Laporan Kuartalan Aktivitas Eksplorasi
Quarterly Report of the Exploration Activities

PT TBS Energi Utama Tbk
Kuartal-II/ the 2nd Quarter of 2024
Page 2
                    KATA PENGANTAR                            INTRODUCTION

     PT TBS Energi Utama Tbk (“Perseroan”)        PT TBS Energi Utama Tbk ("the
     adalah    perusahaan       pertambangan      Company") is a coal mining company
     batubara yang melakukan kegiatan             conducting      mining      activities    in
     penambangan di daerah Sangasanga,            Sangasanga area, Kutai Kartanegara
     Kabupaten Kutai Kartanegara, Propinsi        Regency, East Kalimantan, which the
     Kalimantan Timur, dimana area konsesi        concession area of the three subsidiaries
     ketiga   anak     perusahaan      terletak   is located side by side. All the supporting
     berdampingan.     Seluruh    infrastruktur   infrastructure of mining operations such
     pendukung operasional penambangan            as coal hauling roads, offices, workshop,
     seperti    jalan    angkut      batubara,    coal-only jetty and other infrastructures
     perkantoran, perbengkelan, pelabuhan         are located in Kutai Kartanegara
     khusus batubara dan infrastruktur lainnya    Regency, East Kalimantan.
     berada di daerah Kabupaten Kutai
     Kartanegara, Propinsi Kalimantan Timur.

     Perseroan mempunyai 3 (tiga) anak            The Company has 3 (three) subsidiaries
     perusahaan yang bergerak di bidang           engaged in coal mining sector, located in
     pertambangan batubara, terletak di           Sangasanga area, Kutai Kartanegara
     daerah Sangasanga, Kabupaten Kutai           Regency,    East     Kalimantan.     The
     Kartanegara, Propinsi Kalimantan Timur.      company's subsidiaries are:
     Adapun     ketiga   anak    perusahaan
     Perseroan tersebut adalah:                   1. PT Trisensa Mineral Utama (TMU)
     1. PT Trisensa Mineral Utama (TMU)           2. PT Indomining (IM)
     2. PT Indomining (IM)                        3. PT Adimitra Baratama Nusantara
     3. PT Adimitra Baratama Nusantara               (ABN)
        (ABN)

     Dalam rangka memenuhi Ketentuan              In order to comply with the Provisions
     III.1.6, Peraturan Nomor I-E tentang         III.1.6, Regulation Number I-E concerning
     Kewajiban     Penyampaian   Informasi,       Information       Delivery    Obligations,
     Lampiran Keputusan Direksi PT Bursa          Attachment to the Decree of the Board of
     Efek Jakarta Number Kep-00066/BEI/09-        Directors of PT Bursa Efek Jakarta
     2022 tanggal 30 September 2022, maka         Nomor Kep-00066/BEI/09-2022 dated
     bersama ini kami sampaikan Laporan           September 30, 2022, we here jointly
     Kegiatan Eksplorasi Perseroan untuk          submit the Company's Exploration
     Kuartal-2 2024.                              Activity Report for the 2nd Quarter of
                                                  2024.




www.tbsenergi.com
Page 3
                  BAB I                                           CHAPTER I
              PENDAHULUAN                                       INTRODUCTION



I. Latar Belakang                                 I. Background

Batubara merupakan bahan galian yang              Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh         material, so it is in demand by foreign
investor asing maupung investor dalam             investors as well as domestic investors. Coal
negeri. Usaha pertambangan batubara               mining business has prospects as a mainstay
mempunyai prospek sebagai sektor andalan          sector of oil and gas replacement in building
pengganti migas dalam          membangun          the economy of East Kalimantan in the future.
perekonomian Kalimantan Timur di masa             It is based on available coal resources and
mendatang. Hal ini didasarkan pada sumber         potentials, marketing prospects as well as
daya dan potensi batubara yang tersedia,          local government policy support.
prospek    pemasaran     serta   dukungan
kebijakan pemerintah daerah.

Pengusahaan pertambangan karena sifat             Strive of the Mining business because of the
kegiatannya      pada     dasarnya       selalu   nature of its activities basically always cause
menimbulkan       perubahan       pada    alam    changes in the nature of its environment.
lingkungannya. Di balik perubahan pada            Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan           environment, it is also a fact that mining
pula bahwa usaha pertambangan telah               businesses have succeeded in improving
berhasil    meningkatkan         kesejahteraan    human welfare by providing raw materials for
manusia dengan menyediakan bahan baku             industry, energy and others.
untuk industri, energi dan lain-lain.




                    Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
                       Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
             Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk




    Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
    Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

TMU merupakan perusahaan tambang             TMU is a coal mining company with
batubara dengan daerah penambangan           administrative mining areas including Loa
secara administratif termasuk wilayah        Janan District, Sangasanga, Muara Jawa,
Kecamatan Loa Janan, Sangasanga, Muara       Kutai Kartanegara Regency of East
Jawa, Kabupaten Kutai Kartanegara Propinsi   Kalimantan Province with an area of 3,414 ha
Kalimantan Timur dengan Luas wilayah         and regional code KTN 2010 3133 OP. TMU
3.414 ha dan kode Wilayah KTN 2010 3133      has obtained approval to conduct mining
OP. TMU telah mendapat persetujuan untuk     activities and sales of excavation products
melakukan aktivitas penambangan dan          with the Decree of the Regent of Kutai
penjualan hasil galian dengan Keputusan      Kartanegara Number: 540/3133/IUP-OP/MB-
Bupati Kutai Kartanegara No: 540/3133/IUP-   PBAT/XII/2010 concerning approval of The
OP/MB-PBAT/XII/2010 tentang mengenai         Production Operation Mining Business
persetujuan Izin Usaha Pertambangan          License (KTN 2010 3133 OP) dated
Operasi Produksi (KTN 2010 3133 OP)          December 14, 2010.
tertanggal 14 Desember 2010.

Pada Kuartal-2 2024, pelaksanaan pekerjaan   In the 2nd Quarter of 2024, the
yang dilakukan oleh TMU telah menyerap       implementation of work carried out by TMU
tenaga kerja sebanyak 91 orang sedangkan     has absorbed a workforce of 91 people while
untuk kontraktor dan sub-kontraktornya 436   for contractors and sub-contractors 436
orang dan dibagi menjadi 2 shift kerja.      people and divided into 2 shifts of work. The
Kontraktor tambang yang digunakan adalah     mining contractor used is PT Multido Prima
PT    Multindo    Prima    Teknik   (MPT).   Teknik (MPT). Mining is done by surface
Penambangan yang dilakukan dengan            open pit mining system with truck and shovel
sistem tambang terbuka (surface open pit     method.
mining) dengan metode truck dan shovel.

Produk batubara yang dihasilkan TMU          Coal products produced by TMU have an
memiliki kalori rata-rata 4900 GAR dengan    average calorie of 4900 GAR with Total
Total Sulphur (TS) di bawah 1%. Kualitas     Sulphur (TS) below 1%. The quality of this
batubara ini cukup memenuhi permintaan       coal is enough to meet the demand of the
pasar yang menginginkan batubara dengan      market who want low sulphur coal.
sulphur rendah. Pelaksanaan pengelolaan      Implementation of Occupational Safety and
Keselamatan dan Kesehatan Kerja yang         Health management implemented in TMU
diterapkan di TMU mengacu kepada             refers to the program / plan of Occupational
program/rencana Pengelolaan Keselamatan      Safety and Health Management in
dan Kesehatan Kerja sesuai dengan            accordance with applicable laws and
perundang-undangan yang berlaku.             regulations.

Kegiatan pengelolaan dan pemantauan          Environmental management and monitoring
lingkungan yang dilakukan TMU meliputi       activities carried out by TMU include
kegiatan penghijauan yang dilakukan di       greening activities carried out at the Road
Tanggul Jalan, Tanggul Stockpile, Tanggul    Embankment, Embankment Stockpile, Front
Depan Timbangan, Settling Pond, Waste        Embankment Scales, Settling Pond, Waste
Dump dan Bench Office Baru.                  Dump and New Bench Office.
Page 6
Pada saat ini, TMU juga melakukan             Currently, TMU also manages and monitors
pengelolaan dan pemantauan kualitas air,      water quality, dust, noise, B3 waste and
debu, kebisingan, limbah B3 dan limbah        domestic waste, as well as monitoring
domestik, serta pemantauan tingkat erosi.     erosion rates.


I. 2. PT INDOMINING (“IM”)

Berdasarkan Izin Usaha Produksi Nomor:        Based on Production Business License
540/004/IUP-OP/MB-PBAT/III/2013 tanggal       Nomor: 540/004/IUP-OP/MB-PBAT/III/2013
15 Maret 2013, IM melakukan kegiatan          dated March 15, 2013, IM conducted coal
eksplorasi dan penambangan batubara serta     exploration and mining activities and its
hasil produksinya di daerah Kecamatan         production in Sangasanga District, Kutai
Sangasanga, Kabupaten Kutai Kartanegara,      Kartanegara Regency, East Kalimantan
Propinsi Kalimantan Timur. Tahap produksi     Province. Im's production phase began in
IM dimulai pada bulan Agustus 2007,           August 2007, while commercial production
sedangkan produksi komersial dimulai pada     began in October 2007.
bulan Oktober 2007.

Kegiatan penambangan IM dilakukan             IM mining activities are carried out by mining
kontraktor penambangan yaitu PT RPP           contractor PT RPP Contractors Indonesia
Contractors Indonesia (RCI). Kegiatan         (RCI). Mining activities are surface open pit
penambangan merupakan penambangan             mining with truck and shovel methods.
terbuka (surface open pit mining) dengan
metoda truck dan shovel.

Pada Kuartal-2 2024, sumber daya manusia      As of 2nd Quarter 2024, human resources
yang bekerja dalam kegiatan operasional IM    working in IM's operational activities reached
mencapai 338 tenaga kerja termasuk            338 workers including contractors and sub-
kontraktor dan sub-kontraktor. Dari 338       contractors. Of those 338 people, about 80%
orang tersebut sekitar 80% merupakan          are local workers to support community
tenaga kerja lokal sebagai penunjang          development programs with the aim of
program community development dengan          improving the welfare of the communities
tujuan untuk meningkatkan kesejahteraan       around the mine.
masyarakat di sekitar tambang.

Produk batubara IM memiliki kualitas antara   IM coal products have quality between 4200
4200 - 5600 GAR dengan total sulphur antara   - 5600 GAR with total sulphur between 0.2%
0.2% - 2.0%. Produk cukup bersaing di dalam   - 2.0%. The product is quite competitive in the
pasar internasional maupun domestik           international and domestic markets.
Page 7
I. I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

  ABN didirikan pada tahun 2004, dan                  ABN was established in 2004, and manages
  mengelola daerah pertambangan dengan                a mining area of about 2,990 ha located in
  luas area sekitar 2.990 Ha yang berlokasi di        Kampung Jawa Village, Sangasanga District
  Desa      Kampung        Jawa,   Kecamatan          and Muara Kembang Village, Muara Jawa
  Sangasanga dan Desa Muara Kembang,                  District, Kutai Kartanegara Regency, East
  Kecamatan Muara Jawa, Kabupaten Kutai               Kalimantan. Based on Mining Business
  Kartanegara,         Kalimantan        Timur.       License Production Operation Number:
  Berdasarkan pada Izin Usaha Pertambangan            540/1691/IUP-OP/MB-{BAT/XII/2009 dated
  Operasi Produksi Nomor: 540/1691/IUP-               December 1, 2009, ABN conducts
  OP/MB-{BAT/XII/2009 tanggal 1 Desember              exploration, coal mining, and marketing of
  2009, ABN melakukan kegiatan eksplorasi,            production at its mine site.
  penambangan batubara, dan pemasaran
  hasil produksi di lokasi tambangnya tersebut.

  ABN mulai melakukan kegiatan eksplorasi             ABN began its exploration and infrastructure
  dan pembangunan infrastruktur pada tahun            development activities in 2007, while
  2007, sedangkan produksi komersial dimulai          commercial production began in 2008. ABN
  pada tahun 2008. Produk batubara ABN                coal products belong to thermalcoal group
  termasuk dalam kelompok thermalcoal                 with sub-bituminous and bituminous rank,
  dengan rank sub-bituminous dan bituminous,          with 4 types of ABN 52 (CV 5200 GAR & TS
  dengan 4 jenis tipe yaitu ABN 52 ( CV 5200          < 1), ABN 50 ( CV 5000 GAR & TS < 1), ABN
  gar & TS < 1), ABN 50 ( CV 5000 gar & TS <          42 (CV 4200 GAR & TS < 1) and ABN 56 HS
  1), ABN 42 ( CV 4200 gar & TS < 1) dan ABN          (CV 5600 gar & TS <2)). Thermal coal is
  56 HS(CV 5600 gar & TS < 2)). Thermal coal          marketed to several countries in the world,
  dipasarkan ke beberapa negara di dunia,             including India, China, Japan, Italy, Thailand,
  diantaranya India, Cina, Jepang, Italia,            and Korea. ABN also supplies for domestic
  Thailand, dan Korea. ABN juga mensuplai             needs, namely cement industry and several
  untuk kebutuhan dalam negeri, yaitu industri        other industries.
  semen dan beberapa industri lainnya.

  Sistem penambangan yang dilakukan ABN               ABN's mining system is surface open pit
  yaitu sistem penambangan terbuka (surface           mining. Coal ABN has a low ash content, so
  open pit mining). Batubara ABN memiliki             it is not done by washing process, only done
  kandungan abu yang rendah, sehingga tidak           by crushing process. Mining activities of PT.
  dilakukan pencucian (washing), hanya                ABN is carried out by one main contractor, PT
  dilakukan proses peremukan (crushing).              RPP Contractors Indonesia (RCI).
  Kegiatan penambangan PT. ABN dilakukan
  oleh satu kontraktor utama, yaitu PT. RPP
  Contractors Indonesia (RCI).

  Pada Kurtal-2 2024, sumber daya manusia yang        In The 2nd Quarter of 2024, human resources
  terlibat dalam kegiatan operasional ABN             involved in ABN's operational activities reached
  mencapai sekitar 477 orang, yang terdiri dari 196   about 477 people, consisting of 196 workers in
  orang tenaga kerja pada ABN dan 281 orang           ABN and 281 workers in contractors and sub-
  tenaga kerja pada kontraktor maupun sub-            contractors.
  kontraktor.
Page 8
Sebagai salah satu wujud pemberdayaan            As the form of empowerment of the surrounding
masyarakat sekitar, ABN bersama-sama dengan      community, ABN along with contractors and sub-
kontraktor dan sub-kontraktor saat ini telah     contractors currently have accommodated local
menampung tenaga kerja lokal Kecamatan           workers in Sangasanga District & Muara Jawa
Sangasanga & Kecamatan Muara Jawa,               District,    Kutai     Kartanegara        Regency
Kabupaten Kutai Kartanegara kurang lebih 70 %    approximately about 70% of the labor needs,
dari kebutuhan tenaga kerja, sedangkan sisanya   while the remaining about 30% comes from
sekitar 30 % berasal dari luar daerah dua        outside the area of the two sub-districts.
kecamatan tersebut.
Page 9
                 BAB II                                           CHAPTER II
          KEGIATAN EKSPLORASI                                EXPLORATION ACTIVITY



II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)

1. 1. DAERAH EKSPLORASI                              1. 1. EXPLORATION AREA
Pada Kuartal-2 2024 kegiatan eksplorasi              In Q2 2024, exploration activities will be in
berupa kegiatan sampling di Pit Aktif yaitu pit      the form of sampling activities in Active
B1WA, B2A dan pit 5B36.                              Pits, namely pit B1WA, B2A and pit 5B36.

Kegiatan sampling batubara di pit aktif guna         Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai total   determine the quality value, especially the
sulphur (TS) dan nilai total kalori. kegiatan        total sulphur (TS) value and total calorie
sampling batubara. Seam target adalah seam           value. coal sampling activities. The target
seam WA, WB, X, RU, RL, R3di pit B1WA.               seam is the WA, WB, X, RU, RL, R3 seam
Sampling di pit B2A dengan seam target seam          seam in pit B1WA. Sampling in pit B2A with
F, D, E H10, G20, G Pit 5B36 dengan seam 42,         seam target seamF, D, E, H10, G20, G Pit
43, 32, 33, 34, 35, 36, 37, 41                       5B36 with seam 42, 43, 32, 33, 34, 35, 36,
                                                     37, 41

1. 2. METODE PENGUKURAN                              1. 2. MEASUREMENT METHODS

Trenching                                            Trenching

Secara teknis di lapangan tim geologist              Technically in the field, the geologist team
melakukan trenching dengan membuat paritan           conducted trenching by making an
memanjang memotong strike seam – seam                elongated trench cutting the strike seam –
target sebatas titik plan yang dibuat                seam target to the point plan made earlier.
sebelumnya. Hal ini berfungsi untuk mengcover        This serves to cover the entire region so
seluruh wilayah agar semua seam dapat di             that all seams can be found. The average
temukan. Rata – rata panjang paritan trenching       length of trenching in a day can reach 80 m
dalam sehari bisa mencapai 80 m -100 m               -100 m depending on the terrain / area of
tergantung dari medan/areal kerjanya apakah di       work whether in a ramp, swamp or hilly with
tempat landai, rawa atau berbukit dengan             a steep slope.
kemiringan terjal.

Pengambilan sampel untuk di mengetahui nilai         Sampling to find out the values of quality is
–nilai kualitasnya di lakukan per jarak 100 m        done per distance of 100 m between
antar lubang trenching.                              trenching holes

Sampling                                             Sampling

Tim geologi juga melakukan sampling seam –           Geologies team also sampling seam -
seam di pit guna mengetahui kualitas ter update      seam in the pit to find out the updated
dari seam – seam yang akan tambang.                  quality of the seam - seam that will be mine.
Page 10
Metode yang digunakan adalah:                             The methods used are:

   1. Jarak antar titik sampling maksimal 20 m              1. The distance between sampling
      per seam searah strike bukaan batubara                   points maximum 20 m per seam direct
      yang akan di ambil (getting).                            strike coal openings to be taken
                                                               (getting).
   2. Sampling ulang/update pada tiap bukaan                2. Re-sampling/update on each new
      layer baru pada suatu seam (maksimal 1                   layer opening on a seam (maximum 1
      bukaan layer setinggi 3 m).                              layer opening as high as 3 m).
   3. Sampling pada seam – seam bukaan                      3. Sampling on seam – seam new
      baru/seam yang pertama kalinya akan di                   openings / seam the first time will be
      getting. Adapun plan penambangan                         in getting. The mining plan until the
      sampai dengan akhir tahun di targetkan                   end of the year is targeted at seam
      pada seam dengan nilai Calori (ar)_g di                  with calorie value (ar)_g above 4200.
      atas 4200.

1. 3. BIAYA EKSPLORASI                                    1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di                  TMU Exploration Costs incurred in the 2nd
Kuartal-2 2024 sebagai berikut:                           Quarter of 2024 as follows:

                                        Q2 2024                 Year to Date
       Biaya Operasional       Anggaran      Realisasi  Anggaran        Realisasi
       Operating Expense         Budget     Realization  Budget         Realization
                                  (IDR)        (IDR)      (IDR)           (IDR)
       Biaya Eksplorasi        35.000.000 129.000.000 360.000.000      189.000.000
       Exploration Costs

Catatan:                                             Note:
Jumlah Jumlah sampling di Kuartal 2 2024 berjumlah   The number of samplings in the 2nd Quarter 2024
86 sampel.54 hasil sampling di pit dan 32 hasil      amounted to 86 samples. 54 sampling result in the pits
sampling raw coal di ROM                             and 32 are raw coal sampling result in ROM

Biaya Eksplorasi untuk tahun 2024 yang               Exploration Cost for 2024 in accordance with
sesuai dengan RKAB 2024 bagian geologi               RKAB 2024 geological section in the form of
berupa biaya analisa kualitas batubara di            coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan.               maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang                  trenching activities that use PC 200 units is
mengunakan unit PC 200 biayanya                      accommodate to production department for
dimaksukan ke departement produksi untuk             general work with a record of trenching
pekerjaan general dengan catatan kegiatan            activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.

Banyaknya sampel pada kuartal 2 2024 ini             The large number of samples in Q2 2024 is
disebabkan oleh adanya daily monitoring              due to the daily quality monitoring of the B1WA
kualiti pada pit B1WA untuk seam RU, RL              pit for RU, RL and R3 seam in the pits and in
dan R3 di pit dan di ROM (raw coal)                  ROM (raw coal)
Page 11
1. 4. PELAKSANAAN DAN PENGAWASAN                1.4. IMPLEMENTATION AND SUPERVISION
Pengawasan     Test      Pit/Trenching  dan     Supervision of Test Pit/ Trenching sampling of
sampling batubara di pit TMU di lakukan oleh    coal in the TMU pit conducted by TMU’s
Geologist TMU.                                  geologist.

1. 5. KEMAJUAN EKSPLORASI                       1. 5. EXPLORATION PROGRESS

Kesimpulan Eksplorasi TMU Kuartal-2             Conclusion of TMU Exploration in the 2nd
2024                                            Quarter of 2024

Selain kegiatan trenching kami dari tim         In addition to our trenching activities from the
geologi juga melakukan sampling seam –          geology team also sampling seam-seam in the
seam di pit guna mengetahui kualitas ter        pit to find out the update quality from seam -
update dari seam – seam yang akan di            seam to be getting. The methods used are:
getting. Metode yang digunakan adalah:

1. Jarak antar titik sampling maksimal 50 m     1. Distance    between     sampling     points
   per seam searah strike bukaan batubara          maximum 50 m per unidirectional strike coal
   yang akan di ambil (getting).                   openings to be taken (getting).

2. Sampling ulang/update pada tiap bukaan       2. Sampling/update on each new layer
   layer baru pada suatu seam (maksimal 1          opening on one seam (maximum 1-layer
   bukaan layer setinggi 3 m).                     aperture as high as 3 m).

3. Sampling pada seam – seam bukaan             3. Sampling on seam - seam new openings /
   baru/seam yang pertama kalinya akan di          seam the first time will be in the getting. The
   getting. Adapun plan penambangan                mining plan until the end of the year is
   sampai dengan akhir tahun di targetkan          targeted at seam with calorie (ARB) GAR
   pada seam dengan nilai Calori (ARB)             value above 4200.
   GAR di atas 4200.

4. Selama Kwartal-2 2024 kegiatan berupa        4. During Q1 2024, activities in the form of
   sampling pit aktif yaitu di pit B2A dengan      active pit sampling are in pit B2A with target
   seam target adalah seam F, D, E, G, H10,        seam are seam F, D, E, G, H10, G20.. Pit
   G20. Pit 5B36 seam 42, 43, 47, 32, 33,          5B36 seam 42, 43, 47, 32, 33, 34, 35, 36,
   34, 35, 36, 37, 45. Pit B1WA dengan             37, 45. Pit B1WA with target seam Z, ZA, Y,
   seam target Z, ZA, Y, RU, RL, R3                RU, RL, R3 Sampling in ROM are seam RU,
   Sampling di ROM seam RU, RL, R3                 RL, and R3

5. Rata – rata hasil analisa kualitas dari      5. The average quality analysis results of the
   seam –seam tersebut di atas TM 33.54            seam -seam above TM 33.54%, ASH
   %, ASH 4.81 %, TS 0.80 % dan nilai CAL          4.81%, TS 0.80 % and CAL (ar)
   (ar) 4.500                                      values4.500.
Page 12
1. 6. RENCANA KEGIATAN EKSPLORASI                1. 6. PLANS FOR FURTHER EXPLORATION
SELANJUTNYA                                      ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-3        The Geological Division Plan for 3rd Quarter
2024:                                            2024:

1. Melakukan pembaharuan / updating              1. Updating the Geological model based on
   model Geologi berdasarkan data updating          monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit          survey data and cs holes data from coal
   serta cs_holes dari data channel sampling        sampling channel data. The results of this
   batubara. Hasil dari pembaharuan model           model update are then sent to the mine plan
   ini kemudian di kirim ke bagian mine plan        enginnering section as a basis for
   enginnering sebagai dasar ajuan untuk            submissions for making pit designs for next
   pembuatan design pit untuk Bulan depan.          month.

2. Trenching di luar Rencana PIT yang di Plan    2. Trenching outside the PIT Plan that is
   kan oleh tim Engineering di tiadakan dan         planned by the Engineering team is not in
   sebagai penggantinya adalah trenching di         place and in lieu of trenching is done in the
   lakukan di plan pit yang data trenchingnya       plan pit whose trenching data is lacking or
   kurang     atau      tingkat     confidence      confidence level of continuity, seam
   kemenerusan, ketebalan seam di pit               thickness in the pit is still lacking.
   tersebut masih kurang.

3. Memonitoring adanya anomali pada suatu        3. Monitoring the presence of anomalies in an
   bukaan PIT yang aktif.                           active PIT aperture.

4. Tim geologist akan melakukan sampling         4. The geological team will be sampling the
   pada bukaan seam seam yang berada di             seam seam openings located in the active
   pit aktif terutama mengontrol perubahan          pit, especially controlling changes in the
   nilai Total Sulfur dan nilai Kalori di seam      value of Total Sulphur and value of
   –seam ber kalori tinggi baik kearah down         Calory in seam -seam with high calories
   dip maupaun kearah strike nya.                   both towards down dip maupaun towards
                                                    his strike.

5. Memonitoring kualitas dari seam –seam         5. Monitoring the quality of seam -seam that is
   yang tertambang di bulan Juli – September        mined in July until September 2024,
   2024 terutama dalam hal perubahan nilai          especially in terms of changes in TS value in
   TS seiring penurunan elevasi dari masing         line with the decrease in elevation of each
   –masing seam yang tertambang.                    seam that is mined.

6. Update    data     kualitas berdasarkan       6. Quality data update based on mining
   kemajuan penambangan pada seam–                  progress on seam–seam target in previous
   seam target di bulan sebelumnya.                 month.

7. Rencana kegiatan pengeboran eksplorasi        7. The plan for exploration drilling activities in
   di tahun 2024 sebanyak 78 titik bor atau         2024 is 78 drill points or as many as 9,360
   sebanyak 9.360 m di wilayah barat pit            m in the western area of the B3KL pit with
   B3KL dengan seam Target seam R, S, T,            seam Target seam R, S, T, U, WA, WB, X,
   U, WA, WB, X, Y.                                 Y.
Page 13
8. Rencana kegiatan pengeboran geoteknik      8. The plan for geotechnical drilling activities in
   di tahun 2024 sebanyak 5 titik pemboran       2024 is 5 drilling points or as much as 600
   atau sebanyak 600 m di wilayah Barat pit      m in the Western area of the B3KL pit.
   B3KL.


II. 2. PT INDOMINING (“IM”)

2. 1. DAERAH EKSPLORASI                       2. 1. EXPLORATION AREA
Pada Kuartal-2 2024, IM tidak ada kegiatan    In the 2nd Quarter of 2024, IM had no drilling
pemboran.                                     activities.


2. 2. METODE PENGUKURAN                       2. 2. MEASUREMENT METHODS
Untuk kegiatan pemboran infill menggunakan    For infill drilling activities using touch coring
metode touch coring, sedangkan untuk          method, while for geotechnical drilling is done
pemboran geoteknik dilakukan dengan           by drilling Full Coring method.
pemboran metode Full Coring.

Pemboran geoteknik dilakukan juga dengan      Geotechnical drilling is also carried out using
menggunakan metode Standart Penetration       the Standard Penetration Test (SPT) method.
Test (SPT). Prinsip kerja SPT adalah dengan   The working principle of SPT is to hit a standard
memukul sebuah tabung standar ke dalam        tube into a drill hole 45 cm deep using a
lubang bor sedalam 45 cm menggunakan          hammer weighing 63.5 KG that falls freely from
palu dengan berat 63.5 KG yang jatuh bebas    a height of 76 cm. What counts is the number of
dari ketinggian 76 cm. Yang dihitung adalah   blows to penetrate as deep as 15 cm. The
jumlah pukulan untuk melakukan penetrasi      number of blows used is penetration as deep as
sedalam 15 cm. Jumlah pukulan yang            the last 30 cm.
digunakan adalah penetrasi sedalam 30 cm
terakhir.



2. 3. BIAYA EKSPLORASI                        2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di       IM Exploration Costs incurred in the 2nd Quarter
Kuartal-2 2024 sebagai berikut:               of 2024 as follows:

                                      Q2 2024               Year To Date
          Biaya Operasional    Anggaran Realisasi      Anggaran     Realisasi
          Operating Expense      Budget   Realization   Budget      Realization
                                  (IDR)      (IDR)       (IDR)        (IDR)
          April/ April         83,333,333       -     883,333,330        -
          Mei/ May             83,333,333       -     916,666,663        -
          Juni/ June           83,333,333       -     999,999,996        -
Page 14
2. 4. PELAKSANAAN DAN                             2. 4. IMPLEMENTATION AND
      PENGAWASAN                                         SUPERVISION
Kegiatan    Pemboran     diawasi     oleh         Drilling activities are supervised by the
Departemen Engineering Section Geologist.         Department of Engineering geologist section.


2. 5. KEMAJUAN EKSPLORASI                         2. 5. EXPLORATION PROGRESS
Pada Kuartal-2 2024 belum ada kegiatan            As of the 2nd Quarter of 2024, there are no
pemboran lanjutan. Namun ada beberapa             further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan,        geological activities that continue to be carried
diantaranya:                                      out, including:

1. Melakukan pembaharuan / updating               1. Updating the Geological model based on
   model Geologi berdasarkan data updating           monthly roof/floor updating data from pit
   roof/floor bulanan dari data survey Pit           survey data and cs_holes data from coal
   serta cs_holes dari data channel sampling         sampling channel data, and supervision in
   batubara, dan pengawasan dalam                    the   activities   of   taking   roof/floor
   kegiatan pengambilan data pengukuran              measurement data and cs_holes.
   roof/floor serta cs_holes tersebut.

2. Melakukan kegiatan channel sampling            2. Conducting channel sampling activities as
   serta pengukuran tebal aktual batubara di         well as actual thick measurement of coal at
   lokasi Pit AB Blok 13-15 & sekitarnya             the pit AB location Block 13-15 &
   untuk keperluan pembuatan data channel            surrounding areas for the purposes of
   sampling untuk support pembaharuan /              making data sampling channels to support
   updating model Geologi dan variasi                the renewal / updating of geological models
   kualitas batubara dari coal inventory yang        and variations in the quality of coal from coal
   akan ditambang.                                   inventory to be mined.

3. Melakukan analisis kestabilan lereng di        3. Perform slope stability analysis in the pit
   area pit aktif Pit, baik pada sisi low wall,      active pit area, both on the low wall side,
   high wall maupun sidewall serta disposal          high wall and sidewall and disposal IPD
   IPD border Selatan, kaitannya untuk               South border, related to know the value of
   mengetahui nilai safety factor (FoS) untuk        safety factor (FoS) to control the formation
   kontrol pembentukan desain Pit Aktif              of Active Pit design to be stable and safe.
   supaya stabil dan aman.


2. 6. RENCANA KEGIATAN                            2. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                            EXPLORATION ACTIVITIES

IM pada periode Kuartal-3 2024 belum              IM for 3rd Quarter of 2024 doesn’t have planned
merencanakan melakukan aktifitas kembali          to resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu          be it infill drilling or Geotechnical drilling in IM
pengeboran infill maupun pengeboran               concession area.
Geoteknik di area konsesi IM.
Page 15
Adapun untuk rencana kegiatan eksplorasi       As for the IM exploration activity plan in 2024, in
IM tahun 2024, sehubungan dengan rencana       connection with the mining optimization plan at
pengoptimalan penambangan pada pit utama       the Indomining main pit to a depth of RL-175
Indomining hingga kedalaman RL-175 meter       meters according to the Mine Plan target for pit
sesuai target Mine Plan untuk pit AB dan       AB and in order to optimize the mineable
dalam rangka mengoptimalkan mineable           reserve potential seams, where several
reserve seam-seam potensial, dimana            potential seams in pit area still needs to be
beberapa seam-seam potensial di dalam          known continuity up to the lower limit (down dip)
area pit masih perlu diketahui kemenerusan     of the pit plan and lateral continuity, the
hingga sampai batas bawah (down dip) dari      company intends to conduct infill drilling
rencana pit dan kemenerusan lateral, maka      activities to increase the accuracy of drilling
perusahaan      bermaksud       mengadakan     data in the pit area to the lower limit of the pit
kegiatan pemboran infill untuk menambah        plan where some potential seams from roof &
akurasi data pemboran pada area pit hingga     floor data indicated that there was thinning or
batas bawah rencana pit dimana beberapa        pinch out laterally and/or down dip.
seam potensial dari data roof & floor
terindikasi ada yang mengalami penipisan
atau pinchout secara lateral dan atau down
dip.


Sedangkan, tujuan dari kegiatan pemboran       Meanwhile, the purpose of the infill drilling
infill adalah untuk menambah keyakinan         activity is to increase the confidence of the
batas penyebaran lateral dari seam-seam        lateral spreading limit of potential seams that
potensial     yang  mengalami    pinchout,     has been pinch out, increase confidence in
menambah keyakinan kemenerusan serta           continuity and determine the thickness of the
mengetahui ketebalan lapisan kearah            layer towards the down dip which is indicated to
downdip      yang  terindikasi  mengalami      be thinning to the planned lower pit limit, and
penipisan hingga rencana batas bawah pit,      maximize the mineable reserve of potential
serta memaksimalkan mineable reserve           seams, and validate the update of the Geology
seam-seam potensial, dan mem-validasi          model from the update of adding infill drilling
update model Geologi dari pembaruan            data.
penambahan data pemboran infill.

Pemboran infill pada area pit AB               Infill drilling in the pit AB area is planned to be
direncanakan dilakukan sebanyak 10 titik bor   carried out as many 10 boreholes with a
dengan kedalaman lubang pemboran               maximum drilling hole depth of 100 meters with
maksimal 100 meter dengan total meter yang     a total required meter of 1000 meters. The work
diperlukan adalah sebanyak 1000 meter.         is planned to be carried out using a minimum of
Pekerjaan tersebut rencananya akan             2 units of Jacro 300 rigs or the like. This infill
dikerjakan dengan menggunakan minimal 2-       drilling project will be carried out using the
unit rig tipe Jacro 300 atau yang sejenis.     vertical touch coring drilling method and
Proyek pemboran infill ini akan dilakukan      equipped with geophysical logging up to the
dengan menggunakan metode pemboran             drilling depth target.
touch coring vertikal dan dilengkapi dengan
geophysical logging sampai dengan target
kedalaman pemboran.
Page 16
II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)

3. 1. DAERAH EKSPLORASI                         3. 1. EXPLORATION AREA
Pada Kwartal-2 2024, ABN melakukan              In the 2nd Quarter of 2024, ABN conducted
update model geologi berdasarkan data           geological model updates based on channel
channel sampling serta data roof & floor        sampling data as well as actual roof & floor data
aktual dari hasil pengukuran survey, serta      from survey measurement results, as well as
melakukan rekonsiliasi model geologi            reconciling geological models to actual survey
terhadap data survey aktual.                    data.

Selain kegiatan eksplorasi didalam konsesi      Apart from exploration activities within the ABN
IUP ABN, tim eksplorasi juga melakukan          IUP concession, the exploration team also
studi prospeksi dan review terhadap potensi     carried out prospecting studies and reviews of
pengembangan bahan galian di luar IUP           the potential for developing minerals outside the
ABN. Pada kuartal-2, tim eksplorasi telah       ABN IUP. In the 2nd quarter, the exploration
menyelesaikan sebanyak 6 desk studi             team completed 6 of prospecting studies on the
prospeksi terhadap potensi bahan galian         potential for new minerals including coal and
baru meliputi batubara & emas.                  gold.


3. 2. METODE PENGUKURAN                         3. 2. MEASUREMENT METHODS
Channel      sampling  dilakukan     dengan     Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara          actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip,   exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara          taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas       quality as the basis for geology model update in
batubara sebagai dasar untuk update model       line with the progress of the mine. Channel
geologi seiring dengan kemajuan tambang.        sampling in the 2nd Quarter of 2024 was
Chanel sampling pada kwartal-2 2024             conducted at seam S22, S21U di Pit 4, S26U,
dilakukan pada seam S22, S21U di Pit 4,         S26L, S31, S32 di Pit NW, S12AU, S12, di Pit 8
S26U, S26L, S31, S32 di Pit NW, S12AU,
S12, di Pit 8

3. 3. BIAYA EKSPLORASI                          3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di        ABN Exploration Costs issued in the 2nd Quarter
Kuartal-2 2024 sebagai berikut:                 of 2024 as follows:

                           Q2 2024                         Year To Date
         Biaya Operasional Anggaran      Realisasi         Anggaran      Realisasi
         Operating Expense Budget        Realization       Budget        Realization
                           (IDR)         (IDR)             (IDR)         (IDR)
         April/ April      399.300.000,-      -            399.300.000,-      -
         Mei/ May          399.300.000,-      -            399.300.000,-      -
         Juni/ June        399.300.000,-      -            399.300.000,-      -


3. 4. PELAKSANAAN DAN                           3. 4. IMPLEMENTATION AND
      PENGAWASAN                                      SUPERVISION
Kegiatan dilaksanakan & diawasi oleh            Activities are carried out and supervised by the
Departemen Mining section Geotech &             Department of Mining section Geotech &
Exploration Development                         Exploration Development.
Page 17
3. 5. KEMAJUAN EKSPLORASI                        3. 5. EXPLORATION PROGRESS
Pada Kuartal-2 2024 tidak ada kegiatan           In the 2nd Quarter of 2024 there are no
pemboran    eksplorasi, namun  berikut           exploration drilling activities, but the following
kegiatan team geologi selama Kuartal-2           are the activities of the geological team during
2024:                                            the 2nd Quarter of 2024:

1. Melakukan monitoring di area Pit Aktif,       1. Monitoring the Active Pit area, both slope
   baik monitoring kestabilan lereng maupun         stability monitoring and coal monitoring to
   monitoring batubara untuk memantau               monitor the suitability between geological
   kesesuaian antara Model Geologi &                models and actual in the field.
   aktual di lapangan.
2. Update Model Geologi berdasarkan data         2. Geological Model Update based on coal
   roof/floor batu bara dari data survey            roof/floor data from actual survey data and
   actual dan dari data pemboran                    drilling data.
3. Analisa kestabilan lereng di area Low         3. Analysis of slope stability in low wall pit area
   Wall Pit Aktif & area disposal.                  active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan    4. Pit and disposal slope stability monitoring
   disposal dengan titik pantau prisma dan          using monitoring point prism and EWS
   ekstensometer EWS.                               ekstensometer.
5. Pemasangan sensor EWS di Pit 6 & Pit          5. EWS extensometer sensor installation in Pit
   NW.                                              6 & Pit NW.
6. Menindaklanjuti beberapa IUP yang             6. Follow up on several potential IUP for
   potensial untuk dilakukan eksplorasi             detailed exploration.
   detail.


3. 6. RENCANA KEGIATAN                           3. 6. PLANS FOR FURTHER
      EKSPLORASI SELANJUTNYA                            EXPLORATION ACTIVITIES
Rencana ABN pada periode Kuartal-3 2024          In the 3rd quarter of 2024, ABN has no plans for
tidak ada rencana kegiatan pemboran. Selain      drilling activities. However, exploration activities
itu kegiatan eksplorasi dan geologi              are focused on the following activities:
difokuskan pada kegiatan berikut:                1. Sampling for coal quality updates &
1. Pengambilan sample untuk update                    geological models in the Active Pit area.
    kualitas batubara & model geologi di area
    Pit Aktif.
2. Monitoring di area Pit Aktif untuk             2. Monitoring in the Active Pit area to monitor
    memantau kesesuaian antara Model                 the suitability between actual and
    Geologi dan aktual di lapangan.                  Geological Models in the field.
3. Melakukan update Model Geologi                 3. Update geological model based on
    berdasarkan data channel sampling, data          sampling channel, actual survey data and
    survey aktual dan data pemboran.                 drilling data.
4. Rekonsiliasi antara Model Geologi              4. Reconciliation between Geological Model to
    terhadap data survey actual.                     actual survey data.
5. Monitoring geotek di area Pit & Disposal.      5. Geotech monitoring in Pit & Disposal Area.
6. Analisa kestabilan lereng pit dan disposal.    6. Slope stability analysis for Pit and Disposal
7. Pemasangan monitoring point untuk              7. Monitoring point installation for slope
    pemantauan pergerakan lereng.                    movement monitoring program.

File

File Open PDF
Source IDX
Size0.54 MB
Published10 Jul 2024
Pages17
Characters45,321
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 11 people and organisations named in the text · linked when the evidence is strong

linked org TBS Energi Utama Tbk p.1 ×26
unresolved org PT Trisensa Mineral Utama p.2 ×4
unresolved org PT Indomining p.2 ×4
unresolved org PT Adimitra Baratama Nusantara p.2 ×4
unresolved org PT Multido Prima p.5
unresolved org PT RPP p.6
unresolved org PT RPP Contractors Indonesia Contractors Indonesia p.6
unresolved org PT. ABN p.7
unresolved org PT. RPP Contractors Indonesia p.7
unresolved org Departemen Engineering Section Geologist. p.14
unresolved org Departemen Mining p.16

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result