Back to announcement
20240710_TOBA_Laporan Informasi dan Fakta Material_31682332_lamp1.pdf
Other Text extracted TOBASource file signed link, expires in 15 minutes
Extracted text 3
Page 1 OCR 0.933
8 TBS Nomor/Number 1 140 /TBSIVII/2024 Lampiran/Attachment : - Kepada Yth./To Kepala Eksekutif Pengawas Pasar Modal Otoritas Jasa Keuangan Gedung Sumitro Djojohadikusumo Jalan Lapangan Banteng No. 2—4 Jakarta 10710 Kepada Yth./To Direksi PT Bursa Efek Indonesia Gedung Bursa Efek Indonesia, Tower | Jl. Jend. Sudirman Kav 52-53 Jakarta 12190 PT TBS Energi Utama Tbk Treasury Tower, Level 33 District 8, SCBD Lot 28 JI. Jend Sudirman Kav-52-53, Jakarta 12190, Indonesia Telp. 46221 5020 0353 | Fax. t6221 50200352 corsec@tbsenergi.com Jakarta, 10 Juli 2024 Jakarta, July 10, 2024 Perihal : Laporan Informasi atau Fakta Material Subject: Material Information or Fact Report Dengan hormat, To whom it may concem Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material, sebagai berikut: We hereby for and on behaif of the company submit the information and/or material fact report, as per the following description: Nama Emiten atau Perusahaan Publik Name of the Company Bidang Usaha/Section Telepon/Telephone Faksimili/Facsimile Alamat surat elektronik (e-mail) PT TBS Energi Utama Tbk (“Perseroan”) PT TBS Energi Utama Tbk (“the Company”) Menjalankan usaha di bidang pertambangan batubara melalui Entitas Anak Conducting coal mining businesses through its Subsidiaries (62-21) 5020 0353 (62-21) 5020 0352 corsec@tbsenergi.com 1. | Tanggal Kejadian Date of Event 8 Juli 2024 8 July 2024 2. | Jenis Informasi atau Fakta Material Type of Information or Material Fact Informasi atau Fakta Material Lainnya. Information or Othor Matorial Faot. www.tbsenergi.com
Page 2 OCR 0.935
8 TBS
3. | Uraian Informasi atau Fakta
Material
Material Information or Fact
Description
Pada tanggal 8 Juli 2024, Perseroan bersama
dengan PT PLN Nusantara Power (“PLN NP”)
selaku konsorsium (“Konsorsium”), telah
menandatangani suatu Novasi Perjanjian Jual Beli
Listrik dengan PLN Batam dan PT Nusantara
Tembesi Baru Energi (“NTBE”), selaku
perusahaan proyek sehubungan dengan Penyedia
Listrik Tenaga Surya Terapung Tembesi 46 MWp
(“Novasi PJBL”).
On 8 July 2024, the Company together with
PT PLN Nusantara Power ("PLN NP") as a
consortium (“Consortium”), has signed a Novation
of Power Purchase Purchase Agreement with PLN
Batam and PT Nusantara Tembesi Baru Energi
("NTBE"') as the project company in relation to 46
MWp Tembesi Floating Solar Power Supply
("Novation of PPA").
Novasi PJBL ini merupakan tindak lanjut dari
penandatanganan Perjanjian Jual Beli Listrik
antara Konsorsium dan PLN Batam sehubungan
dengan Penyedia Listrik Tenaga Surya Terapung
Tembesi 46 MWp (“PJBL”) yang telah dilaporkan
oleh Perseroan kepada Otoritas Jasa Keuangan
(OJK) dan diumumkan kepada masyarakat pada
tanggal 15 Februari 2024. Lebih lanjut pendirian
NTBE selaku perusahaan proyek juga telah
dilaporkan oleh Perseroan ke OJK dan diumumkan
kepada masyarakat pada tanggal 16 April 2024.
This Novation of PPA is a follow-up to the signing
of the Power Purchase Agreement between the
Consortium and PLN Batam in relation to the 46
MWp Tembesi Floating Solar Power Supply
("PPA") which has been reported by the Company
to Financial Services Authority (OJK) and
announced to the public on 15 February 2024.
Furthermore, the establishment of NTBE as the
project company has also been reported by the
Company to OJK and announced to the public on
16 April 2024.
Dengan telah dilakukannya Novasi PJBL, maka
PJBL telah berlaku efektif dan semua hak beserta
kewajiban sebagaimana diatur dalam PJBL
seluruhnya beralih dari Konsorsium kepada NTBE
selaku perusahaan proyek.
With the Novation of PPA, the PPA has become
effective and all rights and obligations as stipulated
in the PPA are entirely transferred from the
Gansartium to NTBE as the project company,
Page 3 OCR 0.930
8 TBS | Dampak kejadian, informasi atau fakta material tersebut terhadap kegiatan operasional, hukum, kondisi keuangan, atau kelangsungan usaha Emiten atau Perusahaan Publik Impact of such events, information or material fact on the operational activities, Iaw, financial condition, or business continuity of the Company. Penandatanganan Novasi PJBL ini diharapkan akan memberikan kontribusi positif kepada kegiatan operasional, kondisi keuangan dan kelangsungan usaha Perseroan. Tindakan Perseroan untuk menandatangani Novasi PJBL ini merupakan salah satu upaya Perseroan secara grup untuk melakukan pengembangan usaha dalam sektor kegiatan usaha ramah lingkungan, sejalan dengan tujuan untuk mencapai target netralitas karbon di tahun 2030. Secara jangka panjang, penandatanganan Novasi PJBL ini akan memperkuat kondisi keuangan Perseroan. The signing of this Novation of PPA is expected will make a positive contribution to the Company's operational activities, financial condition and business continuity. The Company's action to sign this PPA Novation is one of the Company's group efforts to expand its business in the environmentally friendly business activities sector, in line with the goal of achieving carbon neutrality targets by 2030. In the long term, the signing of this Novation of PPA will strengthen the Company's financial condition. Keterangan lain-lain Other information Tidak ada. None. Demikian Laporan Informasi atau Fakta Material ini kami sampaikan, atas perhatiannya kami ucapkan terima kasih. Accordingly, we convey this Information or Material Fact Report, thank you for your attention. Hormat kami, Sincerely PT TBS Energi Utama Tbk Direkttr/Director Tembusan Kepada Yth/ with copy to.: Direktur Penilaian Keuangan Perusahaan Sektor Riil - OJK Direktur Pengelolaan Keuangan - OJK Direktur Penilaian Perusahaan PT Bursa Efek Indonesia yp— Juli Oktarina Direktur/Director
Names mentioned 7 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT PLN Nusantara Power
p.2 ×2
unresolved
org
PT Nusantara Tembesi Baru Energi
p.2 ×2
unresolved
org
Financial Services Authority
p.2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.