Back to announcement
20240710_BRMS_Laporan Bulanan Aktivitas Eksplorasi_31682556_lamp2.pdf
Other Text extracted BRMSSource file signed link, expires in 15 minutes
Extracted text 14
Page 1 OCR 0.918
(SP BRM PT Bumi Resources Minerals Tbk. Bakrie Tower, 6 & 10” Floor Komplek Rasuna Epicentrum Jl. H.R. Rasuna Said, Kuningan Jakarta Selatan 12940 Indonesia T 46221 5794 5698 F 46221 5794 5687 www.bumiresourcesminerals.com LAPORAN TENTANG AKTIVITAS EKSPLORASI OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK. (REPORT ON EXPLORATION ACTIVITIES BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.) PT Citra Palu Minerals Nama Perusahaan (Name of Company) Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Periode (Period of Exploration Report) PT Citra Palu Minerals (“PT CPM”) Operasi Produksi (Production Operation) April - Juni (April - June) 2024 Daerah Eksplorasi Exploration Areas 1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block 1, Central Sulawesi (Production 2. Blok Il, Sulawesi Selatan (Eksplorasi) Operation) 3. Blok IV, Sulawesi Tengah (Eksplorasi) 2. Block Il, South Sulawesi (Exploration) 4. Blok V, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration) 5. Blok VI, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration) 5. Block VI, Central Sulawesi (Exploration) Biaya Eksplorasi Exploration Cost 1.038.613,61 Dollar AS USD 1.038.613,61 Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pengeboran sumber daya di Prospek River Reef, Blok I Poboya, dengan total kedalaman saat ini 56.724,00m. 2. Melanjutkan kegiatan pengeboran sumber daya di area Watu Putih, Blok | Poboya, dengan total kedalaman saat ini 14.686,05m. 3. Melanjutkan kegiatan pengeboran eksplorasi di area Prospek Hill Reef 1, Blok | Poboya, dengan total kedalaman saat ini 15.820,35m. 4. Melanjutkan kegiatan pemetaan geologi di Area Malomba, Ogowele, Anggasan, dan Taanes, Blok IV, dengan total 463 sampel batuan dan 1125 sampel tanah. 5. Melakukan kegiatan survey geofisika CSAMT dengan total lintasan 14.950m dan pemetaan 1. Continued resource drilling program at the River Reef Prospect, Block I Poboya, with a current total depth of 56,724.00m. 2. Continue resource drilling program in the Watu Putih area, Block 1 Poboya, with a current total depth of 14,686.05m. 3. Continued exploration drilling program in the Hill Reef 1 Prospect area, Block I Poboya, with a current total depth of 15,820.35m. 4. Continued geological mapping activities in Malomba, Ogowele, Anggasan and Taanes Areas, Block IV, with & total of 463 rock samples and 1125 soil samples. 5. Conduct CSAMT geophysical survey with a total length 14,950m and geological mapping oi | kh
Page 2 OCR 0.902
(SP BRM geologi sepanjang jalur lintasan survey in geophysical survey line covered 133.25Ha geofisika mencakup luasan area sebesar area and collected 16 rock samples. 133,25Ha dan mengumpulkan 16 conto batuan 6. Melakukan pengiriman sampel inti bor untuk |6. Carried out geochemical analysis from drill analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, core samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Mo, Hg dan kombinasi Au 4 ICP OES multi Hg and combination of Au & ICP OES multi elemen) dan analisi AAT (Air Asam Tambang) elements) and AAT (Acid Mine Drainage) ke Laboratorium PT Geoservices. analysis by PT Geoservices Laboratory. Pihak-Pihak yang Terlibat Involved Parties 1. Laboratorium PT CPM 1. Internal PT CPM Laboratory 2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar 3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory 4. Bureau Varitas — PT IOL Indonesia 4. Bureau Varitas — PT IOL Indonesia 5. PT Pos Indonesia 5. PT Pos Indonesia 6. PT Intertek Utama Service 6. PT Intertek Utama Service PT Geoservices - Divisi Eksplorasi Z. PT Geoservices — Exploration Division Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area 1. AAS 1. AAS 2. Spedfic Gravity 2. Speafic Gravity 3. Fire Assay 3. Fire Assay 4. Agua Regia Digest 4. Agua Regia Digest 5. Hg Analisis 5. Hg Analysis 6. ICP OES 42 unsur 6. ICP OES 42 elements 7. Natural density, dry density, seturated | 7. Natural density, dry density, saturated density, density, Brazillian test, direct shear, ultrasonic Brazillian test, direct shear, ultrasonic velocity, velocity, UCS UCS 8. Analisis Air Asam Tambang 8. ARD Test 9. Survey Geofisika CSAMT 9. CSAMT Geophysical Survey Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward the Preceding | Guarter Activities 1. Pengeboran sumber daya di Prospek River Reef dilakukan dengan menggunakan 3 rig. Total 254 titik bor, termasuk 3 titik bor hidrogeologi dan 5 titik bor geotek, dengan total kedalaman 56.724.00m sampai akhir Juni 2024. Terdapat penambahan 12 titik bor dengan jumlah kedalaman 3.557,60m dari periode sebelumnya. Pengeboran sumberdaya di Prospek Watu Putih dilanjutkan dengan menggunakan 1 rig. Total 43 titik bor dengan total ia Resources drilling program in Poboya River Reef Prospect Block I was conducted using 3 rgs. A Total of 254 drill holes, induded 3 hydrogeology holes and 5 geotech holes, with total depth of 56,724.00m has been reached by the end of June 2024. There are 12 additional drill holes with total depth of 3,557.60m from previous period. Resources drilling program in Watu Putih Prospect was continued using 1 rig. A total of 43 drill holes with total depth of 14,686.05m 1
Page 3 OCR 0.925
(SP BRM kedalaman 14.686,05m sampai akhir Juni 2024. Terdapat penambahan 4 titik bor dengan jumlah kedalaman 1.417,30m dari periode sebelumnya. Pengeboran eksplorasi di Prospek Hill Reef 1 dilanjutkan dengan menggunakan 1 rig. Total 172 titik bor dengan total kedalaman 15.820,35m sampai akhir Juni 2024. Terdapat penambahan 15 titik bor dengan jumlah kedalaman 1.095,70m dari periode sebelumnya Survey geofisika CSAMT di Blok | Poboya sebanyak 14.950m dari total 38.000m mencakup 3 dari 8 lintasan survey. Pemetaan geologi di sepanjang jalur lintasan survey geofisika CSAMT meliputi area seluas 133,25Ha dan mengumpulkan 16 conto batuan. Penambahan jumlah sampel sebanyak 2.130 sampel hasil pengeboran Prospek River Reef Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au #- ICP 42 unsur), serta 22 sampel untuk analisis AAT (Air Asam Tambang) Penambahan jumlah sampel sebanyak 1.342 sampel hasil pengeboran Prospek Watu Putih Blok | Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur. Penambahan jumlah sampel sebanyak 882 sampel hasil pengeboran Prospek Hill Reef 1 Blok I Poboya yang dikirim ke Laboratorium PT Geoservices untuk dianalisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan kombinasi Au 4 ICP 42 unsur dan 33 sampel untuk analisis air asam tambang. Total penambahan sebanyak 44 sampel batuan berasal dari kegiatan pemetaan geologi di Area Taanes Blok IV. has been reached by the end of June 2024. There are adojtional 4 drill holes with total depth of 1,417.30m from previous period, Exploration drilling program in Hill Reef 7 Prospect was continued using 1 rig. A total of 172 drill holes with total depth of 15,820.35m has been reached by the end of June 2024. There are additional 15 drill holes with total depth of 1,095.70m from previous period, CSAMT geophysical survey in Block 1 Poboya with total length 14,950m of 38.000m from 3 of 8 survey line. Geological mapping in CSAMT geophysical survey line covered 133.25Ha area and collected 16 rock samples. Additional 2, 130 drill core samples from River Reef Prospect of Block 1 Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au # ICP 42 elements), also 22 samples for ARD (Acid Rock Drainage). Additional 1,342 drill core samples from Watu Putih Prospect of Block 1 Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au 4 ICP 42 elements). Additional 882 drill core samples from Hill Reef 1 Prospect of Block I Poboya drilling program have been sent to PT Geoservices Laboratory to be analyzed (Au, Ag, u, Pb, Zn, As, Sb, Mo, Hg and combination Au 4 ICP 42 elements) and 33 sample for ARD (Acid Rock Drainage). Total additional 44 rock samples collected from geological mapping activity at Taanes Area, Block IV. pp"
Page 4 OCR 0.907
(SP BRM Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pengeboran di Prospek River Reef Blok I Poboya dengan tujuan untuk menambah sumber daya di Prospek River Reef. k Continue resources drilling program in River Reef Prospect of Block I Poboya Prospect with objectives to increase resources in River Reef Prospect. 2. Melanjutkan kegiatan pengeboran di Prospek | 2. Continue resources drilling program in Watu Putih Blok I Poboya dengan tujuan Watuputih Prospect of Block 1 Poboya untuk meningkatkan sumber daya dan Prospect with the objective of resources cadangan di Prospek Watuputih. definition in Watuputih Prospect. 3. Melanjutkan kegiatan pengeboran eksplorasi | 3. Continue exploration drilling program in Hill di Prospek Hill Reef 1 Blok I Poboya dengan Reef 1 Prospect of Block 1 Poboya Prospect tujuan untuk mengetahui potensi bijih kadar with the objective is to test the potential of rendah pada kedalaman dangkal. low grade ore at shallow level. 4. Memulai survei geokimia stream sediment di | 4. Start geochemical stream sediment survey at Blok V Moutong. Block V Moutong. 5. Melanjutkan kegiatan survey geofisika | 5. Continue CSAMT geophysical survey at Block I CSAMT di blok | Poboya diikuti dengan Poboya followed by CSAMT line survey pemetaan geologi di sepanjang lintasan geological mapping. survey CSAMT. Hambatan Eksplorasi Barriers to Exploration 1. Kegiatan penambangan tanpa izin (PETI) | 1. Mega mining activities by local community. oleh masyarakat sekitar 2. Pembebasan lahan. 2. Land acguisition. Perizinan/ Persetujuan Baru Yang Diperoleh New Permit/Approvals Acguired Surat Direktorat Jenderal Mineral dan Batubara No. B-696/MB.04/DJB.M/2024 perihal Persetujuan RKAB Kontak Karya PT Citra Palu Minerals Tahun 2024 — 2026 pada tanggal 6 April 2024. Directorate General of Mineral and Coal Letter No. B-696/MB.04/DJB.M/2024 regarding Approval of 2024 — 2026 Annual Activity and Budget Plan of CoW PT Citra Palu Minerals dated on April 6", 2024. —77" 8
Page 5 OCR 0.907
Nama Perusahaan (SP BRM PT. Dairi Prima Mineral (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Bulan (Monthiy Exploration Repord PT Dairi Prima Mineral Operasi Produksi April — Juni (April - June) 2024 A. | Daerah Eksplorasi Exploration Areas Kegiatan eksplorasi pada Prospek Anjing Hitam | #iled exploration activities on Anjing Hitam sudah selesai dilakukan dan saat ini prospek | Prospect has already been completed. The tersebut memasuki tahap Operasi Produksi. prospect currentiy is in Operation and Production Selain Prospek Anjing Hitam, di dalam wilayah | stage. Kontrak Karya DPM masih terdapat prospek- | Beside Anjing Hitam Prospect, there are some prospek lainnya dengan tahap kegiatan yang | other prospect areas within DPM Contract of berbeda-beda dari eksplorasi regional hingga | Work tenement. The prospects work progress are pengeboran deliniasi sumberdaya. in different stages, range from regional Salah satu prospek yang paling maju | @x0loration to delineation resource drilling. pengerjaannya adalah Prospek Lae Jehe yang | Lae Jehe Prospect is the most advantage terletak sekitar 200 meter di sebelah baratlaut | exploration activities. This prospect is situated Prospek Anjing Hitam. Prospek ini sudah | approximately 200 meters toward northwest memasuki tahap pengeboran deliniasi | rom Anjing Hitam Prospect. This prospect work sumberdaya dan masih akan dikembangkan | stage is in resource delineation drilling and will hingga didapatkan sumberdaya mineral dengan | be developed to get final mineral resource value klasifikasi terukur dan tertunjuk yang lebih | with dominant measured and indicated mineral dominan. resources dlassification. B. | Biaya Eksplorasi Exploration Costs 29.017,45 Dollar AS USD 29,017.45 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities Selama Bulan April hingga Juni 2024 tidak ada | During April to June 2024 there is no exploration kegiatan eksplorasi. activities. B | Pihak-Pihak yang Terlibat Parties Invoved E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area F. | Kemajuan Eksplorasi Terhadap Bulan sebelumnya | Exploration Progress relative to Preceding Month's Activities Y pn AN
Page 6 OCR 0.878
(SP BRM Rencana Pengeboran Selanjutnya Next Drilling Plan Penambahan titik bor di Prospek Lae Jehe dan Basecamp INN drilling in Lae Jehe and Basecamp Prospect Hambatan Eksplorasi Barriers to Exploration Izin PPKH Eksplorasi PPKH Exploration permit. Perizinan / Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired # Persetujuan Addendum Amdal tanggal 11 Agustus 2022 # Persetujuan RKAB No.T- 660/MB.04/DJB.M/2022 tanggal 11 Pebruari 2022. e DPM telah mendapatkan Persetujuan Tekno- Ekonomi Dokumen Studi Kelayakan Kontrak Karya PT Dairi Prima Mineral berdasarkan Surat Persetujuan No. 2150/30/DBM/2015. e Tahap kegiatan PT DPM disesuaikan menjadi Tahap Operasi Produksi berdasarkan Surat Keputusan Menteri Energi dan Sumber Daya Mineral No. 456.K/30/DJB/2017. e Letter of Addendum AMDAL Approval 17 August 2022 » DPM 2022 work plan approval No. No.T- 660/MB.04/DJB.M/2022, 11 February 2022. e Letter from Direktorat Jenderal Mineral dan Batubara No. 2150/30/DBM/2015 awarding Techno-£conomic — Approval of Feasibility Study Document Contract of Work of PT DPM has already been received. e PT DPM work activity has already been adjusted became Operation Production Phase based on Decree of Energy and Mineral Resources Minister No. 456.K/30/DJB/2017. aa pn ko
Page 7 OCR 0.881
W. Nama Perusahaan (SP BRM PT Gorontalo Minerals (Name of Company Tahap Kegiatan KK (Phase of Activity of Contract of Work) Laporan Eksplorasi Bulan (Monthiy Exploration Report) PT Gorontalo Minerals (“PT GM") Operasi Produksi (Production Operation) April — Juni (April - June) 2024 A. | Daerah Eksplorasi Exploration Areas 1. Prospek Sungai Mak, Blok 1 (Tombulilato), | 1. Sungai Mak Prospect, Block 1 (Tombulilato) Gorontalo Gorontalo 2. Prospek Motomboto North, Blok I| 2. Motomboto North Prospect Block 1 (Tombulilato), Gorontalo (Tombulilato), Gorontalo 3. Prospek Motomboto East, Blok | (Tombulilato), | 3. Motomboto East Prospect, Block 1 Gorontalo (Tombulilato), Gorontalo 4. Prospek Kayubulan, Blok 1 (Tombulilato), | 4. Kayubulan Prospect, Block 1 (Tombulilato), Gorontalo Gorontalo 5. Prospek Cabang Kiri East, Blok | (Tombulilato), | 5. Cabang Kiri East Prospect, Block 1 Gorontalo (Tombulilato), Gorontalo B. | Biaya Eksplorasi Exploration Costs 209.528,66 Dollar AS USD209, 528.66 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities Ts Total sampel tanah sebanyak 366 sampel dari Prospek Sungai Mak telah dikirimkan ke Laboratorium PT Geoservices untuk analisis geokimia. Melanjutkan pengujian Geoteknik batch II sebanyak 102 sampel batuan dari Prospek Motomboto East, Blok I Tombulilato ke Laboratorium Geomekanika ITB. Melanjutkan pengujian metalurgi column test untuk Domain Oxide dari Prospek Motomboto North, Prospek Motomboto East, dan Prospek Sungai Mak di Laboratorium Geoservices dibawah pengawasan Metso-Autotec. Melakukan pemetaan geologi — dan pengambilan sampel batuan permukaan di area Prospek Cabang Kiri East. Total sampel batuan permukaan sebanyak 1010 sampel dari Prospek Kayubulan, Sungai Mak, Motomboto, dan Cabang Kiri telah dikirim ke Laboratorium PT Geoservices 1. The total 366 soil samples from Sungai Mak Prospect have been sent to PT Geoservices Laboratory for geochemical analysis. 2. Continuing the geotechnical testing of batch II, comprising 102 rock samples from the Motomboto East Prospect Block 1 Tombulilato, — to the Geomechanics Laboratory at ITB. 3. Continuing the metallurgical column test for the Oxide Domain from the Motomboto North Prospect, Motomboto East Prospect, and Sungai Mak Prosoect at the Geoservices Laboratory under the supervision of Metso- Autotec 4. Conducting geological — mapping and collecting surface rock samples in the Cabang Kiri East Prospect area. 5. A total of 1010 surface rock samples from the Kayubulan, Sungai Mak, Motomboto, and Cabang Kiri prospects have been sent to PT Geoservices Laboratory for geochemical we TP DA
Page 8 OCR 0.912
(SP BRM untuk analisis geokimia. Melakukan kegiatan tapping compass dan ridge spur soil sampling pada Prospek Cabang Kiri, Blok I Tombulilato. Melanjutkan estimasi sumber daya dan cadangan untuk Prospek Motomboto East dan Motomboto North serta domain oxide dan Silika Au transisi dari prospek Sungai Mak. analysis. 6. Conducting taoping compass activities and ridge-spur soil sampling in the Cabang Kiri Prospect, Block / Tombulilato. Z. Continuing resource and reserve estimation for the Motomboto East and Motomboto North Prospects, as well as the oxide domain and Silica Au transition from the Sungai Mak Prospect. Pihak-Pihak yang Terlibat Parties Involved 1. Ona Uu Laboratorium PT Geoservices Laboratorium Geomekanika ITB Laboratorium Teknik Lingkungan ITENAS PT Adiprotek Envirodunia PT ITS Tekno Sains PT LAPI ITB Indo Mineral Research Laboratorium NO P WN PT Geoservice Laboratory ITB Geomechanics Laboratory ITENAS Environmental Technic Laboratory PT Adiprotek Envirodunia PT ITS Tekno Sains PT LAPI ITB . Indo Mineral Research Laboratorium Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Kemajuan Eksplorasi Terhadap Kegiatan Triwulan Sebelumnya Exploration Progress toward Previous Ouarters Activities 1, Menyelesaikan analisis 19 sampel petrografi dan 18 sampel mineragrafi dari Prospek Motomboto North ke LAPI-ITB Bandung. Menyelesaikan pengeboran di Prospek Motomboto East, Blok 1 Tombulilato sebanyak 11.073 conto inti bor telah diterima hasil Analisis Geokimia dari PT Geoservices. Menyelesaikan pemetaan geologi dan pengambilan sampel batuan permukaan di sekitar area Prospek Sungai Mak dan Prospek Kayubulan. 1... Completing the analysis of 19 petrographic samples and 18 mineralogical samples from the Motomboto North Prospect at LAPI-ITB Bandung. 2. Completing drilling at the Motomboto East Prospect, Block I Tombulilato, with a total Of 11073 core samples received the Geochemical Analysis results from PT Geoservices. 3. Completing geological mapping and rock sampling around the Sungai Mak and Kayubulan Prospects areas. Rencana Selanjutnya Next Plan 1. Melakukan kegiatan pemetaan geologi dan pengambilan sampel batuan permukaan di area area prospek Cabang Kiri (North). Melakukan kegiatan tapping compass dan ridge spur soil sampling pada Prospek Cabang Kiri (North). Melanjutkan estimasi sumber daya dan cadangan untuk Prospek Motomboto East 1. Conducting geological mapping activities and rock surface sample collection in the Cabang Kiri (North) prospect area. 2. Conducting tapping compass and ridge spur soil sampling activities in the Cabang Kiri (North) prospect. 3. Melanjutkan estimasi sumber daya dan cadangan untuk Prospek Motomboto East TA
Page 9 OCR 0.898
(SP BRM dan Motomboto North serta domain oxide dan Silika Au transisi dari prospek Sungai Mak. Melakukan persiapan untuk kegiatan pengeboran copper project di area Prospek Cabang Kiri. dan Motomboto North serta domain oxide dan Silika Au transisi dari prospek Sungai Mak 4. Preparing for drilling activities for the copper project in the Cabang Kiri prospect area. Hambatan Eksplorasi Barriers to Exploration 1 Adanya aktifitas Penambangan Tanpa Izin (PETI) di area rencana pengeboran Prospek Motomboto. 1. An Illegal Mining Activity (PETI) in the drilling planned area of the Motomboto Prospect. 2. New Illegal Mining Activity (PETI) in the 2. Munculnya aktifitas Penambangan Tanpa opening area alongside the pioneering road Izin (PETI) baru di area sepanjang jalur construction bukaan jalan perintis. Perizinan/Persetujuan Baru Yang Diperoleh New Permit/Approvals Acguired AN &
Page 10 OCR 0.922
(SP BRM
IV. PT Linge Mineral Resources
Nama Perusahaan PT Linge Mineral Resources ("PT LMR")
(Name of Company)
Tahap Kegiatan IUP Eksplorasi (Exploration)
(Phase of Activity of Mining Permit
Laporan Eksplorasi Periode 1 April — Juni (April - June) 2024
(Period of Exploration Repori
A. | Daerah Eksplorasi Exploration Areas
1. Prospek Bulan (Proyek Abong) 1. Bulan Prospect (Abong Project)
2. Prospek Bintang 1 (Proyek Abong) 2. Bintang 1 Prospect (Abong Project)
3. Prospek Bintang 2 (Proyek Abong) 3. Bintang 2 Prospect (Abong Project)
4. Eksplorasi Regional IUP 4. Regional Exploration IUP
B. | Biaya Eksplorasi Exploration Costs
75.723 Dollar AS USD75,723
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
1. Melanjutkan kegiatan pemetaan detail | 7. Continued geology exploration detail activities or
geologi atau follow up work di area proyek follow up work in the field in Abong Project ,
Abong (Bulan, Bintang, Lumut, Kapar) namely Bulan, Bintang, Lumut and Kapar wita
dengan total 65 sampel batuan. total 65 rock chip samples.
2. Melanjutkan kegiatan eksplorasi regional | 2. Continued exploration activities in the field in the
Pantan Nangka, Owag dengan total 12 form of regional geological surveys namely
sampel batuan. Pantan Nangka and Owag with a total 12 rock
chip samples.
3. Melanjutkan mapping geologi IUP di daerah | 3 Continued geology mapping on IUP, namely
Lumut Barat, Owag Barat dan Pantan West Lumut, West Owag and Pantan Nangka.
Nangka. 4. The Total 80 sample rock Chip from geology
4. Total sampel batuan sebanyak 80 sampel dari mapping have been sent to PT Geoservices
pemetaan geologi telah dikirimkan ke Laboratory for geochemical analysis Undluded
Laboratorium PT Geoservices untuk analisis Blank Samples).
geokimia (termasuk sample blank).
5. Proses penyelesaian studi AMDAL dan | 5. The process of completing the AMDAL study and
permohonan Persetujuan Teknis Pembuangan reguesting Technical Approval for Waste Water
Air Limbah ke Badan Permukaan Air serta Disposal to Surface Water Bodies as well as
permohonan Persetujuan Teknis Pengelolaan reguesting Technical Approval for 83 Waste
Limbah B3 kepada Kementerian Lingkungan Management to the Ministry of Environment and
Hidup dan Kehutanan. Forestry.
D. | Pihak-Pihak yang Terlibat Parties Involved
PT Bahtera Ratu Engineering PT Bahtera Ratu Engineering
PT Geoservices PT Geoservices
E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
AMDAL AMDAL
F. | Kemajuan Eksplorasi Terhadap Kegiatan Bulan Exploration Progress toward Previous Month's
Sebelumnya Activities
1. Pada periode ini, PT LMR telah menyelesaikan | 1. In this period, PT LMR has completed exploration
kegiatan eksplorasi di lapangan berupa activities in the field in work carried stream
pengambilan Stream Sediment dan survei sediment and regional geological survey namely
PA)
Page 11 OCR 0.926
(SP BRM regional geologi yaitu Pantan Nangka, Lumut Pantan Nangka,west lumut and west Owag. bagian barat dan Owag Bagian barat. 2. Menyelesaikan analisis geokimia 95 sampel | 2. Completing the analysis of 95 stream sediment Stream Sediment di Laboratorium PT Intertek samples by PT Intertek Laboratory dan 196 Rock dan 196 sampel Rock Chip Regional di Chip Samples by PT Geoservices Laboratory Laboratorium PT Geoservices. 3. Melakukan interpretasi dan pemodelan | 3 Geological interpretation and modeling of the geologi Prospek Abong (validasi bawah Abong Prospect (subsurface validation and permukaan dan sebaran permukaan) untuk surface distribution) for GAP mineral analysis keperluan GAP analisis mineral. 4. Proses penyelesaian studi AMDAL dan | 4. The process of completing the AMDAL study and permohonan Persetujuan Teknis Pemenuhan reguesting Technical Approval Fulfillment of Baku Mutu Air Limbah dalam rangka Waste Water Guality Standards in the framework Pembuangan Air Limbah ke Badan of Waste Water Disposal to Surface Water Bodies Permukaan Air serta permohonan Persetujuan as well as reguesting Technical Approval for B3 Teknis Pengelolaan Limbah B3 kepada Waste Management to the Ministry of Kementerian Lingkungan — Hidup — dan Environment and Forestry Kehutanan. Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pemetaan detail | 7. Continued geology exoloration detail activities or geologi atau follow up work di area proyek follow up work in the field in Abong Project. Abong. 2. Melanjutkan kegiatan eksplorasi regional dan | 2. Continued regional exploration and sterilization sterilisasi IUP di daerah Serule dan Penarun. IUP, namely Serule and Penarun. 3. Melanjutkan kegiatan eksplorasi lanjutan atau | 3. Continuing further exploration activities or follow follow up work North Bintang, North Bulan, up work North Bintang, North Bulan, Lumut Lumut (Ujung Kambing dan Genting Kari). (Ujung Kambing and Genting Kari). 4. Merencanakan pekerjaan pengeboran sesuai | 4. Plan drilling work according to technical needs kebutuhan teknis terkait data untuk regarding data to carry out metallurgical, dilakukan studi metalurgi, geotek dan geotechnical and hydrogeological studies in the hidrogeologi di dalam Proyek Abong. Stage 1 Abong Project. Stages 1 with a total 2000 meters dengan total 2000 meter 18 lubang with 18 hole. 5. Melanjutkan penyelesaian studi AMDAL dan | 5. Continue to complete the AMDAL study and mendapatkan Persetujuan Teknis Technical Approval for Waste Water Disposal to Pembuangan Air Limbah ke Badan Surface Water Bodies as well as Technical Permukaan Air serta Persetujuan Teknis Approval for B3 Waste Management. Pengelolaan Limbah B3. Hambatan Eksplorasi Barriers to Exploration 1. Adanya kegiatan Penambangan Tanpa Izin | 7. There are Illegal Mining (PETI) activities in Bulan (PETI) di Prospek Bulan Prospect. 2. Munculnya pihak ketiga yang akan | 2 The emergence of a third party that will mengakomodir PETI di Prospek Abong. accommodate PETI in the Abong Prospect Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired AN
Page 12 OCR 0.902
(SS BRM V. PT Suma Heksa Sinergi Nama Perusahaan (Name of Company Tahap Kegiatan IUP (Phase of Activity of Mining Permit) Laporan Eksplorasi Periode (Period of Exploration Report) PT Suma Heksa Sinergi (“PT SHS”) Operasi Produksi (Production Operation Phase) April — Juni (April - June) 2024 A. | Daerah Eksplorasi Exploration Areas Prospek Cisadang Central dan Cisadang North Cisadang Central and Cisadang North Prospect B. | Biaya Eksplorasi Exploration Costs 294.970,54 Dollar AS USD294,970.54 C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities 1. Melanjutkan kegiatan pemetaan geologi di | 1. Continuing geological mapping activities in the Prospek Cisadang Central dan Cisadang Cisadang Central and Cisadang North Prospect. North. 2. Melanjutkan kegiatan rekonstruksi corel 2. Continuing core drilling — reconstruction pengeboran. activities. 3. Melakukan kegiatan pengeboran di Prospek | 3. Conducting drilling activities at the Cisadang Cisadang Central untuk program pemboran Central Prospect for infill resources drilling sumberdaya. program. 4. Melanjutkan kerjasama dengan konsultan | 4 Continuing to collaborate with consultant for untuk cadangan JORC. JORC Reserve. 5. Melanjutkan kerjasama dengan konsultan | 5. Continuing to collaborate with consultant for untuk Metallurgy dan Processing. Metallurgy and Processing. 6. Melakukan pengiriman sampel inti bor | & Sending a total 772 drill core samples from sejumlah 772 conto untuk analisa geokimia metallurgical study drilling program for (Au, Ag) dengan metode fire assay dan ICP geochemical analysis (Au, Ag) with fire assay OES. dan ICP OES. 7. Melakukan pengiriman sampel inti bor batch | 7. Sending drill core sample for second batch of kedua sejumlah total 32 sampel untuk uji geotechnical study drilling program with a total geoteknik ke laboratorium LAPI, Institut 32 samples for geotechnical test and have been Teknologi Bandung (ITB). sent to LAPI laboratory, Institute of Technology Bandung (ITB). 8. Melanjutkan proses permohonan | 8. Continuing the Forest Area Use Approval Persetujuan Penggunaan Kawasan Hutan (“PPKH") application process for further (“PPKH”) untuk eksplorasi lanjutan. exploration. D. | Pihak-Pihak yang Terlibat Involved Parties 1. PT Namsuma Luban Abadi 1. PT Namsuma Luban Abadi 2. PT COMO Engineers Indonesia 2. PT COMO Engineers 3. Koperasi Produsen Limantaka 3. Koperasi Produsen Limantaka 4. PT Asahi Diamond Industrial Indonesia 4. PT Asahi Diamond Industrial Indonesia NA Ha 2
Page 13 OCR 0.899
(SS BRM 5. PT Haluan Baru Energi 6. PT Tera Widyagama 7. Laboratorium PT Geoservices 8. CV Banten Central Link 9. PT Anugerah Mitra Sejahtera 10. PT Bahtera Ratu Engineering 11. PT LAPI ITB 12. PT Parama Asha Nirwana OS ND» PT Haluan Baru Energi PT Tera Widyagama PT Geoservices Laboratory CV Banten Centra Link PT Anugerah Mitra Sejahtera 10. PT Bahtera Ratu Engineering 11. PT LAPI ITB 12. PT Parama Asha Nirwana Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area Specific Gravity Fire Assay Agua Regia Digest ICP OESA unsur Uji Physical Properties (PP), Uji Brazilian (B2), Uji Uniaxial Compresive Strength (UCS), Uji Triaxial, Uji Direct Shear (DS) Specific Gravity Fire Assay Agua Regia Digest ICP OESA elements Physical Properties (PP) Test, Brazilian Test (B2), Uniaxial Compresive Strength (UCS) Test, Triaxial Test, Direct Shear Test (DS) Kemajuan Eksplorasi Terhadap Kegiatan Bulan Sebelumnya Exploration Progress toward Previous Month's Activities 1. Kegiatan rekonstruksi core pengeboran telah diselesaikan sebanyak 125 lubang bor dari total 209 lubang bor. Kemajuan pemetaan geologi di Prospek Cisadang Central sudah selesai 10044 Kemajuan pemetaan geologi di Prospek Cisadang North sudah mencapai 2046 Melakukan pengeboran infi// sumberdaya di prospek Cisadang Central sebanyak 6 lubang bor dengan total kedalaman 1590.10 meter dari total rencana 44 titik lubang bor dengan total target kedalaman 10000 meter. Penambahan jumlah sampel hasil pengeboran dari titik pengeboran infill sumberdaya sejumlah 772 conto yang dikirim ke laboratorium Geoservices untuk analisa geokimia (Au, Ag,) dengan metode fire assay dan ICP OES. Penambahan — jumlah — sampel hasil pengeboran studi geoteknik sejumlah total 32 sampel untuk uji geoteknik ke laboratorium — LAPI, Institut — Teknologi Bandung (ITB). 1. Drilling core reconstruction activities have been completed in 125 drill holes of 209 total drill holes. Geological mapping progress in Cisadang Central Prospect has been completed 10096. Geological mapping progress in Cisadang North Prospect has reached 2096 completion. Conducting 6 infill resources drilling in Cisadang Central prospect with a total depth of 1590.10 meters from a total of 44 planned drill holes with a total target depth of 10000 meters. Additional drill core samples from infill resources drilling program with a total 772 samples has been sent to Geoservices laboratory for geochemical analysis (Au, Ag) with fire assay and ICP OES. Additional — drill core samples — from geotechnical study drilling program with a total 32 samples for geotechnical analysis and has been sent to LAPI laboratory, Institute of Technology Bandung (ITB). pn aa
Page 14 OCR 0.899
(PS BRM Rencana Selanjutnya Next Plan 1. Melanjutkan kegiatan pemetaan geologi di Prospek Cisadang North. 2. Melanjutkan kegiatan pengeboran di Prospek Cisadang Central untuk program pemboran sumberdaya. 3. Melanjutkan kegiatan pengeboran di Prospek Cisadang Central untuk studi geoteknik dan hidrogeologi yang berada di Kawasan Hutan Produksi (HP). 1. Continuing geological mapping activity at Cisadang North prospect 2. Continuing drilling activities at the Cisadang Central Prospect for infill resources drilling program. 3. Continuing drilling activities at the Cisadang Central Prospect for geotechnical and hydrogeological studies in Production Forest Area. 4. Melanjutkan kegitan rekonstruksi corel 4. Gontinuing of core drilling reconstruction from pengeboran dari kegiatan pengeboran historical drillhole. terdahulu. Hambatan Eksplorasi Barriers to Exploration 1. Perizinan terkait Persetujuan Penggunaan Kawasan Hutan (“PPKH") untuk eksplorasi lanjutan masih dalam proses pengurusan di Kementerian Lingkungan Hidup — dan Kehutanan Republik Indonesia. 2. Keberadaan lokasi IUP PT SHS berada di dekat area pemukiman masyarakat. 1. Permit related to Forest Area Use Aoproval (“PPKH”) for further exploration is still being processed in the Ministry of Environment and Forestry of Republic of Indonesia. 2. The location of the IUP PT SHS is near a community residential area. Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired Le pp"
Names mentioned 55 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Citra Palu Minerals Nama Perusahaan
p.1
unresolved
org
PT Citra Palu Minerals
p.1 ×2
unresolved
org
PT Geoservices.
p.2 ×15
unresolved
org
PT Geoservices Laboratory. Pihak-Pihak
p.2
unresolved
org
PT CPM Laboratory
p.2
unresolved
org
PT Sumagud Sapta Sinar
p.2 ×2
unresolved
org
PT Geoservices Laboratory
p.2 ×6
unresolved
org
PT IOL Indonesia
p.2 ×2
unresolved
org
PT Intertek Utama Service
p.2 ×2
unresolved
org
Direktorat Jenderal Mineral dan Batubara No. B-
p.4
unresolved
org
PT Citra Palu Minerals Tahun
p.4
unresolved
org
PT. Dairi Prima Mineral
p.5 ×2
unresolved
org
PT Dairi Prima Mineral Operasi Produksi
p.5
unresolved
org
PT DPM
p.6 ×3
unresolved
org
Menteri Energi dan Sumber Daya Mineral
p.6
unresolved
org
Direktorat Jenderal Mineral
p.6
unresolved
org
PT Gorontalo Minerals
p.7 ×2
unresolved
org
PT GM
p.7
unresolved
org
PT Geoservices Laboratorium Geomekanika ITB Laboratorium Teknik Lingkungan
p.8
unresolved
org
PT Adiprotek Envirodunia
p.8 ×2
unresolved
org
PT ITS Tekno Sains
p.8 ×2
unresolved
org
PT LAPI ITB Indo Mineral Research Laboratorium
p.8
unresolved
org
PT Geoservice Laboratory ITB Geomechanics Laboratory ITENAS Environmental
p.8
unresolved
org
PT LAPI ITB
p.8 ×3
unresolved
org
PT Geoservices. Menyelesaikan
p.8
unresolved
org
PT Linge Mineral Resources Nama Perusahaan
p.10
unresolved
org
PT Linge Mineral Resources
p.10
unresolved
org
PT LMR
p.10 ×3
unresolved
org
Permukaan Air
p.10
unresolved
org
Kementerian Lingkungan Management
p.10
unresolved
org
Ministry of Environment
p.10 ×2
unresolved
org
PT Bahtera Ratu Engineering
p.10 ×4
unresolved
org
PT Geoservices E.
p.10
unresolved
org
PT Intertek
p.11
unresolved
org
PT Intertek Laboratory
p.11
unresolved
org
PT Geoservices Laboratory Laboratorium
p.11
unresolved
org
Ministry of Kementerian Lingkungan
p.11
unresolved
org
Surface Water Bodies
p.11
unresolved
org
PT Suma Heksa Sinergi Nama Perusahaan
p.12
unresolved
org
PT Suma Heksa Sinergi
p.12
unresolved
org
PT SHS
p.12 ×3
unresolved
org
PT Namsuma Luban Abadi
p.12 ×2
unresolved
org
PT COMO Engineers Indonesia
p.12
unresolved
org
PT COMO Engineers
p.12
unresolved
org
Koperasi Produsen Limantaka
p.12 ×2
unresolved
org
PT Asahi Diamond Industrial Indonesia
p.12
unresolved
org
PT Asahi Diamond Industrial Indonesia NA Ha
p.12
unresolved
org
PT Haluan Baru Energi
p.13 ×2
unresolved
org
PT Tera Widyagama
p.13 ×2
unresolved
org
PT Anugerah Mitra Sejahtera
p.13 ×2
unresolved
org
PT Parama Asha Nirwana OS ND
p.13
unresolved
org
PT Geoservices Laboratory CV Banten Centra Link
p.13
unresolved
org
PT Parama Asha Nirwana Metode Pengujian
p.13
unresolved
org
Kementerian Lingkungan Hidup
p.14
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.