AMMAN NNN Exploration Report - Guarter 2 2024 Introduction During the period 1t April 2024 to 30st June 2024 (A2-2024), PT Amman Mineral Nusa Tenggara (PT AMNT), a subsidiary of PT Amman Mineral Internasional (PT AMI), carried out exploration activities on IUPK Blocks I, II, Illand IV, located in Sumbawa, Indonesia (Figure 1). Total exploration expenditure for 42-2024 was approximately USD $ 9,65 M. Aw TS Ta A aa Maliwang Lombok Kayangan Porte4- Mataram | / 73 #Lembar Port 4 Lombok Int'l Airport Ha evo) LA Sumbawa N A 20 Km “Na INDONESIA 2 Sumbawa AMNT Asset Jakarta. 4 IUPK PTAMNT @ Batu Hijau Mine Operation . Er Map Location Project Area — @ Elang Cu-Au Project Figure 1. PT AMNT IUPK blocks, Sumbawa, Indonesia. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 1
Page 2 OCR 0.874
AMMAN NNN Batu Hijau Block | Expenditure: e In pit resource drilling program costs, including core sample assay costs, amounted to approximately USD $ 3.12 M. Work areas: e Batu Hijau Cu-Au mine. e Batu Hijau Area of Interest - Aol (near-mine prospects). Exploration parties: e Manager (Resource drilling) - AMNT Mine Technical Service (MTS). Drilling contractor - PT Minera Nusa Drillindo (PT MND). Assay laboratory - Intertek Utama Service (ITS). Umpire assay laboratory - PT Geoservices. Manager (Mapping) - AMNT Exploration. Assessment methods: e Diamond coring (12 drill rigs). » Geological mapping (including rock sampling). # Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer. Objectives: e The aim of the on-going drill program is to increase the confidence level of mineral resource classifications below Batu Hijau Phase-8 pit design. e First-pass geological mapping and prospecting, within the Batu Hijau Aol areas, is designed to define Cu-Au exploration targets. Exploration Results: e 36 drill holes, completed or in progress, totaling 15,593.1m (Figure 2). e Core samples submitted to the assay lab amounted to 5,238. e Batu Hijau Aol mapping - 30 rock samples were submitted to the lab. Forward Plan: e The resource drilling program (12 rigs) will continue in 43-2024. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 2
Page 3 OCR 0.844
AMMAN 0 NNN 487000 E MW. : AMMAN 9009000 N @ In Progress Drilling A2-2024 O Completed Drilling A2-2024 (C3 Phase 8 Boundary Figure 2. Batu Hijau Block |! 02-2024 - In Pit Drill Collar Locations. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 3
Page 4 OCR 0.876
AMMAN NNN Elang Block II Expenditure: e Exploration activities included drilling and geological mapping. Costs were circa USD $5.25M. Work Areas: e Elang Cu-Au Project. » Alma Cu-Au Prospect. e Sebu East Cu-Au Prospect. Exploration Parties: » Manager - AMNT Exploration. e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS). Assessment Methods: e Diamond drilling (3 rigs). » Geological mapping (including rock sampling). # Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer. Objectives: e Resource development drilling continued at the Elang Cu-Au deposit (Figure 3). The purpose of this infill program was to explore information gaps, improve the geological model and to increase the confidence level of mineral resource classifications. Drilling in progress at Elang South is testing mineralisation extension to the south and at depth extension of the Cu-Au resource block model. e Exploration drilling at Alma tested for potential Cu-Au porphyry mineralisation beneath a lithocap (Figure 3). e Exploration drilling at Sebu East tested for potential Cu-Au porphyry mineralisation within a significant IP conductivity and resistivity anomaly (Figure 3). Exploration Results: » Elang Block diamond drilling (9 holes for 4,831.7 m): o Elang Cu-Au resource infill & exploration - 7 holes, completed or in progress, totaling 4,031.5 m. o Alma Cu-Au exploration - 1 hole completed, amounting to 204.0 m. o Sebu East Cu-Au exploration - 1 hole completed, amounting to 596.2 m. # Core samples submitted to the assay lab amounted to 2,098. e# Geological mapping program - 55 rock samples were submitted to the lab. Forward Plan: e# Elang deposit resource development drilling, geotechnical drilling, hydrogeological drilling, and metallurgy drilling, using six (6) rigs, is planned for 43-2024. » Sebu East exploration drilling (1 rig), over a porphyry Cu-Au target, will continue in 04-2024. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 4
Page 5 OCR 0.815
AMMAN NNN — IUPK PTAMNT AMMAN amman.co.id 1Km: ANNNN Auita (. 8 9010000 N 9012000 N 9014000 N 9008000 N 9006000 N 8 In Progress Drilling @2-2024 Completed Drilling @2-2024 Previous Holes (2271 Mapping Area @2-2024 9004000 N 538000 £ 549000 E 542000 E 1 544000 E Figure 3. Elang Block II @2-2024 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 162215799 4600 F. 162 215296 4136
Page 6 OCR 0.864
AMMAN NNN Rinti Block III Expenditure: e Exploration drilling program and geological mapping costs, including core sample and rock assay costs, amounted to approximately USD $ 1.25 M. Work Areas: e Rinti Cu-Au Project. Exploration Parties: » Manager - AMNT Exploration. e Drilling contractor - PT Minera Nusa Drillindo (PT MND). e Assay Laboratory (rocks) - Intertek Utama Service (ITS). Assessment Method: e Diamond drilling (1 rig). » Geological mapping (including rock sampling). Objectives: e The aim of the current exploration drilling program is to test for potential Cu-Au porphyry mineralisation beneath an advanced argillic alteration lithocap (Figure 4). e Detailed geological mapping was carried out over a significant Cu-Au soil anomaly in the SW portion of the Rinti Block (Figure 4). Exploration Results: e Rinti diamond drilling - 2 holes (908.9 m) completed. e Core samples submitted to the assay lab amounted to 337. e# Geological mapping program - 27 rock samples were submitted to the lab. Forward Plan: # Review of previous exploration results. e The exploration drilling program (1 rig) will continue in 44-2024. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 6
Page 7 OCR 0.671
AMMAN NNN NRKAN 564000 E 566000 E AMMAN IUPK PT AMNT Bokol sa HE z ekolarCamp H3 L 2 9— NE 2 | O TG se 5 8 J N z 2 - 2 4 8 P N K.Beringin Camp 2 2 8 FT MMI Guartz Vein (CA Agilic Alteration 8) 3 Vuggy Guartz MA | Advance Argillic Alteration 8 1 Hydrothermal Breccia CE Phyllic Alteration Pe Silica Alteration N 9 Completed Drilling A2-2024 A - “ Previous Holes $ (Mapping Area @2-2024 — 4 (6 MHoisTEM Resistivity at depth 100m m g . h E « n Figure 4. Rinti Block III 42-2024 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 7
Page 8 OCR 0.861
AMMAN NNN Lampui Block IV Expenditure: e Exploration was limited to geological mapping. Costs were circa USD $ 0.40 M. Work Areas: e Kokar Tuna Cu-Au Prospect (Figure 5). Exploration Parties: # Manager - AMNT Exploration. e Assay Laboratory (drill core, rock) - Intertek Utama Service (ITS). Assessment Methods: » Geological mapping (including rock sampling). # Alteration analyses using an ASD TerraSpec 4 Mineral Spectrometer. Objectives: e Detailed geological mapping, over a significant Cu-Au soil anomaly, was designed to define drill targets. Exploration Results: » Geological mapping program - 27 rock samples were submitted to the lab. Forward Plan: # The geological mapping and rock sampling program will continue in 43-2024. e The exploration drilling program (1 rig), over a porphyry Cu-Au target, will begin in 04-2024. amman.co.id PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136 8
Page 9 OCR 0.757
AMMAN 532000 E NN x 1-—-. Argillic Alteration 1-—. Intermediate Argillic Alteration -— Advanced Argillic Alteration -— Silica Alteration -— Ouartz Vein 34000 E NN Pa - dm AMMAN / aa PT AMNT y Re (as 1 Fr 8 Plan Holes 2024 Previous Holes Completed IP Line 11//Mapping Area @2-2024 h ) ( 500m amman.co.id Figure 5. Lampui Block IV @2-2024 - Exploration Locations. PT AMMAN MINERAL INTERNASIONAL TBK MENARA KARYA 6TH LEVEL, JALAN H.R. RASUNA SAID BLOK X-5 KAV. 1-2 JAKARTA, INDONESIA 12950 T 4622157994600 F. 462 215296 4136
Names mentioned 9 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Amman Mineral Nusa Tenggara
p.1
unresolved
org
PT AMNT
p.1 ×2
unresolved
org
PT AMI
p.1
unresolved
org
PT AMNT IUPK
p.1
unresolved
org
PT Minera Nusa Drillindo
p.2 ×3
unresolved
org
PT MND
p.2 ×3
unresolved
org
PT Geoservices. Manager
p.2
unresolved
org
PT AMNT Bokol
p.7
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.