Page 1
Laporan Kuartalan Aktivitas Eksplorasi Quarterly Report of the Exploration Activities PT TBS Energi Utama Tbk Kuartal-II/ the 2nd Quarter of 2024
Page 2
KATA PENGANTAR INTRODUCTION
PT TBS Energi Utama Tbk (“Perseroan”) PT TBS Energi Utama Tbk ("the
adalah perusahaan pertambangan Company") is a coal mining company
batubara yang melakukan kegiatan conducting mining activities in
penambangan di daerah Sangasanga, Sangasanga area, Kutai Kartanegara
Kabupaten Kutai Kartanegara, Propinsi Regency, East Kalimantan, which the
Kalimantan Timur, dimana area konsesi concession area of the three subsidiaries
ketiga anak perusahaan terletak is located side by side. All the supporting
berdampingan. Seluruh infrastruktur infrastructure of mining operations such
pendukung operasional penambangan as coal hauling roads, offices, workshop,
seperti jalan angkut batubara, coal-only jetty and other infrastructures
perkantoran, perbengkelan, pelabuhan are located in Kutai Kartanegara
khusus batubara dan infrastruktur lainnya Regency, East Kalimantan.
berada di daerah Kabupaten Kutai
Kartanegara, Propinsi Kalimantan Timur.
Perseroan mempunyai 3 (tiga) anak The Company has 3 (three) subsidiaries
perusahaan yang bergerak di bidang engaged in coal mining sector, located in
pertambangan batubara, terletak di Sangasanga area, Kutai Kartanegara
daerah Sangasanga, Kabupaten Kutai Regency, East Kalimantan. The
Kartanegara, Propinsi Kalimantan Timur. company's subsidiaries are:
Adapun ketiga anak perusahaan
Perseroan tersebut adalah: 1. PT Trisensa Mineral Utama (TMU)
1. PT Trisensa Mineral Utama (TMU) 2. PT Indomining (IM)
2. PT Indomining (IM) 3. PT Adimitra Baratama Nusantara
3. PT Adimitra Baratama Nusantara (ABN)
(ABN)
Dalam rangka memenuhi Ketentuan In order to comply with the Provisions
III.1.6, Peraturan Nomor I-E tentang III.1.6, Regulation Number I-E concerning
Kewajiban Penyampaian Informasi, Information Delivery Obligations,
Lampiran Keputusan Direksi PT Bursa Attachment to the Decree of the Board of
Efek Jakarta Number Kep-00066/BEI/09- Directors of PT Bursa Efek Jakarta
2022 tanggal 30 September 2022, maka Nomor Kep-00066/BEI/09-2022 dated
bersama ini kami sampaikan Laporan September 30, 2022, we here jointly
Kegiatan Eksplorasi Perseroan untuk submit the Company's Exploration
Kuartal-2 2024. Activity Report for the 2nd Quarter of
2024.
www.tbsenergi.com
Page 3
BAB I CHAPTER I
PENDAHULUAN INTRODUCTION
I. Latar Belakang I. Background
Batubara merupakan bahan galian yang Coal is an economically valuable excavation
bernilai ekonomis, sehingga diminati oleh material, so it is in demand by foreign
investor asing maupung investor dalam investors as well as domestic investors. Coal
negeri. Usaha pertambangan batubara mining business has prospects as a mainstay
mempunyai prospek sebagai sektor andalan sector of oil and gas replacement in building
pengganti migas dalam membangun the economy of East Kalimantan in the future.
perekonomian Kalimantan Timur di masa It is based on available coal resources and
mendatang. Hal ini didasarkan pada sumber potentials, marketing prospects as well as
daya dan potensi batubara yang tersedia, local government policy support.
prospek pemasaran serta dukungan
kebijakan pemerintah daerah.
Pengusahaan pertambangan karena sifat Strive of the Mining business because of the
kegiatannya pada dasarnya selalu nature of its activities basically always cause
menimbulkan perubahan pada alam changes in the nature of its environment.
lingkungannya. Di balik perubahan pada Behind the changes in nature and the
alam dan lingkungannya, suatu kenyataan environment, it is also a fact that mining
pula bahwa usaha pertambangan telah businesses have succeeded in improving
berhasil meningkatkan kesejahteraan human welfare by providing raw materials for
manusia dengan menyediakan bahan baku industry, energy and others.
untuk industri, energi dan lain-lain.
Gambar 1.1. Lokasi Tambang PT TBS Energi Utama Tbk
Image 1.1. PT TBS Energi Utama Tbk Mining Site
Page 4
Gambar 1.2. Skema Kegiatan Operasional Penambangan PT TBS Energi Utama Tbk
Image 1.2. Scheme of Mining Operations of PT TBS Energi Utama Tbk
Gambar 1.3. Lokasi Konsesi Ketiga Anak Perusahaan PT TBS Energi Utama Tbk
Image 1.3. Concession area of The Three Subsidiaries of PT TBS Energi Utama Tbk
Page 5
I. 1. PT TRISENSA MINERAL UTAMA (“TMU”) TMU merupakan perusahaan tambang TMU is a coal mining company with batubara dengan daerah penambangan administrative mining areas including Loa secara administratif termasuk wilayah Janan District, Sangasanga, Muara Jawa, Kecamatan Loa Janan, Sangasanga, Muara Kutai Kartanegara Regency of East Jawa, Kabupaten Kutai Kartanegara Propinsi Kalimantan Province with an area of 3,414 ha Kalimantan Timur dengan Luas wilayah and regional code KTN 2010 3133 OP. TMU 3.414 ha dan kode Wilayah KTN 2010 3133 has obtained approval to conduct mining OP. TMU telah mendapat persetujuan untuk activities and sales of excavation products melakukan aktivitas penambangan dan with the Decree of the Regent of Kutai penjualan hasil galian dengan Keputusan Kartanegara Number: 540/3133/IUP-OP/MB- Bupati Kutai Kartanegara No: 540/3133/IUP- PBAT/XII/2010 concerning approval of The OP/MB-PBAT/XII/2010 tentang mengenai Production Operation Mining Business persetujuan Izin Usaha Pertambangan License (KTN 2010 3133 OP) dated Operasi Produksi (KTN 2010 3133 OP) December 14, 2010. tertanggal 14 Desember 2010. Pada Kuartal-2 2024, pelaksanaan pekerjaan In the 2nd Quarter of 2024, the yang dilakukan oleh TMU telah menyerap implementation of work carried out by TMU tenaga kerja sebanyak 91 orang sedangkan has absorbed a workforce of 91 people while untuk kontraktor dan sub-kontraktornya 436 for contractors and sub-contractors 436 orang dan dibagi menjadi 2 shift kerja. people and divided into 2 shifts of work. The Kontraktor tambang yang digunakan adalah mining contractor used is PT Multido Prima PT Multindo Prima Teknik (MPT). Teknik (MPT). Mining is done by surface Penambangan yang dilakukan dengan open pit mining system with truck and shovel sistem tambang terbuka (surface open pit method. mining) dengan metode truck dan shovel. Produk batubara yang dihasilkan TMU Coal products produced by TMU have an memiliki kalori rata-rata 4900 GAR dengan average calorie of 4900 GAR with Total Total Sulphur (TS) di bawah 1%. Kualitas Sulphur (TS) below 1%. The quality of this batubara ini cukup memenuhi permintaan coal is enough to meet the demand of the pasar yang menginginkan batubara dengan market who want low sulphur coal. sulphur rendah. Pelaksanaan pengelolaan Implementation of Occupational Safety and Keselamatan dan Kesehatan Kerja yang Health management implemented in TMU diterapkan di TMU mengacu kepada refers to the program / plan of Occupational program/rencana Pengelolaan Keselamatan Safety and Health Management in dan Kesehatan Kerja sesuai dengan accordance with applicable laws and perundang-undangan yang berlaku. regulations. Kegiatan pengelolaan dan pemantauan Environmental management and monitoring lingkungan yang dilakukan TMU meliputi activities carried out by TMU include kegiatan penghijauan yang dilakukan di greening activities carried out at the Road Tanggul Jalan, Tanggul Stockpile, Tanggul Embankment, Embankment Stockpile, Front Depan Timbangan, Settling Pond, Waste Embankment Scales, Settling Pond, Waste Dump dan Bench Office Baru. Dump and New Bench Office.
Page 6
Pada saat ini, TMU juga melakukan Currently, TMU also manages and monitors pengelolaan dan pemantauan kualitas air, water quality, dust, noise, B3 waste and debu, kebisingan, limbah B3 dan limbah domestic waste, as well as monitoring domestik, serta pemantauan tingkat erosi. erosion rates. I. 2. PT INDOMINING (“IM”) Berdasarkan Izin Usaha Produksi Nomor: Based on Production Business License 540/004/IUP-OP/MB-PBAT/III/2013 tanggal Nomor: 540/004/IUP-OP/MB-PBAT/III/2013 15 Maret 2013, IM melakukan kegiatan dated March 15, 2013, IM conducted coal eksplorasi dan penambangan batubara serta exploration and mining activities and its hasil produksinya di daerah Kecamatan production in Sangasanga District, Kutai Sangasanga, Kabupaten Kutai Kartanegara, Kartanegara Regency, East Kalimantan Propinsi Kalimantan Timur. Tahap produksi Province. Im's production phase began in IM dimulai pada bulan Agustus 2007, August 2007, while commercial production sedangkan produksi komersial dimulai pada began in October 2007. bulan Oktober 2007. Kegiatan penambangan IM dilakukan IM mining activities are carried out by mining kontraktor penambangan yaitu PT RPP contractor PT RPP Contractors Indonesia Contractors Indonesia (RCI). Kegiatan (RCI). Mining activities are surface open pit penambangan merupakan penambangan mining with truck and shovel methods. terbuka (surface open pit mining) dengan metoda truck dan shovel. Pada Kuartal-2 2024, sumber daya manusia As of 2nd Quarter 2024, human resources yang bekerja dalam kegiatan operasional IM working in IM's operational activities reached mencapai 338 tenaga kerja termasuk 338 workers including contractors and sub- kontraktor dan sub-kontraktor. Dari 338 contractors. Of those 338 people, about 80% orang tersebut sekitar 80% merupakan are local workers to support community tenaga kerja lokal sebagai penunjang development programs with the aim of program community development dengan improving the welfare of the communities tujuan untuk meningkatkan kesejahteraan around the mine. masyarakat di sekitar tambang. Produk batubara IM memiliki kualitas antara IM coal products have quality between 4200 4200 - 5600 GAR dengan total sulphur antara - 5600 GAR with total sulphur between 0.2% 0.2% - 2.0%. Produk cukup bersaing di dalam - 2.0%. The product is quite competitive in the pasar internasional maupun domestik international and domestic markets.
Page 7
I. I. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)
ABN didirikan pada tahun 2004, dan ABN was established in 2004, and manages
mengelola daerah pertambangan dengan a mining area of about 2,990 ha located in
luas area sekitar 2.990 Ha yang berlokasi di Kampung Jawa Village, Sangasanga District
Desa Kampung Jawa, Kecamatan and Muara Kembang Village, Muara Jawa
Sangasanga dan Desa Muara Kembang, District, Kutai Kartanegara Regency, East
Kecamatan Muara Jawa, Kabupaten Kutai Kalimantan. Based on Mining Business
Kartanegara, Kalimantan Timur. License Production Operation Number:
Berdasarkan pada Izin Usaha Pertambangan 540/1691/IUP-OP/MB-{BAT/XII/2009 dated
Operasi Produksi Nomor: 540/1691/IUP- December 1, 2009, ABN conducts
OP/MB-{BAT/XII/2009 tanggal 1 Desember exploration, coal mining, and marketing of
2009, ABN melakukan kegiatan eksplorasi, production at its mine site.
penambangan batubara, dan pemasaran
hasil produksi di lokasi tambangnya tersebut.
ABN mulai melakukan kegiatan eksplorasi ABN began its exploration and infrastructure
dan pembangunan infrastruktur pada tahun development activities in 2007, while
2007, sedangkan produksi komersial dimulai commercial production began in 2008. ABN
pada tahun 2008. Produk batubara ABN coal products belong to thermalcoal group
termasuk dalam kelompok thermalcoal with sub-bituminous and bituminous rank,
dengan rank sub-bituminous dan bituminous, with 4 types of ABN 52 (CV 5200 GAR & TS
dengan 4 jenis tipe yaitu ABN 52 ( CV 5200 < 1), ABN 50 ( CV 5000 GAR & TS < 1), ABN
gar & TS < 1), ABN 50 ( CV 5000 gar & TS < 42 (CV 4200 GAR & TS < 1) and ABN 56 HS
1), ABN 42 ( CV 4200 gar & TS < 1) dan ABN (CV 5600 gar & TS <2)). Thermal coal is
56 HS(CV 5600 gar & TS < 2)). Thermal coal marketed to several countries in the world,
dipasarkan ke beberapa negara di dunia, including India, China, Japan, Italy, Thailand,
diantaranya India, Cina, Jepang, Italia, and Korea. ABN also supplies for domestic
Thailand, dan Korea. ABN juga mensuplai needs, namely cement industry and several
untuk kebutuhan dalam negeri, yaitu industri other industries.
semen dan beberapa industri lainnya.
Sistem penambangan yang dilakukan ABN ABN's mining system is surface open pit
yaitu sistem penambangan terbuka (surface mining. Coal ABN has a low ash content, so
open pit mining). Batubara ABN memiliki it is not done by washing process, only done
kandungan abu yang rendah, sehingga tidak by crushing process. Mining activities of PT.
dilakukan pencucian (washing), hanya ABN is carried out by one main contractor, PT
dilakukan proses peremukan (crushing). RPP Contractors Indonesia (RCI).
Kegiatan penambangan PT. ABN dilakukan
oleh satu kontraktor utama, yaitu PT. RPP
Contractors Indonesia (RCI).
Pada Kurtal-2 2024, sumber daya manusia yang In The 2nd Quarter of 2024, human resources
terlibat dalam kegiatan operasional ABN involved in ABN's operational activities reached
mencapai sekitar 477 orang, yang terdiri dari 196 about 477 people, consisting of 196 workers in
orang tenaga kerja pada ABN dan 281 orang ABN and 281 workers in contractors and sub-
tenaga kerja pada kontraktor maupun sub- contractors.
kontraktor.
Page 8
Sebagai salah satu wujud pemberdayaan As the form of empowerment of the surrounding masyarakat sekitar, ABN bersama-sama dengan community, ABN along with contractors and sub- kontraktor dan sub-kontraktor saat ini telah contractors currently have accommodated local menampung tenaga kerja lokal Kecamatan workers in Sangasanga District & Muara Jawa Sangasanga & Kecamatan Muara Jawa, District, Kutai Kartanegara Regency Kabupaten Kutai Kartanegara kurang lebih 70 % approximately about 70% of the labor needs, dari kebutuhan tenaga kerja, sedangkan sisanya while the remaining about 30% comes from sekitar 30 % berasal dari luar daerah dua outside the area of the two sub-districts. kecamatan tersebut.
Page 9
BAB II CHAPTER II
KEGIATAN EKSPLORASI EXPLORATION ACTIVITY
II. 1. PT TRISENSA MINERAL UTAMA (“TMU”)
1. 1. DAERAH EKSPLORASI 1. 1. EXPLORATION AREA
Pada Kuartal-2 2024 kegiatan eksplorasi In Q2 2024, exploration activities will be in
berupa kegiatan sampling di Pit Aktif yaitu pit the form of sampling activities in Active
B1WA, B2A dan pit 5B36. Pits, namely pit B1WA, B2A and pit 5B36.
Kegiatan sampling batubara di pit aktif guna Coal sampling activities in active pits to
mengetahui nilai kualitas nya terutama nilai total determine the quality value, especially the
sulphur (TS) dan nilai total kalori. kegiatan total sulphur (TS) value and total calorie
sampling batubara. Seam target adalah seam value. coal sampling activities. The target
seam WA, WB, X, RU, RL, R3di pit B1WA. seam is the WA, WB, X, RU, RL, R3 seam
Sampling di pit B2A dengan seam target seam seam in pit B1WA. Sampling in pit B2A with
F, D, E H10, G20, G Pit 5B36 dengan seam 42, seam target seamF, D, E, H10, G20, G Pit
43, 32, 33, 34, 35, 36, 37, 41 5B36 with seam 42, 43, 32, 33, 34, 35, 36,
37, 41
1. 2. METODE PENGUKURAN 1. 2. MEASUREMENT METHODS
Trenching Trenching
Secara teknis di lapangan tim geologist Technically in the field, the geologist team
melakukan trenching dengan membuat paritan conducted trenching by making an
memanjang memotong strike seam – seam elongated trench cutting the strike seam –
target sebatas titik plan yang dibuat seam target to the point plan made earlier.
sebelumnya. Hal ini berfungsi untuk mengcover This serves to cover the entire region so
seluruh wilayah agar semua seam dapat di that all seams can be found. The average
temukan. Rata – rata panjang paritan trenching length of trenching in a day can reach 80 m
dalam sehari bisa mencapai 80 m -100 m -100 m depending on the terrain / area of
tergantung dari medan/areal kerjanya apakah di work whether in a ramp, swamp or hilly with
tempat landai, rawa atau berbukit dengan a steep slope.
kemiringan terjal.
Pengambilan sampel untuk di mengetahui nilai Sampling to find out the values of quality is
–nilai kualitasnya di lakukan per jarak 100 m done per distance of 100 m between
antar lubang trenching. trenching holes
Sampling Sampling
Tim geologi juga melakukan sampling seam – Geologies team also sampling seam -
seam di pit guna mengetahui kualitas ter update seam in the pit to find out the updated
dari seam – seam yang akan tambang. quality of the seam - seam that will be mine.
Page 10
Metode yang digunakan adalah: The methods used are:
1. Jarak antar titik sampling maksimal 20 m 1. The distance between sampling
per seam searah strike bukaan batubara points maximum 20 m per seam direct
yang akan di ambil (getting). strike coal openings to be taken
(getting).
2. Sampling ulang/update pada tiap bukaan 2. Re-sampling/update on each new
layer baru pada suatu seam (maksimal 1 layer opening on a seam (maximum 1
bukaan layer setinggi 3 m). layer opening as high as 3 m).
3. Sampling pada seam – seam bukaan 3. Sampling on seam – seam new
baru/seam yang pertama kalinya akan di openings / seam the first time will be
getting. Adapun plan penambangan in getting. The mining plan until the
sampai dengan akhir tahun di targetkan end of the year is targeted at seam
pada seam dengan nilai Calori (ar)_g di with calorie value (ar)_g above 4200.
atas 4200.
1. 3. BIAYA EKSPLORASI 1. 3. EXPLORATION COSTS
Biaya Eksplorasi TMU yang dikeluarkan di TMU Exploration Costs incurred in the 2nd
Kuartal-2 2024 sebagai berikut: Quarter of 2024 as follows:
Q2 2024 Year to Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
Biaya Eksplorasi 35.000.000 129.000.000 360.000.000 189.000.000
Exploration Costs
Catatan: Note:
Jumlah Jumlah sampling di Kuartal 2 2024 berjumlah The number of samplings in the 2nd Quarter 2024
86 sampel.54 hasil sampling di pit dan 32 hasil amounted to 86 samples. 54 sampling result in the pits
sampling raw coal di ROM and 32 are raw coal sampling result in ROM
Biaya Eksplorasi untuk tahun 2024 yang Exploration Cost for 2024 in accordance with
sesuai dengan RKAB 2024 bagian geologi RKAB 2024 geological section in the form of
berupa biaya analisa kualitas batubara di coal quality analysis cost at laboratory
laboratorium maksimal 14 sampel/bulan. maximum 14 samples per month. The cost for
Biaya untuk kegiatan trenching yang trenching activities that use PC 200 units is
mengunakan unit PC 200 biayanya accommodate to production department for
dimaksukan ke departement produksi untuk general work with a record of trenching
pekerjaan general dengan catatan kegiatan activities on the unit usage timesheet.
trenching pada lembar timesheet pemakaian
unit.
Banyaknya sampel pada kuartal 2 2024 ini The large number of samples in Q2 2024 is
disebabkan oleh adanya daily monitoring due to the daily quality monitoring of the B1WA
kualiti pada pit B1WA untuk seam RU, RL pit for RU, RL and R3 seam in the pits and in
dan R3 di pit dan di ROM (raw coal) ROM (raw coal)
Page 11
1. 4. PELAKSANAAN DAN PENGAWASAN 1.4. IMPLEMENTATION AND SUPERVISION Pengawasan Test Pit/Trenching dan Supervision of Test Pit/ Trenching sampling of sampling batubara di pit TMU di lakukan oleh coal in the TMU pit conducted by TMU’s Geologist TMU. geologist. 1. 5. KEMAJUAN EKSPLORASI 1. 5. EXPLORATION PROGRESS Kesimpulan Eksplorasi TMU Kuartal-2 Conclusion of TMU Exploration in the 2nd 2024 Quarter of 2024 Selain kegiatan trenching kami dari tim In addition to our trenching activities from the geologi juga melakukan sampling seam – geology team also sampling seam-seam in the seam di pit guna mengetahui kualitas ter pit to find out the update quality from seam - update dari seam – seam yang akan di seam to be getting. The methods used are: getting. Metode yang digunakan adalah: 1. Jarak antar titik sampling maksimal 50 m 1. Distance between sampling points per seam searah strike bukaan batubara maximum 50 m per unidirectional strike coal yang akan di ambil (getting). openings to be taken (getting). 2. Sampling ulang/update pada tiap bukaan 2. Sampling/update on each new layer layer baru pada suatu seam (maksimal 1 opening on one seam (maximum 1-layer bukaan layer setinggi 3 m). aperture as high as 3 m). 3. Sampling pada seam – seam bukaan 3. Sampling on seam - seam new openings / baru/seam yang pertama kalinya akan di seam the first time will be in the getting. The getting. Adapun plan penambangan mining plan until the end of the year is sampai dengan akhir tahun di targetkan targeted at seam with calorie (ARB) GAR pada seam dengan nilai Calori (ARB) value above 4200. GAR di atas 4200. 4. Selama Kwartal-2 2024 kegiatan berupa 4. During Q1 2024, activities in the form of sampling pit aktif yaitu di pit B2A dengan active pit sampling are in pit B2A with target seam target adalah seam F, D, E, G, H10, seam are seam F, D, E, G, H10, G20.. Pit G20. Pit 5B36 seam 42, 43, 47, 32, 33, 5B36 seam 42, 43, 47, 32, 33, 34, 35, 36, 34, 35, 36, 37, 45. Pit B1WA dengan 37, 45. Pit B1WA with target seam Z, ZA, Y, seam target Z, ZA, Y, RU, RL, R3 RU, RL, R3 Sampling in ROM are seam RU, Sampling di ROM seam RU, RL, R3 RL, and R3 5. Rata – rata hasil analisa kualitas dari 5. The average quality analysis results of the seam –seam tersebut di atas TM 33.54 seam -seam above TM 33.54%, ASH %, ASH 4.81 %, TS 0.80 % dan nilai CAL 4.81%, TS 0.80 % and CAL (ar) (ar) 4.500 values4.500.
Page 12
1. 6. RENCANA KEGIATAN EKSPLORASI 1. 6. PLANS FOR FURTHER EXPLORATION
SELANJUTNYA ACTIVITIES
Rencana Kegiatan Divisi Geologi Kuartal-3 The Geological Division Plan for 3rd Quarter
2024: 2024:
1. Melakukan pembaharuan / updating 1. Updating the Geological model based on
model Geologi berdasarkan data updating monthly roof/floor updating data from pit
roof/floor bulanan dari data survey Pit survey data and cs holes data from coal
serta cs_holes dari data channel sampling sampling channel data. The results of this
batubara. Hasil dari pembaharuan model model update are then sent to the mine plan
ini kemudian di kirim ke bagian mine plan enginnering section as a basis for
enginnering sebagai dasar ajuan untuk submissions for making pit designs for next
pembuatan design pit untuk Bulan depan. month.
2. Trenching di luar Rencana PIT yang di Plan 2. Trenching outside the PIT Plan that is
kan oleh tim Engineering di tiadakan dan planned by the Engineering team is not in
sebagai penggantinya adalah trenching di place and in lieu of trenching is done in the
lakukan di plan pit yang data trenchingnya plan pit whose trenching data is lacking or
kurang atau tingkat confidence confidence level of continuity, seam
kemenerusan, ketebalan seam di pit thickness in the pit is still lacking.
tersebut masih kurang.
3. Memonitoring adanya anomali pada suatu 3. Monitoring the presence of anomalies in an
bukaan PIT yang aktif. active PIT aperture.
4. Tim geologist akan melakukan sampling 4. The geological team will be sampling the
pada bukaan seam seam yang berada di seam seam openings located in the active
pit aktif terutama mengontrol perubahan pit, especially controlling changes in the
nilai Total Sulfur dan nilai Kalori di seam value of Total Sulphur and value of
–seam ber kalori tinggi baik kearah down Calory in seam -seam with high calories
dip maupaun kearah strike nya. both towards down dip maupaun towards
his strike.
5. Memonitoring kualitas dari seam –seam 5. Monitoring the quality of seam -seam that is
yang tertambang di bulan Juli – September mined in July until September 2024,
2024 terutama dalam hal perubahan nilai especially in terms of changes in TS value in
TS seiring penurunan elevasi dari masing line with the decrease in elevation of each
–masing seam yang tertambang. seam that is mined.
6. Update data kualitas berdasarkan 6. Quality data update based on mining
kemajuan penambangan pada seam– progress on seam–seam target in previous
seam target di bulan sebelumnya. month.
7. Rencana kegiatan pengeboran eksplorasi 7. The plan for exploration drilling activities in
di tahun 2024 sebanyak 78 titik bor atau 2024 is 78 drill points or as many as 9,360
sebanyak 9.360 m di wilayah barat pit m in the western area of the B3KL pit with
B3KL dengan seam Target seam R, S, T, seam Target seam R, S, T, U, WA, WB, X,
U, WA, WB, X, Y. Y.
Page 13
8. Rencana kegiatan pengeboran geoteknik 8. The plan for geotechnical drilling activities in
di tahun 2024 sebanyak 5 titik pemboran 2024 is 5 drilling points or as much as 600
atau sebanyak 600 m di wilayah Barat pit m in the Western area of the B3KL pit.
B3KL.
II. 2. PT INDOMINING (“IM”)
2. 1. DAERAH EKSPLORASI 2. 1. EXPLORATION AREA
Pada Kuartal-2 2024, IM tidak ada kegiatan In the 2nd Quarter of 2024, IM had no drilling
pemboran. activities.
2. 2. METODE PENGUKURAN 2. 2. MEASUREMENT METHODS
Untuk kegiatan pemboran infill menggunakan For infill drilling activities using touch coring
metode touch coring, sedangkan untuk method, while for geotechnical drilling is done
pemboran geoteknik dilakukan dengan by drilling Full Coring method.
pemboran metode Full Coring.
Pemboran geoteknik dilakukan juga dengan Geotechnical drilling is also carried out using
menggunakan metode Standart Penetration the Standard Penetration Test (SPT) method.
Test (SPT). Prinsip kerja SPT adalah dengan The working principle of SPT is to hit a standard
memukul sebuah tabung standar ke dalam tube into a drill hole 45 cm deep using a
lubang bor sedalam 45 cm menggunakan hammer weighing 63.5 KG that falls freely from
palu dengan berat 63.5 KG yang jatuh bebas a height of 76 cm. What counts is the number of
dari ketinggian 76 cm. Yang dihitung adalah blows to penetrate as deep as 15 cm. The
jumlah pukulan untuk melakukan penetrasi number of blows used is penetration as deep as
sedalam 15 cm. Jumlah pukulan yang the last 30 cm.
digunakan adalah penetrasi sedalam 30 cm
terakhir.
2. 3. BIAYA EKSPLORASI 2. 3. EXPLORATION COSTS
Biaya Eksplorasi IM yang dikeluarkan di IM Exploration Costs incurred in the 2nd Quarter
Kuartal-2 2024 sebagai berikut: of 2024 as follows:
Q2 2024 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
April/ April 83,333,333 - 883,333,330 -
Mei/ May 83,333,333 - 916,666,663 -
Juni/ June 83,333,333 - 999,999,996 -
Page 14
2. 4. PELAKSANAAN DAN 2. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Kegiatan Pemboran diawasi oleh Drilling activities are supervised by the
Departemen Engineering Section Geologist. Department of Engineering geologist section.
2. 5. KEMAJUAN EKSPLORASI 2. 5. EXPLORATION PROGRESS
Pada Kuartal-2 2024 belum ada kegiatan As of the 2nd Quarter of 2024, there are no
pemboran lanjutan. Namun ada beberapa further drilling activities. But there are several
kegiatan Geologi yang berlanjut dilakukan, geological activities that continue to be carried
diantaranya: out, including:
1. Melakukan pembaharuan / updating 1. Updating the Geological model based on
model Geologi berdasarkan data updating monthly roof/floor updating data from pit
roof/floor bulanan dari data survey Pit survey data and cs_holes data from coal
serta cs_holes dari data channel sampling sampling channel data, and supervision in
batubara, dan pengawasan dalam the activities of taking roof/floor
kegiatan pengambilan data pengukuran measurement data and cs_holes.
roof/floor serta cs_holes tersebut.
2. Melakukan kegiatan channel sampling 2. Conducting channel sampling activities as
serta pengukuran tebal aktual batubara di well as actual thick measurement of coal at
lokasi Pit AB Blok 13-15 & sekitarnya the pit AB location Block 13-15 &
untuk keperluan pembuatan data channel surrounding areas for the purposes of
sampling untuk support pembaharuan / making data sampling channels to support
updating model Geologi dan variasi the renewal / updating of geological models
kualitas batubara dari coal inventory yang and variations in the quality of coal from coal
akan ditambang. inventory to be mined.
3. Melakukan analisis kestabilan lereng di 3. Perform slope stability analysis in the pit
area pit aktif Pit, baik pada sisi low wall, active pit area, both on the low wall side,
high wall maupun sidewall serta disposal high wall and sidewall and disposal IPD
IPD border Selatan, kaitannya untuk South border, related to know the value of
mengetahui nilai safety factor (FoS) untuk safety factor (FoS) to control the formation
kontrol pembentukan desain Pit Aktif of Active Pit design to be stable and safe.
supaya stabil dan aman.
2. 6. RENCANA KEGIATAN 2. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
IM pada periode Kuartal-3 2024 belum IM for 3rd Quarter of 2024 doesn’t have planned
merencanakan melakukan aktifitas kembali to resume further exploration drilling activities,
pengeboran eksplorasi lanjutan, baik itu be it infill drilling or Geotechnical drilling in IM
pengeboran infill maupun pengeboran concession area.
Geoteknik di area konsesi IM.
Page 15
Adapun untuk rencana kegiatan eksplorasi As for the IM exploration activity plan in 2024, in IM tahun 2024, sehubungan dengan rencana connection with the mining optimization plan at pengoptimalan penambangan pada pit utama the Indomining main pit to a depth of RL-175 Indomining hingga kedalaman RL-175 meter meters according to the Mine Plan target for pit sesuai target Mine Plan untuk pit AB dan AB and in order to optimize the mineable dalam rangka mengoptimalkan mineable reserve potential seams, where several reserve seam-seam potensial, dimana potential seams in pit area still needs to be beberapa seam-seam potensial di dalam known continuity up to the lower limit (down dip) area pit masih perlu diketahui kemenerusan of the pit plan and lateral continuity, the hingga sampai batas bawah (down dip) dari company intends to conduct infill drilling rencana pit dan kemenerusan lateral, maka activities to increase the accuracy of drilling perusahaan bermaksud mengadakan data in the pit area to the lower limit of the pit kegiatan pemboran infill untuk menambah plan where some potential seams from roof & akurasi data pemboran pada area pit hingga floor data indicated that there was thinning or batas bawah rencana pit dimana beberapa pinch out laterally and/or down dip. seam potensial dari data roof & floor terindikasi ada yang mengalami penipisan atau pinchout secara lateral dan atau down dip. Sedangkan, tujuan dari kegiatan pemboran Meanwhile, the purpose of the infill drilling infill adalah untuk menambah keyakinan activity is to increase the confidence of the batas penyebaran lateral dari seam-seam lateral spreading limit of potential seams that potensial yang mengalami pinchout, has been pinch out, increase confidence in menambah keyakinan kemenerusan serta continuity and determine the thickness of the mengetahui ketebalan lapisan kearah layer towards the down dip which is indicated to downdip yang terindikasi mengalami be thinning to the planned lower pit limit, and penipisan hingga rencana batas bawah pit, maximize the mineable reserve of potential serta memaksimalkan mineable reserve seams, and validate the update of the Geology seam-seam potensial, dan mem-validasi model from the update of adding infill drilling update model Geologi dari pembaruan data. penambahan data pemboran infill. Pemboran infill pada area pit AB Infill drilling in the pit AB area is planned to be direncanakan dilakukan sebanyak 10 titik bor carried out as many 10 boreholes with a dengan kedalaman lubang pemboran maximum drilling hole depth of 100 meters with maksimal 100 meter dengan total meter yang a total required meter of 1000 meters. The work diperlukan adalah sebanyak 1000 meter. is planned to be carried out using a minimum of Pekerjaan tersebut rencananya akan 2 units of Jacro 300 rigs or the like. This infill dikerjakan dengan menggunakan minimal 2- drilling project will be carried out using the unit rig tipe Jacro 300 atau yang sejenis. vertical touch coring drilling method and Proyek pemboran infill ini akan dilakukan equipped with geophysical logging up to the dengan menggunakan metode pemboran drilling depth target. touch coring vertikal dan dilengkapi dengan geophysical logging sampai dengan target kedalaman pemboran.
Page 16
II. 3. PT ADIMITRA BARATAMA NUSANTARA (“ABN”)
3. 1. DAERAH EKSPLORASI 3. 1. EXPLORATION AREA
Pada Kwartal-2 2024, ABN melakukan In the 2nd Quarter of 2024, ABN conducted
update model geologi berdasarkan data geological model updates based on channel
channel sampling serta data roof & floor sampling data as well as actual roof & floor data
aktual dari hasil pengukuran survey, serta from survey measurement results, as well as
melakukan rekonsiliasi model geologi reconciling geological models to actual survey
terhadap data survey aktual. data.
Selain kegiatan eksplorasi didalam konsesi Apart from exploration activities within the ABN
IUP ABN, tim eksplorasi juga melakukan IUP concession, the exploration team also
studi prospeksi dan review terhadap potensi carried out prospecting studies and reviews of
pengembangan bahan galian di luar IUP the potential for developing minerals outside the
ABN. Pada kuartal-2, tim eksplorasi telah ABN IUP. In the 2nd quarter, the exploration
menyelesaikan sebanyak 6 desk studi team completed 6 of prospecting studies on the
prospeksi terhadap potensi bahan galian potential for new minerals including coal and
baru meliputi batubara & emas. gold.
3. 2. METODE PENGUKURAN 3. 2. MEASUREMENT METHODS
Channel sampling dilakukan dengan Channel sampling is done by mapping and
mapping dan pengukuran aktual batubara actual measurement of coal that has been
yang telah terekspos (thickness, strike, dip, exposed (thickness, strike, dip, collar) then
collar) kemudian diambil sampel secara taken composite sample to be analyzed coal
komposit untuk dilakukan analisa kualitas quality as the basis for geology model update in
batubara sebagai dasar untuk update model line with the progress of the mine. Channel
geologi seiring dengan kemajuan tambang. sampling in the 2nd Quarter of 2024 was
Chanel sampling pada kwartal-2 2024 conducted at seam S22, S21U di Pit 4, S26U,
dilakukan pada seam S22, S21U di Pit 4, S26L, S31, S32 di Pit NW, S12AU, S12, di Pit 8
S26U, S26L, S31, S32 di Pit NW, S12AU,
S12, di Pit 8
3. 3. BIAYA EKSPLORASI 3. 3. EXPLORATION COSTS
Biaya Eksplorasi ABN yang dikeluarkan di ABN Exploration Costs issued in the 2nd Quarter
Kuartal-2 2024 sebagai berikut: of 2024 as follows:
Q2 2024 Year To Date
Biaya Operasional Anggaran Realisasi Anggaran Realisasi
Operating Expense Budget Realization Budget Realization
(IDR) (IDR) (IDR) (IDR)
April/ April 399.300.000,- - 399.300.000,- -
Mei/ May 399.300.000,- - 399.300.000,- -
Juni/ June 399.300.000,- - 399.300.000,- -
3. 4. PELAKSANAAN DAN 3. 4. IMPLEMENTATION AND
PENGAWASAN SUPERVISION
Kegiatan dilaksanakan & diawasi oleh Activities are carried out and supervised by the
Departemen Mining section Geotech & Department of Mining section Geotech &
Exploration Development Exploration Development.
Page 17
3. 5. KEMAJUAN EKSPLORASI 3. 5. EXPLORATION PROGRESS
Pada Kuartal-2 2024 tidak ada kegiatan In the 2nd Quarter of 2024 there are no
pemboran eksplorasi, namun berikut exploration drilling activities, but the following
kegiatan team geologi selama Kuartal-2 are the activities of the geological team during
2024: the 2nd Quarter of 2024:
1. Melakukan monitoring di area Pit Aktif, 1. Monitoring the Active Pit area, both slope
baik monitoring kestabilan lereng maupun stability monitoring and coal monitoring to
monitoring batubara untuk memantau monitor the suitability between geological
kesesuaian antara Model Geologi & models and actual in the field.
aktual di lapangan.
2. Update Model Geologi berdasarkan data 2. Geological Model Update based on coal
roof/floor batu bara dari data survey roof/floor data from actual survey data and
actual dan dari data pemboran drilling data.
3. Analisa kestabilan lereng di area Low 3. Analysis of slope stability in low wall pit area
Wall Pit Aktif & area disposal. active & disposal area.
4. Monitoring kestabilan lereng untuk pit dan 4. Pit and disposal slope stability monitoring
disposal dengan titik pantau prisma dan using monitoring point prism and EWS
ekstensometer EWS. ekstensometer.
5. Pemasangan sensor EWS di Pit 6 & Pit 5. EWS extensometer sensor installation in Pit
NW. 6 & Pit NW.
6. Menindaklanjuti beberapa IUP yang 6. Follow up on several potential IUP for
potensial untuk dilakukan eksplorasi detailed exploration.
detail.
3. 6. RENCANA KEGIATAN 3. 6. PLANS FOR FURTHER
EKSPLORASI SELANJUTNYA EXPLORATION ACTIVITIES
Rencana ABN pada periode Kuartal-3 2024 In the 3rd quarter of 2024, ABN has no plans for
tidak ada rencana kegiatan pemboran. Selain drilling activities. However, exploration activities
itu kegiatan eksplorasi dan geologi are focused on the following activities:
difokuskan pada kegiatan berikut: 1. Sampling for coal quality updates &
1. Pengambilan sample untuk update geological models in the Active Pit area.
kualitas batubara & model geologi di area
Pit Aktif.
2. Monitoring di area Pit Aktif untuk 2. Monitoring in the Active Pit area to monitor
memantau kesesuaian antara Model the suitability between actual and
Geologi dan aktual di lapangan. Geological Models in the field.
3. Melakukan update Model Geologi 3. Update geological model based on
berdasarkan data channel sampling, data sampling channel, actual survey data and
survey aktual dan data pemboran. drilling data.
4. Rekonsiliasi antara Model Geologi 4. Reconciliation between Geological Model to
terhadap data survey actual. actual survey data.
5. Monitoring geotek di area Pit & Disposal. 5. Geotech monitoring in Pit & Disposal Area.
6. Analisa kestabilan lereng pit dan disposal. 6. Slope stability analysis for Pit and Disposal
7. Pemasangan monitoring point untuk 7. Monitoring point installation for slope
pemantauan pergerakan lereng. movement monitoring program.
Names mentioned 11 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Trisensa Mineral Utama
p.2 ×4
unresolved
org
PT Indomining
p.2 ×4
unresolved
org
PT Adimitra Baratama Nusantara
p.2 ×4
unresolved
org
PT Multido Prima
p.5
unresolved
org
PT RPP
p.6
unresolved
org
PT RPP Contractors Indonesia Contractors Indonesia
p.6
unresolved
org
PT. ABN
p.7
unresolved
org
PT. RPP Contractors Indonesia
p.7
unresolved
org
Departemen Engineering Section Geologist.
p.14
unresolved
org
Departemen Mining
p.16