Back to announcement
20240628_HDTX_Laporan Informasi dan Fakta Material_31676811_lamp1.pdf
Other Text extracted HDTXSource file signed link, expires in 15 minutes
Extracted text 1
Page 1
LAMPIRAN NOMOR: I-N.l
Laporan Perkembangan Realisasi Rencana Pemulihan Kondisi atau Penyebab Suspensi Penisahaan Tercatat
Progress Report on the Realization of Plans for Restoring Conditions or Causes of Suspension of Listed Companies
Periode Juni Tahun 2024
Period: June 2024
I. Realisasi / Realization
No. Uraian Rencana Target Waktu Program Pelaksanaan Persentase Progres
Plan Description Deadline Implementation Program Progress Percentage
1. Memaksimalkan pemanfaatan gudang yang dimiliki Desember 2024 • Melakukan renovasi (skala ringan) atas
agar bisa disewakan December 2024 gudang yang dimiliki
Maximize the use of owned warehouses so they can Carrying out renovations (l^S^^ scale) of the
he rented out warehouse OMmed
• Menawarkan gudang yang dimiliki kepada
calon penyewa baru
Offering owned warehouses to prospective
new tenants
II. Informasi lainnya / Other information
Bandung, 28 Juni 2024/Bandung, June 28, 2024
Enriro Harvono
Direktur ikama/President Director ofPT Panasia Indo Resources Tbk.
Names mentioned 1 people and organisations named in the text · linked when the evidence is strong
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.