addendum VIII dated December 17,
          Desember 2021, kesepakatan harga jual beli                       2021, the agreement on the sale and purchase
          bahan bakar minyak (HSD dan MFO) sejak                           price of fuel oil (HSD and MFO) from January 1,
          tanggal 1 Januari 2021 sampai dengan 31                          2021 to December 31, 2023 between Pertamina
          Desember 2023 antara Pertamina dan                               and the Company is as follows:
          Perusahaan adalah sebagai berikut:

          a. Selama masa negosiasi, formula harga                          a. During the negotiation period, the new price
             baru untuk periode tanggal 1 Januari 2021                        formula for the period of January 1, 2021 to
             sampai dengan 31 Desember 2021,                                  December 31, 2021, uses the provisional
             menggunakan formula harga sementara                              price formula agreed in the amendment for
             yang telah disepakati pada addendum                              the period of January 1, 2018 to December
             untuk periode 1 Januari 2018 sampai                              31, 2020.
             dengan 31 Desember 2020.
          b. Sehubungan dengan hal tersebut, formula                       b. Based on the above situation, a new price
             harga baru akan disepakati untuk periode                         formula will be agreed for the period starting
             terhitung mulai tanggal 1 Januari 2022                           from January 1, 2022 to December 31, 2023.
             sampai dengan 31 Desember 2023.

          Pada 18 Juni 2024, Perusahaan telah                              On June 18, 2024, the Company signed a new
          menandatangani perjanjian jual beli bahan                        Fuel Sale and Purchase Agreement with
          bakar          minyak        baru        No.                     Pertamina       Patra      Niaga        No.
          0007/DAN.01.01/PLNEPI0100/2024 dengan                            0007/DAN.01.01/PLNEPI0100/2024 for period
          Pertamina Patra Niaga untuk periode 1 Januari                    January 1, 2024 until June 30, 2024.
          2024 sampai dengan 30 Juni 2024. Atas                            Amendments are being made to this agreement
          perjanjian ini sedang dilakukan amandemen                        to extend the Fuel Sales and Purchase
          untuk perpanjangan atas Kontrak Perjanjian                       Agreement.
          Jual Beli Bahan Bakar Minyak.

          Uap panas bumi                                                   Geothermal steam

          Pada tanggal 30 Juni 2024 dan 31 Desember                        As at June 30, 2024 and December 31, 2023, the
          2023, Grup memiliki perjanjian dengan                            Group entered into geothermal steam purchase
          beberapa pemasok untuk pengadaan uap                             agreements with several suppliers as follows:
          panas bumi sebagai berikut:

                                                                                                               Periode/
                   Sektor/Sector                                 Pemasok/Supplier                               Period

         Kamojang Unit 1, 2 & 3                 PGE                                                          2012 - 2040
         Lahendong Unit 1                       PGE                                                          2002 - 2032
         Lahendong Unit 2 & 3                   PGE                                                          2007 - 2039
         Lahendong Unit 4                       PGE                                                          2011 - 2041
         Ulubelu Unit 1 & 2                     PGE                                                          2012 - 2042
         Hululais Unit 1 & 2                    PGE                                                        30 tahun/years*)
         Sungai Penuh Unit 1 & 2                PGE                                                        30 tahun/years*)
         Kotamobagu Unit 1,2,3 & 4              PGE                                                        30 tahun/years*)
         Darajat Unit 1                         PGE, Star Energy Geothermal Darajat I                        1994 - 2030
                                                  Ltd., Star Energy, Geothermal Darajat II Ltd.
         Gunung Salak Unit 1,2 & 3              PGE, Star Energy Geothermal Salak Ltd.,
                                                  Ltd., Star Energy Geothermal Salak Pratama Ltd.             1993 - 2040

         *) Sejak Commercial Date/Since Commercial Date
Page 170
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/160 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                        FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                   JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)               (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                      IKATAN        DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                 AND CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan                            b.    Power purchase agreements and energy
          kontrak penjualan energi                                                 sales contracts

          Sebelum         tahun     1997,      Perusahaan                          Prior to 1997, the Company entered into PPAs
          mengadakan PPA dan ESC dengan IPP skala                                  and ESCs with large-scale IPPs. In 1999, the
          besar. Pada tahun 1999, Perusahaan telah                                 Company entered into renegotiation of the PPAs
          melaksanakan renegosiasi terhadap PPA dan                                and ESCs through a Working Group on PT PLN
          ESC melalui Kelompok Kerja Renegosiasi                                   (Persero) Special Contract Renegotiation under
          Kontrak Khusus PT PLN (Persero) di bawah                                 the direction of the Government. Such
          arahan Pemerintah. Renegosiasi tersebut                                  renegotiation includes, among other subjects,
          meliputi antara lain keseimbangan kondisi                                equalisation     in     contract    conditions,
          kontrak, kewajaran harga dan disparitas harga                            reasonableness of price and disparity of selling
          jual listrik IPP dan harga jual Perusahaan.                              price between the IPPs and the Company.

          Dalam perjanjian dengan IPP tertentu,                                    Based on the agreements with certain IPPs, the
          disepakati bahwa setiap saat selama perjanjian                           Group may exercise its option to purchase all of
          berlaku, Grup dapat melaksanakan opsi untuk                              the IPP’s rights, title and interest in the projects at
          membeli hak penjual, milik, dan kepentingan                              any time during the contract period.
          atas proyek yang bersangkutan.

          Pada tanggal 30 Juni 2024, perjanjian                                    As at June 30, 2024, the significant agreements
          signifikan antara Grup dengan IPP adalah                                 between the Group with IPPs are as follows:
          sebagai berikut:

          Sudah beroperasi                                                         In operation

                                                                                                                           Tanggal Operasi
                                                                                     Kapasitas/                               komersial/
                                                                    Bahan Bakar/      Capacity                Periode/       Commercial
          Perusahaan/Company                Proyek/Project              Fuel           (MW)       AF (%)       Period       Operation Date


         Perusahaan

         PT Bajradaya Sentranusa     PLTA Asahan                     Tenaga Air/        180        1,175     2011 - 2041    18 Januari 2011/
                                                                       Hydro                       GWh/                     January 18, 2011
                                                                                                    year
         PT Malea Energy             PLTA Malea                      Tenaga Air/         90         474      2021 - 2051      2 Juli 2021/
                                                                       Hydro                       GWh/                       July 2, 2021
                                                                                                    year
         PT Poso Energy              PLTA Poso                       Tenaga Air/        315         846      2012 - 2042   30 Desember 2012/
                                                                       Hydro                       GWh/                    December 30, 2012
                                                                                                    year
         PT Poso Energy              PLTA Poso Ekstension            Tenaga Air/        200         823      2023 - 2053    7 Februari 2023/
                                                                       Hydro                       GWh/                     February 7, 2023
                                                                                                    year
         PT Tanggamus Electric       PLTA Semangka                   Tenaga Air/         56        278.7     2018 - 2048      2 Juli 2018/
          Power                                                        Hydro                       GWh/                       July 2, 2018
                                                                                                    year
         PT UPC Sidrap Bayu          PLTB Sidrap                     Angin/Wind          70       92.5% -    2018 - 2048       5 April 2018/
          Energi                                                                                  107.5%                       April 5, 2018
         PT Energi Bayu Jeneponto    PLTB Tolo                       Angin/Wind          60       92.5% -    2019 - 2049       14 Mei 2019/
                                                                                                  107.5%                       May 14, 2019
         PT Bekasi Power             PLTGU Bekasi Power               Gas Pipa/         119        90%       2013 - 2033     5 Januari 2013/
                                                                      Gas Pipe                                               January 5, 2013
         PT Cikarang Listrindo       PLTGU Cikarang Ekspansi (150     Gas Pipa/         150        72%       2011 - 2031        1 Juni 2011/
                                     MW)                              Gas Pipe                                                 June 1, 2011
         PT Metaepsi Pejebe Power    PLTGU Gunung Megang (2x40        Gas Pipa/         110        85%       2007 - 2027   10 November 2007/
          Generation                 MW + 1 x30 MW)                   Gas Pipe                                             November 10,2007
         PT Jawa Satu Power          PLTGU Jawa-1 #2                  Gas Pipa/        1,760       60%       2024 - 2049      29 Maret 2024/
                                                                      Gas Pipe                                               March 29, 2024
         PT Asrigita Prasarana       PLTGU Palembang Timur (150       Gas Pipa/         150        85%       2005 - 2025   16 Desember 2005/
                                     MW)                              Gas Pipe                                             December 16, 2005
         PT Medco Ratch Power        PLTGU Riau (275 MW)              Gas Pipa/         275        60%       2022 - 2042    10 Februari 2022/
          Riau                                                        Gas Pipe                                              February 10, 2022
         PT Kertanegara Energi       PLTGU Senipah (117 MW)           Gas Pipa/         117        85%       2015 - 2040       17 Juni 2015/
          Perkasa                                                     Gas Pipe                                                June 17, 2015
         Pertamina dan Star Energy   PLTP Darajat Unit 2 & 3         Panas Bumi/        220        80%       2000 - 2030     1 Februari 2000/
          Geothermal Ltd                                             Geothermal                                             February 1, 2000
         PT Geo Dipa Energi          PLTP Dieng                      Panas Bumi/         55        95%       2002 - 2032    11 Oktober 2002/
                                                                     Geothermal                                             October 11, 2002
Page 171
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/161 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                      JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                     IKATAN           DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                    AND CONTINGENCIES (continued)

    b.    Perjanjian jual beli tenaga listrik dan                               b.     Power purchase agreements and energy
          kontrak penjualan energi (lanjutan)                                          sales contracts (continued)

          Sudah beroperasi (lanjutan)                                                  In operation (continued)

                                                                                                                                            Tanggal Operasi
                                                                                         Kapasitas/                                            komersial/
                                                                       Bahan Bakar/       Capacity                             Periode/       Commercial
          Perusahaan/Company                 Proyek/Project                Fuel            (MW)             AF (%)              Period       Operation Date

         Perusahaan
         (lanjutan/continued)

         PT Pertamina Geothermal     PLTP Kamojang Unit 4              Panas Bumi/          60               90%              2008 - 2038     26 Januari 2008/
          Energy                                                       Geothermal                                                            January 26, 2008
         PT Pertamina Geothermal     PLTP Lumut Balai                  Panas Bumi/          55               90%              2019 - 2049   1 September 2019/
          Energy                                                       Geothermal                                                           September 1, 2019
         PT Supreme Energy Muara     PLTP Muara Laboh                  Panas Bumi/          80               90%              2019 - 2049   16 Desember 2019/
          Laboh                                                        Geothermal                                                           December 16, 2019
         PT Geo Dipa Energi          PLTP Patuha                       Panas Bumi/          55               95%              2014 - 2054      27 September
                                                                       Geothermal                                                             2014/September
                                                                                                                                                   27, 2014
         PT Supreme Energy           PLTP Rantau Dedap                 Panas Bumi/          86               90%              2021 - 2051   26 Desember 2021/
          Rantau Dedap                                                 Geothermal                                                           December 26, 2021
         Star Energy Geothermal      PLTP Salak Unit 4-6               Panas Bumi/          197              85%              2000 - 2030    1 Desember 2000/
          Ltd                                                          Geothermal                                                            December 1, 2000
         Sarulla Operations Ltd      PLTP Sarulla 1 Unit 1, 2          Panas Bumi/          220              90%              2017 - 2047     2 Oktober 2017/
                                                                       Geothermal                                                             October 2, 2017
         Sarulla Operations Ltd      PLTP Sarulla 1 Unit 3             Panas Bumi/          110              90%              2018 - 2048       3 April 2018/
                                                                       Geothermal                                                               April 3, 2018
         PT Sorik Marapi             PLTP Sorik Marapi #3              Panas Bumi/          50               90%              2022 - 2052     7 Oktober 2022/
            Geothermal Power                                           Geothermal                                                             October 7, 2022
         PT Pertamina Geothermal     PLTP Ulubelu Unit 3               Panas Bumi/          55               90%              2016 - 2046       26 Juli 2016/
          Energy                                                       Geothermal                                                               July 26, 2016
         PT Pertamina Geothermal     PLTP Ulubelu Unit 4               Panas Bumi/          55               90%              2017 - 2047      25 Juni 2017/
          Energy                                                       Geothermal                                                              June 25, 2017
         Star Energy Geothermal      PLTP Wayang Windu Unit 1&2        Panas Bumi/          227              95%              2000 - 2030        1 Juni 2000/
          Ltd                                                          Geothermal                                                               June 1, 2000
         PT Pembangkitan Jawa        PLTS Terapung Cirata              Surya/Solar          145        2024 = 80% - 120%      2023 - 2053   13 November 2023/
                                                                                                      2025 = 92.5% - 102.5%
          Bali Masdar Energy                                                                                                                November 13, 2023
         PT Lestari Banten Energi    PLTU Banten (1x625 MW)            Batubara/Coal        625              80%              2017 - 2042      28 Juni 2017/
                                                                                                                                               June 28, 2017
         PT Tenaga Listrik           PLTU Bengkulu (2x100 MW)          Batubara/Coal        200              80%              2020 - 2045       27 Juli 2020/
          Bengkulu                                                                                                                              July 27, 2020
         PT General Energy Bali      PLTU Celukan Bawang (2x125        Batubara/Coal        380              85%              2015 - 2045      23 September
                                     & 1x130 MW)                                                                                              2015/September
                                                                                                                                                   23, 2015
         PT Sumber Segara            PLTU Cilacap (2x281 MW)           Batubara/Coal        562              80%              2007 - 2037     1 Februari 2007/
          Primadaya                                                                                                                           February 1, 2007
         PT Sumber Segara            PLTU Cilacap Ekspansi (1x614      Batubara/Coal        614              80%              2016 - 2046      10 Juni 2016/
          Primadaya                  MW)                                                                                                       June 10, 2016
         PT Cirebon Electric Power   PLTU Cirebon (1x660 MW)           Batubara/Coal        660              80%              2012 - 2042       27 Juli 2012/
                                                                                                                                                July 27, 2012
         PT Cahaya Fajar Kaltim      PLTU Embalut Ekspansi (1x50       Batubara/Coal        50               87%              2014 - 2039    14 Agustus 2014/
                                     MW)                                                                                                     Agustus 14, 2014
         PT Cirebon Energy           PLTU Jawa 1/Cirebon Exp           Batubara/Coal       1000              86%              2023 - 2048       19 Mei 2023/
          Prasarana                                                                                                                            May 19, 2023
         PT Bhimasena Power          PLTU Jawa Tengah 1 (2x1000        Batubara/Coal       1900              86%              2022 - 2047    31 Agustus 2022/
          Indonesia                  MW)                                                                                                      August 31, 2022
         PT Bhumi Jati Power         PLTU Jawa-4 (FTP2) (2x1000        Batubara/Coal       2000              86%              2022 - 2047      17 Juni 2022/
                                     MW)                                                                                                       June 17, 2022
         PT Shenhua Guohua           PLTU Jawa-7 Bojonegara            Batubara/Coal       2000              86%              2021 - 2046        8 Juli 2021/
          Pembangkitan Jawa Bali     (2x1000 MW)                                                                                                 July 8, 2021
         PT Sumber Segara            PLTU Jawa-8 – Cilacap (1x945      Batubara/Coal        945              80%              2019 - 2049    9 November 2019/
          Primadaya                  MW)                                                                                                     November 9, 2019
         PT Bosowa Energi            PLTU Jeneponto (2x100 MW)         Batubara/Coal        200              80%              2012 - 2042    31 Oktober 2012/
                                                                                                                                             October 31, 2012
         PT Bosowa Energi            PLTU Jeneponto Ekspansi           Batubara/Coal        250              80%              2018 - 2048       1 April 2018/
                                     (2x125 MW)                                                                                                 April 1, 2018
         PT GCL Indo Tenaga          PLTU Kalbar-1 (2x100 MW)          Batubara/Coal        200              80%              2021 - 2046      25 Juni 2021/
                                                                                                                                               June 25, 2021
         PT Tanjung Power            PLTU Kalsel-1 (FTP2) (2x100       Batubara/Coal        200              80%              2019 - 2044   14 Desember 2019/
          Indonesia                  MW)                                                                                                    December 14, 2019
         PT SKS Listrik Kalimantan   PLTU Kalteng-1 / Kalselteng-1     Batubara/Coal        200              80%              2020 - 2045    4 November 2020/
                                     (2x100 MW)                                                                                              November 4, 2020
         PT Graha Power Kaltim       PLTU Kaltim-2 (FTP2) (2x100       Batubara/Coal        200              80%              2020 - 2045      30 Juni 2020/
                                     MW)                                                                                                       June 30, 2020
         PT Indonesia Energi         PLTU Kaltim-4 (2x100 MW)          Batubara/Coal        200              80%              2020 - 2045      14 April 2020/
          Dinamika (INDOEKA)                                                                                                                   April 14, 2020
Page 172
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                             Lampiran 5/162 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                      (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                        IKATAN              DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                        AND CONTINGENCIES (continued)

    b.     Perjanjian jual beli tenaga listrik dan                                 b.      Power purchase agreements and energy
           kontrak penjualan energi (lanjutan)                                             sales contracts (continued)

           Sudah beroperasi (lanjutan)                                                     In operation (continued)

                                                                                                                                 Tanggal Operasi
                                                                                           Kapasitas/C                              komersial/
                                                                         Bahan Bakar/        apacity               Periode/        Commercial
           Perusahaan/Company                   Proyek/Project              Fuel              (MW)       AF (%)     Period        Operation Date

         Perusahaan
         (lanjutan/continued)

         PT DSSP Power Kendari          PLTU Kendari-3 (2x50 MW)         Batubara/Coal         100        80%     2019 - 2044    28 Oktober 2019/
                                                                                                                                 October 28, 2019
         PT. Lombok Energy              PLTU Lombok Timur (2x25 MW)      Batubara/Coal         50         80%     2017 - 2042      10 April 2017/
          Dynamics                                                                                                                 April 10, 2017
         PT Rekind Daya Mamuju          PLTU Mamuju (2x25 MW)            Batubara/Coal         50         80%     2018 - 2043   18 September 2018/
                                                                                                                                September 18, 2018
         PT Meulaboh Power              PLTU Meulaboh 3 & 4              Batubara/Coal         400        80%     2023 - 2048       14 Juli 2023/
          Generation                     (2x200 MW)                                                                                July 14, 2023
         PT Bukit Pembangkit            PLTU MT Banjarsari               Batubara/Coal         220        80%     2015 - 2045      30 Juni 2015/
          Innovative                     (2x110 MW)                                                                                June 30, 2015
         PT Indo Ridlatama Power        PLTU MT Kaltim-1 (2x27,5 MW)     Batubara/Coal         55         80%     2018 - 2048    1 Desember 2018/
                                                                                                                                 December 1, 2018
         PT Priamanaya Energi           PLTU MT Keban Agung              Batubara/Coal         240        80%     2016 - 2046       1 Mei 2016/
                                         (2x120 MW)                                                                                 May 1, 2016
         PT Gou Hua Energi Musi         PLTU MT Simpang Belimbing        Batubara/Coal         227        80%     2013 - 2043    27 Februari 2013/
          Makmur Indonesia               (2x113,5 MW)                                                                            February 27, 2013
         PT DSSP Power Sumsel           PLTU MT Sumsel-5                 Batubara/Coal         300        80%     2016 - 2041   20 Desember 2016/
                                          (2x150 MW)                                                                            December 20, 2016
         PT Huadian Bukit Asam          PLTU MT Sumsel-8                 Batubara/Coal        1243        80%     2023 - 2048     7 October 2023/
          Power                                                                                                                   October 7, 2023
         PT Paiton Energy               PLTU Paiton 1 (2x615 MW)         Batubara/Coal        1230        85%     2001 - 2041     1 Januari 2001/
                                                                                                                                  January 1, 2001
         PT Jawa Power                  PLTU Paiton 2 (2x610 MW)         Batubara/Coal        1220        83%     2000 - 2030    1 November 2020/
                                                                                                                                 November 1, 2020
         PT Paiton Energy               PLTU Paiton 3 (1x815 MW)         Batubara/Coal         815        85%     2012 - 2042      18 Juni 2012/
                                                                                                                                   June 18, 2012
         PT Gorontalo Listrik Perdana   PLTU Sulbagut-1 (2x50 MW)        Batubara/Coal         100        80%     2021 - 2046   31 Desember 2021/
                                                                                                                                December 31, 2021
         Lainnya                                                                               723

         PLN Batam

         PT Dalle Energy Batam          PLTG Panaran                         Gas/Gas           82         90%     2005 - 2025   1 Desember 2005/
                                                                                                                                December 1, 2005
         PT Mitra Energy Batam          PLTG Panaran                         Gas/Gas           56         84%     2004 - 2034   29 Oktober 2004/
                                                                                                                                October 29, 2004
         PT Energi Listrik Batam        PLTG Tanjung Uncang                  Gas/Gas           70         85%     2016 - 2036      1 Mei 2016/
                                                                                                                                   May 1, 2016
         KSO PT Beringin Mas            PLTMG Sewa Kabil 50 MW               Gas/Gas           50         65%     2023 - 2028   4 November 2023/
          Powerindo-PT VPower                                                                                                   November 4, 2023
          Operation Services-PT
          Supreme Energi Indonesia
         PT TJK Power                   PLTU Tanjung Kasam               Batubara/Coal         110        85%     2012 - 2042    25 Oktober 2012/
                                                                                                                                 October 25, 2012
                   a)
         Lainnya                                                                               201


         Jumlah                                                                               25,350                                  Total


         a) Meliputi kontrak dengan IPP, yang terdiri                                    a) Represents contracts with IPPs, consisting
            dari IPP berlokasi di berbagai daerah di                                        of IPPs which are located in several areas of
            Indonesia, menggunakan bahan bakar                                              Indonesia which will use coal, geothermal,
            batu bara, panas bumi dan mini hydro                                            and mini hydro for generation with each
            dengan       kapasitas     masing-masing                                        power plant’s capacity less than 50 MW.
            pembangkit kurang dari 50 MW.
Page 173
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/163 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                       FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                  JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                              (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                                IKATAN                DAN   54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                                 AND CONTINGENCIES (continued)

    b.   Perjanjian jual beli tenaga listrik dan                                               b.     Power purchase agreements and energy
         kontrak penjualan energi (lanjutan)                                                          sales contracts (continued)

         Belum beroperasi (dalam tahap pengembangan)                                                  Not yet in operation (development stage)
                                                                                                               Kapasitas/
                                                                                             Bahan bakar/       Capacity     AFb)       Periode/                     Status/
         No.               Perusahaan/Company                       Proyek/Project              Fuel             (MW)        (%)        Perioda)                     Status
               Perusahaan
          1    PT Indo Raya Tenaga                      PLTU Jawa-9&10                 Batubara/Coal                 2,000   86%    2024 - 2049    Tahap Pembangunan/Construction Stage
          2    PT Shenhua Guohua Lion Power Indonesia   PLTU MT Sumsel -1              Batubara/Coal                   600   80%    2023 - 2053    Tahap Pembangunan/Construction Stage
          3    PT North Sumatera Hydro Energy           PLTA Batang Toru               Tenaga Air/Hydro                510   47%    2026 - 2056    Tahap Pembangunan/Construction Stage
          4    PT Kerinci Merangin Hidro                PLTA Merangin                  Tenaga Air/Hydro                350   41%    2025 - 2055    Tahap Pembangunan/Construction Stage
          5    PT Sumbangselenergi Sakti Pewali         PLTU MT Sumbagsel-1            Batubara/Coal                   300   80%    2024 - 2049    Tahap Pembangunan/Construction Stage
          6    PT Supreme Energy Rantau Dedap (SERD)    Rantau Dedap #2                Panas Bumi/Geothermal           134   90%    2025 - 2055    Eksplorasi/Exploration
          7    Star Energy Geothermal Wayang Windu      Wayang Windu #4                Panas Bumi/Geothermal           120   90%    2028 - 2058    Potensi/Potential
          8    PT Sejahtera Alam Energy (SAE)           Baturaden #1                   Panas Bumi/Geothermal           110   90%    2025 - 2055    Eksplorasi/Exploration
         10    PT Supreme Energy Rajabasa               Rajabasa #1                    Panas Bumi/Geothermal           110   90%    2025 - 2055    Eksplorasi/Exploration
         11    PT Supreme Energy Rajabasa               Rajabasa #2                    Panas Bumi/Geothermal           110   90%    2029 - 2059    Eksplorasi/Exploration
         12    PT Supreme Energy Muara Laboh (SEML)     Muara Laboh #2                 Panas Bumi/Geothermal           140   90%    2025 - 2055    Eksplorasi/Exploration
         13    PT Sintesa Banten Geothermal             Rawadano #2                    Panas Bumi/Geothermal            80   90%    2025 - 2055    Eksplorasi/Exploration
         14    PT Sejahtera Alam Energy (SAE)           Baturaden #2                   Panas Bumi/Geothermal            75   90%    2025 - 2055    Eksplorasi/Exploration
         15    Bali Energy Limited (BEL)                Bedugul #2                     Panas Bumi/Geothermal            55   95%    2030 - 2055    Eksplorasi/Exploration
         16    Star Energy Geothermal Wayang Windu      Wayang Windu #3                Panas Bumi/Geothermal            60   80%    2026 - 2056    Eksplorasi/Exploration
         17    Geo Dipa Energy                          Dieng #2                       Panas Bumi/Geothermal            55   90%    2025 - 2055    Tahap Pembangunan/Construction Stage
         18    Geo Dipa Energy                          Dieng #3                       Panas Bumi/Geothermal            55   90%    2028 - 2058    Eksplorasi/Exploration
         19    Geo Dipa Energy                          Dieng #4                       Panas Bumi/Geothermal            55   90%    2031 - 2061    Eksplorasi/Exploration
         20    Star Energy Geothermal                   Gunung Salak #7                Panas Bumi/Geothermal            55   80%    2025 - 2055    Eksplorasi/Exploration
         21    Pertamina Geothermal Energy              Hululais #1                    Panas Bumi/Geothermal            55   85%    2025 - 2055    Pendanaan/Financing
         22    Pertamina Geothermal Energy              Hululais #2                    Panas Bumi/Geothermal            55   85%    2025 - 2055    Pendanaan/Financing
         23    PT Medco Cahaya Geothermal               Ijen #3                        Panas Bumi/Geothermal            50   90%    2026 - 2056    Tahap Pembangunan/Construction Stage
         24    PT Pertamina Geothermal Energy           Lumut Balai #2                 Panas Bumi/Geothermal            55   90%    2024 - 2054    Tahap Pembangunan/Construction Stage
         25    PT Pertamina Geothermal Energy           Lumut Balai #3                 Panas Bumi/Geothermal            55   90%    2024 - 2054    Potensi/Potential
         26    PT Pertamina Geothermal Energy           Lumut Balai #4                 Panas Bumi/Geothermal            55   90%    2024 - 2054    Potensi/Potential
         27    PT Geo Dipa Energi                       Patuha #2                      Panas Bumi/Geothermal            55   75%    2025 - 2055    Tahap Pembangunan/Construction Stage
         28    PT Geo Dipa Energi                       Patuha #3                      Panas Bumi/Geothermal            55   75%    2028 - 2058    Eksplorasi/Exploration
         29    PT Geo Dipa Energi                       Patuha #4                      Panas Bumi/Geothermal            55   75%    2029 - 2059    Potensi/Potential
         30    PT Pertamina Geothermal                  Sungai Penuh #1                Panas Bumi/Geothermal            55   90%    2028 - 2058    Potensi/Potential
         31    PT Pertamina Geothermal                  Sungai Penuh #2                Panas Bumi/Geothermal            55   90%    2028 - 2058    Potensi/Potential
         32    PT Bakrie Darmakarya                     Telaga Ngebel #1               Panas Bumi/Geothermal            55   90%    2027 - 2057    Eksplorasi/Exploration
         33    PT Bakrie Darmakarya                     Telaga Ngebel #2               Panas Bumi/Geothermal            55   90%    2030 - 2057    Potensi/Potential
         34    PT Bakrie Darmakarya                     Telaga Ngebel #3               Panas Bumi/Geothermal            55   90%    2030 - 2057    Potensi/Potential
         35    Geo Dipa Energy                          Dieng #5                       Panas Bumi/Geothermal            50   90%    2025 - 2055    Eksplorasi/Exploration
         36    Geo Dipa Energy                          Dieng #6                       Panas Bumi/Geothermal            50   90%    2025 - 2055    Eksplorasi/Exploration
         37    PT Sorik Merapi Geothermal Power         Sorik Marapi #5                Panas Bumi/Geothermal            50   90%    2022 - 2051    Eksplorasi/Exploration
               Lainnya/Othersc)                                                                                        848

               PLN Batam
          1    KSO PT Bagus Karya -                     PLTMG Sewa Kabil 50 MW         Gas                             60    90%    2024 - 2029    Tahap Pembangunan/Construction Stage
               PT CNTIC Indonesia
          2    Lainnya/Others                                                          Gas                             79

               Jumlah                                                                                               6,876                          Total



         a) Perjanjian berlaku sejak ditandatangani,                                                  a) The agreements are effective from the date of
            dan jual beli tenaga listrik berlaku antara 20                                               signing, and buying and selling of electricity is
            sampai dengan 30 tahun sejak tanggal                                                         valid between 20 to 30 years starting from the
            operasi komersial.                                                                           commercial operation date.
         b) AF = Faktor pemasokan tenaga yang harus                                                   b) AF = Power supply factor which must be
            diserap Perusahaan.                                                                          absorbed by the Company.
         c) Meliputi kontrak dengan IPP, yang terdiri                                                 c) Represents contracts with IPPs, consisting of
            dari IPP dalam tahap pembangunan dan                                                         IPPs under construction and IPPs in the
            IPP dalam tahap pembiayaan PPA                                                               financing stage, and PPAs which are located
            berlokasi di berbagai daerah di Indonesia,                                                   in several areas of Indonesia which will use
            menggunakan bahan bakar batu bara,                                                           coal, geothermal, and mini hydro for
            panas bumi dan mini hydro dengan                                                             generation with each power plant’s capacity
            kapasitas masing-masing pembangkit kurang                                                    less than 50 MW.
            dari 50 MW.
Page 174
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                        Lampiran 5/164 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                           FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                      JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                  (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                    IKATAN           DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                    AND CONTINGENCIES (continued)

    b.     Perjanjian jual beli tenaga listrik dan                             b.     Power purchase agreements and energy
           kontrak penjualan energi (lanjutan)                                        sales contract (continued)

           Belum    beroperasi      (dalam                     tahap                  Not yet in operation (development stage)
           pengembangan) (lanjutan)                                                   (continued)

           Harga tenaga listrik per kWh untuk                                         The electricity power price per kWh for gas, MFO,
           pembangkitan bahan bakar gas, MFO dan                                      and coal power plants is determined by certain
           batubara ditetapkan berdasarkan formula                                    formulas as stated in the agreement which
           tertentu yang ditetapkan dalam perjanjian yang                             regulates, among other subjects, capital cost
           antara lain mengatur pemulihan biaya modal,                                recovery, fixed operation and maintenance cost
           pembayaran biaya tetap operasi dan                                         payment, fuel expense and variable operation
           pemeliharaan, biaya bahan bakar dan                                        and maintenance cost payment. For geothermal
           pembayaran biaya variabel operasi, dan biaya                               heat power plants, the electricity power price is
           pemeliharaan. Untuk pembangkitan yang                                      determined by a certain formula as stated in the
           menggunakan panas bumi, harga tenaga listrik                               agreement, involving, among other things,
           ditetapkan berdasarkan formula tertentu                                    Energy Charge and Capacity Charge.
           sebagaimana dinyatakan dalam perjanjian
           antara lain Energy Charge dan Capacity
           Charge.

           Selain dari perjanjian jual beli tenaga listrik di                         In addition to the above PPAs, the Group also
           atas, Grup juga memiliki beberapa perjanjian                               entered into rental agreements that fall into the
           sewa yang termasuk dalam kategori sewa                                     category of operating leases.
           operasi.

    c.     Perolehan barang modal                                              c.     Capital expenditures

           Pada tanggal 30 Juni 2024 dan 31 Desember                                  As at June 30, 2024 and December 31, 2023,
           2023, jumlah ikatan perolehan barang modal                                 total commitments for capital expenditures based
           berdasarkan kontrak, terutama sehubungan                                   on contracts, which are related to procurement of
           dengan pengadaan pembangkitan, jaringan                                    power plants, transmission and distribution are as
           transmisi dan distribusi adalah sebagai berikut:                           follows:

                                                            30 Juni 2024/ June 30, 2024
                                                                     Jumlah dalam
                                                                   mata uang asing/
                                           Mata uang/                  Amount in         Setara Rupiah/
                                           Currencies            foreign currencies *) Rupiah equivalent *)

          Program percepatan                                                                                                  Fast track program
            Kontrak pembangkitan     USD                                 33,980,697                 557,080              Power plant contracts
                                     Rupiah                                                       1,138,586
                                                                                                  1,695,666

            Kontrak transmisi        Rupiah                                                          59,121              Transmision contracts

                                                                                                     59,121

          Kontrak konstruksi rutin   USD                                560,373,305               9,186,760     Regular construction contracts
                                     EUR                                271,034,808               4,752,162
                                     JPY                              6,089,183,182                 620,404
                                     Rupiah                                                      24,184,750
                                     Lain-lain/Others **)             7,841,413,351                  10,793
                                                                                                 38,754,868


    *)    Dalam jumlah penuh                                                     *)  In full amount
    **)   Perolehan barang modal dalam mata uang asing lainnya                   **) Capital expenditures denominated in other foreign currencies
          disajikan dalam jumlah setara USD menggunakan kurs                         are presented as USD equivalents using the exchange rates
          tanggal pelaporan                                                          prevailing at the reporting date
Page 175
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                   Lampiran 5/165 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)            (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                IKATAN              DAN   54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                               AND CONTINGENCIES (continued)

    c.     Perolehan barang modal (lanjutan)                             c.   Capital expenditures (continued)

                                                          31 Desember/ December 31, 2023
                                                                     Jumlah
                                                                   dalam mata
                                                                  uang original/          Setara
                                                                   Amount in             Rupiah/
                                               Mata Uang/            original            Rupiah
                                                Currency           currency*)           equivalent

          Program percepatan                                                                                            Fast track program
             Kontrak pembangkitan        USD                           34,621,335                 533,722           Power plant contracts
                                         Rupiah                                                 1,142,144

                                                                                                1,675,866

            Kontrak transmisi            Rupiah                                                    68,585          Transmission contracts

          Kontrak konstruksi rutin       USD                           587,748,048              9,060,724     Regular construction contracts
                                         EUR                           285,505,302              4,893,424
                                         JPY                         6,843,564,388                749,692

                                         Rupiah                                               27,522,179
                                         Lain-lain/Others**)         7,841,413,351                10,628

                                                                                              42,236,647

    *)     Dalam jumlah penuh                                             *) In full amount
    **)    Perolehan barang modal dalam mata uang asing lainnya           **) Capital expenditures denominated in other foreign currencies
           disajikan dalam jumlah setara USD menggunakan kurs                 are presented as USD equivalents using the exchange rates
           tanggal pelaporan                                                  prevailing at the reporting date

           Jumlah diatas adalah diluar dari nilai tersisa                     The above amount excludes the remaining
           pembayaran di muka yang sudah dibayarkan                           advance payments that have been paid by the
           oleh Grup sesuai dengan masing-masing                              Group in accordance with the respective
           kontrak, yang nantinya akan mengurangi                             contracts, which then will reduce future payments
           pembayaran di masa depan yang dilakukan                            to be made by the Group.
           oleh Grup.

           Program percepatan                                                 Fast track program

           Berdasarkan Peraturan Presiden Republik                            Based on Presidential Regulation of the Republic
           Indonesia No. 71 Tahun 2006 tanggal 5 Juli                         of Indonesia No. 71 Year 2006 dated July 5, 2006
           2006 yang kemudian diubah melalui Peraturan                        which was amended by Presidential Regulation
           Presiden Republik Indonesia No. 59 tanggal 23                      of the Republic of Indonesia No. 59 dated
           Desember 2009, Pemerintah menugaskan                               December 23, 2009, the Government mandates
           Perusahaan     untuk    membangun      PLTU                        the Company to build coal-fired PLTUs at 42
           berbahan bakar batubara di 42 lokasi di                            locations in Indonesia, which include ten power
           Indonesia, meliputi 10 pembangkit dengan                           plants with aggregate capacity of 7,490 MW in
           jumlah kapasitas 7.490 MW di Jawa - Bali dan                       Java - Bali and 32 power plants with aggregate
           32 pembangkit dengan jumlah kapasitas 2.769                        capacity of 2,769 MW outside Java - Bali.
           MW di luar Jawa - Bali.

           Kontrak pembangkitan                                               Power plant contracts

           Sampai dengan tanggal 31 Desember 2023,                            Until December 31, 2023, the Company has
           Perusahaan telah menandatangani 37 kontrak                         signed 37 EPC contracts, which consist of ten
           EPC meliputi 10 pembangkit tenaga listrik                          electricity power plants with an aggregate
           dengan jumlah kapasitas 7.490 MW di Jawa -                         capacity of 7,490 MW in Java - Bali and 27
           Bali dan 27 pembangkit tenaga listrik dengan                       electricity power plants with an aggregate
           jumlah kapasitas 2.489 MW di luar Jawa - Bali.                     capacity of 2,489 MW outside Java - Bali. Based
           Berdasarkan       kontrak      EPC      tersebut,                  on the EPC contracts, the Company is required
           Perusahaan diharuskan membayar uang muka                           to pay the contractor a down payment, which is
           sekitar 15% dari nilai kontrak dan 85% akan                        approximately 15% of the contract price and the
           didanai melalui fasilitas kredit perbankan.                        remaining 85% will be funded through credit
                                                                              facilities from banks.
Page 176
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/166 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                 IKATAN    DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

    c.    Perolehan barang modal (lanjutan)                      c.    Capital expenditures (continued)

          Program percepatan (lanjutan)                                Fast track program (continued)

          Kontrak pembangkitan (lanjutan)                              Power plant contracts (continued)

          Sampai dengan tanggal 31 Desember 2023,                      Until December 31, 2023, the Company has
          Perusahaan        telah     membayar      uang               made a down payment amounting to
          muka sebesar USD876.217.780 (nilai penuh)                    USD876,217,780 (full amount) and Rp4,790,016
          dan Rp4.790.016 untuk 35 kontrak EPC yang                    for 35 EPC contracts which is recorded as
          dicatat sebagai aset dalam pembangunan                       construction in progress (Note 6). The down
          (Catatan 6). Uang muka tersebut didanai dari                 payments are funded by the proceeds of the
          hasil penerbitan Obligasi Terjamin dan                       issued Guaranteed Notes and withdrawal of
          penarikan fasilitas kredit program percepatan.               credit facilities for the fast track program.

          Kontrak transmisi                                            Transmission contracts

          Kontrak transmisi merupakan kontrak untuk                    Transmission contracts are contracts for
          peningkatan dan pembangunan transmisi baru                   upgrading and constructing new transmission
          dan gardu induk di Jawa dan luar Jawa. Proyek                and sub-stations in Java and outside Java. These
          ini dibiayai melalui dana sendiri dan penarikan              projects are financed by the Company’s own
          fasilitas kredit perbankan.                                  funds and withdrawal of credit facilities from
                                                                       banks.

          Kontrak konstruksi rutin                                     Regular construction contracts

          Ikatan pengadaan barang modal untuk                          Capital expenditure commitments for regular
          konstruksi rutin merupakan kontrak yang telah                construction represent project contracts signed
          ditandatangani untuk tambahan pembangkit                     for additional electricity generating plants and
          listrik dan pengembangan jaringan transmisi                  development of the transmission and distribution
          dan distribusi. Proyek ini dibiayai melalui dana             network. These projects are financed by the
          sendiri Perusahaan dan pihak luar melalui                    Company’s own funds and other external funding
          pinjaman luar negeri, bantuan dan proyek                     through offshore loans, grants and investment
          investasi sebagai bagian dari anggaran belanja               projects from the state budget.
          negara.

    d.    Fasilitas pinjaman yang belum digunakan                d.    Unused loan facilities

          Penerusan pinjaman                                           Two-step loans

                                                                      Dalam mata uang original/       Ekuivalen Rp/
                                 Mata uang/Currency                     In original currency*)        Rp equivalent

         USD                                                                           609,033,005             9,984,487
         JPY                                                                        13,881,478,886             1,414,331

         Jumlah/Total                                                                                         11,398,818
         *) Dalam jumlah penuh                                         *) In full amounts


          Pada tanggal 30 Juni 2024 dan 31 Desember                    As at June 30, 2024 and December 31, 2023, the
          2023, fasilitas pinjaman belum digunakan                     unused facilities equivalent to Rp11,398,818 and
          setara Rp11.398.818 dan Rp10.932.783                         Rp10,932,783 bear a provision charge of 0.10%
          dikenakan provisi sebesar 0,10% - 0,34% per                  - 0.34% per annum. There is no remaining
          tahun. Tidak ada lagi fasilitas yang tidak                   facilities that do not bear any provision charge.
          dikenakan provisi. Fasilitas ini berakhir antara             These facilities will expire between 2025 and
          tahun 2025 sampai dengan 2028.                               2028.
Page 177
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                      Lampiran 5/167 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                 JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                             (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                                 IKATAN             DAN    54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                                AND CONTINGENCIES (continued)

    d.    Fasilitas               pinjaman             belum              digunakan        d.        Unused loan facilities (continued)
          (lanjutan)

          Perjanjian pinjaman tidak terkait program                                                  Loan agreements not related to fast track
          percepatan                                                                                 program

          Sampai dengan tanggal penyelesaian laporan                                                 Up to the completion date of the consolidated
          keuangan konsolidasian, rincian fasilitas                                                  financial statements, the details of unused loan
          pinjaman belum digunakan tidak terkait                                                     facilities not related to fast track program are as
          program percepatan adalah sebagai berikut:                                                 follows:
                                                                                                               Fasilitas
                                                                                                               pinjaman
                                                                                        Fasilitas                belum                       Tanggal
                                                                                       maksimum/              digunakan/                    perjanjian/                 Periode
                                      Kreditur dan pembiayaan proyek/                  Maximum               Unused loan                     Date of                   Period**)
           No.                           Creditor and project funded                    facility*)            facilities*)                  agreement                Tahun/ Year

                         Fasilitas pinjaman dalam ASD/USD loan facilities

               1         Japan Bank for International Cooperation                                    108                     10           14 Maret 2016/                    16
                         PLTU Lontar Extension Facility Tr. A                                                                             March 14, 2016
               2         Japan Bank for International Cooperation                                    72                          7        14 Maret 2016/                    16
                         PLTU Lontar Extension Facility Tr. B                                                                             March 14, 2016
               4         Japan Bank for International Cooperation                                    53                      12            20 Juni 2017/                    15
                         PLTU Kalselteng 2 Facility Tr.A                                                                                   June 20, 2017
               5         Japan Bank for International Cooperation                                    36                          8         20 Juni 2017/                    15
                         PLTU Kalselteng 2 Facility Tr.B                                                                                   June 20, 2017
               7         HSBC                                                                        214                     -           19 Februari 2018/                  15
                         PLTGU Tambak Lorok III                                                                                         February 19, 2018
               8         Asian Development Bank                                                      600                 274            8 Desember 2020/                    20
                         ADB 4009-INO - RBL KMP                                                                                         December 8, 2020
               9         Asian Development Bank                                                      600                 450            31 Desember 2021/                   20
                         ADB 4164-INO - SREAP Western and Central Java                                                                  December 31, 2021
               10        AIIB                                                                        310                 213             10 Februari 2021/                  20
                         AIIB L0292A - East Java & Bali Power Distribution                                                               February 10, 2021
               11        IBRD                                                                        500                 500                7 Mei 2024/
                         IBRD 9557-ID ISLE-1 Program                                                                                        May 7, 2024
               12        Clean Technology Fund                                                       15                      15             7 Mei 2024/
                         CTF Loan TF0C1477                                                                                                  May 7, 2024
               13        Canada Clean Energy and Forest Climate Fund                                 48                      48             7 Mei 2024/
                         Canada Clean Energy and Forest Climate TF0C1478                                                                    May 7, 2024
                         Jumlah dalam USD/Total in USD                                         2,555                  1,537



                       Fasilitas pinjaman dalam EUR/EUR loan facilities

                       Fasilitas pinjaman dalam EUR/EUR loan facilities

               1       Kreditanstalt fur Wiederaufbau                                                  83                        3    15 September 2017/                  11
                       Bangkanai Peaker                                                                                               September 15, 2017
               2       Kreditanstalt fur Wiederaufbau                                                  85                        83   15 Desember 2017/                   15
                       Power Plant Kumbih                                                                                             December 15, 2017
               3       BGK                                                                             81                        18   21 Februari 2018/                   15
                       PLTU Lombok FTP-2                                                                                              February 21, 2018
               4       Kreditanstalt fur Wiederaufbau                                                 150                    148      11 Oktober 2018/                    15
                       Geothermal Energy Program                                                                                      October 11, 2018
               5       Kreditanstalt fur Wiederaufbau                                                 225                    219      5 September 2019/                   14
                       Bakaru I + II Hydro Power Project                                                                              September 5, 2019
               6       Kreditanstalt fur Wiederaufbau                                                  70                        69   5 September 2019/                   14
                       1000 Islands Renewable Energy for electrification Program                                                      September 5, 2019
               7       Mizuho Bank                                                                     85                        85   13 Maret 2020/                      12
                       Riau Peaker - Finvera Covered Facility                                                                         March 13, 2020
               8       Kreditanstalt fur Wiederaufbau                                                 255                    126      8 Desember 2020/                    15
                       KfW 29069 - RBL SNT                                                                                            December 8, 2020
               9       Kreditanstalt fur Wiederaufbau                                                  58                        58   8 Desember 2020/                    15
                       KfW 30606 - Sawangan Hydropower Plant (HPP)                                                                    December 8, 2020
           10          Kreditanstalt fur Wiederaufbau                                                  64                        64   28 Desember 2023/                    5
                       KfW Loan No.31229 - RBL SREAP Western and Central Java                                                         December 28, 2023
                       Jumlah dalam EUR/Total in EUR                                                 1,155                   872


          *)        Dalam jutaan                                                                                                                                        *) In million
         **)        Termasuk masa tenggang                                                                                                                 **) Include grace period
Page 178
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                  Lampiran 5/168 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                          FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                     JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                 (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                              IKATAN              DAN       54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                                                 AND CONTINGENCIES (continued)

    d.    Fasilitas          pinjaman              belum           digunakan                 d.      Unused loan facilities (continued)
          (lanjutan)

          Perjanjian pinjaman tidak terkait program                                                  Loan agreements not related to fast track
          percepatan (lanjutan)                                                                      program (continued)

                                                                                                                    Fasilitas
                                                                                                                    pinjaman
                                                                                               Fasilitas              belum                  Tanggal
                                                                                              maksimum/            digunakan/               perjanjian/           Periode
                                    Kreditur dan pembiayaan proyek/                           Maximum             Unused loan                Date of              Period**)
           No.                         Creditor and project funded                             facility*)          facilities*)             agreement           Tahun/ Year


                   Fasilitas pinjaman dalam JPY/JPY loan facilities

             1     Japan Bank for International Cooperation                                             16,430               1,532     14 Maret 2016/                 16
                   PLTU Lontar                                                                                                         March 14, 2016
             2     Japan Bank for International Cooperation                                             16,939               5,248     20 Juni 2017/                  15
                   PLTU Kalselteng 2                                                                                                   June 20, 2017
                   Jumlah dalam JPY/Total in JPY                                                        33,369               6,780

                   Fasilitas pinjaman dalam Rupiah/Rupiah loan facilities

            1      PT Bank Rakyat Indonesia (Persero) Tbk                                         4,506,787         567,068          14 November 2018/                10
                   Bank Loan Capex Sindikasi 2018 PKS 6 - JBT                                                                        November 14, 2018
            2      PT Bank Rakyat Indonesia (Persero) Tbk                                      20,000,000        20,000,000               4 Juli 2023/                 1
                   Kredit Modal Kerja Standby Loan (Revolving)                                                                           July 4, 2023
            3      PT Bank Syariah Mandiri (Persero) Tbk (Agen Sindikasi)                         2,846,000       1,057,271          18 Desember 2019/                10
                   4 proyek PLTU dan PLTMG Tahap II                                                                                  December 18, 2019
            4      PT BCA Tbk (Bilateral)                                                         3,000,000       3,000,000           6 Desember 2022/                 1
                   Corporate Loan Facilities BCA 2019 - Revolving                                                                    December 6, 2022
            5      PT Bank Danamon Indonesia, Tbk                                                 2,000,000       2,000,000          12 Desember 2022/                 -
                   Kredit Modal Kerja 2019-Danamon-Revolving Syariah                                                                 December 12, 2022
            6      PT Bank UOB Indonesia                                                          1,000,000       1,000,000           11 February, 2021                1
                   Kredit Modal Kerja 2021 - UOB - Revolving                                                                          February 11, 2021
            7      PT Bank HSBC Indonesia                                                         1,400,000              -               22 April 2021/                1
                   Kredit Modal Kerja 2021 - HSBC - Revolving                                                                           April 22, 2021
            8      PT Bank Maybank Indonesia, Tbk                                                 1,000,000       1,000,000             14 Maret 2022/                 1
                   Pembiayaan Musyarakah 2022 - Maybank - Revolving                                                                    March 14, 2022
            9      LPEI                                                                           3,500,000       3,500,000          20 Desember 2021/                 2
                   Kredit Modal Kerja 2021 - LPEI- Revolving                                                                         December 20, 2021
           10      MUFG                                                                           1,000,000       1,000,000              6 April 2022/                 1
                   Kredit Modal Kerja 2022 - Bank MUFG- Revolving                                                                        April 6, 2022
           11      PT Bank Mandiri, Tbk                                                           1,000,000       1,000,000           23 Agustus 2022/                 1
                   Kredit Modal Kerja 2022 - Bank Mandiri- Revolving                                                                   August 23, 2022
           12      PT Bank QNB Indonesia Tbk                                                       500,000          500,000          21 September 2022/                1
                   Kredit Modal Kerja 2022 - Bank QNB- Revolving                                                                     September 21, 2022
           13      PT Bank Negara Indonesia (Persero) Tbk                                          108,607               -           30 November 2022/                 1
                   Kredit Modal Kerja 2022 - BNI- Revolving                                                                          November 30, 2022
           14      PT Bank Permata Tbk (Agen Sindikasi)                                           2,750,000         342,415           8 Desember 2022/                10
                   Bank Loan Sindikasi 2022 PKS 4 Syariah - PLTU Timor 2x5 MW Tahap III                                               December 8,2022
           15      PT Bank Mandiri (Persero) Tbk (Agen Sindikasi)                                 9,000,000       9,000,000          29 Desember 2023/                10
                   Bank Loan Capex Sindikasi 2023 - Konvensional                                                                      December 29,2023
           16      PT Bank Syariah Indonesia (Persero) Tbk                                        1,000,000       1,000,000          29 Desember 2023/                10
                   Bank Loan Capex Sindikasi 2023 - Syariah                                                                           December 29,2023
           17      PT SMI (Persero)                                                               1,000,000       1,000,000          29 Desember 2023/                10
                   Bank Loan Capex Bilateral 2023 - Konvensional PT SMI                                                               December 29,2023
           18      PT SMI (Persero)                                                               1,000,000       1,000,000          29 Desember 2023/                10
                   Bank Loan Capex Bilateral 2023 - Syariah PT SMI                                                                    December 29,2023
           19      PT Bank Negara Indonesia (Persero) Tbk                                         5,071,000       1,010,235          18 Desember 2019/                 -
                   Bank Loan Capex Sindikasi 2019 PKS 18 - PLTU dan PLTMG Tahap I                                                     December 18,2019
           20      PT Bank Permata                                                                1,000,000       1,000,000           29 Februari 2024/                -
                   Kredit Modal Kerja 2024 - Bank Permata - Revolving                                                                 February 29 2024

                   Jumlah dalam IDR/Total in IDR                                               62,682,394        48,976,988

         *) Dalam jutaan                                                                                                                                           *) In million
         **) Termasuk masa tenggang                                                                                                                   **) Include grace period



                                                                            30 Juni/                   31 Desember/
                                                                            June 30,                   December 31,
                                                                              2024                         2023
         Tingkat suku bunga per tahun                                                                                                   Interest rate per annum
         Rupiah                                                         5.16% - 9.10%                  4.48% - 8.87%                                     Rupiah
         USD                                                            0.75% - 8.06%                  2.56% - 8.03%                                        USD
         JPY                                                            0.62% - 1.74%                  0.60% - 1.74%                                        JPY
         EUR                                                            0.40% - 5.40%                  0.40% - 6.66%                                        EUR
Page 179
                  PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                               DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/169 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,            IKATAN       DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

    e.   Program operasi dan pemeliharaan                         e.   Operation and maintenance programs

         Untuk meningkatkan dan memulihkan daya                        In order to improve and restore the performance
         guna unit pembangkit sampai pada tingkat                      of generator units up to a certain level, the
         tertentu,    Perusahaan     menandatangani                    Company has entered into Operation and
         Operation and Maintenance Agreement                           Maintenance Agreements with contractors. The
         dengan beberapa kontraktor. Nilai kontrak                     contract payment comprises fixed and variable
         terdiri dari porsi tetap dan tidak tetap.                     portions. The contractors have to meet certain
         Kontraktor diharuskan memenuhi target                         targets and will be charged a penalty if these
         tertentu dan akan dikenakan denda jika target                 targets are not met. The commitments with the
         tersebut tidak tercapai. Komitmen dengan                      contractors for the fixed portion are as follows:
         kontraktor untuk porsi tetap adalah sebagai
         berikut:
                                                                                   Nilai kontrak
                                                                                  Setara/ Contract
               Pembangkitan/                     Kontraktor/                     amount equivalent           Periode/
                Power plant                      Contractors                             Rp                  Period
         PLTU Tanjung Jati B       PT Komipo Pembangkitan Jawa Bali                       1,110,926         2011 - 2032
         PLTU Tanjung Jati B       Konsorsium/ consortium of
                                    Fortum Service OY & PT Medco Energy                     477,149         2005 - 2029
         Jumlah                                                                           1,588,074                   Total


    f.   Kontinjensi                                              f.   Contingencies

         (i)   Pada tanggal 29 Agustus 2018,                           (i)   On August 29, 2018, the Company faced an
               Perusahaan menghadapi Permohonan                              Arbitration Request filed by PT Kalimantan
               Arbitrase yang diajukan oleh PT                               Jawa Gas (“KJG”) as the Applicant against
               Kalimantan Jawa Gas (“KJG”) sebagai                           PC Muriah Ltd (“PCML”) as the first
               Pemohon melawan PC Muriah Ltd                                 defendant and the Company as the second
               (“PCML”) sebagai Termohon 1 dan                               defendant in the International Court of
               Perusahaan sebagai Termohon 2 di                              Commerce (“ICC”). The application is
               International Court of Commerce (“ICC”).                      related to the Gas Transportation
               Permohonan tersebut terkait sengketa                          Agreement (“GTA”) dispute between PCML
               Gas Transportation Agreement (“GTA”)                          as the Shipper/Seller, KJG as the
               antara PCML selaku Shipper/Penjual, KJG                       Transporter, and the Company as the
               selaku Transporter, dan Perusahaan                            Offtaker/Buyer regarding the underpayment
               selaku      Offtaker/Pembeli  mengenai                        of gas transportation costs to the PLTGU
               kekurangan pembayaran atas biaya                              Tambak Lorok since the volume of gas sent
               transportasi gas ke PLTGU Tambak Lorok                        is less than the minimum gas volume
               dikarenakan volume gas yang dikirim                           agreed.
               kurang dari volume gas minimum yang
               disepakati.

               Pemohon menuntut pengembalian sejumlah                        The Applicant demands a refund of the
               uang yang dipotong oleh Perusahaan dari                       amount deducted by the Company from the
               tagihan Pemohon sejak April 2018 dan                          Applicant's invoice since April 2018 and
               secara alternatif dengan PCML bertanggung                     alternatively with PCML being responsible
               jawab atas Ship or Pay (“SOP”) 2016-2019                      for Ship or Pay ("SOP") for 2016-2019
               senilai USD144.536.677 (nilai penuh)                          amounting to USD144,536,677 (full amount)
               ditambah biaya-biaya (pre-award dan post-                     plus costs (pre-award and post-award).
               award).

               Manajemen meyakini bahwa Perusahaan                           Management believes that the Company
               memiliki posisi yang kuat karena                              has a strong position because based on
               berdasarkan fakta hukum, kegagalan                            legal facts, the failure to deliver the agreed
               pengiriman volume gas yang disepakati                         gas volume was not caused by the
               tidak disebabkan oleh kesalahan dari                          Company's fault, but was PCML's fault due
               Perusahaan melainkan kesalahan dari                           to its failure to supply gas according to the
               PCML karena kegagalannya dalam                                agreed minimum gas volume. In addition,
               menyediakan gas sesuai volume gas                             KJG and the Company have agreed that
               minimum yang disepakati. Selain itu, KJG                      KJG frees the Company from the
               dengan Perusahaan telah menyepakati                           responsibility for paying the 2016-2019
               bahwa KJG membebaskan Perusahaan dari                         SOP, whatever the decision of the ICC
               tanggung jawab pembayaran SOP 2016-                           Assembly will be.
               2019, apapun putusan Majelis ICC nantinya.
Page 180
                        PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                     DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                    Lampiran 5/170 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                   IKATAN       DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                             AND CONTINGENCIES (continued)

    f.          Kontinjensi (lanjutan)                                f.     Contingencies (continued)
                   Pada 14 Juni 2024 Majelis ICC telah                            On June 14, 2024, the International Court of
                   memutus perkara tersebut yang pada pokok                       Commerce ("ICC") issued a verdict
                   Putusannya memenangkan PLN dengan                              essentially PLN obtained favourable
                   amar putusan antara lain menolak                               decision among other things, rejected
                   permohonan pemohon yang meminta
                   pengembalian sejumlah uang yang dipotong                       request to received refund of the amount
                   oleh Perusahaan dari tagihan Pemohon                           deducted by the company from the
                   sejak April 2018 dan secara alternatif dengan                  applicant's invoice since April 2018 and with
                   PCML bertanggung jawab atas Ship or Pay                        PCML as an alternative is responsible for
                   (“SOP”) 2016-2019 senilai USD144.536.677.                      Ship or Pay ("SOP") 2016-2019 amounted
                                                                                  to USD144.536.677.


         (ii)     Pada tanggal 7 Juni 2022, Perusahaan                     (ii)   On June 7, 2022, the Company faced a
                  menghadapi gugatan yang diajukan oleh                           lawsuit filed by Ronny Rotinsulu Tumengkol
                  Ronny Rotinsulu Tumengkol sebagai                               as a Plaintiff in the District Court of Tondano
                  Penggugat di Pengadilan Negeri Tondano                          with register No.172/Pdt.G/2022/PN.Tnn
                  dengan            register           No.                        regarding ownership of land rights in PLTA
                  172/Pdt.G/2022/PN.Tnn             terkait                       Tonsea Lama. The Plaintiff filed for losses
                  kepemilikan atas tanah di PLTA Tonsea                           amounted to Rp409,560 and a demand that
                  Lama. Penggugat mengajukan ganti rugi                           the land of 15,000 m2 with proof of ownership
                  sebesar Rp409.560 dan tuntutan bahwa                            of land rights by Land Line Book of Tonsea
                  tanah seluas 15.000 m2 dengan bukti                             Lama No. 829 Folio 80 is on behalf of
                  kepemilikan berupa Buku Garisan Tanah                           Almarhum Hendrik Nelwan.
                  Tonsea Lama No. 829 Folio 80 adalah atas
                  nama Almarhum Hendrik Nelwan.


                  Pada tanggal 5 April 2023, perkara tersebut                     On April 5, 2023, the District Court of
                  telah diputus oleh Pengadilan Negeri                            Tondano decided to declare inadmissible
                  Tondano dengan amar putusan gugatan                             the Plaintiff’s claim. On April 26, 2023, the
                  tidak    dapat     diterima.    Penggugat                       Plaintiff filed an appeal to the High Court of
                  mengajukan permohonan Banding ke                                Manado and sent the Memorandum of
                  Pengadilan      Tinggi     Manado       dan                     Appeal on April 26, 2023.
                  menyerahkan Memori Banding pada
                  tanggal 26 April 2023.

                  Pada tanggal 17 Juli 2023, Pengadilan                           On July 17, 2023, the Jakarta High District
                  Tinggi Manado telah menerbitkan Putusan                         Court decided to deny the entire Plaintiff's
                  Banding dengan amar putusan menolak                             claim. On August 15, 2023, the Plaintiff filed
                  gugatan Penggugat untuk seluruhnya.                             a cassation to the Supreme Court and
                  Pada tanggal 15 Agustus 2023, Penggugat                         submitted a Memorandum of Cassation on
                  mengajukan permohonan Kasasi ke                                 September 5, 2023.
                  Mahkamah Agung dan menyerahkan
                  Memori Kasasi pada 5 September 2023.

                  Pada tanggal 2 Mei 2024, perkara tersebut                       On May 2, 2024, the Supreme Court
                  telah diputus oleh Mahkamah Agung                               decided to deny the Plaintiff’s Cassation
                  dengan     amar     putusan     menolak                         Application.
                  permohonan Kasasi dari Penggugat
Page 181
                       PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                    DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                 Lampiran 5/171 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                               FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                          JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)      (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN     PENTING,                IKATAN      DAN     54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)

    f.           Kontinjensi (lanjutan)                             f.       Contingencies (continued)


         (iii)    Pada tanggal 12 Oktober 2023, salah satu           (iii)   On October 12, 2023, one of the members
                  anggota Konsorsium dalam Perjanjian                        of the Consortium in Agreement Number:
                  Nomor:      1594.PJ/DAN.02.01/DIR/2016                     1594.PJ/DAN.02.01/DIR/2016           regarding
                  terkait Pembangunan PLTU Kalselteng 2                      the Construction of PLTU Kalselteng 2
                  (2x100 MW) yakni Hyundai Engineering                       (2x100 MW), namely Hyundai Engineering
                  Co. Ltd (“Hyundai”) mengajukan gugatan                     Co. Ltd (“Hyundai”) filed a lawsuit against PT
                  perbuatan melawan hukum kepada PT                          PLN (Persero) through the Indonesian
                  PLN (Persero) melalui Badan Arbitrase                      National Arbitration Board (BANI) with case
                  Nasional Indonesia (BANI) dengan perkara                   registration No. 46050/X/ARBBANI/ 2023.
                  register No.46050/X/ARBBANI/ 2023.                         Hyundai is part of a consortium led by PT
                  Hyundai     merupakan      bagian    dari                  Truba Jaya Engineering, with ITOCHU
                  konsorsium yang dipimpin oleh PT Truba                     Corporation and Hyundai as the members.
                  Jaya Engineering, dengan beranggotakan
                  ITOCHU Corporation dan Hyundai.

                  Pada tahun 2022, akibat kesulitan                          In 2022, due to the financial difficulties faced
                  keuangan yang dihadapi oleh Truba,                         by Truba, the Company and the consortium
                  Perusahaan dan pihak konsorsium pun                        agreed to contract amendment No.
                  menyetujui amandemen kontrak No.                           A.04/2022, which states that the remaining
                  A.04/2022, yang menyatakan bahwa sisa                      scope of work for Truba was transferred to
                  lingkup pekerjaan Truba dialihkan kepada                   Hyundai and an extension of time for the
                  Hyundai dan perpanjangan waktu atas                        project was approved from the previous
                  proyek pun disetujui dari yang sebelumnya                  COD target of 20 July and 20 October 2020
                  target COD di tanggal 20 Juli dan 20                       to 31 December 2023. On 17 May 2023, a
                  Oktober 2020 menjadi 31 Desember 2023.                     fire accident occurred at the location
                  Pada 17 Mei 2023, terjadi kebakaran di
                                                                             project, so that contract amendments were
                  lokasi   proyek,     sehingga    dilakukan
                                                                             made regarding additional work on
                  amandemen kontrak terkait tambahan
                  pekerjaan     atas      pemulihan      dan                 recovery and maintenance for materials
                  pemeliharaan untuk material dan peralatan                  and equipment affected by the fire incident.
                  yang terkena dampak insiden kebakaran.
Page 182
                   PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/172 Schedule

  CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
  KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
  30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
  (Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,           IKATAN        DAN      54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)
   f.   Kontinjensi (lanjutan)                                   f.   Contingencies (continued)

              Hyundai beranggapan bahwa Perusahaan                          Hyundai believes that the Company has
              melakukan perbuatan melawan hukum                             committed an unlawful act, hence in this
              sehingga dalam gugatan ini, Hyundai                           lawsuit, Hyundai is asking for compensation
              meminta ganti kerugian terkait biaya yang                     related to costs arising from the transfer of
              timbul akibat pengalihan ruang lingkup,                       scope, extension of work contract time and
              perpanjangan waktu kontrak pekerjaan                          costs arising from a fire incident with a total
              serta biaya yang timbul akibat terjadinya                     demand of Rp2,910,782. As of the
              peristiwa kebakaran dengan total tuntutan                     completion date of these consolidated
              sebesar Rp2.910.782. Sampai dengan                            financial statements, this case is still in
              tanggal penyelesaian laporan keuangan                         process at BANI.
              konsolidasian ini, perkara ini masih dalam
              proses di BANI.

        (v)   Pada tanggal 8 Agustus 2023, Perusahaan                 (v)   On August 8, 2023, the Company received
              menghadapi         gugatan        Nomor                       a lawsuit Number 46033/VIII/ARB-
              46033/VIII/ARB-BANI/2023 yang diajukan                        BANI/2023 filed by PT Truba Jaya
              oleh PT Truba Jaya Engineering (“Truba”)                      Engineering (“Truba”) at BANI regarding
              di BANI terkait proyek pembangunan                            the PLTMG Package 2 construction
              PLTMG Paket 2. Truba mengklaim bahwa                          project. Truba claims that the project
              atas keterlambatan proyek yang terjadi                        delays occurred due to financial difficulties,
              disebabkan kesulitan keuangan yang salah                      one of which was caused by a delay in
              satunya disebabkan karena adanya                              payment of invoice by the Company.
              keterlambatan pembayaran tagihan oleh
              Perusahaan.

              Truba mengajukan permohonan arbitrase                         Truba submitted a request for arbitration
              (konvensi) dan menuntut Perusahaan                            (convention) and sued the Company for
              sebesar     Rp250.980.    Di sisi      lain,                  Rp250,980. On the other hand, the
              Perusahaan mengajukan gugatan balik                           Company         filed    a       counterclaim
              (rekonvensi)     kepada   Truba     karena                    (reconvention) against Truba as the
              Perusahaan berpandangan Truba telah                           Company was of the view that Truba had
              melakukan wanprestasi yang ditunjukkan                        committed a breach of contract as
              dengan tidak dapat terselesaikannya                           demonstrated by the failure to complete this
              proyek ini. Pada tanggal 31 Januari 2024,                     project. On January 31, 2024, the decision
              putusan terhadap kasus ini telah dibacakan                    in this case was read orally at BANI with the
              secara lisan di BANI dengan amar putusan                      convention ruling stating that the Company
              konvensi menyatakan bahwa Perusahaan                          must pay Truba the invoice for payment of
              harus membayar kepada Truba atas                              work progress amounting to Rp39,139. The
              tagihan pembayaran progress pekerjaan                         reconvention decision stated that the
              sebesar     Rp39.139.    Amar      putusan                    PLTMG Package 2 Agreement ended due
              rekonvensi menyatakan bahwa Perjanjian                        to termination on the grounds that Truba had
              PLTMG Paket 2 berakhir karena                                 defaulted and Truba had an obligation to pay
              pemutusan dengan alasan Truba telah                           the Company Rp43,332. On 27 February
              melakukan wanprestasi serta Truba                             2024, this decision had been registered in
              memiliki kewajiban untuk membayar                             South Jakarta District Court with register No.
              kepada Perusahaan sebesar Rp43.332.                           02/ARB/HKM/2024/ PN.Jak.Sel.
              Pada tanggal 27 Februari 2024, putusan ini
              telah selesai didaftarkan di Pengadilan
              Negeri Jakarta Selatan dengan register No.
              02/ARB/HKM/2024/PN.Jak.Sel.

              Pada tanggal 22 Mei 2024, Truba telah                         On May 22, 2024, Truba has been revoked
              melakukan     pencabutan     permohonan                       a petition to annul BANI's decision to the
              pembatalan putusan BANI ke Pengadilan                         South Jakarta District Court with register No.
              Negeri Jakarta Selatan dengan register No.                    316/Pdt.Sus-Arbt/2024/PN.Jkt.Sel.
              316/Pdt.Sus-Arbt/2024/PN.Jkt.Sel.
Page 183
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                  Lampiran 5/173 Schedule

  CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE CONSOLIDATED
  KONSOLIDASIAN                                                                                  FINANCIAL STATEMENTS
  30 JUNI 2024 DAN 31 DESEMBER 2023                                             JUNE 30, 2024 AND DECEMBER 31, 2023
  (Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)         (Expressed in millions of Rupiah, unless otherwise stated)

54. PERJANJIAN      PENTING,             IKATAN         DAN        54. SIGNIFICANT AGREEMENTS, COMMITMENTS
    KONTINJENSI (lanjutan)                                             AND CONTINGENCIES (continued)

   f.    Kontinjensi (lanjutan)                                       f.        Contingencies (continued)

         (vi) Grup juga menghadapi gugatan ganti rugi                       (vi)     The Group is also facing claims for
              dalam jumlah yang tidak material di                                    compensation in immaterial amounts at
              beberapa lokasi bangunan jaringan                                      several transmission or distribution
              transmisi atau distribusi, perselisihan                                network building locations, disputes with
              dengan karyawan, perkara dengan                                        employees, cases with customers and
              pelanggan dan pemasok. Terhadap                                        suppliers. Regarding immaterial claims,
              gugatan yang tidak material tersebut,                                  management follows up in accordance
              manajemen menindaklanjutinya sesuai                                    with the provisions of applicable laws and
              dengan ketentuan peraturan perundang-                                  regulations. Management believes that
              undangan yang berlaku. Manajemen                                       these claims are not material and do not
              berpendapat klaim-klaim tersebut tidak                                 affect the Group's business activities.
              material dan tidak mempengaruhi kegiatan
              usaha Grup.

               Sampai dengan tanggal penyelesaian                                    As of the completion date of these
               laporan keuangan konsolidasian ini, atas                              consolidated financial statements, the
               litigasi-litigasi yang masih dalam proses                             litigation that is still in process cannot be
               tersebut, belum dapat diestimasikan secara                            estimated reliably and management is of
               andal dan manajemen berpendapat bahwa                                 the opinion that the Group has a strong
               Grup memiliki dasar yang kuat dalam                                   basis in these cases, so that the allowance
               perkara tersebut, sehingga penyisihan                                 for losses recorded in these consolidated
               kerugian yang dibukukan dalam laporan                                 financial statements is sufficient to cover
               keuangan konsolidasian ini cukup untuk                                possible future losses.
               menutupi kemungkinan kerugian di masa
               yang akan datang.


  55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                          55. FINANCIAL INSTRUMENTS, FINANCIAL RISK AND
      KEUANGAN DAN RISIKO MODAL                                         CAPITAL RISK MANAGEMENT

        a.   Kategori dan klasifikasi instrumen keuangan                   a.     Categories  and        classes      of    financial
                                                                                  instruments

             Pada tanggal 30 Juni 2024 dan 31 Desember                            As at June 30, 2024 and December 31, 2023, the
             2023, Grup mengklasifikasikan kas dan setara                         Group classified its cash and cash equivalents,
             kas, piutang usaha, piutang dari Pemerintah,                         trade receivables, receivables from Government,
             piutang lain-lain, piutang pihak berelasi, rekening                  other receivables, receivables from related parties,
             bank dibatasi penggunaannya, dan investasi                           restricted cash in banks and short term
             jangka pendek sebesar Rp126.390.761 (2023:                           investments amounting to Rp126,390,761 (2023:
             Rp116.125.129) sebagai aset keuangan yang                            Rp116,125,129) as financial assets at amortised
             diukur pada biaya perolehan diamortisasi dan                         cost and derivative assets were classified by the
             aset derivatif yang diklasifikasikan oleh Grup                       Group as derivative financial instruments through
             sebagai instrumen keuangan derivatif yang                            profit or loss amounting to Rp137,011 (2023:
             dicatat pada laba rugi sebesar Rp137.011 (2023:                      Rp6,258).
             Rp6.258).

             Pada tanggal 30 Juni 2024 dan 31 Desember                            As at June 30, 2024, the Group classified its trade
             2023, Grup mengklasifikasikan utang usaha,                           payables, accrued expenses, customer security
             biaya masih harus dibayar, uang jaminan                              deposits, project cost payable, accrued expenses,
             langganan, utang biaya proyek, utang                                 two-step loans, Government and non-bank
             penerusan pinjaman, utang kepada Pemerintah                          Government financial institution loans, lease
             dan lembaga keuangan Pemerintah non-bank,                            liabilities, bank loans, bonds payable and sukuk
             utang sewa, utang bank, utang obligasi dan                           ijara, electricity purchase payable, and other
             sukuk ijarah, utang listrik swasta, dan utang lain-                  payables amounting to Rp500,067,303 (2023:
             lain     sebesar        Rp500.067.303        (2023:                  Rp492,945,917) as financial liabilities carried at
             Rp492.945.917) sebagai kewajiban keuangan                            amortised cost and derivative liabilities were
             yang diukur pada biaya perolehan diamortisasi                        classified by the Group as derivative financial
             dan liabilitas derivatif yang diklasifikasikan oleh                  instruments through profit or loss amounting to
             Grup sebagai instrumen keuangan derivatif yang                       Rp28,709 (2023: Rp201,359).
             dicatat pada laba rugi sebesar Rp28.709 (2023:
             Rp201.359).
Page 184
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/174 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                        AND CAPITAL RISK MANAGEMENT (continued)

    b.   Manajemen risiko modal                                b.   Capital risk management

         Grup mengelola risiko modal untuk memastikan               The Group manages capital risk to ensure that it
         bahwa mereka akan mampu untuk melanjutkan                  will be able to continue as a going concern and to
         kelangsungan usaha dan untuk memastikan                    ensure compliance with the covenants of the
         pemenuhan batasan rasio kecukupan modal.                   capital adequacy ratio. The Group’s capital
         Struktur modal Grup terdiri dari pinjaman                  structure consists of debt (Notes 24, 25, 26, 27,
         (Catatan 24, 25, 26, 27, 28 dan 29) dan ekuitas            28 and 29) and equity attributable to owners of
         pemegang saham induk, yang terdiri dari modal              the parent consisting of capital stock (Note 21),
         yang ditempatkan (Catatan 21), saldo laba, dan             retained earnings, and additional paid-in capital
         tambahan modal disetor (Catatan 22).                       (Note 22).

         Direksi Grup secara berkala melakukan                      The Directors of the Group periodically review the
         tinjauan struktur permodalan Grup. Sebagai                 Group’s capital structure. As part of this review,
         bagian      dari   tinjauan   ini,  Direksi                the Board of Directors considers the cost of
         mempertimbangkan biaya permodalan dan                      capital and related risks.
         risiko yang berhubungan.

         Batasan pinjaman Grup mensyaratkan antara                  The Group’s loan covenants require among other
         lain pemenuhan rasio pinjaman terhadap                     things, the fulfillment of a certain debt to equity
         ekuitas dan rasio kecukupan modal.                         ratio and capital adequacy ratio. Management
         Manajemen      secara   berkala  memonitor                 regularly monitors such requirements to ensure
         persyaratan tersebut untuk memastikan tidak                that there are no defaults on the loans of the
         terdapat pelanggaran dalam batasan pinjaman                Company.
         Perusahaan.

         Grup berusaha untuk meminimalkan biaya                     The Group aims to minimise the cost of debt in
         pinjaman sehingga dapat memaksimalkan nilai                order to maximise its value. Therefore, in its
         Grup. Oleh karena itu, kebijakan Grup dalam                financing policies, the Group always takes into
         mencari pendanaan melalui utang selalu                     account the financial risk that may arise in the
         memperhitungkan risiko keuangan yang                       future.
         mungkin timbul di masa depan.

    c.   Tujuan dan kebijakan manajemen risiko                 c.   Financial risk management objectives and
         keuangan                                                   policies

         Tujuan dan kebijakan manajemen risiko                      The objectives and policies of the Group’s
         keuangan Grup adalah untuk memastikan                      financial risk management are to ensure that
         bahwa sumber daya keuangan yang memadai                    adequate financial resources are available for the
         tersedia untuk operasi dan pengembangan                    operation and development of their business,
         bisnis, serta untuk mengelola risiko pasar                 while managing their exposure to market risks
         (termasuk risiko mata uang asing dan risiko                (including foreign currency risk and interest rate
         tingkat suku bunga), risiko kredit dan risiko              risk), credit risk and liquidity risk. The Group
         likuiditas. Grup beroperasi dengan kebijakan               operates within defined policies approved by the
         yang telah ditentukan oleh Direksi.                        Directors.

         Dalam pengelolaan risiko, Grup membentuk                   In managing those risks, the Group established a
         Subdirektorat Manajemen Risiko (“SEVP Risk                 subdirectorate of Risk Management (“SEVP Risk
         Management”) yang bertanggung jawab                        Management”) which is responsible for the
         terhadap penyusunan kebijakan, kerangka                    preparation of the policies, the relevant
         kerja, pedoman penerapan manajemen risiko                  frameworks, implementation guidelines and the
         dan infrastruktur pengelolaan risiko, serta                necessary risk management infrastructure to
         memastikan implementasi manajemen risiko                   ensure the implementation of risk management in
         tersebut di lingkungan Grup. Subdirektorat ini             the Group’s environment. The subdirectorate is
         juga bertugas untuk memfasilitasi penyusunan               also established to facilitate a strategic risk profile
         profil risiko yang bersifat strategis sebagai              as an early warning to the Group’s management.
         himbauan awal kepada manajemen Grup.                       SEVP Risk Management is responsible to the
         SEVP Risk Management bertanggung jawab                     Director of Finance.
         kepada Direktur Keuangan.
Page 185
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/175 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                             FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                        JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)    (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                     55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                         AND CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan manajemen risiko                  c.   Financial risk management objectives and
         keuangan (lanjutan)                                         policies (continued)

         Grup telah menetapkan taksonomi risiko                      The Group has established a risk taxonomy by
         dengan membagi risiko menjadi lima kelompok                 dividing risk into five categories, such as strategic
         yaitu risiko strategis, risiko keuangan, risiko             risk, financial risk, operational risk, project risk
         operasional, risiko proyek, dan risiko                      and compliance risk. Financial risk includes
         kepatuhan. Risiko keuangan diantaranya                      market risk (including foreign currency risk and
         adalah risiko pasar (termasuk risiko mata uang              interest rate risk), credit risk, and liquidity risk. In
         asing dan risiko tingkat suku bunga), risiko                managing those risks, the Group considers
         kredit, dan risiko likuiditas. Dalam mengelola              prioritisation based on risk level. Risk level is
         risiko, Grup mempertimbangkan skala prioritas               determined by the level of possibility and scale of
         yang didasarkan pada tingkat risikonya. Tingkat             potential impact.
         risiko    ditentukan     berdasarkan     tingkat
         kemungkinan terjadinya dan skala dampak
         yang ditimbulkan.

         Terkait dengan risiko keuangan, Grup telah                  Related to financial risks, the Group has
         menetapkan kebijakan manajemen untuk                        established management’s policy related to
         melakukan transaksi lindung nilai. Sebagai                  hedging transactions. As a SOE, the approved
         salah satu BUMN, kebijakan manajemen yang                   management policy is very important in order to
         telah disetujui menjadi sangat penting agar                 avoid any issues that may arise during the
         tidak timbul masalah pada waktu pelaksanaan                 implementation of such hedging programs. All
         akuntansi lindung nilai tersebut. Seluruh                   derivative instruments are recognised in the
         instrumen derivatif dicatat dalam laporan posisi            consolidated statement of financial position at
         keuangan konsolidasian berdasarkan nilai                    their fair values. Fair value is determined based
         wajarnya. Nilai wajar tersebut ditentukan                   on market value using the Bloomberg rate at the
         berdasarkan        harga       pasar      dengan            reporting date. Derivative assets or liabilities are
         menggunakan kurs Bloomberg pada tanggal                     presented as the amount of unrealised gain or
         laporan. Aset dan liabilitas derivatif disajikan            loss from derivative contracts. The Group’s
         sebesar keuntungan maupun kerugian yang                     derivative contracts are classified as financial
         belum direalisasi dari kontrak derivatif. Kontrak           assets measured at FVTPL. These transactions
         derivatif Grup diklasifikasikan sebagai aset                are solely intended for mitigating foreign
         keuangan yang diukur pada FVTPL. Transaksi                  exchange risk, not for trading and ensuring the
         ini      semata-mata     dimaksudkan        untuk           availability of foreign currency liquidity for
         memitigasi risiko nilai tukar, tidak untuk                  principal and interest payments due in the 1-3
         diperdagangkan,          dan         memastikan             months of the Group’s reporting period. Refer to
         ketersediaan likuiditas valas untuk pembayaran              Note 3 for the accounting policy of financial
         sebagian kewajiban valas yang jatuh tempo                   assets and liabilities for the financial instruments
         dalam jangka waktu 1-3 bulan pada periode                   classification. The Group does not apply hedge
         pelaporan Grup. Lihat Catatan 3 untuk                       accounting on those transactions.
         kebijakan akuntansi untuk aset keuangan dan
         liabilitas keuangan untuk klasifikasi instrumen
         keuangan. Grup tidak menerapkan akuntansi
         lindung nilai atas transaksi-transaksi tersebut.

         Manajemen risiko mata uang asing                            Foreign currency risk management

         Grup memiliki banyak transaksi dan sumber                   The Group undertakes many transactions and
         pendanaan dalam mata uang asing. Sebagai                    funding sources denominated in foreign
         akibatnya timbul eksposur terhadap fluktuasi                currencies. Consequently, there are exposures to
         nilai tukar mata uang asing.                                exchange rate fluctuations.
Page 186
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                                    Lampiran 5/176 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                                          (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                                          55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                                                              AND CAPITAL RISK MANAGEMENT (continued)

    c.    Tujuan dan kebijakan manajemen risiko                                                                            c.       Financial risk management objectives and
          keuangan (lanjutan)                                                                                                       policies (continued)

          Manajemen risiko mata uang asing (lanjutan)                                                                               Foreign     currency                            risk             management
                                                                                                                                    (continued)

          Grup telah melakukan diskusi dengan Bank                                                                                  The Group holds regular discussions with Bank
          Indonesia   (“BI”)   untuk    mendapatkan                                                                                 Indonesia (“BI") to get a comprehensive
          pemahaman komprehensif atas keadaan                                                                                       understanding of the market outlook. The Group
          pasar.     Grup        kemudian        akan                                                                               then incorporates this outlook into its internal
          mempertimbangkan keadaan pasar ke dalam                                                                                   financial forecasts and develops a concerted
          proyeksi keuangan internal mereka dan                                                                                     strategy to mitigate its foreign currency exposure
          mengembangkan strategi yang telah disetujui                                                                               by purchasing the required foreign currency
          bersama untuk memitigasi eksposur risiko                                                                                  denominated instruments at the right time.
          mata uang asing dengan membeli instrumen
          mata uang asing yang dibutuhkan disaat yang
          tepat.

          Jumlah eksposur mata uang asing bersih Grup                                                                               The Group’s foreign currency exposure as at the
          pada tanggal pelaporan diungkapkan dalam                                                                                  reporting date is disclosed in Note 52.
          Catatan 52.

          Sensitivitas mata uang asing                                                                                              Foreign currency sensitivity

          Tabel di bawah ini memaparkan rincian                                                                                     The following table explains the details of the
          sensitivitas Grup untuk setiap 10% kenaikan                                                                               Group’s sensitivity to a 10% increase and
          dan penurunan Rupiah terhadap mata uang                                                                                   decrease in Rupiah against the relevant foreign
          asing yang relevan. Kenaikan dan penurunan                                                                                currencies. This 10% increase or decrease
          10% menggambarkan penilaian manajemen                                                                                     represents management’s assessment of the
          terhadap perubahan yang rasional pada nilai                                                                               reasonably possible changes in foreign currency
          tukar dengan mempertimbangkan kondisi                                                                                     rates considering the current economic
          ekonomi saat ini. Analisis sensitivitas ini                                                                               conditions. The sensitivity analysis includes after
          mencakup saldo item moneter setelah pajak                                                                                 tax outstanding foreign denominated monetary
          dalam mata uang asing dan menyesuaikan                                                                                    items and adjusts their translation at the end of
          translasi pada akhir tahun untuk 10%                                                                                      the year for a 10% change in foreign currency
          perubahan dalam nilai tukar mata uang asing.                                                                              rates.

                                                                                                                  30 Juni/ June 30, 2024
                                                                            USD                             JPY                                 EUR                       Others
                                                                   10%             -10%           10%              -10%              10%               -10%        10%             -10%
         Aset keuangan                                                                                                                                                                                               Financial assets
         Piutang pihak berelasi                                       96,775         (96,775)         -                 -               -                   -           -              -              Receivables from related parties
         Rekening dan deposito Berjangka dibatasi penggunaannya       73,112         (73,112)     194,567          (194,567)            -                   -           -              -    Restricted cash in banks and time deposits
         Kas dan setara kas                                          565,659        (565,659)      11,532           (11,532)         13,990             (13,990)      3,192         (3,192)                 Cash and cash equivalents
         Investasi jangka pendek                                       1,507          (1,507)                                                                                                                    Short term investment
         Jumlah aset keuangan                                        737,053        (737,053)     206,099          (206,099)         13,990             (13,990)      3,192         (3,192)                     Total financial assets

         Liabilitas keuangan                                                                                                                                                                                        Financial liabilities
         Penerusan pinjaman                                        (1,037,185)     1,037,185    (1,098,154)       1,098,154          (11,896)            11,896         -              -                                 Two-step loans
         Utang sewa                                                   (37,313)        37,313       (94,021)          94,021              -                  -           -              -                                 Lease liabilities
         Utang bank dan surat utang jangka menengah                (4,679,391)     4,679,391    (1,085,357)       1,085,357       (1,127,567)         1,127,567         -              -            Bank loans and medium term notes
         Utang obligasi                                           (13,028,121)    13,028,121      (154,969)         154,969       (1,367,605)         1,367,605         -              -                                  Bonds payable
         Utang listrik swasta                                        (445,806)       445,806           -                -                -                  -           -              -                   Electricity purchase payable
         Utang lain-lain                                              (96,539)        96,539       (17,207)          17,207          (21,023)            21,023         -              -                                 Other payables
         Utang biaya proyek                                           (41,294)        41,294       (43,842)          43,842           (2,749)             2,749         -              -                            Project cost payable
         Utang usaha                                               (2,104,230)     2,104,230           -                -                -                  -       (18,616)        18,616                               Trade payables
         Biaya masih harus dibayar                                   (205,399)       205,399       (26,998)          26,998          (26,002)            26,002         -              -                              Accrued expenses
         Jumlah liabilitas keuangan                               (21,675,278)    21,675,278    (2,520,548)       2,520,548       (2,556,842)         2,556,842     (18,616)        18,616                     Total financial liabilities

         Jumlah - bersih                                          (20,938,225)    20,938,225    (2,314,449)       2,314,449       (2,542,852)         2,542,852     (15,424)        15,424                                     Total-net



          *)     Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                                                        *)     Not considering the effect of borrowing cost capitalisation
          **)    Mata uang asing lainnya disajikan dalam jumlah setara USD menggunakan                                              **)    Other foreign currencies are presented as USD equivalent using the exchange rates
                 kurs tanggal pelaporan                                                                                                    prevailing at reporting date
Page 187
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                 Lampiran 5/177 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                           FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                      JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                  (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                 55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                                     AND CAPITAL RISK MANAGEMENT (continued)

    c.     Tujuan dan kebijakan manajemen risiko                                                c.      Financial risk management objectives and
           keuangan (lanjutan)                                                                          policies (continued)

           Sensitivitas mata uang asing (lanjutan)                                                      Foreign currency sensitivity (continued)
                                                                               Dampak terhadap laba setelah pajak/
                                                                                    Effect to profit after tax*)
                                                                                31 Desember/ December 31, 2023
                                            USD                               JPY                            EUR                       Lain-lain/Others**)
                                     10%           -10%          10%              -10%            10%                 -10%            10%            -10%

         Aset keuangan                                                                                                                                                Financial assets
                                                                                                                                                                      Receivables from
         Piutang pihak berelasi        96,806        (96,806)            -                 -                  -                -              -               -       related parties
         Rekening bank dibatasi                                                                                                                                               Restricted
             penggunaannya             74,028        (74,028)     268,485           (268,485)                 -                -              -               -        cash in banks
                                                                                                                                                                         Cash and cash
         Kas dan setara kas         1,195,229     (1,195,229)      21,112            (21,112)        43,313             (43,313)          1,394          (1,394)          equivalents
         Investasi jangka pendek       58,401        (58,401)           -                  -              -                   -               -               - Short-term investments

         Jumlah aset keuangan       1,424,464     (1,424,464)     289,597           (289,597)        43,313             (43,313)          1,394          (1,394)   Total financial assets

         Liabilitas keuangan                                                                                                                                        Financial liabilities
         Penerusan pinjaman         (1,046,180)    1,046,180    (1,220,333)        1,220,333         (12,601)            12,601               -               -          Two-step loans
         Utang sewa                    (38,937)       38,937      (106,119)          106,119               -                  -               -               -          Lease liabilities
         Utang bank dan                                                                                                                                                        Bank loans
            surat utang                                                                                                                                                  and medium
            jangka menengah         (4,952,687)    4,952,687    (1,274,030)        1,274,030     (1,163,867)          1,163,867               -               -            term notes
         Utang obligasi dan                                                                                                                                          Bonds payable and
            sukuk ijarah           (12,269,193)   12,269,193     (166,102)           166,102     (1,332,731)          1,332,731               -               -             sukuk ijara
                                                                                                                                                                     Electricity purchase
         Utang listrik swasta         (441,153)      441,153            -                  -               -                  -               -              -               payables
         Utang lain-lain              (139,072)      139,072      (28,695)            28,695         (30,843)            30,843               -              -           Other payables
         Utang biaya proyek            (31,015)       31,015      (34,896)            34,896          (2,127)             2,127               -              -     Project cost payables
         Utang usaha                (1,725,603)    1,725,603            -                  -               -                  -         (10,211)        10,211           Trade payables
         Biaya masih harus
            dibayar                  (241,383)      241,383       (49,428)            49,428         (10,134)            10,134               -               -       Accrued expenses

         Jumlah liabilitas                                                                                                                                                 Total financial
            keuangan               (20,885,223)   20,885,223    (2,879,603)        2,879,603     (2,552,303)          2,552,303         (10,211)        10,211               liabilities

         Jumlah - bersih           (19,460,759)   19,460,759    (2,590,006)        2,590,006     (2,508,990)          2,508,990          (8,817)         8,817               Total – net


           *)    Tidak memperhitungkan efek atas kapitalisasi biaya pinjaman                            *)        Not considering the effect of borrowing cost capitalisation
           **)   Mata uang asing lainnya disajikan dalam jumlah setara USD                              **)       Other foreign currencies are presented as USD equivalent using the
                 menggunakan kurs tanggal pelaporan                                                               exchange rates prevailing at reporting date


           Manajemen risiko tingkat suku bunga                                                          Interest rate risk management

           Grup memiliki transaksi pada tingkat suku                                                    The Group has transactions at fixed and floating
           bunga tetap dan tingkat suku bunga                                                           interest rates. Transactions at floating interest
           mengambang. Transaksi dengan tingkat suku                                                    rates are exposed to cash flow interest rate risk.
           bunga mengambang terekspos terhadap risiko                                                   Borrowing issued at fixed rates exposes the
           suku bunga arus kas. Pinjaman yang                                                           Group to fair value interest risk. The Group
           diterbitkan dengan tingkat suku bunga tetap                                                  manages the risk by maintaining an appropriate
           mengekspos Grup dengan risiko suku bunga                                                     mix of fixed and floating rate borrowings.
           nilai wajar. Grup mengelola risiko dengan
           menyeimbangkan porsi pinjaman dengan
           bunga tetap dan bunga mengambang.
Page 188
                     PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                  DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                Lampiran 5/178 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                           JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)       (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                       55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                           AND CAPITAL RISK MANAGEMENT (continued)

    c.    Tujuan dan kebijakan manajemen risiko                       c.   Financial risk management objectives and
          keuangan (lanjutan)                                              policies (continued)

          Sensitivitas tingkat suku bunga                                  Interest rate sensitivity

          Analisis sensitivitas berikut telah ditentukan                   The sensitivity analysis below has been
          berdasarkan eksposur Grup terhadap tingkat                       determined based on the Group’s exposure to
          suku bunga untuk saldo instrumen keuangan                        interest rates for financial instruments after tax
          terutang setelah pajak pada tanggal pelaporan.                   outstanding at the reporting date. The analysis is
          Analisis ini disusun dengan mengasumsikan                        prepared assuming the amount of assets and
          jumlah saldo aset dan liabilitas terutang pada                   liabilities outstanding at the end of the reporting
          akhir tahun pelaporan, terutang sepanjang                        period was outstanding for the whole year. The
          tahun. Analisis sensitivitas ini menggunakan                     sensitivity analysis uses an assumption of a 50
          asumsi kenaikan dan penurunan sebesar 50                         basis point (“bp”) increase and decrease in the
          basis poin (“bp”) pada tingkat bunga yang                        relevant interest rates with all other variables held
          relevan dengan variabel lain dianggap konstan.                   constant. A 50 bp increase or decrease
          Kenaikan dan penurunan sebesar 50 bp                             represents management’s assessment of the
          merupakan      penilaian    manajemen      atas                  reasonably possible change in interest rates after
          kemungkinan perubahan yang rasional                              considering the current economic conditions.
          terhadap       tingkat      bunga       setelah
          mempertimbangkan kondisi ekonomi saat ini.

                                                   Dampak terhadap laba setelah pajak/
                                                        Effect to profit after tax
                                                          30 Juni/ June 30, 2024
                                                      +50 bp                     -50bp


         Aset                                                                                                              Assets
         Rekening dan deposito berjangka                                                             Restricted cash in banks and
         dibatasi penggunaannya                              14,139                   (14,139)                       time deposits
         Kas dan setara kas                                 116,645                  (116,645)          Cash & cash equivalents
         Investasi jangka pendek                                634                      (634)             Short-term investments
         Subjumlah laba (rugi)                              131,419                  (131,419)              Subtotal income (loss)


         Liabilitas                                                                                                   Liabilities
         Penerusan pinjaman                                 (107,224)                    107,224                  Two-step loans
         Utang bank                                         (541,649)                    541,649                    Bank loans
         Subjumlah laba (rugi)                              (648,872)                    648,872           Subtotal income (loss)
         Total laba (rugi)                                  (517,454)                    517,454             Total income (loss)




                                                              Dampak terhadap
                                                             laba setelah pajak/
                                                           Effect to profit after tax
                                                                     2023
                                                         + 50 bp               - 50 bp

         Aset keuangan                                                                                             Financial assets
         Kas dan setara kas                                   218,053             (218,053)             Cash and cash equivalents
         Rekening bank dan deposito berjangka                                                          Restricted cash in banks and
            dibatasi penggunaannya                             17,679              (17,679)                          time deposits
         Investasi jangka pendek                                3,563               (3,563)                  Short-term investments

         Subjumlah laba/(rugi)                                239,295             (239,295)                  Subtotal income/(loss)

         Liabilitas Keuangan                                                                                   Financial Liabilities
         Penerusan pinjaman                                  (113,815)            113,815                           Two-step loans
         Utang bank                                          (580,407)            580,407                               Bank loans

         Subjumlah (rugi)/laba                               (694,222)            694,222                    Subtotal (loss)/income

         Total (rugi)/laba                                   (454,927)            454,927                      Total (loss)/income
Page 189
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/179 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                        AND CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan manajemen risiko                 c.   Financial risk management objectives and
         keuangan (lanjutan)                                        policies (continued)

         Manajemen risiko kredit                                    Credit risk management

         Risiko kredit mengacu pada risiko bahwa pihak              Credit risk refers to the risk that the counterparties
         ketiga akan gagal dalam memenuhi kewajiban                 will default on their contractual obligations
         kontraktualnya yang mengakibatkan kerugian                 resulting in a loss to the Group. As a company
         bagi Grup. Sebagai perusahaan yang diberikan               that performs a public service obligation on behalf
         kewajiban untuk melayani publik oleh                       of the Government of the Republic of Indonesia,
         Pemerintah     Republik    Indonesia,    Grup              the Group is obliged to serve all customers
         diwajibkan melayani semua pelanggan tanpa                  regardless of the ability to pay. To minimise the
         melihat apakah nantinya akan bisa membayar                 risk of uncollected receivables, the Group collects
         atau tidak. Dalam meminimalkan risiko tidak                customer security deposits and will terminate the
         tertagihnya piutang, Grup menerapkan uang                  electricity connection to the customer if a
         jaminan pelanggan dan melakukan pemutusan                  customer does not make payment on time after
         sambungan listrik ke pelanggan ditentukan jika             three-months to minimise the Group’s credit risk.
         pelanggan tidak membayar lewat dari Enam                   For cash and cash equivalents, the Group
         bulan untuk meminimalkan risiko kredit. Untuk              maintains accounts with several banks to avoid a
         kas dan setara kas, Grup mengelola rekening                significant concentration of cash with one
         pada beberapa bank untuk menghindari                       institution.
         konsentrasi kas yang signifikan pada satu
         institusi.

         Nilai tercatat aset keuangan pada laporan                  The carrying amount of financial assets recorded
         keuangan konsolidasian setelah dikurangi                   in the consolidated financial statements, net of
         dengan        penyisihan     untuk      kerugian           any allowance for losses represents the Group’s
         mencerminkan eksposur Grup terhadap risiko                 exposure to credit risk. See Note 55.a for details.
         kredit. Lihat Catatan 55.a untuk rinciannya.

         Pada tanggal 30 Juni 2024, jumlah maksimum                 As at June 30, 2024, the total maximum exposure
         eksposur     dari    risiko   kredit    adalah             from credit risk was Rp126,374,404 (2023:
         Rp126.374.404 (2023: Rp116.115.590). Risiko                Rp116,115,590). Credit risk arises from cash in
         kredit terutama berasal dari kas di bank,                  banks, time deposits, trade receivables,
         deposito berjangka, piutang usaha, piutang dari            receivables from the Government, other
         Pemerintah, piutang lain-lain, piutang pihak               receivables, receivables from related parties,
         berelasi,     rekening      bank       dibatasi            restricted cash in banks and short-term
         penggunaannya, dan investasi jangka pendek.                investments.

         Kualitas kredit piutang usaha                              Credit quality of trade receivables

         Grup berkeyakinan bahwa tidak ada risiko                   The Group believes that there is no significant
         kredit kualitas signifikan yang terpusat karena            concentration of credit quality risk because its
         piutang usaha Grup tersebar merata atas                    trade receivables are spread over a large number
         jumlah pelanggan yang besar yang meliputi                  of customers across diverse industries covering
         berbagai jenis pelanggan baik ritel maupun                 various types of customers, both retail and
         industrial yang tersebar di setiap wilayah                 industrial, which are spread across a number of
         geografis. Grup juga melakukan evaluasi kredit             geographic areas. The Group also performs
         berkelanjutan atas piutang usaha secara                    ongoing credit evaluation of its trade receivables.
         berkala. Lihat Catatan 15 untuk rincian umur               See Note 15 for detailed information of the aging
         piutang usaha dan penilaian penurunan nilai                of trade receivables and impairment assessment
         piutang usaha.                                             of trade receivables.

         Kualitas kredit piutang dari pemerintah                    Credit quality of        receivables     from     the
                                                                    Government

         Grup berkeyakinan bahwa piutang dari                       The Group believes that receivables from the
         pemerintah dapat diterima sepenuhnya dalam                 Government can be fully recovered in time from
         jangka waktu yang telah ditentukan dari                    the Government of the Republic of Indonesia.
         Pemerintah    Republik    Indonesia.  Grup                 The Group believes there is no risk of default by
         berkeyakinan bahwa tidak ada risiko gagal                  the Government.
         bayar oleh Pemerintah.
Page 190
                 PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                              DAN ENTITAS ANAK/AND SUBSIDIARIES

                                             Lampiran 5/180 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                            FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                       JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)   (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                    55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                        AND CAPITAL RISK MANAGEMENT (continued)

    c.   Tujuan dan kebijakan manajemen risiko                 c.   Financial risk management objectives and
         keuangan (lanjutan)                                        policies (continued)

         Manajemen risiko kredit (lanjutan)                         Credit risk management (continued)

         Kualitas kredit kas di bank, deposito                      Credit quality of cash in banks, time deposits
         berjangka dan rekening bank yang dibatasi                  and restricted cash in banks
         penggunaannya

         Grup menempatkan kas di bank, deposito                     The Group places cash in banks, time deposits
         berjangka dan rekening bank yang dibatasi                  and restricted cash in banks with reputable
         penggunaannya pada bank yang memiliki                      counterparties that have a good credit rating or
         peringkat kredit yang baik. Oleh karena itu,               standing. Consequently, the Group believes that
         Grup berkeyakinan bahwa risiko kredit atas                 the credit risk of such financial assets is minimal.
         aset keuangan ini adalah minimal. Pihak terkait            These counterparties include large financial
         yang dimaksud termasuk institusi keuangan                  institutions and SOEs.
         utama dan BUMN.

         Kualitas kredit piutang lainnya                            Credit quality of other receivables

         Piutang lainnya ditagihkan kepada pihak                    Other receivables are to be collected from the
         berelasi dan karyawan Grup. Oleh karena itu,               Group’s related parties and employees.
         Grup dapat memonitor kolektibilitas piutang-               Therefore, the Group can closely monitor the
         piutang ini dengan seksama. Grup memiliki                  collectability of these receivables. The Group has
         tingkat kolektibilitas yang baik atas piutang-             a good historical collection rate of these financial
         piutang terkait.                                           assets.

         Manajemen risiko likuiditas                                Liquidity risk management

         Risiko likuiditas didefinisikan sebagai risiko             Liquidity risk is defined as the risk that the Group
         bahwa Grup akan menghadapi kesulitan dalam                 will encounter difficulty in meeting its obligations
         memenuhi kewajiban terkait dengan liabilitas               associated with financial liabilities that are settled
         keuangan       yang    diselesaikan   dengan               by delivering cash or another financial asset.
         pembayaran kas atau aset keuangan lainnya.                 Ultimate responsibility for liquidity risk
         Tanggung jawab utama manajemen risiko                      management rests with the Directors, which have
         likuiditas terletak pada Direksi, yang telah               built an appropriate liquidity risk management
         membangun kerangka manajemen risiko                        framework for the management of the Group’s
         likuiditas yang sesuai untuk persyaratan                   short, medium and long-term funding and liquidity
         manajemen likuiditas dan pendanaan jangka                  management requirements. The Group manages
         pendek, menengah dan panjang Grup. Grup                    liquidity risk by maintaining adequate cash,
         mengelola risiko likuiditas dengan menjaga                 reserves, banking facilities and reserve
         kecukupan kas, simpanan, fasilitas bank dan                borrowing facilities by continuously monitoring
         cadangan fasilitas pinjaman dengan terus                   forecast and actual cash flows and matching the
         menerus memonitor perkiraan dan realisasi                  maturity profiles of financial liabilities.
         arus kas dan mencocokkan profil jatuh tempo
         liabilitas keuangan.

         Selanjutnya Grup juga memelihara kecukupan                 In addition, the Group maintains an adequate
         dana     dengan     cara  mempertahankan                   amount of cash and cash equivalents and short-
         kecukupan jumlah kas dan setara kas dan                    time investments, which may be readily
         investasi jangka pendek yang mudah                         converted to cash should there be any
         dikonversi menjadi uang tunai ketika                       unforeseen interruption to its cash collections.
         mengalami gangguan yang tak terduga dari
         penagihan kas.
Page 191
                           PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                        DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                                         Lampiran 5/181 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                               NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                                      FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                                 JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                                             (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                                            55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                                                AND CAPITAL RISK MANAGEMENT (continued)

    c.     Tujuan dan kebijakan manajemen risiko                                                             c.        Financial risk management objectives and
           keuangan (lanjutan)                                                                                         policies (continued)

           Manajemen risiko likuiditas (lanjutan)                                                                      Liquidity risk management (continued)

           Tabel dibawah ini menganalisis liabilitas                                                                   The table below analyses the Group’s financial
           keuangan Grup pada tanggal pelaporan                                                                        liabilities at the reporting date into relevant
           berdasarkan kelompok jatuh temponya dari                                                                    maturity groupings based on the remaining
           sisa periode hingga tanggal jatuh tempo                                                                     period to the contractual maturity date. The
           kontraktual. Jumlah yang diungkapkan dalam                                                                  amount disclosed in the table represent
           tabel ini adalah nilai arus kas kontraktual yang                                                            contractual undiscounted cash flows including
           tidak      didiskonto     termasuk      estimasi                                                            estimated interest payments.
           pembayaran bunga.

                                                                                                    30 Juni 2024/ June 30, 2024
                                                                                                       Lebih dari tiga tahun
                                                                            Lebih dari satu tahun        tetapi tidak lebih
                                                                              tetapi tidak lebih          dari lima tahun/
                                                                               dari tiga tahun/        Over three years but
                                                Kurang dari satu tahun/    Over one year but not       not longer than five       Lebih dari lima tahun/    Jumlah/
                                                  Less than one year      longer than three years               years             More than five years       Total

          Liabilitas keuangan                                                                                                                                                                 Financial liabilities

          Penerusan Pinjaman                                 3,008,059                 6,333,075                   5,615,662                 12,536,446         27,493,978                        Two- step loans
          Utang kepada Pemerintah dan lembaga                                                                                                                                        Government and non bank
          keuangan                                             750,000                 1,125,000                         -                          -            1,875,000   Government financial institution loans
          Utang sewa pembiayaan                              1,743,412                 1,935,464                   1,600,332                  7,084,645         16,252,159                       Lease liabilities
          Utang bank                                        21,121,317                45,626,498                  27,826,883                 44,309,599        145,624,580                              Bank loans
          Utang obligasi dan sukuk ijarah                    4,617,880                37,379,120                  28,180,000                135,721,720        200,380,772                         Bonds payable
          Utang listrik swasta                                 606,320                 1,326,953                   1,503,472                  2,278,717          5,675,322          Electricity purchace payable
          Utang usaha                                       63,967,568                                                                                          63,967,568                         Trade payable
          Uang jaminan langganan                            17,982,000                                                                                          17,982,000            Customer secuirty deposit
          Utang biaya proyek                                 1,920,836                                                                                           1,920,836                   Project cost payable
          Biaya yang masih harus dibayar                     8,419,859                                                                                           8,419,859                     Accrued expenses
          Utang lain lain                                   14,932,291                       -                           -                           -          14,932,291                          Other payable

          Jumlah                                          139,069,542                 93,726,110                 64,726,349                 201,931,127        504,524,365                                   Total



                                                                                          31 Desember/ December 31, 2023
                                                                     Lebih dari satu tahun      Lebih dari tiga tahun
                                                                       tetapi tidak lebih         tetapi tidak lebih
                                                 Kurang dari            dari tiga tahun/           dari lima tahun/
                                                 satu tahun/          More than one year        More than three years      Lebih dari
                                                  Less than           but not longer than        but not longer than      lima tahun/                      Jumlah/
                                                  one year                three years                 five years      More than five years                  Total

         Liabilitas keuangan                                                                                                                                                             Financial liabilities
         Penerusan pinjaman                          3,879,000                   11,152,850                       5,863,507                14,158,231        35,053,588                       Two-step loans
         Utang kepada Pemerintah dan                                                                                                                                            Government and non-bank
             lembaga keuangan                                                                                                                                                     Government financial
             Pemerintah non-bank                       860,086                    1,572,657                               -                         -         2,432,743                   institution loans
         Utang sewa                                  7,755,080                   16,465,372                       9,717,289                15,979,902        49,917,643                       Lease liabilities
         Utang bank                                 30,132,625                   79,207,058                      29,005,608                48,755,197       187,100,488                             Bank loans
         Utang obligasi                                                                                                                                                                        Bonds payable
             dan sukuk ijarah                       15,901,038                   67,554,314                      50,997,451              204,084,612        338,537,415                    and sukuk ijara
         Utang listrik swasta                          904,491                    2,771,110                       1,804,735                1,890,337          7,370,673       Electricity purchase payables
         Utang usaha                                56,560,627                            -                               -                        -         56,560,627                       Trade payables
         Uang jaminan langganan                     17,440,297                            -                               -                        -         17,440,297         Customer security deposits
         Utang biaya proyek                          1,512,219                            -                               -                        -          1,512,219                Project cost payables
         Biaya masih harus dibayar                   8,281,513                            -                               -                        -          8,281,513                    Accrued expenses
         Utang lain-lain                            11,900,979                            -                               -                        -         11,900,979                       Other payables

         Jumlah                                   155,127,955                   178,723,361                      97,388,590              284,868,279        716,108,185                                     Total


           Manajemen berkeyakinan bahwa tidak terdapat                                                                         Management believes that there will be no
           masalah likuiditas karena Grup memiliki                                                                             liquidity issue as the Group has sufficient
           cadangan fasilitas kredit yang memadai, adanya                                                                      standby      credit   facilities,    government
           jaminan Pemerintah untuk pembayaran utang                                                                           guarantees for related debt repayment and
           bank terkait, dan pendapatan subsidi dari                                                                           subsidy revenue from the Government of
           Pemerintah Indonesia atas penyediaan listrik.                                                                       Indonesia for provision of electricity.
Page 192
                      PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                   DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                          Lampiran 5/182 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                     FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                                JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                            (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                                        55. FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                                            AND CAPITAL RISK MANAGEMENT (continued)

    d.   Nilai wajar instrumen keuangan                                                 d.     Fair value of financial instruments

         Nilai wajar adalah suatu jumlah dimana suatu                                          The fair value is the amount for which an asset
         aset dapat dipertukarkan atau suatu liabilitas                                        could be exchanged or a liability settled between
         diselesaikan antara pihak yang memahami dan                                           knowledgeable and willing parties in an arm’s
         berkeinginan untuk melakukan transaksi wajar.                                         length transaction.

         Nilai wajar aset dan liabilitas keuangan                                              The fair value of financial assets and liabilities is
         diestimasi untuk keperluan pengakuan,                                                 estimated for recognition and measurement or for
         pengukuran    atau   untuk      keperluan                                             disclosure purposes.
         pengungkapan.

         PSAK No. 68, “Pengukuran Nilai Wajar”,                                                SFAS No. 68, “Fair Value Measurement”,
         mensyaratkan pengungkapan atas pengukuran                                             requires disclosure of fair value measurements
         nilai wajar dengan tingkat hierarki nilai wajar                                       through the following fair value measurement
         sebagai berikut:                                                                      hierarchy:

         -   Harga kuotasian (tidak disesuaikan) dalam                                         -    Quoted prices (unadjusted) in active markets
             pasar aktif untuk aset atau liabilitas yang                                            for identical assets or liabilities (Level 1);
             identik (Tingkat 1);
         -   Input selain harga kuotasian dari pasar                                           -    Inputs other than quoted prices included
             yang termasuk dalam Tingkat 1 yang dapat                                               within Level 1 that are observable for the
             diobservasi untuk aset atau liabilitas, baik                                           asset or liability, either directly (that is, as
             secara langsung (misalnya harga) atau                                                  prices) or indirectly (that is, derived from
             secara tidak langsung (misalnya turunan                                                prices) (Level 2); and
             dari harga) (Tingkat 2); dan
         -   Input untuk aset atau liabilitas yang bukan                                       -    Inputs for the asset or liability that are not
             berdasarkan data pasar yang dapat                                                      based on observable market data (that is,
             diobservasi (informasi yang tidak dapat                                                unobservable inputs) (Level 3).
             diobservasi) (Tingkat 3).

         Tabel di bawah ini menggambarkan nilai                                                The table below describes the carrying amount of
         tercatat dan nilai wajar dari liabilitas keuangan                                     the financial liabilities that are not presented by
         yang tidak disajikan Grup pada nilai wajarnya:                                        the Group at fair value:

                                                    30 Juni/June 30, 2024                        31 Desember/December 31, 2023
                                            Nilai Tercatat /          Nilai Wajar/            Nilai Tercatat /       Nilai Wajar/
                                           Carrying amount             Fair value            Carrying amount          Fair value
         Liabilitas pada biaya perolehan
             diamortisasi                                                                                                               Liabilities at amortised cost
         Penerusan pinjaman                         27,493,242            26,535,004                 29,183,428           28,287,133                 Two-step loans
         Utang kepada Pemerintah dan                                                                                                      Government and non-bank
             lembaga keuangan                                                                                                               Government financial
             Pemerintah non-bank                     2,022,737             1,903,833                  2,457,019            2,285,989             institution loans
         Utang obligasi dan sukuk ijarah           205,898,720           191,794,547                197,564,833          190,970,657   Bonds payable and sukuk ijara
         Utang bank                                138,884,297           138,023,872                148,822,188          148,079,072                      Bank loans




         Penerusan pinjaman dan utang bank                                                     Two-step loans and bank loans are financial
         merupakan liabilitas keuangan dengan tingkat                                          liabilities with floating interest rates, thus the
         bunga mengambang, sehingga nilai tercatat                                             carrying amount of the financial liabilities
         setara dengan nilai wajar.                                                            approximate their fair values.
Page 193
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                     Lampiran 5/183 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                   FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                              JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)          (Expressed in millions of Rupiah, unless otherwise stated)

55. INSTRUMEN KEUANGAN, MANAJEMEN RISIKO                          55 FINANCIAL INSTRUMENTS, FINANCIAL RISK
    KEUANGAN DAN RISIKO MODAL (lanjutan)                             AND CAPITAL RISK MANAGEMENT (continued)

    d.     Nilai wajar instrumen keuangan (lanjutan)                   d.      Fair value of financial instruments (continued)

           Beberapa pinjaman dengan suku bunga tetap,                          For certain loans with fixed interest rates, the
           nilai tercatat atas liabilitas keuangan tidak                       carrying amount of the financial liabilities does not
           menunjukkan nilai wajarnya, sehingga pada                           represent their fair values, thus as at June 30,
           tanggal 30 Juni 2024 dan 31 Desember 2023,                          2024 and December 31, 2023, the fair value of
           nilai wajar atas pinjaman diukur dengan                             loans is measured using discounted cash flows
           mendiskontokan estimasi arus kas masa depan                         based on the interest rate based on credit
           menggunakan suku bunga pasar dengan                                 adjusted market interest rates at the reporting
           penyesuaian kredit pada tanggal pelaporan.                          date. The fair values of the above financial
           Nilai wajar instrumen keuangan di atas                              instruments are classified as Level 2 fair values
           diklasifikasikan sebagai nilai wajar Tingkat 2                      in the fair value hierarchy.
           dalam hirarki nilai wajar.

           Nilai wajar dari utang obligasi, ditentukan                         The fair value of bonds payable is determined by
           dengan mengacu pada harga kuotasian dalam                           the quoted market price at the reporting date. The
           pasar aktif pada tanggal pelaporan. Nilai wajar                     fair values of the bonds payable is classified as
           utang obligasi di atas diklasifikasikan sebagai                     Level 1 fair values in the fair value hierarchy.
           nilai wajar Tingkat 1 dalam hirarki nilai wajar.

           Pada tanggal 31 Desember 2023 dan 2022,                             As at December 31, 2023 and 2022, the
           instrumen     keuangan      derivatif dihitung                      derivative financial instruments are measured
           menggunakan Tingkat 2. Nilai wajar diukur                           using a Level 2 method. The fair value is
           pada nilai tunai estimasi arus kas masa depan                       measured as the present value of the estimated
           berdasarkan kurva pendapatan yang dapat                             future cash flows based on observable yield
           diobservasi.                                                        curves.

           Nilai tercatat dari aset dan liabilitas keuangan                    The carrying amounts of other financial assets
           lainnya telah berkisar menunjukkan nilai                            and liabilities approximate their fair values due to
           wajarnya karena memiliki sifat jangka pendek                        the short-term nature of the financial instruments.
           dari instrumen keuangannya.

           Untuk tahun-tahun yang berakhir pada tanggal                        For the years ended December 31, 2023 and
           31 Desember 2023 dan 2022, tidak terdapat                           2022, there were no transfers between levels.
           pengalihan antar tingkat.


56. ASET/(LIABILITAS) DERIVATIF                                   56. DERIVATIVE ASSETS/(LIABILITIES)

    Perusahaan melaksanakan hedging terbatas untuk                     The Company has implemented limited hedging on
    memitigasi risiko selisih kurs atas transaksi-                     certain transactions to mitigate its foreign currency
    transaksi tertentu. Jenis transaksi hedging yang                   exposure. The type of hedge transaction is a currency
    dilaksanakan adalah kontrak-kontrak currency                       forward contract with details as at June 30, 2024 and
    forward dengan jumlah rincian pada 30 Juni 2024                    December 31, 2023, as follows:
    dan 31 Desember 2023 adalah sebagai berikut:

                                                                                                                    30 Juni/ June 30, 2024
                                                                                                  Aset                    Liabilitas
                    Pihak lawan/           Jangka waktu hedging   Jumlah Nasional/         Derivatif/Derivative      Derivatif/Derivative
                   Counterparties            Hedging periods      National amount                Assets                   Liabilities


    Mandiri                                  < 1 Bulan/Months               385,000,000                    52,557                        6,646
    BRI                                      < 1 Bulan/Months               395,000,000                    20,116                        7,616
    BNI                                      < 1 Bulan/Months               120,000,000                     9,997                        1,673
    Mandiri                                  > 1 Bulan/Months               620,000,000                   236,010                        4,862
    BRI                                      > 1 Bulan/Months               160,000,000                     8,560                        6,791
    BNI                                      > 1 Bulan/Months               555,000,000                   145,976                        1,122
    Jumlah/Total                                                        2,235,000,000                     473,215                       28,709


    *) dalam jutaan Rupiah/in Rp million
Page 194
                          PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                       DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                         Lampiran 5/184 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                     (Expressed in millions of Rupiah, unless otherwise stated)

56. ASET/(LIABILITAS) DERIVATIF (lanjutan)                                   56. DERIVATIVE ASSETS/(LIABILITIES) (continued)

                                                                                                  31 Desember/ December 31, 2023
    Pihak lawan/                 Jangka waktu hedging/    Jumlah nosional (USD)/               Aset derivatif/      Liabilitas derivatif
   Counterparties                   Hedging periods       Notional amount (USD)              Derivative assets*)   Derivative liabilities*)

   BRI                                < 1 Bulan/Month                        10,000,000                          -                                   (1,149)
   Mandiri                            < 1 Bulan/Month                       100,000,000                          -                                  (12,994)
   Mandiri                            > 1 Bulan/Month                       940,000,000                      3,827                                  (96,829)
   BRI                                > 1 Bulan/Month                       625,000,000                      2,383                                  (80,539)
   BNI                                > 1 Bulan/Month                        65,000,000                         48                                   (9,848)

   Jumlah/Total                                                       1,740,000,000                          6,258                                (201,359)
    *) dalam jutaan Rupiah/in Rp million




57. INFORMASI TAMBAHAN TERKAIT PENERAPAN                                      57. ADDITIONAL INFORMATION RELATED                                        TO
    POJK NO. 6                                                                    IMPLEMENTATION OF POJK NO. 6

    Sejak 1 Januari 2016, Perusahaan menerapkan                                  Since January 1, 2016, the Company has
    secara prospektif POJK No. 6 untuk transaksi                                 implemented POJK No. 6 prospectively for
    berdasarkan Perjanjian Jual Beli Tenaga Listrik                              transactions based on Power Purchase Agreements
    dengan IPP. Dampak penerapan POJK No. 6 telah                                with IPPs. The effect of POJK No. 6 implementation
    disesuaikan ke saldo laba 1 Januari 2016 (Catatan                            has been accounted for by adjustment to retained
    2.a).                                                                        earnings as at January 1, 2016 (Note 2.a).

    Sesuai POJK No. 6, setiap transaksi berdasarkan                              In accordance with POJK No. 6, all transactions based
    Perjanjian Jual Beli Tenaga Listrik diperlakukan                             on Power Purchase Agreements are treated as sale
    sebagai transaksi jual beli, meskipun sebenarnya                             and purchase transactions, although containing a
    mengandung substansi selain jual beli (Catatan 3.l).                         substance other than sale and purchase (Note 3.l).
    Tabel berikut ini disajikan sebagai informasi                                The following tables are presented as additional
    tambahan jika perjanjian jual beli listrik dianggap                          information on whether PPAs were deemed to contain
    mengandung sewa.                                                             a lease.


    Tabel di bawah ini mengandung sewa, namun                                    The table below contains leases, but has not yet
    belum memperhitungkan dampaknya terhadap                                     considered their impact on subsidy and compensation
    peritungan subsidi dan kompensasi.                                           calculations.


                                                           Dengan / Under         Dengan / Under
                                                            Non POJK 6              Non POJK 6
                                                              30 Juni/             31 Desember/
                                                              June 30,             December 31,
                                                                2024                   2023

    Laporan posisi keuangan konsolidasian interim                                                         Interm Consolidated statement of financial position

    Aset tidak lancar                                                                                                                     Noncurrent assets
      Aset tetap                                              1,450,198,669          1,734,508,347                          Property plant and equipment

    Ekuitas                                                                                                                                          Equity
      Saldo laba - Tidak ditentukan penggunaannya                14,854,307             30,337,664                    Retained earnings - Unappropriated

    Liabilitas Jangka panjang                                                                                                           Noncurrent liabilities
      Utang sewa pembiayaan                                     406,319,331            382,666,776                                         Lease liabilities
      Utang listrik swasta                                        4,448,668              4,440,725                           Electricity purchase payable
      Liabilitas pajak tangguhan                                 32,222,495             36,520,083

    Liabilitas jangka pendek                                                                                                                Current liabilities
      Utang usaha                                                                                                                           Trade payable
             Pihak berelasi                                      18,310,502             15,153,778                                     Related parties
             Pihak ketiga                                        40,832,001             38,354,041                                        Third parties
      Biaya masih harus dibayar                                  12,442,353             11,159,094                                       Accrued expense
      Utang listrik swasta                                          565,603                513,891                           Electricity purchase payable
      Utang sewa                                                 15,288,446             15,781,088                                         Lease liabilities
Page 195
                         PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                      DAN ENTITAS ANAK/AND SUBSIDIARIES

                                                            Lampiran 5/185 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                                                  FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                                             JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)                         (Expressed in millions of Rupiah, unless otherwise stated)

57. INFORMASI TAMBAHAN TERKAIT PENERAPAN                                          57. ADDITIONAL INFORMATION RELATED TO
    POJK NO. 6 (lanjutan)                                                             IMPLEMENTATION OF POJK NO. 6 (continued)


                                                              Dengan / Under         Dengan / Under
                                                               Non POJK 6             Non POJK 6
                                                                 30 Juni/               30 Juni/
                                                                 June 30,               June 30,
                                                                   2024                   2023
     Laporan laba rugi komprehensif konsolidasian interim                                                  Consolidated statement of comprehensive income

     Beban usaha:                                                                                                                       Operating expense
      Bahan bakar dan pelumas                                      120,383,294            102,741,535                                       Fuel expense
      Pembelian tenaga listrik                                       6,261,379              7,472,782                                Electricity purchase
      Sewa                                                           1,258,049                966,423                                               Lease
      Pemeliharaan                                                  19,682,016             18,256,492                                         Maintenace
      Penyusutan                                                    29,620,389              1,386,009                                        Depreciation

     Laba usaha setelah subsidi                                     61,319,483             57,656,151                      Operating income after subsidy
     Keuntungan (kerugian) kurs mata uang asing - bersih           (45,965,837)            21,865,109                     Gain (loss) on Foreign Exchange
     Beban Keuangan                                                (33,804,584)           (37,356,152)                                    Finance Expense

     Laba sebelum pajak                                            (15,131,792)            42,529,606                                     Income before tax
     Beban pajak                                                     1,118,017             (9,217,916)                                        Tax expense

     Laba periode berjalan                                         (14,013,776)            33,311,690                                 Income for the period

     Laporan arus kas konsolidasian interim                                                                Consolidated statement of comprehensive income

     Arus kas dari aktivitas operasi                                                                                         Cash from operating activities
       Pembayaran kas kepada pemasok                              (150,589,860)          (135,236,233)                           Cash paid to suppliers
       Kas diperoleh dari aktifitas operasi                         16,191,245             16,538,856
       Pembayaran bunga                                            (42,926,973)           (35,223,844)                             Interest expense paid
     Kas bersih dari aktifitas operasi                              18,486,550             25,293,278              Net cash provided by operating activities

     Arus kas dari aktivitas pendanaan                                                                                       Cash from financing activities
       Pembayaran utang listrik swasta                                (242,450)              (217,589)           Payment of electricity purchase payable
       Pembayaran utang sewa pembiayaan                             (5,561,458)            (5,260,137)                         Payment of finance lease
     Kas bersih dari aktifitas pendanaan                           (22,288,650)           (24,125,448)             Net cash provided by financing activities



    Nilai kini pembayaran minimum atas utang sewa                                      The present value of minimum lease payments on
    pada tanggal 30 Juni 2024 dan 31 Desember 2023                                     lease liabilities as at June 30, 2024 and December
    jika Grup menerapkan Non POJK 6, “Sewa” adalah                                     31, 2023, if the Group applied Non POJK 6, “Leases”
    sebagai berikut:                                                                   are as follows:


                                                            30 Juni/               31 Desember/
                                                            June 30,               December 31,
                                                              2024                     2023

   Berdasarkan jatuh tempo                                                                                                              By due date

      Pembayaran jatuh tempo dalam waktu :                                                                         Minimum lease payments due :
         Tidak lebih dari 1 tahun                             78,830,155                63,120,975                      Not later than 1 year
         Antara lebih dari 1 tahun sampai                                                                Later than 1 year and not later than
           5 tahun                                           299,077,705              225,347,594                                     5 years
         Lebih dari 5 tahun                                  878,318,606              687,961,006                          Later than 5 years
         Jumlah pembayaran minimum
            sewa pembiayaan                                 1,256,226,466              976,429,575          Total minimum lease payments
      Dikurangi bunga                                        (834,618,687)            (666,159,827)                                  Less interest
      Nilai tunai pembayaran minimum                                                                             Present value of future minimum
         sewa pembiayaan masa datang                         421,607,779              310,269,748                           lease payments
      Dikurangi bagian jatuh tempo dalam
         satu tahun                                           15,288,445                13,318,281                               Less current maturity
      Bagian jangka panjang                                  406,319,333              296,951,467                                   Long-term portion




                                                                                                                                                               \
Page 196
                    PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA
                                 DAN ENTITAS ANAK/AND SUBSIDIARIES

                                               Lampiran 5/186 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE CONSOLIDATED
KONSOLIDASIAN                                                                              FINANCIAL STATEMENTS
30 JUNI 2024 DAN 31 DESEMBER 2023                                         JUNE 30, 2024 AND DECEMBER 31, 2023
(Dinyatakan dalam jutaan Rupiah, kecuali dinyatakan lain)     (Expressed in millions of Rupiah, unless otherwise stated)

58. PERISTIWA SETELAH PERIODE PELAPORAN                       58. EVENTS AFTER REPORTING PERIOD

    (i)     Berdasarkan surat Keputusan Menteri BUMN              (i)   Based on the letter of Minister of SOE No. SK-
            Republik Indonesia No. SK-72/MBU/03/2024                    72/MBU/03/2024 dated March 19, 2024, the
            tanggal 19 Maret 2024, telah disetujui:                     following have been approved:
            - Memberhentikan dengan Agus Dermawan                       - Honourably discharged Agus Dermawan
               Mintarto Martowardojo sebagai Komisaris                       Mintarto   Martowardojo     as   President
               Utama PT PLN (Persero).                                       Commissioners of PT PLN (Persero).
            - Mengangkat       Burhanuddin         Abdullah             - Appointed Burhanuddin Abdullah to become
               sebagai Komisaris utama dan Komisaris                         as a President Commissioner concurrently
               Independen PT PLN (Persero).                                  Independent Commissioner of PT PLN
            - Mengangkat Mutanto Yuwono dan Andi                             (Persero).
               Arief sebagai Komisaris Independen PT                    - Appointed Mutanto Yuwono and Andi Arief to
               PLN (Persero)                                                 become as a Independent Commissioner of
                                                                             PT PLN (Persero).

59. INFORMASI KEUANGAN TAMBAHAN                               59. SUPPLEMENTARY FINANCIAL INFORMATION

    Informasi    keuangan     tambahan   menyajikan               The supplementary financial information presents
    informasi terkait kontribusi Perusahaan kepada                information related to the Company’s contribution to
    Pemerintah Indonesia sesuai dengan Surat Edaran               the Government of Indonesia as required by the
    Kementerian BUMN Republik Indonesia No. S-                    Circular Letter of Ministry of SOE of the Republic of
    6/DKU.MBU/02/2024. Selama periode enam bulan                  Indonesia No. S-6/DKU.MBU/02/2024. During six
    yang berakhir 30 Juni 2024, jumlah kontribusi                 month periode ended June 30, 2024, the
    Perusahaan terkait pendapatan pajak dan                       Company’s contribution related to tax revenue and
    Penerimaan Negara Bukan Pajak (“PNBP”) adalah                 non-tax state revenue (“PNBP”) are as follows:
    sebagai berikut:

                                                   30 Juni/             31 Desember/
                                                   June 30,             December 31,
                                                     2024                   2023

          Pajak penghasilan                           7,133,345            14,542,004                  Income Taxes
          PPN                                         7,679,229            20,990,951                            VAT
          Bea materai                                    16,525                77,471                     Stamp duty
          Bea masuk                                      21,641               113,906                    Import duty
          Pajak daerah dan retribusi daerah           9,676,883            16,660,764     Local taxes and retribution
          PNBP                                          100,648               188,230                           PNBP

          Jumlah                                    24,628,271             52,573,326                            Total



60. TANGGUNG    JAWAB  MANAJEMEN  DAN                         60. MANAGEMENT’S RESPONSIBILITY FOR AND
    PERSETUJUAN ATAS LAPORAN KEUANGAN                             APPROVAL OF THE CONSOLIDATED FINANCIAL
    KONSOLIDASIAN                                                 STATEMENTS

    Penyusunan dan penyajian wajar laporan keuangan               The preparation and fair presentation of the
    konsolidasian     merupakan      tanggung  jawab              consolidated financial statements is the responsibility
    manajemen dan telah disetujui oleh Direksi untuk              of the management and the Directors have approved
    diterbitkan pada tanggal 26 Juli 2024.                        them for issuance on July 26, 2024.

File

File Open PDF
Source IDX
Size3.72 MB
Published29 Jul 2024
Pages196
Characters1,441,563
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 86 people and organisations named in the text · linked when the evidence is strong

linked person Suahasil Nazara · Wakil Komisaris Utama p.15 ×3
linked person Dadan Kusdiana · Komisaris p.15 ×2
linked person Susiwijono Moegiarso p.15 ×2
linked person Dudy Purwagandhi p.15 ×2
linked person Nawal Nely p.15
linked person Arcandra Tahar · Komisaris Independen p.15 ×4
linked person Charles Sitorus p.15 ×4
linked person Darmawan Prasodjo · Direktur Utama p.15 ×2
linked person Sinthya Roesly · Direktur Keuangan p.15 ×2
linked person Hartanto Wibowo p.15 ×2
linked person Yusuf Didi Setiarto p.15 ×2
linked person Edi Srimulyanti p.15 ×2
linked person Evy Haryadi p.15 ×2
linked person Adi Lumakso p.15 ×2
linked person Adi Priyanto · Direktur Distribusi p.15 ×2
linked person Wiluyo Kusdwiharto p.15 ×2
linked person Suroso Isnandar p.15 ×2
linked person Mohamad Ikhsan · Anggota p.15 ×4
linked person Tomi Parisianto Wibowo p.15 ×2
linked person Alois Wisnuhardana · Sekretaris Perusahaan p.15 ×2
linked org Asian Development Bank p.58
linked org Bank Mandiri p.155
linked person Burhanuddin | Abdullah p.196 ×2
linked person Mutanto Yuwono p.196 ×2
linked person Andi Arief p.196
possible org Pemerintah Republik Indonesia p.11 ×4
possible org Negara Republik Indonesia p.11
possible org Bursa Efek Indonesia p.12 ×33
possible person Tedi Bharata p.15
possible org Otoritas Jasa Keuangan p.18 ×2
unresolved org Ministry of Energy and Public Kementerian Pekerjaan Umum dan Tenaga. p.11
unresolved person Sutjipto p.11 ×2
unresolved org PT PLN (Persero) p.11 ×12
unresolved org Minister of Justice p.11
unresolved org Menteri Kehakiman p.11
unresolved person Lenny Janis Ishak p.11 ×2
unresolved org Menteri Hukum dan HAM p.11
unresolved org Minister of Law and Human Rights p.11
unresolved org Menteri No. AHU- p.11
unresolved org Milik Negara p.12
unresolved org PT Haleyora Powerindo p.12 ×2
unresolved org PT Haleyora Power p.12
unresolved org Indonesia Stock Exchange p.12 ×33
unresolved org Majapahit Holding B.V. p.14 ×2
unresolved person Agus Dermawan W Martowardojo · Komisaris Utama p.15 ×5
unresolved org Menteri BUMN p.15 ×2
unresolved org Minister of SOE Republik Indonesia Nomor S- p.15
unresolved org PT Pembangkitan Jawa-Bali p.15 ×2
unresolved org PT PLN Energi Primer Indonesia p.15 ×3
unresolved org PT PLN Batubara p.15 ×2
unresolved org PT Pengembang Listrik Nasional Gas p.15 ×2
unresolved org PT Pelayaran Pelayaran Bahtera Adhiguna p.15
unresolved org PT Indonesia Indonesia Comnets Plus p.16
unresolved org PT ICON Plus p.16 ×2
unresolved org Minister of Law and Human p.16
unresolved org Menteri Hukum dan Hak Asasi Manusia p.16
unresolved org Kantor Jasa Penilai Publik Rengganis p.16
unresolved org KJPP RHR p.16 ×6
unresolved person Hanafi p.16 ×2
unresolved person Muhammad Muhammad Hanafi p.16 ×3
unresolved org Direktorat Jenderal Pajak p.17 ×2
unresolved org Directorate General of Taxes p.17 ×2
unresolved org PT PLN Nusantara Power p.17 ×2
unresolved org PT PLN Indonesia p.17
unresolved org Financial Services Authority p.18 ×2
unresolved org Pengawas Pasar Modal p.21
unresolved org Bapepam-LK p.21 ×2
unresolved org Bank Indonesia p.28
unresolved org Ministry of Finance p.30 ×3
unresolved org Kementerian Keuangan p.30 ×3
unresolved org Ministry of SOEs p.30
unresolved org Kementerian BUMN p.30
unresolved org Minister of Energy and Mineral Peraturan Menteri Energi dan Sumber Daya p.47
unresolved org Menteri ESDM p.47
unresolved org Pemeriksa p.47
unresolved org Pengawasan Keuangan p.48
unresolved org Minister of Keuangan p.155
unresolved org Government of the Republic of Indonesia p.155
unresolved org Bank DKI p.155
unresolved org Bank Loans Penerusan Pinjaman p.160
unresolved org Minister of SOE No. SK- Republik Indonesia No. SK- p.196
unresolved — Agus Dermawan Mintarto Martowardojo · Komisaris p.196
unresolved person Mintarto · Komisaris p.196
unresolved — Arief · Komisaris Independen p.196
unresolved org Kementerian BUMN Republik Indonesia No. S- p.196
unresolved org Ministry of SOE p.196

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 5

inlineXBRL.zip done
FinancialStatement-2024-II-PPLN.xlsx done
↑↓ select ↵ open ⇧↵ see every result