Page 1
                                              Dari Obi
                                              Untuk Indonesia
Paparan Publik
Tahunan
(Tahun Buku Kuartal 1 2024)



27 Juni 2024




                              tbpnickel.com
Page 2
Agenda
• Sekilas Harita Nickel       3
• Kinerja Operasional         6
• Proyek Update - ONC + KPS   10
• Informasi Terkini           13
• Sekilas Laporan Keuangan    15
• ESG, CSR & Keberlanjutan    18



                               2
Page 3
Sekilas Terkait Harita                                                    Visi
Nickel                                                                    Mengoptimalkan nilai sumber daya yang
PT Trimegah Bangun Persada Tbk (NCKL) atau Harita Nickel                  kami miliki untuk memberikan kontribusi
merupakan bagian dari Harita Group yang mengoperasikan                    terbaik bagi pemegang saham, pemangku
pertambangan dan pemrosesan nikel terintegrasi berkelanjutan di Pulau     kepentingan, dan negara.
Obi, Halmahera Selatan, Maluku Utara. Selain IUP Pertambangan,
perusahaan sejak 2016 telah memiliki pabrik peleburan (smelter) nikel
saprolit dan sejak 2021 juga memiliki fasilitas pengolahan dan
pemurnian (refinery) nikel limonit di wilayah operasional yang sama.
Kedua fasilitas tersebut hadir untuk mendukung amanat hilirisasi dari
pemerintah Indonesia. Harita Nickel menjadi pionir di Indonesia dalam
pengolahan dan pemurnian nikel limonit (kadar rendah) dengan
teknologi High Pressure Acid Leach (HPAL).                                Misi
Teknologi ini mampu mengolah nikel limonit yang sebelumnya tidak          Keunggulan berkelanjutan melalui
dimanfaatkan, menjadi produk bernilai strategis berupa Mixed
                                                                          peningkatan sumber daya manusia dan
Hydroxide Precipitate (MHP). Dengan teknologi yang sama, MHP
                                                                          proses yang berkesinambungan.
sebagai intermediate product telah berhasil diolah menjadi produk akhir
berupa nikel sulfat dan kobalt sulfat yang merupakan material inti
pembuatan prekursor katoda sumber energi baru, yaitu baterai
kendaraan listrik.                                                                                    3
Page 4
Ekosistem Bisnis di Harita Nickel
               Hulu                                                                                    Tengah                                                                                                            Hilir

                                              RKEF
                     Saprolit                                                          Feronikel                                                                                        Baja Nirkarat



                                                                                                                                                      Nikel Sulfat                                                                                     Kawasan
                                                                                                                                                                                                                           Katoda
                                                                                                                                                                                                                                                       Industri
                                              HPAL                                        MHP
                     Limonit                                                 (Mixed Hydroxide Precipitate)
                                                                                                                                                                                           Prekursor

                                                                                                                                                                                                                    Baterai Mobil
                                                                                                                                                     Kobalt Sulfat                                                     Listrik


         Tambang                                                                  HPAL                                                                                                               RKEF




              TBP                                                                                                                                                                                                                                KPS2
                                                           HPL                                           ONC2                                           MSP                                            HJF                      12 jalur RKEF - 185k ton kandungan Ni/ tahun
  Mulai berproduksi di tahun 2011            3 Jalur HPL– 55k ton kandungan Ni/                                                                 4 jalur RKEF – 25k ton                  8 jalur RKEF – 95k ton kandungan
                                                                                           65k ton kandungan Ni/tahun (7.5k                                                                                                     Tahap pertama dengan 4 jalur RKEF – 60k ton
                                                            tahun                                                                               kandungan Ni/ tahun                                 Ni/ tahun                  kandungan Ni/ tahun akan beroperasi di tahun
                                                                                            ton kandungan Co/tahun), ONC
                                                                                                                                                                                                                                                     2025
              GPS                                                                                akan mulai beroperasi:
  Mulai berproduksi di tahun 2010
                                                                                                 Jalur ke-1 – April 2024                                                  Baja Nirkarat                   Kawasan Industri
                                                                                                  Jalur ke-2 –Juni 2024
      JMP, OAM & GTS1                                                                          Jalur ke-3 – Agustus 2024
         Tahap eskplorasi                                                                                                                                                       OSS2                              DCM2

 Peluang Kedepannya                 Proyek Selanjutnya         Terencana          Catatan: 1. GTS, JMP dan OAM adalah tambang yang mimiliki prospek; 2. KPS, ONC, OSS, DCM dalam tahap perencanaan/ konstruksi.                      4
Page 5
Potensi Tinggi dari Tambang dan Fasilitas Pengolahan Nikel
Terintegrasi Milik Harita Nickel


                                                                        Pulai Obi




                                                                   Semua tambang terletak
                                                                      di area ultramafic



                                                      Jarak transportasi yang dekat antara tambang, smelter
                                                      dan refinery.

                                                      Perjanjian pasokan yang menjamin stabilitas bahan baku
                                                      antar anak perusahaan.

                                                      Semua Power Plant di miliki dan di kelola oleh Harita
                                                      Nickel.

                                                      Akses pelabuhan yang terintegrasi, sehingga memberikan
                                                      efisiensi terhadap biaya pengiriman.




                                                                                             5
Page 6
Kinerja Operasional

                      6
Page 7
Operasional Tambang




▪   Produksi tambang berasal dari 2 tambang yang telah beroperasi (TBP & GPS); dimana JMP, OAM dan GTS masih dalam tahap eksplorasi.
▪   Pada 1Q23, TBP telah memiliki 2 RKEF smelter, (MSP) - 4 jalur produksi dengan kapasitas terpasang 25.000 ton kandungan nikel/tahun dalam FeNi dan (HJF) - 5 jalur
    produksi (dari 8) smelter RKEF. Selain 2 RKEF smelter tersebut, TBP juga mengoperasikan 1 HPAL refinery (HPL) - 3 jalur produksi dengan kapasitas terpasang 55.000 ton
    kandungan nikel/tahun dalam MHP.
▪   Permintaan yang tinggi dari bijih nikel di 1Q24 disebabkan oleh 8 jalur produksi dari RKEF smelter (HJF) yang telah beroperasi secara penuh. Pada 1Q24, TBP memiliki total
    12 jalur produksi RKEF Smelter dengan kapasitas terpasang 120.000 ton kandungan nikel/tahun dalam FeNi dan 3 jalur produksi HPAL refinery dengan kapasitas
    terpasang 55.000 ton kandungan nikel/tahun dalam MHP.
▪   Produksi limonit yang tinggi dibandingkan periode sebelumnya disebabkan oleh proyek HPAL refinery mendatang (ONC).

                                                                                                                                                            7
Page 8
Operasional HPAL




▪   Di akhir tahun 2021, 2 jalur produksi HPAL (HPL) telah beroperasi, dengan kapasitas terpasang 37.000 ton kandungan nikel/tahun dalam MHP. Jalur produksi ke-3 dengan
    kapasitas terpasang 18.000 ton kandungan nikel/tahun dalam MHP telah beroperasi di Januari 2023 dan beroperasi secara penuh dalam waktu 2 bulan.
▪   HPL mulai melakukan ekspor Nikel Sulfat dan Kobalt Sulfat di Juni 2023 dan Juli 2023. Belum ada produksi dari fasilitas sulfat di 1Q23.
▪   Di 1Q24, produksi HPL mencapai 16.716 ton kandungan nikel dalam MHP, Diatas 22% dari kapasitas terpasang.
▪   Di produksi HPAL, produksi Nikel Sulfat adalah bagian dari produksi MHP, karena Nikel Sulfat adalah produk konversi dari MHP. Dimana pada volume penjualan, total volume
    penjualan HPL di 1Q24 adallah volume MHP + volume Nikel Sulfat.


                                                                                                                                                          8
Page 9
Operasional RKEF




• Pada FY21 - FY22, Produksi FeNi hanya dari MSP, yang telah beroperasi sejak 2017.
• HJF RKEF telah menyelesaikan 2 jalur produksi di akhir tahun 2022. Jalur produksi ke-3, ke-4 dan ke-5 selesai di Januari 2023, Februari 2023 and Maret 2023.
  Tersisa 3 jalur produksi yang selesai di bulan Mei 2023. HJF mencapai 100% kapasitas produksi diakhir bulan Agustus 2023, hal ini menyebabkan peningkatan
  signifikan pada pertumbuhan penjualan FeNi YoY.
• Produksi di 1Q24 telah mencapai 30.434 ton kandungan nikel dalam FeNi, diatas 1% dari kapasitas terpasang.
                                                                                                                                             9
Page 10
Proyek Update: ONC + KPS

                           10
Page 11
HPAL (ONC) – Fasilitas MHP




                                                          Penyimpanan dan fasilitas pengentalan lumpur
                                                          dari bijih nikel




                                                          - Jalur ke-1 telah beroperasi di April, 2024 dan telah
                                                            mencapai kapasitas produksi 100% di akhir Mei,
                                                            2024
                                                          - Jalur ke-2 telah beroperasi bulan Juni, 2024
                                                          - Jalur ke-3 akan mulai beroperasi di bulan Agustus,
Perkembangan konstruksi (akhir Mei, 2024 – 95% selesai)     2024




                                                                                              11
Page 12
RKEF (KPS) – Konstruksi Tahap Pertama




                                                          Bagian electric furnace




                                                          Pembangkit Listrik 1x380 MW untuk menunjang
Perkembangan konstruksi (akhir Mei, 2024 – 45% selesai)   proyek KPS (akhir Mei, 2024 - 42% selesai)



                                                                                         12
Page 13
Informasi Terkini

                    13
Page 14
Perusahaan Baru

                 PT Bhakti Bumi Sentosa (BBS)                          PT Cipta Kemakmuran Mitra (CKM)


▪ Tanggal Pendirian: 21 Mei 2024.                   5.76%    ▪ Tanggal Pendirian : 21 Mei 2024.
▪ Perusahan Joint Venture oleh:                              ▪ Perusahan Joint Venture oleh:
      ▪ PT HPL* : 94,24%.                                         ▪ PT TBP, Tbk : 40%.
      ▪ Hongkong Blue Whale                                       ▪ Hongkong Blue Whale                             40.00%
        International Ltd : 5,76%.                                   International Ltd : 60%.
                                                                                                  60.00%
▪ Tujuan:                                                    ▪ Bertujuan:
                                           94.24%
  Mendaur ulang bahan sisa dari produksi                       Memproduksi limestone menjadi
  HPAL (tailing).                                              quicklime.

*PT HPL 45.1% dimiliki oleh PT TBP, Tbk      HPL     HKBWI                                             TBP        HKBWI




                                                                                                             14
Page 15
Sekilas Laporan Keuangan

                           15
Page 16
Sekilas Terkait
Laporan Laba & Rugi

▪   Pertumbuhan pendapatan dipengaruhi        (Audited) (Audited) (Audited) (Audited)   (Unaudited)   (Unaudited)   (Audited) (Audited) (Audited) (Audited)   (Unaudited)   (Unaudited)
    oleh Peningkatan produksi di sektor
    pertambangan dan proses pengolahan
    nikel (HJF smelter).
▪   Terlepas dari rendahnya harga nikel dan
    kobalt secara global, TBP mampu
    mempertahankan angka yang positif
    dengan pertumbuhan Laba Bruto
    sebesar 3% dan EBITDA sebesar 1% YoY.




                                              (Audited) (Audited) (Audited) (Audited)   (Unaudited)   (Unaudited)   (Audited) (Audited) (Audited) (Audited)   (Unaudited)   (Unaudited)




                                                                                                                                                                16
Page 17
ASP, Cash Cost dan Cash Margin
(pertambangan dan pengolahan nikel)




 •   Cash margin yang sehat pada bisnis pertambangan: 69% margin untuk Limonit dan 64% margin untuk Saprolit.
 •   Cash margin untuk MHP di sekitar USD 5.300/ton kandungan nikel dalam MHP, sedangkan cash margin untuk FeNi di sekitar USD 2.500/ton kandungan
     nikel dalam FeNi.
 •   TBP adalah salah satu perusahaan pegolahan nikel terintegrasi dengan cash cost terendah mengacu pada lokasi yang strategis dan efesiensi operasional
     di pulau Obi.

                                                                                                                                       17
Page 18
ESG, CSR & Keberlanjutan

                           18
Page 19
Standar Tata Kelola dan Pelaporan

                                                                                              Progres RMI RMAP (PT HPL)
                                                                                              •   Fase Pre-Assessment telah
 Progres IRMA                                IFRS Sustainability Disclosure Standards             selesai.
 •   Self-assessment telah selesai.          readiness                                        •   Auditor telah ditentukan.
 •   Auditing firm telah dipilih.            •   Standar 1: 80% indikator telah dilaporkan.   •   Terdaftar sebagai fasilitas
                                             •   Standar 2: 65% indikator telah dilaporkan.       aktif di.
 •   Terdaftar sebagai self-assessing mine
     di                                      Pada laporan keberlanjutan FY23.
     https://connections.responsibleminin
     g.net/self-assessment.                                                                       https://www.responsiblemineralsinitiativ
                                                                                                  e.org/facilities-lists/eligible-facilities-list/
                                             Standar pelaporan terintegrasi yang
 Sebuah standar komprehensif untuk           komprehensif untuk laporan keuangan dan
 penambangan dan pengolahan mineral          keberlanjutan. IFRS digunakan sebagai            Transparansi rantai pasokan & standar
 yang bertanggung jawab dan didukung         standar penyajian laporan keungan dan            penilaian ESG untuk mendukung perusahaan
 oleh berbagai pemangku kepentingan          keberlanjutan secara global, dimana              dalam mengidentifikasi sumber mineral yang
 (Pemerintah, LSM, dll.).                    laporan ini digunakan untuk memenuhi             diperoleh secara bertanggung jawab.
                                             kebutuhan informasi investor; serta telah
                                             diadopsi oleh 14 bursa efek.




                                                                                                                                    19
Page 20
Standar Tata Kelola dan Pelaporan


                GRI Disclosures.
                23% peningkatan dalam indikator yang    Implementasi rekomendasi TCFD.
                dilaporkan pada laporan keberlanjutan   Termasuk pada IFRS Sustainability Disclosures di laporan
                                                        keberlanjutan periode tahun 2023 (63% indicator yang
                2022 -> 2023 (95 -> 117 indikator).
                                                        berhubungan telah dilaporkan).
                                                        Climate-related risk assessment telah selesai & Climate Scenario
                                                        Analysis akan dilaksanakan pada 2024.




 GHG Emissions perhitungan cakupan 1-3:                 IFC Sustainability. Performance Standards.
 ISO 14064-1:2018 & GHG Protocol Corporate              Penilaian kepatuhan berkala yang dilakukan sejak tahun
 Standard.                                              2018 oleh pihak ketiga untuk bank loan compliance.




                                                                                                                           20
Page 21
Intensitas Emisi (Desember 2023)

                                                                               Setelah perubahan pada metodologi, intensitas dari PT HPL, Produksi emisi
                                                                               MHP mengalami penurunan yang signifikan dibandingkan dengan standar
                                                                               industry.
      75,33                                                                                                                                                   59
                     68,38
                                    *Peningkatan pada intensitas emisi
                                    disebabkan oleh calcium carbonate
                                    reaction yang sekarang juga perlu
                                    diperhitungkan. Jika Intensitas emisi di
                                    tahun    2022    dihitung    berdasarkan
                                    ketentuan saat ini, maka nilainya adalah
                                    14.31 tCO2e/konten nikel.

                                                                                                                             19
                                                                                             13
                                                             13,36
                                                10,11



              FeNi                                    MHP*                          PT HPL (Harita)                        HPAL                      Matte via NPI
                             2022      2023                                     Source: IEA, GHG emissions intensity for class 1 nickel by resource type and processing route,
                                                                                IEA, Paris https://www.iea.org/data-and-statistics/charts/ghg-emissions-intensity-for-class-1-
                                                                                nickel-by-resource-type-and-processing-route, IEA. Licence: CC BY 4.0.



                                                                                                                                                         21
Page 22
Ekosistem & Lingkungan
Komitmen.
▪ Net Terrestrial Conservation akan dilakukan dalam 20 tahun.
▪ Landscape-level Nature Risk Assessment.
▪ Detail analisa dampak lingkungan dan sosial.


                       • >67,700 bakau yang ditanam.
                       • 23ha Total area yang di konservasi.
                       • 1,696 terumbu karang buatan.
  Konservasi Laut
                       • 667m2 Total area terumbu karang.



      O
      Udara
           2           Coal Dome – Ruang penyimpanan Batubara
                       (600 x 140 mtr ~ 300,000 MT).




                       • 476,000 - 479,000 bibit yang
                         ditanam/tahun.
                       • 232.09 ha Total reklamasi area.
  Reforesterisasi

                                                                22
Page 23
Ekosistem & Lingkungan

         Water
         Ukuran Sediment Pond
         >500x ukuran kolam renang olimpiade.
                               Cr-VI Bunaken
                        STP Bunaken      PerMen LHK No. 9/1006

0.2

0.1
               <0.005                 <0.005                      IP*
 0
                Jan                    Feb                        Mar

                                 TSS Bunaken
                        STP Bunaken       PerMen LHK No. 9/1006

400

200
                  1                      6                         IP*
  0
                 Jan                    Feb                        Mar
 Note: *In progress



                                                                  23
Page 24
New Kawasi Village Progress (s/d Feb 2024)




                                         Access to community’s port    Church          Adequate electricity supply        Mosque


                                         259 Residential Units are 100% Completed.
                                         with all public facilities (water & electricity and roads & permanent channels in the
                                         area).
                                         Community’s port 100% Completed and it has been used by the community.
                                         Access Road to community’s port is under construction 90.62% (1,836 m’ from 2,026
                                         m’).



                                                                                                                     24
Page 25
Area Komersil Desa Kawasi Baru (s/d April 2024)



                                                             Blok C                 Blok A
 Infrastruktur        Infrastruktur                Blok D                Blok B




                                          209 kios dan toko di area komersil masih dalam tahap
                                          pembangunan
Blok C                Blok C              Presentasi penyelesaian area komersil:
                                          ▪ Penimbunan dan penyiapan area = 100%.
                                          ▪ Konstruksi Blok B = 4.73%.
                                          ▪ Blok C1 (29.5%), C2 (28.2%), C3 (36.7%), C4 (45%), C5 (21.3%),
                                            dan C6 (13.3%).
                                          ▪ Blok D1 (50.6%), D2 (47.3%), D3 (34%), D4 (39.3%), D5 (25.4%),
                                            dan D6 (30.1%).
Blok D               Blok D

                                                                                        25
Page 26
Pengembangan & Pemberdayaan
Masyarakat


                       Pelayanan Kesehatan
                                                                       1.333
                                                                   Total pasien Polindes


93 Jumlah
   stunting
           pasien


      Jumlah peserta
43    penyuluhan


85 Jumlah pasien imunisasi
      Jumlah pasien pengobatan
84    gratis
                                             891
                                             Penimbangan dan PMT
                                                                            26
Page 27
Pengembangan & Pemberdayaan
Masyarakat


                           Pendidikan
                                                                           225
                                                        Jumlah peserta Harita Mengajar

      Sekolah penerima
 3    manfaat


89 Guru penerima tunjangan
      Jumlah peserta pelatihan
25    menjahit

      Jumlah peserta
14    pelatihan operator alat
      berat                             206
                                        Jumlah Murid – Taman Ceria
                                                                           27
Page 28
Program Pengembangan &
Pemberdayaan Masyarakat


                     Sosial & Budaya
                                                                              1.425
                                                                     Donasi hari Raya Idul Fitri




 198                           500                 924
                                                  Aktivitas Sosial
Donasi hari Paskah            Donasi anak yatim

                                                                                    28
Page 29
Program Pengembangan & Pemberdayaan
Masyarakat

                                                             691
 Transaksi tertinggi                                       Menciptakan

 nilai/bulan                 Rp 13,2 Milyar              Lapangan Kerja




                     65                         26
             Pemasok Lokal              Pemasok Lokal

                                                        29
Page 30
Terima Kasih


Informasi lebih lanjut dapat menghubungi: PT Trimegah Bangun Persada Tbk | kantor pusat, Gedung Bank Panin,
   Jendral Sudirman Kav.1 | Jakarta 102720 – Indonesia | Tel. +62 – 21 - 5722924 | Fax. +62 – 21 – 72789908.
                   Email: lukito.gozali@haritanickel.com | investor.relations@haritanickel.com.

File

File Open PDF
Source IDX
Size8.8 MB
Published24 Jun 2024
Pages30
Characters27,382
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org Trimegah Bangun Persada Tbk p.3 ×5
possible org International Ltd p.14 ×2
unresolved org PT Bhakti Bumi Sentosa p.14
unresolved org PT Cipta Kemakmuran Mitra p.14
unresolved org PT HPL p.14 ×5
unresolved org PT TBP p.14 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result