Skip to content
Back to announcement

20240710_BRMS_Laporan Bulanan Aktivitas Eksplorasi_31682556_lamp2.pdf

Other Text extracted BRMS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 14

Page 1 OCR 0.918
(SP BRM

PT Bumi Resources Minerals Tbk.
Bakrie Tower, 6 & 10” Floor
Komplek Rasuna Epicentrum

Jl. H.R. Rasuna Said, Kuningan
Jakarta Selatan 12940

Indonesia

T 46221 5794 5698
F 46221 5794 5687
www.bumiresourcesminerals.com

LAPORAN TENTANG AKTIVITAS EKSPLORASI
OLEH ANAK PERUSAHAAN PT BUMI RESOURCES MINERALS TBK.
(REPORT ON EXPLORATION ACTIVITIES
BY SUBSIDIARIES OF PT BUMI RESOURCES MINERALS TBK.)

PT Citra Palu Minerals

Nama Perusahaan

(Name of Company)

Tahap Kegiatan KK

(Phase of Activity of Contract of Work)

Laporan Eksplorasi Periode
(Period of Exploration Report)

PT Citra Palu Minerals (“PT CPM”)

Operasi Produksi (Production Operation)

April - Juni (April - June) 2024

Daerah Eksplorasi Exploration Areas
1. Blok I, Sulawesi Tengah (Operasi Produksi) 1. Block 1, Central Sulawesi (Production
2. Blok Il, Sulawesi Selatan (Eksplorasi) Operation)
3. Blok IV, Sulawesi Tengah (Eksplorasi) 2. Block Il, South Sulawesi (Exploration)
4. Blok V, Sulawesi Tengah (Eksplorasi) 3. Block IV, Central Sulawesi (Exploration)
5. Blok VI, Sulawesi Tengah (Eksplorasi) 4. Block V, Central Sulawesi (Exploration)
5. Block VI, Central Sulawesi (Exploration)

Biaya Eksplorasi

Exploration Cost

1.038.613,61 Dollar AS

USD 1.038.613,61

Bentuk Kegiatan Eksplorasi

Form of Exploration Activities

1. Melanjutkan kegiatan pengeboran sumber
daya di Prospek River Reef, Blok I Poboya,
dengan total kedalaman saat ini 56.724,00m.

2. Melanjutkan kegiatan pengeboran sumber
daya di area Watu Putih, Blok | Poboya,
dengan total kedalaman saat ini 14.686,05m.

3. Melanjutkan kegiatan pengeboran eksplorasi
di area Prospek Hill Reef 1, Blok | Poboya,
dengan total kedalaman saat ini 15.820,35m.

4. Melanjutkan kegiatan pemetaan geologi di
Area Malomba, Ogowele, Anggasan, dan
Taanes, Blok IV, dengan total 463 sampel
batuan dan 1125 sampel tanah.

5. Melakukan kegiatan survey geofisika CSAMT
dengan total lintasan 14.950m dan pemetaan

1. Continued resource drilling program at the
River Reef Prospect, Block I Poboya, with a
current total depth of 56,724.00m.

2. Continue resource drilling program in the
Watu Putih area, Block 1 Poboya, with a
current total depth of 14,686.05m.

3. Continued exploration drilling program in the
Hill Reef 1 Prospect area, Block I Poboya, with
a current total depth of 15,820.35m.

4. Continued geological mapping activities in
Malomba, Ogowele, Anggasan and Taanes
Areas, Block IV, with & total of 463 rock
samples and 1125 soil samples.

5. Conduct CSAMT geophysical survey with a
total length 14,950m and geological mapping

oi |

kh
Page 2 OCR 0.902
(SP BRM

geologi sepanjang jalur lintasan survey in geophysical survey line covered 133.25Ha
geofisika mencakup luasan area sebesar area and collected 16 rock samples.
133,25Ha dan mengumpulkan 16 conto
batuan
6. Melakukan pengiriman sampel inti bor untuk |6. Carried out geochemical analysis from drill
analisis geokimia (Au, Ag, Cu, Pb, Zn, As, Sb, core samples (Au, Ag, Cu, Pb, Zn, As, Sb, Mo,
Mo, Hg dan kombinasi Au 4 ICP OES multi Hg and combination of Au & ICP OES multi
elemen) dan analisi AAT (Air Asam Tambang) elements) and AAT (Acid Mine Drainage)
ke Laboratorium PT Geoservices. analysis by PT Geoservices Laboratory.
Pihak-Pihak yang Terlibat Involved Parties
1. Laboratorium PT CPM 1. Internal PT CPM Laboratory
2. PT Sumagud Sapta Sinar 2. PT Sumagud Sapta Sinar
3. Laboratorium PT Geoservices 3. PT Geoservices Laboratory
4.  Bureau Varitas — PT IOL Indonesia 4.  Bureau Varitas — PT IOL Indonesia
5. PT Pos Indonesia 5. PT Pos Indonesia
6. PT Intertek Utama Service 6. PT Intertek Utama Service
PT Geoservices - Divisi Eksplorasi Z. PT Geoservices — Exploration Division
Metode Pengujian dan Pemilihan Areal Testing Method and Selection Area
1. AAS 1. AAS
2.  Spedfic Gravity 2. Speafic Gravity
3. Fire Assay 3. Fire Assay
4.  Agua Regia Digest 4. Agua Regia Digest
5. Hg Analisis 5. Hg Analysis
6. ICP OES 42 unsur 6. ICP OES 42 elements
7. Natural density, dry density, seturated | 7. Natural density, dry density, saturated density,
density, Brazillian test, direct shear, ultrasonic Brazillian test, direct shear, ultrasonic velocity,
velocity, UCS UCS
8. Analisis Air Asam Tambang 8. ARD Test
9. Survey Geofisika CSAMT 9. CSAMT Geophysical Survey

Kemajuan Eksplorasi Terhadap Kegiatan Triwulan
Sebelumnya

Exploration Progress toward the Preceding |

Guarter Activities

1.

Pengeboran sumber daya di Prospek River
Reef dilakukan dengan menggunakan 3 rig.
Total 254 titik bor, termasuk 3 titik bor
hidrogeologi dan 5 titik bor geotek, dengan
total kedalaman 56.724.00m sampai akhir
Juni 2024. Terdapat penambahan 12 titik
bor dengan jumlah kedalaman 3.557,60m
dari periode sebelumnya.

Pengeboran sumberdaya di Prospek Watu
Putih dilanjutkan dengan menggunakan 1
rig. Total 43 titik bor dengan total

ia

Resources drilling program in Poboya River
Reef Prospect Block I was conducted using 3
rgs. A Total of 254 drill holes, induded 3
hydrogeology holes and 5 geotech holes, with
total depth of 56,724.00m has been reached
by the end of June 2024. There are 12
additional drill holes with total depth of
3,557.60m from previous period.

Resources drilling program in Watu Putih
Prospect was continued using 1 rig. A total of
43 drill holes with total depth of 14,686.05m

1
Page 3 OCR 0.925
(SP BRM

kedalaman 14.686,05m sampai akhir Juni
2024. Terdapat penambahan 4 titik bor
dengan jumlah kedalaman 1.417,30m dari
periode sebelumnya.

Pengeboran eksplorasi di Prospek Hill Reef 1
dilanjutkan dengan menggunakan 1 rig.
Total 172 titik bor dengan total kedalaman
15.820,35m sampai akhir Juni 2024.
Terdapat penambahan 15 titik bor dengan
jumlah kedalaman 1.095,70m dari periode
sebelumnya

Survey geofisika CSAMT di Blok | Poboya
sebanyak 14.950m dari total 38.000m
mencakup 3 dari 8 lintasan survey. Pemetaan
geologi di sepanjang jalur lintasan survey
geofisika CSAMT meliputi area seluas
133,25Ha dan mengumpulkan 16 conto
batuan.

Penambahan jumlah sampel sebanyak 2.130
sampel hasil pengeboran Prospek River Reef
Blok I Poboya yang dikirim ke Laboratorium
PT Geoservices untuk dianalisis geokimia
(Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan
kombinasi Au #- ICP 42 unsur), serta 22
sampel untuk analisis AAT (Air Asam
Tambang)

Penambahan jumlah sampel sebanyak 1.342
sampel hasil pengeboran Prospek Watu Putih
Blok | Poboya yang dikirim ke Laboratorium
PT Geoservices untuk dianalisis geokimia
(Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan
kombinasi Au 4 ICP 42 unsur.

Penambahan jumlah sampel sebanyak 882
sampel hasil pengeboran Prospek Hill Reef 1
Blok I Poboya yang dikirim ke Laboratorium
PT Geoservices untuk dianalisis geokimia
(Au, Ag, Cu, Pb, Zn, As, Sb, Mo, Hg dan
kombinasi Au 4 ICP 42 unsur dan 33 sampel
untuk analisis air asam tambang.

Total penambahan sebanyak 44 sampel

batuan berasal dari kegiatan pemetaan
geologi di Area Taanes Blok IV.

has been reached by the end of June 2024.
There are adojtional 4 drill holes with total
depth of 1,417.30m from previous period,

Exploration drilling program in Hill Reef 7
Prospect was continued using 1 rig. A total of
172 drill holes with total depth of
15,820.35m has been reached by the end of
June 2024. There are additional 15 drill holes
with total depth of 1,095.70m from previous
period,

CSAMT geophysical survey in Block 1 Poboya
with total length 14,950m of 38.000m from
3 of 8 survey line. Geological mapping in
CSAMT geophysical survey line covered
133.25Ha area and collected 16 rock samples.

Additional 2, 130 drill core samples from River
Reef Prospect of Block 1 Poboya drilling
program have been sent to PT Geoservices
Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
As, Sb, Mo, Hg and combination Au # ICP 42
elements), also 22 samples for ARD (Acid
Rock Drainage).

Additional 1,342 drill core samples from Watu
Putih Prospect of Block 1 Poboya drilling
program have been sent to PT Geoservices
Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
As, Sb, Mo, Hg and combination Au 4 ICP 42
elements).

Additional 882 drill core samples from Hill
Reef 1 Prospect of Block I Poboya drilling
program have been sent to PT Geoservices
Laboratory to be analyzed (Au, Ag, u, Pb, Zn,
As, Sb, Mo, Hg and combination Au 4 ICP 42
elements) and 33 sample for ARD (Acid Rock
Drainage).

Total additional 44 rock samples collected
from geological mapping activity at Taanes
Area, Block IV.

pp"

Page 4 OCR 0.907
(SP BRM

Rencana Selanjutnya

Next Plan

1.

Melanjutkan kegiatan pengeboran di Prospek
River Reef Blok I Poboya dengan tujuan
untuk menambah sumber daya di Prospek
River Reef.

k

Continue resources drilling program in River
Reef Prospect of Block I Poboya Prospect with
objectives to increase resources in River Reef
Prospect.

2. Melanjutkan kegiatan pengeboran di Prospek | 2. Continue resources drilling program in
Watu Putih Blok I Poboya dengan tujuan Watuputih Prospect of Block 1 Poboya
untuk meningkatkan sumber daya dan Prospect with the objective of resources
cadangan di Prospek Watuputih. definition in Watuputih Prospect.

3. Melanjutkan kegiatan pengeboran eksplorasi | 3. Continue exploration drilling program in Hill
di Prospek Hill Reef 1 Blok I Poboya dengan Reef 1 Prospect of Block 1 Poboya Prospect
tujuan untuk mengetahui potensi bijih kadar with the objective is to test the potential of
rendah pada kedalaman dangkal. low grade ore at shallow level.

4. Memulai survei geokimia stream sediment di | 4. Start geochemical stream sediment survey at
Blok V Moutong. Block V Moutong.

5. Melanjutkan kegiatan survey geofisika | 5. Continue CSAMT geophysical survey at Block I
CSAMT di blok | Poboya diikuti dengan Poboya followed by CSAMT line survey
pemetaan geologi di sepanjang lintasan geological mapping.
survey CSAMT.

Hambatan Eksplorasi Barriers to Exploration

1. Kegiatan penambangan tanpa izin (PETI) | 1. Mega mining activities by local community.
oleh masyarakat sekitar

2. Pembebasan lahan. 2. Land acguisition.

Perizinan/ Persetujuan Baru Yang Diperoleh

New Permit/Approvals Acguired

Surat Direktorat Jenderal Mineral dan Batubara
No. B-696/MB.04/DJB.M/2024 perihal Persetujuan
RKAB Kontak Karya PT Citra Palu Minerals Tahun
2024 — 2026 pada tanggal 6 April 2024.

Directorate General of Mineral and Coal Letter
No. B-696/MB.04/DJB.M/2024 regarding Approval
of 2024 — 2026 Annual Activity and Budget Plan
of CoW PT Citra Palu Minerals dated on April 6",
2024.

—77" 8
Page 5 OCR 0.907
Nama Perusahaan

(SP BRM

PT. Dairi Prima Mineral

(Name of Company

Tahap Kegiatan KK

(Phase of Activity of Contract of
Work)

Laporan Eksplorasi Bulan

(Monthiy Exploration Repord

PT Dairi Prima Mineral

Operasi Produksi

April — Juni (April - June) 2024

A. | Daerah Eksplorasi Exploration Areas
Kegiatan eksplorasi pada Prospek Anjing Hitam | #iled exploration activities on Anjing Hitam
sudah selesai dilakukan dan saat ini prospek | Prospect has already been completed. The
tersebut memasuki tahap Operasi Produksi. prospect currentiy is in Operation and Production
Selain Prospek Anjing Hitam, di dalam wilayah | stage.
Kontrak Karya DPM masih terdapat prospek- | Beside Anjing Hitam Prospect, there are some
prospek lainnya dengan tahap kegiatan yang | other prospect areas within DPM Contract of
berbeda-beda dari eksplorasi regional hingga | Work tenement. The prospects work progress are
pengeboran deliniasi sumberdaya. in different stages, range from regional
Salah satu prospek yang paling maju | @x0loration to delineation resource drilling.
pengerjaannya adalah Prospek Lae Jehe yang | Lae Jehe Prospect is the most advantage
terletak sekitar 200 meter di sebelah baratlaut | exploration activities. This prospect is situated
Prospek Anjing Hitam. Prospek ini sudah | approximately 200 meters toward northwest
memasuki tahap pengeboran deliniasi | rom Anjing Hitam Prospect. This prospect work
sumberdaya dan masih akan dikembangkan | stage is in resource delineation drilling and will
hingga didapatkan sumberdaya mineral dengan | be developed to get final mineral resource value
klasifikasi terukur dan tertunjuk yang lebih | with dominant measured and indicated mineral
dominan. resources dlassification.

B. | Biaya Eksplorasi Exploration Costs
29.017,45 Dollar AS USD 29,017.45

C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities
Selama Bulan April hingga Juni 2024 tidak ada | During April to June 2024 there is no exploration
kegiatan eksplorasi. activities.

B | Pihak-Pihak yang Terlibat Parties Invoved

E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area

F. | Kemajuan Eksplorasi Terhadap Bulan sebelumnya | Exploration Progress relative to Preceding

Month's Activities

Y

pn AN

Page 6 OCR 0.878
(SP BRM

Rencana Pengeboran Selanjutnya

Next Drilling Plan

Penambahan titik bor di Prospek Lae Jehe dan

Basecamp

INN drilling in Lae Jehe and Basecamp Prospect

Hambatan Eksplorasi

Barriers to Exploration

Izin PPKH Eksplorasi

PPKH Exploration permit.

Perizinan / Persetujuan Baru Yang Diperoleh

New Permits/Approvals Acguired

# Persetujuan Addendum Amdal tanggal 11
Agustus 2022

# Persetujuan RKAB No.T-
660/MB.04/DJB.M/2022 tanggal 11 Pebruari
2022.

e DPM telah mendapatkan Persetujuan Tekno-
Ekonomi Dokumen Studi Kelayakan Kontrak
Karya PT Dairi Prima Mineral berdasarkan
Surat Persetujuan No. 2150/30/DBM/2015.

e Tahap kegiatan PT DPM disesuaikan menjadi
Tahap Operasi Produksi berdasarkan Surat
Keputusan Menteri Energi dan Sumber Daya
Mineral No. 456.K/30/DJB/2017.

e Letter of Addendum AMDAL Approval 17
August 2022

» DPM 2022 work plan approval No. No.T-
660/MB.04/DJB.M/2022, 11 February 2022.

e Letter from Direktorat Jenderal Mineral dan
Batubara No. 2150/30/DBM/2015 awarding
Techno-£conomic — Approval of Feasibility
Study Document Contract of Work of PT DPM
has already been received.

e PT DPM work activity has already been
adjusted became Operation Production Phase
based on Decree of Energy and Mineral
Resources Minister No. 456.K/30/DJB/2017.

aa
pn

ko
Page 7 OCR 0.881
W.
Nama Perusahaan

(SP BRM

PT Gorontalo Minerals

(Name of Company

Tahap Kegiatan KK

(Phase of Activity of Contract of Work)

Laporan Eksplorasi Bulan

(Monthiy Exploration Report)

PT Gorontalo Minerals (“PT GM")

Operasi Produksi (Production Operation)

April — Juni (April - June) 2024

A. | Daerah Eksplorasi Exploration Areas
1. Prospek Sungai Mak, Blok 1 (Tombulilato), | 1. Sungai Mak Prospect, Block 1 (Tombulilato)
Gorontalo Gorontalo
2. Prospek  Motomboto North, Blok I| 2. Motomboto North Prospect Block 1
(Tombulilato), Gorontalo (Tombulilato), Gorontalo
3. Prospek Motomboto East, Blok | (Tombulilato), | 3. Motomboto East Prospect, Block 1
Gorontalo (Tombulilato), Gorontalo
4. Prospek Kayubulan, Blok 1 (Tombulilato), | 4. Kayubulan Prospect, Block 1 (Tombulilato),
Gorontalo Gorontalo
5. Prospek Cabang Kiri East, Blok | (Tombulilato), | 5. Cabang Kiri East Prospect, Block 1
Gorontalo (Tombulilato), Gorontalo
B. | Biaya Eksplorasi Exploration Costs
209.528,66 Dollar AS USD209, 528.66
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities

Ts

Total sampel tanah sebanyak 366 sampel
dari Prospek Sungai Mak telah dikirimkan ke
Laboratorium PT Geoservices untuk analisis
geokimia.

Melanjutkan pengujian Geoteknik batch II
sebanyak 102 sampel batuan dari Prospek
Motomboto East, Blok I Tombulilato ke
Laboratorium Geomekanika ITB.

Melanjutkan pengujian metalurgi column
test untuk Domain Oxide dari Prospek
Motomboto North, Prospek Motomboto
East, dan Prospek Sungai Mak di
Laboratorium Geoservices dibawah
pengawasan Metso-Autotec.

Melakukan pemetaan geologi — dan
pengambilan sampel batuan permukaan di
area Prospek Cabang Kiri East.

Total sampel batuan permukaan sebanyak
1010 sampel dari Prospek Kayubulan, Sungai
Mak, Motomboto, dan Cabang Kiri telah
dikirim ke Laboratorium PT Geoservices

1. The total 366 soil samples from Sungai Mak
Prospect have been sent to PT Geoservices
Laboratory for geochemical analysis.

2. Continuing the geotechnical testing of
batch II, comprising 102 rock samples from
the Motomboto East Prospect Block 1
Tombulilato, — to the Geomechanics
Laboratory at ITB.

3. Continuing the metallurgical column test for
the Oxide Domain from the Motomboto
North Prospect, Motomboto East Prospect,
and Sungai Mak Prosoect at the Geoservices
Laboratory under the supervision of Metso-
Autotec

4. Conducting  geological — mapping and
collecting surface rock samples in the
Cabang Kiri East Prospect area.

5. A total of 1010 surface rock samples from
the Kayubulan, Sungai Mak, Motomboto,
and Cabang Kiri prospects have been sent to
PT Geoservices Laboratory for geochemical

we

TP DA
Page 8 OCR 0.912
(SP BRM

untuk analisis geokimia.

Melakukan kegiatan tapping compass dan
ridge spur soil sampling pada Prospek
Cabang Kiri, Blok I Tombulilato.

Melanjutkan estimasi sumber daya dan
cadangan untuk Prospek Motomboto East
dan Motomboto North serta domain oxide
dan Silika Au transisi dari prospek Sungai
Mak.

analysis.

6. Conducting taoping compass activities and
ridge-spur soil sampling in the Cabang Kiri
Prospect, Block / Tombulilato.

Z. Continuing resource and reserve estimation
for the Motomboto East and Motomboto
North Prospects, as well as the oxide domain
and Silica Au transition from the Sungai Mak
Prospect.

Pihak-Pihak yang Terlibat

Parties Involved

1.

Ona Uu

Laboratorium PT Geoservices
Laboratorium Geomekanika ITB
Laboratorium Teknik Lingkungan ITENAS
PT Adiprotek Envirodunia

PT ITS Tekno Sains

PT LAPI ITB

Indo Mineral Research Laboratorium

NO P WN

PT Geoservice Laboratory

ITB Geomechanics Laboratory

ITENAS Environmental Technic Laboratory
PT Adiprotek Envirodunia

PT ITS Tekno Sains

PT LAPI ITB

. Indo Mineral Research Laboratorium

Metode Pengujian dan Pemilihan Areal

Testing Method and Selection of Area

Kemajuan Eksplorasi Terhadap Kegiatan Triwulan
Sebelumnya

Exploration Progress toward Previous Ouarters

Activities

1,

Menyelesaikan analisis 19 sampel petrografi
dan 18 sampel mineragrafi dari Prospek
Motomboto North ke LAPI-ITB Bandung.

Menyelesaikan pengeboran di Prospek
Motomboto East, Blok 1 Tombulilato
sebanyak 11.073 conto inti bor telah

diterima hasil Analisis Geokimia dari PT
Geoservices.

Menyelesaikan pemetaan geologi dan
pengambilan sampel batuan permukaan di
sekitar area Prospek Sungai Mak dan
Prospek Kayubulan.

1... Completing the analysis of 19 petrographic
samples and 18 mineralogical samples from
the Motomboto North Prospect at LAPI-ITB
Bandung.

2.  Completing drilling at the Motomboto East
Prospect, Block I Tombulilato, with a total
Of 11073 core samples received the
Geochemical Analysis results from PT
Geoservices.

3.  Completing geological mapping and rock

sampling around the Sungai Mak and
Kayubulan Prospects areas.

Rencana Selanjutnya

Next Plan

1.

Melakukan kegiatan pemetaan geologi dan
pengambilan sampel batuan permukaan di
area area prospek Cabang Kiri (North).
Melakukan kegiatan tapping compass dan
ridge spur soil sampling pada Prospek
Cabang Kiri (North).

Melanjutkan estimasi sumber daya dan
cadangan untuk Prospek Motomboto East

1. Conducting geological mapping activities
and rock surface sample collection in the
Cabang Kiri (North) prospect area.

2. Conducting tapping compass and ridge spur
soil sampling activities in the Cabang Kiri
(North) prospect.

3. Melanjutkan estimasi sumber daya dan
cadangan untuk Prospek Motomboto East

TA

Page 9 OCR 0.898
(SP BRM

dan Motomboto North serta domain oxide
dan Silika Au transisi dari prospek Sungai
Mak.

Melakukan persiapan untuk kegiatan
pengeboran copper project di area Prospek
Cabang Kiri.

dan Motomboto North serta domain oxide
dan Silika Au transisi dari prospek Sungai
Mak

4. Preparing for drilling activities for the copper
project in the Cabang Kiri prospect area.

Hambatan Eksplorasi

Barriers to Exploration

1

Adanya aktifitas Penambangan Tanpa Izin
(PETI) di area rencana pengeboran Prospek
Motomboto.

1. An Illegal Mining Activity (PETI) in the drilling
planned area of the Motomboto Prospect.

2. New Illegal Mining Activity (PETI) in the

2. Munculnya aktifitas Penambangan Tanpa opening area alongside the pioneering road
Izin (PETI) baru di area sepanjang jalur construction
bukaan jalan perintis.

Perizinan/Persetujuan Baru Yang Diperoleh New Permit/Approvals Acguired

AN &

Page 10 OCR 0.922
(SP BRM

IV. PT Linge Mineral Resources

Nama Perusahaan PT Linge Mineral Resources ("PT LMR")
(Name of Company)

Tahap Kegiatan IUP Eksplorasi (Exploration)

(Phase of Activity of Mining Permit

Laporan Eksplorasi Periode 1 April — Juni (April - June) 2024

(Period of Exploration Repori

A. | Daerah Eksplorasi Exploration Areas
1. Prospek Bulan (Proyek Abong) 1. Bulan Prospect (Abong Project)
2. Prospek Bintang 1 (Proyek Abong) 2. Bintang 1 Prospect (Abong Project)
3. Prospek Bintang 2 (Proyek Abong) 3. Bintang 2 Prospect (Abong Project)
4. Eksplorasi Regional IUP 4. Regional Exploration IUP
B. | Biaya Eksplorasi Exploration Costs
75.723 Dollar AS USD75,723
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities

1. Melanjutkan kegiatan pemetaan detail | 7. Continued geology exploration detail activities or
geologi atau follow up work di area proyek follow up work in the field in Abong Project ,
Abong (Bulan, Bintang, Lumut,  Kapar) namely Bulan, Bintang, Lumut and Kapar wita
dengan total 65 sampel batuan. total 65 rock chip samples.

2. Melanjutkan kegiatan eksplorasi regional | 2. Continued exploration activities in the field in the
Pantan Nangka, Owag dengan total 12 form of regional geological surveys namely
sampel batuan. Pantan Nangka and Owag with a total 12 rock

chip samples.

3. Melanjutkan mapping geologi IUP di daerah | 3 Continued geology mapping on IUP, namely

Lumut Barat, Owag Barat dan Pantan West Lumut, West Owag and Pantan Nangka.
Nangka. 4. The Total 80 sample rock Chip from geology

4. Total sampel batuan sebanyak 80 sampel dari mapping have been sent to PT Geoservices
pemetaan geologi telah dikirimkan ke Laboratory for geochemical analysis Undluded
Laboratorium PT Geoservices untuk analisis Blank Samples).

geokimia (termasuk sample blank).
5. Proses penyelesaian studi AMDAL dan | 5. The process of completing the AMDAL study and

permohonan Persetujuan Teknis Pembuangan reguesting Technical Approval for Waste Water
Air Limbah ke Badan Permukaan Air serta Disposal to Surface Water Bodies as well as
permohonan Persetujuan Teknis Pengelolaan reguesting Technical Approval for 83 Waste
Limbah B3 kepada Kementerian Lingkungan Management to the Ministry of Environment and
Hidup dan Kehutanan. Forestry.
D. | Pihak-Pihak yang Terlibat Parties Involved
PT Bahtera Ratu Engineering PT Bahtera Ratu Engineering
PT Geoservices PT Geoservices
E. | Metode Pengujian dan Pemilihan Areal Testing Method and Selection of Area
AMDAL AMDAL
F. | Kemajuan Eksplorasi Terhadap Kegiatan Bulan Exploration Progress toward Previous Month's
Sebelumnya Activities

1. Pada periode ini, PT LMR telah menyelesaikan | 1. In this period, PT LMR has completed exploration
kegiatan eksplorasi di lapangan berupa activities in the field in work carried stream
pengambilan Stream Sediment dan survei sediment and regional geological survey namely

PA)
Page 11 OCR 0.926
(SP BRM

regional geologi yaitu Pantan Nangka, Lumut Pantan Nangka,west lumut and west Owag.
bagian barat dan Owag Bagian barat.
2. Menyelesaikan analisis geokimia 95 sampel | 2. Completing the analysis of 95 stream sediment
Stream Sediment di Laboratorium PT Intertek samples by PT Intertek Laboratory dan 196 Rock
dan 196 sampel Rock Chip Regional di Chip Samples by PT Geoservices Laboratory
Laboratorium PT Geoservices.
3. Melakukan interpretasi dan pemodelan | 3 Geological interpretation and modeling of the
geologi Prospek Abong (validasi bawah Abong Prospect (subsurface validation and
permukaan dan sebaran permukaan) untuk surface distribution) for GAP mineral analysis
keperluan GAP analisis mineral.
4. Proses penyelesaian studi AMDAL dan | 4. The process of completing the AMDAL study and
permohonan Persetujuan Teknis Pemenuhan reguesting Technical Approval Fulfillment of
Baku Mutu Air Limbah dalam rangka Waste Water Guality Standards in the framework
Pembuangan Air Limbah ke Badan of Waste Water Disposal to Surface Water Bodies
Permukaan Air serta permohonan Persetujuan as well as reguesting Technical Approval for B3
Teknis Pengelolaan Limbah B3 kepada Waste Management to the Ministry of

Kementerian Lingkungan — Hidup — dan Environment and Forestry
Kehutanan.
Rencana Selanjutnya Next Plan

1. Melanjutkan kegiatan pemetaan detail | 7. Continued geology exoloration detail activities or
geologi atau follow up work di area proyek follow up work in the field in Abong Project.

Abong.

2. Melanjutkan kegiatan eksplorasi regional dan | 2. Continued regional exploration and sterilization
sterilisasi IUP di daerah Serule dan Penarun. IUP, namely Serule and Penarun.

3. Melanjutkan kegiatan eksplorasi lanjutan atau | 3. Continuing further exploration activities or follow
follow up work North Bintang, North Bulan, up work North Bintang, North Bulan, Lumut
Lumut (Ujung Kambing dan Genting Kari). (Ujung Kambing and Genting Kari).

4. Merencanakan pekerjaan pengeboran sesuai | 4. Plan drilling work according to technical needs
kebutuhan teknis terkait data untuk regarding data to carry out metallurgical,
dilakukan studi metalurgi, geotek dan geotechnical and hydrogeological studies in the
hidrogeologi di dalam Proyek Abong. Stage 1 Abong Project. Stages 1 with a total 2000 meters

dengan total 2000 meter 18 lubang with 18 hole.
5. Melanjutkan penyelesaian studi AMDAL dan | 5. Continue to complete the AMDAL study and
mendapatkan Persetujuan Teknis Technical Approval for Waste Water Disposal to

Pembuangan Air Limbah ke Badan Surface Water Bodies as well as Technical
Permukaan Air serta Persetujuan Teknis Approval for B3 Waste Management.
Pengelolaan Limbah B3.

Hambatan Eksplorasi Barriers to Exploration

1. Adanya kegiatan Penambangan Tanpa Izin | 7. There are Illegal Mining (PETI) activities in Bulan
(PETI) di Prospek Bulan Prospect.

2. Munculnya pihak ketiga yang akan | 2 The emergence of a third party that will
mengakomodir PETI di Prospek Abong. accommodate PETI in the Abong Prospect

Perizinan/Persetujuan Baru Yang Diperoleh New Permits/Approvals Acguired

AN
Page 12 OCR 0.902
(SS BRM

V. PT Suma Heksa Sinergi

Nama Perusahaan

(Name of Company

Tahap Kegiatan IUP

(Phase of Activity of Mining Permit)

Laporan Eksplorasi Periode

(Period of Exploration Report)

PT Suma Heksa Sinergi (“PT SHS”)

Operasi Produksi (Production Operation Phase)

April — Juni (April - June) 2024

A. | Daerah Eksplorasi Exploration Areas

Prospek Cisadang Central dan Cisadang North Cisadang Central and Cisadang North Prospect
B. | Biaya Eksplorasi Exploration Costs

294.970,54 Dollar AS USD294,970.54
C. | Bentuk Kegiatan Eksplorasi Form of Exploration Activities

1. Melanjutkan kegiatan pemetaan geologi di | 1. Continuing geological mapping activities in the
Prospek Cisadang Central dan Cisadang Cisadang Central and Cisadang North Prospect.
North.

2. Melanjutkan kegiatan rekonstruksi corel 2. Continuing core drilling — reconstruction
pengeboran. activities.

3. Melakukan kegiatan pengeboran di Prospek | 3. Conducting drilling activities at the Cisadang
Cisadang Central untuk program pemboran Central Prospect for infill resources drilling
sumberdaya. program.

4. Melanjutkan kerjasama dengan konsultan | 4 Continuing to collaborate with consultant for
untuk cadangan JORC. JORC Reserve.

5. Melanjutkan kerjasama dengan konsultan | 5. Continuing to collaborate with consultant for
untuk Metallurgy dan Processing. Metallurgy and Processing.

6. Melakukan pengiriman sampel inti bor | & Sending a total 772 drill core samples from
sejumlah 772 conto untuk analisa geokimia metallurgical study drilling program for
(Au, Ag) dengan metode fire assay dan ICP geochemical analysis (Au, Ag) with fire assay
OES. dan ICP OES.

7. Melakukan pengiriman sampel inti bor batch | 7. Sending drill core sample for second batch of
kedua sejumlah total 32 sampel untuk uji geotechnical study drilling program with a total
geoteknik ke laboratorium LAPI, Institut 32 samples for geotechnical test and have been
Teknologi Bandung (ITB). sent to LAPI laboratory, Institute of Technology

Bandung (ITB).

8. Melanjutkan proses permohonan | 8. Continuing the Forest Area Use Approval
Persetujuan Penggunaan Kawasan Hutan (“PPKH") application process for further
(“PPKH”) untuk eksplorasi lanjutan. exploration.

D. | Pihak-Pihak yang Terlibat Involved Parties

1. PT Namsuma Luban Abadi 1. PT Namsuma Luban Abadi

2. PT COMO Engineers Indonesia 2. PT COMO Engineers

3. Koperasi Produsen Limantaka 3. Koperasi Produsen Limantaka

4. PT Asahi Diamond Industrial Indonesia 4. PT Asahi Diamond Industrial Indonesia

NA

Ha

2
Page 13 OCR 0.899
(SS BRM

5. PT Haluan Baru Energi

6. PT Tera Widyagama

7. Laboratorium PT Geoservices
8. CV Banten Central Link

9. PT Anugerah Mitra Sejahtera
10. PT Bahtera Ratu Engineering
11. PT LAPI ITB

12. PT Parama Asha Nirwana

OS ND»

PT Haluan Baru Energi

PT Tera Widyagama

PT Geoservices Laboratory

CV Banten Centra Link

PT Anugerah Mitra Sejahtera

10. PT Bahtera Ratu Engineering
11. PT LAPI ITB
12. PT Parama Asha Nirwana

Metode Pengujian dan Pemilihan Areal

Testing Method and Selection of Area

Specific Gravity
Fire Assay

Agua Regia Digest
ICP OESA unsur

Uji Physical Properties (PP), Uji Brazilian (B2),
Uji Uniaxial Compresive Strength (UCS), Uji
Triaxial, Uji Direct Shear (DS)

Specific Gravity
Fire Assay

Agua Regia Digest
ICP OESA elements

Physical Properties (PP) Test, Brazilian Test (B2),
Uniaxial Compresive Strength (UCS) Test,
Triaxial Test, Direct Shear Test (DS)

Kemajuan Eksplorasi Terhadap Kegiatan Bulan
Sebelumnya

Exploration Progress toward Previous Month's
Activities

1.

Kegiatan rekonstruksi core pengeboran
telah diselesaikan sebanyak 125 lubang bor
dari total 209 lubang bor.

Kemajuan pemetaan geologi di Prospek
Cisadang Central sudah selesai 10044
Kemajuan pemetaan geologi di Prospek
Cisadang North sudah mencapai 2046
Melakukan pengeboran infi// sumberdaya di
prospek Cisadang Central sebanyak 6
lubang bor dengan total kedalaman
1590.10 meter dari total rencana 44 titik
lubang bor dengan total target kedalaman
10000 meter.

Penambahan jumlah sampel hasil
pengeboran dari titik pengeboran infill
sumberdaya sejumlah 772 conto yang

dikirim ke laboratorium Geoservices untuk
analisa geokimia (Au, Ag,) dengan metode
fire assay dan ICP OES.

Penambahan — jumlah — sampel hasil
pengeboran studi geoteknik sejumlah total
32 sampel untuk uji geoteknik ke
laboratorium — LAPI, Institut — Teknologi
Bandung (ITB).

1.

Drilling core reconstruction activities have
been completed in 125 drill holes of 209 total
drill holes.

Geological mapping progress in Cisadang
Central Prospect has been completed 10096.

Geological mapping progress in Cisadang
North Prospect has reached 2096 completion.
Conducting 6 infill resources drilling in
Cisadang Central prospect with a total depth
of 1590.10 meters from a total of 44 planned
drill holes with a total target depth of 10000
meters.

Additional drill core samples from infill
resources drilling program with a total 772
samples has been sent to Geoservices
laboratory for geochemical analysis (Au, Ag)
with fire assay and ICP OES.

Additional — drill core samples — from
geotechnical study drilling program with a
total 32 samples for geotechnical analysis and
has been sent to LAPI laboratory, Institute of
Technology Bandung (ITB).

pn

aa

Page 14 OCR 0.899
(PS BRM

Rencana Selanjutnya

Next Plan

1. Melanjutkan kegiatan pemetaan geologi di
Prospek Cisadang North.

2. Melanjutkan kegiatan pengeboran di
Prospek Cisadang Central untuk program
pemboran sumberdaya.

3. Melanjutkan kegiatan pengeboran di
Prospek Cisadang Central untuk studi
geoteknik dan hidrogeologi yang berada di
Kawasan Hutan Produksi (HP).

1. Continuing geological mapping activity at
Cisadang North prospect

2. Continuing drilling activities at the Cisadang
Central Prospect for infill resources drilling
program.

3. Continuing drilling activities at the Cisadang
Central Prospect for geotechnical and
hydrogeological studies in Production Forest
Area.

4. Melanjutkan kegitan rekonstruksi corel 4. Gontinuing of core drilling reconstruction from
pengeboran dari kegiatan pengeboran historical drillhole.
terdahulu.

Hambatan Eksplorasi Barriers to Exploration

1. Perizinan terkait Persetujuan Penggunaan
Kawasan Hutan (“PPKH") untuk eksplorasi
lanjutan masih dalam proses pengurusan di
Kementerian Lingkungan Hidup — dan
Kehutanan Republik Indonesia.

2. Keberadaan lokasi IUP PT SHS berada di
dekat area pemukiman masyarakat.

1. Permit related to Forest Area Use Aoproval
(“PPKH”) for further exploration is still being
processed in the Ministry of Environment and
Forestry of Republic of Indonesia.

2. The location of the IUP PT SHS is near a
community residential area.

Perizinan/Persetujuan Baru Yang Diperoleh

New Permits/Approvals Acguired

Le

pp"

File

File Open PDF
Source IDX
Size6.85 MB
Published10 Jul 2024
Pages14
Characters32,931
Text sourceOCR
OCR confidence0.905

Names mentioned 55 people and organisations named in the text · linked when the evidence is strong

linked org Bumi Resources Minerals Tbk. p.1 ×8
unresolved org PT Citra Palu Minerals Nama Perusahaan p.1
unresolved org PT Citra Palu Minerals p.1 ×2
unresolved org PT Geoservices. p.2 ×15
unresolved org PT Geoservices Laboratory. Pihak-Pihak p.2
unresolved org PT CPM Laboratory p.2
unresolved org PT Sumagud Sapta Sinar p.2 ×2
unresolved org PT Geoservices Laboratory p.2 ×6
unresolved org PT IOL Indonesia p.2 ×2
unresolved org PT Intertek Utama Service p.2 ×2
unresolved org Direktorat Jenderal Mineral dan Batubara No. B- p.4
unresolved org PT Citra Palu Minerals Tahun p.4
unresolved org PT. Dairi Prima Mineral p.5 ×2
unresolved org PT Dairi Prima Mineral Operasi Produksi p.5
unresolved org PT DPM p.6 ×3
unresolved org Menteri Energi dan Sumber Daya Mineral p.6
unresolved org Direktorat Jenderal Mineral p.6
unresolved org PT Gorontalo Minerals p.7 ×2
unresolved org PT GM p.7
unresolved org PT Geoservices Laboratorium Geomekanika ITB Laboratorium Teknik Lingkungan p.8
unresolved org PT Adiprotek Envirodunia p.8 ×2
unresolved org PT ITS Tekno Sains p.8 ×2
unresolved org PT LAPI ITB Indo Mineral Research Laboratorium p.8
unresolved org PT Geoservice Laboratory ITB Geomechanics Laboratory ITENAS Environmental p.8
unresolved org PT LAPI ITB p.8 ×3
unresolved org PT Geoservices. Menyelesaikan p.8
unresolved org PT Linge Mineral Resources Nama Perusahaan p.10
unresolved org PT Linge Mineral Resources p.10
unresolved org PT LMR p.10 ×3
unresolved org Permukaan Air p.10
unresolved org Kementerian Lingkungan Management p.10
unresolved org Ministry of Environment p.10 ×2
unresolved org PT Bahtera Ratu Engineering p.10 ×4
unresolved org PT Geoservices E. p.10
unresolved org PT Intertek p.11
unresolved org PT Intertek Laboratory p.11
unresolved org PT Geoservices Laboratory Laboratorium p.11
unresolved org Ministry of Kementerian Lingkungan p.11
unresolved org Surface Water Bodies p.11
unresolved org PT Suma Heksa Sinergi Nama Perusahaan p.12
unresolved org PT Suma Heksa Sinergi p.12
unresolved org PT SHS p.12 ×3
unresolved org PT Namsuma Luban Abadi p.12 ×2
unresolved org PT COMO Engineers Indonesia p.12
unresolved org PT COMO Engineers p.12
unresolved org Koperasi Produsen Limantaka p.12 ×2
unresolved org PT Asahi Diamond Industrial Indonesia p.12
unresolved org PT Asahi Diamond Industrial Indonesia NA Ha p.12
unresolved org PT Haluan Baru Energi p.13 ×2
unresolved org PT Tera Widyagama p.13 ×2
unresolved org PT Anugerah Mitra Sejahtera p.13 ×2
unresolved org PT Parama Asha Nirwana OS ND p.13
unresolved org PT Geoservices Laboratory CV Banten Centra Link p.13
unresolved org PT Parama Asha Nirwana Metode Pengujian p.13
unresolved org Kementerian Lingkungan Hidup p.14

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result