Skip to content
Back to announcement

20260901_TPIA_Laporan Informasi dan Fakta Material_32143948_lamp2.pdf

Other Text extracted TPIA

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 3

Page 1
                                                                                 PRESS RELEASE


 Chandra Asri Group Opens CPN’s Public Terminal Access, Supported by
            Three Jetties with Capacity of Up to 80,000 DWT


Jakarta, September 1, 2026 – The port infrastructure of PT Chandra Pelabuhan Nusantara
(CPN) is now open to support external logistics needs. The subsidiary of PT Chandra Asri Pacific
Tbk (Chandra Asri Group) has officially obtained a Business License for the Operation of a
Public Terminal from the Directorate General of Sea Transportation, Ministry of
Transportation of the Republic of Indonesia, enabling CPN to expand the utilization of its
facilities, including three jetties with a capacity of up to 80,000 DWT, to support industrial
supply chains in Cilegon and surrounding areas.

The issuance of this license marks an important development for CPN in expanding its role, from
a facility supporting Chandra Asri Group’s operational needs to logistics infrastructure that can
serve the needs of industrial players and external service users in accordance with applicable
regulations. With this license, CPN further strengthens its role in the industrial logistics and port
ecosystem.

Director of PT Chandra Pelabuhan Nusantara, Edi Riva’i, said, “The issuance of the Business
License for the Operation of a Public Terminal marks an important transformation for CPN. The
infrastructure that has primarily supported Chandra Asri Group’s operational needs can now be
utilized by industrial players and external service users in accordance with applicable regulations.
With its strategic location in Cilegon, three jetties with varying capacities, as well as integrated
storage and liquid product handling facilities, CPN has the capability to reliably, safely, and
efficiently support industrial logistics needs. We view the opening of access as a strategic step to
expand CPN’s role in the logistics and port ecosystem while providing added value to connectivity
and the competitiveness of national industries.”

CPN operates three jetties with varying capacities, namely Jetty A with a maximum capacity of
80,000 DWT, Jetty B with a capacity of up to 6,000 DWT, and Jetty C with a capacity of up
to 10,000 DWT. This variation in capacity provides flexibility in supporting various vessel
requirements and logistics activities.

In addition to vessel berthing and mooring facilities, CPN also facilitates the loading and unloading
of various liquid chemical and refined petroleum products. The products that can be handled
include naphtha, LPG, propylene, ethylene, py-gas, raffinate-1, butadiene, and PFO. These

Page 2
capabilities support industrial logistics needs, particularly in the petrochemical, chemical, and
related sectors.

In addition to its jetties, CPN is also supported by storage facilities in the form of a tank farm
consisting of 56 tanks with a combined capacity of 501,606 m³. The facility includes 25
atmospheric tanks for liquid chemical products, such as naphtha, MTBE, and methanol, as well
as 31 pressurized tanks for liquefied gas products, such as ethylene, propylene, butadiene, and
butene-1.

The combination of jetty, loading and unloading, and tank farm facilities provides CPN with
flexibility in supporting the industrial supply chain, from the receipt of raw materials and storage
to the distribution of products by sea.

CPN’s location in Cilegon, Banten, also provides strategic access to shipping through the Sunda
Strait, which is connected to domestic, regional, and international shipping routes. This position
enables CPN to support the movement of industrial raw materials and products while
strengthening supply chain connectivity.

With access now open to external service users, CPN has the opportunity to establish broader
cooperation with industrial players that require port and logistics solutions for liquid products and
industrial raw materials.

“We believe CPN could grow as a logistics infrastructure provider that delivers tangible added
value to the industry. Our focus is to provide port services that prioritize safety, reliability,
efficiency, and service quality. With the capabilities we currently have, we are open to exploring
cooperation opportunities with service users and industry partners that require competitive and
reliable logistics solutions,” Edi concluded.

                                                     ***


About Chandra Asri Group
Chandra Asri Group is a leading industrial company in Southeast Asia, operating through three strategic
pillars, Energy & Chemicals, Integrated Infrastructure, and Mobility Solutions. Established in Indonesia in
1992, Chandra Asri Group has built a strong track record as a reliable Growth Partner to its customers and
stakeholders, with strategic businesses and assets in Indonesia and Singapore, and an expanding
presence in Malaysia. The Group’s asset portfolio encompasses integrated Energy & Chemicals
operations, including a naphtha cracker in Cilegon with an ethylene production capacity of 0.9 million metric
tons per annum, a refinery with a capacity of more than 300,000 barrels per day and a naphtha cracker
with a capacity of 1.1 million metric tons per annum on Bukom Island, as well as approximately 2.5 million
metric tons of downstream chemical assets on Jurong Island. Chandra Asri Group is also expanding its
chemicals portfolio through the development of a world-scale chlor-alkali and ethylene dichloride facility in

Page 3
Cilegon. The Integrated Infrastructure pillar comprises four key areas, Power, Water, Port & Storage, and
Logistics, providing essential services to support industrial activities and regional connectivity. In line with
the development of its portfolio, Mobility Solutions brings the Group closer to consumers through ~60 Esso
retail service stations. For more information, visit www.chandra-asri.com.

For further information, please contact:

Chandra Asri Group
Chrysanthi Tarigan
Head of Corporate Communications
Telp: 021-530 7950
Email: corporate.comm@capcx.com


File

File Open PDF
Source IDX
Size0.23 MB
Published1 Sep 2026
Pages3
Characters6,056
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

possible org Chandra Asri Pacific Tbk p.1 ×2
unresolved org PT Chandra Pelabuhan Nusantara p.1 ×2
unresolved org Directorate General of Sea Transportation p.1
unresolved org Ministry of Transportation p.1

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result